clinton ready mix · fischer concrete services, llc has applied for the authority to construct a...
TRANSCRIPT
dnr.mo.gov
DEC O 9 2019
Mr. Jim Jackson President Clinton Ready Mix 2300 Clinton Road Sedalia, MO 64735
RE: New Source Review Permit - Project Number: 2019-08-039
Dear Mr. Jackson:
Enclosed with this letter is your permit to construct. Please study it carefully and refer to Appendix A for a list of common abbreviations and acronyms used in the permit. Also, note the special conditions on the accompanying pages. The document entitled, "Review of Application for Authority to Construct," is part of the permit and should be kept with this permit in your files. Operation in accordance with these conditions and your new source review permit application are necessary for continued compliance. In addition, please note that Clinton Ready Mix cannot operate with any other plants that have ambient impact limits based on the Air Pollution Control Program's nomographs. Please refer to the permits of any plant that you are operating with to see if their respective permits contain an ambient impact limit. The reverse side of your permit certificate has important information concerning standard permit conditions and your rights and obligations under the laws and regulations of the State of Missouri.
This permit may include requirements with which you may not be familiar. Ifyou would like the department to meet with you to discuss how to understand and satisfy the requirements contained in this permit, an appointment referred to as a Compliance Assistance Visit (CA V) can be set up with you. To request a CAV, please contact your local regional office or fill out an online request. The regional office contact information can be found at the following website: http://dnr.mo. !!ov/regions/. The online CAV request can be found at http://dnr.mo.gov/ cav /compliance.htm.
Ifyou were adversely affected by this permit decision, you may be entitled to pursue an appeal before the administrative hearing commission pursuant to Sections 621.250 and 643.075.6 RSMo. To appeal, you must file a petition with the administrative hearing commission within thirty days after the date this decision was mailed or the date it was delivered, whichever date was earlier. Ifany such petition is sent by registered mail or certified mail, it will be deemed filed on the date it is mailed; if it is sent by any method other than registered mail or certified mail, it will be deemed filed on the date it is received by the administrative hearing commission
(} Recycled paper
Mr. Jim Jackson Page Two
whose contact information is: Administrative Hearing Commission, United States Post Office Building, 131 West High Street, Third Floor, P.O. Box 1557, Jefferson City, Missouri 65102, phone: 573-751-2422, fax: 573-751-5018, website: Vvww.oa.mo. gov/ahc.
If you have any questions regarding this permit, please do not hesitate to contact Dakota Fox at the department's Air Pollution Control Program, P.O. Box 176, Jefferson City, MO 65102 or at (573) 751-4817. Thank you for your attention to this matter.
Sincerely,
AIR POLLUTION CONTROL PROGRAM
New Source Review Unit Chief
SH:dfa
Enclosures
c: Kansas City Regional Office PAMS File: 2019-08-039
Permit Number:
~1§1 MISSOURI ~ 'I ,&,. IDEPARTMENT OF l_gJ ~ NATURAL RESOURCES
MISSOURI AIR CONSERVATION COMMISSION
PERMIT TO CONSTRUCT
Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized to construct the air contaminant source(s) described below, in accordance with the laws, rules and conditions as set forth herein.
Permit Number: 1 2 2 0 1 9 - 0 0 2 Project Number: 2019-08-039 Installation ID: 083-0030
Parent Company: Fischer Concrete SeNices, LLC
Parent Company Address: 2300 Clinton Road, Sedalia, MO 64735
Installation Name: Clinton Ready Mix
Installation Address: 195 East Highway 7, Clinton, MO 64735
Location Information: Henry County, S6, T41N, R25W
Application for Authority to Construct was made for: Rebuilding of a ready mix plant. This review was conducted in accordance with Section (5), Missouri State Rule 10 CSR 10-6.060, Construction Permits Required.
D Standard Conditions (on reverse) are applicable to this permit.
✓Standard Conditions (on reverse) ant pecial Conditions are applicable to
this permtt. • l ) f lv\1-1"r1 'K. \
Director or !Y' signee Department of Natural Resources
DEC O 9 2019
Effective Date
STANDARD CONDITIONS:
Permission to construct may be revoked if you fail to begin construction or modification within two years from the effective date of this permit. Permittee should notify the Enforcement and Compliance Section of the Air Pollution Control Program if construction or modification is not started within two years after the effective date of this permit, or if construction or modification is suspended for one year or more.
You will be in violation of 10 CSR 10-6.060 if you fail to adhere to the specifications and conditions listed in your application, this permit and the project review. In the event that there is a discrepancy between the permit application and this permit, the conditions of this permit shall take precedence. Specifically, all air contaminant control devices shall be operated and maintained as specified in the application, associated plans and specifications.
