coastal geolo gic services i nc - salish sea · eschine 2010 re used to p argeted outr nducted in p...

43
Pre S m Pre eparers: An Sm ma Fee Islan epared by: C ndrea MacLe e 103, Belling Cover co ms in YELLOW as not been d eder Blu nd and E Coastal Geo ennan, Jim ham, WA 982 [Rep ould use prop W. Recommen done. uff Resto East Jeff ologic Serv Johanness Ma COASTA 225 (36 . port Title posal cover up nd check figur oration A ferson C vices, Inc. an sen, Brande ay 30, 2017 AL GEOLO 60) 647-1845 e] pdated (M dr re and table n Assessm Counties nd Northwe en Rishel, A OGIC SER www.c ive). numbers and ment for s — FINA est Straits F Alison Lubec RVICES, I coastalgeo.co reference to r AL Foundation ck, and Lisa INC. m a Kaufman

Upload: others

Post on 20-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Pre

    1711

     

     

     

     

    LISA/NWSthose num

    Pre

    eparers: An

    Ellis St. Suite

    SF Action Itemmbers. This ha

    FeeIslan

    epared by: C

    ndrea MacLe

    e 103, Belling

    Cover co

    ms in YELLOWas not been d

    eder Blund and E

    Coastal Geo

    ennan, Jim

    ham, WA 982

    [Repould use prop

    W. Recommendone.  

    uff RestoEast Jeff

    ologic Serv

    Johanness

    Ma

    COASTA

    225 (36

    .

    port Titleposal cover up

    nd check figur

    oration Aferson C

    vices, Inc. an

    sen, Brande

    ay 30, 2017

    AL GEOLO

    60) 647-1845

    e] pdated (M dr

    re and table n

    AssessmCounties

    nd Northwe

    en Rishel, A

     

    OGIC SER

    www.c

    ive). 

    numbers and 

    ment fors — FINAest Straits F

    Alison Lubec

    RVICES, I

    coastalgeo.co

    reference to 

    r AL Foundation

    ck, and Lisa

    INC.

    m

    a Kaufman

  • Feeder Bluff

    Table of F

    Table of T

    Executive

    Introduct

    Process

    Project

    Armor Re

    Method

    Armo

    Struc

    Shor

    Shor

    Feas

    Bene

    Synthes

    Top a

    Data Utilit

    Outreach 

    Mailers

    Worksh

    Site Ass

    Permit‐Le

    Beckett

    Maylor

    Waterm

    Seahor

    Conclusio

    Reference

    Appendix

     

    ff Restoration Ass

    Figures ..........

    Tables ...........

     Summary ....

    ion and Purpo

    ses and Ratio

    t Approach ...

    moval Feasib

    ds and Result

    or Removal F

    cture Setback

    re Change Me

    re Change Res

    ibility Screen

    efits of Armor

    sis ................

    and High Ben

    ty .................

    Efforts to Att

    s ...................

    hops .............

    sessments ....

    evel Designs ..

    t Point ..........

    r to Forbes Po

    man ..............

    se Siesta ......

    ons ................

    es .................

    ....................

     

    sessment for Isla

    .....................

    .....................

    .....................

    ose ...............

    nale .............

    .....................

    bility and Bene

    ts ..................

    easibility ......

    k Distances ...

    ethods ..........

    sults .............

    ing ...............

    r Removal .....

    .....................

    nefit Parcels fo

    .....................

    tain Landown

    .....................

    .....................

    .....................

    .....................

    .....................

    oints ..............

    .....................

    .....................

    .....................

    .....................

    .....................

    and and East Jeffe

    Table .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    efits Assessm

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    or Armor Rem

    .....................

    ner Willingnes

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    ferson Counties —

    of Conte......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ment ...............

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    moval ............

    ......................

    ss ..................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    COASTAL

    — FINAL May 30,

    ents .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    GEOLOGIC

    0, 2017, p. 2

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    .....................

    C SERVICES,

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    ......................

    INC. 

    ....... 3 

    ....... 3 

    ....... 4 

    ....... 5 

    ....... 5 

    ....... 5 

    ....... 6 

    ....... 7 

    ....... 7 

    ....... 7 

    ....... 7 

    ..... 10 

    ..... 11 

    ..... 12 

    ..... 14 

    ..... 16 

    ..... 17 

    ..... 17 

    ..... 17 

    ..... 17 

    ..... 19 

    ..... 19 

    ..... 21 

    ..... 22 

    ..... 25 

    ..... 26 

    ..... 28 

    ..... 29 

    ..... 30 

  • Feeder Bluff

    Figure 1. Figure 2. Figure 3. AFigure 4. Figure 5. Figure 6. WFigure 7. AFigure 8. AFigure 9. AFigure 10Figure 11Figures 12

    Table 1. STable 2. BTable 3. P ...............Table 4. STable 5. STable 6. STable 7. NTable 8. WTable 9. PTable 10.  

     

    ff Restoration Ass

    Project workfBluff crest digAverage erosRatio of maxiFrequency diWorkshop locAerial photo Aerial photo Aerial photo . Before and . Aerial photo2–24. Map fo

    Shore orientatBluff erosion rProposed “like.....................Scoring categoSummary of reSummary of reNumber of paWorkshop outPre‐workshopDesign proje

     

    sessment for Isla

    flow. .............gitizing examsion rate (FT/yimum benefitstribution of cations, site vlooking northlooking northlooking west after bulkheao looking soutolio, appended

    tion and fetchrates (FT/yr) fely safe” setb.....................ories, metric esults of restestoration bercels, prioritytreach, particp survey respoct elements. 

     

    and and East Jeffe

    Table.....................ple. ...............yr) by shore ot value associarmor removvisits and preheast at the Bhwest at the Mat the Waterad removal atthwest at thed to this docu

    Tableh categories ffrom shore chback distances.....................rationale, scooration beneenefit data foy ranking, andcipation, and onses. ................................

    ferson Counties —

    e of Figur............................................orientation anated with diffval benefit scoliminary desigBeckett Point Maylor to Forrman armor rt Waterman se Seahorse Sieument 

    e of Tablefor feeder bluhange data, ws (FT) for arm......................ores and explafit scores. .....r all parcels ind presence ofevaluations o............................................

    COASTAL

    — FINAL May 30,

    res ..........................................nd fetch categfferent scorinores for all fegn projects. .armor removrbes Point armremoval site.site................esta armor re

    es uffs. ..............with orientatimor removal f.....................anation of ca.....................n which armof house. ........overview. ...............................................

    GEOLOGIC

    0, 2017, p. 3

    .....................

    .....................gories. ..........g categories. easible parcel.....................val site. .........mor removal ..........................................emoval site. ..

    .....................on and fetch rom bluffs of.....................alculation ...........................or removal wa....................................................................................

    C SERVICES,

    ......................

    ......................

    ...........................................s. ..............................................................site. ................................................................................

    ......................categories. ..

    f various heig..................................................................as feasible. ...........................................................................................

    INC. 

    ....... 6 

    ....... 9 

    ..... 11 

    ..... 14 

    ..... 15 

    ..... 20 

    ..... 21 

    ..... 23 

    ..... 25 

    ..... 26 

    ..... 27 

    ....... 8 

    ..... 10 hts...... 12 ..... 13 ..... 15 ..... 16 ..... 17 ..... 18 ..... 19 ..... 21 

  • Feeder Bluff

    The primaprioritizedbenefit do

    The projevalues ando not typmain concWithout ebenefits. Sit is often services (Laction, weproject’s tsurveys cowould be 

    The projesets includ(PSNERP) prioritize restoratioperforme

    Phase Twincrease aarmoring,and directarmor implandownestructure drift cell; etc.). Thisthe Island

    Phase Thrwas feasibsediment Straits proCompanioallowed fo

    ff Restoration Ass

    ary objective d list of privatown‐drift sho

    ct was a targd concerns, tpically view acern (CGS laneducational oShoreline armperceived asLeschine 2010ere used to ptargeted outronducted in pat risk witho

    ct consisted oding feeder bstrategies anbluff restoraton priority andd by Coastal 

    o used the teawareness of , and establist outreach topacts as well ers gave a siteand septic seproximity to fs phase was led and Jefferso

    ree forwardedble and landosupply to shoovided the lanon funds fromor the start o

     

    sessment for Isla

    of the Feederte and publicaoreforms and 

    eted developo identify priormor removandowner needopportunities mor embodiess benefiting h0). Landowneursue armor reach reflectepriority areas ut armor. 

    of three phasbluff mappingnd shoretypestion sites withd by landownGeologic Serv

    echnical analycoastal proceh landowner  managers ofas a venue foe‐specific asseetback distancforage fish sped by the Noron Marine Res

    d the site assowner willingnoreline procendowner coom Washingtonf the permitt

    and and East Jeffe

    Executr Bluff and Arally‐owned arhabitat.  

    pment strategority projectsal as an accepds assessmenand/or incens many contruman well‐beer outreach aremoval on ped the values and removal

    ses of work: Pg, drift cells, Ps, LIDAR, habih the highest ner type. Thisvices. 

    ysis to develoesses, encourwillingness fof public landsor engaging wessment and ces; bluff recepawning habitrthwest Straitsources Comm

    essments to pness was obtass units throu

    ordination andn Departmenting process a

    ferson Counties —

    ive Summrmor Removarmor remova

    gy, informed bs and build lanptable option t 2010, NWS

    ntives, landowadictory aspeeing despite nnd educationprivately ownand concern would not b

