CMOM ANNUAL REPORT FY2017

Upload: vucong

Post on 24-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

CMOM ANNUAL REPORT FY2017

Page 1 of 22

Contents Capacity, Management, Operations and Maintenance (CMOM) Plan Overview ......................................... 2

Report Purpose ......................................................................................................................................... 2

Permit Requirements ................................................................................................................................ 2

CMOM Program Self-Assessment ............................................................................................................. 3

FOG Policy ..................................................................................................................................................... 3

FOG Enforcement...................................................................................................................................... 4

SSO Analyses ................................................................................................................................................. 4

Permit Requirements ................................................................................................................................ 4

SSO Study Team ........................................................................................................................................ 4

Causes & Mitigations ................................................................................................................................ 6

SSO Tabulation & Analysis ........................................................................................................................ 7

Volume Spilled and Recovered ................................................................................................................. 9

Actions Implemented and On-Going Programs .......................................................................................... 10

General .................................................................................................................................................... 10

FOG Policy Implementation: ................................................................................................................... 10

Overflow Emergency Response Plan (OERP) .......................................................................................... 11

Force Main Inspection Program .............................................................................................................. 12

Closed Circuit Television (CCTV) ............................................................................................................. 12

Cleaning Program Goal ........................................................................................................................... 13

Root Foaming .......................................................................................................................................... 15

Generator Plan ........................................................................................................................................ 15

Odor Complaints ..................................................................................................................................... 15

Identified Gaps in the Water Authority Processes with Recommendation to Close .................................. 18

Prohibited Discharges, i.e., SSOs ............................................................................................................. 18

Formalize SSO Follow-Up Involving Administrative Assessments or Equivalent .................................... 18

Appendices .................................................................................................................................................. 19

Appendix 1 Sanitary Sewer Overflow Analysis Table ........................................................................ 20

Appendix 2 Sanitary Sewer Overflow Volume Captured Analysis Table ........................................... 21

Appendix 3 Overflow Emergency Response Plan (OERP) ................................................................. 22

Page 2 of 22

Capacity, Management, Operations and Maintenance (CMOM) Plan Overview In accordance with National Pollutant Discharge Elimination System (NPDES) Permit No.

NM0022250 (Permit), the Albuquerque Bernalillo County Water Utility Authority (Water

Authority) prepared a Capacity, Management, Operations and Maintenance (CMOM) Plan with

Emphasis on the Fats, Oils and Grease (FOG) Policy. The effective date of the Water

Authority’s permit is October 1, 2012.

The CMOM Plan consists of the following documents:

1. FOG Policy

2. CMOM Annual Report

3. CMOM Program Self-Assessment

The FY2017 CMOM Annual Report follows previous FY2013-16 reports. The four previous

reports, as well as the most recent, can be accessed at

http://www.abcwua.org/Sewer_System.aspx.

Report Purpose As indicated by its name, the CMOM Annual Report will be reissued to describe CMOM

activities in the previous fiscal year (July 1 to June 30). This CMOM Annual Report covers July

1, 2016 to June 30, 2017. The CMOM Annual Report provides summary descriptions of CMOM

activities (past and planned) and is intended to be a communication tool. The report is intended

for Water Authority staff, regulatory authorities, customers, and the general public.

In order to match calendar year reporting typically utilized in communications with the US EPA,

the Water Authority will provide future reports for the January 1 through December 31

timeframe. The next report will for CY2017.

Permit Requirements The Water Authority discharges to the Rio Grande under authority of NPDES Permit No.

NM0022250 (Permit). Under this Permit, the Water Authority operates the Southside Water

Reclamation Plant (SWRP) and the Collection System. The following are the Permit

requirements that impact the collection system.

1. The Water Authority must submit a (monthly) Discharge Monitoring Report (DMR)

in tabular form for all overflows. (Part I, Paragraph C.6).

2. The Water Authority must develop a Capacity, Management, Operation and

Maintenance (CMOM) Plan with emphasis on the Fats, Oils and Grease (FOG)

Policy. The FOG Policy will be a re-evaluation of the existing Sewer Use and

Wastewater Control (SCO) Ordinance. The goal of the FOG Policy will be to reduce

Sanitary Sewer Overflows (SSOs). The FOG Policy may address such items as an

inventory of repeat Food Service Establishments (FSE) that cause SSOs and routine

grease trap inspection programs at FSE with increased frequencies for repeat FOG

SSO FSEs. Additional elements of the FOG Policy may be sewer line inspections,

such as video recording and required sewer line cleaning activities if warranted at

repeat sites.

Page 3 of 22

CMOM Program Self-Assessment

EPA states (see http://www.epa.gov/npdes/pubs/cmomselfreview.pdf): “An important

component of a successful CMOM program is to periodically collect information on current

systems and activities and develop a “snapshot-in-time” analysis. From this analysis, the utility

establishes its performance goals and plans its CMOM program activities.” The Water Authority

developed Self-Audits as a part of the FY2013 and FY2014 reports. Because the data provided in

the Self-Audit does not significantly change year-to-year, the next update will coincide with the

CY2018 CMOM Report.

FOG Policy The Water Authority’s FOG Policy is a separate document. The FOG Policy was developed as a

requirement of the NPDES Permit effective on October 1, 2012 and subsequently approved by

the United States Environmental Protection Agency (EPA). The policy was developed to work in

conjunction with the Water Authority Sewer Use and Wastewater Control Ordinance (SUO) and

Enforcement Response Plan (ERP) to reduce the rate of SSOs in the collection system and

decrease FOG loading at the SWRP. The policy describes expectations for FOG dischargers such

as Food Service Establishments (FSEs) and waste haulers, and the steps the Water Authority is

taking to mitigate FOG.

The FOG Policy sets a Water Authority goal of inspecting every FSE at least once every three

years. Details of what is expected of the FSE in terms of Grease Removal System (GRS)

functionality, pumping schedule, maintenance, and recordkeeping are identified. The FOG policy

explains the Water Authority use of the 25% solids and grease rule (25 Percent Rule) to

determine if a GRS is filled to capacity. The policy also contains Best Management Practices

(BMPs) such as scraping plates, using screens, and not using emulsifiers, etc.

Pumper requirements are also covered in the FOG Policy. Full evacuation of a GRS is required

each time pumping occurs. The pumper must leave the FSE documentation in the form of

manifests that contain pertinent information such as date, time, volume pumped, and the

condition of the GRS. The FOG Policy lists the minimum service to be provided by the pumper.

Enforcement of FOG violations and hauled wastewater violations is described in the FOG

Policy. The FOG Policy works in conjunction with the ERP to set administrative assessments for

violations.

The FOG Policy also sets forth the process for identifying new sources of FOG. The Water

Authority Pretreatment Program will update the FOG database on an annual basis. The FOG

Policy sets a goal that the Water Authority will meet with the City of Albuquerque, Bernalillo

County, the Village of Los Ranchos, the Village of Corrales, plumbers, and the New Mexico

Restaurant Association on a semiannual basis to discuss FOG issues.

In developing the FOG Policy, the Water Authority held a meeting with the hauled wastewater

permit holders on July 22, 2013 and a public meeting on July 25, 2013 to discuss the proposed

Policy. The final FOG Policy was submitted to the EPA on September 27, 2013 and updated in

the Pretreatment Program modification documents sent to EPA on June 2, 2014. No comments

from EPA were received regarding either submission, thus indicating approval.

Page 4 of 22

FOG Enforcement In FY2017, the Water Authority Pretreatment Program had 1,812 compliant FSEs out 2,036 FSE

sites for a compliance rate of 89%. 1,350 FSE inspections were conducted with 1,110 passing

and 240 failing. Of the 240 failed inspections, 75 FSEs corrected the deficiencies and called for a

re-inspection within seven (7) days. The remaining 165 FSEs did not take corrective action and

thus were issued Notices of Violation (NOVs) of which 1 was for no GRS, 36 were for non-

functioning GRS, 65 were for GRS needs pumping, and 123 were for missing manifests.

In response to SSOs, 23 FSE inspections were conducted with 6 failing. Within the seven day

grace period, 1 FSE corrected the deficiency. After the seven day grace period, 5 NOVs were

issued. In addition, Water Authority Pretreatment personnel distributed FOG brochures to FSEs,

single-family residences and apartment complexes upstream of the SSOs.

Additionally, the Water Authority’s Public Information Office advanced radio, print and

television public outreach for the purpose of improving the Water Authority’s FOG Policy.

SSO Analyses

Permit Requirements The Permit requires a CMOM Plan with an emphasis on FOG Policy. The Plan goal is to reduce

impacts on the sewer system caused by FOG and the Policy goal is to reduce SSOs. The FOG

Policy states that the Pretreatment Program will investigate all SSOs related to large amounts of

grease. The policy is to take enforcement actions for violations of FOG requirements with

priority on FSEs causing repeat SSOs.

