china baseline package master building

320
4.7 September 2003 English China Baseline Package Master Building Block (J01) Building Block Installation Guide

Upload: siber-ck

Post on 30-Jan-2016

47 views

Category:

Documents


0 download

DESCRIPTION

China Baseline Package Master Building Block (J01)

TRANSCRIPT

Page 1: China Baseline Package Master Building

4.7

September 2003

English

China Baseline Package Master Building Block (J01)

SAP AGNeurottstr. 1669190 Walldorf

Building Block Installation Guide

Page 2: China Baseline Package Master Building

Germany

Page 3: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Copyright

© Copyright 2003 SAP AG. All rights reserved.

No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice.

Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors.

Microsoft®, WINDOWS®, NT®, EXCEL®, Word®, PowerPoint® and SQL Server® are registered trademarks of Microsoft Corporation.

IBM®, DB2®, DB2 Universal Database, OS/2®, Parallel Sysplex®, MVS/ESA, AIX®, S/390®, AS/400®, OS/390®, OS/400®, iSeries, pSeries, xSeries, zSeries, z/OS, AFP, Intelligent Miner, WebSphere®, Netfinity®, Tivoli®, Informix and Informix® Dynamic ServerTM are trademarks of IBM Corporation in USA and/or other countries.

ORACLE® is a registered trademark of ORACLE Corporation.

UNIX®, X/Open®, OSF/1®, and Motif® are registered trademarks of the Open Group.

Citrix®, the Citrix logo, ICA®, Program Neighborhood®, MetaFrame®, WinFrame®, VideoFrame®, MultiWin® and other Citrix product names referenced herein are trademarks of Citrix Systems, Inc.

HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C®, World Wide Web Consortium, Massachusetts Institute of Technology.

JAVA® is a registered trademark of Sun Microsystems, Inc.

JAVASCRIPT® is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape.

MarketSet and Enterprise Buyer are jointly owned trademarks of SAP AG and Commerce One.

SAP, SAP Logo, R/2, R/3, mySAP, mySAP.com, xApps, mySAP Business Suite, and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP AG in Germany and in several other countries all over the world. All other product and service names mentioned are the trademarks of their respective companies.

© SAP AG Page 3 of 257

Page 4: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Icons

Icon Meaning

Caution

Example

Note

Recommendation

Syntax

Typographic Conventions

Type Style Description

Example text Words or characters that appear on the screen. These include field names, screen titles, pushbuttons as well as menu names, paths and options.

Cross-references to other documentation.

Example text Emphasized words or phrases in body text, titles of graphics and tables.

EXAMPLE TEXT Names of elements in the system. These include report names, program names, transaction codes, table names, and individual key words of a programming language, when surrounded by body text, for example, SELECT and INCLUDE.

Example text Screen output. This includes file and directory names and their paths, messages, source code, names of variables and parameters as well as names of installation, upgrade and database tools.

EXAMPLE TEXT Keys on the keyboard, for example, function keys (such as F2) or the ENTER key.

Example text Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.

<Example text> Variable user entry. Pointed brackets indicate that you replace these words and characters with appropriate entries.

© SAP AG Page 4 of 257

Page 5: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Contents

China Baseline Master Building Block 14

Installation Guide 14

1. Purpose 14

2. Preparation 14

3. Use 14

4. Upload Installation Role 15

5. Installation: Layer 0 Building Blocks 15

5.1 Install Building Block J02 – Organizational Structure 15

5.1.1 Activation of Configuration 15

5.1.1.1 Common Organizational Structure Setup 16

5.1.1.2 More Logistics Organizational Structure Setup 19

5.1.1.3 Intercom. Organizational Structure Setup 20

5.1.2 Completion Activities 22

5.1.2.1 Maintaining Address for Sales Organizations 23

5.1.2.2 Maintaining Address for Plants 23

5.2 Install Building Block J03 – Financial Accounting 24

5.2.1 Activation of Customizing 24

5.2.1.1 Finance Organizational Structure 24

5.2.1.2 FI Master-data 25

5.2.1.3 FI Configuration 25

5.2.1.4 Create GL Accounts for BP0X 26

5.2.1.5 Intercompany Procedures 27

5.2.2 Completion Activities 28

5.2.2.1 Copy Financial Statement Version from Client 000 28

5.2.2.2 Maintain Address for Company Code 28

5.2.2.3 Create House Banks 29

5.2.2.4 Import tax codes 29

5.3 Install Building Block J08 – Standard Cost and Profit Center Accounting 30

5.3.1 Activation of Configuration - OM & PCA 30

5.3.1.1 Activate Business Configuration Sets 30

5.3.1.2 Takeover Process Groups CO on current value 31

5.3.2 Data Preparation - CO 32

5.3.2.1 Profit Center Accounting 32

Creates the profit center groups. 33

© SAP AG Page 5 of 257

Page 6: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.3.2.2 Cost Center Controlling 36

5.3.2.3 Additional Data 44

5.3.3 Activation of Configuration - Additional OM & PCA 45

5.3.3.1 Activating Cost Center Account 45

5.3.3.2 Activating Profit Center Account 46

5.3.4 Activation of Configuration - PC 47

5.3.4.1 Product Cost Planning 47

5.3.4.2 Activate Cost Component Structure 49

5.3.4.3 Cost Object Controlling 50

5.3.4.4 Manually Maintain the Rate of Percentage Overhead Controlling 51

5.4 Install Building Block J05 – Materials Management 52

5.4.1 Materials Management 52

5.4.1.1 Material Master MM 53

5.4.1.2 Create Char. PO Release Strategy 54

5.4.1.3 Create Class PO Release Strategy 54

5.4.1.4 Install Material Management 55

5.4.1.5 Install Inter Company MM (Optional) 56

5.4.1.6 Active PO Release Strategy 57

5.4.2 Create Output Condition Records 57

5.4.2.1 Outline Agreement 57

5.4.2.2 Request Quotation 58

5.4.2.3 Purchase Order 59

5.4.2.4 Inventory Management 60

5.4.3 Batch Management 61

5.4.3.1 Update LOBM standard characteristics 61

5.4.3.2 Specify Batch Level and Activate Status Management 61

5.4.3.3 Activate Automatic Number Assignment 62

5.4.3.4 Create Sort Sequence 63

5.4.3.5 Create Class for Batch Management 63

5.4.3.6 Batch Setting 64

5.5 Install Building Block J04 – Sales and Distribution 64

5.5.1 Activation of Customizing without Intercompany 64

5.5.1.1 Activate SD Core Configuration without Intercompany 65

5.5.1.2 Create Output Tax Condition Records 67

5.5.2 Activation of Customizing for Intercompany (optional) 67

5.5.2.1 Activate SD Core Configuration Intercompany 67

© SAP AG Page 6 of 257

Page 7: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.5.2.2 Create Internal Customer (BP0001 in BP0X and BP000X in BP01) 68

5.5.2.3 Activate Sales and Distribution Core Configuration with Internal Customer Data 69

5.6 Install Building Block J07 – Quality Management 70

5.6.1 Business Configuration Sets Activation 70

5.6.1.1 General Settings in QM 70

5.6.1.2 QM in Procurement 71

5.6.1.3 QM in PP-PI 72

5.6.2 Master Data 72

5.6.2.1 Create Inspection Methods 72

5.6.2.2 Create Sampling Procedure 73

5.6.2.3 Create Dynamic Modification Rule 73

5.6.2.4 Create Work Center 74

5.6.2.5 Create Characteristics Quantitative 74

5.6.2.6 Create Characteristics Qualitative 75

5.7 Install Building Block J06 – Production Planning and Control 76

5.7.1 Sales and Operations Planning (SOP) 76

5.7.2 Materials Requirement Planning (MRP) 76

5.7.3 Shop Floor Control (SFC) 78

6. Installation: Layer 1 Building Blocks 79

6.1 Install Building Block J11 – Cash Management 79

6.2 Install Building Block J17 – Profitability Analysis 80

6.2.1 Structures 80

6.2.1.1 Import Operating Concern from Source Client 000 (if necessary) 80

6.2.1.2 Check and Activate Source Operating Concern 81

6.2.1.3 Copy Operating Concern from delivery client 82

6.2.1.4 Set Operating Concern 83

6.2.1.5 Maintain Characteristics 84

6.2.1.6 Generate Target Operating Concern 86

6.2.1.7 Assign controlling area to operating concern 88

6.2.2 Master Data 89

6.2.2.1 Maintain Characteristic Values 90

6.2.2.2 Define Characteristic Derivation 93

6.2.2.3 Maintain Planning Versions for Valuation 94

6.2.2.4 Valuation 96

6.2.3 Planning 96

6.2.4 Flows of Actual Values 97

© SAP AG Page 7 of 257

Page 8: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.2.5 Information System 99

6.2.5.1 Information System 99

6.2.5.2 Manually Create Profitability Report 100

6.2.6 Activate Profitability Analysis 101

6.2.7 Troubleshooting in CO-PA 102

6.2.7.1 Inconsistencies in derivation rules / creation of billing document not possible 102

6.2.7.2 General Troubleshooting – Regenerating the Operating Concern 105

6.3 Install Building Block J10 – Asset Management 106

6.3.1 Assets Accounting Settings 106

6.3.2 Check/Complete Texts in Asset Explorer 107

6.4 Install Building Block J49 – Procurement of Stock Material 108

6.4.1 Business Configuration Sets Activation 108

6.4.1.1 RFQ/Quotation and Price Comparison 108

6.4.1.2 Procurement of Stock Material 109

6.4.2 Master Data 110

6.4.2.1 Create Material Master C40060 110

6.4.2.2 Create Vendor Master C8010 and C8020 111

6.4.2.3 Create Classification View in Material Master 112

6.4.2.4 Create QM Info in Material Master 112

6.4.2.5 Create Stock Material Info Record 113

6.4.2.6 Create Inspection Plans for Goods Receipt of Stock Material 113

6.4.2.7 Change Inspection Plans: Characteristics Quantitative 114

6.4.2.8 Change Inspection Plans: Characteristics Qualitative 114

6.4.2.9 Create Quality-Info Record 114

6.5 Install Building Block J50 – Procurement - Contract 115

6.5.1 Business Configuration Sets Activation 115

6.5.1.1 Procurement - Contract 115

6.5.2 Master Data 116

6.5.2.1 Create Material Master C40660 116

6.5.2.2 Create Vendor Master C7110 117

6.6 Install Building Block J51 – Internal Procurement (Stock Transfer with Delivery) 118

6.6.1 Activation of Customizing 118

6.6.2 Create Master Data 119

6.6.2.1 Create Material Master via eCATT/LSMW (Trading Goods C10180) 119

6.6.2.2 Create Customer Master BP0001 for Receiving Plant via eCATT/LSMW120

© SAP AG Page 8 of 257

Page 9: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.6.2.3 Create Initial Stock for Material C10080 121

6.7 Install Building Block J53 – Internal Procurement (Cross-Company Stock Transfer) 122

6.7.1 Activation of Customizing 122

6.7.2 Create Master Data 123

6.7.2.1 Create Material Master via eCATT/LSMW (Trading Goods C20080) 123

6.7.2.2 Create Pricing Condition for Material C20080 via eCATT/LSMW 124

6.7.2.3 Create Customer Master C6000 via eCATT/LSMW 125

6.7.2.4 Create Customer Master BP0001 for Receiving Plant via eCATT/LSMW126

6.7.2.5 Creating Vendor BP000X for Supplying Plant with eCATT/LSMW 127

6.7.2.6 Create Initial Stock for Material C20080 128

6.8 Install Building Block J57 – Standard Sales Process 129

6.8.1 Activation of Customizing 129

6.8.2 Master Data Preparation 129

. 130

6.8.2.1 Create Customer Master C6000 via eCATT/LSMW 130

6.8.2.2 Create Customer Master C6120 via eCATT/LSMW 131

6.8.2.3 Create Customer Master C6130 via eCATT/LSMW 132

6.8.2.4 Create Material Master via eCATT/LSMW (Trading Goods C20010) 133

6.8.2.5 Create Classification View for Material Master C20010 134

6.8.2.6 Create Pricing Condition for Material C20010 via eCATT/LSMW 135

6.8.2.7 Create Batch Search Strategy for Material C20010 136

6.8.2.8 Create Material Master via eCATT/LSMW (Trading Goods C20020) 136

6.8.2.9 Create Classification View for Material Master C20020 138

6.8.2.10 Create Pricing Condition for Material C20020 via eCATT/LSMW 138

6.8.2.11 Create Batch Search Strategy for Material C20020 140

6.8.2.12 Create Material Master via eCATT/LSMW (Packaging Material C50010)140

6.8.2.13 Create Material Master via eCATT/LSMW (Finished Goods C10150) 141

6.8.2.14 Create Classification View for Material Master C10150 142

6.8.2.15 Create Pricing Condition for Material C10150 via eCATT/LSMW 143

6.8.2.16 Create Batch Search Strategy for Material C10150 144

6.8.2.17 Create Free Goods Condition Record 145

6.8.2.18 Material Substitution Condition Record 145

6.8.2.19 Create Output Condition Record for BA00 146

6.8.2.20 Create Output Condition Record for LD00 146

6.8.2.21 Create Initial Stock for Material C20020 147

© SAP AG Page 9 of 257

Page 10: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.8.2.22 Create Initial Stock for Material C50010 147

6.9 Install Building Block J58 – Customer Consignment Process 148

6.9.1 Activation of Customizing 148

6.9.2 Master Data Preparation 149

6.9.2.1 Create Customer Master C6100 via eCATT/LSMW 149

6.9.2.2 Create Material Master via eCATT/LSMW (Trading Goods C20040) 150

6.9.2.3 Create Classification View for Material Master C20040 151

6.9.2.4 Create Pricing Condition for Material C20040 via eCATT/LSMW 152

6.9.2.5 Create Batch Search Strategy for Material C20040 153

6.9.2.6 Create Material Master via eCATT/LSMW (Trading Goods C20050) 154

6.9.2.7 Create Classification View for Material Master C20050 155

6.9.2.8 Create Batch Search Strategy for Material C20050 156

6.9.2.9 Create Pricing Condition for Material C20050 via eCATT/LSMW 156

6.9.2.10 Create Output Condition Record for BA00 157

6.9.2.11 Create Output Condition Record for LD00 158

6.9.2.12 Create Initial Stock for Material C20040 158

6.9.2.13 Create Initial Stock for Material C20050 159

6.10 Install Building Block J59 – Returns and Complaints 160

6.10.1 Activation of Customizing 160

6.10.2 Create Master Data 160

6.10.2.1 Create Material Master via eCATT/LSMW (Trading Goods C20033) For Return 160

6.10.2.2 Create Quality Management View for Material Master C20033 162

6.10.2.3 Create Classification View for Material Master C20033 162

6.10.2.4 Create Pricing Condition for Material C20033 via eCATT/LSMW 163

6.10.2.5 Create Batch Search Strategy for Material C20033 164

6.10.2.6 Create Customer Master C6000 via eCATT/LSMW 165

6.10.2.7 Create Initial Stock for Material C20033 166

6.10.2.8 Create Material Master via eCATT/LSMW (Non-Stock Material C90900) For Complaints 166

6.11 Install Building Block J60 – Returnable Processing 167

6.11.1 Activation of Customizing 167

6.11.2 Create Master Data 168

6.11.2.1 Create Material Master via eCATT/LSMW (Trading Goods C20070) 168

6.11.2.2 Create Pricing Condition for Material C20070 via eCATT/LSMW 169

6.11.2.3 Create Material Master via eCATT/LSMW (Empties C60100) 170

6.11.2.4 Create Pricing Condition for Material C60100 via eCATT/LSMW 171

© SAP AG Page 10 of 257

Page 11: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.11.2.5 Create Customer Master C6000 via eCATT/LSMW 172

6.11.2.6 Create Initial Stock for Material C20070 and C60100 173

6.12 Install Building Block J61 – Batch Recall 174

6.12.1 Creating View ZZRECALL 174

6.12.2 Load Program ZZRECALL 179

6.12.3 Activation of Batch Recall Process Customizing 182

6.12.4 Master Data Preparation 182

6.12.4.1 Create Output Condition for Sales Activities 183

6.13 Install Building Block J62 – Cross-Company Sales Order Processing 183

6.13.1 Activation of Customizing 183

6.13.2 Create Master Data 184

6.13.2.1 Create Material Master via eCATT/LSMW (Trading Goods C20080) 184

6.13.2.2 Create Pricing Condition for Material C20080 via eCATT/LSMW 185

6.13.2.3 Create Customer Master C6000 via eCATT/LSMW 186

6.13.2.4 Create Initial Stock for Material C20080 187

6.14 Install Building Block J64 – Discrete Manufacturing 188

6.14.1 Activation of Configuration 188

6.14.1.1 J64 settings 188

6.14.2 Data Preparation 188

6.14.2.1 Create Material Master Data 188

6.14.2.2 Create Material Master Classification View 189

6.14.2.3 Create Search Strategy Conditions PP 190

6.14.2.4 Create BOM Header Data 190

6.14.2.5 Create BOM Item Data 191

6.14.2.6 Create Work Center 191

6.14.2.7 Create Routing 192

6.14.2.8 Change Routing 192

6.14.2.9 Create Vendor Master Data 193

6.14.2.10 Create Subcontract Info Record 194

6.14.2.11 Create routing for subcontract 194

6.14.2.12 Create Initial Stock 196

6.15 Install Building Block J65 – Process Manufacturing 196

6.15.1 Activation of Configuration 196

6.15.2 Data Preparation 197

6.15.2.1 Copying PI Characteristics from Client 000 197

6.15.3 Material 198

© SAP AG Page 11 of 257

Page 12: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.15.3.1 General Views 198

6.15.3.2 Classification View 199

6.15.3.3 Create Inspection Types within MMR 199

6.15.4 Batch Determination 200

6.15.4.1 Create Batch Search Strategy Conditions PI 200

6.15.5 BOM 200

6.15.5.1 Create BOM Header Data 200

6.15.5.2 Create BOM Item Data 201

6.15.6 Resources 201

6.15.6.1 Create Resources 201

6.15.7 Recipes 202

6.15.7.1 Create recipe group 202

6.15.7.2 Create operations and phases 203

6.15.7.3 Create process instructions per phase 203

6.15.7.4 Create Process Instruction Characteristic 204

6.15.7.5 Create standard values per phase 204

6.15.7.6 Maintain relationships of phases 205

6.15.7.7 Allocation material-recipe-production version 205

6.15.7.8 Set production version 205

6.15.7.9 Allocation of material components 206

6.15.7.10 Recipes for QM Data 206

6.15.8 Create Initial Stock 207

6.15.8.1 Create Initial Stock – Raw Material 207

6.15.8.2 Create Initial Stock – Packaging Material 207

6.16 Install Building Block J66 – MTO Processing 208

6.16.1 Activation of Configuration 208

6.16.1.1 J66 Setting 208

6.16.2 Data Preparation 208

6.16.2.1 Create Characteristic (CHAR) 209

6.16.2.2 Create Characteristic (with Table Reference) 209

6.16.2.3 Create Class 210

6.16.2.4 Create Object Dependency 210

6.16.2.5 Create Materials Master 211

6.16.2.6 Create Material Master Classification View 212

6.16.2.7 Create BOM Header Data 212

6.16.2.8 Create BOM Item Data 213

© SAP AG Page 12 of 257

Page 13: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.9 Change BOM (Add Dependency, Set Relevancy to Sales) 213

6.16.2.10 Create Work Center 214

6.16.2.11 Create Routing 214

6.16.2.12 Change Routing 215

6.16.2.13 Create Configuration Profile 215

6.16.2.14 Define Key 216

6.16.2.15 Create Customer Master Data 216

6.16.2.16 Create Vendor Master Data 217

6.16.2.17 Create Condition Records - VA00 218

6.16.2.18 Create Customer Credit Management Data 219

6.16.2.19 Create Initial Stock 219

6.17 Install Building Block J67 – Repetitive Manufacturing 220

6.17.1 Activation of Customizing 220

6.17.1.1 Repetitive Manufacturing Customizing 220

6.17.1.2 Batch Management for Repetitive Manufacturing 220

6.17.2 Completion Activities 221

6.17.2.1 Create Material Master 221

6.17.2.2 Create BOM 222

6.17.2.3 Create Work Center 223

6.17.2.4 Create Routing 224

6.17.2.5 Create Production Version 225

6.17.2.6 Create Material: Classification View 226

6.17.2.7 Create Batch Search Strategy 226

6.17.2.8 Create Initial Stock 227

6.18 Install Building Block J70 – Procurement of Consumables 228

6.18.1 Business Configuration Sets Activation 228

6.18.1.1 Procurement of Consumables 228

6.18.2 Master Data 228

6.18.2.1 Create Vendor Master C7000 228

6.19 Install Building Block J71 – Credit Control in Sales Order Process 229

6.19.1 Master Data Preparation 229

6.19.1.1 Create Credit Master via CATT 230

6.20 Install Building Block J72 – Sales and Operations Planning 230

6.20.1 Create Master Data 230

6.20.1.1 Create Material Master via eCATT/LSMW 230

6.20.1.2 Create Product Group 231

© SAP AG Page 13 of 257

Page 14: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.20.1.3 Change the product group SOP_PG 232

6.20.1.4 Change the product group SOP_PG 233

6.20.1.5 Create Initial sales plan 233

6.20.1.6 Create Routing Header 234

6.20.1.7 Change Routing Item 234

6.21 Install Building Block J74 – Product Cost Planning 235

6.21.1 Activation of Configuration 235

6.21.2 Data Preparation 236

6.21.2.1 Material 236

6.21.2.2 BOM 237

6.21.2.3 Resources 238

6.21.2.4 Recipes 239

6.22 Install Building Block J75 – Third-Party Procurement, Subcontracting and External Processing 242

6.22.1 Activation of Customizing 242

6.22.1.1 Activation of Basic Setting 242

6.22.1.2 Activation of Shop Floor Control Settings 243

6.22.1.3 Activation of Material Management Settings 244

6.22.1.4 Activation of Sales and Distribution Settings 245

6.22.2 Create Master Data 246

6.22.2.1 Create Material Master via eCATT/LSMW 246

6.22.2.2 Create Customer Master J75 via eCATT/LSMW 247

6.22.2.3 Create Vendor Master via eCATT/LSMW 248

6.22.2.4 Create Condition Master data via eCATT/LSMW 249

6.22.2.5 Create Initial Stock for Material 250

6.22.2.6 Create Info record 251

6.22.2.7 Create Source List 251

6.22.2.8 Create BOM 252

6.22.2.9 Create Work Center 253

6.22.2.10 Create Routing 253

© SAP AG Page 14 of 257

Page 15: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

China Baseline Master Building Block

Installation Guide

1. PurposeThis Installation Guide provides you with the information you need to set up the configuration of China Baseline Package Master J01 using automated configuration tools, such as BC Sets or CATT Procedures. If you are not familiar working with BC Sets or CATTs, refer to the section Working with CATTs and Working with BC Sets in the documentation Building Block J00 Essential Documentation.

2. PreparationBefore starting the installation of the China Baseline Master Building Block J01, some preparation activities must be performed. Some of these activities can only be done manually; while others are automated in the installation role. All of these activities are described in the following pages.

3. UseThis building block is the master building block of the Baseline Package. It can be seen as a holding container for the other building blocks that belong to the Baseline Package. It must be installed when the Layer 0 Building Blocks are being installed completely. The Layer 0 building blocks in the sequence in which they have to be installed are:

J02 - Organizational Structure

J03 - Financial Accounting

J08 - Cost/Profit Center Accounting

J05 - Materials Management

J04 - Sales and Distribution

J07 - Quality Management

J06 - Production Planning and Control

The following scenarios form the Layer 1 building blocks:

J11 - Cash Management

J17 - Profitability Analysis

J10 - Asset Management

J49 to J53 - Procurement scenarios

J57 to J62 - Sales scenarios

J64 to J67 - Manufacturing scenarios

J70 to J75 - China specific scenarios

© SAP AG Page 15 of 257

Page 16: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Before starting with the installation, read the documentation building block J00 Essential Documentation.

4. Upload Installation Role

UseBefore you can start with the installation using the automated procedures described in this Installation Guide, you need to upload the installation role and assign it to your user.

The China Baseline Package Master Building Block provides an installation role for each mySAP Business Suite component that is involved in this installation, such as SAP APO; SAP R/3, or SAP CRM. The installation role enables you to comfortably access all transactions required for the installation from the relevant system. The following roles are available:

Technical name Description File name for upload

/SMB11/J01_01IChina Baseline Package Master Building Block Installation _SMB11_J01_01I.SAP

 

ProcedureFor details how to upload the installation roles to the system and how to work with the roles please refer to Building Block J00 Essential Documentation.

5. Installation: Layer 0 Building Blocks

51 Install Building Block J02 – Organizational Structure

5.1.1 Activation of Configuration

UseIn this activity, you activate the BC Sets to set up organizational structure configuration.

ProcedureThe activation is processed with the T-code SCPR20. The activation procedure of this building block is supported by the installation role.

Activation logs can help by error and warning messages.

By errors listed in the activation logs, the relevant BC-SETS must be processed separately again.

© SAP AG Page 16 of 257

Page 17: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.1.1.1 Common Organizational Structure Setup

UseIn this activity, you activate the BC Sets to set up the organizational structure configuration.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J02 Baseline Organizational Structure -> Activation of Configuration ->Common Org. Structure

Transaction Code /SMB12/S003_J02_01

2. Activate the BC Set /SMB12/0000-COM-ORGST_S003_J02.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

Chart of Accounts CAZH

City 北京

Company BP0001

Company code BP01

Company code BP01

Company Name SAP 样本公司代码

Controlling Area BP01

Country CN

Country grouping 10

Country Key

Country Key CN

Credit control area BP01

Credit control area (name)

Chinese 信贷控制范围 BP01

Credit control area (name)

English Credit control area BP01

Currency CNY

Currency CNY

Description 采购组织 BP01

Description p. group

采购组 001

Description Transportation Planning P.

Chinese 运输计划点 BP01

© SAP AG Page 17 of 257

Page 18: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Description Transportation Planning P.

English Transp. BP01 (comm.)

Distribution Channel

01

Division 01

Division (name) Chinese 产品组 01

Division (name) English Product Division 01

Factory calendar CN

Fiscal year variant K4

Fiscal year variant K4

FM Area BP01

FM area currency CNY

FM area Object number

FKBP01

Language Key

Language Key ZH

Name 控制范围 BP01

Description Operating Concern

Chinese BP 经营组织

Description Operating Concern

English BP Operating Concern

Name 1 工厂 BP01

Name of FM area Chinese 财务范围 BP01

Name of FM area English Financial area BP01

Name of the company

SAP 样本公司

Operating concern BPCN

Personnel area BP01

Personnel Area Text

人事范围 BP01

Plant BP01

Plant BP01

Purch. Organization

BP01

Purchasing Group 001

Ref.dist.channel-Cust/Material

01

© SAP AG Page 18 of 257

Page 19: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Sales group 001

Sales office BP01

Sales Office (Description)

Chinese 销售办公室 BP01

Sales Office (Description)

English Sales Office BP01

Sales Organization BP01

Sales Organization (name)

Chinese 销售机构 BP01

Sales Organization (name)

English Sales Org. BP01

Shipping Point (name)

Chinese 装运点 BP01

Shipping Point (name)

English Shipping Point BP01

Shipping Point/Receiving Pt

BP01

Statistics currency CNY

Stge loc. description

标准仓库存储地点

Stge loc. description

简易仓库存储地点

Stge loc. description

产成品存储地点

Stge loc. description

生产存储地点

Stge loc. description

原材料存储地点

Storage Location 0001

Storage Location 0005

Storage location, Fin. Goods

0003

Storage location, Production

0002

Storage location, Raw Mats.

0004

Storage Type 001

Transportation Planning Point

BP01

Valuation area BP01

© SAP AG Page 19 of 257

Page 20: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Warehouse Number

100

4. Complete the activation of the BC Set and go back to the installation role.

5.1.1.2 More Logistics Organizational Structure Setup

UseIn this activity, you activate the BC Sets to set up more logistics organizational structure configuration.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J02 Baseline Organizational Structure -> Activation of Configuration -> More log. org. structure

Transaction Code /SMB12/S004_J02_01

2. Activate the BC Set /SMB12/4000-LO-ORGST_S004_J02.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

Company Code BP01

Country Key

Credit Control Area

BP01

Description Shipping Point

Chinese 装运点 BP02

Description Shipping Point

Chinese 装运点 BP03

Description Shipping Point

English Shipping Point BP02

Description Shipping Point

English Shipping Point BP03

Distribution Channel

02

Distribution Channel

03

Division 01

Factory calendar CN

Language Key

© SAP AG Page 20 of 257

Page 21: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Name 1 工厂 BP02

Name 1 工厂 BP03

Name Distribution Channel

Chinese 公司间销售

Name Distribution Channel

Chinese 批发

Name Distribution Channel

English Intercompany

Name Distribution Channel

English Wholesale

Plant BP02

Plant BP03

Plant BP01

Plant BP02

Plant BP03

Purch. Organization

BP01

Ref.dist.channel 01

Ref.dist.channel 02

Ref.dist.channel 03

Sales group BP1

Sales Office BP01

Sales Organization BP01

Shipping Point/Receiving Pt

BP02

Shipping Point/Receiving Pt

BP03

Stge loc. description

贸易货物存储地点

Storage Location 0001

Valuation Area, Distrib. Center

BP02

Valuation Area, Regional Whse.

BP03

4. Complete the activation of the BC Set and go back to the installation role.

© SAP AG Page 21 of 257

Page 22: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.1.1.3 Intercom. Organizational Structure Setup

UseIn this activity, you activate the BC Sets to set up inter-company organizational structure configuration.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J02 Baseline Organizational Structure -> Activation of Configuration -> Intercompany org structure

Transaction Code /SMB12/S007_J02_01

2. Activate the BC Set /SMB12/3000-ORGST_S007_J02.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

Chart of Accounts CAZH

City 北京

Company BP0001

Company Code BP0X

Company Name SAP样本公司代码 BP0X

Controlling Area BP01

Country Key

Country Key CN

Credit Control Area BP01

Currency CNY

Description Chinese 销售组 BPX

Description English Sales Group BPX

Description Chinese 装运点 BP0X

Description English Shipping Point BP0X Intercomp

Description 采购组织 BP0X

Distribution Channel 03

Division 01

Factory calendar CN

Fiscal Year Variant K4

FM Area BP01

© SAP AG Page 22 of 257

Page 23: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

IC Company Code to IC Sales Org.

BP0X

Language Key

Language Key ZH

Name 1 工厂 BP0X

Name Sales Organization

Chinese 销售机构 BP0X

Name Sales Organization

English Sales Org. BP0X

Plant BP0X

Plant, Intercompany BP0X

Purch. Org. Intercom. BP0X

BP0X

Ref.dist.channel-Cust/Material

01

Ref.dist.channel-Cust/Material

02

Ref.dist.channel-Cust/Material

03

Sales group 001

Sales group BPX

Sales Office, Intercompany

BP0X

Sales Organization BP01

Sales Organization BP0X

Shipping Point/Receiving Pt., Intercomp.

BP0X

Statistics currency CNY

Stge loc. Description 贸易货物

Storage Location 0001

TransportPlanningPt, Intercompany

BP0X

Valuation Area, Intercom.

BP0X

© SAP AG Page 23 of 257

Page 24: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.1.2 Completion Activities

UseIn this step you maintain addresses for sales organization and plants.

ProcedureThis activity is supported by CATT procedures.

Refer to the installation role to start the T-Codes with external CATT variants.

In the following description, you will find more information.

5.1.2.1 Maintaining Address for Sales Organizations

UseThe purpose of this activity is to create address data for Sales Organization BP01 and BP0X.

Procedure1. Maintain the parameters included in the external CATT variant with name

smb12_sm30_c003_J02_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J02 Baseline Organizational Structure -> Completion Activities -> Maintain Address Sales Organization

Transaction Code /SMB12/C003_J02_01

3. Enter the correct path for the file: smb12_sm30_c003_J02_01.txt.

4. Clear the selection of indicator “ Run in Background”.

5. Choose Execute to start the CATT procedure /SMB12/C003_J02_01.

3. Check the CATT log and go back to the installation role.

5.1.2.2 Maintaining Address for Plants

UseThe purpose of this activity is to create address data for Plant BP01, BP02, BP03 and BP0X.

Procedure1. Maintain the parameters included in the external CATT variant with name

smb12_sm30_c001_J02_01.txt using your data.

2. Access the activity using one of the following navigation options:

© SAP AG Page 24 of 257

Page 25: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3Role Menu

Installation Menu: J02 Baseline Organizational Structure -> Completion Activities -> Maintain Address for Plant

Transaction Code /SMB12/C001_J02_01

4. Enter the correct path for the file: smb12_sm30_c001_J02_01.txt.

5. Clear the selection of indicator “ Run in Background”.

6. Choose Execute to start the CATT procedure /SMB12/C001_J02_01.

7. Check the CATT log and go back to the installation role.

52 Install Building Block J03 – Financial Accounting

5.2.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up financial accounting configurations.

ProcedureThe activation is processed with the T-code SCPR20. The activation procedure of this building block is supported by the installation role.

Activation logs can help by error and warning messages.

By errors listed in the activation logs, the relevant BC-SETS must be processed separately again.

5.2.1.1 Finance Organizational Structure

UseIn this activity, you activate the BC Sets to set up the organizational structure configuration.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> Activation of Configuration -> Act. customizing Finance Org. struct

Transaction Code /SMB12/S002_J03_01

2. Activate the BC Set /SMB12/1000_ORG_STRUC_S002_J03.

© SAP AG Page 25 of 257

Page 26: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

Company BP0001

Company code BP01

Credit control area BP01

Field status variant XCN1

FM Area BP01

Functional Area 0100

Functional Area 0300

Functional Area 0400

Functional Area 0500

Functional Area 0980

Name Chinese XCN1 的字段状态

Name English Field status for XCN1

4. Complete the activation of the BC Set and go back to the installation role.

5.2.1.2 FI Master-data

UseIn this activity, you activate the BC Sets to set up finance master data.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> >Activation of Configuration ->Act. Finance Master Data

Transaction Code /SMB12/S003_J03_01

2. Activate the BC Set /SMB12/2000_MASTERDATA_S003_J03.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

Chart of Accounts CAZH

Chart of accounts description

Chinese 中国科目表 – 行业

Chart of accounts description

Chinese 中国科目表 – 行业

© SAP AG Page 26 of 257

Page 27: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Chart of accounts description

English China Chart of accounts - industry

Chart of accounts description

English China Chart of accounts - industry

Company Code BP01

4. Complete the activation of the BC Set and go back to the installation role.

5.2.1.3 FI Configuration

UseIn this activity, you activate the BC Sets to set up financial accounting configurations.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> Activation of Configuration ->Act. Finance Configuations

Transaction Code /SMB12/S004_J03_01

2. Activate the BC Set /SMB12/3000_CONFIG_S004_J03.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

Chart of Accounts CAZH

Company Code BP01

Dunn.procedure XCN1

Fin.Stmt.version YAZH

Name Chinese 变式 XCN1

Name English Variant XCN1

Name Chinese 中国的财务报表版本 - SMB

Name English Fin.St.Version for China - SMB

Paying company code

BP01

Pstng period variant XCN1

Ref.company code BP01

Ref.Dunning Procedure for Texts

XCN1

Subobject value BP01

4. Complete the activation of the BC Set and go back to the installation role.

© SAP AG Page 27 of 257

Page 28: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.2.1.4 Create GL Accounts for BP0X

UseIn this activity, you activate the BC Sets to create GL accounts for company code BP0X.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> Activation of Configuration -> Create GL Accounts for BP0X

Transaction Code /SMB12/B059_J03_01

2. Activate the BC Set /SMB12/FC68_B059_J03.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

Chart of Accounts CAZH

Chart of accounts description

Chinese 中国科目表 – 行业

Chart of accounts description

English China Chart of accounts - industry

Company Code BP0X

4. Complete the activation of the BC Set and go back to the installation role.

5.2.1.5 Intercompany Procedures

UseIn this activity, you activate the BC Sets to setup inter-company settings.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> Activation of Configuration -> Act. Intercompany Settings

Transaction Code /SMB12/S051_J03_01

2. Activate the BC Set /SMB12/4000_INTERCO_S051_J03.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

ABUKR BP01

ABUKR BP0X

© SAP AG Page 28 of 257

Page 29: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Account modification

Company BP0001

Company Code BP0X

Credit control area BP01

Field status variant XCN1

FM Area BP01

Pstng period variant XCN1

Subobject value BP0X

VBUKR BP01

VBUKR BP0X

4. Complete the activation of the BC Set and go back to the installation role.

5.2.2 Completion Activities

UseIn this step you maintain addresses for sales organization and plants.

ProcedureThis activity is supported by CATT procedures.

Refer to the installation role to start the T-Codes with external CATT variants.

In the following description, you will find more information.

5.2.2.1 Copy Financial Statement Version from Client 000

UseThe purpose of this activity is to setup the predefined financial statement in current client.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> Installation Guide ->Completion Activities -> SCC1 Copy Fin.Stat.Version

Transaction Code /SMB12/C001_J03_01

2. Choose Execute to start the CATT procedure /SMB12/SCC1_C001_J03.

© SAP AG Page 29 of 257

Page 30: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. Check the CATT log and go back to the installation role.

5.2.2.2 Maintain Address for Company Code

UseThe purpose of this activity is to create address data for Sales Organization BP01 and BP0X.

Procedure1. Maintain the parameters included in the external CATT variant with name

smb12_sm30_c002_J03_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> Installation Guide ->Completion Activities -> Maintain Address for Company Code

Transaction Code /SMB12/C002_J03_01

3. Enter the correct path for the file: smb12_sm30_c002_J03_01.txt.

4. Clear the selection of indicator “Run in Background”.

5. Choose Execute to start the CATT procedure /SMB12/SM30_C002_J03.

6. Check the CATT log and go back to the installation role.

5.2.2.3 Create House Banks

UseThe purpose of this activity is to create house banks in current client.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> Installation Guide ->Completion Activities -> Create house banks

Transaction Code /SMB12/C003_J03_01

2. Choose Execute to start the CATT procedure /SMB12/FI01_C003_J03.

3. Check the CATT log and go back to the installation role.

5.2.2.4 Import tax codes

UseThe purpose of this activity is to import tax codes for China.

© SAP AG Page 30 of 257

Page 31: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J03 Finance Installation -> Installation Guide ->Completion Activities -> - Import Tax Codes w/ Object List - CN

Transaction Code /SMB12/C051_J03_01

2. Choose Execute to start the CATT procedure /SMB12/SE38_C051_J03.

3. Check the CATT log and go back to the installation role.

53 Install Building Block J08 – Standard Cost and Profit Center Accounting

5.3.1 Activation of Configuration - OM & PCA

5.3.1.1 Activate Business Configuration Sets

UseIn this step, most of the Customizing settings from the Overhead Management and Profit Center Accounting Building Block are copied to the development client.

The Customizing settings are activated using Business Configuration Sets. No additional manual activities are needed.

For a more detailed description of the Customizing, see the Configuration Guide.

Prerequisites

You can use the “Compare with System Tables” function to compare the settings contained in the BC set with the corresponding table values. We recommend using this function before and after you activate the BC sets. For a more detailed description of how to proceed, see the “Essential Documentation” Building Block.

Procedure1. Call the following transaction:

© SAP AG Page 31 of 257

Page 32: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 role menu User Menu J08 Installation Controlling Activation of Configuration - OM & PCA Activate Business Configuration Sets

Transaction code SCPR20

Parameter transaction /SMB12/S000_J08_01

2. Activate BC set /SMB12/StandardCO_S000_J08.

3. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Company Code BP01

Company Code BP0X

Controlling Area BP01

Controlling Area BP01

Cycle BP01001

Cycle BP01010

Cycle BP01101

Cycle BP01110

Cycle BP01120

Cycle 020 (controlling area+'020')

BP01020

Fiscal Year 2003

Name Controlling Area BP01

Set ID

Set ID 0101BP01100

Subobject value BP01

4. Complete the activation of the BC set and return to the installation role.

ResultThe BC sets have been activated and the Customizing settings have been copied to the client.

Please check the activation logs.

© SAP AG Page 32 of 257

Page 33: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Message Type Action

Not all the data was activated in all languages

Warning (yellow)

Check the language selection in your user settings. For more information, see Building Block Essential Documentation.

No Business Configuration Set exists for the view/table

Warning (yellow)

No further action required.The BC set does not contain certain table entries.

5.3.1.2 Takeover Process Groups CO on current value

UseYou have to transfer the business transaction groups for the current controlling area. A report is provided for this purpose.

1. No external variants are needed for this CATT.

2. Start the following activity:

SAP R/3role menu

User Menu J08 Installation Controlling Activation of Configuration - OM & PCA Takeover Process Groups CO on current value

Report RK811XST

Parameter transaction /SMB12/C019_J08_01

3. Click Execute to start CATT run /SMB12/SE38_C019_J08.

4. Check the CATT log (optional) and return to the installation role.

5.3.2 Data Preparation - CO

For the installation of this part use the Log on language ZH.

5.3.2.1 Profit Center Accounting

© SAP AG Page 33 of 257

Page 34: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.3.2.1.1 Set Controlling Area

UseYou have to set the controlling area before you can maintain the master data in Controlling.

In case during the installation, there is controlling area setting to other controlling area or there is log off and log on the client again, please do run this CATT again.

Procedure1. Process the external CATT variant SMB12_OKKS_C001_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Profit Center Accounting Set Controlling Area

Transaction code /SMB12/C001_J08_01

3. Enter the correct path for file SMB12_OKKS_C001_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/OKKS_C001_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.1.2 Create Profit Center Group - New

UseCreates the profit center groups.

Procedure1. Process the external CATT variant SMB12_KCH1_C031_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Profit Center Accounting Create Profit Center Group - New

Transaction code /SMB12/C031_J08_01

3. Enter the correct path for file SMB12_KCH1_C031_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KCH1_C031_J08.

5. Check the CATT log (optional) and return to the installation role.

© SAP AG Page 34 of 257

Page 35: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.3.2.1.3 Change Profit Center Group - Text

PrerequisitesThe profit center groups have been created.

Procedure1. Use the external variant SMB12_KCH2_C009_J08_01.TXT to run this CATT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Profit Center Accounting Change Profit Center Group - Text

Transaction code /SMB12/C009_J08_01

3. Enter the correct path for file SMB12_KCH2_C009_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KCH2_C009_J08

5. Check the CATT log (optional) and return to the installation role.

 

5.3.2.1.4 Manually Create PC Group - Assignmt

PrerequisitesThe profit center groups have been created.

Procedure

This Process has to be manually done.

1. Start the following activity:

SAP menu SAP menu Accounting Controlling Profit Center Accounting Master Data Profit Center Group Change

Transaction code KCH2

2. On the Change Profit Center Group: Initial Screen, make the following entries:

Profit Center Group

BPACC (Or the highest level of the Profit Center Group defined by you)

3. Enter.

© SAP AG Page 35 of 257

Page 36: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. On the Change Standard Hierarchy (Profit Center Group): Structure Screen, choose the high level of the Profit Center Group and then the button “Lower Level”, enter the code of lower level Profit Center Group. The following is the example of the structure:

5. Save and Back.

5.3.2.1.5 EC-PCA: Create Dummy Profit Center

Procedure1. Process the external CATT variant SMB12_KE59_C033_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Profit Center Accounting EC-PCA: Create Dummy Profit Center

Transaction code /SMB12/C033_J08_01

3. Enter the correct path for file SMB12_KE59_C033_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KE59_C033_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.1.6 Create and Activate Profit Centers

Procedure1. Process the external CATT variant SMB12_KE51_C034_J08_01.TXT.

2. Start the following activity:

© SAP AG Page 36 of 257

Page 37: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Profit Center Accounting Create and Activate Profit Centers

Transaction code /SMB12/C034_J08_01

3. Enter the correct path for file SMB12_KE51_C034_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KE51_C034_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.1.7 Create Account Group

Procedure1. Process the external CATT variant SMB12_KDH1_C035_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Profit Center Accounting Create Account Group

Transaction code /SMB12/C035_J08_01

3. Enter the correct path for file SMB12_KDH1_C035_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KDH1_C035_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.1.8 Change Account Groups (Add Groups)

Procedure1. Process the external CATT variant SMB12_KDH2_C036_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Profit Center Accounting Change Account Groups (Add Groups)

Transaction code /SMB12/C036_J08_01

3. Enter the correct path for file SMB12_KDH2_C036_J08_01.TXT.

© SAP AG Page 37 of 257

Page 38: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Click Execute to start CATT run /SMB12/KDH2_C036_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2 Cost Center Controlling

5.3.2.2.1 Set Controlling Area

UseYou have to set the controlling area before you can maintain the master data in Controlling.

Procedure1. Process the external CATT variant SMB12_OKKS_C001_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Set Controlling Area

Transaction code /SMB12/C001_J08_01

3. Enter the correct path for file SMB12_OKKS_C001_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/OKKS_C001_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.2 Create Primary Cost Elements

UseYou use a CATT to create all the cost elements.

PrerequisitesThe accounts for these cost elements already exist in the company code. This has been configured by installing the “Core FI China” Building Block.

Procedure1. Process the external CATT variant SMB12_KA01_C002_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation -

© SAP AG Page 38 of 257

Page 39: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

CO Cost Center Controlling Create Primary Cost Elements

Transaction code /SMB12/C002_J08_01

3. Enter the correct path for file SMB12_KA01_C002_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KA01_C002_J08.

5. Check the CATT log (optional) and return to the installation role.

 

5.3.2.2.3 Create Secondary Cost Elements

Procedure1. Process the external CATT variant SMB12_KA06_C011_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Create Secondary Cost Elements

Transaction code /SMB12/C011_J08_01

3. Enter the correct path for file SMB12_KA06_C011_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KA06_C011_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.4 Create Cost Center Groups (Level 1)

Procedure1. Process the external CATT variant SMB12_KSH1_C012_J08_01.TXT.

2. Start the following activity:

© SAP AG Page 39 of 257

Page 40: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Create Cost Center Groups (Level 1)

Transaction code /SMB12/C012_J08_01

3. Enter the correct path for file SMB12_KSH1_C012_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KSH1_C012_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.5 Change Cost Center Groups (Level 2)

Procedure1. Process the external CATT variant SMB12_KSH2_C013_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Change Cost Center Groups (Level 2)

Transaction code /SMB12/C013_J08_01

3. Enter the correct path for file SMB12_KSH2_C013_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KSH2_C013_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.6 Create Cost Centers

Procedure1. Process the external CATT variant SMB12_KS01_C016_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Create Cost Centers

Transaction code /SMB12/C016_J08_01

3. Enter the correct path for file SMB12_KS01_C016_J08_01.TXT.

© SAP AG Page 40 of 257

Page 41: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Click Execute to start CATT run /SMB12/KS01_C016_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.7 Change Cost Center Groups (Alternative)

Procedure1. Process the external CATT variant SMB12_KSH2_C004_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Change Cost Center Groups (Alternative)

Transaction code /SMB12/C004_J08_01

3. Enter the correct path for file SMB12_KSH2_C004_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KSH2_C004_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.8 Create Cost Element Group (Level 1)

Procedure1. Process the external CATT variant SMB12_KAH1_C014_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Create Cost Element Group (Level 1)

Transaction code /SMB12/C014_J08_01

3. Enter the correct path for file SMB12_KAH1_C014_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KAH1_C014_J08.

5. Check the CATT log (optional) and return to the installation role.

© SAP AG Page 41 of 257

Page 42: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.3.2.2.9 Change Cost Element Group (Level 2-4)

Procedure1. Process the external CATT variant SMB12_KAH2_C005_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Change Cost Element Group (Level 2-4)

Transaction code /SMB12/C005_J08_01

3. Enter the correct path for file SMB12_KAH2_C005_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KAH2_C005_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.10 Change Cost Element Group (Cost Elements)

Procedure1. Process the external CATT variant SMB12_KAH2_C006_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Change Cost Element Group (Cost Elememts)

Transaction code /SMB12/C006_J08_01

3. Enter the correct path for file SMB12_KAH2_C006_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KAH2_C006_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.11 Create Activity Types

Procedure1. Process the external CATT variant SMB12_KL01_C007_J08_01.TXT.