    Phase One waPuget Sound Nitat mapping,potential to  technical ass

    p and implemrage the consor armor remprovided edu

    with decision mgauged feasiession rates; tat; proximityts Foundationmittees (MRC

    permit‐level dained. Four pugh the remod Coastal Geots of Fish andnd work tow

    COASTAL

    — FINAL May 30,

    mary al Assessmental projects tha

    by both sounndowner willand consisteF landowner wners are unaects of humannegatively affn, along with ced land. The s identified ine recommend

    as a technical Nearshore Eco, and parcel drestore procesessment and

    ment a targetsideration of amoval. Workshucation on comakers. Free bility based oand armor rey to pocket esn and accompCs) and Coast

    designs for thprojects were oval of the shoologic Serviced Wildlife andards impleme

    GEOLOGIC

    0, 2017, p. 4

    t project was at were feasib

    d science andingness. Privantly identify ‘needs assessaware of altern relationshipfecting ecosyclear incentivmessaging ann landowner ded at sites w

    analysis usinosystem Restdata layers to esses. Sites wd database de

    ed outreach salternatives thops for privaoastal processtechnical site

    on a combinatemoval benefstuaries and nplished in collal Geologic Se

    hose propertiidentified thoreline armoes completed  Natural Resoentation of th

    C SERVICES,

    to build a ble and would

    d landowner ate land own‘erosion’ as thsment 2012). rnatives and tps with naturestem goods aves for positivnd content ofneeds assesswhere structu

    ng existing dattoration Projeidentify and 

    were sorted byevelopment w

    strategy to to hard shoreate landowneses and shoree visits offeretion of factorfit (location wnatal streamsaboration wiervices. 

    es where remat would restr. Northwest the designs. ources also he projects. 

    INC. 

    ers heir 

    their e, as and ve f this ment ures 

    ta ect 

    y was 

    eline ers eline ed to rs: w/in s, th 

    moval tore 

  • Feeder Bluff

    ProcessSedimentthe primaSound Pahighlighteprojects aprojects isbeaches, likely due

    The impacsimplifies complex fbeach stehydrodynimpacts. Trestoratioeventually

    Private owthis nearsprevent laShoreline perceived(Leschine reflected emphasizremoval isarmor pre

    Project This pilot sediment approach team of pand ecolowith CoasCommitte

    By reachinshorelinesservices, aapproach 

    ff Restoration Ass

    ses and Ra supply is theary restoratiortnership (PSed the need foare on low eles certainly no33% (317 mil to the lack o

    cts of shorelinthe shorelineform. It can bepening and amics and groThe objectiveon (armor remy attained, cu

    wnership of Pshore restoratand owners frarmor embo

    d as benefiting2010). The mthe values deing the ecosys not recommesent. 

    Approachproject aimesupply restobecause sed

    professionals eogy, facilitatiostal Geologic Sees.  

    ng out to the s, this projectas well as amenhances un

     

    sessment for Isla

    Inationale e target procen managemeP), PSNERP, aor more projeevation shoreot due to a laces) of which af willing land

    ne armor are e, often straigbury upper intnarrowing, imoundwater fle of this projemoval) areas iulminating in 

    Puget Sound btion. In additirom viewing aodies many cog human welmessage and cescribed in thystem goods amended along

    d to carve a nration in Pugeiment supplyexperienced on and projectServices, our 

    landowner, et has the poteeliorate the mnderstanding 

    and and East Jeffe

    ntroductio

    ess of the PSNnt measure rand the Estuaects of this stes in which seck of opportuare armored owners amen

    not limited tghtening and tertidal foragempede cross sow, and causct was to idenn which targethe developm

    beaches and bion, societal varmor removontradictory al‐being despitcontent of thee land‐ownerand services tg sites in whic

    navigable patet Sound. Islay restoration tin the field oft planning. Leteam also en

    educating andential to direcmany deleterof landowner

    ferson Counties —

    on and P

    NERP beach rerequired to efry and Salmorategy, as madiment supplnity as over 9(Simenstad enable to remo

    o precluding shortening the fish spawnishore connecse habitat fragntify and prioeted land‐owment of a high

    bluffs presentvalues and peval as an acceaspects of humte negatively e targeted our surveys as athat are enhach existing str

    h through theand and Jeffertargets are abf outreach anead by the Nontailed collabo

    d engaging thctly benefit neious impacts r values and n

    COASTAL

    — FINAL May 30,

    Purpose

    estoration strffectively reston Restorationany existing ply would not 950 miles of Pet al. 2011). Toving armor f

    sediment suphe shoreline ng areas, leadctivity, reducegmentation, aoritize feasiblewner outreachh‐quality rest

    ts an immeaserceived needptable optionman relationsaffecting ecoutreach efforta means of buanced as a resructures wou

    e complex corson Countiesbundant. Thend education, orthwest Straoration with 

    hem in the maearshore ecoassociated wnurtures awa

    GEOLOGIC

    0, 2017, p. 5

    rategy and artore this procn Program (Eproposed bulkbe restored. Puget Sound ahe lack of profrom their pro

    pply processeinto a more ld to sedimene riparian shaamong numee, highly beneh would be fotoration desig

    surable constds for shorelinn regardless oships with naosystem goodts developed uilding commsult of armor ld be compro

    onstraints assos were select project was  GIS, coastal gits Foundatiolocal Marine 

    anagement oosystem procewith shorelineareness of the

    C SERVICES,

    rmor removalcess. The PugeSRP) have all khead removaThe lack of are bluff backojects is moreoperty.  

    es; armoring inear, less t coarsening,ading, alter erous other eficial feedercused and gn. 

    traint to achiene armor largof benefit. ature, as it is ods and servicefor this projeon ground anremoval. Armomised witho

    ociated with ted to apply tcompleted bygeomorpholoon in collaborResources 

    of Puget Sounesses, goods ae armor. This e human 

    INC. 

     is et 

    al 

    ked e 

    r bluff 

    eving gely 

    often es ect nd mor ut 

    his y a ogy ration 

    d and 

  • Feeder Bluff

    connectioand bette

    The projeefforts to armor remof this rep

    Figure 1. P

     

    The objecThe assesfeeder bluriprap or oincludes tIsland.  

    ff Restoration Ass

    on as a part ofer shoreline st

    ct was initiatattain landowmoval designsport.  

    Project workflo

    Armorctive of this sesment was fouffs. Armoredother similar the marine sh

     

    sessment for Isla

    f the nearshotewardship to

    ed with a GISwner willingns (Figure 1). E

    ow. 

    r Removaection is to doocused exclusd bluffs are thstructure, ha

    hores of Island

    and and East Jeffe

    ore ecosystemo benefit nea

    S analysis of sness, and finaEach element 

    al Feasibiocument and sively on parchose where a as been constd and east Jef

    ferson Counties —

    m, as well as imrshore proces

    ite feasibility lly develop a of this appro

    lity and Bdescribe the

    cels within theshore defensructed to redfferson Count

    COASTAL

    — FINAL May 30,

    mproves prosses in the st

    and benefit, portfolio of hoach is discuss

    Benefits Ae various eleme study area tse structure, sduce bluff toeties, excludin

    GEOLOGIC

    0, 2017, p. 6

    perty owner udy area.  

    followed by thighly beneficsed in the ind

    Assessmments of the Gthat encompasuch as a bule erosion. Theng the west sh

    C SERVICES,

    understandin

    targeted outrcial permit‐redividual sectio

    ment GIS assessmeass armored khead, seawae study area hore of Whidb

    INC. 

    ng 

    reach eady ons 

     

    nt. 

    all, 

    bey 

  • Feeder Bluff

    MethodThe methcriteria instructure benefit ofshore‐drifprioritized

    Armor ReAssessingpredictionarmor remdistances determine

    Prior to cofeasibility

    Bth

    Shp

    Pco

    StructureStructure risk to thethere is nfeasible, b

    Setback dmeasuringstructuresvalue.  

    Shore ChThe objeccoastal blarmor rembluffs throunarmorestratified exposed t

    ff Restoration Ass

    s and Resods used to a GIS, both of setback distaf armor remoft cell in whicd by benefit s

    emoval Feas the feasibilitn of bluff recemoval is not li(from the blue feasibility. 

    onducting they assessment,

    luff crest delihe bluff crestshoreline strucarcels with aruget Sound Sommercial ow

    e Setback Dissetback distae structure froo apparent riby default.  

    istances wereg the distances were locate

    hange Methoctive of the shuffs to informmoval projectoughout the sed feeder blufstructure of tto low, mediu

     

    sessment for Isla

    ults assess the feawhich are deances combinval was assesh the parcel iscores and so

    sibility ty of armor reession. This aikely feasibleuff crest), blu

    e analyses, se including:  

    neation of Isls of east Jeffectures of Islanrmored feedehoreline Parcwnership (pre

    stances ance, or the dom bluff cressk to a struct

    e calculated we between thed waterward

    ods hore change am what a safet. To reach thstudy area. Tffs with variathe feeder bluum, and high 

    and and East Jeffe

    asibility and bescribed in deed with bluffssed by analyis located. Parted by owne

    emoval is compproach was . Using a serieff characteris

    everal GIS dat

    land County (erson County nd County weer bluffs, cel geodatabaeviously only 

    distance a strut recession (bure from bluf

    within each phe bluff crest  of or straddl

    analysis was t setback distais goal, bluff he first step ible levels of euff sample refetch (the op

    ferson Counties —

    benefits of armtail below. Arf recession ratzing nearshorcels deemedership type to

    mplex, as consdeveloped toes of GIS analstics, bluff rec

    ta sets were c

    (completed bfor all armorere augmente

    ase was augmresidential pa

    ucture is frombluff erosion)ff erosion and

    parcel with a dand the mosted the bluff c

    to quantify thance is for strrecession ratn conductingexposure, shoquired that een water dist