SSO Study Team To meet these requirements, the Water Authority created an SSO Study Team. The Team is

comprised of:

1. Collection Section – Research Analyst (team lead), Gravity Superintendent, Assistant

Superintendent and Closed Circuit Television (CCTV) Supervisor;

2. NPDES Pretreatment –Industrial Pretreatment Engineer and Pollution Prevention

Specialist.

The Mission Statement for the Study Team is: The SSO Study Team will work inter-divisionally

to study, analyze and determine causes of previous SSOs to mitigate future SSOs in the

Collection System.

Page 5 of 22

The Study Team procedure is:

1. Tabulate all 10-40s, 10-42s and 10-48s (see Table 1 for definitions).

2. Ensure all segments responsible for causing 10-42s and 10-48s are televised.

3. The Research Analyst will review and analyze all CCTV inspections to determine

causes (if possible) and document findings.

4. To conduct meetings with the SSO Study Team to review and analyze CCTV that

needs further investigation for resolution.

5. Recommend/implement and document mitigations (if possible) based on analysis.

6. Coordinate with NPDES Pretreatment concerning grease issues discovered during

analysis.

Table 1 Sewer Trouble Definitions

Sewer Trouble Definitions

10-40 Sewer Backup A gravity line blockage that does not result in a spill,

or in the vacuum system, a low vacuum (low vac)

that causes a customer service disruption. Does not

result in an SSO Reportable (10-42) or a Property

Damage (10-48).

10-42 SSO Reportable An overflow of sewage from the system that may

impact surface waters. These are reported to the

EPA and other locally impacted stakeholders.

10-48 Property Damage An overflow of sewage from the system that results

in damage to private property. These are not

reportable under current definitions.

Appendix 1 identifies all 10-42s and 10-48s, and the overflows that resulted in both a 10-42 and

a 10-48. When documenting the number of Sewer Troubles of different types, for example in

Figure 1 and Figure 2, the 10-42 item includes all overflows that may impact surface waters,

including those that also had property damage; the 10-48 item includes overflows that only

resulted in property damage. This prevents double-counting the number of overflow occurrences.

All 10-40s, 42s and -48s were CCTV inspected, although only 10-42s are “reportable”, i.e.,

required to be reported to the EPA, et al. All 10-42s and -48s were then examined by the Study

Team and a Cause and Mitigation were determined.

Page 6 of 22

Table 2 Types of Causes for SSOs

Cause(s) of SSO from DMR

Causes determined from

CCTV

CO - Construction DB - Debris SC - Surcharged

CU-Cause Unknown RK-Rocks SL - Sag in Line

EQ - Equipment

Failure

GR -

Grease IT - Intruding Tap

SGG-Sand, grit or

gravel RT - Roots MH - Manhole

LF - Line Failure

RN -

Rainfall OJ - Offset Joint

V - Vandalism RGS-Rags

RGR - Roots / Grease BP-Burped

Causes & Mitigations The Cause(s) were selected from Table 2 that identifies SSO causes from the DMR and CCTV.

The monthly SSO DMR has a specific list of Causes that are based on system observations made

by an Operator or Supervisor at the site of an SSO. The CCTV data provided to the Study Team

often results in a different, more refined Cause or Causes. Table 3 provides the causes

determined by the Study team for FY2017. (Note: Percentages may not add up to 100%, as they

are rounded to the nearest percent.)

Table 3 Summary of Causes from SSO Study

FY2017 10-42, 10-48 Causes Total % of Total

Burp 3 6%

Construction 4 8%

Cause Unknown 8 16%

Debris 8 16%

Equipment Failure 3 6%

Grease 7 14%

Line Failure 6 12%

Manhole 1 2%

Manhole/Roots 1 2%

Roots 5 10%

Sand, Grit or Gravel 1 2%

Sag in Line 3 6%

Grand Total 50 100%

Page 7 of 22

Mitigations are the steps that the Team identified to prevent a recurrence of an SSO, at least for

the identified Cause. Specific Mitigations are very dependent on the conditions observed from

the CCTV video and report. Table 4 provides a summary of the various Mitigations. The

Mitigations are tracked through completion or implementation. (Note: Percentages may not add

up to 100%, as they are rounded to the nearest percent.)

Table 4 Summary Mitigations from SSO Study

FY2017 10-42, 10-48 Mitigations Total % of Total

No Follow Up Needed 15 30%

Pretreatment Notified 5 10%

Rehab/Replace 15 30%

Short Interval 7 14%

Short Interval/Special Instructions 1 2%

Special Instructions 4 8%

Special Instructions/Short Interval 1 2%

Short Interval/Special Instructions/Pretreatment

Notified

1 2%

Pretreatment Notified/Short Interval 1 2%

Grand Total 50 100%

SSO Tabulation & Analysis Appendix 1 contains a list of every 10-42 and 10-48 event in FY2017. The table columns are

grouped as follows:

1. The type, i.e., 10-42 or -48, is identified on the left. In two cases a single event was both

a 10-42 and a 10-48, as indicated.

2. Next to the right are the data included in the monthly SSO DMRs. It is noted that a

“Reported Cause” is listed. This is typically based on the observations of the Operator

that reported the SSO.

3. Next to the right is data determined by the Study Team:

a. Cause

b. Mitigation

c. If Pretreatment follow-up is necessary

4. To the far right are follow-ups by NPDES Pretreatment

a. FSEs visited

b. Notice of Violation issued

Figure 1 shows the cumulative 10-42s by month for FY2012-17.

Page 8 of 22

Figure 1 Reportable SSOs

The SSO Rate is defined as 100 times the number of SSOs in a year divided by the miles of

sewer in the system. The Water Authority system has a total of approximately 2,414 miles of line

(p. 8 of the Self-Audit). The SSO rate is therefore 4.5, 2.8, 2.5, 2.3, 1.7, and 1.4 for FY2012-17

respectively.

Page 9 of 22

Figure 2 shows the total sewer troubles, i.e. 10-40s, -42s, and -48s by year for FY2012-17. This

graph does not include 10-48s due to “burps” which are not due to a blockage or other failure

resulting in the overflow of sewage. Instead, air displaced during the Vactor jetting cleaning can

under certain circumstances force out the water in the home fixture P-traps, e.g. toilets and sinks.

These sometimes result in claims and are therefore included in the Property Damage totals for

completeness and consistency. The burps for FY2012-17 have been 1, 0, 5, 5, 9, and 3

respectively. The burps are identified in Appendix 1.

Figure 2 Sewer Trouble Comparison

Volume Spilled and Recovered Via the OERP, the Water Authority has implemented a policy of capturing spills and

documenting actions. Appendix 2 provides estimated spill volumes and volumes recovered for

the 34 reported SSOs for FY2017. Of the spill volume estimated not to be recovered, none was

identified as directly reaching the Rio Grande. Two spills (12/6/2016 and 2/10/2017) did reach

the Los Padillas Drain which is operated by the MRGCD. The Los Padillas Drain eventually

discharges to the Rio Grande. The response to these spills, which includes inter-agency

coordination and procedural changes, is further discussed below as a part of “Actions

Implemented and On-Going Programs”. As discussed below, spill recovery for the 12/6/2016

and 2/10/2017 SSOs involved containment and pumped removal of the spill mixed with base

flow in the drain. As a result, per Appendix more volume was removed than spilled although not

all was spilled sewage.

Page 10 of 22

Actions Implemented and On-Going Programs

General Below are gaps that were identified in the FY2016 CMOM Report and were closed in FY2017,

or are on-going programs, or both. In addition to the commitments made in the FY2016 CMOM

Report, the following additional actions were taken to expand the Water Authority’s ability to

operate and maintain the system.

1. Purchase orders have been issued for two new Vactors which will be obtained and put

into service in FY2018.

2. Updated and posted to the public web site the following brochures: “Grease Removal

System Requirements for Food Service Establishments”

(http://www.abcwua.org/uploads/files/Sewer/FSE.pdf ); “Septage Hauler Best

Management Practices”(

http://www.abcwua.org/uploads/files/Sewer/Best_Management_Practices_063017.pdf );

FOG Policy Implementation: FOG Policy is an on-going program. Long-term recommendations were made in the FY2014

CMOM Report. The following are on-going efforts to meet the long-term FY2014

recommendations:

1. Develop a link between the Linko FOG database utilized by NPDES Pretreatment and the

Maximo work order system used by the Collection Section.

