Committee:
Cabinet
Date:
6 December 2006
Classification: Unrestricted
Report No:
Agenda Item:
Report of:
Corporate Director Development and Renewal Originating officer(s) Dr Tim Williams, Head of Service, Olympic and Paralympic Games
Title: London 2012 Olympic and Paralympic Games Legacy – Strategy and Programme Wards Affected: All
1. SUMMARY
1.1. The report details the opportunities for the Borough from the London 2012 Olympic and Paralympic Games. It outlines a strategy of engagement with key Olympic and Paralympic programmes being developed by external agencies (notably the London Organising Committee for the Olympic Games, the Olympic Development Authority, the London Development Agency, Department of Culture Media and Sport, other Government agencies, the voluntary and community sector, and the private sector). It presents a preliminary programme of activities which is being further developed with Heads of Service in the Directorates. The strategy is also being further developed through the Tower Hamlets Partnership. Where specific programme ideas have significant resource implications they will be brought back to Cabinet for approval.
2. RECOMMENDATIONS
Cabinet is recommended to:- 2.1. Approve the Olympic and Paralympic Legacy Strategy and Programme
referred to in Section 4 of the report and detailed in Appendix 1, subject to necessary and appropriate minor amendments to ensure that the Strategy and Programme are accurate, coherent and reflect the views of the Tower Hamlets Partnership;
2.2. Authorise the Corporate Director Development and Renewal to make appropriate and necessary minor amendments to the Olympic and Paralympic Legacy Strategy and Programme.
Local Government Act, 2000 (Section 97) List of “Background Papers” used in the preparation of this report:
Equalities Impact Assessment of the Tower Hamlets London 2012 Olympic and Paralympic Games Legacy – Strategy and Programme, Ottaway
Strategic Management Ltd, November 2006.
1
3. BACKGROUND
3.1. The Borough was heavily involved in framing the successful London 2012 Bid. After the bid was won on 6 July 2005, there was an inevitable period of pause in East London. In June 2006, the Chief Executive and the Director of Development and Renewal concluded that there needed to be a renewed strategic thrust in order to exploit the emerging opportunities presented by the Games for our communities. The previous authorisation to establish an Interim Olympic and Paralympic Games Unit was activated. An appointment was made on an interim basis to develop the Strategy in conjunction with officers from across the Directorates and the wider Partnership. A draft Strategy was presented to CMT and PMG in September 2006.
3.2. In parallel to this activity within the Borough, all Olympic agencies (London Organising Committee for the Olympic Games, the Olympic Development Authority), the London Development Agency and the Mayor of London have been galvanised into developing policies and strategies relating to the Games and their legacy. A new 5 Borough entity has been established. There are now new opportunities to both add value and engage our communities. The Strategy that follows is the Borough’s response and strategic way forward.
3.3. In addition, a detailed Cultural Programme and Strategy is being developed in conjunction with the 5 Boroughs which will have a strong Olympic and Paralympic theme.
4. BODY OF THE REPORT
4.1. The Strategy follows as an appendix.
5. COMMENTS OF THE CHIEF FINANCIAL OFFICER
5.1. The report seeks Cabinet’s approval to the proposed Olympic and Paralympic legacy strategy, along with a series of programmes, to enable the borough to harness the maximum benefit from the games for the local community.
5.2. Whilst the strategy itself at this stage does not commit the Council to any additional expenditure, if agreed it will provide a focus for prioritisation of resources, within the framework of existing strategies aligned to the Community Plan. However many of the programmed activities set out in the body of the report will have significant financial implications for the Council, and for public and private partners. These will require full exploration of costs and funding opportunities. Key decisions will be brought back to Cabinet for approval prior to project initiation.
5.3. All costs incurred in producing the strategy have been contained within the agreed Olympics development budget.
2
6. CONCURRENT REPORT OF THE ASSISTANT CHIEF EXECUTIVE (LEGAL)
6.1. There are no immediate legal implications arising from this report.
7. EQUAL OPPORTUNITIES IMPLICATIONS
7.1. An independent Equalities Impact Assessment of this Strategy has been undertaken. The London 2012 Olympic and Paralympic Strategy and Programme has sought to take account of all necessary legislation with respect to equal opportunities. A key objective of the Strategy is to promote and enhance social inclusion and community cohesion in the Borough. The strategy has undertaken an independent equality impact assessment and measures will be taken to ensure that the delivery of the strategy will address equality and diversity impacts both likely and actual throughout the course of the delivery of this strategy. The impact assessment has identified areas where there are likely equality and diversity impacts (both positive and adverse) and has set out plans to ensure that any adverse impacts are mitigated. The impact assessment states that the strategy will need to be monitored rigorously to ensure that the Borough’s strong commitment to equality, diversity and community cohesion are upheld.
8. ANTI-POVERTY IMPLICATIONS
8.1. A key intention of the Strategy is to improve the prospects for prosperity for all residents and businesses in the Borough.
9. SUSTAINABLE ACTION FOR A GREENER ENVIRONMENT
9.1. Theme 4 of the Strategy – A Transformed Environment – includes a number of programmes designed to improve the environment of the Borough, particularly around improvements to open space provision.
10. RISK MANAGEMENT IMPLICATIONS
10.1. The London 2012 Olympic and Paralympic Games Legacy – Strategy and Programme is intended to achieve significant change through the co-ordinated execution of multiple projects. Ultimately it will give rise to numerous sponsoring organisations, together with contributions from service providers, suppliers and third party organisations. The environment is complex and dynamic. At any point in the programme’s life there will be events or situations that may affect the direction of the programme, the delivery of its outputs or achievements of its benefits.
10.2. At the strategic level there are a number of drivers (political, financial, operational) arising while the programme is emerging, which may alter the scope and lead to changes in direction. Consideration must be given to the consequences of failing to realise the opportunities for business benefit, so far as they link to, for example, the Tower Hamlets Community Plan, Olympic and Paralympics Lobbying Strategy and Games Communication Strategy and Protocol.
3
10.3. A major area of risk to any programme is where inter-dependencies change, giving rise to new sources of risk. The achievements of the programme’s benefits may be frustrated if such risks are not managed. Other risks to the programme may arise if the underlying assumptions of the business case change, potentially making the business case or significant parts of it invalid.
10.4. Operationally the Olympic and Paralympics Legacy Delivery Unit must be fit-for purpose. It must have sufficient capacity to both lead on local programmes and to engage effectively with the Mayoral-GLA Olympic and Paralympics Games Programme Objectives, the ODA, LOCOG, the 5 Host Borough Organisation, and Government more widely. Failure to recruit the key skills for this unit in a timely manor could be a source of a number of risks.
10.5. It is essential that the Olympic and Paralympics Legacy Delivery Unit produce the Risk Management Strategy. This strategy will guide the programme to reduce or mitigate risk, to develop alternative courses of action and to communicate both the means of averting risks and the responsibilities for this.
11. EFFICIENCY STATEMENT
11.1. The report sets out a proposed legacy programme, aligned to existing strategies, working in partnership to maximise the economic and social benefit to Tower Hamlets. All new initiatives will be assessed in terms of their value for money.
12. LIST OF APPENDICES
12.1. Appendix 1: London 2012 Olympic and Paralympic Games Legacy – Strategy and Programme
4
Appendix 1
London 2012 Olympic and Paralympic Games Legacy
Strategy and Programme
London Borough of Tower Hamlets
Development and Renewal Directorate London Borough of Tower Hamlets Anchorage House, Clove Crescent, E14 2BG Version: 21 November 2006 © London Borough of Tower Hamlets, 2006.
The Olympics in 2012, when the eyes of the world will again be on London, give us a timetable to work towards. Visitors should be shown the new infrastructure supporting economic growth.
They should see the new schools and hospitals, the new housing and the regenerated derelict sites. And we should show that even in the face of global tensions, it is a fair and tolerant
city, welcoming to all, tackling the deprivation and unemployment in our midst and promoting community
harmony.
Tony Blair MP, The Prime Minister, Building on Success: London’s Challenge for 2012,
Government Office for London, April 2006. "London as a whole will benefit but not our community unless
somebody does something. I've not seen any evidence that the Olympic people are thinking how to involve our people. It's just
not happening."
“The people in charge are living in another world. Only last week the fellow in charge of construction of the Olympics said, ‘I don't care where are the workers come from, I just need the
people’."
“Believe me, this place will suffer - we won't get the jobs but we will get all the negative things like traffic and stuff. At the end of the day people who are unemployed around here will
still be unemployed."
Brick Lane business people and residents quoted in: Bridging the Gap: The London Olympics 2012 and South Asian-owned Businesses in
Brick Lane and Green Street, Young Foundation 2006.
Contents
1 Introduction 2
2 Theme 1 – Creating and Sharing Prosperity 8
3 Theme 2 – A Socially Cohesive Community 16
4 Theme 3 – A Transformed Environment 26
5 Theme 4 – Experiencing the Games 36
6 Delivering the Programme 48
Annex A – Olympic and Paralympic Legacy Strategy Action Priorities 52
1
1 Introduction
The Challenge
1. On the 6th July 2005, London won the right to host the London 2012 Olympic and Paralympic Games on Tower Hamlets’ doorstep.
2. Following the decision of the International Olympic Committee to award London the Games, Tower Hamlets, one of only 5 Olympic Host Boroughs and the only Borough to host the headquarters of the Olympic agencies delivering both the Games and the regeneration legacy, has a once in a lifetime opportunity to grasp the benefits such an event can bring for the area, its communities, its young people and its workforce.
3. Whatever the potential material gains for the Borough, everyone in Tower Hamlets should have the opportunity to experience in one way or another the greatest sporting event on earth. Fundamentally our strategy must be to exploit the Games for local benefit and to enable the greatest number locally to simply enjoy the experience – and in the process make a step change towards achieving key goals for the Borough of increasing and sharing prosperity, of making better places and of bringing our communities closer together. In helping to deliver the Games we also seek to raise our game as a Council, a Borough, a partnership and a community. Game on!
4. To achieve our goals requires high level skills of strategising, project formation, coordination, influencing, lobbying, and programme management. The ‘legacy’ of the Games is much discussed. What needs to be grasped is that there is no consensus across the large number of agencies as to what precisely that legacy will be. What is clear already is that faced with rising infrastructure budgets, looming deadlines and increased security concerns, the wider ambitions for legacy will come under pressure. The risk is that some will fall by the wayside. In that context, it is vital that each Host Borough has a clear idea of the Olympic programme and legacy it wants to achieve from the process and what it wants to gain by working collaboratively with stakeholders and partners in bodies such as the 5 Host Borough organisation.
5. For Tower Hamlets that legacy must not just be about buildings and infrastructure, vital though it will be to get those things right on our doorstep. It will incorporate programmes for increased jobs and training, business opportunities, corporate social responsibility, physical activity and health. It will be about enhancing the image and the reality of where we live and work – and maintaining these improvements for generations to come by putting environmental sustainability at the centre of all our work around the Olympics, for example by minimising the carbon emissions that this work generates. It will be about combating worklessness and creating new opportunities for young people. But it will also be about building new civic pride and a shared identity in diverse communities as the people who collectively will help put on the ‘best Games ever’.
6. At the London 2012 Bid Presentation in Singapore, the Mayor of London Ken Livingstone talked about: “A city in which 300 languages are spoken every day and those who speak them live happily side-by-side.” Central to achieving the best Games ever in Tower Hamlets will be building community cohesion. The challenge to the
2
Games organisers is to deliver a truly inclusive Olympic and Paralympic Games and one which enhances cohesion amongst the city’s diverse communities. This has not been a stated aim of previous Games. Many of the actions resulting from this strategy are designed to promote cohesion. More widely, the task is to ensure the Games as a whole are delivered with this as a central objective.
7. The potential exists, as has been seen in previous host cities, to transform an area and the life chances and experiences of many. But experience demonstrates that these benefits will not happen automatically. The Olympic opportunity for Tower Hamlets has to be seen and seized. This is the real challenge of the 2012 Games.
The Vision
8. To be truly relevant to the area and be sustainable the Games Legacy Strategy and Programme must link with the Community Plan. The Community Plan is the plan for the future of Tower Hamlets. It describes the kind of place that the people who live and work in the Borough want it to be. The London 2012 Olympic and Paralympic Games are part of the Borough’s future. There is now an opportunity for a review of the Community Plan with the full input of residents and partners in order to reflect the opportunities and challenges presented by the Olympic and Paralympic Games.
9. The vision and spirit of the Strategy is for these to be the community cohesion Games. This represents an opportunity for people in Tower Hamlets to benefit from the Games but also to contribute to them. Elements in the Strategy address different audiences or target groups. All groups should benefit and contribute – BME groups, women, older people, people with disabilities, faith groups, children and young people, and GLBT people. A central motif of the strategy is that the Games provide bridges between and within groups in Tower Hamlets. We will seek to engage all the diverse communities in the Borough in our work around the Games. We will take measures to ensure that the delivery of the Strategy fully addresses equality and diversity impacts both likely and actual throughout the course of the delivery of this Strategy. The Strategy will be monitored rigorously to ensure that the Borough’s strong commitment to equality, diversity and community cohesion is upheld.
10. The London 2012 Olympic and Paralympic Games provide a unique opportunity for the Borough. This opportunity can be expressed in four principles that are fully aligned with the Community Plan. These are:
Creating and Sharing Prosperity – bringing investment and employment into the Borough and ensuring that all residents and businesses are in a position to benefit from, and contribute to, growing economic prosperity as a result of the Games.
A Socially Cohesive Community – celebrating the rich cultural diversity of local
communities; strengthening community networks and organisations; and enabling the community to develop as a whole.
A Transformed Environment – ensuring that the alluring physical transformation
anticipated in the Olympic Park is matched with the physical transformation within Tower Hamlets.
The London 2012 Olympic and Paralympic Games Experience – providing every
Tower Hamlets resident with an opportunity to have a Games experience, whether participating, volunteering, or being a spectator.
3
The London 2012 Pledge
11. London 2012 in the Candidature File pledged to the International Olympic Committee the core ‘priorities and potential’ of a London Olympic Games:1
Putting the needs of athletes first; Harnessing London’s passion for sport; Creating a legacy to transform sport in the UK; Regenerating east London communities and their environment.
12. The following text clearly lays out the London 2012 pledge to regenerate the Lower
Lea Valley and surrounding communities. The commitment is set in a context of social inclusion, equal opportunities, a more active society, and a reduction in health inequalities. These are high aspirations.
London 2012 – East London Regeneration Pledge
The Olympic Park will become a hub for east London, bringing communities together and acting as a catalyst for profound social and economic change. It will become a model of social inclusion, opening up opportunities for education, cultural and skills development and jobs for people across the UK and London, but especially in the Lea Valley and surrounding areas.
The new facilities in the Olympic Park will be open to the whole community, not just elite athletes. This will lead to more opportunities for everyone to participate in sport and physical activity. This will create a more inclusive, more active community, leading to a fitter society and reducing health inequalities.
13. The question is: will a spectacular physical legacy be built for 2012 but bypass the
communities? Will the Games deliver increased prosperity and enhanced social cohesion? The benefits are not automatic. The opportunities have to be seen and seized. The programmes in this report will show how this can be achieved for the people of Tower Hamlets.
14. With the success of the Bid, a series of Olympic and Paralympic Games Programme Objectives have been agreed by LOCOG, the ODA, the Government, the British Olympic Association, the Mayor of London, and principal stakeholders. These objectives were approved by the Olympic Board at its meeting on 29 March 2006. These comprise four strategic objectives and 44 sub-objectives (see table on next page).
15. Over half of these are directly relevant to Tower Hamlets. Over the past year, these principles and ambitions have been developed into a series of London focussed legacy Delivery Plans by the London 2012 Co-ordination Working Group, the GLA and partners. These cover employment and skills, wider economic benefits, international promotion, increasing sports participation in London, culture, education, health, volunteering, sustainable procurement, sustainable development, and sports venue legacy. The focus of the sub-objectives is on London as a whole rather than East London. These sub-objectives will be cross-referenced in the themed programmes developed in this report. Tower Hamlets along with the 5 Host Boroughs made representations concerning the Delivery Plans in October 2006.
1 London 2012 Candidature File, Volume 1-Theme 1; p.15.
4
[INSERT OBJECTIVES]
5
Showing Off or Showing Up the City?
16. Legacies and impacts can be negative. The Games can not only ‘show off the city’ but can ‘show it up’. The Games themselves focus world media attention on the host city to an unprecedented degree. For London in the year 2012, will the eyes of the world be on a city where deprivation stands side by side with wealth? Or will the world see a transformed East London and the promises made to the IOC in July 2005 having been fulfilled?
17. The quote from the Prime Minister at the start of this document demonstrates the challenge of showing off the host city. The challenge is to reveal London as a tolerant place but also one where deprivation and unemployment are being tackled.
18. Re-imaging is a further aspect of this dimension of Olympic Games. This marketing concept has gained much currency in the literature around mega-events or hallmark events and their effects on cities. The Seoul Olympics in 1988 had as a major objective the re-imaging of South Korea to overseas tourists. The Atlanta Games in 1996 sought to portray the city as racially harmonious and having more to offer than a mere conference city.
19. It is perhaps this aspect of the Olympic Games that offers the most promise for Tower Hamlets as a core element of an Olympic-led regeneration strategy. Much has been spoken about the 2012 Games changing the orientation of the capital – a city with a vibrant East End as well as a vibrant West End. Tower Hamlets is thus uniquely placed between the City of London and Olympic Park to look both West and East and to claim its place in the capital.
From East End to Dividend
20. Understanding the constraints and opportunities is critical to the success of the Games legacy. The key task is to ensure that Games dividends are created in the key areas that were outlined in broad terms in the Bid.
21. The SWOT analysis on the following page demonstrates that delivering the Olympic dividend will not be easy. It is certainly not automatic – as the evidence from other Olympic cities amply attests. Clear guiding principles and a focussed action plan will be essential – as will understanding what the precise nature of the dividend for Tower Hamlets amounts to.
The Programmes of Action
22. The programmes that follow have been developed in consultation with the Local Strategic Partnership, key stakeholders and partners, the council Directorates, and many others. They form a coherent set of actions that will underpin the longer term transformation of Tower Hamlets.
6
Tower Hamlets – Olympic Programme and Legacy SWOT Analysis
Strengths Location between west end and the Games. Strong Council leadership. Youth and enthusiasm. Borough is a strong supporter of the Games. Engagement in Olympic Programme and
Legacy planning by stakeholders. Successful Local Strategic Partnership –
experience in maximising opportunities Effective Local Area Partnerships. Integrated Community Plan. Good community relations. Improving schools and pupil attainment
levels. Large number of cultural institutions. Local enthusiasm for the Games. Up to date regeneration strategies
Weaknesses Lack of experience in large hallmark events. Borough possibly not viewed as a main
player. Most of the Games activities lie outside the
Borough boundary. Suspicion in some parts of the community
that the event is not for them. Experience of other major regeneration
initiatives that have not delivered benefits to local people.
Benefits of the Games could easily by-pass Tower Hamlets.
High level of worklessness in the Borough.
Opportunities Tower Hamlets as the Gateway to the 2012
Games. Opportunity to capture the transformative
potential of the Games to catalyse regeneration in the Borough.
Galvanising all partners in regeneration and most importantly the community.
The London 2012 regeneration commitment. Presence of Canary Wharf – Olympics HQ. Many large corporate headquarters in the
Borough. Renewed emphasis on Corporate Social
Responsibility. Largest Bangladeshi community in the UK. Youthful population. The Lower Lea regeneration being the
‘biggest show in town’. Renewed emphasis on the Western London
Thames Gateway. The four year Olympic cultural programme
post Beijing 2008. Tower Hamlets as an Olympic Site. Olympic visitors have to pass through the
Borough. Volunteering and participation by local
residents. Potential to re-image the Borough amongst
local residents, regionally, and internationally. Developing the tourist industry, particularly
the MICE market.
Threats The Games may stall or threaten other key
elements in the Borough’s Regeneration Strategy – for instance, delays to Crossrail and/or the scrapping of Whitechapel as a station.
The Games may be all pain and no gain for local residents – having to live with construction impacts, increased traffic and crowds during the event, but not being able to afford to attend the Games.
Olympic tourists may never stop to visit the Borough.
The regeneration of the Lower Lea Valley may increasingly be driven by the requirements of the event itself.
Games budget blow-outs may limit regeneration initiatives.
Security considerations may over-ride urban design considerations about access through the Olympic site.
A new ‘red line’ may occur dividing the Olympic site and areas to the west of the River Lea.
Employment opportunities may by-pass Tower Hamlets’ residents if skills base not improved.
Local businesses and people may miss out on Olympic contracts.
Funding bodies may perceive Tower Hamlets as well-resourced, hence loss of potential programmes.
7
2 Theme 1 – Creating and Sharing Prosperity
Context
23. Tower Hamlets ranks as one of the most deprived areas of the country on a wide range of indicators, including employment rates, quality and availability of affordable housing, health inequalities, and relatively high crime levels. All are exacerbated by economic deprivation. Unemployment has fallen in line with the national trend. However, Tower Hamlets still has a higher level of unemployment (13.6%) than the inner London average (6.3%). This is despite the high levels of economic growth that can be witnessed in many parts of the Borough.
24. Of even more concern, Tower Hamlets has one of the highest rates of unemployment for those aged 16–24, representing over 30% of JSA claimants (2,700 unemployed young people). Transition from school to work or post-16 education is a particular problem, with nearly 700 young people aged 16-18 not in education, employment or training (NEET).
25. The Olympic Games have the potential to generate major increases in prosperity for a city or region. Impacts often flow through to an entire national economy. According to one independent study (Blake 20052), London alone will experience a net change in Gross Domestic Product of £5.9 billion over 2005-2016. In addition, 38,875 additional FTE jobs will be created.
26. The London 2012 Games opportunity is to make a generational shift in worklessness and employment chances. Tackling this issue is a crucial objective of this Strategy. The Olympic and Paralympic Games represent the most significant regeneration catalyst the Borough is likely to see in a lifetime. The economic benefits of the Olympic Games need to be captured locally, particularly by the large youthful population.
27. Making an impact on worklessness in Tower Hamlets and providing opportunities for work and enterprise will bring a range of benefits: increased purchasing power, improved health and self-esteem, reduced involvement in crime, and improved life chances for children and young people, whether in the community or public care. Community cohesion can be fostered as economic polarisation diminishes.
28. Some of the key elements of the programme are discussed below.
Local Employment and Training Framework
29. The 5 Boroughs have secured a commitment to, and funding for, job brokerage, skills enhancement and business support through the Local Employment and Training Framework (LETF). This is one of the statutory frameworks under the original planning permission for the Olympic Games. This framework offers a range of activities and interventions to help local residents secure employment and a range of
2 Blake, A. 2005, The Economic Impact of the London 2012 Olympics, Nottingham University Business School.
8
services to assist local companies maximise their chances of gaining access to Olympic opportunities. Although the LETF will cease to be part of the statutory planning process with the revised planning application for Olympic Park to be submitted by the ODA in January 2007, the LDA and ODA have committed themselves to support the LETF. The Borough needs to ensure that the commitment is fully implemented.
30. Work has already commenced to develop initiatives through the LETF. In November 2005, the London Development Agency announced a £9 million funding package to support the LETF. This included a job brokerage and outreach programme, specialist construction employment support, a local 2012 Business Club, supply chain support, and a local young people’s education programme. The launch of the Local Labour and Business Centre occurred at the end of October 2006 along with the first LETF Board Meeting.
City Strategy for East London
31. In March 2006, the Government announced its intention to develop an East London pathfinder under the Department for Work and Pensions’ City Strategies initiative. With key partners, the LDA/GLA, Learning and Skills Council and Jobcentre plus, the 5 Boroughs are forming a local partnership board to align funds, expertise and action to tackle worklessness. This wider partnership, a City Strategy for East London, will work alongside the London Employment and Skills Taskforce (LEST) to further develop the LETF and maximise the employment opportunities presented by the City/Canary Wharf and the development of the Thames Gateway.