© SAP AG Page 42 of 257

Page 43: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Create Activity Types

Transaction code /SMB12/C007_J08_01

3. Enter the correct path for file SMB12_KL01_C007_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KL01_C007_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.12 Create Statistical Key Figures

Procedure1. Process the external CATT variant SMB12_KK01_C008_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Create Statistical Key Figures

Transaction code /SMB12/C008_J08_01

3. Enter the correct path for file SMB12_KK01_C008_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KK01_C008_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.13 Create Accrual Order

Procedure6. Process the external CATT variant SMB12_KO01_C015_J08_01.TXT.

7. Start the following activity:

© SAP AG Page 43 of 257

Page 44: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Create Accrual Order

Transaction code /SMB12/C015_J08_01

8. Enter the correct path for file SMB12_KO01_C015_J08_01.TXT.

9. Click Execute to start CATT run /SMB12/KO01_C015_J08.

10. Check the CATT log (optional) and return to the installation role.

5.3.2.2.14 Maintain Overhead Structure

Procedure1. Process the external CATT variant SMB12_KSAZ_C010_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Maintain Overhead Structure

Transaction code /SMB12/C010_J08_01

3. Enter the correct path for file SMB12_KSAZ_C010_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KSAZ_C010_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.15 Controlling Area / Set Planner Profile

Procedure1. Process the external CATT variant SMB12_KP04_C017_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Controlling Area/Set Planner Prof

Transaction code /SMB12/C017_J08_01

3. Enter the correct path for file SMB12_KP04_C017_J08_01.TXT.

© SAP AG Page 44 of 257

Page 45: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Click Execute to start CATT run /SMB12/KP04_C017_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.2.16 Change Account Groups (Add Values)

Procedure1. Process the external CATT variant SMB12_KDH2_C003_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Change Account Groups (Add Values)

Transaction code /SMB12/C003_J08_01

3. Enter the correct path for file SMB12_KDH2_C003_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KDH2_C003_J08.

5. Check the CATT log (optional) and return to the installation role.

 

5.3.2.2.17 Model Order for Overhead Costs

Procedure1. Process the external CATT variant SMB12_KOM1_C045_J08_01.TXT.

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Model Order for Overhead Costs

Transaction code /SMB12/C045_J08_01

3. Enter the correct path for file SMB12_KOM1_C045_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KOM1_C045_J08.

5. Check the CATT log (optional) and return to the installation role.

 

5.3.2.2.18 Change Planning Activities/Prices

Procedure1. Process the external CATT variant SMB12_KP26_C046_J08_01.TXT.

© SAP AG Page 45 of 257

Page 46: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

2. Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Cost Center Controlling Activity Types Planning

Transaction code /SMB12/C046_J08_01

3. Enter the correct path for file SMB12_KP26_C046_J08_01.TXT.

4. Click Execute to start CATT run /SMB12/KP26_C046_J08.

5. Check the CATT log (optional) and return to the installation role.

5.3.2.3 Additional Data

5.3.2.3.1 Create Revenue Accounts

Procedure1.       Process the external CATT variant SMB12_KA01_R002_J08_01.TXT.

2.       Start the following activity:

SAP R/3 role menu User Menu J08 Installation Controlling Data Preparation - CO Additional Data Create Revenue Accounts

Transaction code /SMB12/R002_J08_01

3.       Enter the correct path for file SMB12_KA01_R002_J08_01.TXT.

4.       Click Execute to start CATT run /SMB12/KA01_R002_J08.

5.       Check the CATT log (optional) and return to the installation role.

5.3.3 Activation of Configuration - Additional OM & PCA

5.3.3.1 Activating Cost Center Account

UseIn this step, the settlement rule for period-end closing is maintained.

© SAP AG Page 46 of 257

Page 47: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Since the settlement rule includes the allocation structure which in itself includes the cost element groups. So this settlement rule can only be maintained after the master data being imported.

For a more detailed description of the Customizing, see the Configuration Guide.

Prerequisites

You can use the “Compare with System Tables” function to compare the settings contained in the BC set with the corresponding table values. We recommend using this function before and after you activate the BC sets. For a more detailed description of how to proceed, see the “Essential Documentation” Building Block.

Procedure1. Call the following transaction:

SAP R/3 role menu User Menu J08 Installation Controlling Activation of Configuration - Additional OM & PCA Activate Cost Center Accounting

Transaction code SCPR20

Parameter transaction /SMB12/S160_J08_01

2. Activate BC set /SMB12/Ctr_S160_J08.

3. Complete the activation of the BC set and return to the installation role.

ResultThe BC sets have been activated and the Customizing settings have been copied to the client.

Please check the activation logs.

Message Type Action

Not all the data was activated in all languages

Warning (yellow)

Check the language selection in your user settings. For more information, see Building Block Essential Documentation.

No Business Configuration Set exists for the view/table

Warning (yellow)

No further action required.The BC set does not contain certain table entries.

© SAP AG Page 47 of 257

Page 48: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.3.3.2 Activating Profit Center Account

UseIn this step, all the Customizing settings from the Standard Profit Center Accounting Building Block are copied to the development client.

The Customizing settings are activated using Business Configuration Sets. No additional manual activities are needed.

For a more detailed description of the Customizing, see the Configuration Guide.

Prerequisites

You can use the “Compare with System Tables” function to compare the settings contained in the BC set with the corresponding table values. We recommend using this function before and after you activate the BC sets. For a more detailed description of how to proceed, see the “Essential Documentation” Building Block.

Procedure1. Call the following transaction:

SAP R/3 role menu User Menu J08 Installation Controlling Activation of Configuration - Additional OM & PCA Activate Profit Center Accounting

Transaction code SCPR20

Parameter transaction /SMB12/S150_J08_01

2. Activate BC set /SMB12/PrCtr_S150_J08.

3. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Controlling Area BP01

4. Complete the activation of the BC set and return to the installation role.

ResultThe BC sets have been activated and the Customizing settings have been copied to the client.

Please check the activation logs.

© SAP AG Page 48 of 257

Page 49: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Message Type Action

Not all the data was activated in all languages

Warning (yellow)

Check the language selection in your user settings. For more information, see Building Block Essential Documentation.

No Business Configuration Set exists for the view/table

Warning (yellow)

No further action required.The BC set does not contain certain table entries.

5.3.4 Activation of Configuration - PC

5.3.4.1 Product Cost Planning

UseIn this step, the customizing for Product Cost Planning is maintained.

For a more detailed description of the Customizing, see the Configuration Guide.

Prerequisites

You can use the “Compare with System Tables” function to compare the settings contained in the BC set with the corresponding table values. We recommend using this function before and after you activate the BC sets. For a more detailed description of how to proceed, see the “Essential Documentation” Building Block.

Procedure1. Call the following transaction:

SAP R/3 role menu User Menu J08 Installation Controlling Activation of Configuration - PC Product Cost Planning

Transaction code SCPR20

Parameter transaction /SMB12/S021_J08_01

2. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Company Code BP01

Controlling Area BP01

3. Activate BC set /SMB12/COPCP_S021_J08.

© SAP AG Page 49 of 257

Page 50: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Complete the activation of the BC set and return to the installation role.

ResultThe BC sets have been activated and the Customizing settings have been copied to the client.

Please check the activation logs.

Message Type Action

Not all the data was activated in all languages

Warning (yellow)

Check the language selection in your user settings. For more information, see Building Block Essential Documentation.

No Business Configuration Set exists for the view/table

Warning (yellow)

No further action required.The BC set does not contain certain table entries.

5.3.4.2 Activate Cost Component Structure

UseIn this step, the Cost Component Structure is activated.

For a more detailed description of the Customizing, see the Configuration Guide.

Prerequisites

You can use the “Compare with System Tables” function to compare the settings contained in the BC set with the corresponding table values. We recommend using this function before and after you activate the BC sets. For a more detailed description of how to proceed, see the “Essential Documentation” Building Block.

Procedure1. Call the following transaction:

SAP R/3 role menu User Menu J08 Installation Controlling Activation of Configuration - PC Activate Cost Component Structure

Transaction code SCPR20

Parameter transaction /SMB12/B003_J08_01

2. Activate BC set /SMB12/ELEMENTESC_B003_J08.

3. Complete the activation of the BC set and return to the installation role.

© SAP AG Page 50 of 257

Page 51: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultThe BC sets have been activated and the Customizing settings have been copied to the client.

Please check the activation logs.

Message Type Action

Not all the data was activated in all languages

Warning (yellow)

Check the language selection in your user settings. For more information, see Building Block Essential Documentation.

No Business Configuration Set exists for the view/table

Warning (yellow)

No further action required.The BC set does not contain certain table entries.

5.3.4.3 Cost Object Controlling

UseIn this step, the customizing for Cost Object Controlling is maintained.

For a more detailed description of the Customizing, see the Configuration Guide.

Prerequisites

You can use the “Compare with System Tables” function to compare the settings contained in the BC set with the corresponding table values. We recommend using this function before and after you activate the BC sets. For a more detailed description of how to proceed, see the “Essential Documentation” Building Block.

Procedure1. Call the following transaction:

SAP R/3 role menu User Menu J08 Installation Controlling Activation of Configuration - PC Cost Object Controlling

Transaction code SCPR20

Parameter transaction /SMB12/S022_J08_01

4. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Company Code BP01

© SAP AG Page 51 of 257

Page 52: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Key field Value (description)

Controlling Area BP01

Plant BP01

Plant BP02

Plant BP03

Plant BP0X

5. Activate BC set /SMB12/COPCC_S022_J08.

6. Complete the activation of the BC set and return to the installation role.

ResultThe BC sets have been activated and the Customizing settings have been copied to the client.

Please check the activation logs.

Message Type Action

Not all the data was activated in all languages

Warning (yellow)

Check the language selection in your user settings. For more information, see Building Block Essential Documentation.

No Business Configuration Set exists for the view/table

Warning (yellow)

No further action required.The BC set does not contain certain table entries.

When you activate the BC Set. If errors occur in the activation log, the BC Sets are marked in red. You should activate these BC Sets a second time.

5.3.4.4 Manually Maintain the Rate of Percentage Overhead Controlling

UsePercentage Overheads are used in the Costing Sheet.

© SAP AG Page 52 of 257

Page 53: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Because the rate maintenance can not be included in BC set, the rate has to be maintained manually. The BC Set /SMB12/CO_CALC2_B031_J08 performed in step 6.1Product Cost Planning creates the code and description of the Overhead Rate.

Procedure

1. Run the following transaction in Customizing CO-PC:

SAP R/3 role menu

User Menu J08 Installation Controlling Activation of Configuration - PC Manually Maintain the Rate of Percentage Overhead Controlling

Transaction Code SPRO

IMG Menu (Customizing) Controlling Product Cost Controlling Product Cost Planning Basic Settings for Material Costing Overhead Costing Sheet: Components Define Percentage Overhead

2. Execute the transaction.

Choose the following Overhead Rate one by one:

O/H rate Name Dependency Description

YB11 Raw Materials Pur D020 Overhead Type/Plant

YB12 Packing Materials Pu D020 Overhead Type/Plant

YB13 Raw Materials OH D020 Overhead Type/Plant

Choose Detail per Overhead rate and Button “New Entry” and enter:

O/Hrate Valid from to COarea OHtype Plant Percent.

YB11 01.01.2002 31.12.9999 BP01 1 BP01 5.000

YB11 01.01.2002 31.12.9999 BP01 2 BP01 5.000

YB12 01.01.2002 31.12.9999 BP01 1 BP01 10.000

YB12 01.01.2002 31.12.9999 BP01 2 BP01 10.000

YB13 01.01.2002 31.12.9999 BP01 1 BP01 5.000

YB13 01.01.2002 31.12.9999 BP01 2 BP01 5.000

ResultOverhead Rates for the Costing Sheet have been created.

© SAP AG Page 53 of 257

Page 54: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

54 Install Building Block J05 – Materials Management

5.4.1 Materials Management

UseYou have to process the subsequent activities to set up the MM configuration.

ProcedureFollow the steps in the installation role as described in this installation guide.

BC Set activation logs can provide help if warning or error messages occur.

Should errors be listed in the activation logs, the relevant BC Sets must be processed again separately.

5.4.1.1 Material Master MM

UseRun this activity to install the general logistics MM functionality . This does not include functionality for intercompany processes as this is an optional installation.

PrerequisitesYou have set the flag for Automatic Recording of Changes using transaction SCC4 Maintain Client and saved your entry.

ProcedureAccess the activity using one of the following navigation options:

SAP R/3 Role Menu J05 Materials Management Materials Management Material Master MM

Transaction Code /SMB12/S003_J05_01

Activate the BC Set /SMB12/2000_MASTER-DATA_S003_J05.

In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Default Value (BC set Conts) Val ( you can change)

Company code BP01 BP01

Current period 08 <enter current period>

© SAP AG Page 54 of 257

Page 55: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Key field Lang. Default Value (BC set Conts) Val ( you can change)

Valuation area BP01 BP01

Valuation area BP02 BP02

Valuation area BP03 BP03

Year current period 2003 <enter current year>

The values for current period and year current period should always be changed to the actual calendar month and year. This allows for posting in the current period.

Complete the activation of the BC Set and go back to the installation role.

ResultYou have configured the logistics general MM functionality in the system.

5.4.1.2 Create Char. PO Release Strategy

UseProcess this activity to create characteristic TNOV. This characteristic is required for the PO release strategy functionality.

Procedure1.       This transaction starts CATT procedure /SMB12/CT04_C001_J05.

2.       Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management Materials Management Create Char. PO Release Strategy

Transaction Code /SMB12/C001_J05_01

3.      Run this CATT with No Variants.

Check the CATT procedure log file for errors.

5.      Complete the CATT procedure and go back to the installation role.

ResultAfter this step the characteristic is created in the system.

© SAP AG Page 55 of 257

Page 56: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.4.1.3 Create Class PO Release Strategy

UseProcess this activity to create class RELEASE_PURCHORD. The characteristic created in the last step will be assigned to this class. The class is required for the PO release strategy.

Procedure1. This transaction starts CATT procedure /SMB12/CL01_C024_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management Materials Management Create Class PO Release Strategy

Transaction Code /SMB12/C024_J05_01

3.      Run this CATT with No Variants.

3. Check the CATT procedure log file for errors.

4. Complete the CATT procedure and go back to the installation role.

ResultAfter this step the class is created in the system.

5.4.1.4 Install Material Management

UseRun this activity to install the general settings for the MM functionality. This does not include functionality for inter company processes as this is an optional installation.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management Materials Management Install Material Management

Transaction Code /SMB12/S002_J05_01

2. Activate the BC Set /SMB12/3000_GEN_SETING_S002_J05.

3. In the Enter Variable Field Values screen, change the values of the following fields:

© SAP AG Page 56 of 257

Page 57: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Key field Lang. Default Value (BC set Conts)

Val ( you can change)

Company code BP01 BP01

MRP controller 001 001

Plant BP01 BP01

Plant BP02 BP02

Plant BP03 BP03

Purch. organization BP01 BP01

Valuation area BP01 BP01

Valuation area BP02 BP02

Valuation area BP03 BP03

4. Complete the activation of the BC Set and go back to the installation role.

Result After processing this activity the configuration for the MM general settings is installed in the system.

5.4.1.5 Install Inter Company MM (Optional)

UseRun this activity to install the general logistics MM functionality for inter company

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management Materials Management Install Inter Company MM (Optional)

Transaction Code /SMB12/S005_J05_01

2. Activate the BC Set /SMB12/4000_INTERCOM_S005_J05.

3. In the Enter Variable Field Values screen, change the values of the following fields:

The values for current period and year current period should always be changed to the actual calendar month and year. This allows for posting in the current period.

Key field Lang. Default Value (BC set Conts)

Val ( you can change)

Company code BP0X BP0X

© SAP AG Page 57 of 257

Page 58: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Key field Lang. Default Value (BC set Conts)

Val ( you can change)

Current period 08 <enter current period>

MRP controller 001 001

Plant BP0X BP0X

Purch. organization BP0X BP0X

Valuation area BP0X BP0X

Year current period 2003 <enter current year>

4. Complete the activation of the BC Set and go back to the installation role.

It is expected that the following BC-Sets will show a warning messages (yellow traffic light) in the activation log:

BC-Set Message

/SMB12/MTART_B004_J05 ‘View T134: View cluster MTART does not contain data at all levels”

5. This message may be ignored.

Result After processing this activity the configuration for general logistics MM for inter company processing is installed in the system.

5.4.1.6 Active PO Release Strategy

UseActive PO release function.

Procedure1. This transaction starts CATT process /SMB12/SM30_C002_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management Materials Management Active PO Release Strategy

Transaction Code /SMB12/C002_J05_01

3. Run this CATT with No Variants.

4. Don’t mark run in background indicator, and run the CATT in foreground mode.

© SAP AG Page 58 of 257

Page 59: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

If CATT stops when run in foreground mode, you can choose Back to continue it.

5. Check the CATT process log file for errors.

6. Complete the CATT process and go back to the installation role.

Result After this step the strategy is activated.

5.4.2 Create Output Condition Records

5.4.2.1 Outline Agreement

UseIn this activity, you create output condition records for the following outline agreement output types:

Output Type Tran./Event Type Description

NEU MK Quantity Contract

NEU WK Value Contract

These condition records are required so that print of outline agreements is allowed. The records set up the output so that the outline agreements print immediately after saving.

Procedure1. This transaction starts the CATT procedure /SMB12/MN07_C022_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Create Output Condition Records ® Outline Agreement

Transaction Code /SMB12/C022_J05_01

3. Run this CATT with No Variants.

4. Check the CATT procedure log file for errors.

5. Complete the CATT procedure and go back to the installation role.

© SAP AG Page 59 of 257

Page 60: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultAfter this step the output condition records are created in the system.

5.4.2.2 Request Quotation

UseIn this activity, you create output condition records for the following request for quotation output types:

Output Type Tran./Event Type Description

NEU AB Request for GP Bid

NEU AN Request for Quotation

These condition records are required so that print of request for quotations is allowed. The records set up the output so that the request for quotations are printed immediately after saving.

Procedure1. This transaction starts CATT procedure /SMB12/MN01_C021_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Create Output Condition Records ® Request Quotation

Transaction Code /SMB12/C021_J05_01

3. Run this CATT with No Variants

4. Check the CATT procedure log file for errors.

5. Complete the CATT procedure and go back to the installation role.

ResultYou have created the output condition records in the system.

© SAP AG Page 60 of 257

Page 61: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.4.2.3 Purchase Order

Use

Process this activity to create an output condition records for the following purchase order output types:

Output Type Tran./Event Type Description

NEU DB Dummy Purchase Order

NEU NB Standard Purchase Order

NEU FO Framework Order

These condition records are required so that print of purchase orders is allowed. The records set up the output so that the purchase orders are printed immediately after saving.

Procedure1. This transaction starts CATT procedure /SMB12/MN04_C020_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Create Output Condition Records ® Purchase Order

Transaction Code /SMB12/C020_J05_01

3. Run this CATT with No Variants

4. Check the CATT procedure log file for errors.

5. Complete the CATT procedure and go back to the installation role.

ResultYou have created the output condition records in the system.

5.4.2.4 Inventory Management

UseProcess this activity to create an output condition records for the following inventory management output types:

Output Type Tran./Event Type Description

WA01 WA GI, tfr. posting, other goods movement

WA01 WE Goods receipt for purchase order

© SAP AG Page 61 of 257

Page 62: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

WA02 WA GI, tfr. posting, other goods movement

WA02 WE Goods receipt for purchase order

WA03 WA GI, tfr. posting, other goods movement

WA03 WE Goods receipt for purchase order

WE01 WE Goods receipt for purchase order

WE02 WE Goods receipt for purchase order

WE03 WE Goods receipt for purchase order

WF01 WF Goods receipt for order

WF02 WF Goods receipt for order

WLB1 WA GI, tfr. posting, other goods movement

WLB2 WA GI, tfr. posting, other goods movement

WLB3 WA GI, tfr. posting, other goods movement

These condition records are required so that print of inventory documents is allowed. For each event type the print version (i.e. 1=Individual Slip, 2=Indiv. Slip w. Inspection Text, 3=Collective Slip) and the printing of document item (i.e. 1=Material Document Printout, 2=Return Delivery, 3=GR/GI Slip for Subcontracting, 6=Mat. Doc. Printout for GR/GI). are set. The records set up the output so that the inventory documents print immediately after saving.

Procedure1. This transaction starts CATT procedure /SMB12/MN21_C019_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Create Output Condition Records ® Inventory Management

Transaction Code /SMB12/C019_J05_01

3. Run this CATT with No Variants

4. Check the CATT process log file for errors.

5. Complete the CATT process and go back to the installation role.

ResultAfter this step the condition records are created in the system.

© SAP AG Page 62 of 257

Page 63: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.4.3 Batch Management

5.4.3.1 Update LOBM standard characteristics

UseProcess this activity to update the standard characteristics

Procedure1. This transaction starts CATT procedure /SMB12/BMSM_C003_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Batch Management ® Update LOBM standard characteristics

Transaction Code /SMB12/C003_J05_01

3. Run this CATT with No Variants

4. Check the CATT procedure log file for errors.

5. Complete the CATT procedure and go back to the installation role.

ResultYou have updated the characteristics

5.4.3.2 Specify Batch Level and Activate Status Management

UseProcess this activity to activate batch management.

Procedure1. This transaction starts CATT procedure /SMB12/OMCT_R001_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Batch Management ® Configure Basic Settings

Transaction Code /SMB12/R001_J05_01

3. Run this CATT with No Variants

4. Check the CATT procedure log file for errors.

5. Complete the CATT procedure and go back to the installation role.

ResultYou have activated the batch management.

© SAP AG Page 63 of 257

Page 64: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.4.3.3 Activate Automatic Number Assignment

UseProcess this activity to activate batch management.

Procedure1. This transaction starts CATT procedure /SMB12/OMCZ_C001_J05.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Batch Management ® Configure Basic Settings

Transaction Code /SMB12/C001_J05_02

3. Run this CATT with No Variants

4. Don’t mark run in background indicator, and run the CATT in foreground mode.

If CATT stops when run in foreground mode, you can choose Back to continue it.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have activated the batch management.

5.4.3.4 Create Sort Sequence

UseProcess this activity to create sort sequence.

Procedure1. Maintain the external CATT variant SMB12_CU70_C007_J05_01.TXT

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Batch Management ® Create Sort Sequence

Transaction Code /SMB12/C007_J05_01

3. Enter the correct path for the file: SMB12_CU70_C007_J05_01.TXT

© SAP AG Page 64 of 257

Page 65: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Choose Execute to start the CATT procedure /SMB12/CU70_C007_J30 with Variants from File.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created sort sequence.

