comitt well solutions llc 1411 vander wilt ln, … collapse. accessing stranded hyrdocarbon 11 new...
TRANSCRIPT
PROVIDING VALUE THROUGH TECHNOLOGY
MAXIMIZEEconomic recovery from
all wells
REDUCEResource consumption
SAFE Reliable Efficient
2
Vision: Global leader in revitalizing wellbores
Started in 2015 - Based in Houston, TX
Focus on developing technologies to maximize wellbore recovery
Management team with extensive downhole tools background
BREATHE NEW LIFE INTO OLD WELLS
Maximize EUR from Existing
Wellbores
Reduction of personnel and logistics
Optimize deployment of resources
3
Patented
Tubing/CT conveyed isolation tool
Pin-Point Re-stimulation of existing wells
100% hydraulic activation of all tool components
Qualified for both Acid and Proppant application
Patent granted: 20160230507 Apparatus for Injecting a Fluid into a Geological Formation
4
Patented
BREATHE NEW LIFE INTO OLD WELLS
5
Patented
A VIDEO SPEAKS A THOUSAND WORDS
GROWING THE PRODUCTION CURVE WITH THE LEARNING CURVE
6
Year bbl/ft Lbs/ft Cluster spacing
PRE 2012 <30 <500 100 – 500+
2012 – 2014 30 1,000 60 – 100
2015 35 1,400 30
2016 50 1,700 15
2017 50 3,000 <15
2017
2016
2017
2015
Source: Pioneer
Cu
m. O
il P
rod
uct
ion
[b
bl]
Cu
m. O
il P
rod
uct
ion
[b
bl]
Days on Production Days on Production
BIGGER AND BETTER FRACS ARE MAKING BIGGER AND BETTER WELLS
7
Proppant [lbs/ft]: Fluids [bbls/ft]: Stage Spacing [ft]
Oil Production Rate [BPD]
Source: EP Energy
PIN-POINT REFRACTURING:RETROFITTING NEW DESIGNS INTO OLD WELLS
8
Year Eagle Ford Barnett Bakken Marcellus
2012 3,806 2,032 2,240 1,938
2013 4,400 1,602 2,763 2,182
2014 4,400 748 2,632 1,769
TOTAL: 12,606 4,382 7,635 5,889
Wells drilled per year:
Over 100,000 Refrac candidates in US alone(Bloomberg)
FIELD TRIAL WELL FOR PROPPANT REFRAC
10
2008 vintage Shale Well – 200 BPD IP
Pre Re-frac: 3 BPD
Lateral length: 2800 ft
Casing issues limited treatments to 20% of lateral
Casing Collapse
ACCESSING STRANDED HYRDOCARBON
11
New PerfProp Frac
Old StageAcid
New PerfProp Frac
Old StageAcid
New PerfProp Frac
New PerfProp Frac
Casing Collapse
Original completion: 10 stages
Treat old stages w/acid (2 stages)
Treat new perf clusters with proppant laden fluid (4 stages)
220 ft
110 ft 110 ft
DRESSING THE TOOL FOR SUCCESS
12
Conveyed via Stick Pipe on Pulling Unit
2-7/8” PH6 Work String
80 ft spacing between packers-> Adjustable on the rig floor
GETTING IN TOUCH WITH UNTOUCHED ROCK
13
Tool Activation
ISIP similar to original frac
Tool Reset
Treating Pressure consistent with average treating pressure in initial frac
CONCLUSIVE EVIDENCE OF AN INDUSTRY FIRST PIN-POINT REFRAC
14
Original Frac Comitt Re-Frac
Fluid Volume: 35 bbls/ft 50 bbl/ft
Proppant Volume: 500 lbs/ft 1000 lbs/ft
Stage spacing: 220 ft 110 ft
6 treatments placed successfully
Up to 170,000 lbs of sand placed into a single cluster
Pump rates of up to 17 BPM achieved into a single cluster
WHP increased from 0 psi pre-job to 1,400 psi post treatment
10x increase in oil production pre-stim/post-stim from only 20% of the lateral
IS THE INDUSTRY SITTING ON A PILE OF CASH?
ARE YOU SITTING ON A PILE OF CASH?
15
Tens of thousands of Candidate wells
10x Production increasefrom 20% of wellbore
Pin-Point treatment- 100% product placement control
Field proven refrac system
Retrofit new designsinto old wells
Increase present valueof your existing assets
Maximize recoveryfrom all wells
Access stranded hydro carbon
Revitalize your aging assets
Increase production while lowering costs
EXCITE
TECHNOLOGY SOLUTIONS TO INCREASE ECONOMIC LIFE-TIME OF YOUR WELL
COMITT WELL SOLUTIONS LLC 1411 Vander
Wilt Ln, Katy, TX 77449 www.comitt.net16
Eivind MoenBusiness Development Manager
Brad HolmsVP Production Enhancement
Contact Information: