CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:2
COPYRIGHT
The computer program CLOCKWORK and all associated documentation are proprietary andcopyrighted products. Worldwide rights of ownership rest with NEWTONIAN MACHINES.Unlicensed use of the program or reproduction of the documentation in any form, without priorwritten authorization from NEWTONIAN MACHINES is explicitly prohibited.
NEWTONIAN MACHINESANDRS DE FUENZALIDA 147PROVIDENCIA, SANTIAGO, CHILE
Tel: (+56 2) 2 23553800Email: [email protected]:http://www.newtonianmachines.com
http://www.newtonianmachines.com/http://www.newtonianmachines.com/http://www.newtonianmachines.com/http://www.newtonianmachines.com/ -
7/25/2019 Clockwork Verification Manual
3/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:3
CONTENT
I. INTRODUCTION ...................................................................................................................................... 4
1. TEST CASE 1 .......................................................................................................................................... 5
2. TEST CASE 2 .......................................................................................................................................... 7
3. TEST CASE 3 .......................................................................................................................................... 9
4. TEST CASE 4 ........................................................................................................................................ 11
5. TEST CASE 5 ........................................................................................................................................ 14
-
7/25/2019 Clockwork Verification Manual
4/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:4
I.
INTRODUCTION
Clockwork is a foundation design and analysis software, based on well-known and internationally accepted
theories.
This document provides example problems from recognized publications in order to verify the achievement
of accuracy and acceptable results. However and by the nature of this software, it is difficult to find suitable
examples for this verification manual since most publications are conceived to be a guide for engineers by
doing hand calculations, aside from the laborious task that it is for example calculate a structure with six
degree of freedom, natural frequencies for a coupled system, intricate periodic loads, etc.
The analyzed tests in this manual are just a small part of the rigorous tests that our developers run in the
testing stage to ensure the quality of Clockwork.
-
7/25/2019 Clockwork Verification Manual
5/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:5
1.
TEST CASE 1
Dynamic load of single-cylinder compressor.
a.
Overview
Reference: [1] Foundation Vibration Analysis Using Simple Physical Models, John P. Wolf, pg. 56.,ISBN: 0-13-010711-5
Dynamic Load Type: Periodic Excitation
Units: tonnef / m
b. Problem Description
On a rigid block foundation rests a reciprocating machine composed of a compressor and a driving
motor, which generates a vertical unbalanced dynamic load with two components. The first
component acts at a frequency of 9Hz and the second component at twice this frequency. The
resulting dynamic total load it is represented by P(t) (Fig.1.1).
c. Input Parameters
Compressor and driving motor mass =
Dynamic Load
Total load acts vertically on the foundation block.
Total Load P(t) =
Total Load Operation Frequency = 9 Hz
Number of terms used in Fourier Series = 20
Fig. 1.1Dynamic total load
from vertical single-cylinder
compressor.
-
7/25/2019 Clockwork Verification Manual
6/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:6
Rigid Foundation Block Size
Length = 2.0 m
Width = 1.5 m
Height = 1.0 m
Soil
Poissons Ratio = 0.33
Specific Mass Density =
Shear Modulus G =
d. Analysis
For this analysis the Cone method it is used in Clockwork.
e. Results Comparison
Measured Value
Clockwork
Displacement [mm]
Displacement Ref[1]
[mm]Lower Peak -0.01206 -0.01125 0.00125*
Higher Peak 0.02072 0.02125 0.00125*
* Displacement value from Fig. XX [1]
Fig1.2 - Dynamic vertical displacement from Clockwork results.
-
7/25/2019 Clockwork Verification Manual
7/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:7
2.
TEST CASE 2
Dynamic load of weavers loom.
a.
Overview
Reference: [1] Foundation Vibration Analysis Using Simple Physical Models, John P. Wolf, pg. 56,ISBN: 0130107115
Dynamic Load Type: Periodic Excitation
Units: tonnef / m
b. Problem Description
On a rigid block foundation rests a weavers loom operating at 9Hz with a mass of 2750kg. In this
case the load is expressed as a Fourier series with 20 terms (Fig 2.1).
c. Input Parameters
Weavers loommass =
Dynamic Load
Load acts vertically on the foundation block.
Vertical Load P(t)
Fig 2.1Dynamic vertical load
from weavers loom.
Load Operation Frequency = 9 Hz up to 180 Hz
Number of terms used in Fourier Series = 20
-
7/25/2019 Clockwork Verification Manual
8/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:8
Rigid Foundation Block Size
Length = 2.0 m
Width = 1.5 m
Height = 1.0 m
Soil
Poissons Ratio = 0.33
Mass Density =
Shear Modulus G =
d. Analysis
For this analysis the Cone method it is used in Clockwork
e. Results Comparison
Measured ValueClockwork
Displacement [mm]Displacement Ref[1]
[mm]
Lower Peak -0.015956 -0.0156250.000625*
Higher Peak 0.008334 0.0080.000750*
* Displacement value from Fig. 2-14 [1]
Fig 2.2Dynamic vertical displacement from Clockwork results.
