Medidas de performance 1 1

Upload: macarena-andrea-cabrera-sanchez

Post on 04-Oct-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

  • Medidas de performance 1 1

  • Traje de neoprene Hammer 3/2

  • Hammer 3/2 lnea del tiempo

    El problema del mucho/poco: Pedidos en exceso generan inventarios y grandes

    rebajas en los precios Pedidos chicos corren el riesgo de prdida de ventas

    Nov Dec Jan Feb Mar Apr May Jun Jul Aug

    Generate forecast of demand and submit an order

    to TEC

    Receive order from TEC at the

    end of the month

    Spring selling season

    Left overunits are

    discounted

    Precio de venta: p = $180

    TEC cobra c = $110 por traje

    Precio rebajado: v = $90

    Demanda: Normal (3192 ,1181)

  • Medidas de performance

    Sea Q el tamao del pedido: Expected lost sales Ventas perdidas esperadas

    n Promedio de unidades de demanda por sobre Q Expected sales Ventas esperadas

    n Promedio de unidades vendidas Expected left over inventory Inventario sobrante esperado

    Expected profit Beneficio esperado Expected fill rate Fill Rate esperado

    n Fraccin de la demanda que fue satisfecha In-stock probability

    n Probabilidad de satisfacer toda la demanda

  • Ventas perdidas esperadas (Q=3500) Definicin: Si la demanda es 3800, perdemos 300 ventas Si la demanda es 3200, no perdemos ninguna venta.

    Paso1: Estndarizar la cantidad Q:

    Paso 2: Buscar en la tabla de la Normal loss function el valor correspondiente: L(0.26)=0.2824.

    Paso 3: Calcular L(z) = 1181 * 0.2824 = 334. 26.0

    118131923500

    =

    =

    =Qz

    Caso Distribucin Normal:

  • Clculo de las otras medidas

    Ventas esp. = ventas perdidas esp. = 3192 334 = 2858

    Inventario sobrante esperado = Q - Expected Sales = = 3500 2858 = 642

    Beneficio Esperado = Precio-Costo( ) * Ventas esperadas!" #$- Costo- Precio Liquid.( ) * Inventario sobrante esperado!" #$

    = $702858( )- $20642( )=$187'221

    Fill rate esperado= Ventas esperadas

    Demanda esperada=

    Ventas esperadasm

    =1-Ventas perdidas esperadas

    m=

    28583192

    =89.6%

  • Eligiendo Q para satisfacer un nvel de instock deseado Queremos el Q que genera por lo menos 99% de

    probabilidad instock. Paso 1: Encuentre el z correspondiente En la tabla tenemos (2.32) = 0.9898 and (2.33) =

    0.9901. Elegimos z = 2.33.

    Paso 2: Conversin de z a Q: Q = + z x = 3192 + 2.33 x 1181 = 5944

  • Eligiendo Q para satisfacer un nvel de Fill Rate deseado Queremos el Q que genera por lo menos 99% de

    fill rate: Paso 1: Encuentre las ventas perdidas deseadas.

    Paso 2: Encuentre el z correspondiente L(1.53)=0.0274 y L(1.54) = 0.0267: z = 1.54

    Paso 3: Encuentre Q Q = + z x = 3192 + 1.54 x 1181 = 5011

    ( ) ( ) 0270.099.0111813192

    =

    =

    = rate Fill-1L(z)

  • Instock

    In-stock probability = F(Q) = (z) Encontrar el z que corresponde al Q. (0.26) = 60.26% Probabilidad de Stockout =1 probabilidad de In-stock = 1 0.6026 = 39.74%

    26.0118131923500

    =

    =

    =Qz

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    0 1000 2000 3000 4000 5000 6000 7000

    Order quantity

    In-stock probability

    Expected fill

  • El modelo Newsvendor 10 10

  • Costo de pedir mucho y poco

    Co = overage cost Representa el costo de pedir una unidad ms que la demanda real. En otras palabras, Co es el incremento en ganancia si hubiramos

    pedido una unidad menos. Para el Hammer 3/2: Co = Costo Precio liquidacin= c v = 110

    90 = 20

    Cu = underage cost Representa el costo de pedir una unidad menos que la demanda real.

    En otras palabras, si hay ventas perdidas, Cu es el aumento en ganancia si hubiramos pedido una unidad adicional.

    Para el Hammer 3/2: Cu = Precio Costo = p c = 180 110 = 70

  • Demand Time Series

    0

    10

    20

    30

    40

    50

    60

    70

    1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97

    Period

    Uni

    ts D

    eman

    ded

    0

    500

    1000

    1500

    2000

    2500

    3000

    Cum

    ulat

    ive

    Uni

    ts D

    eman

    ded

    Historical DemandCumulative Demand

    Source: Professors John Muckstadt, David Murray, Jim Rappold

  • Demand Histogram

    0%

    1%

    2%

    3%

    4%

    5%

    6%

    7%

    0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60

    Period Demand (units)

    Freq

    uenc

    y of

    Occ

    urre

    nce

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Cum

    ulat

    ive

    Freq

    uenc

    y

    FrequencyCumulative Frequency

    = 28.1 = 10.9

    Source: Professors John Muckstadt, David Murray, Jim Rappold

  • Operating Costs

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97 Period

    His

    toric

    al D

    eman

    d (u

    nits

    )

    $0

    $50

    $100

    $150

    $200

    $250

    $300

    Ove

    rage

    and

    Und

    erag

    e C

    osts

    ($

    )

