APJ SURVEYING ITEM DESCRIPTION UNIT QTY RATE AMOUNT RM RM A B HARD LANDSCAPE WORKS Construct and complete including where necessary, excavation, lay and subgrade, lean concrete and related works which deem necessary for proper completion of the whole construction to the satisfaction of the Landscape Architect for the following items: Brick Works Pavement Pattern To construct and complete pavement pattern with 150mm thick R.C slab with BRC A8 Grade 30 to Engineer’s detail complete with concrete imprint pattern and colour to Landscape Architect drawing and specification. Brick Wall 110mm Thick in common clay bricks as described in composition mortar as described reinforced with and including brick reinforcement. m2 m2 54 30 160 110 8640 3300 Total to Hardscape Summary Page 11 940 BILLS OF QUANTITIES

Upload: pang-shuen

Post on 14-Jun-2015

108 views

Category:

Education


0 download

DESCRIPTION

-.- -.-

TRANSCRIPT

Page 1: CL Final Assignment Report Part B

APJ SURVEYING

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT

RM RM

A

B

HARD LANDSCAPE WORKS

Construct and complete including where necessary,

excavation, lay and subgrade, lean concrete and related

works which deem necessary for proper completion of

the whole construction to the satisfaction of the

Landscape Architect for the following items:

Brick Works

Pavement Pattern

To construct and complete pavement pattern with

150mm thick R.C slab with BRC A8 Grade 30 to Engineer’s

detail complete with concrete imprint pattern and colour

to Landscape Architect drawing and specification.

Brick Wall

110mm Thick in common clay bricks as described in

composition mortar as described reinforced with and

including brick reinforcement.

m2

m2

54

30

160

110

8640

3300

Total to Hardscape Summary Page 11 940

BILLS OF QUANTITIES

Page 2: CL Final Assignment Report Part B

APJ SURVEYING

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT

RM RM

A

B

C

HARD LANDSCAPE WORKS

Construct and complete including where necessary,

excavation, lay and subgrade, lean concrete and related

works which deem necessary for proper completion of

the whole construction to the satisfaction of the

Landscape Architect for the following items:-

Open Space

Benches

To construct and complete 1500mm length × 1200mm

width × 500mm high concrete benches with 100mm thick

R.C benches top with pebble wash finish to Engineer’s

detail inclusive of light brown broken stone cladding to

L.A approval with 100mm thick brick wall to Engineer’s

detail and R.C Slab to Engineer’s detail and all other

related works as per L.A drawing and specification.

Rubbish Bin

To supply and install 540mmØ × 900mm high rubbish bin

with 50mm × 10mm stainless steel at top and 50mm ×

10mm stainless steel with 10mm dustbin stainless steel at

the bottom to be bolt and nut with 20mm × 50mm ×

575mm H.W complete with MPSJ logo in the 130mm ×

145mm plate steel inclusive of 60mm dia. hollow stainless

steel with 10mm dustbin stainless steel base and all other

related works as per Landscape Architect drawing and

specification and to Local Authority approval.

Bug Zapper

To supply, deliver to site, and install Flowtron BK-15D

Electronic Insect Killer.

m2

No.

No.

7

1

3

5228

1600

272

36 596

1600

816

Total to Hardscape Summary Page 39 012

BILLS OF QUANTITIES

Page 3: CL Final Assignment Report Part B

APJ SURVEYING

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT

RM RM

HARD LANDSCAPE WORKS

SUMMARY PAGE

Brick Works

Open Space

11 940

39 012

Total to Project Summary Page 50 952

BILLS OF QUANTITIES

Page 4: CL Final Assignment Report Part B

APJ SURVEYING

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT

RM RM

A

1

1

2

1

SOFT LANDSCAPE WORKS

To supply nursery grown plants material as listed below,

deliver to the site, provide labour and execute planting

works as per planting details. All plants shall be free from

pest, disease, discoloration and damage.