You must notify the Enforcement and Compliance Section of the Department's Air Pollution Control Program of the anticipated date of start up of this (these) air contaminant sources(s). The information must be made available within 30 days of actual startup. Also, you must notify the Department's regional office responsible for the area within which you are located within 15 days after the actual start up of this (these) air contaminant source{s):
A copy of the permit application and this permit and permit review shall be kept at the installation address and shall be made available to Department's personnel upon request.
You may appeal this permit or any of the listed special conditions to the Administrative Hearing Commission (AflC), P.O. Box 1557, Jefferson City, MO 65102, as provided in RSMo 643.075.6 and 621.250.3. If you choose to appeal, you must file a petition with the AHC within 30 days after the date this decision was mailed or the date it was delivered, whichever date was earlier. If any such petition is sent by registered mail or certified mail, it will be deemed filed on the date it is mailed. If it is sent by any method other than registered mail or certified mail, it will be deemed filed on the date it is received by the AHC.
If you choose not to appeal, this certificate, the project review and your application and associated correspondence constitutes your permit to construct. The permit allows you to construct and operate your air contaminant sources{s}, but in no way relieves you of your obligation to comply with all applicable provisions of the Missouri Air Conservation Law, regulations of the Missouri Department of Natural Resources and other applicable federal, state and local laws and ordinances.
The Air Pollution Control Program invites your questions regarding this air pollution permit. Please contact the Construction Permit Unit using the contact information below.
Contact Information: Missouri Department of Natural Resources
Air Pollution Control Program P.O. Box 176
Jefferson City, MO 65102-0176 (573) 751-4817
The regional office information can be found at the following website: http: //dnr.mo.gov/reqions/
Project No. 2019-08-039
Permit No. 1 2 2 0 1 ~ • 0 0 2
SPECIAL CONDITIONS: The permittee is authorized to construct and operate subject to the following special conditions:
The special conditions listed in this permit were included based on the authority granted the Missouri Air Pollution Control Program by the Missouri Air Conservation Law (specifically 643. 075) and by the Missouri Rules listed in Title 10, Division 10 of the Code ofState Regulations (specifically 10 CSR 10-6.060). For specific details regarding conditions, see 10 CSR 10-6.060 paragraph (3)(E). "Conditions required by permitting authority."
1. Superseding Condition The conditions of this permit supersede all of the special conditions found in Construction Permit 1096-012 previously issued by the Air Pollution Control Program.
2. Annual Emission Limit A Clinton Ready Mix shall emit less than 15.0 tons of PM10 in any consecutive 12-
month period from the entire installation which consists of the equipment listed in Table 1. The SSM emissions as reported to the Air Pollution Control Program's Compliance/Enforcement Section in accordance with the requirements of 1 O CSR 10-6.050 Start-Up, Shutdown, and Malfunction Conditions shall be included in the limit.
B. Clinton Ready Mix shall demonstrate compliance with Special Condition 2.A using Attachment A or another equivalent form that has been approved by the Air Pollution Control Program, including an electronic form.
3. Undocumented Watering Requirement Clinton Ready Mix shall apply a water spray on all haul roads and vehicular activity areas whenever conditions exist that would allow visible emissions from these sources to leave the property.
4. Control Device Requirement-Baghouses A Clinton Ready Mix shall control emissions from the equipment listed below using
baghouses as specified in the permit application. 1) Cement Silo 2) Supplement Silo
B. The baghouses shall be operated and maintained in accordance with the manufacturer's specifications. The baghouses shall be equipped with a gauge or meter, which indicates the pressure drop across the control device. These gauges or meters shall be located such that Department of Natural Resources' employees may easily observe them.
C. Replacement filters for the baghouses shall be kept on hand at all times. The bags shall be made of fibers appropriate for operating conditions expected· to occur (i.e. temperature limits, acidic and alkali resistance, and abrasion resistance) .
Page 3
Project No. ;2019-08-039 . Permit No.l 2 2 0 1 9 - 0 0 2
SPECIAL CONDITIONS: The permittee is authorized to construct and operate subject to the following special conditions:
D. Clinton Ready Mix shall monitor and record the operating pressure drop across the baghouses at least once every 24 hours when the associated equipment is in operation. The operating pressure drop shall be maintained within the design conditions specified by the manufacturer's performance warranty.
E. Clinton Ready Mix shall maintain a copy of the bag house manufacturers' performance warranty on site.
F. Clinton Ready Mix shall maintain an operating and maintenance log for the baghouses which shall include the following: 1) Incidents of malfunction, with impact on emissions, duration of event,
probable cause, and corrective actions; and 2) Maintenance activities, with inspection schedule, repair actions, and
replacements, etc.
5. Record Keeping Requirement Clinton Ready Mix shall maintain all records required by this permit for not less than five years and make them available to any Missouri Department of Natural Resources' personnel upon request.