32. The experience of launching the Pathways to Work pilots on worklessness elsewhere in the country has uncovered many practical issues on participation, assessment and brokerage which should be applied in the City Strategy which is now being introduced. If Tower Hamlets is to capture its fair share of sustainable employment for those who are suffering from worklessness, it should ensure that the lessons learned from the Pathways programmes are fully understood and are introduced by the DWP led partnership when operational in the Borough.
Local Enterprise Growth Initiative
33. The Local Enterprise Growth Initiative (LEGI) was announced by the Chancellor in the 2005 Budget. A joint programme of HM Treasury, the Department for Communities and Local Government, and the Department for Trade and Industry, it aims to release the economic and productivity potential of the most deprived local areas across the country through enterprise and investment, thereby boosting local incomes and employment opportunities, and building sustainable communities.
34. The £26 million LEGI Bid submitted on behalf of the 5 Boroughs in September 2006 specifically aims to capture the economic benefits of the Olympic and Paralympic Games in terms of expenditure and contracts for local firms. Moreover, it aims to provide the prospect of long term change in the patterns of enterprise and wealth creation in the Host Boroughs.
35. The LEGI Bid is based on the premise that connecting residents and business to the many current programmes of capital investment is the best route to renewal. The bid is centred around three complementary workstreams:
9
East London Means Business. This aims to link buyer organisations with local businesses in order to ensure that the additional demand from new developments will become opportunities for local businesses.
Gold Standard Gateways. This recognises the economic development potential of
increased spending power from growth in local residents and workforce. This workstream is targeted at physical renewal of high streets and improved transport linkages.
Enterprise Starting Blocks. Making enterprise pervasive requires outreach and
marketing programmes. Ten years of LEGI funding would enable programmes to target young people, individuals from BME communities, people on incapacity benefit and lone parents to pursue the enterprise option.
36. Whether or not the 5 Host Boroughs are successful in this round, it will be necessary
to pursue the themes and programmes of this LEGI Bid in future rounds or through other funding streams.
The Global City Challenge
37. Canary Wharf is the newest and most prominent part of the London economy. It is the flagship of the London Docklands project and is part of the capital’s global financial hub. The first tenants moved into Canary Wharf in August 1991. Now, 80,000 people work in Canary Wharf. By 2012 over 100,000 will work there and there is a potential to double Canary Wharf’s workforce by 2026. The Olympics represents a once in a lifetime opportunity for the corporate sector in Canary Wharf to directly affect the lives of young people on their doorstep. Corporate Social Responsibility (CSR) is a major platform for companies to demonstrate that they are interested in more than the ‘bottom-line’. The Olympics is likely to generate a major ‘push’ by companies at the Wharf around the CSR agenda.
38. Currently, Canary Wharf tenants include major banks such as Credit Suisse, HSBC, Citigroup, Lehman Brothers, Morgan Stanley, Bank of America, and Barclays, as well as major news media firms, including The Telegraph, The Independent, Reuters, and the Daily Mirror. Global law firm Clifford Chance is also based here. It has also gained more tenants from the public sector, including the Financial Services Authority and 2012 Olympic Games organisers LOCOG and the Olympic Delivery Authority. It is now truly Olympics HQ!
39. The Global City Challenge has two focuses – a ‘narrow and deep’ focus and a ‘broad and shallow’ focus. The narrow and deep programme provides for a small group of young people aged 14 to 19 to obtain private sector sponsored scholarships in further and higher education in a range of fields. This programme will enable these young people to have an intense and potentially life-changing experience. The broad and shallow programme aims to touch all young people in the Borough. The aim is that everyone aged between 14 and 19 will have the opportunity to have a mentor to enable them to lift their ambitions and find a promising direction and start in life. We will ensure that both strands of the Global City Challenge programme appropriately target young people with disabilities.
40. To commence the Global City Challenge, companies based in Canary Wharf will be asked to establish mentoring and scholarship programmes in their fields of business and enterprise, such as law, financial services, SME development, accountancy, journalism and media.
10
41. ELBA and the Canary Wharf Group are key partners in the Global City Challenge. A consortium led by these two organisations has recently won £30m from the Big Lottery Fund for projects across the UK. It is intended that foundations and other potential funding sources, such as the Bill & Melinda Gates Foundation, be approached to support the project.
Employing People with Disabilities
42. People with disabilities experience exclusion in a wide range of forms, including barriers to taking up employment and training opportunities. The Paralympic Games will provide an opportunity to raise awareness of these and other issues relating to disability. Working with the major employers clustered in Canary Wharf, we will develop a programme that encourages businesses of all sizes to employ more people with disabilities, making arrangements that look beyond minimum statutory obligations in accommodating their needs.
South Asian Business Development
43. A recent report published by the Young Foundation examined attitudes and aspirations of South Asian owned businesses in Brick Lane in Tower Hamlets and Green Street in Newham3. The report makes the case for a marketing campaign to highlight the uniqueness of these two South Asian retail/restaurant districts. This would enable them to become national and perhaps internationally recognisable brands. The study also pointed to the need for effective community engagement and consultation with both the businesses and the wider communities.
44. Furthermore, it highlights the need to target employment and skills initiatives to ensure that minority communities fully benefit from these opportunities. These proposals should be acted on in Tower Hamlets. For example, a Place Manager or Town Centre Manager could be appointed to drive the development of Spitalfields/Banglatown in a direction consistent with the aspirations of the local communities and to ensure the Olympic opportunities are fully captured locally.
Marketing the Markets
45. A significant element of Tower Hamlet’s cultural diversity is rooted in neighbourhood merchandising. The Banglatown retailers are a well known presence and the self-evident air of festival which prevails in that neighbourhood is already well known. It is clear that the links between the Bangladeshi communities and the Bangladesh Olympic team could be a distinctive event in the lead up to 2012.
46. Further afield there are equally strong merchandising assets which can be exploited in the network of street markets which extends from Banglatown to Old Spitalfields then down to Toynbee Street and Petticoat Lane and through to Whitechapel Road. These markets are not only a robust example of community and neighbourhood retailing but can also become a unique venue for shoppers to enjoy the special character of the area and benefit from the Borough’s diverse cultural offer in different ways. Improving the markets’ space and their setting will contribute significantly to public realm improvements – and with a clear focus.
3 Carey, S. & Amend, N. 2006, Bridging the Gap: The London Olympics 2012 and South Asian-owned Businesses in Brick Lane and Green Street, The Young Foundation & Agroni Research.
11
Meetings, Incentive Travel, Conference and Exhibition Industry (MICE)
47. There is much scope for development of the hospitality, leisure, travel and tourism sector (HLTT) sector alongside the Olympic Games. The meetings, incentives, conferences and exhibitions (MICE) tourism sub-market is worth examining in more detail as the potential is large. A local labour force component of this theme is designed to address labour shortages in key growth sectors by up-skilling local residents, particularly the workless under 25 year old group. The HLTT and MICE sectors are key opportunities. Both tourism and economic development strategies need to address this expanding opportunity. Development of initiatives in this area should be conducted in collaboration with ELBA.
48. There is a major opportunity to stage an International South Asian Business Expo as a 5 Borough initiative in the lead up to the Games, to promote business links and mutual investment opportunities. India in particular, and South Asia more widely, is a major emerging economy. Delhi is hosting the 2010 Commonwealth Games. One of its objectives is to showcase India as a major modern world economy – a major place to invest but also a significant world economic player. This opportunity should be seriously investigated as to its feasibility. The following issues would need to be addressed in such a preliminary feasibility study:
The timing of the Expo – whether before (2010-2011), during the Games year (2012), or after (2013-2014);
The location of the event – whether it is a multi-site Expo, utilising the many venues in East and South East London, or just a single site event;
Linkages with South Asia communities in other parts of London (especially West and South London);
The focus of the Expo (specific or broad) – such as ITC, financial services/banking, current export opportunities, technology transfer, developments in textiles, education/university sector, research and development;
Potential sponsorship opportunities and benefits for local Tower Hamlets residents; net cost, cost recovery.
Mobilising Opportunities
49. If the Games do not deliver a marked improvement in employment and prosperity to Tower Hamlets, a major regeneration opportunity will be lost. Both small firms and local people have to be involved in this aspect of economic regeneration for the Olympic promise to East London – so boldly put in the Candidature File – to become a reality. Economic impact assessments of these and past Games point to the fact that economic and employment benefits tend to be widely dispersed, in this case, throughout London and the South East. There is the danger that large numbers of construction jobs will not be sourced locally. Those procuring for and delivering the Games need to implement the principles and programmes in LETF, City Strategy and LEGI and also ensure that small business gets a real share of the economic action.
50. Those involved in the 5 Boroughs on initiatives such as City Strategy East London, the Local Enterprise Growth Initiative, and the Local Employment and Training Framework understand the primacy of addressing worklessness. This is most pressing amongst people aged 16 to 25. This focus should not be lost in the plethora of business and skills initiatives. Indeed a major element in addressing worklessness is harnessing the interest of all businesses in becoming involved in some way in the discrete elements of addressing worklessness. These are now much better understood and can be pursued through the City Strategy for East London.
12
Theme 1 – Creating and Sharing Prosperity Programme
Linkages
Tower Hamlets Community Plan
The Employment and Prosperity Programme supports the following Tower Hamlets Community Plan theme:
A Better Place for Creating and Sharing Prosperity – bringing investment into the borough and ensuring that all our residents and businesses are in a position to benefit from, and contribute to, growing economic prosperity.
Tower Hamlets Regeneration Strategy
The Employment and Prosperity Programme supports the following Tower Hamlets Regeneration Strategy priorities:
Develop the economy to create wealth, business and employment for local residents.
Develop people to help local residents find jobs and succeed in the knowledge-driven economy.
Develop marketing to promote the transformation of Tower Hamlets into a global city-district and attract ongoing public and private investment.
Olympic Board – Olympic & Paralympic Games Programme Objectives
The Employment and Prosperity Programme supports the following Olympic Board objectives:
3.2.1 Maximise the employment and skills benefits for Londoners arising from Games-related businesses.
3.2.2 Maximise the wider economic benefits of the Games to London, including those for tourism and business promotion.
3.2.7 Promote London’s image as a leading world city to an international audience.
3.2.8 Ensure London’s diverse communities are engaged with, and benefit from, the changes and opportunities arising from hosting the Games in London.
13
The Programme
Local Employment and Training Framework
1. Engage with the London Development Agency and the 5 Boroughs to ensure that the full potential of the Local Employment Training Framework is realised.
2. Monitor employment, training, and procurement outcomes in conjunction with the 5
Boroughs.
3. Engage with training programmes for volunteering programmes (customer service, hospitality) and ensure NEET residents benefit.
City Strategy for East London
4. Implement the City Strategy for East London. Local Enterprise Growth Initiative
5. Lobby for the Local Enterprise Growth Initiative funding with the 5 Boroughs. The Global City Challenge
6. Establish the Global City Challenge Olympic Opportunity Young People’s Scholarship and Mentoring Programme and establish annual scholarship and mentoring targets in the relevant disciplines. Link with the Big Lottery funded programmes of East London Business Alliance /Canary Wharf Group.
7. Promote the London 2012 Olympic and Paralympic Games as a vehicle for the Tower
Hamlets’ corporate sector to fulfil its Corporate Social Responsibility objectives. Employing People with Disabilities
8. Develop a programme that capitalises on the Paralympic Games to encourage businesses to employ significantly more people with disabilities.
South Asian Business Development and Marketing the Markets
9. Develop a community and business engagement strategy for the South Asian community.
10. Provide direct business advice and support to Whitechapel/Spitalfields/Banglatown
businesses to maximise Olympic opportunities.
11. Appoint a Town Centre Place Manager for Whitechapel/Spitalfields/Banglatown.
12. Establish a marketing and business development strategy for Tower Hamlets street markets, particularly those around Spitalfields, Brick Lane, and Whitechapel.
MICE Industry
13. Establish a Tower Hamlets MICE Task Force with Visit London, the Canary Wharf Group and East London Business Alliance.
14
14. Conduct a feasibility study into the South Asian Business Expo proposal, in conjunction with the 5 Boroughs and East London Business Alliance.
15. Review the East London Tourism Strategy and Action Plan for alignment with
Olympic opportunities.
15
3 Theme 2 – A Socially Cohesive Community
Concept
51. All the themes in this Strategy are intended to make Tower Hamlets a more socially cohesive and inclusive place. In this section, we look at those issues that significantly and directly contribute to community cohesion and well-being: health, education, crime reduction, sport and culture. Community cohesion is a key theme in enhancing the opportunity provided by the Games to build bridges between and among communities in the Borough. This also provides clear links with the Tower Hamlets Community Plan.
52. Tower Hamlets is a youthful and growing Borough. It has comparatively high unemployment and low rates of owner-occupation compared with the rest of England and Wales. It has generally poor health indicators but rapidly improving schools. Tower Hamlets remains a Borough with high levels of deprivation.
53. Tower Hamlets had a total population of 196,106 at the 2001 Census. By 2016, the population is projected to increase to at least 260,000. It is the fastest growing Borough in London. Tower Hamlets has a very youthful population, with over 34% of the population aged between 20 and 34 years of age and 28% under 20 years of age.
54. Tower Hamlets is a highly diverse Borough. The distinctive feature is its large Bangladeshi community, which represents 33.4% of the resident population. Black Africans make up 3.4% and Black Caribbean 2.7%. The White population is 51.4% of the total and 65.3% were born in the UK. Those born outside the EU make up 30.8% of the Borough. The main religious groups are Christian, 38.6%, and Muslim, 36.4%.
55. Tower Hamlets is wealthy and poor at the same time. Despite having a centre of global finance within its borders, many of its residents remain deprived. Based on the Index of Deprivation, Tower Hamlets is ranked 4 out of 354 local authorities in England in terms of average deprivation. (The lower the number indicates the more deprived.)
56. The challenge of enhancing community cohesion is a major platform of the Tower Hamlets Olympic Legacy Strategy. This is a cross-cutting theme. That is, all the other themes in the strategy – such as Creating and Sharing Prosperity and Experiencing the Games – contribute to community cohesion. The specific programme areas under this theme are health, education, respect, sports participation, and culture.
Health
57. The Games present a unique opportunity to promote healthy living amongst all sections of the community. A central element of the Mayor’s Olympic Delivery Plan for Health in London is the Government’s 2004 Public Health White Paper called Choosing Health. This White Paper sets out the priorities for improving health on a range of themes:
16
Tackling health inequalities; Reducing the number of people who smoke; Tackling obesity; Improving sexual health; Improving mental health and well-being; Reducing harm and encouraging sensible drinking.
58. The National Health Service and the Department of Health have prepared a Project
Plan for the health contribution to the London 2012 Olympic and Paralympic Games. It is structured around five elements:
Provision of medical and health services for the Games; Regeneration of North East London and elsewhere; Mitigation of health risks during the Olympic construction phase; The Choosing Health and physical and mental health agenda, through physical
activity; The National Sport and Exercise Medicine Centre, part of the London Olympic
Institute. 59. The well-being and regeneration components of the Health Delivery Plan are based
on capturing measurable improvements to health through skills development, physical activity, improved nutrition and weight reduction. This is also a long term growth area for central government which should support programme enhancement.
60. Health and promoting physical activity are key aspects of existing programmes being conducted in the Borough, such as the weight management programme to minimise child and adolescent obesity and the NRF health trainers’ initiative (part of the NRF Living Well programme – to March 2008). One of the Community Plan’s primary indicators is to increase life expectancy for people living in the Borough and close the gap by 10% between Tower Hamlets and the average for England and Wales. The Borough’s Sport and Physical Activity Service is delivering a wide range of projects to increase physical activity, with NRF funding for a number of initiatives. There has been agreement to join up sports and leisure work in the Healthier Communities Block of the Local Area Agreement.
61. These programmes need to be built and expanded upon with the renewed impetus provided by Choosing Health and the Olympic and Paralympic Games. There are obvious links with the sports legacy programmes. A key task will be identifying new partnerships and building on existing ones. The Borough and the PCT are developing a joint workstream centred on physical activity and health which builds on existing programmes and capitalises on the social marketing opportunities provided by the Games.
62. The workstream will be integrated with the work of the Local Strategic Partnership. The proposed areas of work fit within the Learning Achievement and Leisure and Living Well CPAGs, although there are clear cross-overs with the other CPAGs. An initial meeting with officers of the PCT and the Borough is proposed. It may be advisable to include other organisations as well as LAP members. The purpose of this initial meeting would be to set objectives, scope potential activities and opportunities, and to review facility needs and funding. An issue to be resolved is where in the LSP this workstream resides and whether reporting would be directly to PMG or to CPAGs. Discussion with the LSP is on-going.
63. The workstream will be broad in reach and encompass children and young people, families and adults, people with disabilities, and older persons. It should be culturally
17
competent and sensitive, building on existing programmes, for example, swimming classes for Bangladeshi women. In addition, programmes should be tailored to be accessible to people with a disability. There is a clear opportunity to promote walking in the Borough using the fact that Victoria Park is the venue for the Olympic Walk Race Event.
64. The relationship with Tower Hamlets Primary Care Trust is a central one, as are the links with Tower Hamlets PCT’s Health and Well-Being Strategy and Local Delivery Plan. Other important relationships are primary care providers, including GPs, local Sure Start programmes, and local schools. In particular, The Royal London Hospital provides district general hospital services for the City and Tower Hamlets and specialist tertiary care services for patients from across London and beyond. At 6km from the Olympic Village, and with over 1000 beds, it is the closest large general hospital to the main Olympic venues. (The Homerton is 3km from the Village but is a smaller facility). The Homerton has been designated as the front line hospital facility but will be supported by Whipps Cross and the Royal London. The Royal London Hospital is a Level One Trauma Centre and operates a Helicopter Medical Emergency Service from a helipad above the A&E Department. The London will therefore be a critical element in the procedures for emergency services for the Games being developed by the London Emergency Services Liaison Panel. The Royal London will therefore be the main trauma hospital in the event of a major health incident during Games time. There is separately an opportunity here to strengthen the sports medicine sector on the back of the anticipated growth in that sector in the lead up to the Games – and again, there is an important potential role for the Royal London as a leading centre for Sports Medicine education and research in conjunction with Queen Mary College.
Education
65. The Mayor’s Olympic Delivery Plan for Education in London aims to enthuse and inspire children and young people in London to realise their own capabilities, to sharpen their perception of themselves as young Londoners, and to develop their understanding of the world community of nations. Again this is a priority growth area for central government.
66. The government’s PE, School Sport and Club Links (PESSCL) strategy states that PE and sport in schools can improve pupil concentration, commitment and self esteem, leading to higher attendance and better behaviour and attainment.
67. These are significant objectives that should enhance social cohesion in Tower Hamlets. Projects in this Delivery Plan are grouped under the following headings:
School-based initiatives; Extended schools and work in informal and community education settings; Education/employment links; Post school initiatives.
68. Specific curriculum based activities around the Olympics and Paralympics are being
proposed at a national level through DfES. Clearly, these would meet the additionality test. Other aspects of the Delivery Plan relate to existing activities, such as the UK School Games and the London Youth Games (although in these instances, increased participation by schools in the Borough could be targeted). Clearly, there are many opportunities to develop local education programmes and activities over the next 6 years. Some of these are outlined in the Programme. Education and Children’s
18
Services broadly will play a significant role in developing a Tower Hamlets Olympic Legacy Strategy.
Anti-Social Behaviour
69. The Respect Action Plan published by the Home Office in January 2006 highlights the contribution that volunteering activities and participation in sport can make to reducing anti-social behaviour. As part of the Government’s Respect Action Plan, regional sports and arts bodies are being encouraged to ensure that within target areas current funding is more effectively channelled into activities which support Respect principles. In particular, it seeks to expand mentoring projects as an effective way of developing positive role models and is establishing a Sports Champions Mentoring Programme. There are clear opportunities to promote the aims of the Respect Action Plan through the Games, and in doing so make neighbourhoods in Tower Hamlets safer.
70. Together these community well-being aspects of legacy should enhance social cohesion alongside the more directly linked activities associated with experiencing the Olympics, particularly the cultural programme.
Sport
71. The London 2012 Candidature File makes an ambitious claim:
The new facilities in the Olympic Park will be open to the whole community, not just elite athletes. This will lead to more opportunities for everyone to participate in sport and physical activity. This will create a more inclusive, more active community, leading to a fitter society and reducing health inequalities.4
72. Tower Hamlets has few Olympic sports facilities sited in the Borough. Under the
revised Olympic Park Masterplan (June 2006), the only sports facility in Tower Hamlets will be the temporary Basketball Arena located in the south of Fish Island on the site of the Bow Industrial Park. However, a number of the legacy sports facilities will be regional in nature and therefore benefit the residents of Tower Hamlets. These include the Aquatic Centre and Olympic Stadium in Newham, a multi-purpose indoor arena and velopark in Hackney, a tennis and hockey complex in Waltham Forest.
73. However, as the Rapid Health Impact Assessment of the Proposed London Olympics Games and Their Legacy (ERM, November 2004, p.22) found after an extensive literature review, there is currently little research or evidence that attributes increased sports uptake and physical activity to the Olympics or any other major sporting event.
74. A survey commissioned by UK Sport after the Manchester 2002 Commonwealth Games indicates similar results. People felt more positive but recorded no significant increases in physical activity or sports participation.5
75. Sport England commissioned a nationwide survey, Active People, of participation in physical activity between October 2005 and April 2006. This revealed that Tower
4 London 2012 Candidature File, Volume 1-Theme 1; p.19. 5 MORI 2004, The Sports Development Impact of the Commonwealth Games 2002: Final Report, MORI, London.
19
Hamlets had 21.2% of adults participating in at least 30 minutes moderate intensity sport and active recreation (including recreational walking) on three or more days a week. This result was in the mid-range for London Boroughs, with Greenwich and Newham the lowest (11.9% and 14.2% respectively) and Wandsworth and Richmond the highest (27.3% and 31.6% respectively). Noteworthy is the fact that Tower Hamlets was ahead of many outer London Boroughs that presumably have better access to and provision of open space.
76. The current Tower Hamlets sports strategy, called Seizing the Moment, focuses on improving sports provision in Tower Hamlets and improving the quality of life for the people who live there. The strategy provides a plan for the development of sport in the Borough, which was to guide sports provision over the next 25 years. There are two major themes at the heart of the strategy:
Development of a range of facilities which aim to increase sports participation and achievement, by providing everyone with access to better facilities. The aim is to provide each community area with anchor facilities consisting of a swimming pool and sports hall.
Determination to make these facilities accessible to everyone with equal opportunities for disabled people, for the different cultures of Tower Hamlets and for those on low incomes.
77. The sports legacy programme needs to build on the work already initiated in the
Borough, particularly by the sports development team, and involve each education sector from early years education to further education and higher education. There will be existing valuable knowledge about what works and does not work. Careful consideration needs to be had as to how to tailor any legacy programme to local needs.
78. Fundamental to the sports legacy programme will be developing a range of participatory sports activities and events, from fun runs to sponsored walks to school. Promoting wider participation across East London will be a special theme of the 5 Host Boroughs.
Culture
79. Tower Hamlets has the most extensive arts and culture provision in the Thames Gateway. There are over 90 arts organisations, including 34 galleries and 13 museum/heritage sites. Organisations in Tower Hamlets receive £5.3m p.a. for ACE and £6m p.a. in total including other funding. Tower Hamlets has 36% of all successful Arts Council Grants for the Arts awards in the Thames Gateway and has 32 Arts Council regularly funded organisations.
80. There are also around 45 festivals a year including The Brick Lane Festival (estimated 40,000 attending) and The Baishaki Mela (estimated 80,000 attending). These organisations contribute to delivering the most diverse cultural offer of all boroughs in the Thames Gateway and have strong links with local communities. The sector is largely made up of small and micro businesses, vulnerable to rising rents and land values. It will be important that the sector is afforded a degree of protection through the change ahead and that the organisations are better equipped to maximise the opportunities for change that will come with the Olympics and the spread of activity across the Gateway.