Planting Materials

Trees

Peltophorum Pterocarpum ( Yellow Flame Tree )

( 2.0m trunk height, 50-75mm trunk diameter )

Shrubs

Aglaia Odorata ( Chinese Perfume Plant )

( 350-500mm overall height, 250-350mm spread )

Murraya Paniculata ( Orange Jessamine )

( 350-500mm overall height, 250-350mm spread )

Turfing

Zoysia Matrella ( Manilla Grass )

( 300mm × 300mm sodding size, 20mm thick topsoil )

No.

No.

No.

No.

1

10

22

41

800

20

20

28

800

200

440

1148

Total to Softscape Summary Page 2588

BILLS OF QUANTITIES

Page 5: CL Final Assignment Report Part B

APJ SURVEYING

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT

RM RM

A

1

2

1

2

3

1

2

SOFT LANDSCAPE WORKS

To supply nursery grown plants material as listed below,

deliver to the site, provide labour and execute planting

works as per planting details. All plants shall be free from

pest, disease, discoloration and damage.

Planting Operation

Hole Excavation

To supply all labour, equipment, tool, transportation and

excavation holes as following :-

Trees ( 1.0m × 1.0m × 1.0m )

Shrubs ( 0.45m × 0.45m × 0.45m )

Topsoil & Soil Mixtures

To prepare the ratio of 3 : 2 : 1 topsoil and mixtures :-

3 part is good quality top soil, 2 part is river sand and 1

part is organic fertilizer of well-rooted farmyard manure

Trees ( 1.0m × 1.0m × 1.0m ) x 1 nos

Shrubs ( 0.45m × 0.45m × 0.45m ) x 32 nos

Turfing (0.20m x 41 m2)

Tree Protection

To supply all labour, materials and provide 50mm × 50mm

Wooden stakes buried min. 900mm deep 2 per Tree and 4

nos per palm. Do not drive stake root ball. Nail wire to

stakes to prevent down movement wire completed with

encase galvanised wire in rubber at points of contact with

tree. Nylon rope may be used in liew of wire as per

Landscape Architect Drawing.

Tree staking with ( 500mm × 50mm × 2.0m ) × 1 nos

Mulching for trees and shrubs

No.

No.

m3

m3

m3

No.

m2

1

32

1

2.9

8.2

1

33

30

10

60

60

60

20

5

30

320

60

174

492

20

165

Total to Softscape Summary Page 1261

BILLS OF QUANTITIES

Page 6: CL Final Assignment Report Part B

APJ SURVEYING

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT

RM RM

SOFT LANDSCAPE WORKS

SUMMARY PAGE

Planting Materials

Planting Operation

2588

1261

Total to Project Summary Page 3849

BILLS OF QUANTITIES

Page 7: CL Final Assignment Report Part B

APJ SURVEYING

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT

RM RM

MAINTENANCE

The maintenance shall be carried during planting works

and defect liability period which includes watering,

fertilizing, pruning, aerifying the soil, site cleaning, pest

control, thriving the unhealthy, replacing dead plants and

other maintenance works and procedures plant as

specified.

During the maintenance period, Contractors to provide

the following matters:

i. 3 full time maintenance workers

ii. Fertilizer, insecticide

iii. Provision of maintenance machineries

iv. To remove landscape debris away from the

site to contractor’s own dumping ground.

During warranty period, Landscape Contractors to

prepare the following mater:

i. Monthly maintenance work programme

ii. Maintenance daily work programme or site

iii. Attendance to be recorded and acknowledges

by the project management, client

representative and verify by Landscape

Architect at site for monthly maintenance

claim procedure.

Note:

Contractor to provide competent person to report to

Landscape Architect during implementation and

maintenance.

mth

12

1500

18 000

Total to Project Summary Page 18 000

BILLS OF QUANTITIES

Page 8: CL Final Assignment Report Part B

APJ SURVEYING

ITEM

DESCRIPTION

UNIT

QTY

RATE AMOUNT

RM RM

PROJECT SUMMARY

Hardscape Works

Softscape Works

Maintenance

50 952

3849

18 000

Total Project Cost 72 801