6. Reporting Requirement Clinton Ready Mix shall report to the Air Pollution Control Program, Compliance/ Enforcement Section by mail to P.O. Box 176, Jefferson City, MO 65102 or by email at [email protected], no later than 10 days after any exceedances of the limitations imposed by this permit.
Page4
REVIEW OF APPLICATION FOR AUTHORITY TO CONSTRUCT AND OPERATE SECTION (5) REVIEW
Project Number: 2019-08-039 Installation ID Number: 083-0030 Permit Number: 1 2 2 O 1 9 _ O O 2
Clinton Ready Mix Complete: September 6, 2019 195 East Highway 7 Clinton, MO 64735
Parent Company: Fischer Concrete Services, LLC 2300 Clinton Road Sedalia, MO 64735
Henry County, S6, T41N, R25W
PROJECT DESCRIPTION
Fischer Concrete Services, LLC has applied for the authority to construct a new ready mix concrete plant in Clinton, Missouri. This site was previously the location of another concrete plant owned by Fischer Concrete and that was built under Construction Permit no. 1096-012. This plant has been stripped of its indoor equipment and is thus considered dismantled. The new plant will be constructed inside of the same building as the previous plant was constructed.
The new Clinton Ready Mix plant is a Stallion Model made by Stephens Manufacturing Company and is capable of producing 150 cubic yards or 300 tons per hour. The plant utilizes two silos: one 160 ton silo containing two compartments (storing cement and fly ash) and one 115 ton silo (storing cement). Both silos have a dust collection system vented to a separate baghouse. Dust produced in the truck loading process will be controlled by a shroud but will not be vented to a dust control device. The aggregate hopper bin emissions will not be controlled. A water heater fueled by propane and rated at 1 MMBTU/hr will be used at the facility. The plant will be powered by the grid.
There will be two unpaved haul roads consisting of a 355 ft raw material haul road (EU-9) and a 240 ft finished product haul road (EU-10). There will be two storage piles, each consisting of 0.5 acres of aggregate and sand, respectively.
This installation is located in Henry County, an attainmenUunclassifiable area for all criteria pollutants.
This installation is not on the List of Named Installations found in 1 O CSR 10-6.020(3)(8), Table 2. The installation's major source level is 250 tons per year and fugitive emissions are not counted toward major source applicability.
No operating permit is required for this installation. Page 5
TABLES
Table 1 Read1v M"IX Plant E:quipment L"ISt
Emission Point Description Bottlenecked MHDR Control Device
EU-1 Aggregate Conveyor 140 tph NIA EU-2 Sand Conveyor 105 tph N/A EU-3 Cement Loading 35 tph Baghouse EU-4 Supplement Loading 5 tph Baghouse EU-5 Weigh Hopper 245tph N/A EU-6 Truck Loadinq 40 tph N/A EU-7 Propane Water Heater 1 MMBtu/hr N/A
EU-8a Aggregate Stockpile - Load In 140 tph Undocumented Watering
EU-8b Aggregate Stockpile - Load Out 140 tph Undocumented Waterinq
EU-8c Aggregate Stockpile - Vehicular Activity 0.32 VMT/hr
Undocumented Watering
EU-8d Aggregate Stockpile - Wind Erosion 0.5 acres
Undocumented Watering
EU-9a Sand Stockpile - Load In 105tph Undocumented Watering
EU-9b Sand Stockpile - Load Out 105 tph Undocumented Waterinq
EU-9c Sand Stockpile - Vehicular Activity
0.24 VMT/hr Undocumented Watering
EU-9d Sand Stockpile - Wind Erosion 0.5 acres Undocumented Watering
EU-10 Raw Material Haul Road (Unpaved) 3.1 VMT/hr Undocumented
Watering
EU-11 Finished Product Haul Road (Unpaved)
1.7 VMT/hr Undocumented Watering
The following permits have been issued to Clinton Ready Mix from the Air Pollution Control Program.
Table 2 Perm1·t H" IStOry
Permit Number Description ·-
1096-012 Concrete Batch Plant - Production Increase 0791-004 New De Minimis/Minor Ready Mix Concrete Plant
The table below summarizes the emissions of this project. The existing actual emissions are taken from the 2002 EIQ of the previous installation Clinton Ready Mix operated at this location and the existing potential emissions are taken from the corresponding construction permit (1096-012). The potential emissions of the application represent the emissions of all equipment and activities assuming continuous operation (8760 hours per year). The
Page6
conditioned potential emissions include emissions from sources that will limit their production to ensure compliance with the annual de minimis PM10 limit.