5.4.3.5 Create Class for Batch Management

UseProcess this activity to create class.

Procedure1. Maintain the external CATT variant SMB12_CL04_C004_J05_01.TXT

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J05 Materials Management ® Batch Management ® Create Class for Batch Management

Transaction Code /SMB12/C004_J05_01

3. Enter the correct path for the file: SMB12_CL04_C004_J05_01.TXT

4. Choose Execute to start the CATT procedure /SMB12/CL04_C004_J05 with Variants from File..

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created class.

5.4.3.6 Batch Setting

UseRun this activity to install the general settings for the batch management.

Procedure1. Access the activity using one of the following navigation options:

© SAP AG Page 65 of 257

Page 66: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3Role Menu

J05 Materials Management Batch Management ® Batch Setting

Transaction Code /SMB12/S020_J05_01

2. Activate the BC Set /SMB12/BATCHMGM_S020_J05.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Default Value (BC set Conts)

Val ( you can change)

Plant BP01 BP01

Plant BP02 BP02

Plant BP03 BP03

Plant BP0X BP0X

4. Complete the activation of the BC Set and go back to the installation role.

Result After processing this activity the configuration for the Batch settings is installed in the system.

55 Install Building Block J04 – Sales and Distribution

5.5.1 Activation of Customizing without Intercompany

UseProcess these activities to set up the Sales and Distribution.

ProcedureFollow the steps in the installation role as described in the following sections.

BC-Set activation logs can provide help if warning or error messages occur.

Should errors be listed in the activation logs, the relevant BC sets must be processed again separately.

© SAP AG Page 66 of 257

Page 67: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.5.1.1 Activate SD Core Configuration without Intercompany

UseThis section contains all the information needed to implement the core configuration settings of the Sales and Distribution system.

Procedure1. Access the transaction using:

SAP R/3 Role Menu J04 Sales & Distribution –> SD Core (w/o intercompany) Install SD Core without Intercompany

Transaction Code /SMB12/S001_J04_01

2. Activate the BC Set /SMB12/0000_CORE-SD_S001_J04.

This BC Set is a hierarchical BC Set and consist of several BC Sets. These BC Sets contains all the necessary settings and activities required for sales and distribution.

3. In the Enter Variable Field Values screen, the default values for the field plants are:

Field Value

Country grouping 10

Distrib.channel (Direct Sales)

01

Distribution channel 02

Distribution channel 03

Distribution channel intercompany

03

Division 01

HgLv distrib.channel (Direct Sales)

01

HgLv distrib.channel (Wholesales)

02

Higher-lev.SalesOrg BP01

Higher-level division 01

Int.co billing div. 1 01

Pers. subarea text Subarea 0001

Personnel area BP01

Personnel subarea BP01

Plant BP01

Plant BP02

Plant BP03

© SAP AG Page 67 of 257

Page 68: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Plant BP0X

Prop.shipping point BP01

Prop.shipping point _20 BP02

Prop.shipping point BP03

Prop.shipping point BP0X

Purch. Organization BP0X

Purchasing Group 001 001

Purchasing Organization BP01

BP01

Ref.dist.channel-Cust/Material

01

Ref.dist.channel-Cust/Material

02

Ref.dist.channel-Cust/Material

03

RefDistCh-Conditions 01

RefDistCh-Conditions 02

RefDistCh-Conditions 03

RefDiv-Conditions 01

RefDiv-Customers 01

Sales group BP1

Sales group BPX

Sales office BP01

Sales office BP0X

Sales organization BP01

Sales organization BP0X

Sales Organization _40 BP01

Sales organization (Intercompany)

BP0X

Shipping Point/Receiving Pt

BP01

Shipping Point/Receiving Pt

BP02

Shipping Point/Receiving Pt

BP03

Shipping Point/Receiving Pt

BP0X

Storage Location 0001 0001

© SAP AG Page 68 of 257

Page 69: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

TransportPlanningPt BP0X

TransportPlanningPt BP01

BP01

4. Complete the activation of the BC Set and go back to the installation role.

5.5.1.2 Create Output Tax Condition Records

UseIn this activity, you create output tax condition records

Procedure1. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

J04 Sales & Distribution SD Core (w/o intercompany)Create Output Tax Condition

Transaction Code /SMB12/C041_J04_01

2. Enter the correct path for the file: SMB12_VK11_C041_J30_J04_01.txt

3. Choose Execute to start the CATT procedure /SMB12/VK11_C041_J30.

4. Check the CATT log (optional) and go back to the installation role.

Result The status is set for the building block.

5.5.2 Activation of Customizing for Intercompany (optional)

5.5.2.1 Activate SD Core Configuration Intercompany

UseThis section contains all the information needed to implement the core configuration regarding intercompany transactions of the Sales and Distribution system.

Procedure1. Access the transaction using:

SAP R/3 Role Menu J04 Sales & Distribution –> SD Core Intercompany (optional) Install SD Core Intercompany

Transaction Code /SMB12/S005_J04_01

2. Activate the BC Set /SMB12/5000_INTERCOMP_S005_J04.

3. In the Enter Variable Field Values screen, the default values for the field plants are:

Field Value

© SAP AG Page 69 of 257

Page 70: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Chart of Accounts CAZH

Distrib.channel (intercompany)

03

Division 01

Dummy

Material Type FERT

Material Type HAWA

Material Type LEER

Material Type VERP

Plant BP0X

Prop. shipping point BP0X

Sales group BPX

Sales office BP0X

Sales Organization BP0X

Shipping point / Receiving pt

BP0X

Storage location 0001

5.5.2.2 Create Internal Customer (BP0001 in BP0X and BP000X in BP01)

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J04_01.txt.

2. Access the transaction using:

SAP R/3 Role Menu J04 Sales & Distribution SD Core Intercompany (optional) Create Customers Master (intercompany)

Transaction Code /SMB12/L001_J04_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 01.

© SAP AG Page 70 of 257

Page 71: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J04_01.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created an internal customer using the following LSMW file via ECATT: SMB12_XD01_L001_J04_01.txt

5.5.2.3 Activate Sales and Distribution Core Configuration with Internal Customer Data

UseThis section contains all the information needed to implement the configuration settings of the Sales and Distribution with internal customer data for intercompany billing..

Procedure1. Access the transaction using:

SAP R/3 Role Menu J04 Sales & Distribution –> SD Core Intercompany (optional) Install SD Core with Internal Customer Data

Transaction Code /SMB12/B139_J04_01

2. Activate the BC Set / /SMB12/V_TVKO_IV_B139_J04.

3. Complete the activation of the BC Set and go back to the installation role.

© SAP AG Page 71 of 257

Page 72: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

56 Install Building Block J07 – Quality Management

5.6.1 Business Configuration Sets Activation

5.6.1.1 General Settings in QM

UseThis section contains all the information needed to implement the general settings of the Quality Management system.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Activation of Configuration ® General Settings in QM

Transaction Code /SMB12/S100_J07_01

2. Activate the BC Set /SMB12/1000_QM_CORE_S100_J07.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Field Value

Company code

Planner group 1

Planner group 2

Planner group Q

Plant BP01

Plant BP02

Plant BP03

Predefined plant

Purch. Organization

4. Complete the activation of the BC Set and go back to the installation role.

Result After performing this activity, the configuration settings of the Basic Data of Quality Management are installed in the system. The BC Set /SMB12/1000_QM_CORE_S100_J07comprises the following BC Sets and settings:

Basic Data for Quality Management: /SMB12/1000_QM_CORE_S100_J07

Maintain Settings at Plant Level /SMB12/V_TQSS1_B001_J07

© SAP AG Page 72 of 257

Page 73: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Basic Data for Quality Management: /SMB12/1000_QM_CORE_S100_J07

Create Follow-Up Action for Catalog 3 Usage Decision /SMB12/V_TQ15_B102_J07

Create Code groups/Codes for Catalogs /SMB12/V_QPGR_CL_B107_J07

Edit Selected Sets Code Groups/Codes /SMB12/V_QPAM_CL_B108_J07

Create Number Range for Inspection Characteristics & Method

/SMB12/SNUM_B103_J07

Define Planner Group /SMB12/V_T024A_B104_J07

Maintain Profiles for Default Values /SMB12/OQ85_B105_J07

Define Selection Profile /SMB12/VCCOSS_B106_J07

5.6.1.2 QM in Procurement

UseIn order to perform quality inspections for procurement you have to define the status profile of supplier relations, assign user status, and define the control keys for quality inspections in purchasing and for operation levels. The following BC Set contains these settings.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Activation of Configuration ® QM in Procurement

Transaction Code /SMB12/S200_J07_01

2. Activate the BC Set /SMB12/2000_QM_MM_S200_J07.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. Complete the activation of the BC Set and go back to the installation role.

Result After performing this activity, the configuration settings of the Quality Management in procurement are installed in the system. The BC Set /SMB12/2000_QM_MM_S200_J07 comprises the following BC Sets and settings:

QM in Procurement: /SMB12/2000_QM_MM_S200_J07

Define Status of Supply Relationships /SMB12/BSVS_B201_J07

Define Control Keys for Operation Level /SMB12/V_T430_B204_J07

Define Control Keys for QM Purchasing /SMB12/V_TQ08_B203_J07

Assign User Status to Inspection Type /SMB12/V_TQ32A_B202_J07

© SAP AG Page 73 of 257

Page 74: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5.6.1.3 QM in PP-PI

UseWith an operation control key, you influence the planning and processing of an inspection operation . In this case you determine that there are special characteristics for PP-PI in-process-control and post-process-control.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Activation of Configuration ® QM in PP-PI

Transaction Code /SMB12/S300_J07_01

2. Activate the BC Set /SMB12/3000_QM_PP-PI_S300_J07.

This BC Set is a hierarchical BC Set and consist of a BC Set.

3. Complete the activation of the BC Set and go back to the installation role.

Result After performing this activity, the configuration settings of the Quality Management in Process Manufacturing are installed in the system. The BC Set /SMB12/3000_QM_PP-PI_S300_J07 comprise the following BC Set and setting:

QM in PP-PI: /SMB12/3000_QM_PP-PI_S300_J07

Define Control Keys for PP-PI /SMB12/V_T430_B301_J07

5.6.2 Master Data

5.6.2.1 Create Inspection Methods

UseIn this activity, you use a CATT to create inspection methods.

Procedure1. Maintain the external CATT variant SMB12_QS31_C044_J07_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Data Preparation ® Create Inspection Method

Transaction Code /SMB12/C044_J07_01

3. Enter the correct path for the file: SMB12_QS31_C044_J07_01.TXT.

© SAP AG Page 74 of 257

Page 75: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Choose Execute to start the CATT procedure /SMB12/QS31_C044_J30.

5. Check the CATT log (optional) and go back to the installation role.

Result You have created inspection methods.

5.6.2.2 Create Sampling Procedure

UseIn this activity, you use a CATT to create inspection methods.

Procedure1. Maintain the external CATT variant SMB12_QDV1_C045_J07_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Data Preparation ® Create Sampling Procedure

Transaction Code /SMB12/C045_J07_01

3. Enter the correct path for the file: SMB12_QDV1_C045_J07_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/QDV1_C045_J30.

5. Check the CATT log (optional) and go back to the installation role.

Result You have maintained master data for sampling procedures.

5.6.2.3 Create Dynamic Modification Rule

UseIn this activity, you use a CATT to create master data for a dynamic modification rule.

Procedure1. Maintain the external CATT variant SMB12_QDR1_C046_J07_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Data Preparation ® Create Dynamic Modification Rule

Transaction Code /SMB12/C046_J07_01

3. Enter the correct path for the file: SMB12_QDR1_C046_J07_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/QDR1_C046_J30.

© SAP AG Page 75 of 257

Page 76: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5. Check the CATT log (optional) and go back to the installation role.

Result You have maintained master data for a dynamic modification rule.

5.6.2.4 Create Work Center

UseIn this activity, you use a CATT to create work centers.

Procedure1. Maintain the external CATT variant SMB12_CR01_C047_J07_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Data Preparation ® Create Work Center

Transaction Code /SMB12/C047_J07_01

3. Enter the correct path for the file: SMB12_CR01_C047_J07_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/CR01_C047_J30.

5. Check the CATT log (optional) and go back to the installation role.

Result You have created the work centers.

5.6.2.5 Create Characteristics Quantitative

UseIn this activity, you use a CATT to create master data for quantitative characteristics.

Procedure1. Maintain the external CATT variant SMB12_QS21_C048_J07_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Data Preparation ® Create Characteristics Quantitative

Transaction Code /SMB12/C048_J07_01

3. Enter the correct path for the file: SMB12_QS21_C048_J07_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/QS21_C048_J30.

5. Check the CATT log (optional) and go back to the installation role.

© SAP AG Page 76 of 257

Page 77: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Result You have maintained master data for quantitative characteristics.

5.6.2.6 Create Characteristics Qualitative

UseIn this activity, you use a CATT to create master data for qualitative characteristics.

Procedure1. Maintain the external CATT variant SMB12_QS21_C049_J07_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J07 Quality Management ® Data Preparation ® Create Characteristics Qualitative

Transaction Code /SMB12/C049_J07_01

3. Enter the correct path for the file: SMB12_QS21_C049_J07_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/QS21_C049_J30.

5. Check the CATT log (optional) and go back to the installation role.

Result You have maintained master data for qualitative characteristics.

57 Install Building Block J06 – Production Planning and Control

5.7.1 Sales and Operations Planning (SOP)

UseThis activity configures the settings required for Sales and Operations Planning (SOP). In this step, you specify which plant is to be used for resource planning in SOP in cases where no other plant can be identified.

The SOP allows planning at any level of aggregation (for example, high-level planning of planning hierarchies and/or product groups or detailed planning of finished products).

Procedure1. Access the transaction using:

SAP R/3 Role Menu User menu J06 Production Planning Activation of Configuration /SMB12/S300_J06_01 - Sales & Operations

© SAP AG Page 77 of 257

Page 78: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Planning (SOP)

Transaction Code /SMB12/S300_J06_01

2. Activate the BC Set /SMB12/SOP_S300_J06.

3. In the Enter Variable Field Values screen, the default values for the field Plant are:

Field Value

Plant BP01

Plant BP02

Plant BP03

Plant BP0X

4. Complete the activation of the BC Set and go back to the installation role.

ResultAfter processing this activity, the configuration for the SOP functionality is installed in the system.

5.7.2 Materials Requirement Planning (MRP)

UseThis step contains all the information needed to implement the necessary settings for Material Requirements Planning.

Procedure1. Access the transaction using:

SAP R/3 Role Menu User menu J06 Production Planning Activation of Configuration /SMB12/S400_J06_01 - Material Requirement Planning (MRP)

Transaction Code /SMB12/S400_J06_01

2. Activate the BC Set /SMB12/MRP_S400_J06.

This BC Set is a hierarchical BC Set and consist of several BC Sets. These BC Sets contain all the necessary settings and activities required for the MRP, such as, Plant Dependent Parameters or MRP Groups and so on.

3. In the Enter Variable Field Values screen, the default values for the BC Set are:

Field Value

Plant

Plant BP01

Plant BP02

Plant BP03

Plant BP0X

4. Complete the activation of the BC Set and go back to the installation role.

© SAP AG Page 78 of 257

Page 79: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultAfter performing this activity, the configuration settings for the Materials Requirement Planning are installed in the system. The BC Set /SMB12/MRP_S400_J06 comprises the following BC Sets and settings:

Material Requirement Planning (MRP): /SMB12/MRP_S400_J06

Define MRP Controller /SMB12/V_T024D/B401_J06

Special Procurement type /SMB12/V460A_B402_J06

Planning horizon for plant /SMB12/V_399D_A_B403_J06

Carry Out Overall Maintenance of Plant Parameters /SMB12/OPPQ_B421_J06

Carry Out Overall Maintenance of MRP Groups /SMB12/OPPR_B404_J06

Define Availability of Stock in Transfer/Blocked Stock/Restr /SMB12/V_T399D_I_B405_J06

Define Rescheduling check /SMB12/V_399D_U_B406_J06

Define Error processing in the planning run /SMB12/V_399D_F_B407_J06

Define range of coverage /SMB12/V_T438_R_B408_J06

Storage cost percentage / Check Lot sizing Procedure /SMB12/V439A/L_B409_J06

Define external procurement /SMB12/V_399D_W_B412_J06

Define line item number /SMB12/V_399D_O_B413_J06

Define BOM and Routing selection /SMB12/V_399D_A_B414_J06

Conversion Planned order-> Prod order /SMB12/V_T399D/T438M_U_B415_J06

Number of planned order /SMB12/V_399D_P_B416_J06

Item number of order type /SMB12/V_460D_NP_B417_J06

Activate MRP and set up planning file /SMB12/V_001W_B_B418_J06

Define Receipt Elements for Receipt Days' Supply /SMB12/V_T399D_R_B419_J06

Define scheduling parameters for planned orders /SMB12/V_TCX00_PAUF_B109_J06

5.7.3 Shop Floor Control (SFC)

UseThis activity configures the settings required for Shop Floor Control. In this step, you specify settings and parameters related to Production Orders.

Procedure1. Access the transaction using:

SAP R/3 Role Menu User menu J06 Production Planning Activation of Configuration /SMB12/S200_J06_01 - Shop Floor Control (SFC)

Transaction Code /SMB12/S200_J06_01

2. Activate the BC Set /SMB12/SHPFLOOR_S200_J06.

© SAP AG Page 79 of 257

Page 80: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

This BC Set is a hierarchical BC Set and consist of several BC Sets. These BC Sets contains all the necessary settings and activities required for the SFC such as Parameters for order confirmation or Order dependent parameter and so on.

3. In the Enter Variable Field Values screen, the default values for the BC Set are:

Field Value

Plant BP01

Plant BP02

Plant BP03

4. Complete the activation of the BC Set and go back to the installation role.

ResultAfter performing this activity, the configuration settings for the Shop Floor Control are installed in the system. The BC Set /SMB12/SHPFLOOR_S200_J06 comprises the following BC Sets and settings:

Shop Floor Control (SFC): /SMB12/SHPFLOOR_S200_J06

Define Routing Selection ID /SMB12/V_TCA43_B422_J06

Define Standard Values Parameters /SMB12/V_TC20_B002_J06

Define standard Value key /SMB12/V_TC21_B003_J06

Determine Person Responsible /SMB12/V_TC24_B102_J06

Define Fomulas for Resources & Work centers /SMB12/V_TC25_B005_J06

Define Control Keys /SMB12/V_T430_B006_J06

Define Scheduling Margin Key /SMB12/V_436A_B290_J06

Define Reasons for Variances /SMB12/V_TRUG_B292_J06

6. Installation: Layer 1 Building Blocks

61 Install Building Block J11 – Cash Management

UseThis activity configures the settings required for Cash Management.

Procedure5. Access the transaction using:

SAP R/3 Role Menu User menu J11 Cash Management Activation of Configuration Cash Management Installation

Transaction Code /SMB12/S000_J11_01

© SAP AG Page 80 of 257

Page 81: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6. Activate the BC Set /SMB12/CM_S000_J11.

7. In the Enter Variable Field Values screen, the default values for the field Plant are:

Field Value

Company BP0001

Company Code BP01

Credit control area BP01

FM Area BP01

8. Complete the activation of the BC Set and go back to the installation role.

ResultAfter processing this activity, the configuration for the Cash Management is installed in the system.

The BC Set /SMB12/CM_S000_J11 comprises the following BC Sets and settings:

Cash Management: /SMB12/CM_S000_J11

Activate Cash Management for Company Code /SMB12/V_001_B_B001_J11

Company Code: Default Value Date /SMB12/V_001_K_B002_J11

Source Symbols for Cash Management /SMB12/V_T039_B003_J11

Planning levels G/L Accounts /SMB12/V_T036_B004_J11

Planning Groups /SMB12/V_T035_B006_J11

Define Groupings and Maintain Headers /SMB12/V_T038P_B007_J11

Maintain Structure /SMB12/V_T038_B008_J11

62 Install Building Block J17 – Profitability Analysis

6.2.1 Structures

6.2.1.1 Import Operating Concern from Source Client 000 (if necessary)

Use

© SAP AG Page 81 of 257

Page 82: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

The Operating Concern “BPCN” is based on the the delivery Operating Concern S001. The first step is to copy operating concern “S001” to “BPCN” using transaction “Copy Operating Concern including Customizing” (KECP).

This step has to be manually done.

Procedure

1.   Access the transaction using:

Menu IMG: Controlling -> Profitability Analysis -> Structures -> Define Operating Concern -> Sample Operating Concerns -> Copy Operating Concern including Customizing

Transaction code KECP

2.   On Import Operating Concern screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

SAP Template

Sample Operating Concern

R S001 (EXAMPLE OPERATING CONCERN 1)

Source Client R 000

Copy to

Target Client R YOUR CLIENT

Test Mode No Flag

Overwrite Settings

No Flag

3. Copy (F8)

6.2.1.2 Check and Activate Source Operating Concern

UseCheck and activate in customizing, whether the operation concern S001 has been generated. If not, generate operating concern S001.

This step has to be manually done.

© SAP AG Page 82 of 257

Page 83: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Prerequisite The operating concern S001 must have been transferred from client 000 to the current client.

Procedure

1.   Access the transaction using:

Menu IMG: Controlling -> Profitability Analysis -> Structures -> Define Operating Concern -> Maintain Operating Concern

Transaction code KEA0

2.   On Maintain Operating Concern screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

Operating Concern

R S001 (EXAMPLE OPERATING CONCERN 1)

ENTER

3. There is yellow light in the field Status. Click the icon “Display <-> Change” and accept the caution information.

4. Click the button “Activate Data Structure” and go into Activate Data Source: Characteristic Screen. Choose icon “Activate”.

5. Click the icon “back” and accept the information “Do you wish to generate the operating concern environment?”

6. Check the light of Status. Now it turns to green.

6.2.1.3 Copy Operating Concern from delivery client

Use

This step has to be manually done.

© SAP AG Page 83 of 257

Page 84: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Prerequisite The sample operating concern S001 must have been generated.

Procedure

1.   Access the transaction using:

Menu IMG: Controlling -> Profitability Analysis -> Structures -> Define Operating Concern -> Sample Operating Concerns -> Copy Operating Concern including Customizing

Transaction code KECP

2.   On Copy Operating Concern screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

Copy from

Source Operating Concern

R S001 (EXAMPLE OPERATING CONCERN 1)

Source Client R YOUR CLIENT

Copy to

Target Operating Concern

R BPCN

Target Client R YOUR CLIENT

Data Structures Flag O

Generate Environment

Flag O

Customizing Flag O

Test Mode No Flag O

3. Copy (F8) and accept all the warning information.

6.2.1.4 Set Operating Concern

This step has to be manually done.

© SAP AG Page 84 of 257

Page 85: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

The Operating Concern "BPCN" has to be set before defining the structures.

Procedure

1. Access the transaction using:

Menu IMG: Controlling -> Profitability Analysis -> Structures -> Define Operating Concern -> Maintain Operating Concern

Transaction code KEA0

2. On Maintain Operating Concern screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

Operating Concern

R BPCN

3. On Data Structure Tab, Choose Icon ‘ Display <-> Change’, accept the caution information and enter the description of the Operating Concern as:

Description: BP Operating Concern

4. On attributes Tab, Choose Icon ‘ Display <-> Change’, accept the caution information and enter the following data:

Fiscal year: K4 (Calendar year with 4 special periods)

Local currency: CNY

Save.

Please also maintain the Chinese description of operating concern using the same procedure. (Log on using ZH as language)

Description: BP 经营组织

5. There is yellow light in the field Status. On Data Structure Tab, click the button “Change Data Structure”, and click ‘Yes’ to accept the information “Do you wish to generate the operating concern environment?”