2. Continue working on creating a FSE flier in Spanish. The Pretreatment Section, in

conjunction with the Public Information Office, will continue to develop FSE fliers in

languages other than English.

3. Satellite Community agreements require that FSE connections be coordinated with the

Water Authority.

4. The Pretreatment Program continued issuing NOVs for not complying with the record

keeping requirements of the SUO and FOG policy.

5. The Pretreatment Program continued issuing NOVs for not complying with the direct

access provisions of the SUO and FOG policy.

6. The pretreatment Program continued issuing NOVs for non-functioning Grease Removal

Systems.

7. The pretreatment Program continued issuing NOVs for failure to maintain proper

maintenance frequency.

8. The pretreatment Program has been inspecting FSEs at a higher frequency than required

by Fog Policy.

Page 11 of 22

Overflow Emergency Response Plan (OERP) This is an on-going program to update the OERP as required. In FY2017, the following

modifications were made to the OERP:

1. Page 1: Added note to call Dispatch when a sewer problem is encountered. This will help

everyone to know who to call to get quickest service.

2. Page 4:

a. Added additional contact information for COA and AMAFCA.

3. Page 7: Added information on who to call regarding spills that occur at:

a. KAFB.

b. UNM.

4. Page 11:

a. Updated contact information for MRGCD.

b. In the event that a spill reaches the Rio Grande or an MRGCD facility, added calls

to the POI.

c. Requires E. coli testing in the event of an SSO that reaches an MRGCD facility.

The Collection Section is the “owner” of the OERP. The Collection Section creates the

components of the OERP, routes for internal review (specifically including the Compliance

Division), and the completed portions are approved for posting to SharePoint by the Collection

Section Manager. Appendix 3 provides the OERP which was in effect at the end of FY2017.

In accordance with the OERP, the Water Authority coordinated with the MRGCD on two spills

that occurred on 12/6/2016 and 2/10/2017. Both spills impacted the Los Padillas Drain which is

operated by the MRGCD. In each case, staff from the Water Authority and MRGCD met on-site

and discussed means of spill containment and removal. In the event of the 12/6/2016 spill, a

beaver dam had blocked flow at the first culvert downstream. The MRGCD removes these

beaver dams as a typical maintenance but did not do so until the Water Authority completed its

cleanup. In the event of the 2/10/2017 spill, two temporary berms were installed by the MRGCD

downstream to contain any remaining spill. In each case, contained spill mixed with base flow in

the drain was pumped and removed by the Water Authority. In each case, the containment

location and means, i.e. beaver dam and berms, were determined by the MRGCD based on visual

monitoring of the drain flow characteristics in conjunction with the spill.

As a result of these spills, issues were identified with the OERP and addressed as noted above. It

is noted that both spills were caused by the Vacuum Station 63 force main. As a part of a larger

project, this force main has been replaced and realigned and therefore we don’t anticipate that

there will be additional SSOs from this line.

On 3/29/2017, the COA and Water Authority performed a simulated SSO that impacted a COA

storm drain. The process on page 4 of the Overflow Emergency Response Plan (OERP) was

followed. This process worked well and did not need revision. Additional contact names were

provided and added, as noted above.

Page 12 of 22

Force Main Inspection Program This is an on-going program in which the alignment is annually inspected for all force mains and

valves found in field are compared to those in the GIS mapping and this information is stored in

Maximo.

In FY17, two additional items were addressed relative to force main operation and maintenance.

1. In previous inspections, some valves were not found in the field. These not-found valves

were noted in Maximo. Based on these previous inspection, in FY17 five critical valves

were identified, turned over to the construction group which then found these valves and

brought them to grade.

2. In FY17, a pumping test was performed on the parallel 18” and 24” force mains serving

LS24. One at a time, each of the two lines were closed, all flow pumped through the other

line, and flow conditions observed. This verified the force mains could be operated

separately.

Closed Circuit Television (CCTV) This is an on-going program. The following recommendation is made in the FY2013 CMOM

Report: “CCTV inspections of the collection system as follows: 1) Small diameter main lines

less than 15”: In four of five years, televise approximately 5% per year of the small diameter

system. Televise high risk lines based on current Asset Management Plan and subsequent in-

house analysis. 2) Large diameter lines 15” and larger: Every fifth year, televise as much as

possible acknowledging access limitations of the unlined concrete lines 15” and larger.

Anticipated schedule: 3) FY2014-17: 5% of the small diameter each year. 2) FY18: Large

diameter unlined concrete pipe.”

The CCTV program will continue. Anticipated schedule:

1. FY18: Large diameter unlined concrete pipe.

2. FY19: 5% of the small diameter. (Any small diameter inspections accomplished in FY18

will be allocated to meeting the FY17 or FY19 goals.)

3. FY20: 5% of the small diameter.

4. FY21: 5% of the small diameter.

The FY2017 portion of this recommendation is complete. It is currently estimated that that the

system includes 1996 miles of small diameter gravity pipe. Figure 3 provides the CCTV goal for

a ten-year basis and the actual CCTV inspection for the first four years.

Page 13 of 22

Figure 3 Small Diameter Sewer CCTVed vs. Ten-Year Goal

Cleaning Program Goal This is an on-going program. The following recommendation is made in the FY2013 CMOM

Report: “The Water Authority will establish and monitor a goal of cleaning all gravity small

diameter lines every ten years. (This will be accomplished through the existing Sub-Basin

program.) The Water Authority will continue the program of high-frequency maintenance of

known problem locations within the system. (This will be accomplished through the existing

Short Interval program.) The frequency of Short Interval cleaning will vary in accordance with

system performance and risk factors, maintenance history, and the latest maintenance findings.”

The FY2017 portion of this recommendation is complete. In FY2017, the Water Authority

cleaned approximately 286.9 miles under the Sub-Basin program. This is equal to approximately

14.4% of the small diameter system which exceeds the 10% pace implicit in cleaning every ten

years. Likewise, the Short Interval cleaning program was maintained with approximately an

additional 266.6 miles cleaned.

As shown Figure 4 below, the Water Authority is ahead of its goal to clean then entire system

once in ten years through the Sub-Basin program.

Page 14 of 22

The cleaning program continues with the same goals but the focus will shift to lines identified as

previously experiencing sewer trouble. An in-house study performed in FY2017 identified that

lines previously impacted by a 10-40, 10-42, or 10-48 are much more likely to experience a

future 10-42 or 10-48 than the system as a whole. In FY2017 and FY2018, the lines with

previous trouble not caused by burps, contractor negligence, etc. were added to the Short Interval

program. Because the Short Interval program focuses on the lines more likely to cause future

spills, the Water Authority in FY2018 will increase the cleaning of Short Interval lines. The Sub-

Basin program and associated ten-year goal remain in place.

Figure 4 Small Diameter Sewer Cleaned vs. Ten-Year Goal

Page 15 of 22

Root Foaming The following recommendation is made in the FY2013 CMOM Report: “Starting in FY15,

implement a 3-year pilot program. Root foam selected lines that meet the root infested and / or

inaccessibility criteria. Compare effectiveness to mechanical cleaning currently practiced and

provide recommendation.”

The Root Foaming Pilot Project is a three year program. The FY15 and FY16 groups were

foamed in June 2015 and March 2016 respectively. Per vendor recommendations, the FY15

group was retreated in June 2017. This completes the foaming application of the Pilot Project.

An interim inspection of the FY15 treated and control group was performed in FY2016 and was

inconclusive. During FY2017, the FY15 and FY16 lines, both treated and control, were

scheduled for CCTV inspection. During FY2018, this CCTV data will be examined to compare

treated and control pipes.

Generator Plan The following recommendation is made in the FY2016 CMOM Report: “In FY2017, it is

recommended to run a test at two vacuum stations in which power is actually cut and the

portable generators are hooked up.” This recommendation follows the development of an SOP

for portable generators (recommended in the FY2014 CMOM and reported in the FY2015

CMOM) and a simulation of the simultaneous failure of power at Vacuum Stations 67 and 69

(FY2016 CMOM).

On 4/12/2017, the power was shut down at Vacuum Stations 57 and 68 and portable generators

were utilized simultaneously run both stations. This completes the FY2017 recommendation.

In FY2018, it is recommended that a simultaneous power failure be tested at three vacuum

stations. Again, power will be shut down and portable generators will be hooked up and attempt

to run the three stations simultaneously.

Odor Complaints The Water Authority has committed to tabulate odor complaints by month. The EPA considers

odor and corrosion control an issue in collection system O&M, as indicated by the Hydrogen

Sulfide Monitoring and Control (HSMC) section in the CMOM Program Self-Assessment

standard template from the EPA website.