Table 3: Emissions Summary tons per year) bExisting Existing Actual 8 Potential Conditioned
DeMinimis Potential Emissions Emissions of the Potential Air Pollutant Level/SMAL Emissions (2002 EtQ) Application Emissions
PM 25.0 N/D N/D 351.61 47.52 PM10 15.0 1.44 2.20 111.00 < 15.00 PM2.s 10.0 N/D 0.00 54.21 7.33 SOx 40.0 N/D 0.00 0.06 0.01 NOx 40.0 N/D 0.00 0.72 0.10 voe 40.0 N/D 2.5 X 10-3 0.05 0.01 co 100.0 N/D 0.00 0.40 0.05
GHG (CO2e) N/A N/D N/D 6.55 N/A GHG (mass) N/A N/D N/D 6.52 N/A Total HAPs 25.0 N/D 0.00 0.00 0.00
N/A = Not Applicable; N/D = Not Determined 8 lncludes site specific haul road and storage pile emissions bAII prior equipment from permit 1096-012 has been dismantled
EMISSIONS CALCULATIONS
Emissions for the project were calculated as described below and using emission factors found in the United States EPA document AP-42 Compilation ofAir Pollutant Emission Factors, Volume 1: Stationary Point and Area Sources, Fifth Edition (AP-42).
Emissions from the concrete batch plant: • Calculated using emission factors from AP-42 Section 11.12 "Concrete Batching," June
2006. • This section cites Equation (1) in Section 13.2.4 "Aggregate Handling and Storage
Piles," November 2006 for calculating the emissions from aggregate and sand transfer. • The cement and supplement silos are each controlled with their own baghouse, so the
controlled emission factors were used.
Emissions from the aggregate weigh hopper: • Calculated using AP-42 Section 13.2.4, "Aggregate Handling and Storage Piles,"
November 2006, Equation (1). • Aggregate weigh hopper emissions are not controlled, so the uncontrolled emission
factor was used. • Emissions from mix truck loading are not controlled, so the uncontrolled emission factor
was used.
Emissions from haul roads and vehicular activity areas: • Calculated using the predictive equation from AP-42 Section 13.2.2 "Unpaved Roads,"
November 2006. • A 50% control efficiency for PM and PM10 and a 41 % control efficiency for PM2.s were
applied to the emission calculations for the use of undocumented watering.
Page 7
Emissions from storage piles: • Load-in and load-out of storage piles were calculated using the predictive equation from
AP-42 Section 13.2.4 "Aggregate Handling and Storage Piles," November 2006. • The moisture content of the aggregate is 0. 7% by weight. • Emissions from wind erosion of storage piles were calculated using an equation found
in the Air Pollution Control Program's Emissions Inventory Questionnaire Form 2.8 "Storage Pile Worksheet."
PERMIT RULE APPLICABILITY
This review was conducted in accordance with Section (5) of Missouri State Rule 10 CSR 10-6.060, Construction Permits Required. Potential emissions of PM10 are conditioned to de minimis levels. Potential emissions of PM are above de minimis levels, but below major levels. No NAAQS has been established for PM; therefore, ambient air quality modeling of PM was not performed.
APPLICABLE REQUIREMENTS
Clinton Ready Mix shall comply with the following applicable requirements. The Missouri Air Conservation Laws and Regulations should be consulted for specific record keeping, monitoring, and reporting requirements. ·compliance with these emission standards; based on information submitted in the application, has been verified at the time this application was approved.
GENERAL REQUIREMENTS • Submission of Emission Data, Emission Fees and Process Information, 10 CSR 10-6.110.
A full EIQ is required for the first full calendar year of operation.
• No Operating Permit is required for this installation because emissions are conditioned below de minimis.
• Restriction of Particulate Matter to the Ambient Air Beyond the Premises of Origin, 1 O CSR 10-6.170
• Restriction of Emission of Visible Air Contaminants, 10 CSR 10-6.220
• Restriction of Emission of Odors, 10 CSR 10-6.165
SPECIFIC REQUIREMENTS • Restriction of Emission of Particulate Matter From Industrial Processes, 10 CSR 10-6.400
• None of the New Source Performance Standards (NSPS) apply to the installation.
Page 8
• None of the National Emission Standards for Hazardous Air Pollutants (NESHAPS) or National Emission Standards for Hazardous Air Pollutants for Source Categories (MACTS) apply to the proposed equipment.
STAFF RECOMMENDATION
On the basis of this review conducted in accordance with Section (5), Missouri State Rule 10 CSR 10-6.060, Construction Permits Required, it is recommended that this permit be granted with special conditions.
PERMIT DOCUMENTS
The following documents are incorporated by reference into this permit:
• The Application for Authority to Construct form, dated August 19, 2019, received August 19, 2019, designating Fischer Concrete Services, LLC as the owner and operator of the installation.