6. Check the light of Status. Now it turns to green.

7. Back to IMG

8. Access the transaction using:

Menu IMG: Controlling -> Profitability Analysis -> Structures ->

© SAP AG Page 85 of 257

Page 86: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Set Operating Concern

Transaction code KEBD

9. On Set Operating Concern screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

Operating Concern

R BPCN

Type of Profit. Analysis

costing-based

10. Enter

6.2.1.5 Maintain Characteristics

Use

The characteristics of the Operating Concern represent objects or market segments that can be used as a basis for performing evaluations.

The characteristics also represent reference objects for allocating costs in Profitability Analysis. This enables source-related cost allocation at the level responsible, according to direct costs and contribution margin accounting.

The table below displays the name and meaning of the characteristic, as well as how it is used in a different application and in each company code.

Note

Additionally to the below mentioned characteristics there are fixed characteristics existing in every Operating Concern. They are used to transfer organizational structures to the profitability analysis (e.g. company code, controlling area, plant, sales organization)

This step has to be manually done.

Procedure

1.   Access the transaction using:

© SAP AG Page 86 of 257

Page 87: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Menu IMG: Controlling -> Profitability Analysis -> Structures -> Define Operating Concern -> Maintain Characteristics

Transaction code KEA5

2.   On Edit Characteristic: Start screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

Chars from Operating Concern

R BPCN

Click Button “Change” and accept the caution information

3. On Change Characteristic Overview screen, choose icon “create”. On Pop up window Create Chr: Assignment, enter the necessary data.

Choose user-defined fields, enter the necessary data:

Field name Description R./O./D. User action and values Comment

Char. Key of the characteristic

R e.g. WWPG1

With own value maintenance

R Flag

“Create” Icon

On Edit Characteristic screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

Description R e.g.Product Hierarchy 1

Short text R e.g. Prod.Hier1

Heading R e.g. Product Hierarchy 1

Data type/length

R e.g. NUMC / 5

5. Save and activate using the icons. Accept all the warning information and choose automatic mode to create check table if needed.

As the above procedure, the following data should be entered using the log on language: EN and ZH respectively.

Characteristics in English (Log on using EN as language)

Charact. Description Short Text Dtype Lngth Origin Table Origin Field

© SAP AG Page 87 of 257

Page 88: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

WWPG1 Product Hierarchy 1 Prod.Hier1 CHAR 5

WWPG2 Product Hierarchy 2 Prod.Hier2 CHAR 10

Characteristics in Chinese (Log on using ZH as language)

Charact. Description Short Text

WWPG1 产品层次 01 产品层次 01

WWPG2 产品层次 02 产品层次 02

6.2.1.6 Generate Target Operating Concern

Use

The Operating Concern "BPCN" is defined by means of attributes and data structures.

The controlling area BPCN is assigned to the Operating Concern BPCN. The characteristics and value fields represent data structures or master data for the Operating Concern.

If the operating concern BPCN has the green lights in “Environ.” screen, then ignore this step.

This step has to be manually done.

Procedure

1.   Access the transaction using:

Menu IMG: Controlling -> Profitability Analysis -> Structures -> Define Operating Concern -> Maintain Operating Concern

Transaction code KEA0

2.   On Maintain Operating Concern – Data Structures screen, check the following data.

Field name Description R./O./D. User action and values Comment

Use Icon “Display <-> Change”

© SAP AG Page 88 of 257

Page 89: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Description BP Operating Concern

Use Button “Change Data Structure”

3. On Chars tab, transfer the following fields from right to left:

Characteristic Description

WWPG1 Product Hierarchy 1

WWPG2 Product Hierarchy 2

If the fields are already in the left side, please skip this step.

Go to Value Fields tab, transfer the following fields from right to left:

Value Fields Description

KWMKDP Marketing division

KWFOEN Research & Developmt

KWABLG Lot size variances

KWABMG Quantity variances

KWABPR Price variances

KWABSG Other variances

KWABST Resource-usage var.

If the fields are already in the left side, please skip this step.

Press Icon “Activate”, Green arrow back and accept the information to generate the operating concern.

4. On Maintain Operating Concern – Attribute screen, check the following data.

Field name Description R./O./D. User action and values Comment

Use Icon “Display <-> Change”

Operating concern currency

Choice of Currency

R CNY

Fiscal year variant

Calendar year, 4 spec. periods

R K4

5. On Maintain Operating Concern – Environment screen, check the necessary data.

© SAP AG Page 89 of 257

Page 90: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Field name Description R./O./D. User action and values Comment

Use Icon Cross Client Part “Status” to generate

R Make sure the light is green

Use Icon Client-specific Part “Status” to generate

R Make sure the light is green

6.2.1.7 Assign controlling area to operating concern

Use

In this activity, you allocate the controlling areas that you want to be able to analyze together in Profitability Analysis to an operating concern.

Prerequisites

You can use the “Compare with System Tables” function to compare the settings contained in the BC set with the corresponding table values. We recommend using this function before and after you activate the BC sets. For a more detailed description of how to proceed, see the “Essential Documentation” Building Block.

Procedure1. Call the following transaction:

SAP R/3 role menu User Menu J17 CO-PA Profitability Analysis Activation of Configuration Structures Assign controlling area to op con.

Transaction code SCPR20

Parameter transaction /SMB12/S010_J17_01

2. Activate BC set /SMB12/STRUC_S010_J17.

3. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Controlling Area BP01

Operating Concern BPCN

4. Complete the activation of the BC set and return to the installation role.

© SAP AG Page 90 of 257

Page 91: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultAfter performing this activity, the configuration settings are installed in the system. The BC Set /SMB12/STRUC_S010_J17 comprises the following BC Sets and settings:

Structures: /SMB12/STRUC_S010_J17

Assign controlling area to operating concern /SMB12/V_TKA01_ER_B001_J17

6.2.2 Master Data

UseIn this step you make all the basic settings that determine the basic structure and contents of Profitability Analysis in your system.

In short, you need to define the following:

How the relevant segments of your organization are to be created (so-called "profitabilty segments"). You can do this using the characteristic derivation function.

1. What values should be determined automatically by means of valuation. You can do this using the valuation functions.

6.2.2.1 Maintain Characteristic Values

This step has to be manually done.

Procedure

1.   Access the transaction using:

Menu IMG: Controlling -> Profitability Analysis -> Master Data -> Characteristic Values -> Maintain Characteristic Values

Transaction code KES1

2.   In case there is a pop up window with Enter Operating Concern screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

Operating Concern BPCN Press Enter

© SAP AG Page 91 of 257

Page 92: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

On Change Characteristic Values screen, enter the necessary data.

Field name Description R./O./D. User action and values Comment

Select the characteristic which needs to be maintained

Icon “New entries”

Enter the following data using log on language: EN and ZH respectively

Characteristics in Chinese (Log on using ZH as language)

1 WWPG1 产品层次 01

2 WWPG2 产品层次 02

产品层次 01 (WWPG1)

00001 自产食品

00002 外买食品

产品层次 02 (WWPG2)

0000100001 糕点面包

0000100002 速冻蔬菜

0000100003 加工食品0000200001 易腐食品

0000200002 不易腐食品

0000200003 饮料

Characteristics in English (Log on using EN as language)

© SAP AG Page 92 of 257

Page 93: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

1 WWPG1 Product Hierarchy 1

2 WWPG2 Product Hierarchy 2

Product Hierarchy 1 (WWPG1)

00001 Food Product

00002 Food Trading

Product Hierarchy 2 (WWPG2)

0000100001 Pastries, Bread

0000100002 Frozen vegetables

0000100003 Prepared food

0000200001 Perishable Food

0000200002 Non-perishable Food

0000200003 Beverages

Save and Back.

3.   Access the transaction using:

Menu IMG: Logistics – General -> Material Master -> Settings for Key Fields -> Data Relevant to Sales and Distribution -> Define Product Hierarchies -> Maintain: Product hierarchy

Transaction code V/76

4.   On Change View “Materials: Product Hierarchies”: Overview screen, Select icon “New entries”. Maintain the following new data:

For ZH Version:

00001 自产食品

© SAP AG Page 93 of 257

Page 94: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

00002 外买食品

And then:

0000100001 糕点面包

0000100002 速冻蔬菜

0000100003 加工食品0000200001 易腐食品

0000200002 不易腐食品

0000200003 饮料

For EN Version:

00001 Food Product

00002 Food Trading

And then:

0000100001 Pastries, Bread

0000100002 Frozen vegetables

0000100003 Prepared food

0000200001 Perishable Food

0000200002 Non-perishable Food

0000200003 Beverages

© SAP AG Page 94 of 257

Page 95: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.2.2.2 Define Characteristic Derivation

Use In this step, you set up the derivation of characteristic values. Derivation lets you find values for certain characteristics automatically based on the known values of other characteristics, where these characteristics are logically dependent on one another.

When an operating concern is generated, the system produces a standard derivation strategy containing all known dependencies between characteristics. You can display these by choosing "View -> Display all steps".

If you use the derivation step type "Derivation rule", some additional entry options are available:

Under "Maintain rule values", you enter which values in the target fields should be placed in which characteristic values of the source fields.

Under "Characteristics", you can make additional entries which, for example, make it possible to enter a validity date for the step

In characteristic derivation the way characteristic values are located is settled. This is done for Sales and area managers, as well as the product hierarchy.

Product hierarchy

The single levels of the product hierarchy are determined from the source field material number and the corresponding field for product hierarchy in the material master. Technically it is done by a table lookup.

Prerequisites All characteristics values have been entered and operating concern has been generated successfully.

Procedure 1. Call the following transaction:

SAP R/3 role menu User Menu J17 CO-PA Profitability Analysis Activation of Configuration Master Data Maintain Characteristic Derivation

Transaction code SCPR20

Parameter transaction /SMB12/S020_J17_01

2. Activate BC set /SMB12/MD_S020_J17.

3. In view <Enter Variable Fields Values>, change the values in the following fields:

© SAP AG Page 95 of 257

Page 96: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Key field Value (description)

Operating Concern BPCN

4. Complete the activation of the BC set and return to the installation role.

ResultAfter performing this activity, the configuration settings are installed in the system. The BC Set /SMB12/MD_S020_J17 comprises the following BC Sets and settings:

Master Data - First Part: /SMB12/MD_S020_J17

Define Characteristic Derivation /SMB12/TKEDRH_B002_J17

6.2.2.3 Maintain Planning Versions for Valuation

Use

You can use versions to create independent data groupings in planning and in actual.

This step has to be manually done.

Procedure 1. To carry out the activity, choose one of the following navigation options:

IMG Menu Controlling ® General Controlling ® Organization ® Maintain Versions

2. Choose button “New Entries”, Make the following entries:

3. General Version Definition

Version Name Record Planning data

Exclusive use

YB1 Plan Version: Consumer Products

X 0

4. Settings in Operating Concern, select ‘Yes’ at the information and enter the following data:

Version Operating Concern

Name Exchange Rate Type

Derivation Date

Currency Type

YB1 BPCN Plan version:Consumer

M 2004.01.01

B0

© SAP AG Page 96 of 257

Page 97: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Products

0 BPCN Plan/actual version

M 2004.01.01 B0

5. Controlling Area Settings, select ‘Yes’ at the information and enter the following data:

Controlling Area

Version Version Description

Record Planning Data

Variance

BP01 3 Plan version: revision 3

X X

BP01 YB1 Plan version: Consumer Products

X

6. Setting by fiscal year

Controlling Area

Version Year Copying Allowed

Exchange Rate Type

Value Date

Integrated Planning

Version for indirect act. alloc.

BPCN YB1 2003 X M 2004.01.01

X 0

7. Save.

6.2.2.4 Valuation

Use

In this step you define condition types to use in Profitability Analysis (CO-PA) and CO-PA-specific costing sheets; define your valuation strategies and assign them to a point of valuation.

Prerequisites All Value Fields have been entered and operating concern has been generated successfully.

Procedure 1. Call the following transaction:

© SAP AG Page 97 of 257

Page 98: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 role menu User Menu J17 CO-PA Profitability Analysis Activation of Configuration Master Data Valuation

Transaction code SCPR20

Parameter transaction /SMB12/S021_J17_01

2. Activate BC set /SMB12/MD_S021_J17.

3. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Operating Concern BPCN

4. Complete the activation of the BC set and return to the installation role.

ResultAfter performing this activity, the configuration settings are installed in the system. The BC Set /SMB12/MD_S021_J17 comprises the following BC Sets and settings:

Master Data - Second Part: /SMB12/MD_S021_J17

Create Condition Types and Costing Sheets /SMB12/8KEW_KE_B004_B003_J17

Define and Assign Valuation Strategy /SMB12/COPA_VALSTRAT_B005_J17

6.2.3 Planning

Use

In this step you define the customizing for CO – PA Planning.

Procedure 1. Call the following transaction:

SAP R/3 role menu User Menu J17 CO-PA Profitability Analysis Activation of Configuration Planning Planning

Transaction code SCPR20

Parameter transaction /SMB12/S030_J17_01

2. Activate BC set /SMB12/PLAN_S030_J17.

© SAP AG Page 98 of 257

Page 99: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Controlling Area BP01

Cycle BPCNYB01

Operating concern BPCN

Table CE7BPCN

4. Complete the activation of the BC set and return to the installation role.

ResultAfter performing this activity, the configuration settings are installed in the system. The BC Set /SMB12/PLAN_S030_J17comprises the following BC Sets and settings:

Planning: /SMB12/PLAN_S030_J17

Assign Quantity Fields /SMB12/V_T258M_B009_J17

Define Planning Layout /SMB12/KE34_B010_J17

Maintain Forecast /SMB12/V_T440P_B012_J17

Define Ratios and Ratio Schemes /SMB12/VC_TKEQUO_B013_J17

Plan Settlement: Receiving Version in CO-PA /SMB12/V_TKA07_B014_J17

Create Plan Assessment /SMB12/KEU1_B015_J17

Define Planning Levels, Packages &Methods /SMB12/TKEPPLLEV_B011_J17

6.2.4 Flows of Actual Values

Use

In this step you define the customizing for CO – PA Actual Value Flows.

Procedure 1. Call the following transaction:

© SAP AG Page 99 of 257

Page 100: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 role menu User Menu J17 CO-PA Profitability Analysis Activation of Configuration Flows of Actual Values Flows of Actual Values

Transaction code SCPR20

Parameter transaction /SMB12/S040_J17_01

2. Activate BC set /SMB12/ACT_S040_J17.

3. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Controlling Area BP01

Operating concern BPCN

4. Complete the activation of the BC set and return to the installation role.

ResultAfter performing this activity, the configuration settings are installed in the system. The BC Set /SMB12/ACT_S040_J17 comprises the following BC Sets and settings:

Flows of Actual Values: /SMB12/ACT_S040_J17

Assign Value Fields /SMB12/V_T258I_B018_J17

Assign Quantity Fields /SMB12/V_T258M_B019_J17

Create Actual Assessments CCA to CO-PA /SMB12/KEU1_B020_J17

Define PA Transfer Structure for Variance Settlement /SMB12/PA_SSTRCV_B023_J17

Assign PA Transfer Structure to Settlement Profile /SMB12/TKB1V_B024_J17

When you activate the BC Set. If errors occur in the activation log, the BC Sets are marked in red. You should activate these BC Sets a second time.

6.2.5 Information System

6.2.5.1 Information System

© SAP AG Page 100 of 257

Page 101: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Use

In this step you define the customizing for CO – PA Information System.

Procedure 1. Call the following transaction:

SAP R/3 role menu User Menu J17 CO-PA Profitability Analysis Activation of Configuration Information System Information System

Transaction code SCPR20

Parameter transaction /SMB12/INFOSYS_S050_J17

2. Activate BC set /SMB12/INFOSYS_S050_J17.

3. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Controlling Area BP01

Operating concern BPCN

4. Complete the activation of the BC set and return to the installation role.

ResultAfter performing this activity, the configuration settings are installed in the system. The BC Set /SMB12/INFOSYS_S050_J17 comprises the following BC Sets and settings:

Flows of Actual Values: /SMB12/INFOSYS_S050_J17

Define Key Figure Schemes /SMB12/KER1_B025_J17

Define Variables for Reports /SMB12/KE3E_B026_J17

Define Forms for Profitability Reports /SMB12/KE34_B010_J17

Define Key Figure Schemes /SMB12/KE94_B027_J17

6.2.5.2 Manually Create Profitability Report

UseGeneral SAP Reporting is tool that allows you to create report

variants quickly and easily. The modules used for this purpose are characteristics (combinations of characteristic attributes form the profitability segment) and value fields/key figures which refer to a certain period of time in their plan/actual differentiation.

© SAP AG Page 101 of 257

Page 102: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Standard reports/report tree Predefined standard reports can be stored in a report tree in SAP. The report tree must be maintained by CO-PA and can include the following report types:

Ad-hoc reports In addition to the defined standard reports, every user with authorization to use SAP Reporting can create reports within profitability analysis. Ad-hoc reports are easy to generate and provide statements on business transactions that are not specified precisely by means of a general query.Individual characteristics and value fields, as well as stored calculation rules (key figure scheme) can be accessed here.

Form reports Form reports are complex report structures that serve specific analysis purposes and that have a standardized structure and layout. They can, however, be used variably, for various periods or organizational units, for example.

As an example of a form report, reports YB10 P & L Actual vs. Plan has been created.

This step has to be manually done.

Procedure 1. To carry out the activity, choose the following navigation options:

Transaction Code KE31

IMG Menu Controlling -> Profitability Analysis -> Information System -> Create Profitability Report

2. The reports delivered are based on the forms created:

YB10 P & L Actual vs. Plan

3. Enter the following data

Report YB102003

© SAP AG Page 102 of 257

Page 103: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Text BP P & L Actual vs. Plan 2003

P/L 计划实际差异 2003

Report with form x

Form YB10

4. Icon “Create” in Line “Report with form”

In view “Characteristics” select all characteristics

In view “Variables” maintain the following values

Sales org. BP01 Sales Org. BP01

From Period 1 January

To Period 12 December

From Fiscal Year 2003 2003 (current year)

To Fiscal Year 2003 2003 (current year)

5. Save

Proceed in the same way for year 2004.

6. Enter the Chinese description (Log on using ZH as language)

Description: 计划和实际利润对比表

6.2.6 Activate Profitability Analysis

Use

In this step you activate the Profitability Analysis functions.

Prerequisites All the previous steps have been done.

Procedure 1. Call the following transaction:

© SAP AG Page 103 of 257

Page 104: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 role menu User Menu J17 CO-PA Profitability Analysis Activation of Configuration Activate Profitability Analysis Activate Profitability Analysis

Transaction code SCPR20

Parameter transaction /SMB12/S060_J17_01

2. Activate BC set /SMB12/V_TKA00_ER_B029_J17.

3. In view <Enter Variable Fields Values>, change the values in the following fields:

Key field Value (description)

Controlling Area BP01

Operating Concern BPCN

4. Complete the activation of the BC set and return to the installation role.

ResultAfter performing this activity, the Profitability Analysis is activated.

6.2.7 Troubleshooting in CO-PA

6.2.7.1 Inconsistencies in derivation rules / creation of billing document not possible

6.2.7.1.1 Installation of SAP Note 446279

Use This sections describes how to use SAPNote 446279 to fix inconsistencies in the derivation rules in CO-PA.

They might occur in case of client copies, installation of different operating concerns via BC Set with different derivation rules.

Please use the report RKEDRCHECK described in this section to check whether you have inconsistencies in your operating concern.

Procedure1. To carry out the activity, choose one of the following navigation options:

SAP R/3 Troubleshooting in CO-PA

Transaction SA38

User Menu System -> Services -> Reporting

2. On the Screen “ABAP Execute Program” fill in the program name RKEDRCHECK and choose Execute (F8).

© SAP AG Page 104 of 257

Page 105: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. On the following screen “Characteristic Derivation: Check table”, two options are offered to the user:

Description

1. Check in all clients

2. Delete inconsistent steps

4. Choose “Check in all clients” and choose Execute (F8) to see whether you have inconsistencies in your system.

5. Choose Back (F3).

6. In case you had inconsistencies mark “Delete inconsistent steps” and choose Execute (F8).

7. Save your entries and choose Back

ResultThe inconsistencies in the derivation tables have been removed. If your problem is not solved, proceed with section 3.1.2 Regeneration of Derivation Rules.

6.2.7.1.2 Regeneration of Derivation Rules

Use Sometimes it can occur that derivation rules are inconsistent and that inconsistencies are not removed by processing SAP Note 446279. In this case, you can try to solve the problem by regenerating derivation rules.

Procedure1. To carry out the activity, choose one of the following navigation options:

SAP R/3 Troubleshooting in CO-PA

Transaction KEDR

IMG Menu Controlling Profitability Analysis Master Data Define Characteristic Derivation

2. On the Characteristic Derivation: Display Strategy screen, choose menu path Extras Regenerate. Confirm confirmation pop-up.

ResultThe derivation rules have been regenerated.

6.2.7.1.3 Manual removal of inconsistencies in the derivation rules

Use If neither processing SAP Note 446279 nor regenerating derivation rules resolves your problem, derivation rules must be edited manually.

© SAP AG Page 105 of 257

Page 106: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. To carry out the activity, choose one of the following navigation options:

SAP R/3 Troubleshooting in CO-PA

Transaction KEDR

IMG Menu Controlling Profitability Analysis Master Data Define Characteristic Derivation

2. On the Characteristic Derivation: Display Strategy screen, choose Display all Steps.

3. Mark first step of type Table lookup and choose Details. The step is likely to be inconsistent when on Characteristic Derivation Display Table Lookup screen on tab Definition in area Source Fields for Table Lookup in column Origin there is more than one different table mentioned.

4. If this is the case, try to understand by logical means what the step is supposed to do. In particular, memorize or write down table and field names used. Try to figure out which of the tables mentioned (see step 3) makes sense considering the characteristic to be derived. (For example, if the sales office is to be derived, table MARA (Material Master) makes no sense as the origin table, as the sales office derives from customer related and not from material related data).

Possible manual corrections are:

To remove the table KNVV from derivation rule “Volume rebate group from product number/sales organization”

To remove the table KNVV from derivation rule “ABC indicator from Product number/Plant”

To remove the table MVKE from derivation rule “ Material group from Product number”

To remove the table MARC from derivation rule “Country key from Customer”

5. Choose Back.

6. On the Characteristic Derivation: Display Strategy screen, choose Change. Mark step examined earlier if inconsistent and choose Delete Step.

7. Create corrected step based on your findings of step 4. To do so, please refer to section 2.2.2 Define Characteristic Derivation.

8. Repeat steps 3 to 7 for all steps of category Table Lookup.

9. For the Derivation rule: State from district, remove the check for Issue error message if no value found.

ResultThe inconsistencies in the derivation rules have been removed. If you worked carefully, you should have derivation settings equivalent to what they had supposed to be before.

© SAP AG Page 106 of 257

Page 107: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.2.7.2 General Troubleshooting – Regenerating the Operating Concern

Use Regenerating the operating concern is a useful instrument in all kinds of troublesome situations in profitability analysis. While regenerating the operating concern, the system automatically provides for data consistency, which makes it possible to use this instrument of trouble shooting even after transaction data has been created.

Procedure1. To carry out the activity, choose one of the following navigation options:

SAP R/3 Troubleshooting in CO-PA

Transaction KEA0

IMG Menu IMG: Controlling -> Profitability Analysis -> Structures -> Define Operating Concern -> Maintain Operating Concern

2. On the Maintain Operating Concern screen on tab Data Structure choose DisplayChange and confirm pop-up regarding cross-client-settings.

3. In area Data structure choose Change.

4. On the Edit Data Structure: Characteristics screen, choose menu path Extras Characteristics Unlock and confirm confirmation pop-up.

5. Choose Save.

6. Choose Activate.

7. Choose Back.

8. Confirm pop-up regarding regeneration of operating concern.

ResultThe operating concern has been regenerated.