-
7/25/2019 Clockwork Verification Manual
9/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:9
3.
TEST CASE 3
Vertical single-cylinder compressor.
a.
Overview
Reference: [2] Vibration of Soils and Foundations, F. E. Richart, Jr., pg. 360.ISBN: 0139417168
Dynamic Load Type: Harmonic Excitation
Measured Units: lbf / ft
b. Problem Description
c. Input Parameters
Weight * f compressor =
Dynamic Load
Load acts vertically on the foundation block.
Vertical Load =
Fig. 3.1Dynamic vertical
load
Load Operation Frequency = 7.5 Hz
-
7/25/2019 Clockwork Verification Manual
10/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:10
Rigid Foundation Block Size
Length = 16 ft
Width = 7 ft
Height = 3 ft
Soil
Poissons Ratio = 0.33
Mass Density =
Shear Modulus G =
d. Analysis
For this analysis all available methods were used in Clockwork.
e. Results Comparison
MeasuredValue
Clockwork Displacement Displacement Ref[2][in]
Zero to Peak 0.0001595 [ft] 0.001908 [in] 0.0019
-
7/25/2019 Clockwork Verification Manual
11/16
-
7/25/2019 Clockwork Verification Manual
12/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:12
c. RESULTS - SAP2000 v15
Measured Points Displacements Angular Displacements
CASE
X Y Z u1 u2 u3 1 2 3
mm mm mm m m m rad rad rad
1 0 2500 1000 4,77E-04 2,29E-04 4,00E-05 0 2,70E-05 -1,52E-04
2 0 2500 1000 2,29E-04 4,77E-04 -4,00E-05 -2,70E-05 0 -1,52E-04
3 0 2500 1000 -4,00E-05 4,00E-05 -8,90E-05 -2,40E-05 -2,40E-05 0
4 0 2500 1000 2,21E-04 0 1,60E-05 0 1,10E-05 0
5 0 2500 1000 0 2,21E-04 -1,60E-05 -1,10E-05 0 0
6 0 2500 1000 0 0 -1,70E-05 0 0 0
1 1500 1500 0 2,21E-04 0 0 0 2,70E-05 -1,52E-04
2 1500 1500 0 0 2,21E-04 0 -2,70E-05 0 -1,52E-04
3 1500 1500 0 -1,60E-05 1,60E-05 -1,70E-05 -2,40E-05 -2,40E-05 0
4 1500 1500 0 2,10E-04 0 0 0 1,10E-05 0
5 1500 1500 0 0 2,10E-04 0 -1,10E-05 0 0
6 1500 1500 0 0 0 -1,70E-05 0 0 0
RESULTS - CLOCKWORK v12
Measured Points Displacements Angular Displacements
CASEX Y Z u1 u2 u3 1 2 3
mm mm mm m m m rad rad rad
1 0 2500 1000 4,76E-04 2,28E-04 4,01E-05 0 2,67E-05 -1,52E-04
2 0 2500 1000 2,28E-04 4,76E-04 -4,01E-05 -2,67E-05 0 -1,52E-04
3 0 2500 1000 -4,01E-05 4,01E-05 -8,85E-05 -2,39E-05 -2,39E-05 0
4 0 2500 1000 2,21E-04 0 1,61E-05 0 1,07E-05 0
5 0 2500 1000 0 2,21E-04 -1,61E-05 -1,07E-05 0 0
6 0 2500 1000 0 0 -1,65E-05 0 0 0
1 1500 1500 0 2,21E-04 0 0 0 2,67E-05 -1,52E-04
2 1500 1500 0 0 2,21E-04 0 -2,67E-05 0 -1,52E-04
3 1500 1500 0 -1,61E-05 1,61E-05 -1,65E-05 -2,39E-05 -2,39E-05 0
4 1500 1500 0 2,10E-04 0 0 0 1,07E-05 0
5 1500 1500 0 0 2,10E-04 0 -1,07E-05 0 0
6 1500 1500 0 0 0 -1,65E-05 0 0 0
Fig 4.2 Pile Foundation onClockwork 12
-
7/25/2019 Clockwork Verification Manual
13/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:13
Porcentual Difference of Results between SAP2000 and Clockwork
Measured Point Location Displacements Angular Displacements
CASE
X Y Z u1 u2 u3 1 2 3
mm mm mm m m m rad rad rad
1 0 2500 1000 0,21% 0,44% 0,25% 0,00% 1,11% 0,00%
2 0 2500 1000 0,44% 0,21% 0,25% 1,11% 0,00% 0,00%
3 0 2500 1000 0,25% 0,25% 0,56% 0,42% 0,42% 0,00%
4 0 2500 1000 0,00% 0,00% 0,62% 0,00% 2,73% 0,00%
5 0 2500 1000 0,00% 0,00% 0,62% 2,73% 0,00% 0,00%
6 0 2500 1000 0,00% 0,00% 2,94% 0,00% 0,00% 0,00%
1 1500 1500 0 0,00% 0,00% 0,00% 0,00% 1,11% 0,00%
2 1500 1500 0 0,00% 0,00% 0,00% 1,11% 0,00% 0,00%
3 1500 1500 0 0,62% 0,62% 2,94% 0,42% 0,42% 0,00%
4 1500 1500 0 0,00% 0,00% 0,00% 0,00% 2,73% 0,00%
5 1500 1500 0 0,00% 0,00% 0,00% 2,73% 0,00% 0,00%
6 1500 1500 0 0,00% 0,00% 2,94% 0,00% 0,00% 0,00%
-
7/25/2019 Clockwork Verification Manual
14/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:14
Fig 5. 2Pile
Foundation on
Clockwork 12
5.
