commercial market operations report · reg up*: may 2010 may 2011 required (mw) 640,447 438,748...

28
Commercial Market Operations Report Betty Day ERCOT Board of Directors June 21, 2011 ERCOT Board of Directors

Upload: others

Post on 31-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Commercial Market Operations Report

    Betty Day

    ERCOT Board of Directors

    y y

    June 21, 2011ERCOT Board of Directors

  • Summary

    Retail Activity• Overall Activity – Continued strong switching activity. The Mass Transition noted in May was result of a Mass Acquisition

    (the sale of one REP’s customers to another REP). No default occurred.• Transaction Performance Measures – All measures were above the 98% target for May.• Advanced Metering – Passed the 3M mark in settling Advanced Meters. More than 70% of the load in ERCOT is being

    ttl d ith 15 i d t (AMS d IDR)settled with 15-min data (AMS and IDR).

    Wholesale Activity

    • Settlements & Billing Performance – Perfect performance in May.• Settlement Dollars – Daily average settlement dollars were $10.18M in May compared to $8.45M in April. The increase

    was due to higher prices and warmer weather.• Reliability Services – There were increased levels of RUC commitments during May.• Capacity Services – Ancillary Service costs were down slightly overall compared to April. The biggest drivers in this were

    Responsive and Non SpinResponsive and Non-Spin.• Congestion Management – CRRs were fully funded for May.• Revenue Neutrality – Load received a revenue neutrality credit of $1.38M in May. This was down slightly from April.• Verifiable Costs – Three new verifiable cost submissions were approved during May representing 1,100 MW.

    Market Extracts and Reports O 1 1M t d t t t d d i M d 23 5M d l d• Market Extracts and Reports – Over 1.1M reports and extracts were posted during May and over 23.5M downloads occurred.

    • Disputes – A total of 343 disputes have been filed since Nodal go-live. The volume of disputes continues to be low.• REPs and QSEs Added/Terminated

    0 new REPs 0 terminated REP

    2 ERCOT PublicJune 21, 2011

    – 0 new REPs – 0 terminated REP– 3 new QSEs – 2 terminated QSEs

  • Overall Activity

    Transaction Type

    Retail Transactions Summary

    05/31/2011 05/31/2010 2011 2010YTD May

    Transaction TypeSwitches 307,753

    Move - Ins 851,733

    05/31/2011289,435

    902,605

    05/31/201060,910

    177,993

    201159,680

    191,475

    2010

    ,

    Move Out

    CSA 131 912

    ,

    176 918

    ,

    93,555

    26 666

    ,

    108,148

    38 457

    436,249 493,710

    CSA 131,912 176,918 26,666 38,457

    Mass Transition 22,056 0 14,869 0(Continuous Service Agreement)

    Total 1,749,703

    Since 1 2001

    1,862,668 373,993 397,760

    3

    June 1, 2001 42,131,295

    ERCOT PublicJune 21, 2011

  • Retail Transactions SummarySwitches Move‐Ins

    Move‐Outs Mass Transition

    *Due to Mass Acquisition of Customers . No default occurred.

    *

    4 ERCOT PublicJune 21, 2011

  • Retail Performance Measures – 2011 Switch 1st Quarter 2nd Quarter

    3rd Quarter 4th Quarter

    5 ERCOT PublicJune 21, 2011

  • 1st Quarter 2nd Quarter

    Retail Performance Measures – 2011 Move-In / Priority

    3rd Quarter 4th Quarter

    6 ERCOT PublicJune 21, 2011

  • 1st Quarter 2nd Quarter

    Retail Performance Measures – 2011 Move-In / Standard

    3rd Quarter 4th Quarter

    7 ERCOT PublicJune 21, 2011

  • Migration from Native Affiliate REP

    % of ESI IDs% of Load 1

    R id ti l

    at4/30/11

    at4/30/11

    at4/30/10

    50%54%57%

    at4/30/10

    52%Residential

    Small Non-Residential

    50%

    57%

    54%

    61%

    57%

    82%

    52%

    81%

    Large Non-Residential 78%80%79% 78%

    1 - Percent of Deregulated (Non-NOIE) ESI IDs and Load. Usage based on monthly ttl t lt

    8June 21, 2011 ERCOT Public

    settlement results.

  • Advanced Meter Settlement Impacts

    • Now settling more than 3M ESIIDs using Advanced Meter data!

    • More than 99% of actual reads from AMS are available for initial settlement.

    More than 70% of the load in ERCOT is settled with 15-min interval data (AMS and IDR).