    Historical Demand Cost

    Stock Level = 30 units

    Total Accumulated Costs are $3,708 Overage Costs are $542

    Underage Costs are $3,166 Probability of No Stockout is 59%

    Fill Rate is 87%

    Source: Professors John Muckstadt, David Murray, Jim Rappold Cu = 1, Co = 2

  • Operating Costs

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97 Period

    His

    toric

    al D

    eman

    d (u

    nits

    )

    $0

    $50

    $100

    $150

    $200

    $250

    $300

    Ove

    rage

    and

    Und

    erag

    e C

    osts

    ($

    )

    Historical Demand Cost

    Stock Level = 40 units

    Total Accumulated Costs are $2,012 Overage Costs are $1,272 Underage Costs are $740

    Probability of No Stockout is 85% Fill Rate is 97%

    Source: Professors John Muckstadt, David Murray, Jim Rappold Cu = 1, Co = 2

  • Operating Costs

    0

    10

    20

    30

    40

    50

    60

    70

    80

    90

    100

    1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97 Period

    His

    toric

    al D

    eman

    d (u

    nits

    )

    $0

    $50

    $100

    $150

    $200

    $250

    $300

    Ove

    rage

    and

    Und

    erag

    e C

    osts

    ($

    )

    Historical Demand Cost

    Stock Level = 100 units

    Total Accumulated Costs are $7,190 Overage Costs are $7,190

    Underage Costs are $0 Probability of No Stockout is 100%

    Fill Rate is 100%

    Source: Professors John Muckstadt, David Murray, Jim Rappold Cu = 1, Co = 2

  • Si D fuera conocida, la funcin de costo sera:

    C(Q,D) = CoMax{0, Q-D} + CuMax{0,D-Q}

    = Co [Q - D]+ + Cu [D - Q]+

    (mucho inventario)

    (muy poco inventario)

    Costo total

    D

    Co -Cu

    Source: Professors John Muckstadt, David Murray, Jim Rappold

    Funcin de costos

    Inventario

  • Q* = 42.8 unidades

    0 20 40 60 80 100 $0

    $50

    $100

    $150

    $200

    $250

    $300

    D ~ N(30,102 )

    Co = $1

    Cu = $9 Costo

    Inventario

    Source: Professors John Muckstadt, David Murray, Jim Rappold

    Funcin de costos

  • $0

    $25

    $50

    $75

    $100

    $125

    $150

    $175

    $200

    $225

    $250

    $275

    $300

    0 10 20 30 40 50 60 70 80 90 100 Inventario (unidades)

    Cos

    tos

    espe

    rado

    s ($

    )

    Curva de costo para media = 30, StdDev = 10 Curva de costo para media = 30, StdDev = 20 Curva de costo para media = 30, StdDev = 30

    Deterministic

    Source: Professors John Muckstadt, David Murray, Jim Rappold

    Costos esperados

  • Conviene tener Q unidades?

    Prdida esperada en la Q-sima unidad = Co x Prob(Dem

  • Maximizando la ganancia esperada

    Para maximizar la ganacia esperada tenemos que buscar el Q tal que la ganacia esperada es igual a la prdida esperada:

    Despejando F(Q) llegamos a que Q debe cumplir

    A este trmino Cu / (Co + Cu) lo llamamos critical ratio.

    P(Dem Q) = F (Q) = CuCo + Cu

  • Encontrando el pedido ptimo de Hammer 3/2s que maximiza la ganancia esperada distribucin normal

    En nuestro caso, la razn crtica es:

    Supongamos que la demanda sigue una distribucin normal de parmetros N(,) Cuanto ordenar? Lo suficiente para que Prob(DQ)

    sea igual al critical ratio!

    Q = + Z0.7778

  • Encontrando el pedido ptimo de Hammer 3/2s que maximiza la ganancia esperada distribucin normal

    Supongamos que la demanda sigue una distribucin normal de parmetros N(3192,1181)

    Buscar la razon crtica en la tabla normal

    Si la razn crtica est entre dos valores, elegir lo que genera el mayor z: en este caso z = .77.

    Convertir z en la cantidad a ser pedida:

    z 0 0.01 0.02 0.03 0.04 0.05 0.06 0.07 0.08 0.09

    0.5 0.6915 0.6950 0.6985 0.7019 0.7054 0.7088 0.7123 0.7157 0.7190 0.72240.6 0.7257 0.7291 0.7324 0.7357 0.7389 0.7422 0.7454 0.7486 0.7517 0.75490.7 0.7580 0.7611 0.7642 0.7673 0.7704 0.7734 0.7764 0.7794 0.7823 0.78520.8 0.7881 0.7910 0.7939 0.7967 0.7995 0.8023 0.8051 0.8078 0.8106 0.81330.9 0.8159 0.8186 0.8212 0.8238 0.8264 0.8289 0.8315 0.8340 0.8365 0.8389

  • Acerca del modelo newsvendor

    El modelo puede ser aplicado a ambientes donde - Hay una oportunidad nica de orden/produccin. - Demanda es incierta. - Hay un desafo muy alto-muy bajo:

    u Si la demanda excede la cantidad ordenada, se pierde la venta. u Si la demanda es menor que la cantidad ordenada, sobra inventario.

    La empresa debe tener un modelo de demanda que incluya una demanda esperada y la incertidumbre de esa demanda. - Con la distribucin normal, la incertidumbre en la demanda es

    capturada por la desviacin estandar.

    Al tamao de orden que maximiza el ingreso esperado, la probabilidad de que la demanda sea menor que el tamao de la orden es igual a la razn crtica: - La cantidad que maximiza el beneficio esperado balancea los costos

    del muy alto-muy bajo.