    COASTAL

    — FINAL May 30,

    mor removal rmor removates within there conditionsd feasible for o guide later o

    siderable unco identify andlyses, we assecession rates,

    compiled and

    y CGS in 2013red feeder blued to include 

    mented to incarcels). 

    m the bluff cre. If there is nod armor remo

    digitized struct waterward ecrest, the set

    he range of blructures locates were meag the shore chore orientatioequal portionstance over wh

    GEOLOGIC

    0, 2017, p. 7

    were appliedal feasibility we study area. s within each armor removoutreach effo

    certainty existd filter out paessed structu, and landslid

    d augmented 

    3) was augmeuffs, east Jefferso

    lude parcels w

    est, is indicato structure ooval can be co

    cture and bluextent of the back distance

    uff recessionted landwardsured from 3hange analysion, and surfics of the feedehich wind‐ge

    C SERVICES,

    d as two diffewas informed The potentiaparcel and thval were thenorts. 

    ts regarding trcels in whichure setback e history to 

    to facilitate t

    ented to inclu

    on shores for a

    with public a

    ive of the levn the parcel, onsidered 

    uff crest by structure. We was a negat

     from a varietd of a potentia9 unarmoreds was to idenial geology. Ter bluffs werenerated wave

    INC. 

    rent by al he net n 

    the h 

    he 

    ude 

    all 

    nd 

    vel of then 

    Where tive 

    ty of al d ntify The e es 

  • Feeder Bluff

    form) cateorientatedthen invevisible sho

    Table 1. Sh

    OrienNorth (13)

    South (27)

    Total (39)  

    We identithe shore2003, Mo

    Opan

    U U U A

    ch C

    trThe largesstudy areahighest lowaterwaridentifiedwere presbe interprmet the s

    All shore cfor analysthe locatiposition wlandward shoreline historical 

    ff Restoration Ass

    egories. Rougd to the southstigated for eoreline condit

    hore orientatio

    ntation

    ified and emp change analyrton et al. 20

    Only bluffs freromontories,nd/or shore ase of the largse of the mosse of a singlen automatedhange betweehange rates wrends within ast scale histora. Many histoocal accuracy rd and landwa for analysis dsent for accurreted with adtratification c

    change work sis. Breaks in ton of the blufwas not reliabfeatures canproxy was noaerial photo 

     

    sessment for Isla

    ghly one‐thirdh (Table 1). Teach bluff in ttions was an 

    on and fetch ca

    Low (1

    5

    11

    16

    search to redu09, Fletcher e

    were selectedatic sediment

    00) ff (bluff crest e error assocnalysis System

    d from each t

    red and compng, which was). For examply of the shorehotos, where aded to the dbluffs were r

    1:1,000 scalee shore was tn some locatioard shoreline(Ruggerio et ae year that feed on availab

    GEOLOGIC

    0, 2017, p. 8

    ng and the rebluff stratigran aerial photoff selection.  

    f recession rate

    0)

    uce sources oet al. 2003, R

    d for analysis,t supply loss i

     or bluff toe) ciated with intms (DSAS) was

    transect to nu

    piled in ArcGISs conducted te, control poeline. Some oinsufficient cdegree that fereplaced with

    es and storedtoo heavily foons where the proxy was seal. 2003). Theeature represbility and the 

    C SERVICES,

    emaining phy data werography with 

    es were measu

    of uncertaintyuggerio et al.

    , such as: bedn the drift ce

     terpretations used to mea

    ullify localized

    S throughoutto achieve thints were plaf the bluffs control pointseatures couldh another site

     in a geodataorested to dishe bluff crest elected, as me delineated sented. Differability to clea

    INC. 

    re 

    ured. 

    y in . 

    drock ell, 

    asure 

    t the e ced 

    s d not e that 

    base cern 

    ore 

    ent arly 

  • Feeder Bluff

    view the sranged frophotograpLIDAR imadigitizatio

    Figure 2. Bimagery ofrepresents

    SupportinSound Feebluff mapbluff excefrequencyand recorlocal geolSchasse aavailable 

    All of the to assure 

    ff Restoration Ass

    subject featuom years 195phs of high reagery (Island on process fro

    Bluff crest digitf bluff (shorefos the measured

    ng data was theder Bluff mapped along theptional shorey as comparerded from theogy (high resnd Slaughter for the site.  

    original featuconsistency i

     

    sessment for Isla

    re with a high56 to 1969. Cuesolution (JeffCounty 2002,om both histo

    izing example orm ID) 2754 od bluff crest re

    hen populateapping geodaat shore reaces contribute d to feeder be subject bluffolution; 1:24,2005, WDOE

    ure digitizing n feature inte

    and and East Jeffe

    h level of conurrent featureferson Count, Jefferson Coorical and LIDA

    from 1956 histn southwest Ccession across

    d in the GIS atabase (MacLch was also noa greater volluffs (MacLenf to the most,000, WDGERE 1979, WDOE

    was completeerpretation, a

    ferson Counties —

    fidence. Photes were digitiy 2009, Islandounty 2004). FAR imagery. 

    torical vertical amano Island.  the period of 

    attribute tableLennan et al. oted (feeder blume of sedimnnan et al. 20 distant land.R 2014 in prepE 1978), and w

    ed by a singleand preclude 

    COASTAL

    — FINAL May 30,

    tos were typiized from thed County 201Figure 2 prov

      image (top) an The distance banalysis.  

    e using the sh2013) to idenbluff or feedement to the n013). The max. Shore orientp, Contreras ewhether or n

    e, well‐qualifiunnecessary

    GEOLOGIC

    0, 2017, p. 9

    cally scaled ae most recent13) or more covides an exam

    nd 2002 LIDARbetween the tw

    horeform ID fntify each bluer bluff excepnearshore witximum fetch wtation was reet al. 2013, Poot bluff strat

    ied staff memy bias associat

    C SERVICES,

    at 1:12,000 ant vertical aeriaommonly fromple of the 

    R slope changewo bluff crest 

    from the Puguff. The type optional). Feedh greater was measurecorded, as waolenz et al. 20igraphy data 

    mber (MacLented with mult

    INC. 

    nd al m 

     lines 

    et of er 

    ed as 013, were 

    nnan) tiple 

  • Feeder Bluff

    analysts. Asecondarypotential 

    The DigitaEnvironmchange stallowing fbaselines were creashorelines(25‐metershoreline annual chnumber owithin eac

    Shore ChThe averageology m(31%) or VSchasse amapped arates, howrelationsh

    The averawith the lSurface geglacial dehad over 4as both uncaptured FT/yr, n=7

    Table 2. Bldeviations,

    Bluff ErosRates (FT/

    Minimum

    Maximum

    Average Standard d

    Range

    ff Restoration Ass

    All digitizing wy QA/QC stepproblem area

    al Shoreline Aental Systematistics for a tfor greater efwere createdated by expors landward ofr) intervals acfeature from

    hange which eof years betwech individual 

    hange Resultage length of mapping showVashon outwand Slaughter across one or wever there whips as part of

    age measuredeast erosion eology of theposits that oc41 miles of fendivided Frasin the standa7) eroded con

    uff erosion rat, with shore or

    sion /yr)

    -0

    -0

    -0deviation 0

    -0

     

    sessment for Isla

    was QA/QC’dp was appliedas.  

    Analysis Systes Research Intime series officiency and rd from which rting reaches f the feature cross the samm each transecequates to theeen those feafeeder bluff a

    ts individual showed that the mash deposits 2005, WDOEmore of the 

    was not an adf this effort. 

    d erosion ratemeasured 0.2 bluff was maccurs in the Petch. The surfser and Pre‐Frard deviation nsiderably fas

    tes (FT/yr) fromrientation and 

    Low N S

    0.22 -0.

    0.34 -0.

    0.27 -0.0.05 0.

    0.11 -0.

    and and East Jeffe

     by senior coafter the ero

    m (DSAS) is anstitute (ESRI)f shoreline vereducing opptransects woof the WDNRdigitizing. Cu

    mpled bluffs. Dct and calculae measured datures (e.g., 1and across ex

    ore change mmajority of th(23%) (WDGEE 1979, WDOEbluffs that wedequate numb

    e was 0.36 fee22 FT/yr and apped as glacuget Sound. Tficial geology raser deposit(0.26 FT/yr).ster than feed

    m shore changefetch categori

    S N

    .13 -0.2

    .64 -1.0

    .31 -0.416 0.36

    .51 -0.7

    ferson Counties —

    astal geologisosion rates we

    a free softwar) and USGS (Tector data. DSortunities forould be drawnR Shorezone smulatively, oDSAS then calated an end pdistance betw1957 and 2009xposure and o

    mapping area he bluffs wereER 2014, ContE 1978). At leere analyzed.ber of bluffs t

    et per year (Fwas from a social till, one ofThe bluff withof the bluff ws. The extentAs one mightder bluffs (0.3

    e data, includines. 

