city of fort myers bicycle & pedestrian master plan project...

16
BICYCLE & PEDESTRIAN MASTER PLAN PROJECT OVERVIEW CITY OF FORT MYERS

Upload: others

Post on 03-Jul-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

BICYCLE & PEDESTRIAN MASTER PLANPROJECT OVERVIEW

CITY OF FORT MYERS

Project Overview

PROJECT TEAM

In collaboration with

The purpose of the Bicycle &Pedestrian Master Plan is toestablish a framework toprovide improved mobility andfurther connectivity, leading toa more robust bicycle andpedestrian network.

Project Overview

PURPOSE OF THE MASTER PLAN

Project Overview

MASTER PLAN PROCESS

Understand the existing networks, on-going projects, andrelated plans

Identify and prioritize new and improved bicycle andpedestrian connections in Fort Myers and to the region’slarger active transportation network based on the existingframework and public input process

Inform decision-making associated with implementingbicycle and pedestrian programs and infrastructureimprovements

Project Overview

PROJECT TIMELINE

We are here

Public Engagement Process

ImagineVision and Goals

Draft Recommendations

& Next Steps

Develop Final Plan

Assess Existing Conditions

Project Overview

EXISTING RELATED PLANS

City of Fort Myers Bicycle and Pedestrian Plan, July 2007 Lee County MPO Bicycle Pedestrian Master Plan, June 2011 Lee Countywide Bicycle & Pedestrian Safety Action Plan, September 2013 City of Fort Myers Complete Streets Guidelines, July 2016 City of Fort Myers Complete Street Policy, July 2017 Census Bureau, American Community Survey, 2018 The Lee Plan, May 2019 City of Fort Myers Comprehensive Plan, November 2019 City of Fort Myers 5 Year Capital Improvement Program, FY 2020 Through 2024

EXISTING SIDEWALK FACILITIES

Existing Facilities on key

roadways in the City

Hanson St

Mar

sh A

ve

MichiganAve

Hill Ave

EXISTING BICYCLE & MULTIMODAL FACILITIES

Existing Facilities on key

roadways in the City

Hanson St

Mar

sh A

ve

MichiganAve

Hill Ave

Project Overview

EXISTING TRANSIT ROUTES

Project Overview

PUBLIC ENGAGEMENT PROCESS

Project Website http://cfmbikepedmasterplan.com/ Online Questionnaire/Survey Interactive Map Contact Us

Project Advisory Committee Meetings Public Workshop City Council Meetings Lee County MPO Bicycle Pedestrian Coordinating Committee Meeting

The VISION of this Bicycle & Pedestrian Master Plan is consistent with the City of Fort MyersComplete Streets Guidelines.

Designed for all ages/abilities whether they walk, bicycle, ride transit, or drive cars Integrate income and social equity into future planning and budgetary functions Combine connectivity with traffic-calming and pedestrian-friendly site/building design features

that create safe and inviting places Connect people through everyday interaction Engage the community in designing streets “from the bottom up” Create inviting spaces with engaging architecture, landscaping, and public art that reflect the

diversity and cultures of the community Foster healthy and safe commerce Strengthen and enhance neighborhoods as envisioned by community members without displacing

residents Encourage active and healthy lifestyles Integrate environmental stewardship, water management, energy conservation, and preservation

of plant life Vary in character by neighborhood, density, and function

Project Overview

MASTER PLAN VISION

The GOALS of this Bicycle & Pedestrian Master Plan are consistent with the City of Fort MyersComplete Streets Guidelines.

Provide transportation options for people of all ages, abilities, and income levels Support land uses and public mobility means that service the street Encourage multimodal transportation options including walking, bicycling, and mass transit Enhance the safety and function of streets, from both traffic and pedestrian perspectives Provide sufficient landscaping along streets and sidewalks that will shade pedestrians and bicyclists

from the sun thereby diminishing the “heat-island effect” Maximize infiltration and reuse of stormwater and reduce unfiltered stormwater runoff into

watersheds Reduce greenhouse gas emissions and other air pollution contaminants Reduce energy consumption Promote the economic well-being of businesses and residents Increase civic space and encourage human interaction Efficiently utilize paved areas to accomplish healthier living opportunities Provide increased opportunities for physical activity Create livable neighborhoods that connect communities

Project Overview

MASTER PLAN GOALS

Shared Lane MarkingsShared Lane Markings “Sharrows” area type of pavement markingindicating that cyclists can use thetravel lane. It helps to positionbicyclists within the shared lane andensures safe passing. The roadwaycan also include signage “Share theRoad” or “Bicycle May Use Full Lane”.

Bicycle BoulevardBicycle boulevards are streets withlow traffic volume and speed. Theygenerally prioritize bicycle travelthrough the use of signs andpavement markings. They may alsoemploy other traffic calmingtechniques to create a saferenvironment for bicyclists.

Project Overview

TOOLBOX FOR FUTURE POTENTIAL FACILITIES

Paved ShoulderPaved shoulders provideaccommodations for bicyclistsadjacent to the travel lanes. They canvary in width depending on theavailable pavement.

Bicycle LaneBicycle lanes are designated travellanes for preferential use bybicyclists. Specific pavementmarkings and signage are required toidentify the bicycle lane and includekeyhole lanes at intersections.Additionally, they may be coloredgreen or with other pavementtreatments.

Separated Bicycle LaneSeparated/buffered bicycle lanes orcycle tracks are on-road facilities thatare physically separated from thetravel lanes. This separation may beachieved through the use ofpavement markings, a raised concreteseparator, or landscaping. Theseparation allows bicyclists to bemore comfortable when riding on theroadway.

Shared Use PathShared use paths are off-roadfacilities that are physically separatedfrom, but adjacent to, the roadway.They can accommodate bi-directionaltravel and are shared by bothbicyclists and pedestrians.

Project Overview

TOOLBOX FOR FUTURE POTENTIAL FACILITIES

TrailTrails are off-road facilities that arephysically separated from, and areindependent from, the roadway.Trails can be found in parks, oralongside canals, as examples.

SidewalkSidewalks are paved pathwaysparallel to a roadway and physicallyseparated from vehicular traffic thatare intended for use by pedestrians.

Project Overview

HOW CAN I LEARN MORE?

Visit the project website - Complete the public questionnaire Fill out the interactive online map Review available documents Contact us!

http://cfmbikepedmasterplan.com/

THANK YOU