    9 ERCOT PublicJune 21, 2011

  • ERCOT Wide Load Volumes by Meter Type – INITIAL Settlement

    10 ERCOT PublicJune 21, 2011

  • Settlements and Billing Performance Measures – May 2011

    To Date May05/31/11 201105/31/11 2011

    Settlement Statements:Zonal 44,436 5,692Day Ahead Market 35,170 6,101Real Time Market 60,758 13,821Total 140,364 25,614Untimely 199 0Balance 140,165 25,614% Within Protocol 99.86% 100.00%

    I iInvoices:Zonal 4,792 720Day Ahead Market 35,170 6,101Real Time Market 5,115 898

    CRR Auction* 504 90

    Balancing Account* 890 193 CRR Auction Revenue Disbursement (CARD) 796 99

    Total 47,267 8,101

    Untimely - -

    Balance 47 267 8 101

    11 ERCOT PublicJune 21, 2011

    Balance 47,267 8,101 % Within Protocol 100% 100%

  • May 2011 Market Total Settlement Dollars

    12June 21, 2011 ERCOT Public

  • Reliability Services

    May 2011 ($'s in millions)

    Reliability Unit CommitmentReliability Unit Commitment

    • Make Whole Payments ($2.76)• Claw Back Charges $0.87

    Total Reliability Unit Commitment ($1.88)

    • Capacity Short Charges $2.76 • Make Whole Uplift $0.00

    • RUC Decommitment Payments $0.00

    Note:Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant

    13June 21, 2011 ERCOT Public

  • Capacity Services - Cost

    May($'s in millions)

    May($'s in millions)

    2010 2011Capacity Services**:Reg Up $4.7 $4.5 Reg Down $4.2 $3.2 Responsive Reserve $8.3 $13.0 Non-Spinning Reserve $5.3 $8.2 Black Start $0.5 $0.4 RMR Capacity* $1.3 $0.0 Voltage Services - Reactive Power n/a $0.0 Voltage Services - Lost Opportunity n/a $0.0 TOTAL CAPACITY SERVICES $24.3 $29.3

    * Includes Stand-by, Energy, and Non-Performance**Includes Day-Ahead Market and Supplementary Ancillary Service Markets

    14June 21, 2011 ERCOT Public

  • Capacity Services - Volumes

    Reg Up*: May 2010 May 2011Required (MW) 640,447 438,748 Self Arranged (MW) 126,816 13,482

    Procured DAM (MW) 425,267 Procured RTM (MW) 266 Failure to Provide (MW) 330 Total Procured 515,659 425,532 % Procured 80.5% 97.0%

    Reg Down*:Required (MW) 680,682 375,848 Self Arranged (MW) 138,659 20,897

    Procured DAM (MW) 354,951 Procured RTM (MW) 329 ( )Failure to Provide (MW) 331 Total Procured 543,806 355,279 % Procured 79.9% 94.5%

    Responsive Reserve:Required (MW) 1,708,887 1,711,308 Self Arranged (MW) 650,988 393,666

    Procured DAM (MW) 1,317,642 Procured RTM (MW) 1,364 Failure to Provide (MW) 1,384 Total Procured 1,060,306 1,319,006 % Procured 62.0% 77.1%

    Non-Spinning Reserve:Required (MW) 1 189 794 1 309 567Required (MW) 1,189,794 1,309,567 Self Arranged (MW) 306,380 125,820

    Procured DAM (MW) 1,183,747 Procured RTM (MW) -Failure to Provide (MW) -Total Procured 885,808 1,183,747 % Procured 74 5% 90 4%

    15June 21, 2011 ERCOT Public

    % Procured 74.5% 90.4%

    *A/S Methodology changed in Dec 2010

  • Energy Settlement

    M 2011May 2011 ($'s in millions)

    • Day Ahead Market Energy Settlement

    Energy Purchases $424.27

    Point to Point Obligations Purchases $27.99

    RMR Day Ahead Revenue $0.00

    Energy Sales ($413.76)

    Day Ahead Congestion Rent $38.50

    Day Ahead Make Whole Payments ($0.23)

    • Real Time Market Energy SettlementReal Time Energy Imbalance

    ~Resource Node Settlement Points ($581.24)

    ~Load Zone Settlement Points $801.57

    ~ Hub Settlement Points ($176.69)($ )

    Real Time Congestion from Self Schedules $0.19

    Block Load Transfers and DC Ties ($7.02)

    Energy Settlements Impact to Revenue Neutrality $36.82

    Emergency Energy Payments ($0.05)Base Point Deviation $0 47Base Point Deviation $0.47

    (MWh in millions)Real Time Metered Generation 27.53

    Note:Positive amounts are a charge to the Market Participant

    16June 21, 2011 ERCOT Public

    Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant

  • Congestion Management

    May 2011 ($'s in millions)

    • Auction DisbursementsAnnual Auction $0.00 Monthly Auction ($31.39)Total Disbursements ($31.39)

    • CRR SettlementDay Ahead CRR Settlement ($33.40)y ( )Day Ahead CRR Short Charges $0.27 Day Ahead CRR Short Charges Refunded ($0.27)Real Time CRR Settlement ($8.08)Real Time CRR Short Charges $0.04 Real Time CRR Short Charges Refunded ($0 04)Real Time CRR Short Charges Refunded ($0.04)Total Proceeds ($41.48)

    • PTP Obligations Acquired in DAMDay Ahead Point to Point Obligation Settlement $27.99 Real Time Point To Point Obligation Settlement ($27 35)Real Time Point To Point Obligation Settlement ($27.35)Net Settlement $0.63

    Note:Positive amounts are a charge to the Market Participant

    17June 21, 2011 ERCOT Public

    Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant

  • Net Impact to Load

    May 2011 ($'s in millions)

    Market-Based Fees

    Auction Disbursements ($31.39)

    Balancing Account Proceeds ($5.10)

    Net Reliability Unit Commitment $1.88

    Capacity Services* $29 32Capacity Services $29.32

    Real Time Revenue Neutrality ($1.38)

    Emergency Energy Payments $0.05

    Base Point Deviation Charge ($0.47)

    ($7 10)($7.10)

    ERCOT Fees

    ERCOT Administrative Fee $11.57 Net Impact to Load $4.47

    Note:Positive amounts are a charge to the Market Participant

    * RMR included in Capacity Services

    18June 21, 2011 ERCOT Public

    Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant

  • Revenue Neutrality

    19 ERCOT PublicJune 21, 2011

    Note:Positive amounts are a charge to the Market ParticipantNegative amounts are a payment to the Market Participant

  • Daily DAM and RTM Activity

    20 ERCOT PublicJune 21, 2011

  • Verifiable Costs

    21June 21, 2011 ERCOT Public

  • Extract & Report Postings

    Market Extract & Report PostingsMarket Extract & Report PostingsRun on Jun 7, 2011 2:01:39 PM

    Start Date: May 1, 2011End Date: May 31, 2011

    Posting Classifications:

    TOTAL POSTINGS TOTAL FILE SIZE (GB)1,117,955 173.35

    22 ERCOT PublicJune 21, 2011

    Posting Classifications:Certified = Available only to the Market Participant owning that dataSecure = Available to any Market Participant with a digital certificatePublic = Available to all Market Participants & general public (via ERCOT.com)

  • Extract & Report Postings

    Top 10 Market Extract & Report PostingsTop 10 Market Extract & Report PostingsRun on Jun 7, 2011 2:02:39 PM

    Start Date: May 1, 2011End Date: May 31, 2011

    23 ERCOT PublicJune 21, 2011

  • Extract & Report Downloads

    Market Extract & Report DownloadsMarket Extract & Report DownloadsRun on Jun 7, 2011 2:01:06 PM

    Start Date: May 1, 2011End Date: May 31, 2011

    Posting Classifications:

    TOTAL DOWNLOADS TOTAL FILE SIZE (GB)23,567,580 1,190.27

    24 ERCOT PublicJune 21, 2011

    Posting Classifications:Certified = Available only to the Market Participant owning that dataSecure = Available to any Market Participant with a digital certificatePublic = Available to all Market Participants & general public (via ERCOT.com)

  • Extract & Report Downloads

    Top 10 Market Extract & Report DownloadsTop 10 Market Extract & Report DownloadsRun on Jun 7, 2011 2:02:13 PM

    Start Date: May 1, 2011End Date: May 31, 2011

    25 ERCOT PublicJune 21, 2011

  • ERCOT Wholesale Market Settlement Dispute Report

    CRR Market Day‐Ahead Mkt Real Time Mkt

    May 2011

    CRR Market Day‐Ahead Mkt Real Time Mkt

    Current Month*

    SinceDec 1, 2010

    Current Month*

    SinceDec 1, 2010

    Current Month*

    SinceDec 1, 2010

    Received 0 17 9 65 19 261

    Granted 0 1 1 1 20 68

    Granted w/Exception 0 0 2 2 4 10

    Denied 1 15 3 47 30 104

    In Process 0 1 0 15 0 79

    *Some current month activity is on disputes that were received in prior months.

    26 ERCOT PublicJune 21, 2011

  • REPs and QSEs Added/Terminated – as of May 31, 2011

    • Added REPs • Added QSEs N/A Dynasty Power Inc (QSE – L1)

    Dyon LLC (QSE L1) Dyon LLC (QSE – L1) North Maple Energy LLC (QSE – 1)

    • Terminated REPs • Terminated QSEs N/A Jump Power LLC (QSE – L1)

    SESCO Enterprises LLC (QSE) SESCO Enterprises LLC (QSE)

    QSE Count Level Qualification Description83 1 Performs Inter‐QSE trades only; no direct representation of Load Serving Entity or Resource Entity129 2 Represents Load Serving Entity ; no direct representation of Resource Entity61 3 Represents Load Serving Entity and/or Resource Entity without providing Ancillary Services52 4 Represents Load Serving Entity and/or Resource Entity and provides Ancillary Services

    27 ERCOT PublicJune 21, 2011

    325 total (includes Sub‐QSEs)

  • Questions?