81. Examples of two local organisations with plans to expand their offer are Rich Mix and
20
the Whitechapel Gallery. Rich Mix’s new performance and studio spaces are due to open later in 2006. The Whitechapel Gallery extension will open in 2008 and will transform the gallery from a business with a £2m turnover to £2.9m, an increase of 45%. This will increase footfall by 30% from 199,000 to 239,000 per year.
Cultural Olympiad Programme
82. LOCOG has proposed a four year programme of cultural events. A Tower Hamlets cultural programme needs to reflect the Borough’s diverse communities as well as the broader Olympic themes. These could test the notion of Olympic Live Sites but more importantly maintain momentum and interest in the Games in the four preceding years when typically public interest wanes. In addition, these events would provide a platform for some of the other legacy aspects, notably the health promotion and physical activity programmes.
83. A cultural strategy is in preparation and it has already identified some primary themes upon which a range of initiatives and individual projects are being based.
Increasing the visibility of arts and creative Industries in Tower Hamlets to visitors;
Engaging local people and promoting community cohesion;
Developing further festival programmes; Raising local ambitions through training and skills enhancement;
A new geography post 2012 by spreading the presence of venues.
84. In the time between the first iteration of this strategy (and the lobbying surrounding it) and this version, a significant development has taken place: Victoria Park is now an Olympic sporting venue in its own right. The ODA, in its draft Transport Plan now out to consultation, states its intention that Victoria Park will host the Olympic Walk Race (20km and 50km) Events. It will also now be a centrepiece of the formal Olympic cultural programme and events. The Borough has been highly active in ensuring that the Bid’s commitment that Victoria Park will be the venue for the Party in the Park is honoured. The ODA has also stated that there will be an additional pedestrian and cycle entrance to Olympic Park on the western side via the Greenway from Victoria Park during Games time. This supports Victoria Park being the venue for the Party in the Park. It is now envisaged that there will be an Olympic related event in Victoria Park in the summer of 2007. An annual programme needs to be worked out between the Borough, the 5 Host Boroughs, and LOCOG for the official Cultural Olympiad starting in 2008, with events occurring every year to 2012. The momentum from recent commitments by Olympic organisers needs to be captured by engaging and steering the programme early. There may be a need for preparatory feasibility studies.
85. A significant cultural project that will actively engage older people in the Borough is the Exploring Living Memory Project. This will involve older people exploring the history of the area (Victoria Park, neighbourhoods around the Olympic Boulevard, important events) and recording or representing these with young people.
86. The next step is to develop this strategy and create linkages with the remaining programmes particularly, in sport and community enrichment. The themes which have
21
been identified are rooted in the local situation within Tower Hamlets and are capable of being worked up in early course.
Public Art Programme
87. Barcelona had a significant public art programme in the lead up to the 1992 Olympics.
So did Sydney in 2000. However, these cities had very different approaches to Olympic public art. Though impressive, the Sydney public art programme was deliberately confined to Sydney Olympic Park. The art was commissioned and designed to complement the large scale sports venues and the large piazza. The intention was equally to provide human scale as to showcase artistic talent.
88. Barcelona had a totally different approach. The city commissioned local artists and international artists, including some well-known names. The art works were a mix of temporary installations and permanent works. They were located at city gateways and large public spaces, alongside sports venues, and in other less frequented places. The art was intended to lift the city as a whole and provide a feel that the entire city was celebrating the Olympics.
89. Tower Hamlets requires its own arts and culture strategy as has been envisaged in the previous Chapter. This is currently being developed and will be phased to ensure that the lead up to the Games, the peak participation period and the legacy period are taken into account. The location of works of art could emphasise key Olympic routes or gateways – such as the route of the Marathon or the Torch Relay. It could complement the Olympic Boulevard Project, discussed under Theme 3. Public art would enhance the public realm generally and could be used for a variety of purposes, such as way-finding or sign-posting.
90. Art could also be designed to provide a backdrop to the Live Sites. It should link in with the themes of any local Tower Hamlets cultural festivals. It could encompass community arts projects as well as nationally or internationally commissioned works. An artist-in-residence programme could enable a deeper community involvement in art as has been adopted in the new Royal London Hospital as set out in the s106 public arts strategy.
22
Theme 2 – A Socially Cohesive Community Programme
Linkages
Tower Hamlets Community Plan
The Socially Cohesive Community Programme supports the following Tower Hamlets Community Plan themes:
A Better Place for Living Safely – reducing crime, making people feel safer and creating a more secure and cleaner environment.
A Better Place for Living Well – improving housing, health and social care and promoting healthy living.
A Better Place for Learning, Achievement and Leisure – raising educational aspirations, expectations and achievement, providing the widest range of arts and leisure opportunities for all and celebrating the rich cultural diversity of our communities.
Tower Hamlets Regeneration Strategy
The Socially Cohesive Community Programme supports the following Tower Hamlets Regeneration Strategy priority:
Develop places which combine a healthy environment with enjoyable open spaces, a well-designed mix of homes and business premises, good-quality services and excellent public transport.
Olympic Board – Olympic & Paralympic Games Programme Objectives
The Socially Cohesive Community Programme supports the following Olympic Board objectives:
2.6 Deliver agreed sustainable legacy plans for the Olympic Park and all venues.
3.2.3 Maximise cultural benefits to Londoners from hosting the Games and the Cultural Olympiad.
3.2.4 Maximise social benefits to Londoners, including in health, education and volunteering, of hosting the Games.
3.2.8 Ensure London’s diverse communities are engaged with, and benefit from, the changes and opportunities arising from hosting the Games in London.
4.5 Maximise increase in London participation at community and grass-roots level in all sport and across all groups.
4.7 Implement viable legacy use for Olympic sports facilities in London.
23
The Programme
Lead Role
16. Become the Community Cohesion Lead Borough for the 5 Host Borough organisation and develop a lobbying strategy around this theme.
Health
17. Develop a comprehensive Olympics Health and Physical Activity Legacy Programme jointly with Tower Hamlets Primary Care Trust, to include targeted programmes for children and young people, disabled people, BME, and older people. There is likely to be a strong focus on walking for health linking in with the fact that Victoria Park is the venue for the Olympic Walk Race Event.
18. Support Tower Hamlets PCT with the development of the Centre for Sports Medicine
at Queen Mary College and Barts and the London Hospital. Education
19. Develop a Borough Olympic Education Programme for 2007-2012, in conjunction with early years, primary and secondary schools and also the further and higher education sectors.
20. Develop broad programmes that capitalise on the momentum of Olympic and
Paralympic Games.
21. Work with the private sector and East London Business Alliance on developing the Global City Challenge.
22. Implement the DfES London 2012 Olympic and Paralympic Games curriculum
programmes.
23. Encourage increased participation by children and young people in the Borough in the UK School Games and the London Youth Games, as well as the Annual School Olympiad proposed under the sports legacy programme.
24. Implement a Sport for All programme from 2007 onwards in partnership with the 5
Boroughs. Anti-Social Behaviour
25. Assist young people in Tower Hamlets to be involved in the new Sports Champions Mentoring Programme as part of the Government’s Respect Action Plan.
26. Initiate a Young People’s Olympic Programme, commencing with an interview project
in conjunction with East End Life. Sport
27. Influence the outcome and configuration of the regional sports facility legacy, particularly the multi-use indoor arenas.
28. Investigate the potential reuse of the temporary Basketball Arena (e.g. playing
surfaces) in another location in the Borough.
24
29. Support the 5 Borough Sports Academy Programme. This is being led by the London
Borough of Newham in collaboration with Sport England.
30. Implement the Tower Hamlets Partnership’s Neighbourhood Renewal Fund programme (£769,000 approved) involving a package of sports and health activities. Plan for succession funding to NRF to continue the programme post 2008.
31. Develop an integrated Olympic themed marketing and promotion campaign for the
Borough’s leisure centres aimed at increasing patronage and physical activity.
32. Develop a sequenced Borough wide sports club promotion campaign – focussing on a different sporting discipline each season.
33. Review the Tower Hamlets Sports Strategy to ensure it is fully aligned with all
Olympic opportunities and to enable it to capture all the participatory sports and activity programmes (e.g. fun runs, sponsored walks to school, financial district activities).
34. Develop a Borough-wide Annual School Olympiad to include both primary and
secondary schools. Culture
35. Develop a four year (2008-2012) Tower Hamlets Cultural Olympiad Programme, including building on existing Tower Hamlets festivals.
36. Develop a five year cultural programme for Victoria Park in conjunction with LOCOG
and the 5 Host Boroughs. Initiate a feasibility study if necessary. Plan and deliver an Olympic-related events in Victoria Park in the summer of 2007.
37. Partner with Rich Mix, CIDA, and other local cultural brokers, LOCOG, Sport England
and the Arts Council England to develop an Imagining the Games Project to evolve over the period 2008-2012.
38. Develop an Exploring Living Memory Project with older people and younger people.
39. Appoint a curator for the Tower Hamlets Public Art Programme.
40. Prepare a Business Plan and Strategy for the Tower Hamlets Public Art Programme.
41. Review the Tower Hamlets Planning Obligations Interim Planning Guidance, as the
current policy favours on-site public art.
25
4 Theme 3 – A Transformed Environment
Concept
91. The Olympics is an excellent opportunity to improve the environment of Tower Hamlets. Such a programme requires careful planning and preparation, together with identification and targeting of appropriate resources. To many outsiders, the most obvious legacy of the Olympic Games is the physical and environmental one. This has been show-cased in Poblenou on the waterfront in Barcelona, where an ailing industrial suburb was transformed into the Olympic Village and Olympic Marina. It is now one of the city’s most thriving districts. Similarly, Homebush Bay in Western Sydney was redeveloped from a series of large scale industrial uses and an armaments depot to a new residential and business suburb of Sydney, together with regenerated wetlands and a major new park.
92. The Lower Lea Valley is now the main focus of the recently scaled-up Thames Gateway regeneration project – reputedly the largest regeneration undertaking in Europe. Thames Gateway London has the potential to deliver 120,000 new homes in the next 10 years. The Olympic deadline has provided a unique opportunity to catalyse development and unblock obstacles. For instance, burying electricity transmission lines was considered too costly before London was awarded the Games, but is now proceeding apace.
93. Work on the Olympics Masterplan commenced in 2003. This initial work outlined a number of scenarios for the Lower Lea Valley – a no-Games scenario, a Games scenario, and a post-Games legacy scenario. The master planning work has been taken forward through the Olympic Park Masterplan. The latest version of this was publicly released in June 2006 and incorporates some major changes in venue locations. Tower Hamlets is hosting a temporary Basketball Arena and security check area; plans to also host a coach park were changed in January 2006.
94. A much more comprehensive planning statement was released for public consultation by the Greater London Authority in May 2006. This is the Lower Lea Valley Opportunity Area Planning Framework, which was produced in consultation with the four Lower Lea Valley boroughs. This is significant in its emphasis on the Lower Lea Valley as ‘one of the largest regeneration projects in Britain’. It may not be the only show in town – but it is certainly the most significant.
95. A wider regeneration problem may exist. This is the ‘red-lining’ that was evident with the LDDC developments, where development within the UDC boundary was of a higher quality than that outside. The LDDC red line also marked the poverty line – this legacy can be seen in Tower Hamlets today. An Olympics red line, whether physical or social, should be avoided at all costs.
96. A number of legacy projects suggest themselves as presenting opportunities to maximise the environmental benefits of the Olympic Games, whilst benefiting current and future generations of Tower Hamlets residents and workers. The areas which are most closely linked with the Olympic Park and where physical regeneration associated with the Olympics can be directly brought into effect are in Fish Island and
26
in Whitechapel Road to Mile End Road. Special effort will be needed to ensure that the environmental improvements to East London are not limited to Olympic Park only.
Place-making and Housing
97. London’s successful bid to host the 2012 Olympic Games and Paralympic Games was predicated on the commitment to a successful and sustainable legacy. An important element of that legacy commitment was the delivery of affordable housing in the Olympic Park. The Mayor’s strategic target for affordable housing is set out in the Spatial Development Strategy The London Plan. The Mayor’s target is 50% affordable housing. The Tower Hamlets Local Development Framework adopts this target from new housing in the Borough subject to viability across all sources. The LBTH Housing Study 2004 indicates that when housing benefits are excluded from gross annual household incomes, nearly 64 per cent of all households in the Borough fall below the level threshold of affordability. The need for more affordable housing is growing at such a rate that there is currently an annual shortfall of 3,021 affordable dwellings across the Borough. The provision of affordable housing is crucial for the Borough in providing suitable accommodation for its diverse communities.
98. Approximately 9,000 homes are planned for development in the Olympic Park. In a Joint Statement by the GLA, LDA, the Housing Corporation and the Olympic Delivery Authority, it has been agreed that 50% of housing developed in the Olympic Park will be affordable (subject to standard economic viability tests). It should be noted that the existing planning consent for the private sector Stratford City project requires 30% affordable housing. Under the terms of the Joint Statement, affordable housing developed in the Olympic Park is intended to be a London wide legacy, and therefore nominations to affordable housing will be available on a London wide basis. The London Development Agency with identified partners is arranging meetings of an Olympics Legacy Housing Forum at least three times a year where matters relating to the relocation process and the legacy will be discussed.
99. Previous Host Cities, notably Barcelona and Sydney, have developed distinctive neighbourhoods as part of their regeneration or urban renewal strategies. For instance, Sydney 2000 developed what was claimed at the time to be the world’s largest solar powered suburb with, in addition, 50% water reuse on site. There is a clear opportunity with the London Games to develop new forms of exemplary ‘Millennium Communities’ in and around Olympic Park. These should aim to promote leading edge methods for achieving innovative sustainable mixed tenure mixed-use communities that are well-designed, adopt eco-homes principles, and reduce the carbon footprint. There is now a new proposal in the Olympic Masterplan for a Combined Cooling Heat and Power plant in the north east of the Borough at Kings Yard, which would provide heating and power for the residential neighbourhoods within the Olympic Park. The current proposal is for this plant to utilise biomass, in the form of wood chips, and natural gas. Natural gas emits around 50% less carbon emissions than coal or oil. Biomass should be carbon neutral if the carbon cycle is contained. The Good Quality Combined Heat and Power (GQCHP) standard relates to plants that have a high percentage efficiency of electricity generation and heat use, compared with those where the heat use is low or intermittent. Combined with the proposed wind turbine at Eton Manor in Waltham Forest, these initiatives should result in significant reduction in carbon emissions from the new developments and bring state of the art sustainable technology to the borough and a high profile in this field.
27
100. There are significant opportunities for enhancing the place-making and developing new mixed use neighbourhoods both within the Olympic Masterplan area and in other locations just outside. These locations may provide further opportunities for good urban design, appropriately designed family housing (3 and 4 bedroom units), and new models of delivery and management such as Community Land Trusts. Though there will be significant market pressures towards maximising densities – and ‘Olympic landowners’ such as the LDA itself might see some financial attractions in higher densities – a firm planning approach from all the relevant bodies can moderate these pressures. The aspiration should be for well-designed sustainable communities that integrate well with the existing adjoining neighbourhoods and that make best use of the benefits provided by the Olympic Park for leisure and recreation. The central role of local government in the place-making process should be fully recognised by the Olympic Development Authority and the LDA. The whole issue of housing mix and affordability has been recognised as a critical issue by the ODA. To this end, a genuine partnership process is essential to achieve the vision set out in the Candidature File.
Olympic Park Masterplan Legacy
101. An Olympic Park Legacy Group (OPLG) was established in July 2006. Chaired by the Mayor of London’s Office, this will be a non-decision-making body. The OPLG is soon to discuss the legacy components of the Olympic Park Masterplan arrangements and the future management arrangements for the Park post Games. Particular issues are the legacy uses and configurations of the Stadium and Aquatic Centre. However, the critical task of any future legacy body – managing the parklands – requires careful consideration. The key task is one of place management rather than park management. Effective park management is no simple task in itself; inadequate park management can lead to parks being viewed as problems areas of crime and anti-social behaviour. Place management is even more demanding and necessitates the careful management and maintenance of the ‘edges’ between the public domain and private space, as well as resolution of long-term governance and funding. The area covered by Olympic Park will be a new London neighbourhood not just a new London park. It requires a commensurate response.
102. The Olympic Park Masterplan itself is looking more like the Homebush Bay Masterplan for the Sydney Olympics. The original 2003 Masterplan for the Lower Lea was based on the principle of a ‘flexible Olympics’. That is, the Olympic venues and facilities were to be embedded in a linear urban city fabric in a dense formation. The imperatives of event management, particularly crowd control, security, access and public transport, mean that the current Masterplan appears much more like a traditional Olympics precinct.
103. Membership of the OPLG by the 5 Boroughs will be a critical issue. This has added importance since ODA will be submitting a new planning application in January 2007 to reflect the revised Masterplan. It is not certain that the regeneration commitments made in the conditions attached to the first permission will survive in the new planning permission. Although a public commitment to the benefits included in the original conditions is to be maintained, they may no longer be legally binding planning conditions.
104. A new concept of Legacy Plus has been introduced into the Olympic Park thinking by the ODA. This refers to the long term use and viability of the Park. A planning horizon date of 2025 is cited. The Legacy Plus concept has the potential to complicate legacy commitments and may allow a route for the postponement of some essential legacy
28
components. The Borough needs to be vigilant on this matter and promote a clear Tower Hamlets legacy for the Games.
Lower Lea Valley – Fish Island and Regeneration Bridges
105. Fish Island is viewed in both the emerging Lower Lea Valley Opportunity Planning Framework and the Tower Hamlets Leaside Area Action Plan as having an exciting new future. The agreed approach is to modernise the vision for the mixed use but employment-led regeneration of the area, in an environment which blends into the Olympic Park and the new residential developments within it and links to it by new crossings over the Lea. A critical challenge will be to ensure that the physical legacies of Fish Island and Olympic Park complement each other and that no new ‘red line’ problem arises between development on the east and west sides of the Lea. The continuous review LDF process will enable appropriate development to take place in this important area.
106. Aspirations have emerged through the LDF process for more family friendly development around the Olympic Park that fully benefits from the improved environmental quality and recreational opportunities associated with the new park. There are a range of planning issues surrounding the future of Fish Island and the neighbouring area of Hackney Wick (in LB Hackney). The Local Development Framework and the Opportunity Area Planning Framework envisage Fish Island as a future mixed use area. There will be strong development pressures for this area to become just residential. Residential developers increasingly seek to maximise density and yield. We need to be wary of discussions promoting high densities in this location as they are likely to raise expectations and land values. This will not be in the best interests of creating sustainable and mixed communities, particularly in terms of increasing family housing provision. Increasing funding for the Olympics through maximising land values is not in the best interests of high quality place-making.
107. The Lower Lea Valley OAPF and the Leaside AAP indicate a commitment to deliver a school and a community space as a ‘strategic intervention’. The Lower Lea Valley Opportunity Area Planning Framework indicates the need for increased open space and a series of new vehicular bridges and pedestrian/cycle bridges. An initial meeting has been held with officers from the London Borough of Hackney, at their invitation, with regard to linking the master planning exercises for Hackney Wick and Fish Island in order to create a more integrated neighbourhood with higher value employment uses and a revitalised centre around the Hackney Wick station.
108. The OAPF places great emphasis on the Connected Valley principle – and this is re-affirmed in the Leaside Area Action Plan. This develops the EDAW Masterplan concept of the Bridge of Regeneration. It incorporates a number of measures to increase accessibility via better integration of transport and development, minimisation of physical severance, development of social infrastructure, and both east-west and north-south cycle/pedestrian links, roads and public transport. The provision of a north-south spine road is being discussed as a legacy though this has not yet been confirmed and there must be questions over the cost and deliverability of this project.
109. Physical access is a fundamental legacy issue for the area. Whilst there may be some movement limitation during the Games for security reasons (the ‘Olympic Overlay’), access must not be compromised in the post-Games configuration, lest another barrier be placed to the long term sustainable regeneration of Tower Hamlets. The strategy has several programmes aimed at ensuring that the Olympic agencies fulfil
29
their promises on improved accessibility.
Lower Lea Valley – The Water City
110. In the original EDAW Masterplan (2003), there was the concept of the Water City. This was based on earlier work from a consortium of Barcelona architects (MBM Arquitectes) responsible for designing their Olympic Village, which was termed the Newham Arc of Opportunity. The many waterways criss-crossing the area potentially would add value to the location but needed many bridges and links to make access possible and to ensure one community emerged and not a series of isolated enclaves.
111. There is an obvious need to revive the concept of the Water City and develop a joint initiative with the London Borough of Newham in enhancing north-south links through the Lower Lea Valley to the Thames.
Greening Tower Hamlets 2012
112. Tower Hamlets has one of the lowest rates of open space provision in London. Under the draft Local Development Framework the Council is seeking to protect – and if practicable increase and enhance – the provision of all types of open spaces in the Borough consistent with its inner city character, and most importantly to improve accessibility to, between, and within open spaces.
113. The Draft Open Spaces Strategy made a number of recommendations including using planning obligations more consistently, providing local parks for areas not currently within 5 minutes’ walking distance of open space, and using Section 106 funds more creatively to re-design open spaces to facilitate more intensive use. These are reflected in the current draft Local Development Framework.
114. The LDF uses the concept of ‘green chains’. These are areas of linked but separate open spaces and the footpaths between them. They are accessible to the public and provide way-marked paths and other pedestrian and cycle routes. The Borough is committed to the development of the concept of a green-grid network across the Thames Gateway. Linked to this, the LDF proposes increased playground provision and also more trees and landscaping. These green proposals complement the Blue Ribbon Network. This concept, from the London Plan, includes the River Thames, the docks, the canal network, the other tributaries, rivers and streams.
115. An engaging social marketing concept could be to Plant 2012 Trees. The Borough has around 50,000 trees at the moment but would like to see this number increased. Other ideas are green bridges and gardens on roofs of buildings and car parks. The project should be seen as part of a wider public realm enhancement and should integrate with the Olympic Public Art Programme.
116. Funding should be sought from regeneration partners such as the Millennium Trust, LDA, English Partnerships and Neighbourhood Renewal Fund to complement planning obligations and Section 106 contributions under the LDF.
30
The Olympic Boulevard – the Olympic and Paralympic Marathon Route
117. Whitechapel High Street through to Bow Road is one of the most important ‘streets’ in East London. London’s successful Bid for the Olympics and Paralympics in 2012 means that this route has assumed a new ‘Olympic’ significance as the most direct way to the Olympic Stadium and Olympic Park by road from the City of London. Since the first iteration of this strategy and since Tower Hamlets started lobbying for this concept, the ODA’s draft Transport Plan has adopted the entire route for the final stage of the Olympic and Paralympic Marathons. This is one of the most popular Games events worldwide and will be televised live to audiences around the world. The route will be lined with spectators witnessing the most significant endurance event of the Games.
118. The proposal in the strategy is to transform the route into an Olympic Boulevard and in so doing make this part of the Borough, in effect, an Olympic Site. It will be the route for the Torch Relay as well as part of the Olympic and Paralympic Marathons. It will be the stage for many cultural and artistic events before during and after the 2012 Games.
31
119. We will work with partners to improve the public space along the Olympic Boulevard, in particular to make it a more welcoming environment for pedestrians and cyclists, as we try to encourage people in the borough to adopt these modes of transport. But the Boulevard is not just a public realm initiative: it is a cultural project and economic regeneration project too. The Olympic Boulevard Project will evolve over time as the concept catches the imagination of the community, businesses, and all who want the London 2012 Games to leave a lasting positive legacy in East London.
120. The Boulevard project would incorporate existing projects under the Tower Hamlets Gateway Strategy, such as the Aldgate and Whitechapel Masterplans, but have as its aim the enhancement of the entire length of this major route through the Borough. This would also link with the Olympic Public Art Programme. This project would need to be a joint undertaking with adjoining boroughs and Transport for London. An initial meeting with TfL was positive and indeed all who engage with the concept recognise its attractions.