Odor control is a major issue in warm-weather systems such as Albuquerque’s. A high

correlation has been demonstrated between odor complaints and the sewage temperature

(analysis of FY11 & FY12 temperature vs. odor complaint data, r = 0.89, p < 0.02). Odor

complaints are also known as a 10-52. The following graphic shows the odor complaints

received by the Water Authority in FY2012 through FY2017. All odor complaints received are

included in this graphic; however, study has indicated that approximately ¾ of the complaints

received originate in the private and not the public system.

Page 16 of 22

Figure 5 Odor Complaints

Page 17 of 22

The following flow chart describes the process followed by the Water Authority in response to

an odor complaint. This specific process in the immediate response and the follow-up to odor

complaints is due to the importance placed on customer service. Also, the Water Authority has

found that some odor complaints are due to a blockage prior to an overflow; therefore, a quick

response can prevent an SSO.

Figure 6 Odor Complaint Flow Chart

Page 18 of 22

Identified Gaps in the Water Authority Processes with Recommendation to Close In the process of continuous improvement, the Water Authority is committed to identifying and

closing gaps. As discussed above, most of these recommendations are now considered On-Going

programs.

Prohibited Discharges, i.e., SSOs The Water Authority acknowledges that prohibited discharges have occurred and that all

discharges from the sanitary sewer system are prohibited.

Recommendation: The Water Authority will annually examine sewer system performance, set

specific steps for decreasing SSOs and mitigating their impacts, and has a program of continuous

improvement.

Formalize SSO Follow-Up Involving Administrative Assessments or Equivalent

Some SSOs are directly caused by construction contractors or commercial/industrial users. In

many such cases, the Water Authority has taken steps to hold the offending party responsible and

required financial compensation. Cost assessments have been based on direct costs of a particular

blockage, both to immediately respond and for follow-up cleaning and inspection. Costs have

been developed by the Collection Section, or in the case of contractor repairs, by Centralized

Engineering. Dependent of the particulars of the blockage and the offending party, costs may be

assessed and collected by different groups, e.g. Compliance Division or Risk Management.

The intent is to alert the offending party that their company caused identifiable problems in the

sewer system and to do so in a way that causes them to control their operations and staff. In past

instances in which an offending party was explained how their actions resulted in problems in

the sewer system, they have typically been apologetic and have taken steps to prevent a

recurrence.

In FY2018, it is recommended that the Compliance Division develop a Sewer Trouble Invoice

Statement to be utilized, where appropriate, to assess costs for sewer blockages, including those

for which an SSO did not occur.

Page 19 of 22

Appendices

Page 20 of 22

Appendix 1 Sanitary Sewer Overflow Analysis Table

FY2

01

7 O

verf

low

An

alys

is T

able

10-42

10-48

10-42 &10-48

Maximo WO #

Diameter

Maximo Reported

Date

Repeat

Repeat within 1 year

Date of SSO

Time of SSO

Duration (HH:MM)

Location

Estimated Volume

(gallons)

Reported Cause of

Overflow

Observed

Environmental

Impacts

Action Taken

Ultimate Discharge

Location

Volume Recovered

(gallons)