Page 9
Attachment A PM10 Annual Emissions Tracking Sheet
Clinton Ready Mix Project Number: 201 ~-08-039
Permit Number: 12 2 O 1 9 _ 0 0 2
Site Name: Clinton Ready Mix Site Address: 195 East Highway 7, Clinton, MO 64735 Site County: Henry County, S6, T41 N, R25W
This sheet covers the period from _______ to _______ (Copy as needed) (Month, Year) (Month, Year)
Date (MonthMear)
Production (tons)
PM10 Emission
Factor (lb/ton)
Monthly Emissions1
(lbs)
SSM Emissions2
(tons)
PM10 Monthly
Emissions3
(tons)
12-Month Rolling Total PM10 Emtssions4
(tons)
Example 40,000 0.0845 3,380 0.0 1. 7 1. 7 + 11 previous months at this site
0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845 0.0845
1 Multiply the monthly production by the emission factor. 2 Write the startup, shutdown and malfunction emissions (SSM) in tons reported to the Air Pollution Control
Program's Enforcement/Compliance Section according to the provisions of 10 CSR 10-6.050 for the month. 3 Divide the monthly emissions (lbs) by 2000 and add the SSM Emissions. 4 Add the monthly emissions (tons) to the sum of the monthly emissions from the previous eleven months. A total
of less than 15 tons of PM10 per 12 consecutive months is necessary for compliance.
Page 10
APPENDIX A Abbreviations and Acronyms
% .............. percent
°F ..............degrees Fahrenheit
acfm.......... actual cubic feet per minute
BACT .......Best Available Control Technology
BMPs........ Best Management Practices
Btu ............ British thermal unit
CAM ........Compliance Assurance Monitoring
CAS ..........Chemical Abstracts Service
CEMS ......Continuous Emission Monitor System
CFR..........Code of Federal Regulations
CO ............carbon monoxide
CO2..........•carbon dioxide
C02e .........carbon dioxide equivalent
COMS ......Continuous Opacity Monitoring System
CSR .......... Code of State Regulations
dscf.. ......... dry standard cubic feet
EIQ...........Emission Inventory Questionnaire
EP .............Emission Point
EPA ..........Environmental Protection Agency
EU ............Emission Unit
fps ............. feet per second
ft ............... feet
GACT ......Generally Available Control Technology
GHG......... Greenhouse Gas
gpm ..........gallons per minute
gr .............. grains
GWP ........ Global Warming Potential
HAP.......... Hazardous Air Pollutant
hr .............. hour
hp.............. horsepower
lb ............... pound
lbs/hr ........pounds per hour
MACT ...... Maximum Achievable Control Technology
µ,g/m3 .......• micrograms per cubic meter
mis ............meters per second
Mgal .. ....... 1,000 gallons
MW ..........megawatt
MHDR ..... maximum hourly design rate
MMBtu .....Million British thermal units
MMCF .....million cubic feet
MSDS .......Material Safety Data Sheet
NAAQS ....National Ambient Air Quality Standards
NESHAPs..National Emissions Standards for Hazardous Air Pollutants
NOx ...........nitrogen oxides
NSPS ..... ....New Source Performance Standards
NSR ..........New Source Review
PM ............particulate matter
PM2•5 ...•..•.•particulate matter less than 2.5 microns in aerodynamic diameter
PM10 .........particulate matter less than IO microns in aerodynamic diameter
ppm........... parts per million
PSD Prevention of Significant Deterioration
PTE........... potent1a . I to em1·t
RACT .......Reasonable Available Control Technology
RAL ..........Risk Assessment Level
sec ..........Source Classification Code
scfm ..........standard cubic feet per minute
SDS ...........Safety Data Sheet
SIC ............ Standard Industrial Classification
SIP ............State Implementation Plan
SMAL ....... Screening Model Action Levels
SOx ............sulfur oxides
SO2 ............sulfur dioxide
SSM ..........startup, shutdown, & malfunction
tph ............tons per hour
tpy .............tons per year
VMT .........vehicle miles traveled
VOC ........ .Volatile Organic Compound
Project Summary 1 of 1 2019-08-039 Fischer Concrete Servies Clinton Ready Mix Cales 083-0030.xlsm
NOTICE: This spreadsheet is for your use only and should be used with caution. MoDNR does not guarantee the accuracy of the information it contains. This
spreadsheet is subject to continual revision and updating. It is your responsibility to be aware of the most current, accurate and complete information available. MoDNR is not
responsible for errors or omissions in this spreadsheet. Submittal of the information contained in this spreadsheet (workbook) does not relieve the responsible official of the
certification statement signed on the first page of the application.