63 Install Building Block J10 – Asset Management

UseWhen you activate the BC Sets, the Customizing settings are configured in the development client. You can specify certain organizational units. To set up a demo and evaluation system for starting the shipped master and transaction data CATTs, enter the following:

Organizational Unit Value (Description)

Chart of Depreciation BP01

© SAP AG Page 107 of 257

Page 108: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Organizational Unit Value (Description)

Company Code BP01

ProcedureUse transaction SCPR20 to activate the BC Sets. The role supports the activation process with the assigned BC Set catalog.

 

Activation logs can provide support in the event of warnings or error messages. In the activation log, the system occasionally displays a warning message informing you that not all of the data has been activated in all languages. You can ignore this warning.

 

Rather than activating the entire top node of the BC Set catalog, we recommend that you activate the next level in the structure. This procedure is supported by the installation role.

If errors occur in the activation log, the BC Sets are marked in red. You should activate these BC Sets a second time.

6.3.1 Assets Accounting Settings

UseIn this step, you install the Customizing settings in Asset Accounting.

Procedure1. Start the following activity:

SAP R/3 Role Menu

J10 Asset Management Asset Management Assets Accounting Settings

Transaction Code /SMB12/S001_J10_01

2.       Activate the BC Set /SMB12/ASSET_S001_J10.

3.       If necessary, change the default value for the following variable fields:

Field Lang. BC Set Conts Value

Chart of Depreciation BP01 BP01

CoCode n. alloc. BP01 BP01

Company Code * *

Company Code BP01 BP01

Current fiscal year 2003 2003

© SAP AG Page 108 of 257

Page 109: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Field Lang. BC Set Conts Value

Last posting fiscal year 2003 2003

Last posting period 009 009

Orig. chart of dep. 0CN 0CN

Subobject value BP01 BP01

Transfer date 20030930 20030930

4.       Complete the activation procedure for the BC Set and go back to the installation role menu.

When you activate the BC Set. If errors occur in the activation log, the BC Sets are marked in red. You should activate these BC Sets a second time.

Result (optional) You have activated the BC set of Assets.

6.3.2 Check/Complete Texts in Asset Explorer

UseFor values to be displayed in the Asset Explorer, entries must exist in the logon language in table T093S for either the generic depreciation area 00, or the selected depreciation area.

The correction program RACORR14 in SAP Note 380190 checks whether entries exist in table T093S for the selected charts of depreciation. If this is not the case, the program checks whether the current chart of depreciation was copied from a different one for which texts exist. If no texts are found here, the program tries to read texts from the reference chart of depreciation in client 000.

In an update run, texts missing in the logon language are copied to the selected chart of depreciation.

Procedure

1. Call up the transaction as follows:

Menu Path J10 Asset Management Asset Management Check/Complete Texts in Asset Explorer

Transaction Code SA38

2. Execute program RACORR14 (F8).

© SAP AG Page 109 of 257

Page 110: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. Enter the required data:

Field Name Description R/O/C User Action and Values Comment

Chart of Depreciation

R Enter your chart of depreciation

For example, BP01

Test Run O

4. Execute a test run first.

5. If missing texts are displayed in the test run, execute an update run.

Texts are completed in the logon language only. If necessary, you must log on in a different language and complete this step again.

ResultYou have completed the text s in asset explorer.

64 Install Building Block J49 – Procurement of Stock Material

6.4.1 Business Configuration Sets Activation

6.4.1.1 RFQ/Quotation and Price Comparison

UseThis section contains all the information needed to implement the general settings of RFQ/Quotation and Price Comparison function.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Activation of Configuration ® RFQ/Quotation and Price Comparison

Transaction Code /SMB12/S100_J49_01

2. Activate the BC Set /SMB12/1000_MM_RFQ_S100_J49.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. Complete the activation of the BC Set and go back to the installation role.

© SAP AG Page 110 of 257

Page 111: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Result After performing this activity, the configuration settings of the RFQ/Quotation and Price Comparison function are installed in the system. The BC Set /SMB12/1000_MM_RFQ_S100_J49 comprises the following BC Sets and settings:

RFQ/Quotation and Price Comparison: /SMB12/1000_MM_RFQ_S100_J49

Define RFQ Document Type /SMB12/VVC_T161_VA_B101_J49

Define Contract Document Type /SMB12/VVC_T161_VK_B102_J49

6.4.1.2 Procurement of Stock Material

UseThis section contains all the information needed to implement the general settings of the procurement of stock material function.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Activation of Configuration ® Procurement of Stock Material

Transaction Code /SMB12/S200_J49_01

2. Activate the BC Set /SMB12/2000_MM_PUR_S200_J49.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. Complete the activation of the BC Set and go back to the installation role.

Result After performing this activity, the configuration settings of the procurement of stock material function are installed in the system. The BC Set /SMB12/2000_MM_PUR_S200_J49 comprises the following BC Sets and settings:

RFQ/Quotation and Price Comparison: /SMB12/1000_MM_RFQ_S100_J49

Define PR Document Type /SMB12/VVC_T161_B_VB_B201_J49

Define PO Document Type /SMB12/VVC_T161_VF_B202_J49

Assign Partner Schemas to Document Types /SMB12/V_T161_P_B203_J49

© SAP AG Page 111 of 257

Page 112: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.4.2 Master Data

6.4.2.1 Create Material Master C40060

UseThe purpose of this activity is to create material C40060 using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J49.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Create Material Master Data

Transaction Code /SMB12/L001_J49_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 27.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J49.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 112 of 257

Page 113: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J49.txt.

6.4.2.2 Create Vendor Master C8010 and C8020

UseThe purpose of this activity is to create vendors C8010 and C8020 using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XK01_L001_J49.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Create Vendors

Transaction Code /SMB12/L002_J49_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 28.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J49.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XK03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 113 of 257

Page 114: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_XK01_L001_J49.txt.

6.4.2.3 Create Classification View in Material Master

UseIn this activity, you use a CATT to create the material classification view.

Procedure1. Maintain the external CATT variant SMB12_MM01_C029_J49_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Create Classification View

Transaction Code /SMB12/C029_J49_01

3. Enter the correct path for the file: SMB12_MM01_C029_J49_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created the material classification view.

6.4.2.4 Create QM Info in Material Master

UseThe purpose of this activity is to maintain QM info in the Material Master.

Procedure1. Maintain the external CATT variant SMB12_MM02_C043_J49_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Create QM Info in Material Master

Transaction Code /SMB12/C043_J49_01

3. Enter the correct path for the file: SMB12_MM02_C043_J49_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/MM02_C043_J30.

5. Check the CATT log (optional) and go back to the installation role.

© SAP AG Page 114 of 257

Page 115: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Result The QM info is maintained in the Material Master.

6.4.2.5 Create Stock Material Info Record

UseIn this activity, you use a CATT to create the stock material info record.

Procedure1. Maintain the external CATT variant SMB12_ME11_C051_J49_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Create Stock Material Info Record

Transaction Code /SMB12/C051_J49_01

3. Enter the correct path for the file: SMB12_ME11_C051_J49_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/ME11_C051_J30.

5. Check the CATT log (optional) and go back to the installation role.

6.4.2.6 Create Inspection Plans for Goods Receipt of Stock Material

UseYou have to define the inspection method for the inspection of the goods receipt of raw materials.

Procedure1. Maintain the external CATT variant SMB12_QP01_C052_J49_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Create Inspection Plans for GR

Transaction Code /SMB12/C052_J49_01

3. Enter the correct path for the file: SMB12_QP01_C052_J49_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/QP01_C052_J30.

5. Check the CATT log (optional) and go back to the installation role.

© SAP AG Page 115 of 257

Page 116: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.4.2.7 Change Inspection Plans: Characteristics Quantitative

Use

You have to define the quantitative inspection criteria for the materials in the inspection plan.

Procedure1. Maintain the external CATT variant SMB12_QP02_C055_J49_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Change IP: Characteristics Quanti.

Transaction Code /SMB12/C055_J49_01

3. Enter the correct path for the file:SMB12_QP02_C055_J49_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/QP02_C055_J30.

5. Check the CATT log (optional) and go back to the installation role.

6.4.2.8 Change Inspection Plans: Characteristics Qualitative

UseYou have to define the qualitative characteristics for the inspections methods for the inspections of raw materials and trading goods.

Procedure1. Maintain the external CATT variant SMB12_QP02_C056_J49_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Change IP: Characteristics Quali.

Transaction Code /SMB12/C056_J49_01

3. Enter the correct path for the file: SMB12_QP02_C056_J49_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/QP02_C056_J30.

5. Check the CATT log (optional) and go back to the installation role.

6.4.2.9 Create Quality-Info Record

UseYou have to enter information about your vendor in the quality info record: general data like name and address and the information if the vendor is blocked and no goods can be accepted from this certain vendor.

© SAP AG Page 116 of 257

Page 117: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external CATT variant SMB12_QI01_C053_J49_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J49 Procurement of Stock Material ® Data Preparation ® Change IP: Characteristics Quali.

Transaction Code /SMB12/C053_J49_01

3. Enter the correct path for the file: SMB12_QI01_C053_J49_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/QI01_C053_J30.

5. Check the CATT log (optional) and go back to the installation role.

65 Install Building Block J50 – Procurement - Contract

6.5.1 Business Configuration Sets Activation

6.5.1.1 Procurement - Contract

UseThis section contains all the information needed to implement the general configurations of contract procurement.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J50 Procurement – Contract ® Activation of Configuration ® Procurement - Contract

Transaction Code /SMB12/S100_J50_01

2. Activate the BC Set /SMB12/1000_MM_PUR_CONT_S100_J50.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. Complete the activation of the BC Set and go back to the installation role.

Result After performing this activity, the configuration settings of the contract procurement are installed in the system. The BC Set /SMB12/1000_MM_PUR_CONT_S100_J50 comprises the following BC Sets and settings:

Procurement - Contract: SMB12/1000_MM_PUR_CONT_S100_J50

Define Quantity Contract Document Type /SMB12/VVC_T161_VK_B101_J50

Define PR Document Type /SMB12/VVC_T161_B_VB_B102_J50

© SAP AG Page 117 of 257

Page 118: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procurement - Contract: SMB12/1000_MM_PUR_CONT_S100_J50

Define PO Document Type /SMB12/VVC_T161_VF_B103_J50

Assign Partner Schemas to Document Types /SMB12/V_T161_P_B104_J50

6.5.2 Master Data

6.5.2.1 Create Material Master C40660

UseThe purpose of this activity is to create the material C40660 using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If J64 is installed, the material master may exist.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J50.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J50 Procurement – Contract ® Data Preparation ® Create Material Master Record

Transaction Code /SMB12/L001_J50_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 29.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J50.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

© SAP AG Page 118 of 257

Page 119: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J50.txt.

6.5.2.2 Create Vendor Master C7110

UseThe purpose of this activity is to create vendor C7110 using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XK01_L001_J50.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J50 Procurement – Contract ® Data Preparation ® Create Vendor

Transaction Code /SMB12/L002_J50_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 30.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XK01_L001_J50.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XK03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

© SAP AG Page 119 of 257

Page 120: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_XK01_L001_J50.txt.

66 Install Building Block J51 – Internal Procurement (Stock Transfer with Delivery)

6.6.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up cross company sales process.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J51 Internal Procurement (Stock Transfer with Delivery)->Activation of Configuration

Transaction Code /SMB12/S001_J51_01

2. Activate the BC Set /SMB12/1000_STO-INTER_S010_J51.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Field Value

Distrib.channel

Distrib.channel 01

© SAP AG Page 120 of 257

Page 121: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Int.co billing div.

Int.co billing div. 01

Issuing plant

Plant BP01

Plant BP01

Plant BP02

Sales organization

Sales organization BP01

Supplying plant BP02

4. Complete the activation of the BC Set and go back to the installation role.

6.6.2 Create Master Data

6.6.2.1 Create Material Master via eCATT/LSMW (Trading Goods C10180)

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this material was created in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J51.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J51 Internal Procurement (Stock Transfer with Delivery) -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J51_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 37.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

© SAP AG Page 121 of 257

Page 122: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J51.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C10180 using the following LSMW file via eCATT:SMB12_MM01_L001_J51.txt

6.6.2.2 Create Customer Master BP0001 for Receiving Plant via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J51.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J51 Internal Procurement (Stock Transfer with Delivery)-> Data Preparation-> Create Customer Master

Transaction Code /SMB12/L001_J51_01

© SAP AG Page 122 of 257

Page 123: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 38.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J51.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer BP0001 for receiving plant using the following LSMW file via eCATT: SMB12_XD01_L001_J51.txt

6.6.2.3 Create Initial Stock for Material C10080

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C10080 should be posted to unrestricted-use stock before sales process.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C040_J30_J51_01.txt

2. Access the activity using one of the following navigation options:

© SAP AG Page 123 of 257

Page 124: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 Role Menu Installation Menu: J51 Internal Procurement (Stock Transfer with Delivery) -> Data Preparation-> Create Initial Stock for Material

Transaction Code /SMB12/C040_J51_01

3. Enter the correct path for the file: SMB12_MB1C_C040_J30_J51_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C040_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials C10080 to unrestricted stock.

67 Install Building Block J53 – Internal Procurement (Cross-Company Stock Transfer)

6.7.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up cross company sales process.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J53 Internal Procurement (Cross Company Stock Transfer)->Activation of Configuration

Transaction Code /SMB12/S001_J53_01

2. Activate the BC Set /SMB12/1000_CROSS_STO_S010_J53.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Field Value

Distrib.channel

Distrib.channel 03

Int.co billing div.

Int.co billing div. 01

Plant BP01

Plant BP01

© SAP AG Page 124 of 257

Page 125: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Plant BP0X

Sales organization

Sales organization BP0X

Supplying plant BP0X

4. Complete the activation of the BC Set and go back to the installation role.

6.7.2 Create Master Data

6.7.2.1 Create Material Master via eCATT/LSMW (Trading Goods C20080)

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this material was created in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J53.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J53 Internal Procurement (Cross Company Stock Transfer) -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J53_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 39.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J53.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

© SAP AG Page 125 of 257

Page 126: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C20080 using the following LSMW file via eCATT:SMB12_MM01_L001_J53.txt

6.7.2.2 Create Pricing Condition for Material C20080 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L001_J53.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J53 Internal Procurement (Cross Company Stock Transfer)-> Data Preparation ->Create Pricing Condition

Transaction Code /SMB12/L002_J53_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 43.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

© SAP AG Page 126 of 257

Page 127: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L001_J53.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C20080 using the following LSMW file:SMB12_PR00_L001_J53.txt

6.7.2.3 Create Customer Master C6000 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J53.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J53 Internal Procurement (Cross Company Stock Transfer)-> Data Preparation -> Create Customer Master

Transaction Code /SMB12/L001_J53_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 40.

© SAP AG Page 127 of 257

Page 128: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J53.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer C6000 using the following LSMW file via eCATT: SMB12_XD01_L001_J53.txt

6.7.2.4 Create Customer Master BP0001 for Receiving Plant via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L002_J53.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J53 Internal Procurement (Cross Company Stock Transfer)-> Data Preparation -> Create Customer Master

© SAP AG Page 128 of 257

Page 129: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Transaction Code /SMB12/L001_J53_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 41.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L002_J53.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer BP0001 for receiving plant using the following LSMW file via eCATT: SMB12_XD01_L002_J53.txt

6.7.2.5 Creating Vendor BP000X for Supplying Plant with eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

© SAP AG Page 129 of 257

Page 130: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external LSMW variant file SMB12_XK01_L001_J53.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J53 Internal Procurement (Cross Company Stock Transfer)-> Data Preparation -> Create Vendor Master

Transaction Code /SMB12/L004_J53_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 42.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XK01_L001_J53.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XK03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created vendor BP000X for supplying plant using the following LSMW file via eCATT: SMB12_XK01_L001_J53.txt

6.7.2.6 Create Initial Stock for Material C20080

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C20080 should be posted to unrestricted-use stock before sales process.

If this step was performed in a previous scenario installation, you can skip this step.

© SAP AG Page 130 of 257

Page 131: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external CATT variant SMB12_MB1C_C040_J30_J53_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J53 Internal Procurement (Cross Company Stock Transfer)-> Data Preparation -> Create Initial Stock for Material

Transaction Code /SMB12/C040_J53_01

3. Enter the correct path for the file: SMB12_MB1C_C040_J30_J53_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C040_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials C20080 to unrestricted stock.

68 Install Building Block J57 – Standard Sales Process

6.8.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up standard sales process.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Activation of Configuration ->Install Standard Sales Process

Transaction Code /SMB12/S001_J57_01

2. Activate the BC Set /SMB12/1000_STAND_SALES_S001_J57.

3. In the Enter Variable Field Values screen, the default values for the field plants are:

Field Value

Distribution Channel 01

Distribution Channel 03

Distribution Channel 01

Division 01

Sales Organization BP01

4. Complete the activation of the BC Set and go back to the installation role.

© SAP AG Page 131 of 257

Page 132: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.8.2 Master Data Preparation

UseIn this step you prepare all the master data required for standard sales processing

ProcedureThis activity is supported by LSMW (Legacy System data Migration Workbench) or CATT procedures.

Refer to the installation role to start the T-Codes with external LSMW data files or CATT variants.

In the following description, you will find more information.

In case of CATT prompts error messages when executed with Background mode, try to execute it again with Foreground mode.

.

6.8.2.1 Create Customer Master C6000 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Customer Master

Transaction Code /SMB12/L001_J57_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 05.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

© SAP AG Page 132 of 257

Page 133: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer C6000 using the following LSMW file via eCATT: SMB12_XD01_L001_J57.txt

6.8.2.2 Create Customer Master C6120 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L002_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Customer Master

Transaction Code /SMB12/L001_J57_02

© SAP AG Page 133 of 257

Page 134: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 06.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L002_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer C6120 using the following LSMW file via eCATT: SMB12_XD01_L002_J57.txt

6.8.2.3 Create Customer Master C6130 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L003_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Installation Menu: J57 Standard Sales Process -> Data

© SAP AG Page 134 of 257

Page 135: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Role Menu Preparation -> Create Customer Master

Transaction Code /SMB12/L001_J57_03

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 07.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK..

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L003_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer C6130 using the following LSMW file via eCATT: SMB12_XD01_L003_J57.txt

6.8.2.4 Create Material Master via eCATT/LSMW (Trading Goods C20010)

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this material was created in a previous scenario installation, you can skip this step.

© SAP AG Page 135 of 257

Page 136: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J57_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 08.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C20010 using the following LSMW file via eCATT:SMB12_MM01_L001_J57.txt

6.8.2.5 Create Classification View for Material Master C20010

UseThe purpose of this activity is to create the classification view of a material, which cannot be fulfilled using LSMW as in the previous step.

© SAP AG Page 136 of 257

Page 137: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Prerequisites The material master must exist in order to successfully create the classification view (see previous step for creation of material.)

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MM01_C029_J30_J57_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Classification View for Material Master

Transaction Code /SMB12/C029_J57_01

8. Enter the correct path for the file: SMB12_MM01_C029_J30_J57_01.txt.

9. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

10. Check the CATT log and go back to the installation role.

ResultThe classification view of material master C20010 has been created.

6.8.2.6 Create Pricing Condition for Material C20010 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L001_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Condition Master ->Create Pricing Condtion

© SAP AG Page 137 of 257

Page 138: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Transaction Code /SMB12/L002_J57_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 02.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L001_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C20010 using the following LSMW file:SMB12_PR00_L001_J57.txt

6.8.2.7 Create Batch Search Strategy for Material C20010

UseThe purpose of this activity is to define the batch search strategy for material C20010 using CATT.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external data file SMB12_VCH1_C054_J30_J57_01.txt

© SAP AG Page 138 of 257

Page 139: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Batch Strategy for SD

Transaction Code /SMB12/C054_J57_01

3. Enter the correct path for the file: SMB12_VCH1_C054_J30_J57_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VCH1_C054_J30.

5. Check the CATT log and go back to the installation role.

ResultThe batch search strategy is defined for C20010.

6.8.2.8 Create Material Master via eCATT/LSMW (Trading Goods C20020)

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L002_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J57_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 09.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L002_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

© SAP AG Page 139 of 257

Page 140: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C20020 using the following LSMW file via eCATT:SMB12_MM01_L002_J57.txt

6.8.2.9 Create Classification View for Material Master C20020

UseThe purpose of this activity is to create the classification view of a material, which cannot be fulfilled using LSMW as in the previous step.

Prerequisites The material master must exist in order to successfully create the classification view (see previous step for creation of material.)

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MM01_C029_J30_J57_02.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Classification View for Material Master

Transaction Code /SMB12/C029_J57_02

11. Enter the correct path for the file: SMB12_MM01_C029_J30_J57_02.txt.

12. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

13. Check the CATT log and go back to the installation role.

© SAP AG Page 140 of 257

Page 141: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultThe classification view of material master C20020 has been created.

6.8.2.10 Create Pricing Condition for Material C20020 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L002_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Condition Master ->Create Pricing Condtion

Transaction Code /SMB12/L002_J57_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 03.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L002_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

© SAP AG Page 141 of 257

Page 142: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C20020 using the following LSMW file:SMB12_PR00_L002_J57.txt

6.8.2.11 Create Batch Search Strategy for Material C20020

UseThe purpose of this activity is to define the batch search strategy for material C20020 using CATT.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external data file SMB12_VCH1_C054_J30_J57_02.txt

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Batch Strategy for SD

Transaction Code /SMB12/C054_J57_02

3. Enter the correct path for the file: SMB12_VCH1_C054_J30_J57_02.txt

4. Choose Execute to start the CATT procedure /SMB12/VCH1_C054_J30.

5. Check the CATT log and go back to the installation role.

ResultThe batch search strategy is defined for C20020.

© SAP AG Page 142 of 257

Page 143: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.8.2.12 Create Material Master via eCATT/LSMW (Packaging Material C50010)

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L003_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J57_03

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 10.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L003_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 143 of 257

Page 144: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have created packaging material C50010 using the following LSMW file via eCATT:SMB12_MM01_L003_J57.txt

6.8.2.13 Create Material Master via eCATT/LSMW (Finished Goods C10150)

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this material was created in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L004_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J57_04

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 11.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L004_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

© SAP AG Page 144 of 257

Page 145: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created finished product C10150 using the following LSMW file via eCATT:SMB12_MM01_L004_J57.txt

6.8.2.14 Create Classification View for Material Master C10150

UseThe purpose of this activity is to create the classification view of a material, which cannot be fulfilled using LSMW as in the previous step.

Prerequisites The material master must exist in order to successfully create the classification view (see previous step for creation of material.)

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MM01_C029_J30_J57_03.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Classification View for Material Master

Transaction Code /SMB12/C029_J57_03

3. Enter the correct path for the file: SMB12_MM01_C029_J30_J57_03.txt.

4. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

5. Check the CATT log and go back to the installation role.

ResultThe classification view of material master C10150 has been created.

© SAP AG Page 145 of 257

Page 146: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.8.2.15 Create Pricing Condition for Material C10150 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L003_J57.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Condition Master ->Create Pricing Condtion

Transaction Code /SMB12/L002_J57_03

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 04.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L003_J57.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

8. The eCATT Log Display … screen is displayed. Check the results.

9. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

10. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

11. Choose Back to return to the installation role.

© SAP AG Page 146 of 257

Page 147: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have created the pricing condition for C10150 using the following LSMW file:SMB12_PR00_L003_J57.txt

6.8.2.16 Create Batch Search Strategy for Material C10150

UseThe purpose of this activity is to define the batch search strategy for material C10150 using CATT.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external data file SMB12_VCH1_C054_J30_J57_03.txt

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Batch Strategy for SD

Transaction Code /SMB12/C054_J57_03

6. Enter the correct path for the file: SMB12_VCH1_C054_J30_J57_03.txt

7. Choose Execute to start the CATT procedure /SMB12/VCH1_C054_J30.

8. Check the CATT log and go back to the installation role.

ResultThe batch search strategy is defined for C10150.