Cause

Mitigation

Pretreatment Follow

Up Requested

FSEs Visited

Notice of Violation

X12106013

12

7/2

8/2

016

NN

7/2

8/2

016

7:2

5 A

MN

A

11813 S

AN

JA

CIN

TO

AV

E

NE

NA

R

GS

NA

CC

PP

NA

C

UR

H

X12125495

88/2

2/2

016

NN

8/2

2/2

016

12:0

0 P

M:4

5835 R

IO A

RR

IBA

AV

E S

E

5

RT

NE

AH

CC

/WD

/CW

WP

ST

2

R

TS

I

X12145297

NA

9/1

5/2

016

YN

9/1

4/2

016

11:0

0 P

MN

A7100 I

SLE

TA

BLV

D S

W N

A

EQ

NA

NA

PP

NA

E

QR

H

X12150354

89/2

3/2

016

NN

9/2

0/2

016

12:0

5 P

MN

A610 A

ZT

EC

RD

NW

NA

B

PN

AN

AP

P N

A

BP

NF

X12163570

12

10/9

/2016

NN

10/9

/2016

11:0

0 A

M0.0

6597

8207 C

EN

TR

AL A

VE

NW

200

RG

SN

EA

HC

C/R

P/H

TH

DS

T

150

DB

PT

YY

X12164404

210/1

2/2

016

NN

10/1

0/2

016

10:0

0 A

M:1

0

LIF

T S

TA

TIO

N 3

82 -

Cham

isa R

idg

e L

ift

Sta

tion -

9500 C

alle

Cham

isa N

W

1

0

LF

NE

AH

WD

PS

T

-

LF

RH

X12165893

12

10/1

2/2

016

NN

10/1

1/2

016

11:2

2 A

M0.0

6111

806 M

AR

TIN

LU

TH

ER

KIN

G A

VE

NE

120

RK

/SG

G/D

BN

EA

HC

C/W

D/H

TH

PS

T

-

DB

NF

X12177692

810/2

8/2

016

NN

10/2

8/2

016

8:2

8 A

M:3

2

Ala

meda B

lvd N

e /

Bars

tow

St

Ne

15

RK

NE

AH

CC

/WD

PS

T

-

CU

NF

X12181202

810/2

8/2

016

NN

10/2

8/2

016

1:0

1 P

MN

A1201 S

TO

VE

R A

VE

SW

NA

B

PN

AN

AP

P N

A

BP

SP

X12178714

810/3

1/2

016

NN

10/2

9/2

016

2:0

0 P

MN

A1001 C

EN

TR

AL A

VE

NE

NA

G

R/R

GS

NA

NA

PP

NA

D

BR

H

X12183867

811/3

/2016

NN

11/3

/2016

9:2

0 A

M:5

0

1944 B

UF

FA

LO

DA

NC

ER

TR

L N

E

5

RG

RN

EA

HC

C/W

D/H

TH

PS

T

-

RT

SP

X12199289

811/2

9/2

016

NN

11/2

5/2

016

9:0

0 A

MN

A1728 F

OO

TH

ILL D

R S

W N

A

RT

NA

CC

PP

NA

C

UN

F

X12200207

811/3

0/2

016

YN

11/3

0/2

016

7:5

0 A

M:2

5

Juan T

abo B

lvd/

Lom

as

Blv

d N

E

5

0

GR

/RG

SN

EA

HC

C/R

P/R

S/W

D/H

TH

PS

T

2

5

GR

PT

X12+

X12203061

812/5

/2016

NN

12/4

/2016

11:2

6 P

M:4

9

1608 B

RO

AD

WA

Y B

LV

D

NE

245

GR

NE

AH

CC

/HT

HS

D

250

GR

SP

/SI

X12203681

612/6

/2016

YN

12/6

/2016

2:0

0 P

M0.8

3333

2301 L

uchett

i R

d S

W &

Los P

adill

as D

rain

SW

8,7

00

LF

NE

AH

CW

/RP

MR

GC

D

5,4

82

LF

RH

X12207619

812/1

1/2

016

YN

12/1

1/2

016

7:0

0 P

M0.0

4861

2304 D

ON

LU

IS R

D S

W

200

GR

/RG

SN

EA

HC

C/C

WW

/RP

/HT

HP

ST

35

DB

SI

X12209828

812/1

4/2

016

YN

12/1

4/2

016

8:2

0 A

MN

A

106 B

RO

AD

WA

Y B

LV

D

SE

NA

G

RN

AC

CP

P N

A

GR

SI/

SP

/PT

X12213249

812/1

9/2

016

NN

12/1

7/2

016

9:3

5 A

M0.0

8681

1912 S

UM

ME

R B

RE

EZ

E

DR

NW

1

7,2

50

GR

NE

AH

CC

/WD

/RP

/HT

HO

1,0

00

CU

NF

X12214692

812/2

1/2

016

NN

12/2

1/2

016

6:3

0 P

M:5

0E

nacta

do a

nd T

ram

way N

E

250

SG

GN

EA

HC

C/W

D/R

S/H

TH

PS

T

8

0

MH

/RT

RH

X12218642

812/2

8/2

016

NN

12/2

9/2

016

12:0

2 P

M:2

23500 C

OO

RS

BLV

D S

W

3

,635

GR

/RG

SN

EA

HC

C/C

WW

/WD

/RP

O

3,6

35

CU

NF

X12219157

812/2

9/2

016

YN

12/2

9/2

016

10:1

5 A

M:5

0709 R

IO A

RR

IBA

AV

E S

E

1

0

GR

NE

AH

CC

/WD

/HT

HP

ST

-

C

OR

H

X12221347

81/2

/2017

NN

1/2

/2017

11:3

0 A

M:3

0

13114 C

ON

ST

ITU

TIO

N

AV

E N

E

500

GR

/RG

SN

EA

HC

C/W

D/R

P/H

TH

PS

T

350

RT

SP

X12230244

81/1

7/2

017

NN

1/1

7/2

017

11:5

8 A

M:3

93901 G

EO

RG

IA S

T N

E

200

RG

SN

EA

HC

C/R

P/C

WW

/HT

HP

ST

40

CU

NF

X12232978

81/2

1/2

017

NN

1/2

1/2

017

1:1

0 P

M:3

0

11441 M

ALA

GU

EN

A L

N

NE

30

CO

/GR

/RG

SN

EA

HC

C/R

S/H

TH

PS

T

-

CU

NF

X12233234

81/2

2/2

017

YY

1/2

2/2

017

1:1

5 P

M0.0

8333

6008 R

IVE

RW

ALK

DR

NW

240

GR

/RG

SN

EA

H

CC

/CW

W/R

P/R

S/W

D

/HT

HP

ST

80

GR

SI

XX

12245245

81/3

0/2

017

YY

1/2

9/2

017

11:4

8 A

M0.0

5694

1122 M

AR

IAN

O T

RL S

W

2

,050

GR

/RG

SN

EA

H

CC

/CW

W/W

D/R

P/H

T

HP

ST

2

00

RT

SI/

SP

X12248084

82/1

/2017

NN

2/1

/2017

10:3

0 A

MN

A

10704 W

OO

DLA

ND

AV

E

NE

NA

B

PN

AC

CP

P N

A

BP

SP

X12250373

15

2/3

/2017

YN

2/2

/2017

2:4

5 P

MN

A109 H

EA

DIN

GLY

AV

E N

W N

A

GR

/RG

SN

AC

CP

P N

A

SL

SI

Typ

eD

MR

SS

O T

eam

Stu

dy

En

forc

em

en

t

Pag

e 1

of

2

FY2

01

7 O

verf

low

An

alys

is T

able

10-42

10-48

10-42 &10-48

Maximo WO #

Diameter

Maximo Reported

Date

Repeat

Repeat within 1 year

Date of SSO

Time of SSO

Duration (HH:MM)

Location

Estimated Volume

(gallons)

Reported Cause of

Overflow

Observed

Environmental

Impacts

Action Taken

Ultimate Discharge

Location

Volume Recovered

(gallons)

Cause

Mitigation

Pretreatment Follow

Up Requested

FSEs Visited

Notice of Violation

Typ

eD

MR

SS

O T

eam

Stu

dy

En

forc

em

en

t

XX

12253531

10

2/7

/2017

NN

2/7

/2017

7:0

4 A

M:4

6541 A

TR

ISC

O D

R N

W

1

,150

CU

NE

AH

CC

/CW

W/W

D/R

S/H

T

HS

D

900

LF

RH

X12254350

82/8

/2017

YN

2/8

/2017

7:1

5 P

M0.0

4167

2336 D

ON

LU

IS R

D S

W

300

GR

NE

AH

CC

/WD

/HT

HY

D

-

SL

SI

X12256131

62/1

0/2

017

NN

2/1

0/2

017

12:0

0 A

M0.6

875

2300 B

EC

K R

D S

W

50,0

00

LF

NE

AH

BR

/CW

W/C

C/W

D/R

PM

RG

CD

156,0

00

LF

RH

X12260488

12

2/1

9/2

017

NN

2/1

8/2

017

2:3

3 P

M0.0

5694

1400 M

ON

TA

NO

RD

NE

8,8

00

GR

/RG

SN

EA

HC

C/W

D/R

S/H

TH

O

-

LF

RH

X12266390

62/2

8/2

017

NN

2/2

4/2

017

11:0

2 A

M:5

8311 C

RO

MW

ELL A

VE

SE

2,0

00

CO

NE

AH

CW

W/W

D/H

TH

SD

2,0

00

CO

RH

X12266513

82/2

8/2

017

NN

2/2

8/2

017

9:0

5 A

M:2

0

11004 W

OO

DLA

ND

AV

E

NE

15

GR

/RG

SN

EA

HC

C/W

D/R

PP

ST

5

R

TS

I

X12272263

83/8

/2017

YN

3/8

/2017

2:2

5 P

M0.0

4167

2924 S

an M

ate

o B

lvd N

e

5

GR

NE

AH

CC

/WD

/HT

HP

ST

1

G

RP

TY

2

X12272766

NA

2/1

9/2

017

NN

2/1

9/2

017

6:1

0 P

MN

A2201 C

ELE

ST

E R

D S

W N

A

DB

NA

CC

PP

NA

D

BN

F

X12271501

NA

2/1

9/2

017

NN

2/1

9/2

017

6:1

2 P

MN

A2205 C

ELE

ST

E R

D S

W N

A

DB

NA

CC

PP

NA

D

BN

F

X12271513

NA

2/2

1/2

017

NN

2/2

1/2

017

10:0

0 A

MN

A2424 M

ALP

AIS

RD

SW

NA

D

BN

AC

CP

P N

A

DB

NF

X12272780

NA

2/2

1/2

017

YN

2/2

1/2

017

5:1

5 P

MN

A1810 M

AR

CE

LIN

O R

D S

W N

A

DB

NA

CC

PP

NA

D

BN

F

X12279387

NA

3/2

0/2

017

YY

3/1

8/2

017

12:4

2 P

MN

A2201 M

ALP

AIS

RD

SW

NA

E

QN

AC

CP

P N

A

EQ

NF

X12283494

83/2

7/2

017

NN

3/2

7/2

017

11:3

0 A

M0.0

4167

251 L

EO

NID

AS

LN

NW

120

CO

/RK

/SG

GN

EA

HC

C/C

WW

/RP

/HT

HP

ST

30

SG

GP

TY

X12289576

44/3

/2017

NN

4/3

/2017

3:5

0 P

M:5

5P

rince &

Dauphin

Rd.

SW

15

EQ

NE

AH

WD

/RP

/RS

/HT

HP

ST

15

EQ

NF

X12290837

84/5

/2017

YN

4/5

/2017

8:2

6 P

MN

A

9700 G

OLF

CO

UR

SE

RD

NW

NA

G

RN

AC

CP

P N

A

GR

PT

/SI

X12299860

84/1

8/2

017

NN

4/1

8/2

017

5:0

0 P

M:3

51400 M

ON

TA

NO

RD

NE

175

CO

/EQ

NE

AH

RP

/WD

/RS

/HT

HP

L

150

CO

RH

X12306212

84/3

0/2

017

NN

4/3

0/2

017

12:0

0 P

M0.1

0417

3311 C

OO

RS

BLV

D S

W

100

GR

NE

AH

CC

/WD

/RP

/RS

/HT

HP

ST

80

GR

PT

4

X12307763

85/2

/2017

NN

5/1

/2017

2:0

0 P

MN

A10805 M

EN

AU

L B

LV

D N

E N

A

CO

NE

AH

CC

PP

NA

C

OR

H

X12315488

12

5/1

0/2

017

NN

5/1

0/2

017

7:2

4 A

M0.0

8333

6800 P

AS

EO

DE

L N

OR

TE

NE

3,0

00

GR

NE

AH

CC

/CW

W/R

S/W

D/H

T

HS

D

2,0

00

CU

NF

X12321103

85/1

8/2

017

NN

5/1

7/2

017

11:1

5 A

M:2

51220 1

ST

ST

NW

25

DB

/RG

SN

EA

HC

C/W

D/R

PP

ST

10

SL

SI

X12324488

85/2

2/2

017

NN

5/2

2/2

017

6:3

4 P

M:2

6

CO

ULS

ON

RD

&

LO

UIS

IAN

A B

LV

D N

E

650

GR

NE

AH

CC

/CW

W/W

D/R

P/R

S/

HT

HS

D

600

MH

RH

X12345136

NA

6/1

6/2

017

NN

6/1

6/2

017

8:3

0 A

M:3

02315 M

AR

KH

AM

RD

SW

20

LF

NE

AH

CC

DS

T

-

LF

RH

Pag

e 2

of

2

Page 21 of 22

Appendix 2 Sanitary Sewer Overflow Volume Captured Analysis Table

Maximo WO

# Date of SSO Location

Volume

(gallons)

Volume

Recovered

(gallons)

Volume

Not

Recovered

%

Recovered

12125495 8/22/2016 835 RIO ARRIBA AVE SE 5 2 3

12163570 10/9/2016 8207 CENTRAL AVE NW 200 150 50

12164404 10/10/2016 LIFT STATION 382 - Chamisa Ridge Lift Station - 9500 Calle Chamisa NW 10 0 10