    Mod S

    25 -0.24

    02 -0.77

    48 -0.366 0.18

    78 -0.53

    COASTAL

    — FINAL May 30,

    st Jim Johannere calculated

    re applicationThieler et al. 2SAS automater error. Prior tn perpendicushoreline (WDover 910 translculated the dpoint rate (EPween the two 9). The EPR morientation ca

    analysis was e comprised otreras et al. 2east nine othe. Bluff geologto explore the

    T/yr) across aouth‐facing bf the most resh the greateswas mapped at of the ranget expect, feed35 FT/yr, n=32

    ng average ero

    N

    4 -0.30

    7 -1.53

    6 -0.710.53

    3 -1.23

    GEOLOGIC

    0, 2017, p. 10

    nessen to ensd to identify a

    n that was dev2013). DSAS ces the shore cto running thlar to the shoDNR 2001) ansects were pldistance betwR), a measure features divimeasures werategories.  

    approximateof either Vash2013, Polenz eer surficial geogy is relevant e strength of 

    all bluffs (Tabbluff with onlysistant and prt erosion wasas Qguc, whice of erosion rader bluff exce2).  

    osion rates, ran

    High S

    -0.12

    -0.77

    -0.34 0.17

    -0.65

    C SERVICES,

    ure accuracyand resolve 

    veloped by thcomputes ratchange procehe software, oreline. Baselnd buffering taced at 82‐foween each ement of aveided by the re then analyz

    ely 350 FT. Suhon lodgemeet al. 2013, ology units wto bluff recesthese 

    ble 2). The bluy 2‐miles of ferevalent posts north‐facingch is characteates is well‐eptional units

    nges, and stand

    All Bluffs

    -0.03

    -1.53

    -0.36 0.26

    -1.5

    INC. 

    . A 

    he e of ess, 

    ines those oot 

    erage 

    zed 

    rface nt till 

    were ssion 

    uff etch. t‐g and erized 

     (0.57 

    dard 

  • Feeder Bluff

    North‐facfetch amoTable 2, Fmoderateexposure to approxand Rosarrates of ndocument

    Figure 3. Afetch (5 to 

    FeasibilitThe stratiapplied toshore chaarmored srecession 

    Historical in this casexample, rise, wavepredictedthe rate afactor waon the asslandslides

    Bluff heigrecession 

    ‐0.80

    ‐0.70

    ‐0.60

    ‐0.50

    ‐0.40

    ‐0.30

    ‐0.20

    ‐0.10

    0.00

    Average Erosion Ra

    te (F

    T/yr)

    ff Restoration Ass

    cing bluffs hadong the modeigure 3). Thise to high expoin northern Pximately 25 mrio Strait, wheorth‐facing bted in north‐f

    Average erosion10 miles), Hig

    ty Screeningfied samplingo categorize aange analysis shores. The erates (Table 

    erosion ratesse). However,relying on hine energy, and for the shoreat which coasts added to thsumption thas were presen

    hts ranged corates were m

     

    sessment for Isla

    d consistentlyerate to high s pattern coulosure categorPuget Sound. miles. In contraere maximumluffs are slighfacing bluffs. 

    n rate (FT/yr) bh fetch (>10 m

    g g approach toall armored bwere then userosion rates w2) by 75 year

    s are commo, there are send‐casting alo other implices of the Pacital bluffs recehe 75‐year recat there was nnt, then they 

    onsiderably ameasured wer

    Low

    and and East Jeffe

    y higher bluff exposure catd be due to tries at 10‐mileIn this part oast, north‐facm exposure cahtly higher tha

    by shore orientmiles). 

    o select unarmluffs in the stsed to estimatwere projecters and adding

    nly used to foveral assumpone assumes ations of climfic Northwesede. Because cession distanno previous hwere treated

    cross the studre typically hi

    M

    North

    ferson Counties —

    erosion ratesegories (S‐facthe sampling es. However, of Puget Souncing bluffs canan be 50 milean south‐faci

    tation and fetc

    mored bluffs fudy area. Thete bluff recesed forward 75an additiona

    orecast the fuptions that mathat conditio

    mate change st (Huppert etof these uncence. The resuistory of larged differently. T

    dy area (8–25gher in eleva

    Mod

    South

    COASTAL

    — FINAL May 30,

    s, which is likcing 12.9 mileand the somea similar patt

    nd, maximum n be exposeds or more. Alng bluffs, con

    ch categories. L

    for shore chae bluff recessssion if armor5 years by mual safety facto

    uture positionake this approons will not chsuch as increat al. 2009), eaertainties, anlting setback e landslides wThese details

    50 FT), howevation than the

    Hi

    GEOLOGIC

    0, 2017, p. 11

    kely due to thees, versus N‐fewhat arbitratern exists in fetch to the 

    d to the Strait though the ansiderably mo

    Low fetch (

  • Feeder Bluff

    Jefferson height). Hlandslidesless than t

    Table 3. Pr

    Fetch Low

    Moderate

    High  

    Large landQls in surfand Slaugarmor remstructureslandslide 500 FT of flagged foattributed

    If there wpreviouslyadditiona

    Benefits The potenarmored fthe aforemdescribed

    Nine metrdirect andand embaaddressedmetrics dcame frombluff func

    Each scorgeoprocedrift shorecell (from

    ff Restoration Ass

    and Island CoHigher elevatios. Therefore, tthe higher ele

    roposed “likely

    Bluffs 75 FNorth 45

    49

    65

    e USGS and W13, Polenz etandslides at tre no structucated within dslides were 1979), then thwas left in qu

    al was conside assessmentbility. 

    cels that encooval was deemveloped and a

    val. Potential t supply to doed, except thae points awarortion of the tsulting from r

    parcel geomeaddress the leong the length

    C SERVICES,

    ter than 60 Fmore frequee 3) were sligh

    heights.  

    FT High South 48

    48

    55

    WDNR (mappt al. 2013, Schthe site, thenres. If there w500 FT of a lamapped withhe parcel wasestion (feasib

    ered feasiblet tool, and 

    ompassed med infeasibleapplied are 

    benefits incluown‐drift beacat which rded to other total ranking restored feed

    etry. Consideength of dowh of its littora

    INC. 

    T in nt htly 

    ped as hasse  were arge hin s bility 

    e. As 

    e by 

    uded ches 

    score er 

    erable n‐l drift 

  • Feeder Bluff

    Table 4. Sc

    Category

    Sustains Down-drift

    System (30 pts)

    Beach Sediment

    Sustenance(45 pts)

    Direct HabitaBenefits (45 pts)

    Indirect Habitat Benefits (30 pts)

     

    ff Restoration Ass

    coring categoriMetric Name

    t

    Down-drift lagoon/ estuary

    e

    Length of down-drift

    shore

    Percent of cell down-

    drift

    Potential volume of sediment

    input (totalparcel)

    at

    Forage fishspawn

    Restorablelength (FT)

    Adjacent opportunity

    ?

    Down-drift forage fishspawning

    habitat

    Down-drift forage fishspawning

    habitat

     

    sessment for Isla

    es, metric ratio

    Metric

    Sediment susubject blu

    valuedshoreform

    Sediment susubject bluconsidera

    down-d

    Sediment susubject bluf

    the downnormalizavailable

    provides regiona

    Compare poof potent

    sediment yard

    h Armor re

    immediateburied/cons

    e )

    Measured learmor re

    y

    This would feasibility sthere is noproperty

    fea

    Measur

    documentedto potentiallysediment su

    Percent of dwith spaw

    Assures benot skewed

    c

     

    and and East Jeffe

    onale, scores a

    c Rationale

    upplied from the uff will support

    d down-drift s and habitats.

    upplied from the uff will support

    able lengths of drift shores.

    upplied from the ff sustain X% of n-drift shore, zed out of 15 e points. This a measure of

    al influence.

    otential volumes tially restored supply (cubic

    ds/year)

    emoval would ely recover this strained habitat.

    ength of potentialemoval area.

    be results of the screening. So if o house on the it is generally asible.

    red length of d spawning area y benefit from theupply restoration.

    down-drift shore wning habitat. enefit scores are d to longer drift cells.

    ferson Counties —

    and explanatioScore Type

    Present/Absent

    H/M/L/0

    0-15

    H/M/L/0

    Present/Absent

    l H/M/L/0

    2 shores, 1 shore, or partial

    e

    H/M/L/0

    H/M/L/0

    COASTAL

    — FINAL May 30,

    on of how eachMax

    Score

    30 30 poi

    lag

    15

    Thepar

    pointsmile

    points

    15

    The lirela

    expres

    15

    Tertilethe [a

    thepoint

    >18

    15 15 pdoc

    15

    Length>100 F

    (5 po

    15

    Potenalong

    = 1ma

    15

    Sum oloca

    High poin

    m

    15

    Percspawdrift s

    (mmodefor 3 miles; mee, low (5 points) s are given for pa

    down-dr

    nearly referenceative to the full lessed as a percen

    the neare

    e 5/10/15 of [erosarmor length in the [mean bluff heigts) is >111 cy/yr, 87 cy/yr, low (5 p

    points f

    points if forage fiscumented on the

    poi

    h of armor on paFT, moderate (10oints) is >20 FT,

    F

    ntial to increase leadjacent shores15 pts, one adjacaybe/perhaps = 3

    of length of foragated down-drift (d(15 points) is >1nts) is >0.5 miles

    miles, with 0 point

    cent of the downwning habitat plusshore with sand lax 200%). High

    erate (10 points) =30%, and zero p

    spaw

    C SERVICES,

    alculated.  

    of Calculation

    ier beach with las located down-de 0 points.

    hore from the suell terminus. Highedium (10 pointsis >0 miles, and

    arcels with zero mrift shore.

    ed address of theength of the drift nt, times 15, rounest integer.

    sion rate in FT/yrhe parcel in feet]ght in feet]. Highmedium (10 poi

    points) is >0 FT, for 0 FT.

    sh spawning has parcel. Otherwisints.

    arcel. High (15 po0 points) is >60 Fwith 0 points for

    FT.

    ength of armor res? Both adjacent cent shore = 10 3 per adjacent sh

    ge fish spawning dissolved by spec.5 miles, modera

    s, low (5 points) its given for 0 mile

    -drift shore with ss the percent of dance spawning h(15 points) is >8is >30%, low (5 points for no dowwning.