Pollutant
24.0 49.3
1183.8
PM10 NIA
PM10
Justification for Limit
NAAQS NIA
De Minimis
Limit Hours per Year
Limit Hours per Yearw/24 hr day
Polentlal Polentlal Emissions of Emissions
Polutant Process Including Equipment fugitives
(IDns/yr) (IDns/yr)
PM 201.23 351 .61 PM,0 60.68 111.00
PM2.s 47.74 54.21
so, 0.07 0.07
NO, 0.63 0.63 voe 0.05 0.05 co 0.36 0.36
CH20 0.00 o.oo C11 H10 0.00 0.00
Pb 0.00 0.00 HAPS 0.00 0.00 co, 6.52 6.52
N,O 0.00 0.00
CH4 0.00 0.00
GHGm... 6.52 6.52
C02eq 6.55 6.55
,a t,la)cin,um hounv design 1819 IIOOSRIMI
Alowable Emissions for 1184 hours
per year (IDns/yr)
47.52 15.00 7.33 0.01 0.08 0.01 0.05 0.00 0.00 0.00 0.00 0.88 0.00 0.00
0.88 0.88
300
Plant-wide
DeMlnlmls Composite
Thresholds Emission Factor (lbr'IDn)
25 0.2676 15 0.0845 10 0.0413 40 0.0001 40 0.0005 40 0.0000 100 0.0003 2 0.0000
- 0.0000 0.01 0.0000 10 0.0000 100 0.0050 100 0.0000 100 0.0000
100 0.0050 100,000 0.0050
7,200.01 355,134.0
E=55.0 P.11 - 40 P•Process Rate=MHDR E=
63.00208775
Process Rate 300 Allowable lb/hr 63.00208775 Potential lb/hr 6.87E-01 Weigh hopper EP-5 0.687 lb/hr from the weigh hopper EP-5 is less than 66.31 lb/hr, therefore the aggregate weigh hopper is in compliance with the process rate rule 10 CSR 6.400
Emission Calculations 1 of3 2019-0S-039 Fischer Concreto Sorvlos Clinton Roody Mix Cales 083-0030.xlam
Emission Point
Number
Emission Unit Number Description sec MHDR Units
Control Device
Number Control Type
Capture Efficiency
(%)
Control Effleleney
(%) Pollutant Emission
Factor Units
(pounds par)
Emission Reta
(lb/hr)
Patentiel Emissions (Ions/yr)
Allowable Emissions (Ions/yr)
1 1 Aggregate transfer Moisture Content(% wt.)= 0.7
~5-011-04 13Q.04 tons per hour NIA NIA
NIA
NIA NIA NIA
PM
PM10 PM2.6
0.0254 0.0120
0.0018
ton ton
ton
3.53E+OO
1.67E+00 2.52E-01
15.44
7.30
1.11
2.00 0.99
0.16 2 2 Sand transfer
Moislurtt Content(% wl.) =4.17 ~11-05 108.46 tons per hour NIA
NIA NIA
NIA NIA
NIA
PM
PM10
PMu
0.0021 0.0010
0.0001
Ion ton
Ion
2.22E-01 1.05E-01
1.59E-02
0.97 0.46
0.07
0.13 o.oe 0.01
3 3 Cement unloadtng to sRo ~5-011-07 3e.61 tons per hour FabricfWler 100% 100%
100%
NIA NIA NIA
PM PM 1o PM,.
0.0010 0.0003
0.0003
Ion Ion
Ion
3.62E-02 1.24E-02
1.24E-02
0.16 0.05
0.05
0.02 0.01
0.01 4 4 Supl)iemenl unloedlng (pneumali<) 3-05-011-17 5.44 tons per hour Fabrie filer 100%
100% 100%
NIA NIA NIA
PM
PM10 PM,..
0.0089 0.004Q
0.0049
Ion
Ion
Ion
4.84E-02 2.67E-02
2.67E-02
0.21 0.12
0.12
0.03 0.02
0.02 5 5 Weigh hopper loa<llng ~5-011-08 245.50 tons per hour Uncontrolled NIA
NIA NIA
NIA NIA NIA
PM
PM10 PM:u
0.0048 0.0028 0.0014
Ion Ion
ton
1.18E+OO 6.87E-01
3.54E-01
5.16
3.01
1.55
0.70
0.41 0,21
6 6 Truek laadtng (truek mix) Moisture Content (o/o wt.) = 0.12
3-05-011-10 42.05 tons per hour Uncontro!led NIA NIA NIA
NIA NIA NIA
PM
PM10 PM25
1.118 0.31
0.2795
Ion Ion
Ion
4ME+01
1.13E+01
1.02E+-01
179.25 49.70
44.81
24.22 6.72
6.06 7A 7A Generator
Model Year