121. The Olympic Boulevard could provide an opportunity to consider an additional Area Action Framework focussed primarily on environmental improvement, to link the western and eastern parts of the Borough.
122. An intensive design workshop, called a charette, is being proposed for early 2007 to create innovative ideas. This will involve teams of architects and artists as well as members of the community. This event and further planning events will provide a number of opportunities to involve diverse groups in the design of the Boulevard and provide an additional means of promoting and enhancing community cohesion.
123. Currently, a Olympic Boulevard Prospectus is being prepared to promote the concept and to interest prospective partners and funding bodies. This has the potential to be Tower Hamlets’ big Games project – one that has the potential to galvanise the community and become an integral part of the delivery of the Games in East London.
32
Theme 3 – A Transformed Environment Programme
Linkages
Tower Hamlets Community Plan
The Transformed Environment Programme supports the following Tower Hamlets Community Plan themes:
A Better Place for Living Safely – reducing crime, making people feel safer and creating a more secure and cleaner environment.
A Better Place for Living Well – improving housing, health and social care and promoting healthy living.
A Better Place for Learning, Achievement and Leisure – raising educational aspirations, expectations and achievement, providing the widest range of arts and leisure opportunities for all and celebrating the rich cultural diversity of our communities.
Tower Hamlets Regeneration Strategy
The Transformed Environment Programme supports the following Tower Hamlets Regeneration Strategy priority:
Develop places which combine a healthy environment with enjoyable open spaces, a well-designed mix of homes and business premises, good-quality services and excellent public transport.
Olympic Board – Olympic & Paralympic Games Programme Objectives
The Transformed Environment Programme supports the following Olympic Board objectives:
2.6 Deliver agreed sustainable legacy plans for the Olympic Park and all venues.
3.2.3 Maximise cultural benefits to Londoners from hosting the Games and the Cultural Olympiad.
3.2.5 Ensure that the Games contribute to Sustainable Communities priorities, including the London Thames Gateway.
33
The Programme
Olympic Park Masterplan Legacy
42. Engage fully with the further development and implementation of the Lower Lea Valley Opportunity Area Planning Framework to ensure the ambitions of Tower Hamlets are fully realised in Leaside.
43. Ensure the quality delivery of planned new housing in Fish Island, Bromley-by-Bow,
and Poplar Riverside, including a significant provision of affordable housing units.
44. Maintain engagement with the Olympic Masterplan process and the Lower Lea Valley Opportunity Area Planning Framework process to reinforce the regeneration of Leaside and to avert any ‘red-lining’, whether physical or social.
45. Maintain ongoing engagement with the Olympic Park Legacy Group.
46. Respond to the revised Olympic Park and Legacy Planning Permissions (due
January 2007 and mid-2008 respectively), particularly in terms of planning obligations. Engage the community in developing a response.
Lower Lea Valley – Fish Island and Regeneration Bridges
47. Ensure access and pedestrian links – Bridges of Regeneration – are maintained in the planning for the Lower Lea Valley, particularly Fish Island.
48. Develop Leaside Art Bridges Project with Leaside Regeneration.
49. Build on the ODA’s commitment to a western pedestrian greenway access route into
Olympic Park for use during the Games and after, in partnership with the London Borough of Hackney.
50. Develop a joint master planning initiative with the London Borough of Hackney for
Hackney Wick / Fish Island, consistent with the LDF. Lower Lea Valley – The Water City
51. Develop a joint planning initiative with the London Borough of Newham to further develop the Water City concept.
Greening Tower Hamlets
52. Develop and implement a Greening Tower Hamlets 2012 Project, to include increased commitments and funding for open space improvements and a tree planning programme, Plant 2012 Trees.
53. Review the Tower Hamlets Planning Obligations Interim Planning Guidance to ensure
its policies are aligned with this policy objective. The programme should be linked with the Olympic Live Sites Project and the Olympic Public Art Programme.
54. Promote access to the River Thames and the River Lea through the Blue Ribbon
Network, linking with the Greening Tower Hamlets 2012 Project.
34
The Olympic Boulevard
55. Initiate the Olympic Boulevard in partnership with adjoining boroughs and Transport for London.
56. Prepare a Boulevard Prospectus to promote the project.
57. Launch the Boulevard project and engage the community in an architect and artist led
charette (intensive design workshop).
58. Investigate the potential for a Whitechapel Road-Mile End Road Area Action Plan.
59. Investigate the viability of a Community Development Trust for the long term management of the Boulevard.
35
5 Theme 4 – Experiencing the Games
Concept
124. Join in the experience of a lifetime!
125. One of the lasting legacies of the Games will be the memories people in Tower Hamlets have of the event itself. One challenge will be to enable everyone to fulfil their dreams of experiencing the event to the full – whether watching sporting events from within the new venues, attending a Live Site, participating in the cultural programme, following the Torch Relay, welcoming visitors, organising a street party, hosting a National Olympic Team, or volunteering. There are many ways to be involved. The London 2012 Olympic and Paralympic Games are much more than a TV spectacle.
126. The Closing Ceremony of the Beijing Olympic Games will mark the start of a four year Olympic and Paralympic cultural celebration in the UK, heralding the London 2012 Games. The Cultural Olympiad for the London 2012 Games will start with the handover segment in the Closing Ceremony of the Beijing Games and end with the Closing Ceremony for the London Games. Embracing all art forms across the UK, the programme for the Olympiad will have four main themes:
Connecting the world; Celebrating youth and diversity; Creating cultural and community legacy; and, Developing sustainable relationships between the arts, education and sport.
127. London has over 200 different ethnic communities who speak a total of 300
languages. This makes London the most culturally diverse city in the world. The Games are an opportunity to celebrate this diversity by developing new creative cultural collaborations and relationships that will last beyond the Games. A major part of the Games legacy will be this unforgettable memory of cultural exchange.
128. Bringing communities closer together. Fundamental to the Tower Hamlets vision for the 2012 Games is building a more socially cohesive community. More than any other aspect of the Olympic Programme and Legacy, this can be achieved through experiencing the event itself. Indeed, this bringing together of nations, communities and peoples is part of the foundation of the Olympic Movement and is expressed in the Olympic Charter and Mission.6
129. The opportunity to foster and build social cohesion and bring the diverse communities in the Borough together presents itself through volunteering, cultural activities, street parties, hosting a National Olympic Team, and almost every aspect of the Games experience. However, for this aspect of legacy to be achieved in full, a conscious effort needs to be made to celebrate the rich cultural diversity of local communities, to strengthening community networks and organisations, and enable the community to develop as a whole in all planned activities. It is especially important that the increased emphasis on security and terror risks surrounding the Games does not
6 International Olympic Committee 2004, The Olympic Charter, IOC, Lausanne, (www.olympic.org).
36
inadvertently raise challenges to community cohesion. This championing of community cohesion needs to be a key role for the 5 Host Borough organisation, with Tower Hamlets at the forefront.
Tower Hamlets as an Olympic and Paralympic Site
130. Initial London 2012 Games operational plans limited the direct impact of the event on Tower Hamlets – the only dedicated Olympic sporting venue in the Borough is the temporary Basketball Arena. Work by the Tower Hamlets Olympic Unit over the past few months has resulted in increasing recognition of Tower Hamlets as an Olympic and Paralympic site – both in terms of sport and cultural events.
131. Victoria Park was identified in the Bid as a ‘focal point for popular celebration of the Games’, along with Hyde Park in Central London. These venues will showcase London’s arts and culture. Events will include pop and classical music concerts, cinema, theatre and the presentation of medal winners. There should be no doubt as to whether the commitment to Victoria Park as a focal point will be honoured. This is an important element for the Games in East London and its retention needs to be strongly lobbied for. There have now been a series of commitments by Games organisers which recognised the important role of Victoria Park in the overall Games plans. David Higgins stated at the launch of the Bridging The Lea event at Three Mills in November that Victoria Park is the ‘natural place for cultural events in the lead-up and during the Games’.
132. The Transport Plan for the London 2012 Olympic and Paralympic Games released by the ODA in October 2006 shows a dedicated pedestrian entrance to the Olympic Park from the west via Victoria Park and the Greenway (Figure 7.1). It also shows the route of the Olympic Walk Race (7, 10 & 14 August 2012) taking place in Victoria Park with start and finish in the Olympic Stadium (Figure 8.4). In addition, the Transport Plan confirms the final stages of the Marathon traversing the entire length of the Olympic Boulevard – from Whitechapel High Street to Bow Church and from there finishing in the Stadium. The Marathon is three events – the Women’s Olympic Marathon (Sunday 9 August 2012), the Men’s Olympic Marathon (Sunday 16 August 2012), and the Paralympic Marathon (Saturday September 8 2012). The Men’s Olympic Marathon has historic ties with the Ancient Olympics and is the sporting event that closes the Olympics with the race finishing in the Stadium just before the start of the Closing Ceremony. (Extracts from the Transport Plan are attached).
133. Tower Hamlets role as a key Olympic and Paralympic site is being more and more understood and recognised. There are three key elements to the Tower Hamlets Olympic site concept. These are all interlinked, with each one building on and enhancing the others.
37
Figure 7.1
38
Figure 8.4
39
Figure 8.5
40
The Tower Hamlets Cultural Olympiad Programme
134. The Games cultural programme marks a unique opportunity for the entire London
Borough of Tower Hamlets to become an Olympic Site – for four years! As described under Theme 2, a four year cultural programme is being developed in Tower Hamlets. This will ensure the Borough becomes an Olympic site. The opportunities are legion – especially to enhance the Olympic Boulevard with a variety of arts programmes that will capture the imagination.
The Torch Relay and Marathon
135. The Torch Relay is a very significant element of the Olympic Games and connects
with the roots of the Ancient Olympics in Greece. The flame commences its journey in ancient Olympia, where the first Olympic Games were held in 776 BC, and proceeds on a long route around the world. The event is unique in heralding the Games and garnering enthusiasm throughout the world. This is one aspect of the Olympics that makes it a truly international event.
136. Consistent with the Tower Hamlets Olympic Boulevard concept, the final stages of the Torch Relay will pass through Tower Hamlets on its way to the Opening Ceremony at the Olympic Stadium. As mentioned above, this is a chance to enhance the route with both permanent and temporary public art that reflects the themes of youth and diversity that resonate so strongly with the Borough.
137. As has been described above, the route of the Marathon traverses the entire Olympic Boulevard. The sections prior to athletes entering the Stadium at the finish (the event starts on Tower Bridge) are a free event. There will be many spectators crowding the route along the Olympic Boulevard on the final day of the Olympic Games. This is the perfect link with a Closing Ceremony event and party in Victoria Park.
Live Sites
138. Live Sites are typically locations where people can congregate and imbibe the
Olympic atmosphere while watching the ceremonies or the day’s sporting events on big screens. They were very successfully used in the Sydney 2000 Olympics in six city locations – parks, squares and beside the Harbour. Tower Hamlets has a designated LOCOG Live Site in Victoria Park – an apt choice given the IOC’s internationalism and the park’s iconic significance as the place where Rock Against Racism was launched in the late 1970s. Given this is one of only two for London, the site is likely to attract people from far and wide across North and East London. This is a highly significant event for Tower Hamlets. The Borough should be involved in its organisation and promotion to the fullest extent possible.
139. There may be potential for the Borough to provide smaller scale neighbourhood Live Sites or community street parties. These could be located in local parks or leisure centres. This would be a real opportunity to get to know the neighbours and have a memorable time. It would revive the tradition of street parties in Tower Hamlets. This is a practical example of fostering lasting community bonds and building social cohesion.
41
Hosting the Bangladesh National Olympic Team
140. One of the messages that the London 2012 Bid Team in Singapore gave to the IOC was that everyone in the world who comes to the Olympics in London would find someone from home – someone who would speak their language and share their culture. One of the little publicised opportunities for towns and cities alike in the host country is to host a National Olympic Team.
141. The obvious choice for Tower Hamlets is the Bangladesh National Team. Sports played nationally in Bangladesh include: track and field, swimming, hockey, shooting, volleyball, and of course, cricket (not an Olympic sport). Bangladesh has participated in the 1984, 1988, 1992, 1996, 2000, and 2004 Olympic Games, but has yet to win any medals. For the Athens Olympic Games 2004, the Bangladesh National Olympic Committee sent a 14 member contingent, but it was beset by illness. Out of the four athletes attending, only three athletes competed – in shooting, track and field, and swimming.
142. Hosting the Bangladesh Olympic Team will present a strong demonstration effect. There will be opportunities to connect the local community with the community in Bangladesh. There will be a wealth of human interest stories and plenty of media opportunities. There will be opportunities for coaching and mentoring. There will be cross-over with the Tower Hamlets Olympic cultural programme during the four years preceding 2012.
143. Where other nationalities are strongly represented in Tower Hamlets, for example the Somali community, the Borough should consider hosting these teams too. This will need to be tempered by an understanding of those nations’ political contexts and Olympic history.
Experiencing the Paralympic Games
144. The aim of London 2012 is to deliver accessible and inclusive designs for all facilities, maximise media coverage and strengthen the Paralympic Movement. As with the Olympic Games, the Paralympic Games are the pinnacle of an athlete’s career. London 2012 has committed itself to strive to provide conditions that enable the athletes to compete in an environment of excellence, friendship and enjoyment.
145. The Paralympics is first and foremost an elite sporting event. Other elite sporting events, such as the Commonwealth Games, are now starting to integrate sports for people with a disability into their competition programmes. Many international marathon and long distance running events have been doing this for years. Having said this, all Paralympics promote visibility and awareness, whilst challenging stereotypes. They are a unique experience in themselves – and not to be missed.
146. The Paralympic Games provide the host city with an opportunity to reflect on how user-friendly they are to people with disabilities – and not just people who use wheelchairs. There are different needs for the visually and hearing impaired and those with learning difficulties. London 2012 is committed to the Olympic Village and all of the sports facilities being fully accessible both during and after Games. This commitment is in line with the Disability Discrimination Act 1995. All of the public transport facilities serving the Olympic Park will be accessible to wheelchair users. The entire Docklands Light Railway network and all of London's 21,000 licensed black cabs are already accessible to wheelchair users. Every London bus will be accessible by 2008.
42
147. London 2012 have stated that they will adopt a ‘creative approach to ticketing’ that will learn from the successful promotion of Paralympic events at the 2002 Commonwealth Games in Manchester. Generally, multi-venue day tickets are issued rather than the usual session based tickets. This allows spectators to spend a day seeing a wide variety of sports. Schools, in particular, can benefit from the easier access to tickets and large groups are generally encouraged. The Borough should be able to make provision for those with special educational needs and adults with independent living facilities to benefit from participation.
148. There is a Paralympic Marathon using the same course as the Olympic Marathon. There are additional opportunities to volunteer. For Tower Hamlets, the main opportunities are to ensure the Borough is fully accessible by 2012, promote a Paralympic Schools Programme, and encourage volunteering at the event. Local disability rights/actions groups will be consulted as to how they would best like to engage with the Paralympics and what special issues or opportunities they see.
149. In September 2006, the London Assembly published a report entitled London Olympic and Paralympic Games: A Sporting Legacy for People with Disabilities. This included a number of outline recommendations relating to encouraging boroughs to do more to assist people with disabilities to participate in sport, improving physical education for children with special needs, increased funding for sports clubs engaging in sports provision for people with disabilities, and a dedicated website for sportspeople with disabilities. Tower Hamlets will ensure that it makes the most of the opportunities for local people with disabilities that the Paralympics offers.
Volunteering
150. A chance to say: “I was in it”.
151. Volunteering at the Games is a very rewarding experience. It can enable community building and – in the jargon – the increase of social capital. Individuals can gain new skills and a renewed sense of confidence and pride. It is an opportunity not to be missed.
152. LOCOG estimates that around 70,000 volunteers will be required for the 2012 Olympics. Many of these will also assist at the Paralympics. At previous events, volunteers have been categorised into general volunteers and specialist volunteers, some necessitating technical qualifications. These groupings are:
General volunteers; Sports/field of play volunteers; Olympic Village volunteers; Transport volunteers; Medical/paramedical volunteers; Translator and interpreter volunteers.
153. The first two categories form the majority of the volunteering body – 70% to 80%. The
last three categories require specialist skills and will be screened for suitability and eligibility. For any volunteer programme to be successful, a full training programme in the nature of the event, organisational expectations, and the particular tasks to be carried out is essential. There are usually incentive or reward programmes organised by Olympic sponsors.
154. In Tower Hamlets, sports volunteering is less impressive than direct participation in
43
sports or physical activity. The Sport England Active People survey revealed that only 2.3% of adults (16+) in Tower Hamlets volunteer in sport and active recreation for at least one hour a week. This is the fifth lowest in London.
155. Volunteering represents a golden opportunity for Tower Hamlets residents, but particularly young people and older people, providing a unique bridge between these two groups. A volunteering skills programme has already been listed under the employment and prosperity programme, providing a unique chance for young people not in employment, education, or training to gain new skills in customer service or hospitality. A specific Senior Citizens’ Volunteering Programme will be developed to further the opportunities for older people to share their experiences and act as local champions for the Games. Tower Hamlets should promote awareness of the London 2012 volunteering programme through its own channels and ensure this information gets to hard-to-each groups and ethnic minority groups in the Borough.
156. The London 2012 publicity cannot be relied upon to trickle down to Borough residents. There are many avenues to promote volunteering, for instance through schools, leisure centres and gyms, and local sports clubs. The Borough will have its own requirements for volunteers for events being staged in Tower Hamlets. The Borough should consider establishing its own volunteering programme to ensure all those who wish to can participate in this way. A ‘civic pride’ volunteering programme could be established almost at once to give people additional opportunities to get involved. Participation in the civic pride programme should be considered by London 2012 as a positive criterion when selecting volunteers for the Games.
Ticketing
157. A chance to say: “I saw it”.
158. For many people, having the Olympics in your home town is all about having the chance to see an Olympic event at first hand – in the Olympic Stadium or poolside in the Aquatic Centre. A major concern for all residents in Tower Hamlets is access to attendance at the 2012 Olympics. Previous Olympics have demonstrated that attendance to events is limited by the availability and price of tickets, particularly for popular events. Access to attendance is particularly problematic for disadvantaged groups in the community. The issue of ‘all pain no gain’ is particularly pertinent to the issue of ticket availability.
159. The major factor influencing ticket availability at previous Olympics is not the proportion of tickets available locally but the total ticket pool. This has varied from barely 4 million tickets at Barcelona in 1992 to close to 10 million in Atlanta in 1996. The Sydney Olympics had about 8.5 million tickets available. Of these, around 7.4 million tickets were for sale with the balance of the ticket pool taken up by allocations to the Olympic Family, sponsors, media and National Olympic Committees.
160. Around 4.5 million tickets were available for sale to the Australian public. If Australian sponsors, stadium passes and the Olympic Club are factored in, the Australian ticket allocation was closer to 6 million, representing about 70% of the ticket pool. However, no recent Olympics have seen a sell-out of all tickets.7 Sydney 2000 developed an Olympic Opportunity Programme to more fairly distribute tickets to schools and
7 The Sydney Olympics ticketing procedures were highly controversial – so much so that the New South Wales Legislative Council, the Upper House in the NSW Parliament, established a Select Committee in October 1999 to review the ticketing process.
44
disadvantaged groups.
161. No official 2012 Ticketing Policy has been released to date. In a press statement in February 2005, London 2012 stated that there would be 8 million tickets available and that they expected to sell 6.5 million of them. Tickets prices would start at £15 with 1.5 million available at this price. The average ticket price would be £40. It has not been revealed how tickets will be distributed as the most popular sessions are always vastly over-subscribed. Sydney 2000 used a lottery or ballot system for selecting who to allocate tickets to. A particular issue is to avoid cascading ballot systems for over-subscribed events as these favour customers selecting higher priced seating.
162. There are two major issues with ticket allocation: (i) ensuring fair distribution amongst the general population, and (ii) ensuring disadvantaged groups have access to opportunities to see the Games. Options to increase general access in relation to ticket prices include varying price categories for popular events and operating a half-price ticket system for under-subscribed events, which could become available on the day of the event. Surprisingly, many allocated tickets are unused. This is particularly the case for sponsor allocations and those to National Olympic Committees. A well-organised return system could mean that these tickets could be reallocated and not wasted. Thorough auditing and monitoring systems need to be in place.
163. LOCOG should be encouraged by the 5 Boroughs to adopt an access and equity policy for ticketing as part of the overall commitment to an inclusive diverse Games. This should not be delayed. The primary reason for disadvantaged groups not attending Olympic Games is affordability, though there are issues for people with a disability or special needs. The main measures to increase access are:
Free events; A quota of concession tickets for all sessions; Targeted group discounts for nominated groups; Patron programmes.
164. Free sport events are generally those that are difficult to ticket. These are the
Triathlon, Walk Race (Victoria Park), the Marathon (final stage along the Olympic Boulevard), and the Cycling Road Race. This amounts to 8 events as women’s and men’s events are held at different times. The concession ticket system could potentially be funded through a levy on full priced tickets which could range from 50 pence on cheaper seats to £10 on more expensive seats. Targeted group discounts could be for groups such as school children, as with the Sydney Olympic Opportunity Programme. Group discounts could be limited to under-subscribed events. This option would maximise attendance and provide revenue for seats that would otherwise be unsold.
165. As has been mentioned, the Paralympics generally use a day pass system. Tickets are around the low end of the Olympic price range. This is an ideal opportunity for group discount schemes. Patron programmes are designed for hard-to-reach groups or those not able to access the Games by any other means. Patrons could be sought from individuals, clubs, sporting associations, community organisations, Games sponsors, or non-sponsor corporate bodies. Such a programme would need to be administered by LOCOG. Finally Olympic test events and rehearsals provide another way to promote access. For instance, all volunteers at the Sydney Olympics were invited to the full dress rehearsal of the Olympic Opening Ceremony which occurred a few days prior to the actual event.
45
Theme 4 – Experiencing the Games Programme
Linkages
Tower Hamlets Community Plan
The Experiencing the Games Programme supports the following Tower Hamlets Community Plan themes:
A Better Place for Living Safely – reducing crime, making people feel safer and creating a more secure and cleaner environment.
A Better Place for Living Well – improving housing, health and social care and promoting healthy living.
A Better Place for Learning, Achievement and Leisure – raising educational aspirations, expectations and achievement, providing the widest range of arts and leisure opportunities for all and celebrating the rich cultural diversity of our communities.
Tower Hamlets Regeneration Strategy
The Experiencing the Games Programme supports the following Tower Hamlets Regeneration Strategy priorities:
Develop people to help local residents find jobs and succeed in the knowledge-driven economy.
Develop marketing to promote the transformation of Tower Hamlets into a global city-district and attract ongoing public and private investment.
Olympic Board – Olympic & Paralympic Games Programme Objectives
The Experiencing the Games Programme supports the following Olympic Board objectives:
1.7 Communicate Olympic values across the world, particularly amongst young people.
1.8 Stage inspiring ceremonies and cultural events.
3.2.3 Maximise cultural benefits to Londoners from hosting the Games and the Cultural Olympiad.
3.2.7 Promote London’s image as a leading world city to an international audience.
3.2.8 Ensure London’s diverse communities are engaged with, and benefit from, the changes and opportunities arising from hosting the Games in London.
4.8 Work with those in other countries, particularly those in development, to promote sport excellence and participation.
46
The Programme
Tower Hamlets Olympic Site
60. Actively engage with LOCOG in the development of the Victoria Park Live Site in a way that maximises the opportunities for local residents, in partnership with the London Borough of Hackney.
61. Ensure both the Torch Relay and Marathon pass along the Olympic Boulevard.
62. Prepare a Live Sites / Community Street Party Programme.
Tower Hamlets Hosting the Bangladesh National Olympic Team
63. Make a formal bid to LOCOG to host an Olympic Training Camp. 64. Make a formal request to the National Olympic Committee of Bangladesh to host the
Bangladesh National Olympic Team for 2012. Tower Hamlets and the Paralympics
65. Consult with local disability rights/action groups regarding engagement with the Paralympics.
66. Review disability access in the Borough to ensure Tower Hamlets is fully accessible
by 2012.