    INC. 

    ndward drift,

    ubject h (15 s) is >1 zero

    miles of

    e parcel cell, nded to

    r] times ] times (15 nts) is or 0

    been se, 0

    oints) is FT, low 0 es.

    smelt down-habitat 5%, points)

    wn-drift

  • Feeder Bluff

    Figure 4. R

    Some metto assure found in ssediment and integLiDAR and

    SynthesClose to 7were maparmored fminimummapping lengths w

    Feasibilitythat werecritical eledistances assessmemost casethe presestructuresthem infe

    Structuresparcels, 4

    DiInd

    ff Restoration Ass

    Ratio of maxim

    trics, such as that longer dshorter drift cwas estimaterating those dd the potentia

    sis 7,500 parcels pped as armofeeder bluffs  mapping uniboundaries w

    were as low as

    y was assessee amenable toement of detedue to structnt was condues, state or lonce of structus. Air photo reeasible for arm

    s were not ap55 were resid

    Restorat

    rect habitat bedirect habitat b

     

    sessment for Isla

    um benefit val

    beach sustendrift cells werecells are assumed by extrapodata with siteally restorabl

    were assembored. Approximor bluff‐backit for the preswere not spats 7 FT. The ave

    ed for all parco armor remoermining armture shading oucted to gain cal land use dures. After reeview revealemor removal. 

    pparent on aldential parce

    tion bene

    enefitsbenefits

    and and East Jeffe

    lue associated 

    nance, use boe not overly‐wmed to be eqolating bluff ee characteriste shoreline le

    bled into the imately 1,300 ked beaches (sence of armoially coincideerage potent

    els, which redoval to 501 pamor removal feor a lack of ascertainty of sdata combineviewing land ed that both 

    most half of tls, and the re

    efit rankin

    SustainsBeach s

    ferson Counties —

    with different

    oth the lengthweighted for ually significaerosion rates ics within theength.  

    initial projectof these parcMacLennan eor in the datant with parceial armor rem

    duced the totarcels (Table 5easibility. Howssessor data. structure presed with air phuse data, onparcels had s

    these parcelsmaining 46 w

    ng criteri

    s down‐drift syediment suste

    COASTAL

    — FINAL May 30,

     t scoring catego

    h and percentrestoration, ant locally. Thderived frome subject parc

    t geodatabasecels encompaet al. 2013, Sia set was 20 Fel boundariesmoval length w

    tal number of5). Structure wever, 24 paTo address tsence and armhoto reviews wly 2 parcels atructures on 

    s. Of the 501 pwere under pu

    a

    ystemenance

    GEOLOGIC

    0, 2017, p. 14

    ories.  

    t of down‐drias sediment ahe potential vm the shore chcel, including 

    e for analysisassed shores menstad et aFT; however, s; therefore awas 137 FT.  

    f parcels withsetback distarcels did not his data gap, mor removal were used to ppeared likelthe face of th

    potentially feublic or comm

    C SERVICES,

    ft shore. Thisand habitats volume of reshange analysibluff height f

    , 2,862 of whmapped as al. 2011). The many armor rmor remova

    hin the study ances were a have structuadditional feasibility. In gain insight oly to contain he bluff, mak

    easible restoramercial owne

    INC. 

    s was 

    stored s, from 

    hich 

    al 

    area 

    re 

    n on 

    ing 

    ation rship.  

  • Feeder Bluff

    Table 5. Su

    RestoratioCriteria Sustains d

    Length of d

    Percent of

    Potential v

    On-site for

    Restorable

    Adjacent o

    Down-drift Percent dospawning *adjacent 

    Parcel chaintersectiCounty) amile of shCounty wremoval wencompas

    The potenwas deem(mean) scdistributio

    Figure 5. F

    0

    10

    20

    30

    40

    50

    60

    70

    Parc

    el C

    ount

    ff Restoration Ass

    ummary of res

    on Benefit Sco

    own-drift emba

    down-drift shor

    cell down-drift

    ol. sediment in

    age fish spawn

    e length

    pportunity

    forage fish spaown-drift with fo

    property feasi

    aracteristics ang parcels in t greater parhore in Jeffersere armored were likely skssed forage fi

    ntial benefit omed feasible fcore was 80.0on of scores w

    requency distr

     

    sessment for Isla

    ults of restorat

    oring ToPa

    ayments 2

    e

    put 4

    ning 2

    4

    awning 4orage fish 4

    bility flagged a

    also varied acIsland Countycel density (3son). In additi(44% versus ewed by the ish spawning 

    of armor remfor armor rem0 points, and twas normal (F

    ribution of arm

    and and East Jeffe

    tion benefit sc

    otal arcels Bre

    256

    501 >3 501

    428 >111 252

    414 >100176 2 sid420 >1.5

    421 >85

    as “maybe” 

    cross the study (4,474 parc32 parcels perion, a greater30%) as compgeography asareas (3,252 

    oval was assemoval scored the median scFigure 5).  

    mor removal be

    Be

    ferson Counties —

    ores.  

    High

    eak # Parcels

    mi 177

    cy/yr 177

    0 FT 170

    des 43

    5 mi 160

    5% 145

    dy area in botels in Island Cr mile of shorr proportion opared to Jeffes considerablyin Island Cou

    essed for all p143 points oucore was 79 p

    enefit scores fo

    nefit Scores

    COASTAL

    — FINAL May 30,

    M

    s Break

    P

    >1 mi

    Scored

    >37 cy/yr

    P

    >60 FT

    1 side

    >0.5 mi

    >30%

    h counties, wCounty versusre in Island Coof the shorelierson Countyy more parceunty versus 1,

    parcels. The mut of a total opoints. The lo

    or all feasible p

    GEOLOGIC

    0, 2017, p. 15

    od #

    Parcels P/A

    167

    d as %

    167

    P/A

    131

    127

    161

    140

    with many mos 3,004 parceounty, versus ne parcels foy. The benefitels in Island Co,015 in Jeffer

    maximum scoof 150 points. owest score w

    parcels.  

    C SERVICES,

    Low

    Break # P

    >0 mi

    >0

    >20 FT

    Maybe*

    >0 mi

    >0% 136

    ore shoreline‐els in Jefferso17 parcels peund in Islands of armor ounty son County).

    ring parcel thThe average 

    was 6 points. T

    INC. 

    Parcels

    156

    156

    113

    5

    99

    6

    ‐n er  

    hat 

    The 

     

  • Feeder Bluff

    Feasible abenefit scas many aAs expectfeasible pparcels).  

    The resultstudy areaprovide sepotential and rangithe drift c

    Table 6. Supresence/aRestoratioCriteria Length of d

    Percent of

    Potential v

    Restorable

    Down-drift Percent dospawning ( 

    Top and HThe parcewere higharmor remnext higheremoval wareas werHarbor, aappendedCounty wToandos Pwidesprea

    Specific qstudy arearanking paon the pro

    ff Restoration Ass

    armor removacores). Some as 48. On aveted based on parcels for arm

    ts of the benea. Half of the ediment to doto restore seng up to 14.2cell length (lo

    ummary of restabsence data son Benefit Sco

    down-drift shor

    cell down-drift

    ol. sediment in

    e length (FT)

    forage fish spaown-drift with fo(%)

    High Benefitels in which arhlighted as prmoval represeest scoring tewere located re identified and the northed to this docuith some clusPeninsula (soad coverage t

    ueries of the a and to selecarcels with ovoperty. Table

     

    sessment for Isla

    al parcels werdrift cells hadrage, 8 parcethe contrastimor removal w

    efit scoring prparcels identown‐drift bardiment to co2 miles down‐cated down‐d

    toration benefsummarized in oring

    e (mi)

    (%)

    put (cy/yr)

    awning (mi) orage fish

    t Parcels for rmor removaiorities for ouent the top scertile (34‐66%along the shoalong the eastern shore of Pment. Top rastered in Discutheast of Dathroughout b

    database canct parcels for ver 500 FT of e 7 displays th

    and and East Jeffe

    re identified id only one feals were identng parcel chawere identifie

    rovide interestified as feasirrier embaymnsiderable le‐drift. On avedrift of the pa

    fit data for all pTable 5.  Average

    Value 3.1 mi

    51%

    168

    137

    1.6

    51%

    Armor Remol would likelyutreach and ecoring tertile %), respectivelores of Islandt and west shPenn Cove. Foanking parcelsovery Bay, noabob Bay). Higoth counties 

    n be conductetailored outrarmored sho

    he number of 

    ferson Counties —

    in 61 drift celasible armor rtified as feasibaracteristics aed in Island (3

    sting data on ble for armor

    ment systems ngths of dowrage, armor rarcel).  

