Cisco Application Centric Infrastructure Roadshow Wednesday, 2. April 14

Upload: others

Post on 19-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Application Centric Infrastructure Roadshow

Wednesday, 2. April 14

Page 2: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 2 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

§  IT Trends and Cisco Strategy §  Cisco Application Centric Infrastructure (Data Center)

§  Lunch

§  Cisco APIC Enterprise Module (WAN & Access)

§  Use Cases

Cisco ACI Roadshow - Agenda

Page 3: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Use Cases

February 11, 2014

Page 4: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 4 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

§  Recently upgraded DC network to N7K/N5K/N1Kv, VMW as hypervisor

§  Automated port configuration required in order to decrease time-to-market of new services, plus reduce the OPEX of managing the network

§  VM-visibility desired to provide more troubleshooting visibility, and better availability

§  Selected technology: addition of automation with software-only upgrade (DCNM7.0), plus later optimized forwarding (after testing)

Use Case #1: Enterprise customer in Europe

Page 5: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 5 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

Use Case #1: DFA gradual implementation

Fabric Management

Workload Automation

Virtual Fabrics Optimized Networking

Phase 1 Phase 2 Phase 3 Out of Scope

DCNM 7.0 as add-on to existing

network

Page 6: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 6 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

§  Big growth opportunity in the IaaS / PaaS space

§  Network seen as an obstacle to the agility required for taking advantage of the mid-term business opportunity

§  High-speed (40 GbE) backbone required to deliver enough performance and bandwidth

§  Network CAPEX very important too (surprise surprise)

§  Today: Nexus infrastructure, FEX-based design, multi-hypervisor

§  Selected technology: gradual upgrade with N9K hardware in standalone mode, with eventual upgrade to ACI (fabric mode)

Use Case #2: Service Provider in France

Page 7: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 7 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

L3 L2

Spine

Leaf

Use Case #2: Nexus 9300 as access layer

N7K N7K N9K N9K

N9300 N9300 N9300 N9300 N9300 N9300 N9300 N9300

Integrated L4-L7 Services Physical & Virtual

V

Internet WAN / DCI

Page 8: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 8 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

§  Today offering network services to external customers §  Business opportunity to offer rich network services

§  Intelligent and dynamic network service chaining required

§  Technology selected: ACI as a “services pod”, eventually scaled to server connectivity

Use Case #3: telco in Asia

Page 9: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 9 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

L3 L2

10GE to ACI Fabric

ACI insertion as L2/L3 boundary and transit fabric with overtime migration of access layer (cont.)

Forwarding Flow

Migration Path

•  Default Gateway moves to ACI Leaf layer •  EPG = VLAN / Subnet (initial step) •  Host / FEX can migrate to Leaf (overtime)

Use Case #3: ACI for service insertion FW

ADC

IPS

Page 10: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 10 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

§  2 DCs, around 200 ports each, soon to be refreshed

§  One team managing complete network (DC, firewalls, WLAN, WAN)

§  Absolute need to reduce network complexity, less hands-on configuration, more time for other tasks

§  Requirement for additional security in the network and separating applications from each other

§  Application-specific performance dashboard

§  Technology selected: greenfield ACI implementation

Use Case #4: commercial customer in Netherlands

Page 11: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 11 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

WAN

§  Small scale fabric in each DC §  Interconnect technology planned with L3 routers (ASR 1002)

Use Case #4

DC 1 DC 2

Page 12: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 12 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

§  Situation: Many stores attached to two central DCs in Germany §  Objective: reduce costs in the WAN through the use of DSL lines

instead of MPLS connections

§  PfR tested, deemed as complex to implement

§  Solution: APIC EM as middleware to configure QoS and PfR in the WAN

Use Case #5: Retailer customer in Germany

Page 13: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 13 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

Page 14: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 14 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

§  Evaluate your goals and constraints, decide the best solution satisfying your goals, and the best strategy to go from A to B, depending on your constraints

§  Cisco offers different roadmaps for different needs and constraints, from evolution of existing networks with software add-ons (DFA, APIC-EM), to the next networking revolution of Application Centric Infrastructure

§  Cisco offers end-to-end solutions covering DC, WAN and access, with the goal of application-centricity and the openness of the Open Daylight architecture.

Summary

Page 15: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Thank you.

Page 16: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 16 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

Nexus 9000: a comprehensive portfolio One platform: Two operation modes (standalone / fabric modes)

Switch/Module Description Modes supported Available

9396 2RU switch (48x10GE, 12x40GE)

Standalone / Fabric leaf Yes (PX)

93128 3 RU switch (96x10GE, 8x40GE)

Standalone / Fabric leaf Yes (TX)

9336 2 RU switch (36x40GE)

Fabric spine Roadmap

9500 Modular chassis (4, 8 and 16 line cards

Depends on line cards Yes (9508)

9400/9600 Line cards for N9500 (40GE & 100GE)

Standalone Yes (9636)

9500 Line cards for N9500 (10GE & 40GE)

Standalone / Fabric leaf Yes (9564)

9700 Line cards for N9500 (40GE)

Fabric spine Roadmap

Page 17: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 17 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

Nexus 9000: use the chance!! Attractive bundles today for Nexus 9300 and 9500

Commercial 1

(2xN9396) Commercial 2

(2xN93128) EoR (9508, 2x9564)

Mini Fabric

(9508, 2x9636, 2xN9396)

Page 18: Cisco Application Centric Infrastructure Roadshow · 2 DCs, around 200 ports each, soon to be refreshed ! One team managing complete network (DC, firewalls, WLAN, WAN) ! Absolute

Cisco Confidential 18 © 2013-2014 Cisco and/or its affiliates. All rights reserved.

Migration paths to ACI

Introduce Nexus 9000 in your current design in standalone mode

Migrate your ACI-ready infrastructure to ACI

Enhance your physical Nexus network with DFA

Introduce virtual networking with the Nexus 1000v suite

Today

Supports STP, VPC, FEX… DFA supports all Nexus models No dependency on the physical network Next-gen Network