12165893 10/11/2016 806 MARTIN LUTHER KING AVE NE 120 0 120

12177692 10/28/2016 Alameda Blvd Ne / Barstow St Ne 15 0 15

12183867 11/3/2016 1944 BUFFALO DANCER TRL NE 5 0 5

12200207 11/30/2016 Juan Tabo Blvd/ Lomas Blvd NE 50 25 25

12203061 12/4/2016 1608 BROADWAY BLVD NE 245 250 -5

12203681 12/6/2016 2301 Luchetti Rd SW & Los Padillas Drain SW 8,700 5,482 3,218

12207619 12/11/2016 2304 DON LUIS RD SW 200 35 165

12213249 12/17/2016 1912 SUMMER BREEZE DR NW 17,250 1,000 16,250

12214692 12/21/2016 Enactado and Tramway NE 250 80 170

12218642 12/29/2016 3500 COORS BLVD SW 3,635 3,635 0

12219157 12/29/2016 709 RIO ARRIBA AVE SE 10 0 10

12221347 1/2/2017 13114 CONSTITUTION AVE NE 500 350 150

12230244 1/17/2017 3901 GEORGIA ST NE 200 40 160

12232978 1/21/2017 11441 MALAGUENA LN NE 30 0 30

12233234 1/22/2017 6008 RIVERWALK DR NW 240 80 160

12245245 1/29/2017 1122 MARIANO TRL SW 2,050 200 1,850

12253531 2/7/2017 541 ATRISCO DR NW 1,150 900 250

12254350 2/8/2017 2336 DON LUIS RD SW 300 0 300

12256131 2/10/2017 2300 BECK RD SW 50,000 156,000 -106,000

12260488 2/18/2017 1400 MONTANO RD NE 8,800 0 8,800

12266390 2/24/2017 311 CROMWELL AVE SE 2,000 2,000 0

12266513 2/28/2017 11004 WOODLAND AVE NE 15 5 10

12272263 3/8/2017 2924 San Mateo Blvd Ne 5 1 4

12283494 3/27/2017 251 LEONIDAS LN NW 120 30 90

12289576 4/3/2017 Prince & Dauphin Rd. SW 15 15 0

12299860 4/18/2017 1400 MONTANO RD NE 175 150 25

12306212 4/30/2017 3311 COORS BLVD SW 100 80 20

12315488 5/10/2017 6800 PASEO DEL NORTE NE 3,000 2,000 1,000

12321103 5/17/2017 1220 1ST ST NW 25 10 15

12324488 5/22/2017 COULSON RD & LOUISIANA BLVD NE 650 600 50

12345136 6/16/2017 2315 MARKHAM RD SW 20 0 20

Grand Total 100,090 173,120 -73,030 173%

FY2017 10-42 SPILL VOLUME AND VOLUME RECOVERED

Estimated

Page 22 of 22

Appendix 3 Overflow Emergency Response Plan (OERP)

4-1

4-1

7

Page

1

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Cus

tom

er c

alls

d

ispa

tch

wit

h is

sue

Dis

pat

ch c

olle

cts

dat

a an

d cr

eate

s a

Serv

ice

R

eque

st;

Task

el

evat

ed t

o

supe

rvis

or

Supe

rvis

or c

reat

es a

w

ork

ord

er a

nd

sen

ds

cre

w t

o

loca

tion

. St

atu

s o

f w

ork

ord

er is

u

pdat

ed

to

DIS

PA

TCH

ED

Unb

lock

an

d C

lea

n up

. P

g. 2

Supe

rvis

or r

evie

ws

wor

k o

rder

for

qu

alit

y a

ssur

ance

. St

atu

s o

f w

ork

ord

er is

u

pdat

ed

to C

OM

PLE

TE

AN

D

REA

DY

FOR

RE

VIE

W

Pla

nner

/ S

che

dule

r d

oes

q

ualit

y co

ntr

ol a

nd u

pd

ates

st

atu

s o

f w

ork

ord

er t

o

CO

MP

LETE

Follo

w u

p st

ud

y an

d m

itig

atio

n.

Pg.

6

No

tific

atio

n

pro

cess

.

Pg.

7

Col

lect

ion

Resp

onse

Ale

rt M

edia

. P

g. 1

0

Ap

plie

s o

nly

to

Col

lect

ion

Syst

em

sew

er p

rob

lem

s.

Pri

vate

vs.

p

ublic

SSO

. P

g. 5

Tech

con

firm

s as

set

and

fills

out

req

uire

d in

form

atio

n in

th

e w

ork

ord

er

Spill

to

per

vio

us a

reas

.

Pg.

3

Spill

ent

ered

/

ente

rin

g st

orm

d

rain

co

llect

ion

sy

stem

. P

g. 4

Spill

has

en

tere

d st

orm

p

ump

sta

tion

. P

g. 9

Spill

ent

erin

g W

ate

rway

.P

g. 1

1

No

te: A

ll E

me

rge

ncy

resp

onse

s ar

e in

itia

ted

by a

ca

ll to

Dis

patc

h a

t 84

2-W

ATR

(84

2-92

87).

Ple

ase

call

the

re

firs

t. If

yo

u do

no

t, t

he e

mer

gen

cy

resp

ond

ers

hav

e to

cal

l an

d de

lay

the

resp

onse

4-1

4-1

7

Page

2

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Unb

lock

an

d C

lea

n U

p.

Pg.

1

No

te t

he

tim

e

of d

ispa

tch

an

d

arri

val o

n

scen

e

Inve

stig

ate

the

ca

use

an

d st

op t

he

san

itar

y se

wer

o

verf

low

.

No

te t

he

sta

rt a

nd

st

op t

ime

that

the

ove

rflo

w o

ccu

rred

Is a

dd

itio

nal h

elp

nec

ess

ary

to a

id t

he

clea

n u

p /

rem

edia

tio

n ef

fort

s?

The

Vac

tor

truc

k(s)

sh

ould

be

dis

pat

ched

im

me

diat

ely.

Yes

Det

erm

ine

wh

ethe

r o

verf

low

ha

s en

tere

d

per

vio

us a

rea,

sto

rm

dra

in, d

itch

, can

al, o

r st

orm

pum

p st

atio

n.

Spill

ent

ered

/

ente

rin

g st

orm

d

rain

co

llect

ion

sy

stem

. P

g. 4

Spill

has

ent

ered

a

COA

sto

rm

pum

p st

ati

on.

Pg.

9

Cre

w a

rriv

es o

n s

ite

If e

vid

ence

of

“Ext

rem

e”

FOG

.

Pre

trea

tme

nt

Invo

lvem

ent.

P

g. 8

Ap

ply

HTH

per

SO

P

Rem

ove

spill

fro

m

surf

ace

. R

emov

e an

y so

lids.

Wa

sh

dow

n sp

ill a

rea

and

rem

ove

was

h w

ater

.

Is S

SO c

lear

ly

pub

lic?

Yes

Pri

vate

vs.

P

ublic

SSO

s.

Pg.

5

No

No

Cle

an

Sew

er.

Pg.

5

Spill

to

per

vio

us a

rea.

P

g. 3

Pro

tect

p

ublic

fr

om

are

a.

Spill

has

en

tere

d a

wat

erw

ay.

Pg.

11

4-1

4-1

7

Page

3

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Imm

edia

tely

be

gin

co

llect

ing

spill

wit

h

Vac

tor

tru

ck.

Wh

en S

SO s

top

ped,

ap

ply

was

hw

ater

&

HTH

to

spi

ll ar

ea &

al

low

to

flo

w t

o

per

vio

us a

rea

and

re

mov

e w

ashw

ater

.

Supe

rvis

or o

r Su

peri

nten

dent

to

det

erm

ine

if p

ublic

ac

cess

to

perv

iou

s ar

ea is

a c

once

rn.

Supe

rvis

or o

r Su

peri

nten

dent

to

det

erm

ine

/ re

com

me

nd

rem

edia

tio

n.

Con

sult

wit

h Ch

ief

Engi

nee

r if

requ

ired

.

Yes

Allo

w t

o d

ry.

No

Imp

lem

ent

Rem

edia

tio

n C

ompl

ete.

Pg.

1

Spill

to

per

vio

us

area

. P

g. 2

4-1

4-1

7

Page

4

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Spill

ent

ered

/

ente

rin

g st

orm

d

rain

co

llect

ion

sy

stem

. P

g. 2

Det

erm

ine

how

far

dow

nstr

eam

the

sp

ill h

as r

each

ed.

SSO

Rea

ches

CO

A

stor

m d

rain

.W

ash

wa

ter

to

stre

et a

nd

inle

t.