    parcels in whic

    Min

    0

    0%

    4

    7

    0

    0%

    oval y provide the eventual impl(top 33%), anly. Far more o County. Clushores of southor large scales were scatteorth of Hood gh‐priority pa(Figures 12–2

    ed to explorereach efforts.ore. Two of thparcels acros

    COASTAL

    — FINAL May 30,

    ls across the removal parcble for armoracross the two331 parcels) v

     the values ofr removal hav(Tables 5 and

    wn‐drift shoreremoval could

    ch armor remo

    Max

    14.2

    100%

    7,236

    7,230

    10.2

    79%

    greatest benementation. nd the high raof the higheststers of high rhern Camanoe maps, see Mred throughoHead, and aloarcels were si24).  

    e the range of. For examplehese parcels ass the differe

    GEOLOGIC

    0, 2017, p. 16

    study area (wcel identified wr removal wito counties, coversus Jeffers

    f feeder bluffve the potentd 6). Most pars, with an aved potentially 

    val was feasib

    efit to nearshThe top rankanking parcelt ranking parcranking armoo Island, westMap Folio Figuout the shoreong the west imilarly distri

    f opportunity e, there were appeared to cnt priority ra

    C SERVICES,

    with variable while others hin each driftonsiderably mson County (1

    fs throughouttial, if restorercels had the erage of 3.1 mbenefit 51% o

    le. Parcels with

    hore resourceking parcels fos represent tcels for armor removal priern Holmes ures 12–24 s of Jeffersonshore of the buted with m

    throughout t9 top or highcontain a strunkings, owne

    INC. 

    had t cell. more 170 

    t the ed, to 

    miles of 

    es or he r iority 

    more 

    the h‐ucture ership 

  • Feeder Bluff

    categorieparcels is 

    Table 7. NParcel TypResidentia

    Non-reside

    Structure

    No structur

    Total  

    The resultimplementhe parceThese pararmor remassessme

    A variety landowneto a broadSeparate this lando

    Mailers Postcardsworkshoplimited toalso a goa

    Additionaand incenassistance

    WorkshWorkshopworkshoptwo workpertainingand at the

    ff Restoration Ass

    s, and whethshown in Fig

    umber of parce

    pe Tl

    ential

    re

    ts of these GInt armor remls identified frcels may repmoval may nont efforts aim

    Outreof outreach mers of the highd scale of shooutreach effoowner type. O

    s were sent byp informationo only armoreal.  

    al mailers sentntives available for removal

    hops ps for this prop in the Seattlshops at the g to Island Coe Stanwood C

     

    sessment for Isla

    er or not a houres 12–24. 

    els, priority ran

    Top 160

    8

    103

    65

    168

    S analyses ideoval and feedfor outreach iresent “low‐hot exist. The dmed at advanc

    each Effomethods incluhest ranking aoreline properorts existed foOutreach met

    y mail to land as well as offed parcels as p

    t only to armle to the prop of armor tha

    oject spannedle metro areaPort Hadlockounty were heCommunity an

    and and East Jeffe

    ouse was digi

    nking, and pres

    High 148

    16

    68

    96

    164

    Daentified optimder bluff restoinclude parcehanging fruit”database and cing feasible a

    orts to Atuding mailersarmor removrty owners reor public agenhods are desc

    downers of thfering technicprevention of

    ored parcels perty owners.at was provid

    d three counta to reach non Library, one eld at South Wnd Senior Cen

    ferson Counties —

    tized on the p

    sence of house

    Other 147

    22

    58

    111

    169

    ata Utilitymal parcels tooration in Islaels that appea” where constmaps were uarmor remov

    ttain Land, workshops, al parcels whegardless of thncies as morecribed below

    he feeder blufcal site visits tf the installat

    included a ra. This includeed by a comp

    ies to accommn‐resident laneach in MarcWhidbey Highnter in Snoho

    COASTAL

    — FINAL May 30,

    property. The

    e. 

    o focus outreaand and east Jar to not havetraints that mused to guideval sites towa

    downer Wphone calls, 

    hile also proviheir shore type direct initialw. 

    ff parcels in eto interestedion of new ar

    ack card that hd the design panion grant.

    modate landondowners (Tach and Novemh School for reomish County 

    GEOLOGIC

    0, 2017, p. 17

    e spatial distr

    ach efforts anJefferson coue structures (might otherwi outreach anrd implement

    Willingnesand media wding outreacpe or project l contact was

    each county pd parties. Outrmor along fe

    highlighted thservices as w

    owners and iable 8). Jeffermber of 2015.esidents of Wfor residents

    C SERVICES,

    ribution of the

    nd work to unties. Many houses) on thise preclude d additional tation.  

    ss were used to th and educatfeasibility. s appropriate 

    providing reach was noeeder bluffs w

    he various sewell as permitt

    ncluded a son County st. Workshops Whidbey Islans of Camano 

    INC. 

    of hem. 

    target tion 

    for 

    ot was 

    rvices ting 

    taged 

    d, 

  • Feeder Bluff

    Island. Woheld on Cafter a simprotection

    Table 8. W

    County

    Jefferson

    Snohomish

    Island King (for noresident owof Jeff., Isla& SJ Coun

    Island

    Jefferson

    TOTAL

     As noted mailers, band sociaand includ

    WorkshopNot all paregistered

    Workshopnet shorearmor, itshabitats tit relates tWorkshopJohanness

    ff Restoration Ass

    orkshops weramano Islandmilar one hosn education t

    Workshop outre

    Date March2015

    h March2015 April 42015

    on-wners and, ties)

    April 22015 Octob2015 Novem14, 20

    above, targetbut also includl media annoded shoreline

    p participantsrticipants regd the same da

    p topics and c drift, driverss impacts, andhey form wasto slope stabps included a sen to demon

     

    sessment for Isla

    re held in Aprd at the Four Sted by Island to area contra

    each, participat

    Locah 7, Coun

    Port Hh 28, Stanw

    Cente4, South

    Langl

    22, ShoreConfeShore

    ber 29, Four Hous

    mber 015

    CounPort H

    ted outreach ded general muncements, ae property ow

    s were asked gistered this way therefore t

    concepts coves and rates of d alternativess of great inteility were alsoclassroom senstrate the to

    and and East Jeffe

    ril and MarchSprings HousCounty to practors. 

    tion, and evalu

    tion ty Library, Hadlock wood Senior er, Stanwood h Whidbey HS,ley

    eline erence Center,eline Springs e, Camano ty Library, Hadlock

    to shoreline methods throand radio spowners of all sh

    to complete way and not athe informati

    ered coastal aerosion, ands to hard armoerest to manyo discussed, pegment followopics discusse

    ferson Counties —

     of 2015, respe in October rovide coasta

    uations overvieTotal Mailings

    664 1,478, incl Camano

    505

    1,119

    505

    807

    11,989

    property ownugh communots. As a resulhoreforms.  

    an on‐line suall questions won does not f

    and bluff proc landslides asor. Connectivy participantsproviding manwed by a beaced in the field

    COASTAL

    — FINAL May 30,

    pectively. On2015; this wol processes a

    ew. 

    Attendees

    60

    46

    38

    13

    24

    35

    430

    ners was donnity associatiot, participatio

    rvey as part owere answerfully represen

    cesses includs well as inforvity of the coas. Vegetation ny dos and doch walk whend.

    GEOLOGIC

    0, 2017, p. 18

    e additional workshop was nd alternativ

    Surveys Completed

    34

    25

    18

    0

    11

    15

    170

    e through poons, press releon at the wor

    of their registred. Many parnt all attende

    ing Puget Sourmation and eastal processeand drainageon’ts for bothn practical wit

    C SERVICES,

    workshop waheld immediae shoreline 

    , # Surveys Complete

    56%

    54%

    47%

    0

    46%

    43%

    39.5%

    ostcards and eases, websitrkshops was v

    tration (Tablerticipants ees. 

    und shoreforexamples of ses and the e managemenh topics. th Jim 

     

    INC. 

    as ately 

    ed, %

    te varied 

    e 9). 

    ms, shore 

    nt as 

  • Feeder Bluff

    Table 9. Pr

    Workshop Location Jefferson (March 201Stanwood (March 201Island, Wh(April 2015King (April 2015Island, Cam(Oct 2015)Jefferson (Nov 2015)Average A

    Site AssA total of County, wWatermaa design p

    All of the professionmanagemre‐establihad potenstability. Drecommefor 12 of tforage fisprogress tpermit‐lev

    The primaintended other coaidentifiedfeasibilityIsland Couwith the fconcrete 

    ff Restoration Ass

    re‐workshop su

    PermaneResident

    15) 76%

    15) 59%

    idbey 5) 77%

    5) 25%

    mano 75%

    ) 68%

    All 63%

    sessments21 site asses

    with three resn). The remaproject (Becke

    site assessmenal that visite

    ment recommshment of nantial benefits Drainage mannded for fivethe sites, fromh spawning athrough the dvel designs, w

    ary purpose oto restore costal processe as feasible thy for armor reunty projects four projects bags and ang

     

    sessment for Isla

    urvey response

    ent ts

    Lived on Shore 5 Years or Longer

    HB

    68%

    68%

    70%

    71%

    92%

    76%

    74%

    s sments wereulting in permining eight sitett Point).  

    ents for this ped the properendations, raative plants onfor forage fisnagement, inc of the propem full to partireas nearby, design phase.which are des

    of this projectnnectivity bees at the site. hrough the coemoval and exwere selectecombined, wgular rock pro

    and and East Jeffe

    es. 

    High Bluff

    Low BaBeach

    56% 44

    68% 32

    83% 17

    33% 67

    73% 27

    24% 76

    56% 44

     completed fomit‐level desigte visits were

    project had atrty. Nine of thanging from mn the propertsh spawning hcluding tightlerties. Shore aial removal ortwo of which Four progrescribed in deta

    Permit-Lt was feeder between the blThe four projonceptual moxamined eached. Approximawith approximoposed for rem

    ferson Counties —

    ank or

    PerceivedMedium oHigh Erosion

    % 33%

    % 37%

    % 45%

    % 50%

    % 50%

    % 40%

    % 43%

    or this projecgns (Maylor tcompleted in

    t least one rehese sites hadminor improvety. In most cahabitat and dine replacemarmor removar modificationh were likely cssed through ail in the next

    Level Desbluff restoratuff and beachjects that weodel. Site asseh site in detaiately 1,034 linately 1,178 limoval, giving 

    COASTAL

    — FINAL May 30,

    d or

    Have Shore Armor

    29%

    66%

    39%

    43%

    83%

    64%

    54%

    ct. Of these, 1to Forbes Poin Jefferson Co

    ecommendatid varying degements and cases, suggesterainage, as w

    ments and redal was one ofn. Several procandidates fo the project at section (Fig

    signs tion through rh to restore fre selected foessments for l. One Jeffersnear feet of anear feet of aa total of 2,2

    GEOLOGIC

    0, 2017, p. 19

    Of Armored, Would Consider Removal

    OWCoReM

    23%

    15%

    20%

    0%

    20%

    19%

    16%

    13 were locatnts, Seahorseounty, one of

    on from the crees of vegetcontinued maed vegetationwell as generairecting runof the main recoperties had dor armor remoand resulted iure 6 and Tab

    removal of shfeeder bluff seor permit‐leveeach project son County prarmor is propadditional fai212 linear fee

    C SERVICES,

    f Armored, Would

    onsider emoval w/

    More Info

    ConInstErosProt

    54%

    60%

    40%

    100%

    50%

    63%

    61%

    ed in Island e Siesta, and f which result

    coastal ation aintenance ton managemenlly increasing

    off, was commendatiodocumented oval but did nin preliminaryble 10).  

    hore armor. Tediment inpuel designs weconfirmed roject and thrposed for remled armor of et of removal.

    INC. 

    nsidering alling sion tection

    21%

    33%

    27%

    20%

    0%

    53%

    26%

    ted in 

    o full nt g bluff 

    ons 

    not y 

    This is ut and ere 

    ree moval 

  • Feeder Bluff

    Figure 6. W

    The followDiscoverylocated onSeahorse located inprotrudinbeach of tsoutheast

    ff Restoration Ass

    Workshop locat

    wing table proy Bay approximn Naval Air StSiesta is the cn the westerng structures ithe previous t of Langley, W

     

    sessment for Isla

    tions, site visit

    ovides an ovemately 6 miletation Whidbcommunity b portion of Lain the residenWaterman EnWA.  

    and and East Jeffe

    s and prelimin

    erview of the es west of theey near Oak Hbeach and beaangley. The shntial portions nterprises pro

    ferson Counties —

    ary design pro

    projects. Bece town of PortHarbor on theach access arehore structurof Island Couoperty 1.75 m

    COASTAL

    — FINAL May 30,

    ojects.  

    ckett Point is t Townsend. e south facingea of the Seare at Seahorseunty. Watermmiles north of

    GEOLOGIC

    0, 2017, p. 20

    located on thMaylor Pointg shore near horse Siesta e Siesta is oneman is the easf Clinton and 

    C SERVICES,

     

    he east shore t to Forbes PoCrescent Harcommunity e of the largest‐facing bluff3.5 miles 

    INC. 

    of oint is rbor. 

    er f and 

  • Feeder Bluff

    Table 10. 

    Project Name Becket Point

    Maylor Point to Forbes Point

    Waterman

    Seahorse Siesta

     

    BeckettBecket Poin Jeffersoestimate ccell JEFF‐2area in Di

    Figure 7. A

    ff Restoration Ass

    Design proje

    Linear FeArmor Pro

    for Remo

    165 (-25

    381 LF of bulkhead; 1of additionaarmor and

    440

    136 (-63 rock

    t Point oint proposedon County, Wcost of projec25 is down‐drscovery Bay. 

    Aerial photo loo

     

    sessment for Isla

    ct elements. 

    eet of posed oval

    InB

    Un

    gap)

    intact ,178 LF

    al failed debris

    58,6

    kery) 9,49

    d to remove aWA. Figure 7 shct implementrift of the pro

    oking northeas

    and and East Jeffe

    Cost estimate 

    ntertidal Beach covered E

    N/A $

    600 SQ FT $2

    N/A

    90 SQ FT $3

    a treated soldhows the oblitation is just uoject area. Do

    st at the Becke

    ferson Counties —

    includes conti

    Cost stimate Ar

    $24,819 S

    228,920

    Intatim

    faileba

    bas

    N/A C

    316,790 G

    ier pile wall fique of the prunder $25,000cumented he

    ett Point armor

    COASTAL

    — FINAL May 30,

    ingency, access

    rmor Type

    oldier Pile

    act: treated mber, tires; ed: concrete ags, gabion skets, stone

    Creosoted wood

    Grounded barge

    from the soutroject area al0 (CGS 2015aerring spawn 

    r removal site. 

    GEOLOGIC

    0, 2017, p. 21

    s, mobilization

    Doc. Forage Fish

    Spawning

    Herring

    Surf smelt 5,000 FT down-drift

    Sand lance 1,000 FT down-drift

    Sand lance 700 FT

    down-drift

    theast portionong with a gra). Approximais just offsho

      

    C SERVICES,

    n, tax, and bon

    Length of Down-Drift

    Shore 8% of JEFF25 (2,025 FT

    90% in WHID16 and WHID

    15 (10,073and 7,000 FT

    25% of IS-1(13,150 FT

    91% of WHID1 (18,875 FT

    n of Beckett Pround photo.ately 8% of drre of the proj

    INC. 

    ding.  

    f t

    F-T)

    D-D-

    3 T)

    1 )

    D-T)

    Point  The rift ject 

  • Feeder Bluff

    Along withead remremoval. Abase of thwork requ2015a). P

    Bulkhead site. No nSedimentanticipatesmall excaalong 165at and abgrade andsufficient These cro

    No chemitreatmentconsideredisposal a

    Sedimentremoval fthereforetime requ

    Sufficient offsite. Tharea for tto reduce

    Maylor tThe MayloNaval Air peninsulaalong with2015b). T16. ApproapproximCrescent 

     

    ff Restoration Ass

    h coastal prooval, a small A bulkhead che high marinuired to comportions of tha

    removal itseourishment s currently imed that equipavator would5 FT of shore wove beach grad those that hwood for pul

    oss members 

    cal testing wat. Given the ped contaminatat an approve

     currently imfollowing extr the most suiuired for proje

    space appeahe small turnaruck loading/e impacts to th

    to Forbes or to Forbes PStation Whid between Oah a ground phhis project is oximately 90%ately 5,000 feHarbor.  

     

    sessment for Isla

    cesses restoramount of diomprised of we bluff. The Bplete restoratat memo are 

    lf should provsediment is repounded by tment access  be capable owith approximade to allow have completlling. Some pishould be rem

    as completedprevalence ofted until tested upland faci

    pounded by traction. The stable materiaect completio

    rs available foaround at the/unloading ache residentia

    Points Point project dbey Island, lok Harbor andhoto. The estlocated at th% of each drifeet down drif

    and and East Jeffe

    ration due to irect habitat rwooden soldiBecket Point Btion at the sitparaphrased 

    ve to be relatecommendedthe bulkhead and materialsof removing tmately 102 ora grip‐and‐puely broken ofiles appearedmoved prior t

    d as part of thf creosote treing is performility that acce

    the bulkhead ediment appal for filling voon.  

    or stacking ree end of Becktivities. Howel properties t

    site is the soocated south d Crescent Haimate cost ofe beginning ot cell is downft of the proje

    ferson Counties —

    cross shore arestoration wier piles was pBulkhead Reme and details here where a

    tively straightd at the site dwould be exs transport cahe majority or more piles pull method. Piff will required to be attachto pulling the

    his project to datment in themed. All contaepts creosote 

    should be allears to be cooids in the be

    emoved piles ett Point Roaever, blockagthere. 

    uth‐facing bluof Oak Harborbor. Figure 1f project implof two differen‐drift of the pect within WH

     

    COASTAL

    — FINAL May 30,

    and along showill occur whepresent alongmoval design the preliminappropriate.

    tforward remue to the smapected to fill an all be accoof piles with lipresent. Maniles that are se a small amohed to adjacene piles. 

    determine the Puget Sounaminated wotreated woo

    lowed to colllluvium resuleachface. This

    at the removad may be usege of the road

    uff and beachor, WA, locate11 shows theementation ient diverging project area. HID‐16 on the

    GEOLOGIC

    0, 2017, p. 22

    ore connectivere the beachg approximatmemoranduary permit‐le

    oval of the piall footprint oany voids lef

    omplished froimited effort.y piles have sseverely weatunt of excavant piles by sm

    he natural of wd, all piles shod should bed. 

    apse into theting from blus will reduce 

    val site for sued as a tempod should be ke

    h of Maylor Ped on the ende oblique of ths just under $drift cells, WDocumentede east facing s

    C SERVICES,

    ity from bulk is exposed btely 165 FT atm describes tevel design (C

    iles for haul oof the bulkheft by removal.om the upland. Piles are locsufficient matthered at beaation to exposmall whalers. 

    wood pile ould be e hauled to 

    e hole left by uff erosion, anboth the cost

    bsequent hauorary stockpilept to a minim

    oint Housing d of a small he project are$230,000 (CGHID‐15 and Wd surf smelt isshore toward

    INC. 

    head y pile  the the CGS 

    off ad. . It is ds. A ated terial ach se 

    nd is t and 

    ul le mum 

    on 

    ea GS WHID‐s ds 

  • Feeder Bluff

    Figure 8. Aexamples o

    The southMaylor Pocrest. Therequired tthat mem

    It is anticimain elemare timbeautomotiv

    The prelimbeach aretreated tismall angtechnique1,178 lineapproximof debris fthe Maylo

    ff Restoration Ass

    Aerial photo looof site conditio

    heastern poinoint. The site e Maylor Pointo complete r

    mo are paraph

    pated that eqments of the per and tire bulve tires, angu

    minary designea. The projecmber verticalular rock undes, concrete aear feet of shoately 1,559 lifrom failed gaor to Forbes P

     

    sessment for Isla

    oking northweons along the le

    nt of the peninfaces south tt Bulkhead Rrestoration athrased here w

    quipment andpreliminary dlkhead removular rock, and 

    n includes remct will removel bulkhead. Lader 1 FT in noand other shoore. Therefornear feet of aabion basketsPoints propos

    and and East Jeffe

    st at the Mayloength of the sh

    nsula is Forbeto Saratoga Paemoval prelimt the site andwhere approp

    d materials tresigns for coaval as well as concrete. 

    moving all ante 300 LF of tirarge armor stminal diametore‐perpendice, Maylor to anthropogenis, armor stonsed prelimina

    ferson Counties —

    or to Forbes Pohore. 

    es Point; the sassage. Navy minary design details the priate. 

    ransport will bastal habitat removal of in

    thropogenic sre and treatedtones on the oter from failedcular structurForbes Point ic coastal proe revetment,ry project. 

    COASTAL

    — FINAL May 30,

    oint armor rem

    southwesternresidential hn memorandupermit‐level d

    be accessed aenhancemenntertidal debr

    structures and timber postorder of 2.5 td gabion baskres will be remproposed pre

    ocess impacts, and concret

    GEOLOGIC

    0, 2017, p. 23

     moval site. Gro

    n point of thehousing is landum describesdesign (CGS 20

    and provided nt and feeder ris, including 

    d material frot bulkhead, ato 5.5 FT nomkets and othemoved from aeliminary wil. Just over 58te bags will be

    C SERVICES,

    ound photos pr

    e peninsula is dward of the s the work 015b). Portio

    by barge. Thbluff restoratreated wood

    om the projecs well as 81 L

    minal diameteer shore armoapproximatelyl remove 8,000 square fe removed fro

    INC. 

    rovide 

    bluff 

    ns of 

    e tion d, 

    ct LF of er,  or y 

    feet om 

  • Feeder Bluff

    Originallyyards (CY)burlap baIN by 22 IIN by 22 I1970s strusubtidal oremove aconcrete 

    Large armrevetmenarmor stoarmor boApproximremoval. 

    Smaller, aproject. Aas toe roccan be remareas will 

    The armoerosion rinearby shconcrete been protvertical buset far enbluff toe aremoval w(erosionarecomme

    Currently,We recomshould be3 FT in elewithin theone‐third that the Bthe risk coshore arm

    ff Restoration Ass

    , 8,400 concr) of concrete.gs. The concrN. Therefore,N). Only a veucture. Thereof the project pproximatelybag removal.

    mor stones onnt and betweeone can be reulders can be

    mately 16,000 

    angular rock oApproximatelyck, placed watmoved from tbe uncovere

    r removal invsk of the exishore armor habag (15% covtected from eulkhead are tough back thare closer thawill not increal hot spots atnd full anthro

    , there is a summended thise at least one‐evation abovee project limitburied near t

    Baker Court hontinues to inmor in concert

     

    sessment for Isla

    ete bags wer. Of these, 4,4rete bags obs, approximatery small numefore, approxarea or erody 70% of them  

     the order of en some treatmoved from te removed froSF of upper b

    of approximaty 300 tons of terward of althe intertidald with small 

    volved in this sting Baker Coas failed manyver) and anguerosion in decthe only intacat their erosian the tire buase erosion rit the end of stopogenic stru

    ubstantial piecs piece of woo‐third buried e mean highets that need tthe base of thouses are thrncrease due tt with bluff en

    and and East Jeffe

    re installed du400 were insterved during ely 1.8 squareber of bags reimately 8,000ed to smallerm. At least 10,

    2.5 to 5.5 FTtment sectionthe failed revom throughoubeach and int

    tely 0.25 FT tthis smaller al other techn and beach. Aangular rock 

    feeder bluff rourt houses. Fy years ago wlar rock (40%cades. The tirt sections of on risk will nolkhead, but bsk. Most likeltructures) anducture and de

    ce of large wood remain in at the toe of er high water to be temporhe bluff nearereatened, a bo natural pronhancement 

    ferson Counties —

    uring the 197talled as dry bthe site visit e feet (SF) of emain where 0 bags have br pieces of agg,000 SF of the

    T nominal diamns from the 1vetment near ut the rest of tertidal areas 

    o 1 FT nominangular rock wiques. ApproxApproximatelremoval. 

    restoration pFor the Bakerwith only a mi% cover). The be bulkhead athe 1970s shoot change. Thbecause of thely, these armod exacerbateebris removal

    oody debris nplace. If it hathe bluff nea(MHHW). Anarily stockpileest the closesluff vegetatioocesses, the laand privacy f

    COASTAL

    — FINAL May 30,

    0s project, usbags while 4,0were on avearea is cover they were plbeen depositegregate. Of the intertidal ar

    meter were u1970s project Forbes Pointthe project t will be uncov

    al diameter wwas installed ximately 225 ly 28,500 SF o

    project will nor Court houseinority of sevebluff toe of thnd approximaore protectiohe sporadicalleir poor placeor stones act erosion near. 

    near the bluffas moved befoarest the closey other substed for installast houses. If iton enhancemandowner coufence realignm

    GEOLOGIC

    0, 2017, p. 24

    sing approxim000 were instrage approximed by each sclaced within ted within the hese 8,000, itrea will be un

    used within th. Approximatt. An additiontowards Maylvered with ar

    was used withwithin the ga CY of the smof upper beac

    ot significantlyes closest to teral mid interhe Baker Couately half of ton. The Bakerly‐placed armement and deually create er the houses. 

    f toe of the Baore the projeest Baker Coutantially largeation should at is determineent plan coululd then lookment. 

    C SERVICES,

    mately 130 cutalled as wet mately 12 IN cattered bag the toe of theintertidal or t is practical tncovered thro

    he Forbes Poitely 525 CY ofnal 575 CY of lor Point. rmor stone 

    hin the 1970sabion baskets

    mall angular roch and interti

    y change the he bluff crestrtidal areas wrt bluff has nthe treated ti Court house

    mor stones at esign, their end area erosTherefore, w

    aker Court hoect is installedurt house, at e wood piecesalso be at leaed at a later dld be designek into appropr

    INC. 

    ubic 

    by 5 (12 e 

    to ough 

    nt f large large 

    s s and ock dal 

    t, all with ot mber s are the 

    sion we 

    ouses. d, it least s st date ed. If riate 

  • Feeder Bluff

    ImplemenAction Aggrant fromsummer 2

    WatermThe Wateproperty oThe site faground phproject paDocumen

    Figure 9. A

    The prelimbeach andproject wbulkhead treated wstones wiproject, su

    All equipmmaterial fshall be dwood) or 

    The nearetop of bluclosest thlandward 

    ff Restoration Ass

    ntation Statusgenda update m the US Fish2018. Permitt

    man erman projecton Whidbey Iaces east to Photo. The estartner needs ted sand lanc

    Aerial photo loo

    minary designd bluff toe areill remove thewas estimate

    wood will be rell be removeduch as broken

    ment used forfrom the projisposed of in upland dispo

    est known infuff, in the areae County righof the bulkhe

     

    sessment for Isla

    s: NWSF submNear‐Term A and Wildlife ting is being le

    t site is the eaIsland, locatePossession Soimate cost of(CGS 2015c). ce is approxim

    oking west at t

    n includes remea, including e entire lengted as approxiemoved fromd with the pron pieces of co

    r implementaect will be stoan approved

    osal area.  

    frastructure isa well landwaht‐of‐way roaead and there

    and and East Jeffe

    mitted this proAction procesService’s Puged by US Nav

    ast‐facing blud 1.75 miles ound. Figure 1f project implApproximate

    mately 1,000 

    the Waterman 

    moving all antbut not limiteth of bulkheamately 45 CY

    m the nearshooject. A minoorrugated dra

    ation will be dockpiled and  recycling fac

    s an Island Coard of the buld gets to the efore the risk

    ferson Counties —

    oject for funds. It has receiget Sound Covy personnel w

    ff and beach north of Clint12 shows the ementation wely 25% of drifeet down dr