67. Promote a Paralympic Schools Programme including attendance at the event itself. Volunteering at the London 2012 Olympic and Paralympic Games
68. Hold a Tower Hamlets Volunteering Open Day in 2007 and then annually. 69. Advocate a London 2012 Volunteering Policy in partnership with the 5 Boroughs.
70. Promote the London 2012 volunteering programme through a range of Borough
communication channels to ensure everyone in Tower Hamlets knows of this unique opportunity, especially hard-to-reach groups and ethnic minority groups in the Borough.
71. Promote the London 2012 volunteering programme through schools, leisure centres
and gyms, and local sports clubs.
72. Develop a Tower Hamlets 2012 Event Volunteering Programme for events in the Borough; a Civic Pride Volunteering Programme; and a Senior Citizens’ Volunteering Programme.
Access to London 2012 Olympic and Paralympic Games tickets
73. Advocate for a London 2012 Access and Equity Ticketing Policy in partnership with the 5 Boroughs.
74. Develop and promote the theme of an inclusive diverse Games in partnership with
the 5 Boroughs.
47
6 Delivering the Programme
Dimensions to Effective Delivery
166. A once-in-a-lifetime opportunity such as the Olympic and Paralympic Games requires a special response from Council. It is essential that the response addresses all the dimensions of the task – from high level political lobbying to external relations to programme delivery – and is the most effective and efficient use of resources. The key aspects of delivery are:
A key Olympic and Paralympic Games Champion for the Borough is required at a senior political level – in all the 5 Host Boroughs it will be the Leader or directly elected Mayor;
An LSP Olympic and Paralympic Games Champion; An Olympic and Paralympic Games Champion at officer level in each Directorate; A fit-for-purpose Olympic and Paralympic Games Unit; and The mainstreaming of the Tower Hamlets Olympic Strategy and Programme by
Directorates and the member organisations of the LSP. 167. A group of Olympic and Paralympic Games Champions in each Directorate of the
Council has been in established as of October 2006. The Tower Hamlets Olympic Champions Group met for the first time on 20 October 2006. The Olympic Champions Group will meet regularly to develop the legacy programme. There is a need for a similar approach in each theme partnership of the LSP. The introduction of these champions will reflect the Borough wide priority being given to this programme and embed the Games legacy programme within the Borough.
Olympic and Paralympic Games Legacy Delivery Unit – TH2012
168. De facto, the Borough has begun to create a delivery unit. It currently has an Interim Head of Service and a PA, with other support coming from consultants and temporary officers. The proposal is to formalise the unit as TH2012 by the beginning of 2007/08 with the appointment of full-time permanent staff (backed up with consultancy contracts).
169. The current agreed budget of the unit is some £400,000 per annum, of which £100,000 goes to support the 5 Host Borough structure. That scale of funding allows for a small highly skilled team whose main functions are advocacy, lobbying, strategic development and coordination, with, however, a significant role being played by Directorates. The unit will also liaise with the LSP in shaping and delivering appropriate Olympic and Paralympic programmes. Other boroughs with more direct physical presence of the Games have bigger units in mind and some are using NRF funding for this purpose. The proposal here is to develop the smaller unit backed up by significant contributions from the corporate core, the Directorates and the LSP. The key principle is that existing programmes be bent to enhance the ‘Games effect’ with additional resources being identified over time as our understanding of what is required further develops. The ancillary proposal is to review the effectiveness of this by the summer of 2007.
48
170. It is proposed that under the current budgetary commitment of Council that the following positions be advertised on a permanent basis in January 2007:
A Head of Service for the Olympic and Paralympic Games with primary responsibility for influencing, lobbying, community engagement, advocacy and the further creative development of the legacy programmes;
A Programme Manager with primary responsibility for co-ordinating the delivery of the legacy programme within the Borough and liaising with the Local Strategic Partnership;
A Project Development Officer to assist innovating the legacy programme. An Administrative Support Officer.
In this model, communications and community consultation services will be provided to the unit by the corporate core, supplemented where required by external communications and public affairs consultants from the unit’s own budget. We will now work with Human Resources to progress job descriptions and advertisements for these posts in readiness for the end of the year.
171. Given the current changing nature of the legacy task, the review needs to bear in mind that the unit must be fit-for-purpose and staffed accordingly. The unit needs sufficient capacity both to lead on the local programmes and engage effectively externally with the Mayoral-GLA Olympic and Paralympic Games Programme Objectives, the ODA, LOCOG, the 5 Host Borough organisation, and Government more widely. There will be a growing necessity to engage with the private sector to fulfil the range of expectations contained in this strategy. Whether or not the review by the summer of 2007 leads to a request for increased funding, the unit should seek various forms of Challenge Funding to support its core activities.
Next Steps and Lobbying Strategy
172. Much was learnt by the Borough from the recent high level delegation to Beijing to see at first hand the preparations by Beijing 2008 for the next Olympic and Paralympic Games – particularly in the areas of volunteering and regeneration legacy. These links will be maintained and further developed so we learn as much as possible from the experiences of the current Host City.
173. Tower Hamlets Community Plan. There is a growing consensus within the Tower Hamlets Partnership that the Olympic and Paralympic Games are a good reason to initiate a full review of the Community Plan. This could take the Community Plan to 2020 and include the Games legacy. In particular, the renewed focus on community cohesion would be valuable to incorporate into the Community Plan. This would necessitate a major consultation exercise similar in scope to the one conducted at the start of the Community Plan process in 2000-2001. A separate strategy and work programme needs to be developed for this in conjunction with the Partnership Management Group. It is likely that this process would take until July 2007 to be completed.
174. Olympic and Paralympic Lobbying Strategy. It has been evident over the past 6 months that a more proactive and necessarily political approach needs to be taken to legacy. The pressures of cost, constructing necessary infrastructure, and staging the Games themselves mean that legacy benefits will be squeezed. A comprehensive lobbying strategy needs to be devised to address these concerns. Some particular pressing issues are:
49
Above all, that the importance of the Borough and boroughs in delivering the objectives of the Games and benefits for local people be fully recognised;
The London 2012 commitment to the use of Victoria Park as a Live Site; The Olympic Masterplan and the ODA planning applications; The need for all Olympic agencies to prioritise the regeneration pledges contained
in Bid; The early need for LOCOG to present for consultation amongst the 5 Boroughs its
volunteering policy and master volunteering schedule; The need for LOCOG to develop an access and equity policy for Olympic and
Paralympic tickets; The impact of increased security measures on the nature of the event itself and
the cost of delivery; External funding sources – public sector, foundation/charitable, private sector; Promoting the importance of Corporate Social Responsibility and the opportunity
the Games provides to further this; The importance of delivering a Games that enhances community cohesion and
promotes diversity. 175. Games Communications Strategy and Protocol. There is a need to disseminate the
Olympic and Paralympic Games Strategy and Programme as widely as possible. A communications strategy and protocol should be developed in order to conduct this in the most effective manner possible.
50
Strategic Actions to Delivery the Programme
Strategic Actions Securing strategic linkages
75. Maintain a well resourced TH2012 Unit with both a clear strategic remit and a
business plan. 76. Review the operations and resourcing of the TH2012 Unit by 30 June 2007. 77. Consider the issue of external grant funding in relation to the TH2012 Unit.
78. Prepare a Games Communications Strategy and Protocol within Council.
79. Prepare an external lobbying strategy. 80. Map out potential areas/programmes for long term development to provide focus for
action at strategic level. 81. Harness the economic power of leading sectors in Tower Hamlets by bringing
together global finance and local businesses. 82. Galvanise the private sector, directorates and local agencies and to ramp up their
commitment to the Olympic and Paralympic Legacy Programme. Ensuring added value
83. Facilitate the introduction of Games added value programmes to Directorates and develop service level agreements to incorporate the Games Legacy Programmes.
84. Maintain a cross-Directorate Games Champions Group.
85. Adopt the Games Champion model in the LSP. 86. Facilitate parallel planning within the Unit at community, programme and strategic
levels.
51
Annex A – Olympic and Paralympic Legacy Strategy Action Priorities 2007 Onwards
52
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Act
ion
Prio
ritie
s 20
07 O
nwar
ds
St
rate
gy th
emes
and
K
ey a
ctiv
ities
Pr
ogre
ss m
ilest
ones
Su
cces
s C
riter
ia/
Cos
t Im
plic
atio
ns
prog
ram
mes
In
dica
tors
Them
e 1
– C
reat
ing
and
Shar
ing
Pros
perit
y Pr
ogra
mm
e
Loca
l Em
ploy
men
t and
Tr
aini
ng F
ram
ewor
k
1.
Eng
age
with
the
Lond
on
Dev
elop
men
t Age
ncy
and
the
5 B
orou
ghs
to e
nsur
e th
at th
e fu
ll po
tent
ial o
f the
Loc
al
Em
ploy
men
t Tra
inin
g Fr
amew
ork
is re
alis
ed.
Ens
ure
thro
ugh
liais
on
with
le
ad
boro
ugh
and
LDA
th
at
LETF
sc
hem
e
brok
erag
e el
emen
ts
mee
t the
nee
ds o
f TH
re
side
nts.
Cre
ate
besp
oke
prog
ram
me
with
TH
E
mpl
oym
ent
Con
sorti
um
Ens
ure
that
th
e en
terp
rise
com
pone
nt
of
the
LETF
is m
ade
know
n to
loca
l firm
s.
Firs
t Boa
rd m
eetin
g A
ugus
t 200
6
Initi
al a
gree
men
t si
gned
by
Dec
200
6
Ope
ratin
g pr
otoc
ol
crea
ted
by J
an 2
007
Sub
pro
ject
in
Em
ploy
men
t C
onso
rtium
set
up
by
May
200
7
40 a
pplic
ants
on
regi
ster
by
Jun
200
7
15 re
gist
rant
s in
to w
ork
expe
rienc
e or
trai
ning
pl
acem
ents
by
Aug
200
7
20 fi
rms
on T
HE
C r
egis
ter
of s
uppl
iers
by
Nov
200
7
Fund
ing
requ
ired
but
poss
ibly
ava
ilabl
e fro
m
third
par
ties.
53
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
2.
Mon
itor e
mpl
oym
ent,
train
ing,
an
d pr
ocur
emen
t out
com
es in
co
njun
ctio
n w
ith th
e 5
Bor
ough
s.
Faci
litat
e de
sign
and
in
trodu
ctio
n of
m
onito
ring
arra
ngem
ents
and
ag
ree
repo
rting
pe
riods
.
Mon
itorin
g te
mpl
ates
an
d go
od p
ract
ice
guid
es c
ircul
ated
by
Apr
200
7 M
onito
ring
guid
ance
ci
rcul
ated
by
Jun
2007
Mon
itorin
g sy
stem
fully
op
erat
iona
l by
Jly
2007
N
o fu
ndin
g re
quire
d or
ex
istin
g fu
ndin
g ad
equa
te.
3.
Eng
age
with
trai
ning
pr
ogra
mm
es fo
r vol
unte
erin
g pr
ogra
mm
es (c
usto
mer
se
rvic
e, h
ospi
talit
y) a
nd
ensu
re N
EE
T re
side
nts
bene
fit.
Dra
w u
p fra
mew
ork
agre
emen
ts o
n vo
lunt
eerin
g w
ith
prov
ider
s an
d ke
y in
term
edia
ries
with
sp
ecia
l ref
eren
ce to
N
EE
Ts.
Set
up
proj
ect w
ith
Ski
llsm
atch
Initi
al d
raft
by M
ay
2007
.
Initi
al c
onta
cts
by J
un
2007
Inte
rmed
iarie
s (in
c S
kills
mat
ch) w
orks
hop
Aug
200
7
Pro
vide
rs c
onfe
renc
e by
Oct
200
7
Fram
ewor
k si
gned
Dec
20
07
25 N
EE
T re
side
nts
in
train
ing
for v
olun
teer
ing
prog
ram
mes
by
July
200
8
3 se
para
te
com
mun
icat
ions
on
the
volu
ntee
ring
prog
ram
me
issu
ed b
y D
ec 2
007
Fund
ing
requ
ired
but
poss
ibly
ava
ilabl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
54
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
City
Str
ateg
y fo
r Eas
t Lon
don
4.
Impl
emen
t the
City
Stra
tegy
fo
r Eas
t Lon
don.
Ass
ess
curr
ent g
aps
and
scop
e fo
r new
lo
cal a
ctio
n
Dev
elop
Oly
mpi
c re
late
d p
rosp
ectu
s fo
r City
Stra
tegy
with
P
artn
ers
App
oint
new
del
iver
y ag
ency
if n
eces
sary
Ass
essm
ent c
ompl
ete
by A
pr 2
007
( If S
kills
mat
ch n
ot
avai
labl
e) c
omm
ence
pr
ocur
emen
t of d
eliv
ery
agen
cy b
y M
ay 2
007
Agr
ee p
roto
cols
with
D
WP
/JC
P b
y Jl
y 20
07
Agr
ee O
lym
pics
pr
otoc
ol w
ith T
H
Em
ploy
men
t C
onso
rtium
by
Sep
20
07
Del
iver
y ag
ency
op
erat
iona
l by
Aug
200
7
50 o
n re
gist
er b
y D
ec 2
007
(add
ition
al to
LP
SA
)
30 p
lace
men
ts b
y Fe
b 20
08 (a
dditi
onal
to L
PS
A)
N
o fu
ndin
g re
quire
d or
ex
istin
g fu
ndin
g ad
equa
te.
Loca
l Ent
erpr
ise
Gro
wth
In
itiat
ive
5.
Lobb
y fo
r the
Loc
al E
nter
pris
e G
row
th In
itiat
ive
fund
ing
with
th
e 5
Bor
ough
s.
Lobb
ying
act
ivity
on
goin
g.
Key
resp
onde
nts
appr
oach
ed.
Not
ice
of p
ositi
ve re
spon
se
by m
id-N
ovem
ber 2
006
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
55
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
The
Glo
bal C
ity C
halle
nge
6.
Est
ablis
h th
e G
loba
l City
C
halle
nge
Oly
mpi
c O
ppor
tuni
ty Y
oung
Peo
ple’
s S
chol
arsh
ip a
nd M
ento
ring
Pro
gram
me
and
esta
blis
h an
nual
sch
olar
ship
and
m
ento
ring
targ
ets
in th
e re
leva
nt d
isci
plin
es. L
ink
with
th
e B
ig L
otte
ry fu
nded
pr
ogra
mm
es o
f Eas
t Lon
don
Bus
ines
s A
llian
ce /C
anar
y W
harf
Gro
up.
Set
ou
t te
rms
of
refe
renc
e of
G
loba
l C
ity C
halle
nge;
Set
ou
t fu
ndin
g ar
chite
ctur
e;
and
links
with
BLF
Men
torin
g pr
otoc
ol l
aid
out b
y Fe
brua
ry 2
009
Net
wor
k w
ith
busi
ness
th
roug
h E
LBN
A
and
TH
Bus
ines
s Fo
rum
Est
ablis
h sh
adow
bo
ard
with
LO
CO
G
Pro
ject
tea
m i
n pl
ace
by J
un 2
008
ToR
circ
ulat
ed to
ELB
A
and
THB
F by
Sep
200
8
Pro
ject
lau
nch
by A
pril
20
09
Pro
ject
st
aff
recr
uitm
ent s
tarts
M
ay
2009
Bur
sary
est
ablis
hed
by
Oct
ober
200
9
12 m
ento
rs re
crui
ted
by N
ov
2009
15 m
ente
es re
crui
ted
by J
an
2010
5 bu
rsar
y ca
ndid
ates
pre
pare
d by
Oct
201
0
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
56
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
7.
Pro
mot
e th
e Lo
ndon
201
2 O
lym
pic
and
Par
alym
pic
Gam
es a
s a
vehi
cle
for t
he
Tow
er H
amle
ts’ c
orpo
rate
se
ctor
to fu
lfil i
ts C
orpo
rate
S
ocia
l Res
pons
ibilit
y ob
ject
ives
.
Est
ablis
h lo
cal
amba
ssad
oria
l tea
m
with
LO
CO
G
Pre
pare
pro
spec
tus
for c
ircul
atio
n to
se
lect
ed fi
rms
in
corp
orat
e se
ctor
Laun
ch in
itiat
ive
Pre
para
tory
cas
e pa
per
draf
ted
by J
un 2
008
Initi
al c
onta
cts
with
LO
CO
G a
nd k
now
n co
rpor
ate
sect
or b
y A
ug 2
008
Net
wor
king
com
plet
ed
by N
ov 2
008
Initi
ativ
e la
unch
ed b
y Ja
n 20
09
3 am
bass
ador
ial m
eetin
gs b
y Ju
ly 2
009
1 C
SR
invi
tatio
n to
cor
pora
te
sect
or b
y Ja
nuar
y 20
09
2 pr
ojec
t ini
tiativ
es in
soc
ial
prog
ram
me
area
s by
Oct
ober
20
09
Fu
ndin
g re
quire
d bu
t pos
sibl
y av
aila
ble
from
th
ird p
artie
s.
Empl
oyin
g Pe
ople
With
D
isab
ilitie
s
8.
Dev
elop
a p
rogr
amm
e th
at
capi
talis
es o
n th
e P
aral
ympi
c G
ames
to e
ncou
rage
bu
sine
sses
to e
mpl
oy
sign
ifica
ntly
mor
e pe
ople
with
di
sabi
litie
s.
Est
ablis
h co
ntac
ts
with
em
ploy
ers
Liai
se w
ith
Dis
able
men
t A
dvis
ory
serv
ice
Agr
ee p
roto
col a
nd
prog
ram
me
roll
out
Form
al c
onta
ct w
ith
Can
ary
Wha
rf em
ploy
ers
by J
un 2
008
Em
ploy
men
t C
onso
rtium
eng
aged
by
Sep
200
8
DA
S e
ngag
ed b
y D
ec
2008
Pro
toco
l and
pr
ogra
mm
e de
sign
si
gned
by
Apr
200
9
15 e
mpl
oyer
s si
gn u
p to
pro
toco
l in
per
iod
Apr
200
9-M
ar 2
011
N
o fu
ndin
g re
quire
d or
ex
istin
g fu
ndin
g ad
equa
te.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
57
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Sout
h A
sian
Bus
ines
s D
evel
opm
ent a
nd M
arke
ting
the
Mar
kets
9.
Dev
elop
a c
omm
unity
and
bu
sine
ss e
ngag
emen
t st
rate
gy fo
r the
Sou
th A
sian
co
mm
unity
. In
itial
ena
blin
g ac
tivity
with
BL4
L
Stra
tegy
de
velo
pmen
t
Out
reac
h ac
tivity
Par
tner
ship
es
tabl
ishm
ent
App
oint
pro
ject
offi
cer
by J
ly 2
007
Sig
n of
f ini
tial s
trate
gy
by O
ct 2
007
Com
men
ce o
utre
ach
wor
k by
Dec
200
7
Est
ablis
h pr
ojec
t boa
rd
by M
ar 2
008
Pro
gram
me
com
men
ces
Oct
ober
20
08
Pro
ject
offi
cer a
ppoi
nted
Rep
rese
ntat
ive
boar
d in
pla
ce
by A
ugus
t 200
8
Two
proj
ects
in p
lace
with
in n
ine
m
onth
s of
com
men
cem
ent o
f pr
ojec
t boa
rd
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
10. P
rovi
de d
irect
bus
ines
s ad
vice
and
sup
port
to
Whi
tech
apel
bus
ines
ses
to
max
imis
e O
lym
pic
oppo
rtuni
ties.
A
ppoi
nt B
SO
with
ag
reed
JD
Est
ablis
h lo
cal
stee
ring
grou
p
Rec
ruitm
ent o
f BS
O
star
ts in
Sep
tem
ber
2007
Loca
l ste
erin
g gr
oup
in
plac
e by
Oct
ober
200
7
Acc
epta
ble
ToR
for s
teer
ing
grou
p
100
busi
ness
es c
onta
cted
in fi
rst
year
20 p
rovi
ded
with
det
aile
d bu
sine
ss a
dvic
e
Add
ition
al £
200K
of L
BTH
co
ntra
cts
secu
red
by lo
cal
busi
ness
es in
200
8/9
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
58
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
11. A
ppoi
nt a
Tow
n C
entre
Pla
ce
Man
ager
for
Spi
talfi
elds
/Ban
glat
own.
A
gree
rem
it an
d JD
Mar
ket a
sses
smen
t of
top
rank
ing
TCM
s
Adv
ertis
e an
d re
crui
t m
anag
er
Join
AC
TM b
y M
arch
20
08
Bes
t pra
ctic
e id
eas
from
TC
M b
y M
ay 2
008
Rem
it an
d JD
in p
lace
by
Jun
e 20
08
Rec
ruitm
ent
com
men
ces
Aug
ust
2008
App
oint
men
t by
Dec
20
08
Goo
d qu
ality
long
list
of
appl
ican
ts
Suc
cess
ful c
andi
date
sec
ured
bo
nus
in Y
ear 1
New
fund
ing
requ
ired.
12. E
stab
lish
a m
arke
ting
and
busi
ness
dev
elop
men
t st
rate
gy fo
r Tow
er H
amle
ts
stre
et m
arke
ts, p
artic
ular
ly
thos
e ar
ound
Spi
talfi
elds
, B
rick
Lane
, and
Whi
tech
apel
.
Est
ablis
h so
und
brie
f fo
r stra
tegy
and
en
sure
loca
l buy
-in.
Und
erta
ke
com
preh
ensi
ve
stra
tegy
pla
nnin
g w
hich
is b
espo
ke to
lo
cal m
arke
ts
Stro
ng lo
cal
gove
rnan
ce
arra
ngem
ents
in p
lace
by
Jul
y 20
07
Dra
w u
p be
spok
e de
velo
pmen
t brie
f by
Sep
t 200
7
Eng
age
mar
kets
bu
sine
ss p
lann
er b
y N
ov 2
007
Eng
age
nich
e m
aste
rpla
nner
s by
Jan
20
08
Stra
tegi
c pl
anni
ng
star
ts o
n Fe
b 20
08
Thre
e lo
cal
liais
on g
roup
m
eetin
gs b
y D
ecem
ber 2
007
Stra
tegi
c pl
an b
y M
ay 2
008
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
59
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
MIC
E In
dust
ry
13. E
stab
lish
a To
wer
Ham
lets
M
ICE
Tas
k Fo
rce
with
Vis
it Lo
ndon
, the
Can
ary
Wha
rf G
roup
and
Eas
t Lon
don
Bus
ines
s A
llian
ce.
Mob
ilise
key
con
tact
s es
p w
ith L
OC
OG
Agr
ee T
erm
s of
R
efer
ence
Laun
ch M
ICE
Tas
k Fo
rce
Sco
ping
sta
tem
ent i
n pl
ace
by M
ar 2
007
Key
con
tact
s m
obili
sed
by A
pr 2
007
ToR
agr
eed
May
200
7
Laun
ch s
ite a
gree
d by
Ju
ly 2
007
Laun
ch b
y O
ctob
er
2007
Task
For
ce s
ecur
es 2
maj
or
even
ts b
y Ja
nuar
y 20
08
TF g
ener
ates
MIC
E b
espo
ke
mem
bers
hip
of 3
0 fir
ms
by J
une
2008
150
out o
f tot
al 1
400
empl
oym
ent o
ppor
tuni
ties
secu
red
thro
ugh
Task
forc
e in
20
07/8
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
14. C
ondu
ct a
feas
ibili
ty s
tudy
in
to th
e S
outh
Asi
an B
usin
ess
Exp
o pr
opos
al, i
n co
njun
ctio
n w
ith th
e 5
Bor
ough
s an
d E
ast
Lond
on B
usin
ess
Alli
ance
.
Agr
ee s
cope
of s
tudy
See
k m
atch
fund
ing
Pro
cure
stu
dy
Rev
iew
oth
er E
xpo
proj
ects
with
LO
CO
G
by J
uly
2007
ToR
of s
tudy
in p
lace
by
Sep
t 200
7
Pro
cure
men
t co
mm
ence
s D
ec 2
007
Feas
ibili
ty s
tudy
co
mpl
eted
Apr
il 20
08
Con
clus
ions
of s
tudy
acc
epte
d by
ELB
A
New
fund
ing
requ
ired.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
60
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
15. R
evie
w th
e E
ast L
ondo
n To
uris
m S
trate
gy a
nd A
ctio
n P
lan
for a
lignm
ent w
ith
Oly
mpi
c op
portu
nitie
s.
Rev
iew
stra
tegy
&
actio
n pl
an w
ith
stak
ehol
ders
Iden
tify
key
Oly
mpi
c op
portu
nitie
s
Car
ry o
ut a
lignm
ent
proc
ess
to id
entif
y ne
w o
ppor
tuni
ties
Set
up
stak
ehol
ders
lia
ison
gro
up w
ith
LOC
OG
by
Mar
ch
2007
Oly
mpi
c op
portu
nitie
s pa
per p
rodu
ced
by
Oct
ober
200
7
Exi
stin
g ac
tivity
/ O
lym
pics
alig
nmen
t ex
erci
se c
omm
ence
s N
ovem
ber 2
007
5 ne
w to
uris
m o
ppor
tuni
ties
iden
tifie
d by
Feb
ruar
y 20
08
30 n
ew to
uris
m re
late
d jo
bs
asso
ciat
ed w
ith th
is p
roje
ct
gain
ed b
y lo
cal p
eopl
e by
Jul
y 20
09
500
busi
ness
tour
ism
enq
uirie
s by
Sep
200
8
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
61
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Them
e 2
– A
Soc
ially
C
ohes
ive
Com
mun
ity
Prog
ram
me
Lead
Rol
e
16. B
ecom
e th
e C
omm
unity
C
ohes
ion
Lead
Bor
ough
for
the
5 H
ost B
orou
gh
orga
nisa
tion
and
deve
lop
a lo
bbyi
ng s
trate
gy a
roun
d th
is
them
e.
Est
ablis
h st
rate
gic
busi
ness
cas
e
Eng
age
in
amba
ssad
oria
l wor
k w
ith o
ther
Bor
ough
s
Fina
lise
TH te
rms
of
refe
renc
e
Com
men
ce s
trate
gic
busi
ness
cas
e dr
aftin
g by
Apr
200
7
Par
tner
ship
liai
son
with
LO
CO
G a
nd 5
B
orou
ghs
star
ts J
un
2007
Fina
l ter
ms
and
agre
emen
t sec
ured
by
Oct
200
7
Agr
eem
ent o
n TH
sta
tus
as
com
mun
ity c
ohes
ion
lead
by
Oct
20
07
75%
resi
dent
s be
lieve
peo
ple
get o
n w
ell t
oget
her b
y A
pril
2008
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
62
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Hea
lth
17. D
evel
op a
com
preh
ensi
ve
Oly
mpi
cs H
ealth
and
Phy
sica
l A
ctiv
ity L
egac
y P
rogr
amm
e jo
intly
with
Tow
er H
amle
ts
Prim
ary
Car
e Tr
ust.
Agr
ee k
ey o
bjec
tives
of
the
prog
ram
me
Agr
ee m
anag
emen
t an
d ov
ersi
ght
arra
ngem
ents
Set
up
prog
ram
me
elem
ents
Agr
ee s
cope
of h
ealth
pr
ogra
mm
e w
ith L
SP
, P
CTT
and
LA
Ps
by
Mar
200
7
Cla
rify
NR
F pr
ogra
mm
e lin
kage
s by
A
pril
2007
Cla
rify
LSP
int
erna
l re
porti
ng a
nd
wor
kstre
am li
nkag
es b
y M
ay 2
007
Set
up
prog
ram
me
area
s fo
r chi
ldre
n,
youn
g pe
ople
, adu
lts
and
fam
ilies
by
July
20
07
Pro
gram
me
in p
lace
by
July
20
07
3 m
ost d
isad
vant
aged
LA
Ps
are
prio
ritis
ed u
nder
the
prog
ram
me
Hea
lth im
prov
emen
t acc
eler
ated
- a
dditi
onal
6 li
ves
save
d in
CV
D
dise
ases
com
pare
d to
bas
elin
e.
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
18. S
uppo
rt To
wer
Ham
lets
PC
T w
ith th
e de
velo
pmen
t of t
he
Cen
tre fo
r Spo
rts M
edic
ine
at
Que
en M
ary
Col
lege
and
B
arts
and
the
Lond
on
Hos
pita
l.
Faci
litat
e bu
sine
ss
case
mak
ing
Und
erta
ke lo
bbyi
ng
for l
ocal
inst
itutio
ns
Pro
vide
inpu
t to
case
m
akin
g by
Jun
200
7
Eng
age
with
oth
er
Bor
ough
s an
d LO
CO
G
on s
port
scie
nce
sect
or
QM
C s
hortl
iste
d
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
63
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Educ
atio
n
19. D
evel
op a
Bor
ough
Oly
mpi
c E
duca
tion
Pro
gram
me
for
2007
-201
2, in
con
junc
tion
with
ear
ly y
ears
, prim
ary
and
seco
ndar
y sc
hool
s an
d al
so
the
furth
er a
nd h
ighe
r ed
ucat
ion
sect
ors.
Ens
ure
that
pr
ogra
mm
e ad
ds
valu
e lo
cally
Des
ign
four
el
emen
ts- (
scho
ol;
exte
nded
sch
ool;
educ
atio
n/em
ploy
me
nt a
nd p
ost s
choo
l) pr
ogra
mm
e
Faci
litat
e dr
awin
g up
of
stra
tegy
Est
ablis
h te
am le
d by
E
duca
tion/
Chi
ldre
n’s
serv
ices
by
Mar
200
7
Iden
tify
linka
ges
with
5
Bor
ough
spo
rts p
lan
Rev
iew
PE
SS
CL
stra
tegy
and
May
or’s
ed
ucat
ion
deliv
ery
plan
by
Apr
200
7
Wor
ksho
p to
agr
ee
core
targ
ets
with
E
duca
tion
by J
un 2
007
Stra
tegy
laun
ched
by
Jly
2007
Par
ticip
atio
n ra
te o
f prim
ary
age
child
ren
with
2 h
rs P
E im
prov
ed
by 5
% to
90%
by
Jun
2008
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
64
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
20. D
evel
op b
road
pro
gram
mes
th
at c
apita
lise
on th
e m
omen
tum
of O
lym
pic
and
Par
alym
pic
Gam
es.
Enc
oura
ge
popu
latio
n w
ide
parti
cipa
tion
in
spor
ts/ h
ealth
y liv
ing
and
in th
e O
lym
pics
pr
ogra
mm
e
Eng
age
with
par
tner
s to
sup
port
Bor
ough
w
ide
prog
ram
me
Iden
tify
core
are
as fo
r w
ider
spo
rts
parti
cipa
tion
by J
un
2007
Set
out
key
mes
sage
s
to w
ider
pop
ulat
ion
by
Oct
200
7
Firs
t pro
gram
me
laun
ched
Dec
200
7
Sec
ond
prog
ram
me
laun
ched
Mar
200
8
Firs
t par
tner
agr
eem
ent
in p
lace
by
Jun
2008
Wid
er p
opul
atio
n pa
rtici
patio
n in
P
rogr
amm
e 1
impr
oves
by
300
to 4
200
in fi
rst 2
4 m
onth
s.
Par
tner
agr
eem
ent r
enew
ed
afte
r 12
mon
ths.
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties
/ new
fu
ndin
g re
quire
d.
21. W
ork
with
the
priv
ate
sect
or
and
Eas
t Lon
don
Bus
ines
s A
llian
ce o
n de
velo
ping
the
Glo
bal C
ity C
halle
nge.
Agr
ee a
mbi
tious
pr
ogra
mm
e fo
r GC
C
Agr
ee s
cope
and
pr
ivat
e se
ctor
reac
h of
the
prog
ram
me
Sec
ure
long
term
ag
reem
ent o
n pa
rtner
ship
thro
ugh
ELB
A
Sco
ping
and
stra
tegy
pa
per t
o E
LBA
by
Jun
2008
Dra
ft m
ento
ring
pape
r pr
oduc
ed b
y S
ep 2
008
Firs
t bur
sary
sec
ured
by
Jan
200
9
Thre
e m
ento
rs th
roug
h E
LBA
in
plac
e by
Jun
e 20
08
One
bur
sary
thro
ugh
ELB
A In
pl
ace
by D
ecem
ber 2
009
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
65
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
22. I
mpl
emen
t the
DfE
S L
ondo
n 20
12 O
lym
pic
and
Par
alym
pic
Gam
es c
urric
ulum
pr
ogra
mm
es.
Pro
mul
gate
nat
iona
l pr
ogra
mm
es
Agr
ee lo
cal
arra
ngem
ents
Rol
l out
pro
gram
me
Firs
t pro
mot
ion
of
natio
nal p
rogr
amm
e by
A
pr 2
007
Loca
l pro
toco
l mee
ting
with
LA
dep
artm
ents
an
d D
fES
by
Jun
2007
Loca
l pro
gram
me
conf
irmed
Sep
200
7
Pro
gram
me
com
men
ces
Dec
200
7
150
prim
ary
scho
ol c
hild
ren
parti
cipa
ting
by A
ug 2
008
100
seco
ndar
y ch
ildre
n pa
rtici
patin
g by
Aug
200
8
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
23. E
ncou
rage
incr
ease
d pa
rtici
patio
n by
chi
ldre
n an
d yo
ung
peop
le in
the
Bor
ough
in
the
UK
Sch
ool G
ames
and
th
e Lo
ndon
You
th G
ames
, as
wel
l as
the
Ann
ual S
choo
l O
lym
piad
pro
pose
d un
der t
he
spor
ts le
gacy
pro
gram
me.
Pro
mul
gate
UK
S
choo
l Gam
es a
nd
Lond
on Y
outh
G
ames
and
AS
O.
Agr
ee lo
cal
agre
emen
ts
Rol
l out
pro
gram
me
Firs
t pro
mot
ion
of
natio
nal p
rogr
amm
e by
M
ay 2
007
Loca
l pro
toco
l mee
ting
with
LA
dep
artm
ents
by
Jun
e 20
07
Loca
l pro
gram
me
conf
irmed
Sep
200
7
Pro
gram
me
com
men
ces
Jan
2008
150
prim
ary
scho
ol c
hild
ren
parti
cipa
ting
by M
arch
200
8
100
seco
ndar
y ch
ildre
n pa
rtici
patin
g by
Mar
ch 2
008
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
66
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
24. I
mpl
emen
t a S
port
for A
ll pr
ogra
mm
e fro
m 2
007
onw
ards
in p
artn
ersh
ip w
ith
the
5 B
orou
ghs.
Pro
mul
gate
pr
ogra
mm
e w
ith
LOC
OG
Agr
ee c
ross
Bor
ough
ag
reem
ents
Rol
l out
pro
gram
me
Firs
t pro
mot
ion
of
prog
ram
me
by M
ay
2007
Loca
l pro
toco
l mee
ting
with
LO
CO
G b
y Ju
ne
2007
Loca
l pro
gram
me
conf
irmed
Sep
200
7
Pro
gram
me
com
men
ces
Jan
2008
150
peop
le p
artic
ipat
ing
by
Mar
ch 2
008
400
peop
le
parti
cipa
ting
by
Mar
ch 2
009
Fu
ndin
g re
quire
d bu
t pos
sibl
y av
aila
ble
from
th
ird p
artie
s.
Ant
i-Soc
ial B
ehav
iour
25. A
ssis
t you
ng p
eopl
e in
Tow
er
Ham
lets
to b
e in
volv
ed in
the
new
Spo
rts C
ham
pion
s M
ento
ring
Pro
gram
me
as p
art
of th
e G
over
nmen
t’s R
espe
ct
Act
ion
Pla
n.
Rev
iew
key
ele
men
ts
of th
e R
AP
pla
n
Com
mun
icat
e w
ith
targ
et g
roup
Key
ele
men
ts id
entif
ied
by M
ay 2
007
Pro
gram
me
elem
ents
fin
alis
ed J
uly
2007
Com
mun
icat
ions
pr
ogra
mm
e st
arts
Sep
t 20
07
Firs
t pro
gram
me
parti
cipa
nts
in b
y O
ct
2007
20 p
artic
ipan
ts in
Yea
r 1
40 p
artic
ipan
ts in
Yea
r 2
Fu
ndin
g re
quire
d bu
t pos
sibl
y av
aila
ble
from
th
ird p
artie
s.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
67
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
26. I
nitia
te a
You
ng P
eopl
e’s
Oly
mpi
c P
rogr
amm
e,
com
men
cing
with
an
inte
rvie
w
proj
ect i
n co
njun
ctio
n w
ith
Eas
t End
Life
.
Cla
rify
proj
ect s
cope
Mob
ilise
YP
team
Initi
ate
prog
ram
me
Pro
ject
sco
ping
pap
er
draf
ted
by O
ct 2
008
Firs
t out
reac
h ac
tivity
by
Dec
200
8
Pro
ject
team
in p
lace
Fe
b 20
09
Firs
t fre
e st
andi
ng
initi
ativ
e by
May
200
9
6 Y
oung
Peo
ple
in s
teer
ing
grou
p by
Mar
200
9
3 in
itiat
ives
off
grou
nd in
firs
t tw
elve
mon
ths
afte
r lau
nch
Fu
ndin
g re
quire
d bu
t pos
sibl
y av
aila
ble
from
th
ird p
artie
s.
Spor
t
27. I
nflu
ence
the
outc
ome
and
conf
igur
atio
n of
the
regi
onal
sp
orts
faci
lity
lega
cy,
parti
cula
rly th
e m
ulti-
use
indo
or a
rena
s.
Cla
rify
pref
erre
d op
tions
on
over
all
scen
ario
and
co
nfig
urat
ion
Car
ry o
ut lo
bbyi
ng
Ens
ure
prio
rity
give
n to
mul
ti-us
e in
door
ar
enas
Opt
ions
pap
er
com
men
ced
by M
ay
2007
Adv
ice
pape
r and
aid
e m
emoi
re o
n lo
bbyi
ng
prod
uced
by
Aug
200
7
Firs
t lob
byin
g ex
erci
se
by D
ec 2
007
Follo
w u
p lo
bbyi
ng
com
men
ces
June
200
8
Opt
ions
pap
er a
gree
d by
LB
TH
Sup
port
from
3/5
Oly
mpi
c B
orou
ghs
and
LOC
OG
for
pref
erre
d op
tion
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
68
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
28. I
nves
tigat
e th
e po
tent
ial r
euse
of
the
tem
pora
ry B
aske
tbal
l A
rena
(e.g
. pla
ying
sur
face
s)
in a
noth
er lo
catio
n in
the
Bor
ough
.
Brie
f pre
pare
d fo
r re
use
Pro
cure
men
t of
advi
ser
Neg
otia
tions
ove
r al
tern
ativ
e si
te (
Inc
with
LO
CO
G)
Inst
ruct
ions
for b
rief b
y M
ay 2
007
Pro
cure
men
t of a
dvis
er
star
ts o
n A
ug 2
007
Rep
ort p
rodu
ced
Nov
20
07
Neg
otia
tions
sta
t by
Feb
2008
Rep
ort o
n pr
efer
red
re-lo
catio
n ac
cept
ed b
y LB
TH
Sup
port
for r
eloc
atio
n fro
m
LOC
OG
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
29. S
uppo
rt th
e 5
Bor
ough
Spo
rts
Aca
dem
y P
rogr
amm
e. T
his
is
bein
g le
d by
the
Lond
on
Bor
ough
of N
ewha
m in
co
llabo
ratio
n w
ith S
port
Eng
land
.
Pro
mul
gate
5
Bor
ough
Aca
dem
y pr
ogra
mm
e
Agr
ee B
orou
gh w
ide
agre
emen
ts
Rol
l out
pro
gram
me
Firs
t pro
mot
ion
of
prog
ram
me
by A
pril
2007
Loca
l pro
toco
l mee
ting
with
oth
er B
orou
ghs
by
May
200
7
Loca
l pro
gram
me
conf
irmed
Aug
200
7
Pro
gram
me
com
men
ces
Dec
200
7
30 T
H a
cade
my
mem
bers
in
Yea
r 1
60 T
H a
cade
my
mem
bers
in
Yea
r 2
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
69
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
30. I
mpl
emen
t the
Tow
er H
amle
ts
Par
tner
ship
’s N
eigh
bour
hood
R
enew
al F
und
prog
ram
me
(£76
9,00
0 ap
prov
ed)
invo
lvin
g a
pack
age
of s
ports
an
d he
alth
act
iviti
es. P
lan
for
succ
essi
on fu
ndin
g to
NR
F to
co
ntin
ue th
e pr
ogra
mm
e po
st
2008
.
Liai
se w
ith L
SP
pr
ogra
mm
e m
anag
er
Agr
ee e
lem
ents
and
m
onito
r pro
gres
s
Con
side
r opt
ions
for
post
NR
F st
age
Not
e of
resu
lts o
f lia
ison
sha
red
by M
ay
2007
Qua
rterly
repo
rts o
n N
RF
prog
ress
pr
oduc
ed
Opt
ions
repo
rt on
pos
t N
RF
stag
e by
Dec
20
07
Add
ition
al 7
5 Y
P in
to s
ports
th
roug
h th
ese
prog
ram
mes
by
Apr
200
9.
LSP
prio
ritis
es s
ports
pr
ogra
mm
e po
st N
RF
LSP
agr
ees
on o
ne o
f the
sh
ortli
sted
opt
ions
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
31. D
evel
op a
n in
tegr
ated
O
lym
pic
them
ed m
arke
ting
and
prom
otio
n ca
mpa
ign
for
the
Bor
ough
’s le
isur
e ce
ntre
s ai
med
at i
ncre
asin
g pa
trona
ge a
nd p
hysi
cal
activ
ity.
Iden
tify
Oly
mpi
c lin
k th
emes
Agr
ee p
lan
with
m
anag
ers
Inte
grat
e fu
ndin
g
Agr
ee jo
int a
ppro
ach
betw
een
educ
atio
n an
d le
isur
e on
inte
grat
ed
them
es b
y Ju
n 2
007
Pro
duce
out
reac
h an
d m
arke
ting
plan
by
Sep
20
07
Inte
grat
e fu
ndin
g su
ppor
t thr
ough
liai
son
with
LB
TH b
y Ju
ne
2008
Pro
mot
ions
cam
paig
n se
cure
d ad
ditio
nal 2
00 u
sers
in Y
ear 1
an
d 50
0 us
ers
in Y
ear 2
.
Num
ber o
f tho
se e
ngag
ed in
re
gula
r phy
sica
l act
ivity
rise
s by
30
0 in
Yea
r 1 a
nd 6
00 in
Yea
r 2.
N
o fu
ndin
g re
quire
d or
ex
istin
g fu
ndin
g ad
equa
te /
fund
ing
requ
ired
but
poss
ibly
ava
ilabl
e fro
m th
ird p
artie
s.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
70
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
32. D
evel
op a
seq
uenc
ed
Bor
ough
wid
e sp
orts
clu
b pr
omot
ion
cam
paig
n –
focu
ssin
g on
a d
iffer
ent
spor
ting
disc
iplin
e ea
ch
seas
on.
Agr
ee ta
rget
clu
bs
Agr
ee s
eque
ncin
g ra
tiona
le
Sec
ure
partn
ersh
ip
agre
emen
t with
clu
bs
Rol
l out
pro
gram
me
TH c
lubs
con
tact
ed b
y M
ay 2
007
with
pr
opos
al
Clu
bs m
eet w
ith T
H
Cou
ncil
by J
uly
2007
Agr
ee s
chem
e ra
tiona
le a
nd
sequ
enci
ng a
nd ta
rget
s
by O
ctob
er 2
007
Impl
emen
tatio
n st
arts
on
Jan
200
8
10 c
lubs
agr
ee to
par
ticip
ate
Clu
b pa
rtici
patio
n ra
tes
rise
by
agre
ed ta
rget
figu
re
Fu
ndin
g re
quire
d bu
t pos
sibl
y av
aila
ble
from
th
ird p
artie
s.
33. R
evie
w th
e To
wer
Ham
lets
S
ports
Stra
tegy
to e
nsur
e it
is
fully
alig
ned
with
all
Oly
mpi
c op
portu
nitie
s an
d to
ena
ble
it to
cap
ture
all
the
parti
cipa
tory
sp
orts
and
act
ivity
pr
ogra
mm
es (e
.g. f
un ru
ns,
spon
sore
d w
alks
to s
choo
l, fin
anci
al d
istri
ct a
ctiv
ities
).
Rev
iew
TH
spo
rts
stra
tegy
& a
ctio
n pl
an
with
par
ticip
ator
y ac
tiviti
es
Iden
tify
key
Oly
mpi
c op
portu
nitie
s
Car
ry o
ut a
lignm
ent
proc
ess
to id
entif
y ne
w o
ppor
tuni
ties
Set
up
stak
ehol
ders
lia
ison
gro
up w
ith
LOC
OG
by
Jly
2007
Par
ticip
ator
y sp
orts
/ TH
stra
tegy
and
O
lym
pic
oppo
rtuni
ties
pape
r pro
duce
d by
Nov
20
07
Exi
stin
g pa
rtici
pato
ry
activ
ity /
Oly
mpi
cs
alig
nmen
t exe
rcis
e co
mm
ence
s M
ar 2
008
Full
stra
tegy
com
plet
ed b
y Ju
n 20
08
Par
ticip
atio
n ra
te in
crea
sed
as
chec
ked
by lo
cal s
urve
ys
Fu
ndin
g re
quire
d bu
t pos
sibl
y av
aila
ble
from
th
ird p
artie
s.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
71
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
34. D
evel
op a
Bor
ough
-wid
e A
nnua
l Sch
ool O
lym
piad
to
incl
ude
both
prim
ary
and
seco
ndar
y sc
hool
s.
Pro
mot
e O
lym
piad
co
ncep
t for
sch
ool
child
ren
Con
side
r sch
ool
Oly
mpi
ad c
onte
nt
and
agre
e pr
iorit
ies
Lay
out O
lym
piad
pr
ogra
mm
e
Rol
l out
Oly
mpi
ad
even
ts a
nd p
rom
ote
Sig
n pr
ospe
ctus
for
Oly
mpi
ad w
ith H
ead
Teac
hers
, Chi
ldre
n an
d P
aren
ts b
y A
pril
2007
Det
aile
d pr
ogra
mm
e ag
reed
by
Oct
ober
20
07
Dry
run
even
ts M
arch
20
08
Laun
ch J
une
2008
30%
of s
choo
ls p
artic
ipat
e in
O
lym
piad
in Y
ear 1
50%
sch
ools
par
ticip
ate
by Y
ear
3
F
undi
ng re
quire
d bu
t pos
sibl
y av
aila
ble
from
th
ird p
artie
s.
Cul
ture
35. D
evel
op a
four
yea
r (20
08-
2012
) Tow
er H
amle
ts C
ultu
ral
Oly
mpi
ad P
rogr
amm
e,
incl
udin
g bu
ildin
g on
exi
stin
g To
wer
Ham
lets
fest
ival
s.
Wor
k up
Oly
mpi
ad
Cul
tura
l ide
as o
n ba
sis
of e
xist
ing
fest
ival
s
Con
side
r cul
tura
l O
lym
piad
con
tent
an
d ag
ree
prio
ritie
s
Lay
out O
lym
piad
pr
ogra
mm
e
Rol
l out
Cul
tura
l O
lym
piad
eve
nts
and
prom
ote
Sig
n pr
ospe
ctus
for
Oly
mpi
ad w
ith k
ey
cultu
ral s
take
hold
ers
Out
line
prog
ram
me
agre
ed b
y D
ec 2
007
Dry
run
even
ts M
arch
20
08
Laun
ch C
ultu
ral
Oly
mpi
ad J
une
2008
Cre
ate
cros
s bo
roug
h fe
stiv
als
offic
e by
200
7
30 –
40
arts
and
com
mun
ity
orga
nisa
tions
par
ticip
ate
in th
e O
lym
piad
N
ew fu
ndin
g re
quire
d.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
72
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
36. D
evel
op a
five
yea
r cul
tura
l pr
ogra
mm
e fo
r Vic
toria
Par
k in
con
junc
tion
with
LO
CO
G
and
the
5 H
ost B
orou
ghs.