Ad

d w

ash

wat

er &

rem

ove

at d

own

stre

am m

anho

le.

Rem

ove

imm

edi

ate

ly if

rai

n is

imm

inen

t. If

no

t, r

emov

e n

ext

norm

al w

ork

day

.

Rem

edia

tio

n C

ompl

ete.

P

g. 1

Ass

ist

in c

lean

up

as

req

uest

ed.

If p

oss

ible

, pos

itio

n

2nd V

acto

r to

re

mov

e sp

ill p

rio

r to

re

achi

ng in

let.

No

te:

Pro

cess

sh

ow

n is

fo

r ty

pic

al s

pill

s. S

pill

s th

at a

re n

ot

app

rop

riat

e fo

r V

acto

r re

mo

val m

ay r

eq

uir

e a

jo

int

resp

on

se

wit

h t

he

imp

acte

d M

S4

Pe

rmit

tee

in w

hic

h t

he

sp

ill is

ca

ptu

red

, tre

ated

, an

d d

ete

rmin

ed a

pp

rop

riat

e fo

r re

lea

se.

*If

Jer

ry L

ova

to is

no

t im

me

dia

tely

ava

ilab

le, c

all:

No

lan

Be

nn

ett

: Fi

eld

En

gin

eer

(50

5) 3

01-

69

41H

erm

an

Gab

ald

on

: Su

pe

rin

ten

den

t (5

05)

36

6-8

209

**I

f K

evi

n D

agg

ett

is n

ot

imm

ed

iate

ly a

vaila

ble

, cal

l:

Bry

an W

olf

e:

En

gr. D

iv. M

an

age

r (5

05)

25

0-7

364

Car

l Rin

ken

be

rger

: O

&M

Man

age

r (5

05)

25

0-4

334

Da

nie

l Tap

ia:

O&

M S

up

t (5

05)

22

8-6

874

4-1

4-1

7

Page

5

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Ask

Sup

ervi

sor.

Cle

arl

y Pu

blic

?Ye

s

Cle

arl

y Pr

iva

te?

No

Elev

ate

to

Supe

rint

ende

nt.

No

Res

olv

e if

P

ublic

?Ye

s

Info

rm P

ub

licN

oYe

s

Do

not

clea

n s

ew

er

Dep

end

ing

on

juri

sdic

tio

n,

follo

w u

p w

ith

City

of

Alb

uqu

erq

ue, B

erna

lillo

Co

unty

, V

illa

ge o

f La

s R

anch

os

or N

ME

D (

See

tabl

e fo

r co

ntac

ts)

Cit

y o

f Alb

uq

uerq

ue

Co

de E

nfo

rcem

ent

(50

5) 9

24-

3450

No

te:

The

ide

nti

fied

co

de

en

forc

em

en

t co

nta

cts

will

als

o b

e u

tiliz

ed

to

rep

ort

pri

vate

se

rvic

e

line

s is

sue

s re

sult

ing

in s

ew

age

sp

ills

to p

riva

te o

r p

ub

lic

pro

pe

rty.

Cle

an

Sew

er.

P

g. 2

Rem

edia

tio

n C

ompl

ete.

P

g. 1

Pri

vate

vs.

P

ublic

SSO

s.

Pg.

2

Ber

nalil

lo C

oun

tyN

atur

al R

eso

urce

Se

rvic

esR

evie

w &

Per

mit

tin

g Se

ctio

n(5

05)

31

4-03

75

NM

EDLi

qui

d W

aste

Pro

gram

(50

5) 2

22-

9500

(50

5) 8

27-

1840

Pu

blic

an

d p

riva

te li

ne

s m

ay b

e

dif

fere

nti

ated

on

th

e W

ate

r A

uth

ori

ty G

IS M

app

ing

.

Pri

vate

lin

es

that

may

be

con

fuse

d

wit

h W

ater

Au

tho

rity

ma

ins

sho

uld

b

e id

enti

fie

d t

o t

he

Co

llec

tio

n

Sect

ion

Re

sear

ch A

nal

yst

for

incl

usi

on

in t

he

“Was

te W

ate

r N

on

-A

uth

ori

ty”

lay

er.

For

non

-Au

tho

rity

spi

lls in

th

e Ci

ty li

mit

s, in

ad

diti

on t

o c

allin

g th

e a

ppr

opr

iate

po

rtio

n o

f CO

A

Cod

e En

forc

eme

nt, a

lso

ale

rt:

Kev

in D

agge

tt-

(50

5) 8

03-

8058

For

non

-Au

tho

rity

spi

lls in

th

e Co

unt

y, in

add

itio

n to

cal

ling

Na

tura

l Re

sou

rce

s Se

rvic

es, c

onta

ct H

ugh

O

’Nea

ll at

93

4-27

04. F

or

any

non-

Au

tho

rity

th

at

imp

act

an A

MA

FCA

or

NM

DO

T fa

cilit

y, a

lert

th

e ap

pro

pria

te c

on

tact

list

ed

on p

age

4.

Vill

age

of

Los

Ran

chos

(50

5) 3

44-

6582

Cod

e En

forc

eme

nt o

ffic

e

4-1

4-1

7

Page

6

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Follo

w u

p st

ud

y an

d m

itig

atio

n.

Pg.

1

Res

ear

ch A

nal

yst/

GIS

Inte

rn

cre

ate

s a

follo

w-u

p cl

ean

ing

and

CCTV

wo

rk o

rder

s fo

r gr

avit

y 1

0-4

0s,

-42

s, a

nd

48s.

Sew

er li

ne

is

tele

vise

d.

Res

ear

ch A

nal

yst

com

pile

s m

aps

and

dat

a as

soci

ated

wit

h a

ll u

nstu

died

10

-42

s an

d -

48s

for

SSO

Stu

dy

Team

Mee

tin

g.

Res

ear

ch A

nal

yst

stud

ies

SSO

s.

Ob

vio

us c

ause

?Ye

sN

oSS

O T

eam

exa

min

e/

req

uest

mo

re d

ata/

reso

lve.

Con

sen

sus

cau

se.

Con

sen

sus

mit

igat

ion

.

Con

sen

t Li

stSS

O T

eam

acc

epts

/re

que

sts

furt

her

st

udy

Acc

epte

d C

ause

.A

ccep

ted

Mit

igat

ion

.

Res

ear

ch A

nal

yst

com

pile

s SS

O c

ause

an

d m

itig

atio

n

Mit

igat

ion

Rev

iew

wit

h C

olle

ctio

n

Sect

ion

Ma

nage

r fo

r su

gges

tio

ns

and

appr

ova

l.N

on-

FOG

FOG

Col

lect

ion

Sect

ion

Man

age

r ap

pro

ves

and

ro

ute

s fo

r im

ple

men

tati

on

.*

SSO

Tra

ckin

g T

able

End

of

Pre

trea

tme

nt

invo

lvem

ent.

P

g. 8

Subm

it t

o P

retr

eatm

ent

for

enfo

rcem

ent.

P

g. 8

Com

pile

dat

a in

SSO

A

nal

ysis

Tab

le f

or

incl

usi

on

in C

MO

M

Rep

ort.

Is a

de

fect

id

enti

fied

as

Gra

de

7 o

r 8?

No

Will

it b

e a

ssig

ned

in

-hou

se o

r to

on-

call

con

trac

tor?

*Ye

s

*If t

he

def

ect

is d

ue t

o co

rro

ded

co

ncr

ete,

reh

ab o

f th

e m

anh

ole

to m

anho

le p

ipe

segm

ent

is t

ypic

ally

fo

rwar

ded

dire

ctly

to

C

entr

aliz

ed E

ngin

eer

ing

for

assi

gnm

ent

to a

n O

n-C

all c

ontr

acto

r o

r in

clu

sio

n in

pla

nn

ed r

ehab

pro

ject

. If t

he

def

ect

is in

a V

CP

line

, A

ssis

tant

Su

per

inte

nd

ent/

Gra

vity

Sup

erin

tend

ent/

Con

stru

ctio

n

Supe

rvis

or w

ill m

ake

the

dete

rmin

atio

n.

Cre

ate

Max

imo

W

ork

Ord

er.

In-H

ouse

Forw

ard

to

Cen

tral

ize

d En

gin

eer

ing

and

cop

y C

olle

ctio

n Se

ctio

n M

anag

er,

Gra

vity

Su

peri

nte

nd

ent,

an

d R

esea

rch

An

alys

t.O

n-C

all

4-1

4-1

7

Page

7

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

No

tific

atio

n

Pro

cess

. P

g. 1

Spill

fro

m W

UA

Sy

ste

m?

No

Re

port

ing

No

Spill

con

tain

ed in

W

UA

Fac

ility

(e.

g. d

ry

wel

l)?