6.8.2.17 Create Free Goods Condition Record

UseIn this activity, you use a CATT to create the Free Goods condition record.

Procedure1. Maintain the external CATT variant: SMB12_VBN1_C050_J30_J57_01.txt

2. Access the activity using one of the following navigation options:

© SAP AG Page 147 of 257

Page 148: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 Role Menu Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Free Goods

Transaction Code /SMB11/C050_J57_01

3. Enter the correct path for the file: SMB12_VBN1_C050_J30_J57_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VBN1_C050_J57

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created the free goods condition record.

6.8.2.18 Material Substitution Condition Record

UseIn this activity, you use a CATT to create the material substitution condition record.

Procedure1. Maintain the external CATT variant: SMB12_VB11_C042_J30_J57_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J57 Standard Sales Process -> Data Preparation -> Create Material Determination

Transaction Code /SMB11/C042_J57_01

3. Enter the correct path for the file: SMB12_VB11_C042_J30_J57_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VB11_C042_J57.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created the material substitution condition record.

6.8.2.19 Create Output Condition Record for BA00

UseIn this activity, you use a CATT to create the output condition record for BA00.

Procedure1. Maintain the external CATT variant: SMB12_VV11_C028_J30_J57_01.txt

2. Access the activity using one of the following navigation options:

© SAP AG Page 148 of 257

Page 149: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 Role Menu Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Condition Master-> Create Output Condition for Sales Document

Transaction Code /SMB12/C028_J57_01

3. Enter the correct path for the file: SMB12_VV11_C028_J30_J57_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VV11_C028_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created the output condition record for BA00.

6.8.2.20 Create Output Condition Record for LD00

UseIn this activity, you use a CATT to create the output condition record for LD00.

Procedure1. Maintain the external CATT variant SMB12_VV21_C027_J30_J57_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Condition Master-> Create Output Condition for Delivery

Transaction Code /SMB12/C027_J57_01

3. Enter the correct path for the file: SMB12_VV21_C027_J30_J57_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VV21_C027_J30

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created the output condition record for LD00.

6.8.2.21 Create Initial Stock for Material C20020

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C20020 should be posted to unrestricted-use stock before sales process.

If this step was performed in a previous scenario installation, you can skip this step.

© SAP AG Page 149 of 257

Page 150: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure6. Maintain the external CATT variant SMB12_MB1C_C030_J30_J57_01.txt

7. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Initial Stock for Material

Transaction Code /SMB12/C030_J57_01

8. Enter the correct path for the file: SMB12_MB1C_C030_J30_J57_01.txt

9. Choose Execute to start the CATT procedure /SMB12/MB1C_C030_J30

10. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials C20020 to unrestricted stock.

6.8.2.22 Create Initial Stock for Material C50010

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C50010 should be posted to unrestricted-use stock before sales process.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C040_J30_J57_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J57 Standard Sales Process -> Data Preparation-> Create Initial Stock for Material

Transaction Code /SMB12/C040_J57_01

3. Enter the correct path for the file: SMB12_MB1C_C030_J40_J57_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C040_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials C50010 to unrestricted stock.

© SAP AG Page 150 of 257

Page 151: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

69 Install Building Block J58 – Customer Consignment Process

6.9.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up customer consignment process.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment-> Installation- Configuration in Customer Consignment ->Install Standard Sales Process

Transaction Code /SMB12/S001_J58_01

2. Activate the BC Set /SMB12/2000_CUST_CONSIG_S001_J58.

This BC Set is a hierarchical BC Set and consist of several BC Sets. These BC Sets contains all the necessary settings and activities required for consignment processing.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Value

Distribution Channel 01

Division 01

Sales Organization BP01

5. Complete the activation of the BC Set and go back to the installation role.

6.9.2 Master Data Preparation

UseIn this step you prepare all the master data required for standard sales processing

ProcedureThis activity is supported by LSMW (Legacy System data Migration Workbench) or CATT procedures.

Refer to the installation role to start the T-Codes with external LSMW data files or CATT variants.

In the following description, you will find more information.

© SAP AG Page 151 of 257

Page 152: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

In case of CATT prompts error messages when executed with Background mode, try to execute it again with Foreground mode.

.

6.9.2.1 Create Customer Master C6100 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J58.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J58 Customer Consignment-> Data Preparation -> Create Customer Master

Transaction Code /SMB12/L001_J58_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 14.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J58.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using

© SAP AG Page 152 of 257

Page 153: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer C6100 using the following LSMW file via eCATT: SMB12_XD01_L001_J58.txt

6.9.2.2 Create Material Master via eCATT/LSMW (Trading Goods C20040)

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this material was created in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J58.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J58_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 15.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J58.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

© SAP AG Page 153 of 257

Page 154: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C20040 using the following LSMW file via eCATT:SMB12_MM01_L001_J58.txt

6.9.2.3 Create Classification View for Material Master C20040

UseThe purpose of this activity is to create the classification view of a material, which cannot be fulfilled using LSMW as in the previous step.

Prerequisites The material master must exist in order to successfully create the classification view (see previous step for creation of material.)

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MM01_C029_J30_J58_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment -> Data Preparation -> Create Classification View for Material Master

Transaction Code /SMB12/C029_J58_01

3. Enter the correct path for the file: SMB12_MM01_C029_J30_J58_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

5. Check the CATT log and go back to the installation role.

ResultThe classification view of material master C20040 has been created.

© SAP AG Page 154 of 257

Page 155: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.9.2.4 Create Pricing Condition for Material C20040 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L001_J58.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment -> Data Preparation -> Create Condition Master ->Create Pricing Condtion

Transaction Code /SMB12/L002_J58_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 12.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L001_J58.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

© SAP AG Page 155 of 257

Page 156: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C20040 using the following LSMW file:SMB12_PR00_L001_J58.txt

6.9.2.5 Create Batch Search Strategy for Material C20040

UseThe purpose of this activity is to define the batch search strategy for material C20040 using CATT.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external data file SMB12_VCH1_C054_J30_J58_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment -> Data Preparation-> Create Batch Strategy for SD

Transaction Code /SMB12/C054_J58_01

3. Enter the correct path for the file: SMB12_VCH1_C054_J30_J58_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VCH1_C054_J30.

5. Check the CATT log and go back to the installation role.

ResultThe batch search strategy is defined for C20040.

6.9.2.6 Create Material Master via eCATT/LSMW (Trading Goods C20050)

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

© SAP AG Page 156 of 257

Page 157: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L002_J58.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J58_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 16.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L002_J58.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C20050 using the following LSMW file via eCATT:SMB12_MM01_L002_J58.txt

6.9.2.7 Create Classification View for Material Master C20050

UseThe purpose of this activity is to create the classification view of a material, which cannot be fulfilled using LSMW as in the previous step.

© SAP AG Page 157 of 257

Page 158: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Prerequisites The material master must exist in order to successfully create the classification view (see previous step for creation of material.)

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MM01_C029_J30_J58_02.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment -> Data Preparation -> Create Classification View for Material Master

Transaction Code /SMB12/C029_J58_02

3. Enter the correct path for the file: SMB12_MM01_C029_J30_J58_02.txt.

4. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

5. Check the CATT log and go back to the installation role.

ResultThe classification view of material master C20050 has been created.

6.9.2.8 Create Batch Search Strategy for Material C20050

UseThe purpose of this activity is to define the batch search strategy for material C20050 using CATT.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external data file SMB12_VCH1_C054_J30_J58_02.txt

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment -> Data Preparation-> Create Batch Strategy for SD

Transaction Code /SMB12/C054_J58_02

3. Enter the correct path for the file: SMB12_VCH1_C054_J30_J58_02.txt

4. Choose Execute to start the CATT procedure /SMB12/VCH1_C054_J30.

5. Check the CATT log and go back to the installation role.

© SAP AG Page 158 of 257

Page 159: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultThe batch search strategy is defined for C20050.

6.9.2.9 Create Pricing Condition for Material C20050 via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L002_J58.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J58 Customer Consignment-> Data Preparation -> Create Condition Master ->Create Pricing Condtion

Transaction Code /SMB12/L002_J58_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 13.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L002_J58.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

© SAP AG Page 159 of 257

Page 160: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C20050 using the following LSMW file:SMB12_PR00_L002_J58.txt

6.9.2.10 Create Output Condition Record for BA00

UseIn this activity, you use a CATT to create the output condition record for BA00.

Procedure1. Maintain the external CATT variant: SMB12_VV11_C028_J30_J58_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J58 Customer Consignment -> Data Preparation -> Create Condition Master-> Create Output Condition for Sales Document

Transaction Code /SMB12/C028_J58_01

3. Enter the correct path for the file: SMB12_VV11_C028_J30_J58_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VV11_C028_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created the output condition record for BA00.

6.9.2.11 Create Output Condition Record for LD00

UseIn this activity, you use a CATT to create the output condition record for LD00.

Procedure1. Maintain the external CATT variant: SMB12_VV21_C027_J30_J58_01.txt

2. Access the activity using one of the following navigation options:

© SAP AG Page 160 of 257

Page 161: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 Role Menu Installation Menu: J58 Customer Consignment -> Data Preparation -> Create Condition Master-> Create Output Condition for Delivery

Transaction Code /SMB12/C027_J58_01

3. Enter the correct path for the file: SMB12_VV21_C027_J30_J58_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VV11_C028_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created the output condition record for LD00.

6.9.2.12 Create Initial Stock for Material C20040

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C20040 should be posted to unrestricted-use stock before sales process.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C030_J30_J58_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J58 Customer Consignment -> Data Preparation-> Create Initial Stock for Material

Transaction Code /SMB12/C030_J58_01

3. Enter the correct path for the file: SMB12_MB1C_C030_J30_J58_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C030_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials C20040 to unrestricted stock.

6.9.2.13 Create Initial Stock for Material C20050

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C20050 should be posted to unrestricted-use stock before sales process.

© SAP AG Page 161 of 257

Page 162: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C030_J30_J58_02.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J58 Customer Consignment -> Data Preparation-> Create Initial Stock for Material

Transaction Code /SMB12/C030_J58_02

3. Enter the correct path for the file: SMB12_MB1C_C030_J30_J58_02.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C030_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials C20050 to unrestricted stock.

610 Install Building Block J59 – Returns and Complaints

6.10.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up cross company sales process.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J59 Returns and Complaints ->Activation of Configuration

Transaction Code /SMB12/S100_J59_01 - Returns

/SMB12/S100_J59_02 - Complaints

2. Activate the BC Set /SMB12/1200_RE_ORDER_S020_J59 for Returns and activate the BC Set /SMB12/1000_COMPLAIN_S010_J59 for Complaints.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. In the Enter Variable Field Values screen when /SMB12/S100_J59_02 – Complaints is activated, change the values of the following fields:

© SAP AG Page 162 of 257

Page 163: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Field Value

Distribution Channel 01

Division 01

Sales Organization BP01

4. Complete the activation of the BC Set and go back to the installation role.

6.10.2 Create Master Data

6.10.2.1 Create Material Master via eCATT/LSMW (Trading Goods C20033) For Return

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this material was created in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J59.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J59 Returns and Complaints -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J59_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 44.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J59.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

© SAP AG Page 163 of 257

Page 164: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C20033 using the following LSMW file via eCATT:SMB12_MM01_L001_J59.txt

6.10.2.2 Create Quality Management View for Material Master C20033

UseThe purpose of this activity is to create the Quality Management view of a material, which cannot be fulfilled using LSMW as in the previous step.

Prerequisites The material master must exist in order to successfully create the Quality Management view (see previous step for creation of material.)

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MM02_C043_J59_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J59 Returns and Complaints-> Data Preparation -> Create Quality Management View for Material Master

Transaction Code /SMB12/C043_J59_01

3. Enter the correct path for the file: SMB12_MM02_C043_J59_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/MM02_C043_J30.

5. Check the CATT log and go back to the installation role.

© SAP AG Page 164 of 257

Page 165: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultThe Quality Management view of material master C20033 has been created.

6.10.2.3 Create Classification View for Material Master C20033

UseThe purpose of this activity is to create the classification view of a material, which cannot be fulfilled using LSMW as in the previous step.

Prerequisites The material master must exist in order to successfully create the classification view (see previous step for creation of material.)

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MM01_C029_J59_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J59 Returns and Complaints-> Data Preparation -> Create Classification View for Material Master

Transaction Code /SMB12/C029_J59_01

3. Enter the correct path for the file: SMB12_MM01_C029_J59_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

5. Check the CATT log and go back to the installation role.

ResultThe classification view of material master C20033 has been created.

6.10.2.4 Create Pricing Condition for Material C20033 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

© SAP AG Page 165 of 257

Page 166: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L001_J59.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J59 Returns and Complaints -> Data Preparation ->Create Pricing Condition

Transaction Code /SMB12/L002_J59_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 47.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L001_J59.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C20033 using the following LSMW file:SMB12_PR00_L001_J59.txt

6.10.2.5 Create Batch Search Strategy for Material C20033

UseThe purpose of this activity is to define the batch search strategy for material C20033 using CATT.

© SAP AG Page 166 of 257

Page 167: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external data file SMB12_VCH1_C054_J30_J59_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J59 Returns and Complaints -> Data Preparation -> Create Batch Strategy for SD

Transaction Code /SMB12/C054_J59_01

3. Enter the correct path for the file: SMB12_VCH1_C054_J30_J59_01.txt

4. Choose Execute to start the CATT procedure /SMB12/VCH1_C054_J30.

5. Check the CATT log and go back to the installation role.

ResultThe batch search strategy is defined for C20033.

6.10.2.6 Create Customer Master C6000 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J59.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J59 Returns and Complaints-> Data Preparation-> Create Customer Master

Transaction Code /SMB12/L001_J59_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 46.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

© SAP AG Page 167 of 257

Page 168: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J59.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer C6000 using the following LSMW file via eCATT: SMB12_XD01_L001_J59.txt

6.10.2.7 Create Initial Stock for Material C20033

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C20033 should be posted to unrestricted-use stock before sales process.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C030_J30_J59_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J59 Returns and Complaints -> Data Preparation-> Create Initial Stock for Material

Transaction Code /SMB12/C030_J59_01

3. Enter the correct path for the file: SMB12_MB1C_C030_J30_J59_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C030_J30

5. Check the CATT log (optional) and go back to the installation role.

© SAP AG Page 168 of 257

Page 169: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Result You have posted the materials C20033 to unrestricted stock.

6.10.2.8 Create Material Master via eCATT/LSMW (Non-Stock Material C90900) For Complaints

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this material was created in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L002_J59.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J59 Returns and Complaints -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J59_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 45.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L002_J59.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using

© SAP AG Page 169 of 257

Page 170: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C90900 using the following LSMW file via eCATT:SMB12_MM01_L002_J59.txt

611 Install Building Block J60 – Returnable Processing

6.11.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up cross company sales process.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J60 Returnable Processing ->Activation of Configuration

Transaction Code /SMB12/S100_J60_01

2. Activate the BC Set /SMB12/1000_RETURNABLE_S010_J60.

3. Complete the activation of the BC Set and go back to the installation role.

6.11.2 Create Master Data

6.11.2.1 Create Material Master via eCATT/LSMW (Trading Goods C20070)

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this material was created in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

© SAP AG Page 170 of 257

Page 171: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J60.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J60 Returnable Processing -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J60_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 48.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J60.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C20070 using the following LSMW file via eCATT:SMB12_MM01_L001_J60.txt

6.11.2.2 Create Pricing Condition for Material C20070 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

© SAP AG Page 171 of 257

Page 172: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L001_J60.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J60 Returnable Processing -> Data Preparation-> Create Pricing Condition

Transaction Code /SMB12/L002_J60_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 51.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L001_J60.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C20070 using the following LSMW file:SMB12_PR00_L001_J60.txt

© SAP AG Page 172 of 257

Page 173: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.11.2.3 Create Material Master via eCATT/LSMW (Empties C60100)

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this material was created in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L002_J60.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J60 Returnable Processing -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J60_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 49.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L002_J60.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 173 of 257

Page 174: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have created trading material C60100 using the following LSMW file via eCATT:SMB12_MM01_L002_J60.txt

6.11.2.4 Create Pricing Condition for Material C60100 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L002_J60.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J60 Returnable Processing -> Data Preparation-> Create Pricing Condition

Transaction Code /SMB12/L002_J60_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 52.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L002_J60.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

© SAP AG Page 174 of 257

Page 175: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C60100 using the following LSMW file:SMB12_PR00_L002_J60.txt

6.11.2.5 Create Customer Master C6000 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J60.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J60 Returnable Processing ->Data Preparation-> Create Customer Master

Transaction Code /SMB12/L001_J60_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 50.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J60.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

© SAP AG Page 175 of 257

Page 176: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer C6000 using the following LSMW file via eCATT: SMB12_XD01_L001_J60.txt

6.11.2.6 Create Initial Stock for Material C20070 and C60100

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C20070 and C60100 should be posted to unrestricted-use stock before sales process.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C040_J30_J60_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J60 Returnable Processing -> Data Preparation-> Create Initial Stock for Material

Transaction Code /SMB12/C040_J60_01

3. Enter the correct path for the file: SMB12_MB1C_C040_J30_J60_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C040_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials C20070 and C60100 to unrestricted stock

© SAP AG Page 176 of 257

Page 177: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

612 Install Building Block J61 – Batch Recall

6.12.1 Creating View ZZRECALL

UseThe purpose of this activity is to create a DDIC view required in the report ZZRecall. This report is used to find the recipients of a defect batch that must be recalled in the scenario “Batch Recall.”

Procedure1. Access the activity using the following navigation options:

SAP R/3 Menu Tools ® ABAP Workbench ® Development ® ABAP Dictionary

Transaction Code SE11

2. Enter the name of the view ZZRECALL and choose Create.

3. Select: Database view ® Copy

4. Enter Short Text for the view: ZZRECALL

5. On the tab Table/join condition, enter the tables:

KNA1

LIPS

LIKP

KNVV

6. Enter join conditions:

KNA1 KUNNR = LIKP KUNNR

LIKP VBELN = LIPS VBELN

KNA1 KUNNR = KNVV KUNNR

LIKP VKORG = KNVV VKORG

LIPS VTWEG = KNVV VTWEG

LIPS SPART = KNVV SPART

KNA1 MANDT = KNVV MANDT

KNA1 MANDT = LIKP MANDT

LIKP MANDT = LIPS MANDT

7. Choose Activate.

8. On the tab View fields, make the following entries:

In order to make the following entries select the lines and use Ctrl + C and Ctrl + V.

View field Table name Field name

MANDT KNA1 MANDT

KUNNR KNA1 KUNNR

© SAP AG Page 177 of 257

Page 178: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

LAND1 Kann1 LAND1

NAME1 Kann1 NAME1

NAME2 Kann1 NAME2

ORT01 Kann1 ORT01

PSTLZ Kann1 PSTLZ

REGIO Kann1 REGIO

SORTL Kann1 SORTL

STRAS KNA1 STRAS

TELF1 KNA1 TELF1

TELFX KNA1 TELFX

XCPDK KNA1 XCPDK

ADRNR Kann1 ADRNR

MCOD1 Kann1 MCOD1

MCOD2 Kann1 MCOD2

MCOD3 Kann1 MCOD3

ANRED Kann1 ANRED

AUFSD Kann1 AUFSD

BAHNE Kann1 BAHNE

BAHNS Kann1 BAHNS

BBBNR Kann1 BBBNR

BBSNR Kann1 BBSNR

BEGRU Kann1 BEGRU

BRSCH Kann1 BRSCH

BUBKZ Kann1 BUBKZ

DATLT KNA1 DATLT

ERDAT KNA1 ERDAT

ERNAM KNA1 ERNAM

EXABL KNA1 EXABL

FAKSD KNA1 FAKSD

FISKN KNA1 FISKN

KNAZK Kann1 KNAZK

KNRZA KNA1 KNRZA

KONZS Kann1 KONZS

KTOKD KNA1 KTOKD

KUKLA KNA1 KUKLA

LIFNR KNA1 LIFNR

© SAP AG Page 178 of 257

Page 179: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

LIFSD KNA1 LIFSD

LOCCO KNA1 LOCCO

LOEVM Kann1 LOEVM

NAME3 Kann1 NAME3

NAME4 Kann1 NAME4

NIELS Kann1 NIELS

ORT02 Kann1 ORT02

PFACH Kann1 PFACH

PSTL2 Kann1 PSTL2

COUNC KNA1 COUNC

CITYC KNA1 CITYC

RPMKR KNA1 RPMKR

SPERR Kann1 SPERR

SPRAS Kann1 SPRAS

STCD1 Kann1 STCD1

STCD2 Kann1 STCD2

STKZA Kann1 STKZA

STKZU Kann1 STKZU

TELBX Kann1 TELBX

TELF2 KNA1 TELF2

TELTX KNA1 TELTX

TELX1 KNA1 TELX1

LZONE KNA1 LZONE

XZEMP KNA1 XZEMP

VBUND Kann1 VBUND

STCEG Kann1 STCEG

DEAR1 KNA1 DEAR1

DEAR2 KNA1 DEAR2

DEAR3 KNA1 DEAR3

DEAR4 KNA1 DEAR4

DEAR5 KNA1 DEAR5

GFORM Kann1 GFORM

BRAN1 Kann1 BRAN1

BRAN2 Kann1 BRAN2

BRAN3 Kann1 BRAN3

BRAN4 Kann1 BRAN4

© SAP AG Page 179 of 257

Page 180: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

BRAN5 Kann1 BRAN5

EKONT Kann1 EKONT

UMSAT Kann1 UMSAT

UMJAH Kann1 UMJAH

UWAER Kann1 UWAER

JMZAH Kann1 JMZAH

JMJAH Kann1 JMJAH

KATR1 Kann1 KATR1

KATR2 Kann1 KATR2

KATR3 Kann1 KATR3

KATR4 Kann1 KATR4

KATR5 Kann1 KATR5

KATR6 Kann1 KATR6

KATR7 Kann1 KATR7

KATR8 Kann1 KATR8

KATR9 Kann1 KATR9

KATR10 Kann1 KATR10

STKZN Kann1 STKZN

UMSA1 Kann1 UMSA1

TXJCD Kann1 TXJCD

PERIV KNA1 PERIV

ABRVW KNA1 ABRVW

INSPBYDEBI KNA1 INSPBYDEBI

INSPATDEBI Kann1 INSPATDEBI

KTOCD Kann1 KTOCD

PFORT Kann1 PFORT

WERKS KNA1 WERKS

DTAMS KNA1 DTAMS

DTAWS KNA1 DTAWS

DUEFL KNA1 DUEFL

HZUOR KNA1 HZUOR

SPERZ Kann1 SPERZ

ETIKG KNA1 ETIKG

CIVVE KNA1 CIVVE

MILVE KNA1 MILVE

KDKG1 KNA1 KDKG1

© SAP AG Page 180 of 257

Page 181: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

KDKG2 KNA1 KDKG2

KDKG3 KNA1 KDKG3

KDKG4 KNA1 KDKG4

KDKG5 KNA1 KDKG5

XKNZA KNA1 XKNZA

FITYP KNA1 FITYP

STCDT Kann1 STCDT

STCD3 Kann1 STCD3

STCD4 Kann1 STCD4

XICMS Kann1 XICMS

XXIPI Kann1 XXIPI

XSUBT Kann1 XSUBT

CFOPC Kann1 CFOPC

TXLW1 Kann1 TXLW1

TXLW2 Kann1 TXLW2

CCC01 Kann1 CCC01

CCC02 Kann1 CCC02

CCC03 Kann1 CCC03

CCC04 Kann1 CCC04

CASSD KNA1 CASSD

KNURL KNA1 KNURL

J_1KFREPRE KNA1 J_1KFREPRE

J_1KFTBUS Kann1 J_1KFTBUS

J_1KFTIND Kann1 J_1KFTIND

CONFS KNA1 CONFS

UPDAT KNA1 UPDAT

UPTIM Kann1 UPTIM

NODEL KNA1 NODEL

DEAR6 KNA1 DEAR6

VBELN LIPS VBELN

POSNR LIPS POSNR

MATNR LIPS MATNR

CHARG LIPS CHARG

VKORG KNVV VKORG

VTWEG KNVV VTWEG

SPART KNVV SPART

© SAP AG Page 181 of 257

Page 182: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

9. Choose Enter.

10. Save ® Enter a development class ® Continue

11. Enter workbench request ® Continue

12. Activate ® back

6.12.2 Load Program ZZRECALL

UseThis program selects the customer addresses of all recipients of a defect batch that must be recalled in the scenario “Batch Recall.”.