In
itiat
e a
feas
ibili
ty s
tudy
if
nece
ssar
y.
Con
cept
gen
erat
ion
Val
idat
ion
proc
ess
with
5 b
orou
gh
cultu
ral g
roup
Res
ourc
ing
and
partn
er in
put
Cre
ate
prog
ram
me
pros
pect
us
Com
bine
arts
and
sp
ortin
g ev
ent
Ope
ratio
nal p
hase
Dra
ft co
ncep
t pap
er b
y Ju
ly 2
007
Und
erta
ke fe
asib
ility
an
d va
lidat
ion
wor
k by
N
ov 2
007
Pul
l tog
ethe
r pa
rtner
ship
with
LO
CO
G a
nd B
orou
ghs
by F
eb 2
008
Pro
spec
tus
issu
ed b
y Jl
y 20
08
Fest
ival
s an
d ev
ents
te
am s
treng
then
ed b
y D
ec 2
008
Ope
ratio
nal p
hase
st
arts
Jly
200
9
Feas
ibili
ty s
tudy
acc
epte
d by
LO
CO
G
25-3
0 co
mm
unity
gro
ups
enga
ged
in th
e pr
ogra
mm
e
N
ew fu
ndin
g re
quire
d.
37. P
artn
er w
ith R
ich
Mix
, CID
A,
and
othe
r loc
al c
ultu
ral
brok
ers,
LO
CO
G, S
port
Eng
land
and
the
Arts
Cou
ncil
Eng
land
to d
evel
op a
n Im
agin
ing
the
Gam
es P
roje
ct
to e
volv
e ov
er th
e pe
riod
2008
-201
2.
Dev
elop
ele
men
ts o
f pr
ogra
mm
e
Dra
ft bu
sine
ss c
ase
Sec
ure
LOC
OG
and
ot
her p
artn
er s
uppo
rt fo
r the
Pro
ject
Bra
inst
orm
ing
sess
ion
on e
lem
ents
of I
mag
ine
The
Gam
es b
y M
ay
2007
App
oint
feas
ibili
ty
cons
ulta
nt b
y Jl
y 20
07
Bus
ines
s ca
se s
tart
by
Sep
200
7
Par
tner
agr
eem
ent b
y Fe
b 20
08
LOC
OG
com
mitm
ent m
ade
Pro
ject
laun
ch b
y S
ept 2
008
Fu
ndin
g re
quire
d bu
t pos
sibl
y av
aila
ble
from
th
ird p
artie
s.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
73
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
38. D
evel
op a
n E
xplo
ring
Livi
ng
Mem
ory
Pro
ject
with
old
er
peop
le a
nd y
oung
er p
eopl
e.
Rev
iew
exi
stin
g Li
ving
Mem
ory
proj
ect i
n Lo
ndon
Iden
tify
mod
e of
op
erat
ion
(virt
ual o
r ph
ysic
al)
and
stak
ehol
ders
Dra
w u
p bu
sine
ss
case
for p
roje
ct
Iden
tify
spon
sors
Rep
ort o
n ex
istin
g Lo
ndon
pro
ject
dra
fted
by S
ep 2
008
Bus
ines
s ca
se
com
plet
ed b
y M
ar 2
009
Com
men
ce o
pera
tion
by O
ctob
er 2
009
Inte
r-ge
nera
tiona
l act
ivity
re
cord
ed a
s pa
rt of
200
8/9
AR
S
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
39. A
ppoi
nt a
cur
ator
for t
he
Tow
er H
amle
ts P
ublic
Art
Pro
gram
me.
Sco
pe
resp
onsi
bilit
ies
Pro
cure
app
oint
men
t
Sco
ping
pap
er a
nd J
D
by A
pr 2
008
App
oint
men
t pr
oces
s st
arts
Jun
200
8
App
oint
men
t Oct
200
8
Add
ed v
alue
inpu
t to
15 p
roje
cts
by D
ec 2
009
New
fund
ing
requ
ired.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
74
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
40. P
repa
re a
Stra
tegy
and
B
usin
ess
Pla
n fo
r the
Tow
er
Ham
lets
Pub
lic A
rt P
rogr
amm
e.
Stra
tegi
c pl
an
prod
uced
Bus
ines
s P
lan
scop
e ag
reed
Bus
ines
s P
lan
deve
lope
d
Spe
cial
ist c
onsu
ltant
ap
poin
ted
Oct
200
7
Stra
tegy
dra
fted
Dec
20
07
Key
bus
ines
s id
eas
gene
rate
d an
d ag
reed
by
Mar
200
8
BP
sig
ned
off
Apr
20
08
Key
stra
tegi
c ob
ject
ives
sig
ned
off b
y m
ain
stak
ehol
ders
Top
3 bu
sine
ss p
lan
obje
ctiv
es
secu
red
in Y
ear 2
New
fund
ing
requ
ired.
41. R
evie
w th
e To
wer
Ham
lets
P
lann
ing
Obl
igat
ions
Inte
rim
Pla
nnin
g G
uida
nce,
as
the
curr
ent p
olic
y fa
vour
s on
-site
pu
blic
art.
Con
side
r ove
rarc
hing
pl
anni
ng s
trate
gy o
n P
A in
s10
6
Lay
out r
evis
ed
guid
ance
in li
ght o
f O
lym
pic
Pro
gram
me
Ens
ure
futu
re
proo
fing
Com
men
ce h
igh
leve
l re
view
by
May
200
7
Dra
ft ne
w g
uida
nce
by
Aug
200
7
New
gui
danc
e ad
opte
d by
Jul
y 20
08
50%
new
dev
elop
ers
prov
ide
assi
stan
ce in
line
with
new
gu
idan
ce b
y en
d of
Yea
r 2 o
f op
erat
ion
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
75
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Them
e 3
– A
Tr
ansf
orm
ed
Envi
ronm
ent
Prog
ram
me
Oly
mpi
c Pa
rk M
aste
rpla
n Le
gacy
42. E
ngag
e fu
lly w
ith th
e fu
rther
de
velo
pmen
t and
im
plem
enta
tion
of th
e Lo
wer
Le
a V
alle
y O
ppor
tuni
ty A
rea
Pla
nnin
g Fr
amew
ork
to
ensu
re th
e am
bitio
ns o
f To
wer
Ham
lets
are
fully
re
alis
ed in
Lea
side
.
Agr
ee p
riorit
ies
unde
r A
AP
pre
ferr
ed
optio
ns
Lobb
y G
LA a
nd O
DA
Lobb
y O
PLG
Rev
iew
AA
P fo
r fin
al
vers
ion
Con
fer w
ith L
BTH
pl
anne
rs o
n pr
iorit
ies
quar
terly
Mai
n ca
se to
GLA
and
O
DA
by
Jun
2007
Key
lobb
ying
sta
tem
ent
to O
PLG
by
Jly
2007
OA
PF
mod
ified
as
nece
ssar
y Ju
n 20
08
LLV
OA
PF
and
AA
P c
ome
into
al
ignm
ent b
y Ju
ne 2
008
Fina
l AA
P fu
lly c
onsi
sten
t with
O
lym
pics
lega
cy b
y 20
09
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
76
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
43. E
nsur
e th
e qu
ality
del
iver
y of
pl
anne
d ne
w h
ousi
ng in
Fis
h Is
land
, Bro
mle
y-by
-Bow
, and
P
opla
r Riv
ersi
de, i
nclu
ding
a
sign
ifica
nt p
rovi
sion
of
affo
rdab
le h
ousi
ng u
nits
.
Leas
ide
plan
ning
po
licy
team
es
tabl
ishe
d
Mas
terp
lans
de
velo
ped
Dev
elop
men
t brie
fs
prep
ared
S10
6 ag
reem
ents
put
in
pla
ce
Est
ablis
h te
am b
y M
ay
2007
Com
mis
sion
requ
ired
area
mas
terp
lans
by
Aug
ust 2
007
Com
men
ce d
rafti
ng o
f de
velo
pmen
t brie
fs b
y D
ec 2
007
Est
ablis
h cl
ient
pr
ocur
emen
t tea
m b
y A
pril
2008
Firs
t dev
elop
men
t se
cure
d S
prin
g 20
09
Mas
terp
lans
/ de
velo
pmen
t br
iefs
gen
erat
e in
tere
st fr
om
suffi
cien
t num
ber o
f dev
elop
ers
to s
pur g
ood
desi
gn a
nd
com
petit
ion
S10
6 ob
ligat
ions
agr
eed
by
pref
erre
d de
velo
pers
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
44. M
aint
ain
enga
gem
ent w
ith th
e O
lym
pic
Mas
terp
lan
proc
ess
and
the
Low
er L
ea V
alle
y O
ppor
tuni
ty A
rea
Pla
nnin
g Fr
amew
ork
proc
ess
to
rein
forc
e th
e re
gene
ratio
n of
Le
asid
e an
d to
ave
rt an
y ‘re
d-lin
ing’
, whe
ther
phy
sica
l or
soci
al.
Cla
rify
criti
cal
rege
nera
tion
elem
ents
of
mas
terp
lan
and
OA
PF
Iden
tify
red
linin
g is
sues
Eng
age
with
OD
A
and
GLA
Sec
ure
Hea
ds o
f A
gree
men
t
Crit
ical
ele
men
ts
iden
tifie
d by
Apr
200
7
Red
lini
ng is
sues
ag
reed
by
TH b
y Ju
n
2007
Issu
es to
OP
LG b
y S
ep
2007
Hea
ds o
f agr
eem
ent
draf
ted
by M
ar 2
008
Red
lini
ng a
gree
men
t with
TH
re
ache
d by
May
200
8
OP
LG s
igns
off
red
linin
g ag
reem
ent
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
77
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
45. M
aint
ain
ongo
ing
enga
gem
ent w
ith th
e O
lym
pic
Par
k Le
gacy
Gro
up (O
PLG
) .
Agr
ee te
rms
of
enga
gem
ent w
ith
OP
LG
Agr
ee lo
ng te
rm
conf
igur
atio
n of
st
adiu
m a
nd a
quat
ic
cent
re
Dra
ft an
d co
mm
unic
ate
by J
ly 2
007
term
s of
en
gage
men
t with
oth
er
mem
bers
of t
he O
PLG
Link
offi
cer w
ith O
PLG
ap
poin
ted
Sep
200
7
Pre
ferr
ed c
onfig
urat
ion
desi
gn w
orke
d up
and
co
mm
unic
ated
thro
ugh
OP
LG
Eng
agem
ent M
OU
agr
eed
with
pa
rtner
s by
Jul
y 20
07
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
46. R
espo
nd to
the
revi
sed
Oly
mpi
c P
ark
and
Lega
cy
Pla
nnin
g P
erm
issi
ons
(due
Ja
nuar
y 20
07 a
nd m
id-2
008
resp
ectiv
ely)
, par
ticul
arly
in
term
s of
pla
nnin
g ob
ligat
ions
. E
ngag
e th
e co
mm
unity
in
deve
lopi
ng a
resp
onse
.
Pla
nnin
g po
licy
and
plan
ning
obl
igat
ions
in
put.
Ana
lysi
s of
pla
nnin
g co
nditi
ons
Com
mun
ity
enga
gem
ent
Dra
fting
of p
lann
ing
oblig
atio
ns
TH p
lann
ers
draf
t m
enu
of le
gacy
re
quire
men
ts b
y M
ay
2007
TH p
lann
ers
mak
e re
com
men
datio
ns
with
in tw
o m
onth
s of
pl
anni
ng p
erm
issi
on
Com
mun
ity
enga
gem
ent d
urin
g m
onth
s 3-
4 of
PP
S10
6 ob
ligat
ions
fin
alis
ed in
mon
th 5
of
PP
LSP
agr
eem
ent t
o le
gacy
fra
mew
ork
and
cond
ition
s as
soci
ated
with
pla
nnin
g pe
rmis
sion
S10
6 co
nditi
ons
acce
pted
by
OD
A
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
78
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Low
er L
ea V
alle
y –
Fish
Isla
nd
and
Reg
ener
atio
n B
ridge
s
47. E
nsur
e ac
cess
and
pe
dest
rian
links
– B
ridge
s of
R
egen
erat
ion
– ar
e m
aint
aine
d in
the
plan
ning
for
the
Low
er L
ea V
alle
y,
parti
cula
rly F
ish
Isla
nd.
Dra
ft br
ief f
or
deve
lopm
ent
Mon
itor p
rogr
ess
Lobb
y as
nec
essa
ry
Brie
f in
plac
e by
May
20
07
Firs
t mon
itorin
g re
port
by A
ug 2
007
Lobb
ying
com
plet
ed b
y M
ar 2
008
Fina
l des
igns
inco
rpor
ate
“Brid
ges
of R
egen
erat
ion”
.
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
48. D
evel
op L
easi
de A
rt B
ridge
s P
roje
ct w
ith L
easi
de
Reg
ener
atio
n.
Com
mis
sion
pro
ject
de
velo
pmen
t
Mon
itor
Sig
n of
f pro
ject
pr
opos
al
Wor
k ha
s al
read
y st
arte
d
Pro
ject
brie
f in
plac
e by
Ju
ne 2
007
Firs
t mon
itorin
g re
port
by S
ept 2
007
Pro
ject
sig
ned
off b
y M
ar 2
008
Pro
ject
pro
posa
l agr
eed
by L
SP
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
49. I
nves
tigat
e th
e po
tent
ial f
or a
w
este
rn p
edes
trian
gre
enw
ay
acce
ss ro
ute
into
Oly
mpi
c P
ark
for u
se d
urin
g th
e G
ames
and
afte
r, in
pa
rtner
ship
with
the
Lond
on
Bor
ough
of H
ackn
ey.
Dra
ft br
ief f
or
prop
osal
Mon
itor p
rogr
ess
Liai
se a
s ne
cess
ary
with
LB
H
Pro
ject
brie
f in
plac
e by
Ju
ly 2
007
Firs
t des
ign
repo
rt by
O
ct 2
007
Pro
ject
pro
posa
l fin
al
cons
ider
atio
n by
Mar
20
08
Pro
ject
brie
f in
plac
e by
dea
dlin
e
LSP
con
side
rs p
ropo
sal b
y A
pril
2008
New
fund
ing
requ
ired.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
79
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
50. D
evel
op a
join
t mas
ter
plan
ning
initi
ativ
e w
ith th
e Lo
ndon
Bor
ough
of H
ackn
ey
for H
ackn
ey W
ick
/ Fis
h Is
land
, con
sist
ent w
ith th
e LD
F.
Pro
posa
ls fo
r in
itiat
ive
draf
ted
Join
t wor
king
un
derta
ken
Res
ults
and
bes
t pr
actic
e pu
blis
hed
Bor
ough
s ag
ree
term
s of
eng
agem
ent b
y A
pril
2007
Firs
t wor
king
gro
up
mee
ting
July
200
7
Join
t pro
toco
l and
vi
sion
pub
lishe
d M
ar
2008
Bes
t pra
ctic
e pa
per O
ct
2008
Join
t mas
terp
lan
agre
ed b
y G
LA
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Low
er L
ea V
alle
y –
The
Wat
er
City
51. D
evel
op a
join
t pla
nnin
g in
itiat
ive
with
the
Lond
on
Bor
ough
of N
ewha
m to
furth
er
deve
lop
the
Wat
er C
ity
conc
ept.
Agr
ee te
rms
of
refe
renc
e
Des
igns
dev
elop
ed
and
agre
ed jo
intly
Issu
es e
xplo
red
ToR
by
Dec
200
7
Firs
t des
ign
team
m
eetin
g M
ar 2
008
Issu
es p
aper
pre
sent
ed
Jun
2009
Join
t pla
nnin
g pr
otoc
ol a
gree
d
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
80
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Gre
enin
g To
wer
Ham
lets
52. D
evel
op a
nd im
plem
ent a
G
reen
ing
Tow
er H
amle
ts
2012
Pro
ject
, to
incl
ude
incr
ease
d co
mm
itmen
ts a
nd
fund
ing
for o
pen
spac
e im
prov
emen
ts a
nd a
tree
pl
antin
g pr
ogra
mm
e, P
lant
20
12 T
rees
.
Cre
ate
stak
ehol
der
grou
p
Dev
elop
ope
n sp
aces
st
rate
gy
Com
men
ce
impl
emen
tatio
n of
G
reen
ing
plan
Sta
keho
lder
gro
up
esta
blis
hed
by A
ug
2007
Ref
ined
and
agr
eed
stra
tegy
pub
lishe
d in
M
ar 2
008
Impl
emen
tatio
n pr
ogra
mm
e st
arts
Jan
20
09
1000
tre
es p
lant
ed b
y 20
10 a
s pa
rt of
gre
enin
g ac
tion
plan
New
fund
ing
requ
ired.
53. R
evie
w th
e To
wer
Ham
lets
P
lann
ing
Obl
igat
ions
Inte
rim
Pla
nnin
g G
uida
nce
to e
nsur
e its
pol
icie
s ar
e al
igne
d w
ith
this
pol
icy
obje
ctiv
e. T
he
prog
ram
me
shou
ld b
e lin
ked
with
the
Oly
mpi
c Li
ve S
ites
Pro
ject
and
the
Oly
mpi
c P
ublic
Art
Pro
gram
me.
Ove
rall
revi
ew o
f pr
ogra
mm
es a
nd
guid
ance
Des
ign
and
artic
ulat
e
linka
ges
betw
een
gree
ning
pro
gram
me
and
s106
pra
ctic
e
Rev
iew
sta
rts O
ct 2
007
Link
ages
repo
rt dr
afte
d M
ar 2
008
Inte
grat
ed p
lann
ing
/ gre
enin
g ob
ligat
ions
fram
ewor
k op
erat
iona
l by
2009
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
54. P
rom
ote
acce
ss to
the
Riv
er
Tham
es a
nd th
e R
iver
Lea
th
roug
h th
e B
lue
Rib
bon
Net
wor
k, li
nkin
g w
ith th
e G
reen
ing
Tow
er H
amle
ts
2012
Pro
ject
.
Arti
cula
te b
lue/
gre
en
visi
on
Pro
mot
iona
l act
ivity
Cre
ate
links
with
ULV
P
and
BW
by
Sep
200
7
Che
ck L
LV V
isio
n an
d O
AP
F fo
r pol
icy
links
by
Dec
200
7 an
d w
rite
repo
rt
Pro
mot
iona
l wor
k co
mm
ence
s M
ar 2
008
Link
ed V
isio
n ba
sed
on L
LV
Vis
ion
and
OA
PF
prin
cipl
es
used
as
part
of n
ew s
106
cond
ition
s
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
81
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
The
Oly
mpi
c B
oule
vard
55. I
nitia
te th
e O
lym
pic
Bou
leva
rd
in p
artn
ersh
ip w
ith a
djoi
ning
bo
roug
hs a
nd T
rans
port
for
Lond
on.
Clie
nt te
am
arra
ngem
ents
Key
con
cept
s
Gen
eric
prin
cipl
es
Arti
cula
tion
of k
ey
conc
epts
by
Apr
200
7
Clie
nt te
am re
sour
cing
an
d ar
rang
emen
ts s
et
out b
y M
ay 2
007
Are
a w
ide
gene
ric
prin
cipl
es e
stab
lishe
d by
Jun
200
7
OB
spe
cial
clie
nt te
am
esta
blis
hed
Key
con
cept
s re
port
acce
pted
by
Bor
ough
s an
d Tf
L by
Apr
il
2007
New
fund
ing
requ
ired.
56. P
repa
re a
Bou
leva
rd
Pro
spec
tus
to p
rom
ote
the
proj
ect.
K
ey s
ite p
ropo
sals
Pro
gres
s so
far
Pha
sing
Par
tner
ship
ar
rang
emen
ts
Hig
h le
vel s
ite
prop
osal
s dr
afte
d by
Fe
b 2
007
Pha
sing
pla
n in
pla
ce
by M
ar 2
007
Par
tner
ship
laun
ched
by
Mar
200
7
Pro
spec
tus
publ
ishe
d A
pr 2
007
Pro
spec
tus
laun
ched
by
mid
20
07
New
fund
ing
requ
ired.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
82
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
57. L
aunc
h th
e B
oule
vard
pro
ject
an
d en
gage
the
com
mun
ity in
an
arc
hite
ct a
nd a
rtist
led
char
ette
(int
ensi
ve d
esig
n w
orks
hop)
.
Com
mun
ity
enga
gem
ent
Laun
ch d
esig
n
Cha
rette
pro
gram
me
and
met
hods
Sta
rt co
mm
unity
pr
ogra
mm
e by
Dec
20
06
Pre
pare
laun
ch
desi
gns
by J
an 2
007
Pre
pare
cha
rette
pr
ogra
mm
e by
Feb
20
07
Pro
ject
giv
en p
riorit
y by
LS
P
30 c
omm
unity
par
ticip
ants
at
char
ette
4 co
mm
unity
vol
unte
ers
for
Sha
dow
Boa
rd
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
58. I
nves
tigat
e th
e po
tent
ial f
or a
W
hite
chap
el R
oad-
Mile
End
R
oad
Are
a A
ctio
n P
lan.
P
lann
ing
polic
y
optio
ns p
aper
on
sepa
rate
AA
P
refle
ctin
g LD
F st
ruct
ure
Eco
nom
ic im
pact
Ove
rall
eval
uatio
n
Com
plet
e po
licy
optio
ns p
aper
on
AA
P
by J
une
2007
Sta
rt ec
onom
ic im
pact
as
sess
men
t of
Bou
leva
rd P
roje
ct J
uly
2007
Und
erta
ke o
vera
ll ev
alua
tion
of o
ptio
n in
O
ct 2
007
App
rais
al c
ompl
eted
and
act
ed
on b
y D
ec 2
007
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
83
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
59. I
nves
tigat
e th
e vi
abili
ty o
f a
Com
mun
ity D
evel
opm
ent
Trus
t for
the
long
term
m
anag
emen
t of t
he
Bou
leva
rd.
Term
s of
Ref
eren
ce
Gov
erna
nce
stru
ctur
e
Cap
ital p
rogr
amm
es
Rev
enue
pr
ogra
mm
es a
nd
fund
ing
Usi
ng D
TA g
uida
nce
draw
up
ToR
for a
B
oule
vard
Dev
Tru
st b
y Ju
n 20
08
Opt
ions
pap
er o
n go
vern
ance
issu
es b
y D
ec 2
008
Pot
entia
l cap
ital a
nd
reve
nue
prog
ram
mes
w
ith o
utlin
e fu
ndin
g st
ruct
ure
by M
ar 2
009
Term
s of
refe
renc
e ag
reed
with
LB
TH
Key
ele
men
ts o
f inc
ome
budg
et
agre
ed b
y pa
rtner
s
Loca
l (no
n pu
blic
) inc
ome
stre
am id
entif
ied
and
com
mitm
ent t
o Y
ears
1 a
nd 2
m
ade
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties
/ new
fu
ndin
g re
quire
d.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
84
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Them
e 4
– Ex
perie
ncin
g th
e G
ames
Pro
gram
me
Tow
er H
amle
ts O
lym
pic
Site
60. A
ctiv
ely
enga
ge w
ith L
OC
OG
in
the
deve
lopm
ent o
f the
V
icto
ria P
ark
Live
Site
in a
w
ay th
at m
axim
ises
the
oppo
rtuni
ties
for l
ocal
re
side
nts,
in p
artn
ersh
ip w
ith
the
Lond
on B
orou
gh o
f H
ackn
ey.