TEST CASE 5
a. OVERVIEW
The Foundation from Fig 5.1 was subjected to six load cases in order to compare results
using SAP2000 and Clockwork.
Dynamic Load Type: Harmonic ExcitationUnits: SIDamping and Group Effect were not considered
b. PROBLEM DESCRIPTION
A square foundation is loaded on one of
its edges and on the geometric center of
gravity of the soil contact area.
c. PARAMETERS
FOUNDATION PARAMETERS
Piles: 6
Pile Diameter: 400 mm
Block 1 - Height: 1500 mm
Block 1 - Length: 2000 mm
Block 1 - Width: 3000 mm
Block 2 - Height: 2500 mm
Block 2 - Length: 3000 mm
Block 2 - Width: 3000 mm
Reinf. Concrete Specific Weight 2500 kgf/m3
Peso fundacin : 78,75 kgf
Soil Stiffness 80 kgf/cm2
Fig 5. 1 Pile Foundation on SAP2000
-
7/25/2019 Clockwork Verification Manual
15/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:15
RESULTS - CLOCKWORK v12
Measured Points Displacements Angular Displacements
Caso X Y Z u1 u2 u3 1 2 3
mm mm mm m m m rad rad rad
1 0 3000 1000 2,49E-04 1,57E-04 2,22E-05 0 8,88E-06 -6,29E-05
2 0 3000 1000 1,57E-04 4,84E-04 -6,01E-05 -4,00E-05 0 -1,04E-04
3 0 3000 1000 -2,22E-05 6,00E-05 -7,80E-05 -2,76E-05 -1,02E-05 0
4 0 3000 1000 1,41E-04 0 6,87E-06 0 2,75E-06 0
5 0 3000 1000 0 1,62E-04 -1,86E-05 -1,24E-05 0 0
6 0 3000 1000 0 0 -1,10E-05 0 0 0
1 2500 1500 0 1,41E-04 0 0 0 8,88E-06 -6,29E-05
2 2500 1500 0 0 1,62E-04 0 -4,00E-05 0 -1,04E-04
3 2500 1500 0 -6,87E-06 1,86E-05 -1,10E-05 -2,76E-05 -1,02E-05 0
4 2500 1500 0 1,37E-04 0 0 0 2,75E-06 0
5 2500 1500 0 0 1,43E-04 0 -1,24E-05 0 0
6 2500 1500 0 0 0 -1,10E-05 0 0 0
PILES LOCATION X mm Y mm
Pile 1 : 500 750
Pile 2 : 500 2250
Pile 3 : 2500 750
Pile 4 : 2500 2250
Pile 5 : 4500 750
Pile 6 : 4500 2250
CASE LocationLoadtonf
Xmm
Ymm
1 X 35 0 30002 Y 35 0 3000
3 Z -35 0 3000
4 X 35 2500 1500
5 Y 35 2500 1500
6 Z -35 2500 1500
RESULTS SAP2000 v15
Measured Points Displacements Angular Displacements
Caso X Y Z u1 u2 u3 1 2 3
mm mm mm m m m rad rad rad
1 0 3000 1000 2,49E-04 1,57E-04 2,20E-05 0 8,87E-06 -6,30E-05
2 0 3000 1000 1,57E-04 4,84E-04 -6,00E-05 -4,00E-05 0 -1,05E-04
3 0 3000 1000 -2,20E-05 6,00E-05 -7,80E-05 -2,80E-05 -1,00E-05 0
4 0 3000 1000 1,41E-04 0 6,84E-06 0 2,73E-06 0
5 0 3000 1000 0 1,62E-04 -1,80E-05 -1,20E-05 0 0
6 0 3000 1000 0 0 -1,10E-05 0 0 0
1 2500 1500 0 1,41E-04 0 0 0 8,87E-06 -6,30E-05
2 2500 1500 0 0 1,62E-04 0 -4,00E-05 0 -1,05E-04
3 2500 1500 0 -6,84E-06 1,80E-05 -1,10E-05 -2,80E-05 -1,00E-05 0
4 2500 1500 0 1,37E-04 0 0 0 2,73E-06 0
5 2500 1500 0 0 1,44E-04 0 -1,20E-05 0 0
6 2500 1500 0 0 0 -1,10E-05 0 0 0
-
7/25/2019 Clockwork Verification Manual
16/16
CLOCKWORK VERIFICATION MANUAL
I.C.: VM-12 Page:16