bhp gallons per hour mmBtu/hour
NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA
NIA NIA
NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA
PM PM,o PMu so, ND, co voe CH,O
HAP• co, N,O
GHG,_. CH,
MMBtu MMBtu MMBtu Gallon MMBtu MMBlu MMBlu MMBtu MMBt.u MMBlu MMBlu MMBlu MMBlu
7B 78 Generator
Model Veer
bhp gallons per hour mmBtu/hour
NIA NIA NIA NIA NIA NIA NIA
NIA NIA NIA NIA
N/A NIA
NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA
PM PM10 PMu so, NO, CD voe CH20 HAPs co, N,O
GHG_
CH,
MMBlu MMBlu MMBtu Gallon MMBtu MMBlu MMBtu MMBlu MMBtu MMBtu MMBlu
MMBh..: MMBlu
7C 7C Generator
ModolYear
bhp gallons p&r hour mmBtu/hour
NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA NIA
NIA NIA NIA
NIA NIA NIA NIA NIA NIA NIA
NIA NIA
NIA
PM
PM10 PM:z.s so, No, CD voe CH,O HAPs co, N,O
GHG_ CH,
MMBtu MMBtu MMBbJ Gallon MMBlu MMBlu MMBlu MMBlu MMBtu MMBhJ
MMBlu MMBtu MMBtu
2of3Emission Calculations 2019-08-03~ Fischer Concrete Servi... Clinton Ready Mix Calco 083-0030.><lsm
Emission Equipment
Equipment Unit ID Description of Unit Hel!!lt Rate UoM per hour Faclor DesoriplkmlSCC llbs/UoMl
Combustion #1 Propl!!lne (>=0.3, <10 mm 1 mmBtu 100!(, NIA PM 0.70 mgol 7,69E-il3 0.03 D,DD
0.01 mgal 100% NIA PM,. 0.70 mgal 7.69E-il3 0,03 0.00
mmscf - 100% NIA PMu D.70 mgol 7.BQE-03 003 0.00
100% NIA so, 1.50 mgal 1,65E-il2 0,07 0.01 . -
100% NIA NO, 13.00 ~ai· ·1:·,faE::01 0.63 0.08
100% NIA voe 1.00 mgel 1.10E-02 0.05 0.01 - - 100% NIA co 7.50 mgal 8.24E-02 0.30 0.05
100% NIA CH,O mgal O.OOE+OO 0.00 0.00 - . -
100% NIA Pb mgal O.OOE+OO 0.00 0.00 100% NIA HAPs mgel O.OOE+OO 0.00 0.00
- .. -100% NIA co, 135.50 mgol 1.4QE+OO 6.52 0.88
100% NIA N,O 0.00 mga l 1.45E-il5 0.00 0.00
100% NIA GHG.- 135.50 mgol 1.49E+OO 6,52 0.88
100% NIA CH, 0.01 mgel 7.27E-il5 0.00 0.00
CombuatiOII #2 mmBtu IDO!- NIA PM mgel
"""" 100% NIA PM,. mgel
mmscf 100% NIA PM,, mgel 100% NIA so, mgel
- -100% NIA NO, 1Tl9"I
. - .... 100% NIA voe mgel -100% NIA co mgol 100% NIA CH,O mgal
- - - . -100% NIA Pb mgal
- -- - 100% NIA HA?s mgal " -
100% NIA co, nlgal.. 100% NIA N,O mgal 100% NIA GHG_ mgal
100% NIA CH, mgal
Combustion #3 mmBtu 100% NIA PM mgal
mnel 100% NIA PM,. mgal -
mmacf 100% NIA PM,.. mgal 100% NIA so, mgel -- - . 100% NIA NO2 mgal 100% NIA voe mgel
- 100% NIA co mgol 100% NIA CH,O mgal
- ·-- - - - . 100% NIA Pb mgel
- - . - - - 100% NIA HAPs mg~I 100% NIA co, mgol 100% NIA N,O mgel 100% NIA GHG_ mgol
100% NIA CH, maal
PIie #1(use<I for,A1ig rawa__!o ••n•f!l!I - -------Load In 13g,04 tons par hour NIA NIA PM 0.0254 ton 3.53E+OO 15.44 2.09
NIA NIA PM10 0.0120 ton 1.87E+OO 71111 0.119
NIA NIA PM2.5 0.0018 ton 2.52E-il1 1.11 0.16
Lo.adoul 139.04 Iona per hour NIA NIA PM 0.0254 ton 3.53E+OO ,~.. ~ NIA NIA PM10 0.0120 ton 1.87E+OO 7.30 0,119
-- NIA N,A PM,.. 0.0018 ton 2.52E::01 1.11 0.15 --· Vah!eular Activity 0.32 v~ Unpaved, Undocumented Walering NIA 50% PM 8.68ell VMT 1.37E+OO 6.01 0.81