Yes

Spill

con

tain

ed in

p

riva

te fa

cilit

y (e

.g.

bas

emen

t SS

O)?

No

Yes

O &

M S

up

ervi

sor

Rep

orts

No

Wit

hin

12 h

rs. o

r 24

hrs

. o

f tim

e of

d

isp

atch

not

ifie

d

or

cont

ract

or

verb

ally

rep

ort

s

Ora

l re

port

P

ueb

lo o

f Is

leta

(12

hrs

.)

NM

Env

iro

nmen

t D

ept

. (24

hrs

.)Em

ail

repo

rt

EPA

(24

hrs

.)

Wri

tten

Rep

ort

EP

A

NM

Env

iro

nmen

t D

epa

rtm

ent

P

ueb

lo o

f Is

leta

Wit

hin

5 d

ays

Doc

umen

t bu

t d

o n

ot r

epor

t.

Spill

res

ult

s fr

om

con

trac

tor’

s w

ork

or

con

stru

ctio

n a

ctiv

ity

(Sec

tion

91

1).

Yes

No

Con

trac

tor

verb

ally

re

por

ts t

o co

llect

ion

se

ctio

n Su

peri

nten

dent

or

stan

db

y Su

per

viso

r.

Yes

Con

trac

tor

pro

vid

es

24 h

our

wri

tten

re

por

t.

Ass

ista

nt

Supe

rint

ende

nt

pre

pare

s w

ritt

en

rep

ort.

Fie

ld

Div

isio

n M

anag

er

sign

s.

DM

R C

olle

ctio

n Se

ctio

n S

SOs

Com

plia

nce

Div

isio

nEP

A D

MR

, 15

th o

f th

e m

on

th

Col

lect

ion

Sect

ion

M

anag

er t

o C

OA

&

AM

AFC

A

GW

QB

Re

po

rtin

gP

on

de

d s

ew

age

on

a p

erv

iou

s ar

ea

may

re

qu

ire

add

itio

nal

re

po

rtin

g to

th

e G

rou

nd

Wat

er

Qu

alit

y

Bu

reau

(G

WQ

B).

Cir

cum

stan

ces

pre

sum

ed

to

re

qu

ire

this

re

po

rtin

g w

ill b

e:

1. A

se

wag

e s

pil

l th

at:

a. Is

po

nd

ed

fo

r m

ore

th

an 2

4 h

ou

rs a

nd

,

b. A

t a

de

pth

of

mo

re t

han

12

inch

es

ove

r an

are

a o

f

mo

re t

han

0.1

acr

e.

The

no

rmal

24-

ho

ur

call

to

NM

ED S

urf

ace

Wat

er

is

pre

sum

ed

to

me

et

the

re

qu

ire

me

nt

for

a 24

-ho

ur

no

tifi

cati

on

to

th

e G

WQ

B. T

he

Co

lle

ctio

n S

ect

ion

Man

age

r sh

all b

e n

oti

fie

d a

nd

sh

all b

e r

esp

on

sib

le f

or

pre

par

ing

the

fo

llo

win

g ad

dit

ion

al r

ep

ort

ing:

1. O

ne

we

ek

wri

tte

n r

ep

ort

. Pre

sum

ed

th

e s

ame

as

the

five

day

re

po

rt p

rovi

de

d t

o N

MED

Su

rfac

e W

ate

r.

2. 1

5-d

ay C

orr

ect

ive

Act

ion

Re

po

rt.

For

syst

em

bre

aks

resu

ltin

g in

rel

ease

on

KAFB

: Cal

l K

irtl

and

AFB

Co

mm

and

Post

at

(50

5) 8

46-

3777

wit

hin

12

hou

rs.

For

spill

s o

n t

he U

NM

Mai

n an

d N

orth

Cam

pus

cont

act

the

Wo

rk C

ontr

ol C

ent

er (

M-

-F 7

:00

a.m

. to

4:30

p.m

.) a

t (5

05)

27

7-16

00 a

nd

all o

ther

ti

mes

co

ntac

t th

e C

ampu

s P

olic

e at

(50

5) 2

77-

2241

.

4-1

4-1

7

Page

8

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Supe

rvis

or c

alls

P

retr

eatm

ent

Off

ice

Ass

ista

nt (

289-

3419

)

o

Ad

dres

so

Dat

eo

Tim

eo

Supe

rvis

or N

ame

o

Esti

mat

ed V

olu

me

Is P

2 sp

ec.

avai

lab

le?

Pre

trea

tme

nt

Engi

nee

r In

vest

igat

es

No

P2

spec

. in

vest

igat

esYe

sP

roce

ed t

o SS

O

Loca

tion

Ob

serv

e si

te, f

ill o

ut

form

, tak

e p

ictu

res,

an

d co

llect

sam

ple

if

pos

sib

le

Use

map

pin

g re

sour

ces

to

esta

blis

h up

stre

am

bas

in a

rea

Dev

elo

p li

st o

f FSE

s in

are

a

No

te a

ny

pro

blem

FS

Es.

Vis

it F

SEs

and

ch

eck

GR

Ss a

nd

man

ifes

ts

Is a

FSE

re

spon

sibl

e?

No

Sta

rt E

nfo

rce

men

t P

roce

ssYe

s

Upd

ate

SSO

Tr

acki

ng T

able

. P

g. 6

LIN

KO

Gen

erat

ed

No

tice

of

Vio

lati

on

(NO

V)

Pre

trea

tme

nt

Invo

lvem

ent.

P

g. 2

Subm

it t

o P

retr

eatm

ent

for

enfo

rcem

ent.

P

g. 6

4-1

4-1

7

Page

9

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Shut

dow

n p

umps

Rem

ove

sew

age

wit

h V

acto

r or

pu

mp

to

SA

S

Wa

sh d

ow

n w

et

we

ll an

d re

mo

ve w

ash

w

ate

r

Rem

edia

tio

n C

ompl

ete.

P

g. 1

Spill

has

ent

ered

a

COA

sto

rm

pum

p st

ati

on.

Pg.

2

No

te:

Pro

cess

sh

ow

n is

fo

r ty

pic

al s

pill

s. S

om

e sp

ills

may

req

uir

e a

join

t re

spo

nse

wit

h t

he

Cit

y o

f A

lbu

qu

erq

ue

in w

hic

h t

he

sp

ill is

cap

ture

d, t

reat

ed,

and

de

term

ined

ap

pro

pri

ate

for

rele

ase

.

4-1

4-1

7

Pa

ge 1

0

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

For

larg

e or

si

gnif

ican

t sp

ills.

Supe

rint

ende

nt, C

hief

En

gin

eer,

or

Div

isio

n

Man

ager

to

con

tact

Pu

blic

Aff

airs

Man

ager

(P

AM

), D

ave

Mo

rris

, or

Chie

f Ope

rati

ng

Off

icer

(C

OO

), Jo

hn

Sto

mp

. P

rovi

de

req

uir

ed

info

rmat

ion

.

Me

dia

aler

ted

by

PA

M,

CO

O, o

r d

esig

nee

Ale

rt M

edia

. P

g. 1

4-1

4-1

7

Pa

ge 1

1

Ove

rflo

w E

mer

gen

cy R

esp

ons

e P

lan

Alb

uq

uerq

ue

Be

rnal

illo

Co

un

ty W

ate

r U

tilit

y A

uth

ori

ty

Spill

has

en

tere

d a

wat

erw

ay.

Pg.

2

If p

oss

ible

, sto

p t

he

flow

fro

m e

nte

ring

th

e w

ate

rway

an

d

colle

ct w

ast

ew

ater

.

Rea

che

s M

RG

CD

Fa

cilit

y?R

emov

e de

bris

.N

o

Con

tact

(In

seq

uenc

e un

til c

ont

acte

d)

Ja

son

Cas

uga

En

gin

eer

I(5

05)

25

9-10

05 C

ell

Jo

e B

rem

A

lbq

uerq

ue

Div

isio

n M

anag

er(5

05)

24

9-57

80 C

ell

R

ay G

omez

En

gin

eeri

ng S

uper

viso

r (50

5) 2

80-

1093

Cel

l

Joe

Bac

a Eq

uipm

ent

Op

erat

ion

s &

Mai

nten

ance

Sup

ervi

sor

(50

5) 2

49-

5155

Cel

l

Yes

Ass

ist

in

clea

nu

p as

re

que

ste

d.

Pg.

1

Rea

che

s R

io

Gra

nde?

No

No

Yes

Sam

ple

MR

GC

D f

acili

ty f

or

E-co

liu

pstr

eam

an

d do

wns

trea

m o

f SSO

.