Dev
elop
initi
al p
roje
ct
scop
e w
ith L
OC
OG
(s
hort
and
long
term
)
Gen
erat
e an
d re
view
ad
ded
valu
e el
emen
ts w
ith
com
mun
ity
Fina
lise
proj
ect
defin
ition
Out
reac
h ac
tivity
Impl
emen
tatio
n pl
ans
Live
Site
ele
men
t
Lega
cy p
rogr
amm
e
Initi
al s
copi
ng
com
plet
ed b
y A
pr 2
007
Con
sulta
tion
with
co
mm
unity
on
adde
d va
lue
elem
ents
sta
rts
May
200
7
Fina
l pro
duct
def
ined
D
ec 2
007
Out
reac
h st
arts
Mar
20
08
Impl
emen
tatio
n st
arts
M
ar 2
009
Live
site
201
1-20
12
Lega
cy s
tarts
201
3
LOC
OG
/ LB
TH H
eads
of
Agr
eem
ent
LSP
sig
ns o
ff co
mm
unity
as
pira
tions
Atte
ndan
ce ta
rget
s ac
hiev
ed
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties
/ new
fu
ndin
g re
quire
d.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
85
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
61. E
nsur
e bo
th th
e To
rch
Rel
ay
and
Mar
atho
n pa
ss a
long
the
Oly
mpi
c B
oule
vard
.
Bou
leva
rd d
esig
n in
put
Lobb
ying
Impl
emen
tatio
n
Bou
leva
rd d
esig
ns a
nd
man
agem
ent f
or T
orch
R
elay
pre
pare
d by
Jun
20
07
OP
LG lo
bbyi
ng s
tarts
O
ct 2
007
Impl
emen
tatio
n pl
an in
pl
ace
as p
art o
f B
oule
vard
mas
terp
lan
by N
ov 2
008
LOC
OG
agr
ees
Bou
leva
rd ro
ute
by O
ctob
er 2
008
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
62. P
repa
re a
Liv
e S
ites
/ C
omm
unity
Stre
et P
arty
P
rogr
amm
e.
Iden
tify
pote
ntia
l site
s
Ass
ess
cand
idat
e
site
s
Agr
ee p
refe
rred
site
s an
d de
sign
layo
uts
Agr
ee p
rogr
amm
e
Site
iden
tific
atio
n an
d as
sess
men
t sta
rts A
ug
2009
Com
mun
ity s
ites
shor
t lis
t agr
eed
Oct
200
9
Pro
gram
me
elem
ents
ag
reed
Dec
200
9
Com
men
ce
prog
ram
me
Jun
2010
Com
mun
ity s
ites
cite
d as
ex
ampl
e of
resi
dent
s in
fluen
cing
de
cisi
ons
for t
heir
area
in A
RS
.
Full
com
mun
ity p
rogr
amm
e go
es
live
in M
arch
201
2
New
fund
ing
requ
ired.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
86
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Tow
er H
amle
ts H
ostin
g th
e B
angl
ades
h N
atio
nal O
lym
pic
Team
63. M
ake
a fo
rmal
bid
to L
OC
OG
to
hos
t an
Oly
mpi
c Tr
aini
ng
Cam
p.
Rev
iew
Man
ches
ter
expe
rienc
e
Pre
pare
site
and
m
anag
emen
t pla
n
Pre
pare
bid
Und
erta
ke b
id e
vent
Impl
emen
t op
erat
iona
l pla
n
Site
iden
tifie
d by
Oct
20
07
Bid
fully
pre
pare
d by
D
ec 2
007
Trai
ning
cam
p pl
anni
ng
appl
icat
ion
mad
e Ju
n 20
08
Con
stru
ctio
n co
mpl
eted
Dec
200
9
LOC
OG
prio
ritis
es T
H a
s ca
ndid
ate
Par
ticip
atio
n ra
te o
f Ban
glad
eshi
at
hlet
es in
crea
sed
by 2
5%
(TB
A)
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
64. M
ake
a fo
rmal
requ
est t
o th
e N
atio
nal O
lym
pic
Com
mitt
ee
of B
angl
ades
h to
hos
t the
B
angl
ades
h N
atio
nal O
lym
pic
Team
for 2
012.
Pre
pare
bus
ines
s ca
se
Dra
ft pr
ospe
ctus
Mak
e fo
rmal
su
bmis
sion
Bus
ines
s ca
se b
y O
ct
2007
Pro
spec
tus
by D
ec
2007
Sub
mis
sion
by
Mar
20
08
NO
CB
reco
gnis
es T
H c
andi
dacy
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
87
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Tow
er H
amle
ts a
nd th
e Pa
raly
mpi
cs
65. C
onsu
lt w
ith lo
cal d
isab
ility
rig
hts/
actio
ns g
roup
s re
gard
ing
enga
gem
ent w
ith
the
Par
alym
pics
.
Con
sulta
tion
plan
ning
Par
alym
pics
en
gage
men
t iss
ues
Par
alym
pics
lega
cy
Con
sulta
tion
stra
tegy
by
Nov
200
7
Issu
es p
aper
by
Mar
20
08
Key
issu
es a
ddre
ssed
by
Dec
200
8
Lega
cy is
sues
id
entif
ied
by J
un 2
009
Neg
otia
tions
on
lega
cy
issu
es s
tarts
Jan
201
0
Stra
tegy
and
issu
es p
aper
s si
gned
off
by T
H d
isab
ility
gr
oups
Two
key
lega
cy is
sues
su
cces
sful
ly n
egot
iate
d w
ith
LOC
OG
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
66. R
evie
w d
isab
ility
acc
ess
in
the
Bor
ough
to e
nsur
e To
wer
H
amle
ts is
fully
acc
essi
ble
by
2012
. S
cope
of r
evie
w
dete
rmin
ed
Car
ry o
ut re
view
Act
on
resu
lts
Sco
ping
pap
er
prod
uced
by
Jun
2007
Rev
iew
com
men
ces
Oct
200
7
Initi
al re
sults
Oct
200
8
Prio
ritis
e ac
tion
by J
un
2009
Car
ry o
ut
impr
ovem
ents
by
2011
Key
gap
s af
fect
ing
gam
es
acce
ssib
ility
add
ress
ed b
y 20
11
New
fund
ing
requ
ired.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
88
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
67. P
rom
ote
a P
aral
ympi
c S
choo
ls P
rogr
amm
e in
clud
ing
atte
ndan
ce a
t the
eve
nt it
self.
K
ey m
essa
ges
iden
tifie
d
Map
ping
of
oppo
rtuni
ties
and
need
s
Atte
ndan
ce
prog
ram
me
orga
nise
d
Mes
sage
s id
entif
ied
by
Oct
200
7
Opp
ortu
nitie
s an
d ne
eds
map
ping
by
Jan
2008
Sch
ools
out
reac
h pr
ogra
mm
e st
arts
Sep
t 20
08
Atte
ndan
ce p
rogr
amm
e de
sign
ed M
ar 2
009
Atte
ndan
ce a
t eve
nt
oper
atio
n co
mm
ence
s Ju
n 20
11
Opp
ortu
nitie
s an
d ne
eds
pape
r si
gned
off
by L
OC
OG
Atte
ndan
ce o
f sch
ool c
hild
ren
25%
hig
her t
han
benc
hmar
k fig
ure
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties
/ new
fu
ndin
g re
quire
d.
Volu
ntee
ring
at th
e Lo
ndon
20
12 O
lym
pic
and
Para
lym
pic
Gam
es
68. H
old
a To
wer
Ham
lets
V
olun
teer
ing
Ope
n D
ay in
20
07 a
nd th
en a
nnua
lly.
Key
mes
sage
s
Com
mun
icat
ions
pr
ogra
mm
e
Eve
nt o
rgan
isat
ion
Ong
oing
m
anag
emen
t
Com
mun
icat
ions
pr
ogra
mm
e in
pla
ce b
y M
ar 2
007
Eve
nt o
rgan
isat
ion
plan
si
gned
off
by J
un 2
007
Firs
t eve
nt h
eld
by O
ct
2007
Ong
oing
man
agem
ent
plan
in p
lace
by
Feb
2008
500
volu
ntee
rs re
gist
er b
y S
ep
2008
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
89
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
69. A
dvoc
ate
a Lo
ndon
201
2 V
olun
teer
ing
Pol
icy
in
partn
ersh
ip w
ith th
e 5
Bor
ough
s.
Iden
tify
gaps
in
exis
ting
volu
ntee
ring
prog
ress
Agr
ee s
cope
of p
olic
y w
ith p
artn
er
Bor
ough
s
Dev
elop
and
co
mm
unic
ate
volu
ntee
ring
polic
y
Gap
ping
pap
er
prep
ared
by
Oct
200
7
Firs
t mee
ting
of
Bor
ough
task
forc
e by
M
ar 2
008
Dev
elop
ed
volu
ntee
ring
polic
y an
noun
ced
and
rolle
d ou
t by
Oct
200
8
5 B
orou
ghs
sign
vol
unte
erin
g co
ncor
dat
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
70. P
rom
ote
the
Lond
on 2
012
volu
ntee
ring
prog
ram
me
thro
ugh
a ra
nge
of B
orou
gh
com
mun
icat
ion
chan
nels
to
ensu
re e
very
one
in T
ower
H
amle
ts k
now
s of
this
uni
que
oppo
rtuni
ty, e
spec
ially
har
d-to
-rea
ch g
roup
s an
d et
hnic
m
inor
ity g
roup
s in
the
Bor
ough
.
Rol
e of
vol
unte
erin
g pa
per
Com
mun
icat
ions
pla
n
Targ
et g
roup
s co
mm
unic
atio
ns p
lan
Pro
mot
ion
of
volu
ntee
ring
prog
ram
me
“Vol
unte
erin
g –
a G
reat
Lo
cal o
ppor
tuni
ty”
publ
ishe
d by
Jly
200
7
Cor
pora
te c
oms
plan
by
Sep
200
7
Targ
et g
roup
com
s pl
an b
y N
ov 2
007
Ong
oing
pro
mot
ion
of
volu
ntee
ring
star
ts M
ar
2008
Add
ition
al 5
000
adul
ts &
YP
vo
lunt
eerin
g by
201
1
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
90
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
71. P
rom
ote
the
Lond
on 2
012
volu
ntee
ring
prog
ram
me
thro
ugh
scho
ols,
leis
ure
cent
res
and
gym
s, a
nd lo
cal
spor
ts c
lubs
. S
ports
and
chi
ldre
n co
ms
plan
Ong
oing
pro
mot
iona
l ca
mpa
ign
Feed
into
“Vol
unte
erin
g –
A G
reat
Loc
al
Opp
ortu
nity
” by
Nov
20
07
Com
s pl
an is
sued
by
Feb
2008
Ong
oing
pro
mot
ions
to
scho
ols
and
club
s st
arts
Sep
200
8
Add
ition
al 1
500
child
ren,
you
ng
peop
le a
nd a
thle
tes
(of 5
000)
vo
lunt
eerin
g by
201
1
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
72. D
evel
op a
Tow
er H
amle
ts
2012
vol
unte
erin
g pr
ogra
mm
e fo
r eve
nts
in th
e B
orou
gh a
nd
a ci
vic
prid
e vo
lunt
eerin
g pr
ogra
mm
e.
Dra
ft ci
vic
prid
e st
atem
ent f
or
volu
ntee
rs
Map
out
key
201
2 vo
lunt
eerin
g ev
ents
Liai
se w
ith L
OC
OG
&
OP
LG o
n vo
lunt
eers
issu
es
Iden
tify
20%
sp
ecia
list v
olun
teer
s
Lay
dow
n lo
ng te
rm
plan
for v
olun
teer
ing
Sta
tem
ent i
ssue
d by
D
ec 2
007
Map
ping
exe
rcis
e by
M
ar 2
008
LOC
OG
sup
port
stat
emen
t by
Jun
2008
Scr
eeni
ng fo
r 20%
sp
ecia
lists
sta
rts D
ec
2008
Long
term
pla
n is
sued
S
umm
er 2
010
Loca
l vol
unte
erin
g (L
AA
App
1)
rises
to 6
0,00
0 by
201
1
1000
spe
cial
ist v
olun
teer
s in
pl
ace
by 2
010
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties
/ new
fu
ndin
g re
quire
d.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
91
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Acc
ess
to L
ondo
n 20
12
Oly
mpi
c an
d Pa
raly
mpi
c G
ames
tick
ets
73. A
dvoc
ate
for a
Lon
don
2012
A
cces
s an
d E
quity
Tic
ketin
g P
olic
y in
par
tner
ship
with
the
5 B
orou
ghs.
Rev
iew
Gre
enw
ich
expe
rienc
e in
Dom
e
Acc
ess
and
equi
ty
stra
tegy
sta
tem
ent
Ong
oing
age
nda
item
in
LO
CO
G m
eetin
gs
5 B
orou
gh lo
bbyi
ng
GLA
lobb
ying
Less
ons
lear
ned
from
D
ome
by J
ly 2
007
Sta
tem
ent b
y A
ug
2007
LOC
OG
age
nda
item
ra
ised
by
Oct
200
7
Bor
ough
cam
paig
n m
eetin
gs s
tart
Nov
20
07
Fina
l neg
otia
tions
with
O
DA
and
LO
CO
G s
tart
Mar
200
8
Acc
ess
rate
to lo
cals
co
mpa
rabl
e w
ith a
gree
men
t for
G
reen
wic
h re
side
nts
in D
ome
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
92
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
74. D
evel
op a
nd p
rom
ote
the
them
e of
an
incl
usiv
e di
vers
e G
ames
in p
artn
ersh
ip w
ith th
e 5
Bor
ough
s.
Dev
elop
the
me
in
cons
ulta
tion
with
B
orou
ghs
Wid
er c
onsu
ltatio
n
Sta
tem
ent o
n in
clus
ive
and
dive
rse
Gam
es is
sued
Mon
itor c
ross
cut
ting
incl
usio
n of
them
es in
20
12 p
rogr
amm
es
Them
e de
velo
pmen
t dr
aft a
nd c
onsu
ltatio
n be
gins
Aug
200
7
Wid
er c
onsu
ltatio
n w
ith
key
inte
rest
s st
arts
Dec
20
07
Sta
tem
ent i
ssue
d Fe
b 20
08
Mon
itorin
g of
cro
ss
cutti
ng in
clus
ion
in
oper
atio
ns a
nd p
roje
cts
star
ts S
ep 2
008
LOC
OG
sig
ns o
ff st
atem
ent w
ith
Bor
ough
s on
Feb
200
8
AR
S re
sults
indi
cate
77%
feel
th
ey g
et o
n w
ell t
oget
her b
y Fe
b 20
09
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
93
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Stra
tegi
c A
ctio
ns
to
Del
iver
the
Prog
ram
me
Secu
ring
stra
tegi
c lin
kage
s
75. M
aint
ain
a w
ell r
esou
rced
TH
2012
Uni
t with
bot
h a
clea
r st
rate
gic
rem
it an
d a
busi
ness
pl
an.
Stra
tegi
c re
mit
of U
nit
form
ulat
ed
Dra
ft bu
sine
ss p
lan
Stra
tegi
c re
mit
draw
n up
and
sig
ned
off b
y O
ct 2
007
Long
term
bus
ines
s pl
anni
ng s
tarts
Feb
20
08
Rem
it ap
prov
ed
New
fund
ing
requ
ired.
76. R
evie
w th
e op
erat
ions
and
re
sour
cing
of t
he T
H20
12 U
nit
by 3
0 Ju
ne 2
007.
D
raw
up
scop
e of
U
nit a
ppra
isal
Car
ry o
ut a
ppra
isal
of
Uni
t
Bus
ines
s ap
prai
sal
com
men
ces
Feb
2007
App
rais
al s
igne
d of
f A
pril
2007
Res
ourc
e pl
anni
ng
unde
rtake
n by
Jun
e 20
07
Ope
ratio
ns a
gree
d by
LB
TH
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
77. C
onsi
der t
he is
sue
of e
xter
nal
gran
t fun
ding
in re
latio
n to
the
TH20
12 U
nit.
Rev
iew
bus
ines
s pl
an
Map
ext
erna
l op
portu
nitie
s fo
r fu
ndin
g
Third
par
ty li
aiso
n
Fina
lise
exte
rnal
fu
ndin
g st
rate
gy
BP
revi
ew c
ompl
eted
by
Sep
200
7
Third
par
ty li
aiso
n co
mpl
eted
by
Oct
200
7
Stra
tegy
com
plet
ed b
y D
ec 2
007
Ext
erna
l par
tner
s in
dica
te
supp
ort f
or U
nit s
trate
gic
rem
it
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
94
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
78. P
repa
re a
Gam
es
Com
mun
icat
ions
Stra
tegy
and
P
roto
col w
ithin
Cou
ncil.
Stra
tegi
c is
sues
m
appe
d
Com
mun
icat
ions
ty
polo
gies
map
ped
Cou
ncil
prot
ocol
ag
reed
Issu
es p
aper
dra
wn
up
by N
ov 2
007
Prio
rity
form
s of
co
mm
unic
atio
n ag
reed
by
Feb
200
8
Cou
ncil
prot
ocol
ad
opte
d by
Apr
il 20
08
Stra
tegi
c pr
otoc
ol b
eing
pr
actis
ed b
y al
l Dep
artm
ents
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
79. P
repa
re a
n ex
tern
al lo
bbyi
ng
stra
tegy
. M
appi
ng o
f lob
byin
g en
viro
nmen
t
Stra
tegi
c in
terv
entio
ns
Tact
ical
prio
ritie
s
Act
ion
plan
Con
text
pap
er b
y M
ay
2007
Inte
rven
tions
and
pr
iorit
ies
plan
by
Jly
2007
Act
ion
plan
dra
ft by
S
ep 2
007
TH P
artn
ersh
ip s
igns
off
actio
n pl
an
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
80. M
ap o
ut p
oten
tial a
reas
/ pr
ogra
mm
es fo
r lon
g te
rm
deve
lopm
ent t
o pr
ovid
e fo
cus
for a
ctio
n at
stra
tegi
c le
vel.
Stra
tegi
c pl
an g
roup
as
sem
bled
Cor
e de
velo
pmen
t ar
eas
map
ped
Long
term
de
velo
pmen
t /
stra
tegi
c pl
anni
ng
Gro
up fi
rst m
eetin
g by
Ju
n 20
08
Dev
elop
men
t syn
ergi
es
cons
ider
atio
n st
arts
S
ep 2
008
Focu
s ar
eas
/ pr
ogra
mm
es a
gree
d Ju
n 20
09
Agr
eem
ent f
rom
Cor
pora
te
Team
on
prio
ritie
s fo
r foc
usse
d ac
tion
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
95
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
81. H
arne
ss th
e ec
onom
ic p
ower
of
lead
ing
sect
ors
in T
ower
H
amle
ts b
y br
ingi
ng to
geth
er
glob
al fi
nanc
e an
d lo
cal
busi
ness
es.
Vis
ion
stat
emen
t for
co
llabo
ratio
n
Mob
ilisa
tion
of
finan
cial
and
bu
sine
ss s
ecto
rs
Team
wor
king
Pro
spec
tus
Prio
rity
Rol
l out
Vis
ion
for s
ecto
r co
llabo
ratio
n is
sued
O
ct 2
007
Fina
ncia
l ser
vice
s,
busi
ness
ser
vice
s,
MIC
E, l
ocal
trad
ers,
m
arke
t tra
ders
m
obili
sed
from
Jan
20
08
Team
wor
king
co
mm
ence
s M
ar 2
008
Pro
spec
tus
Dec
200
8
Top
3 fin
anci
al in
stitu
tions
agr
ee
to a
ct a
s am
bass
ador
s fo
r in
itiat
ive
Mar
ket t
rade
rs re
pres
enta
tives
ag
ree
to jo
in
Fund
ing
requ
ired
but p
ossi
bly
avai
labl
e fro
m
third
par
ties.
82. G
alva
nise
the
priv
ate
sect
or,
dire
ctor
ates
and
loca
l ag
enci
es t
o ra
mp
up th
eir
com
mitm
ent t
o th
e O
lym
pic
and
Par
alym
pic
Lega
cy
Pro
gram
me.
Onc
e in
a li
fetim
e R
amp
Up
initi
ativ
e la
unch
ed
Rev
iew
com
mon
pu
rpos
e pr
ogra
mm
es
Oly
mpi
cs c
omm
on
purp
ose
idea
pr
omot
ed
TH 2
012
com
mon
pu
rpos
e pr
ogra
mm
e dr
afte
d
Laun
ch o
f ini
tiativ
e
Ram
p U
p in
itiat
ive
laun
ch N
ov 2
007
CP
revi
ew c
ompl
eted
by
Jan
200
8
Oly
mpi
cs C
P id
ea
prom
oted
Apr
200
8
Initi
ativ
e la
unch
ed S
ept
2008
Sig
n of
f to
initi
ativ
e by
D
irect
orat
es a
nd C
orpo
rate
S
ecto
r
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
96
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
Ensu
ring
adde
d va
lue
83. F
acili
tate
the
intro
duct
ion
of
Gam
es a
dded
val
ue
prog
ram
mes
to D
irect
orat
es
and
deve
lop
serv
ice
leve
l ag
reem
ents
to in
corp
orat
e th
e G
ames
Leg
acy
Pro
gram
mes
.
Bac
kgro
und
and
scop
e of
add
ed v
alue
pr
ogra
mm
e
Dis
sem
inat
ion
elem
ent
Wor
ksho
ps a
nd
Dire
ctor
ate
inpu
t
SLA
pro
toco
l
Sco
ping
pap
er
prod
uced
by
Jly
2007
Bro
ad c
omm
unic
atio
n to
Dire
ctor
ates
by
Sep
20
07
Wor
ksho
ps c
omm
ence
N
ov 2
007
Dra
ft S
LA p
roto
col
prod
uced
by
Feb
2008
5 ad
ded
valu
e pr
ogra
mm
es
intro
duce
d by
Jly
200
9
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
84. M
aint
ain
a cr
oss-
Dire
ctor
ate
Gam
es C
ham
pion
s G
roup
. D
raft
rem
it of
the
Cha
mpi
ons
Gro
up
Cor
pora
te a
gree
men
t
Rem
it pa
per c
ircul
ated
by
Jul
y 20
07
Cor
pora
te d
ecis
ions
by
Oct
200
7
Acc
epta
nce
by C
orpo
rate
team
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
85. A
dopt
ing
the
Gam
es
Cha
mpi
on m
odel
in th
e LS
P.
Dra
ft re
mit
of th
e C
ham
pion
s G
roup
Exe
cutiv
e
agre
emen
t
Rem
it pa
per c
ircul
ated
by
Sep
200
7
LSP
cor
pora
te
deci
sion
s by
Dec
200
7
Acc
epta
nce
by L
SP
Cor
pora
te
team
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
97
Stra
tegy
them
es a
nd
prog
ram
mes
K
ey A
ctiv
ities
Pr
ogre
ss M
ilest
ones
Su
cces
s C
riter
ia/
Indi
cato
rs
Cos
t Im
plic
atio
ns
86. F
acili
tate
par
alle
l pla
nnin
g w
ithin
the
Uni
t at c
omm
unity
, pr
ogra
mm
e an
d st
rate
gic
leve
ls.
Out
line
case
for
para
llel p
lann
ing
Key
mea
sure
s to
fa
cilit
ate
syne
rgy
Gui
danc
e fo
r par
alle
l pl
anni
ng
Adv
ice
note
for
partn
ers
and
Dire
ctor
ate
Cas
e pa
per p
repa
red
by J
une
2007
Wor
ksho
p on
m
easu
res
by O
ct 2
007
Gui
danc
e is
sued
Dec
20
07
Adv
ice
note
to o
ther
s by
Apr
200
7
3 in
stan
ces
of p
aral
lel a
dded
va
lue
crea
ted
by D
ec 2
008
No
fund
ing
requ
ired
or
exis
ting
fund
ing
adeq
uate
.
Tow
er H
amle
ts O
lym
pic
Stra
tegy
: Tar
gets
and
Mile
ston
es
98