NIA 60% PM 10 2.4702 VMT a:ooe..(i, 1.71 0.23
NIA 41% PM,..~ - 0.2470 VMT 4.60E.02 0.20 0.03
Wind Erosion ~so- ..,.. NIA ~ 0.1783 aC<O« 8.92E-il2 0.39 0.05
NIA NIA PM10 0.08Q2 OC<O« 4.46E-il2 0 20 0.03
Nii>. NIA ~PM2.s 6.01-34 Sere« 8."BQE.--03 0.03 0.00
PDa #2(usad for Sand transfer) Load In 106.48 tons per hoUf NIA NIA PM 0.0021 lon 2.22E-il1 0.97 0.13
NIA NIA PM10 0.0010 ton 1.05E-il1 0.46 0.06 - -
- -- - ---- ii1i>. Niii PMu 0.0001 ton 1.sOE-02-·-~ 0.07 0.01
Load out 106.46 tons per hour --- - - NIA NIA PM 0.0021 l(?n 2.22E-il1 0,97 0.13
NIA NIA PM,o 0.0010 ton 1.05E--01 0.46 0.08
- NIA NIA PM,.. 0.0001 Ion 1.59E-il2 0.07 0.01
Vehleular Activity 0.24 VMT per hour Unpawd, UnctOCu"inented Watering NIA 50% PM 8.6868 VMT 1.05E+OO 7:ao ~ NIA 50% PM10 2.4702 VMT 2.9DE-il1 1.31 0.18
-NIA 41% PM2.6 0.2470 VMT 3.52E-02 0.15 0,02
-Wind Erosion 0.50 acres NIA NIA PM 0.2898 ecnrhr 1.45E-01 0.63 0.09
NIA ·i',wi PM10 0.1449 acni-hr 724-E-il2 0.32 0.04
NIA NIA ?M2s 0.0217 ecre-hr 1.01lE-il2 0.05 0,01
For P < 60,000 lb/hr E = (4.1 )PA(0.67)
For P > 60,000 lb/hr E = (55)PA(0.11 )-40
p 600000 lb/hr p 300 tph E 63.00208775 lb/hr
Actual PM 47.52 Actual PM 10.85
H~
]
i • ii ~ 3 i ~ '1
~ I I .I
l I .I I ! ~
ti ~ • !
h
! I E
! I ! ! ! J ~
ui
lfl ! i l I ( i j ~
L..,1~ r 6 5 :;: :;:
ilf H
i ~ ~~ g..; ...
iJ!' ~~ '~ ~ ~~
..: ~ ...
I J iG1I l J• II ,i
1.. l
Data Entry 2019-08-039 Fischer ConcrvleSavlee Cllnlorl Ready Mix Ca1c1 083-0030.xllm '"'
:,u,... l'l,.l•fo-•d•
Sloft&cPilcIDNG. Ple#l r- r.r4n... n te ,....m1
..... !-.l l'oo &IDdtnmfeQ
...... ...... Mui11111111AreaorSto,qc:Pilt(~)
T~of~ CNlbcd Limc.lOs .... MoilhlreCOlelll%: ,.,
Si11COIRIII%:
MdbodofLoadhiloSkn.~Pil"
Mdltodo(LoedOlllfi-omSkn.~Pilc Look,I DiUncc:LoederTrwcl1(fod ► f l1nloadedloldcrWeisi-(c001J
l..cw:ln:ll.nMk:rWei~(COlll) I
60 I 1• >• 1
.'!'1 00 I
450 I 14.00
24.00
Ralr:(loua'1inur) I 139.04 106.46
ma. VMT _EOOIIT I 11.31611 0.2420
SlllflecTICllmcal I U.,,al J___U~wxl
VebicularAm!Control U~Waleriag U~Wlleriag
HnlllHllllfi,,M•rl•
Rolld#l Rold#3 ...... ...... ...... l.nllli.tlloollloed((nll
Entcr1hclcqCh.ore111:hroadwayinCcd. Tbc:plmlayovt dUlpun(dnr.1111lo1C11~ ► 1hoolddocwnentandq,portthe
valucetRRXI. Nole: Twi1:etbiulilllncei1uaed,....,1ripi11 1ndonewt.
Ual-sod TruckWcigli (llfflll)
Loaded Truck Wciglil (10111)
RatcHaulod(~)
mu.VMT_Ebour 3.1031u- 1.1045 Sul'&oeTfflltmcd u,,.,..
U~cdWIICriDC Uadooumcmcd Watering
I • ~
c-,una..s-,- ,_.., Heatlutc
~ - ..... ••! Jo,,w_ 1 Malhit.bt
0.0l ~ w -tii;ra....111~(
I- _('oal,..&.,1]
maJilM""-!!'
11111111fllil• Jaicptdlto
l'l::i~-lnn:pnbtoI tl:!IC'l'I' " ·
ln~rd,,lo lnRC,lnlllo M1t.,,SI.
':~•to ID1q11idatoI ~ >----------~""'= T~-...Fuel Sulfur Cont.nt (% weight sulfur. for ell; gralne of llllfur/100 cuff: gaa vapor for Butane and Propane; not ~forN:aturalgae}
.•~•= m~l>-<1.3 <10 ...-,.lo•tl p~-
IS ggin1,of11Jlfur/100ft311119VBpOr %welghtlUlfur %w.igh!11.1lli.ir