Procedure1. Access the activity using the following navigation options:

SAP R/3 Menu Tools ® ABAP Workbench ® Development ® ABAP Editor

Transaction Code SE38

2. Enter the name of the program: ZZRECALL

3. Select Source code.

4. Choose Create and make the following entries:

Title Batch recall address selection report

Type Executable program

Status SAP standard production program

Application Sales

5. Save your entries.

6. Enter the development class ® Continue.

7. Enter the workbench request ® Continue.

8. Load local file ZZRECALL.TXT which is available on the HTML-CD (Path: Misc\Baseline\Programs).

9. In the Menu, select Go To Selection Texts.

10. On tab Text Symbols make the following entries:

Sym

Text mLen

001 ID: Take advertising material into account

42

002 'Advertising material ID' 25

A01 Customer 8

A02 Selection criteria addresses ------------------------------ Cust./sales prospect

80

© SAP AG Page 182 of 257

Page 183: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

A03 Selection criteria 18

A04 Contact person criteria 23

P01 Other customer address 22

P02 Customer 8

P03 Other business address 22

P04 Sales prospect 14

P05 Home address 12

11. On tab Selection Texts make the following entries:

Name Text Dictionary ref.

CHARGE Batch number

DADRESSE Business address

KADRESSE Customer address

KUNDE Customer

KUNNR Customer Select

MATNR Article number

PADRESSE Home address

POTKUNDE Sales Prospect

S_SPART Division Select

S_VKORG Sales organization Select

S_VTWEG Distribution channel Select

12. Press Enter and select Goto -> Translation, enter ZH as Target Language. Click on Enter.

13. On the Translation ABAP Text Pool:ZZRECALL from Language EN to ZH screen, make the following entries:

Text in EN Text in ZH

Customer 客户

Selection criteria addresses ------------------------------ Cust./sales prospect 地址 选择标准 ――客户/潜在客户

Selection criteria 选择标准

Contact person criteria 联系人选择标准

Other customer address 其他客户地址

Customer 客户

Other business address 其他业务地址

Sales prospect 潜在客户

© SAP AG Page 183 of 257

Page 184: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Home address 家庭地址

Batch number 批次

Business address 业务地址

Customer address 客户地址

Customer 客户

Customer 客户

Article number 物料

Home address 家庭地址

Sales Prospect 潜在客户

Division 产品线

Sales organization 销售组织

Distribution channel 分销渠道

14. Save and activate program.

Result Program ZZRECALL saved.

6.12.3 Activation of Batch Recall Process Customizing

UseIn this activity, you activate the BC Sets to set up batch recall process. Sales activity types, number ranges, and incompletion procedures are a few of the customizing activities included.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J61 Batch Recall -> Installation- Configuration in Batch Recall ->Install Batch Recall Process

Transaction Code /SMB12/S001_J61_01

2. Activate the BC Set /SMB12/3000_BATCH_RECALL_S001_J61.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Value

Sales Organization BP01

Sales Organization BP0X

4. Complete the activation of the BC Set and go back to the installation role.

© SAP AG Page 184 of 257

Page 185: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.12.4 Master Data Preparation

UseIn this step you prepare all the master data required for standard sales processing

ProcedureThis activity is supported by LSMW (Legacy System data Migration Workbench) or CATT procedures.

Refer to the installation role to start the T-Codes with external LSMW data files or CATT variants.

In the following description, you will find more information.

In case of CATT prompts error messages when executed with Background mode, try to execute it again with Foreground mode.

.

6.12.4.1 Create Output Condition for Sales Activities

UseThe purpose of this activity is to create an output condition record for sales activities that allows a user to print out the direct mailing to be sent to customers.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu:: J61 Batch Recall ® Data Preparation ® Create Condition Master ® Create Output Condition for Sales Activity

Transaction Code /SMB12/C026_J61_01

2. Enter the correct path for the file: SMB12_VV51_C026_J30_J61_01.txt

3. Choose Execute to start the CATT procedure /SMB12/VV51_C026_J30.

4. Check the CATT log (optional) and go back to the installation role.

© SAP AG Page 185 of 257

Page 186: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

613 Install Building Block J62 – Cross-Company Sales Order Processing

6.13.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up cross company sales process.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J62 Cross Company Sales Order Processing ->Activation of Configuration

Transaction Code /SMB12/S100_J62_01

2. Activate the BC Set /SMB12/1000_SALE_PRO_S010_J62.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

3. Complete the activation of the BC Set and go back to the installation role.

6.13.2 Create Master Data

6.13.2.1 Create Material Master via eCATT/LSMW (Trading Goods C20080)

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this material was created in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J62.txt.

2. Access the activity using one of the following navigation options:

© SAP AG Page 186 of 257

Page 187: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3Role Menu

Installation Menu: J62 Cross Company Sales Order Processing -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L003_J62_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 53.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J62.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created trading material C20080 using the following LSMW file via eCATT:SMB12_MM01_L001_J62.txt

6.13.2.2 Create Pricing Condition for Material C20080 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

© SAP AG Page 187 of 257

Page 188: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L001_J62.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J62 Cross Company Sales Order Processing -> Data Preparation ->Create Pricing Condition

Transaction Code /SMB12/L002_J62_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 55.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L001_J62.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created the pricing condition for C20080 using the following LSMW file:SMB12_PR00_L001_J62.txt

6.13.2.3 Create Customer Master C6000 via eCATT/LSMW

UseThe purpose of this activity is to create the master data using LSMW in an automated process supported by eCATT.

© SAP AG Page 188 of 257

Page 189: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

If this step was performed in a previous scenario installation, you can skip this step.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J62.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu

Installation Menu: J62 Cross Company Sales Order Processing -> Data Preparation ->Create Customer Master

Transaction Code /SMB12/L001_J62_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 54.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J62.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have created customer C6000 using the following LSMW file via eCATT: SMB12_XD01_L001_J62.txt

© SAP AG Page 189 of 257

Page 190: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.13.2.4 Create Initial Stock for Material C20080

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials C20080 should be posted to unrestricted-use stock before sales process.

If this step was performed in a previous scenario installation, you can skip this step.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C040_J30_J62_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J62 Cross Company Sales Order Processing -> Data Preparation-> Create Initial Stock for Material

Transaction Code /SMB12/C040_J62_01

3. Enter the correct path for the file: SMB12_MB1C_C040_J30_J62_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C040_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials C20080 to unrestricted stock.

614 Install Building Block J64 – Discrete Manufacturing

6.14.1 Activation of Configuration

6.14.1.1 J64 settings

UseIn this step, you install the Customizing settings in discrete manufacturing.

Procedure1. Start the following activity:

SAP R/3 Role Menu

J64 Production Planning and Discrete Manufacturing Activation of Configuration J64 setting

Transaction Code /SMB12/S001_J64_01

2.       Activate the BC Set /SMB12/PP_DM_S001_J64.

© SAP AG Page 190 of 257

Page 191: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3.       If necessary, change the default value for the following variable fields:

Field Lang. BC Set Conts Value

Plant BP01 BP01

4.       Complete the activation procedure for the BC Set and go back to the installation role menu.

When you activate the BC Set. You can ignore these warning messages.

Result You have activated the BC set of Assets.

6.14.2 Data Preparation

6.14.2.1 Create Material Master Data

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J30_J64_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing Data Preparation Create Material Master Data

Transaction Code /SMB12/L001_J64_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 23.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J30_J64_01.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed please check the results is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

© SAP AG Page 191 of 257

Page 192: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J30_J64_01.txt.

6.14.2.2 Create Material Master Classification View

UseProcess this activity to create material master classification view.

Procedure1. Maintain the external CATT variant SMB12_MM01_C029_J30_J64_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Material Master Classif. View

Transaction Code /SMB12/C029_J64_01

3. Enter the correct path for the file: SMB12_MM01_C029_J30_J64_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created classification view.

6.14.2.3 Create Search Strategy Conditions PP

UseProcess this activity to create search strategy conditions for PP.

© SAP AG Page 192 of 257

Page 193: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external CATT variant SMB12_COB1_C031_J30_J64_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create Search Strategy Conditions PP

Transaction Code /SMB12/C031_J64_01

3. Enter the correct path for the file: SMB12_COB1_C031_J30_J64_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/COB1_C031_J30.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created search strategy condition.

6.14.2.4 Create BOM Header Data

UseProcess this activity to create BOM Header Data.

Procedure1. Maintain the external CATT variant SMB12_CS01_C001_J30_J64_01.TXT

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create BOM Header Data

Transaction Code /SMB12/C001_J64_01

3. Enter the correct path for the file: SMB12_CS01_C001_J30_J64_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/CS01_C001_J30.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created BOM header data.

6.14.2.5 Create BOM Item Data

UseProcess this activity to create BOM Item Data.

© SAP AG Page 193 of 257

Page 194: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external CATT variant SMB12_CS02_C002_J30_J64_01.TXT

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create BOM Item Data

Transaction Code /SMB12/C002_J64_01

3. Enter the correct path for the file: SMB12_CS02_C002_J30_J64_01.TXT.

4. Choose Execute to start the CATT procedure /SMB12/CS02_C002_J30.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created BOM item data.

6.14.2.6 Create Work Center

UseProcess this activity to create work center.

Procedure1. Maintain the external CATT variant SMB12_CR01_C017_J30_J64_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create work center

Transaction Code /SMB12/C017_J64_01

3. Enter the correct path for the file: SMB12_CR01_C017_J30_J64_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/CR01_C017_J30.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created work center.

6.14.2.7 Create Routing

UseProcess this activity to create routing.

© SAP AG Page 194 of 257

Page 195: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external CATT variant SMB12_CA01_C018_J30_J64_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create routing

Transaction Code /SMB12/C018_J64_01

3. Enter the correct path for the file: SMB12_CA01_C018_J30_J64_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/CA01_C018_J30.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created routing.

6.14.2.8 Change Routing

UseProcess this activity to change routing.

Procedure1. Maintain the external CATT variant SMB12_CA02_C022_J30_J64_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create routing

Transaction Code /SMB12/C022_J64_01

3. Enter the correct path for the file: SMB12_CA02_C022_J30_J64_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CA02_C022_J30.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created routing.

6.14.2.9 Create Vendor Master Data

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

© SAP AG Page 195 of 257

Page 196: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XK01_L002_J30_J64_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing Data Preparation Create Vendor Master Data

Transaction Code /SMB12/L002_J64_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 22.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XK01_L002_J30_J64_01.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed please check the results is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_XK01_L002_J30_J64_01.txt.

6.14.2.10 Create Subcontract Info Record

UseProcess this activity to create info. record.

© SAP AG Page 196 of 257

Page 197: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external CATT variant SMB12_ME11_C032_J30_J64_01.TXT

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create routing

Transaction Code /SMB12/C032_J64_01

3. Enter the correct path for the file: SMB12_ME11_C032_J30_J64_01.TXT

4. Choose Execute to start the CATT procedure /SMB12/ME11_C032_J30.

5. Check the CATT procedure log file for errors.

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created info. record.

6.14.2.11 Create routing for subcontract

UseProcess this activity to create routing for subcontract.

Procedure1. To carry out the activity, choose one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create routing for subcontract

Transaction Code CA01

2. On the Create Routing: Initial screen, enter the values of the following fields:

Fields Values

Material C10150

Plant BP01

3. Confirmation with ENTER

4. On the Create Routing: Overview screen, click new entries button(Ctrl+F1)

5. On the Create Routing: Header Detail screen, enter the values of the following fields:

Fields Values

Group Counter 2

Description External Processing

Usage 1

Status 4

© SAP AG Page 197 of 257

Page 198: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6. Choose Operation button.

7. On the Create Routing: Operation Overview screen, enter the values of the following fields:

Fields Values

Work center J64-03

Control Key YB05

8. Confirmation with ENTER.

9. On the Create Routing: Operation check screen, enter the values of the following fields:

Fields Values

Subcontracting X

Purchasing info rec. 5611111114

Purch. organization BP01

Cost Element 41010101

10. Confirmation with ENTER.

11. Choose SAVE button.

ResultYou have created routing.

6.14.2.12 Create Initial Stock

UseProcess this activity to create Initial Stock. Please note that J50 (procurement – contract), J64 and J57 (sales order processing) are a series of scenarios. J50 purchase raw materials for J64 production. And J57 sell the finished goods J64 produced. So if you want to follow the processing, use the external CATT variant SMB12_MB1C_C040_J30_J64_01.TXT and not begin J64 BPP until J50 BPP has finished. If you need to run J64 separately, you can use the external CATT variant SMB12_MB1C_C040_J30_J64_02.TXT that includes all materials needed.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C040_J30_J64_01.TXT or

SMB12_MB1C_C040_J30_J64_02.TXT

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J64 Production Planning and Discrete Manufacturing ® Data Preparation ® Create routing

Transaction Code /SMB12/C040_J64_01

3. Enter the correct path for the file: SMB12_MB1C_C040_J30_J64_01.TXT or SMB12_MB1C_C040_J30_J64_02.TXT

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C040_J30.

5. Check the CATT procedure log file for errors.

© SAP AG Page 198 of 257

Page 199: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6. Complete the CATT procedure and go back to the installation role.

ResultYou have created initial stock.

615 Install Building Block J65 – Process Manufacturing

6.15.1 Activation of Configuration

UseThis activity configures the settings required for Cash Management.

Procedure1. Access the transaction using:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Activation of Configuration Configuration Process Order Settings

Transaction Code /SMB12/S100_J65_01

2. Activate the BC Set /SMB12/PROCESSORDER_S100_J65.

3. In the Enter Variable Field Values screen, the default values for the field Plant are:

Field Value

Plant BP01

Plant BP02

Plant BP03

Plant BP0X

Production scheduler 065

4. Complete the activation of the BC Set and go back to the installation role.

ResultAfter processing this activity, the configuration for the Process Order is installed in the system.

The BC Set /SMB12/PROCESSORDER_S100_J65 comprises the following BC Sets and settings:

Configuration Process Order Settings: /SMB12/PROCESSORDER_S100_J65

Define PP - PI Order Types /SMB12/V_T003O_40_B005_J65

Define PP - PI Order Type-Dependent Parameters /SMB12/V_T399X_40_B006_J65

Define Process Instruction Categories (General) /SMB12/O12C_B003_J65

Define Production Scheduler /SMB12/V_T024F_B002_J65

© SAP AG Page 199 of 257

Page 200: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Configuration Process Order Settings: /SMB12/PROCESSORDER_S100_J65

Define and Setup Control Recipe Destinations /SMB12/V_TC52_B004_J65

Define Production Scheduling Profile /SMB12/V_TCO43_40_B001_J65

Define Scheduling Parameters for Production Orders /SMB12/OPU3_B211_J65

Define checking control /SMB12/V_TCO11_B270_J65

6.15.2 Data Preparation

6.15.2.1 Copying PI Characteristics from Client 000

UseIn this step, you Copy the SAP standard PI Characteristics from Client 000 to the current client.

Procedure1. Process the ECATT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Copying PI Characteristics from Client 000

Transaction Code /SMB12/O003_J65_01

3. Enter the Test Configuration /SMB12/O23C_O003_J65.

4. Click Execute to start ECATT.

5. Check the CATT log (optional) and return to the installation role.

6.15.3 Material

6.15.3.1 General Views

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

© SAP AG Page 200 of 257

Page 201: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J65.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

User menu J65 Production Planning & Process Manufacturing Data Preparation Material Create Material Master - Gen View

Transaction Code /SMB12/L001_J65_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 17.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J65.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J65.txt.

6.15.3.2 Classification View

UseIn this step, you create Classification view for materials.

© SAP AG Page 201 of 257

Page 202: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Process the external CATT variant SMB12_MM01_C029_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Material Material Master Classif. View

Transaction Code /SMB12/C029_J65_01

3. Enter the correct path for file SMB12_MM01_C029_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/MM01_C029_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.3.3 Create Inspection Types within MMR

UseIn this step, you create Inspection Types for materials.

Procedure1. Process the external CATT variant SMB12_MM02_C043_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Material Create Inspection Types within MMR

Transaction Code /SMB12/C043_J65_01

3. Enter the correct path for file SMB12_MM02_C043_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/MM02_C043_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.4 Batch Determination

6.15.4.1 Create Batch Search Strategy Conditions PI

UseIn this step, you create Batch Search Strategy Conditions for Process Production.

Procedure1. Process the external CATT variant SMB12_COB1_C031_J30_J65_01.txt.

2. Start the following activity:

© SAP AG Page 202 of 257

Page 203: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Batch Determination Create Search Strategy Conditions PP

Transaction Code /SMB12/C031_J65_01

3. Enter the correct path for file SMB12_COB1_C031_J30_J65_01.txt.

4. Click Execute to start CATT run /SMB12/COB1_C031_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.5 BOM

6.15.5.1 Create BOM Header Data

UseIn this step, you create BOM Header for materials.

Procedure1. Process the external CATT variant SMB12_CS01_C001_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation BOM Create BOM Header Data

Transaction Code /SMB12/C001_J65_01

3. Enter the correct path for file SMB12_CS01_C001_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/CS01_C001_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.5.2 Create BOM Item Data

UseIn this step, you create BOM Item data for materials.

Procedure1. Process the external CATT variant SMB12_CS02_C002_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation BOM Create BOM Item Data

Transaction Code /SMB12/C002_J65_01

© SAP AG Page 203 of 257

Page 204: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. Enter the correct path for file SMB12_CS02_C002_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/CS02_C002_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.6 Resources

6.15.6.1 Create Resources

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_CRC1_L002_J65.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

User menu J65 Production Planning & Process Manufacturing Data Preparation Resources Create Resources

Transaction Code /SMB12/L002_J65_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 18.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_CRC1_L002_J65.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as CRC3.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

© SAP AG Page 204 of 257

Page 205: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_CRC1_L002_J65.txt.

6.15.7 Recipes

6.15.7.1 Create recipe group

UseIn this step, you create recipe group 10000 for finished goods and 30000 for three semi-finished goods.

Procedure1. Process the external CATT variant SMB12_C201_C006_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Create recipe group

Transaction Code /SMB12/C006_J65_01

3. Enter the correct path for file SMB12_C201_C006_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/C201_C006_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.7.2 Create operations and phases

UseIn this step, you create Operations and Phases for recipe group 10000 and 30000.

Procedure1. Process the external CATT variant SMB12_C202_C007_J30_J65_01_.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Create operations and phases

© SAP AG Page 205 of 257

Page 206: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Transaction Code /SMB12/C007_J65_01

3. Enter the correct path for file SMB12_C202_C007_J30_J65_01_.TXT.

4. Click Execute to start CATT run /SMB12/C202_C007_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.7.3 Create process instructions per phase

UseIn this step, you assign process instruction YBINSTR to the Phases of the Recipes.

Procedure1. Process the external CATT variant SMB12_C202_C008_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Create process instructions perphase

Transaction Code /SMB12/C008_J65_01

3. Enter the correct path for file SMB12_C202_C008_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C008_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.7.4 Create Process Instruction Characteristic

UseIn this step, you assign the Process Instruction Characteristic to the Recipes.

Procedure1. Process the external CATT variant SMB12_C202_C009_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Create process instruction character

Transaction Code /SMB12/C009_J65_01

3. Enter the correct path for file SMB12_C202_C009_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C009_J30.

© SAP AG Page 206 of 257

Page 207: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

5. Check the CATT log (optional) and return to the installation role.

6.15.7.5 Create standard values per phase

UseIn this step, you define the standard values for each phase of the recipes.

Procedure1. Process the external CATT variant SMB12_C202_C010_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Create standard values per phase

Transaction Code /SMB12/C010_J65_01

3. Enter the correct path for file SMB12_C202_C010_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C010_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.7.6 Maintain relationships of phases

UseIn this step, you maintain the relationships among the phases in the recipe.

Procedure1. Process the external CATT variant SMB12_C202_C011_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Maintain relationships of phases

Transaction Code /SMB12/C011_J65_01

3. Enter the correct path for file SMB12_C202_C011_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C011_J30.

5. Check the CATT log (optional) and return to the installation role.

© SAP AG Page 207 of 257

Page 208: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.15.7.7 Allocation material-recipe-production version

UseIn this step, you allocate the material recipe production version.

Procedure1. Process the external CATT variant SMB12_C202_C012_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Allocation material-recipe-prod. ver

Transaction Code /SMB12/C012_J65_01

3. Enter the correct path for file SMB12_C202_C012_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C012_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.7.8 Set production version

UseIn this step, you create the production versions for finished goods and semi-finished goods.

Procedure1. Process the external CATT variant SMB12_MM02_C013_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Set production version

Transaction Code /SMB12/C013_J65_01

3. Enter the correct path for file SMB12_MM02_C013_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/MM02_C013_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.7.9 Allocation of material components

UseIn this step, you allocate the material components used in the production to the recipe operations.

© SAP AG Page 208 of 257

Page 209: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Procedure1. Process the external CATT variant SMB12_C202_C014_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Allocation of material components

Transaction Code /SMB12/C014_J65_01

3. Enter the correct path for file SMB12_C202_C014_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C014_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.7.10 Recipes for QM Data

UseIn this step, you create the Quality Management data to the Recipe Phases.

Procedure1. Process the external CATT variant SMB12_C202_C016_J30_J65_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Recipes Recipes for QM Data

Transaction Code /SMB12/C016_J65_01

3. Enter the correct path for file SMB12_C202_C016_J30_J65_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C016_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.8 Create Initial Stock

6.15.8.1 Create Initial Stock – Raw Material

UseIn this step, you create Initial Stocks for Raw Materials used in Process Manufacturing

Procedure1. Process the external CATT variant SMB12_MB1C_C030_J30_J65_01.txt.

2. Start the following activity:

© SAP AG Page 209 of 257

Page 210: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Create Initial Stock Create Initial Stock – Raw Material

Transaction Code /SMB12/C030_J65_01

3. Enter the correct path for file SMB12_MB1C_C030_J30_J65_01.txt.

4. Click Execute to start CATT run /SMB12/MB1C_C030_J30.

5. Check the CATT log (optional) and return to the installation role.

6.15.8.2 Create Initial Stock – Packaging Material

UseIn this step, you create Initial Stocks for Packaging Materials used in Process Manufacturing

Procedure1. Process the external CATT variant SMB12_MB1C_C057_J30_J65_01.txt.

2. Start the following activity:

SAP R/3 Role Menu User menu J65 Production Planning & Process Manufacturing Data Preparation Create Initial Stock Create Initial Stock – Packaging Material

Transaction Code /SMB12/C057_J65_01

3. Enter the correct path for file SMB12_MB1C_C057_J30_J65_01.txt.

4. Click Execute to start CATT run /SMB12/MB1C_C057_J30.

5. Check the CATT log (optional) and return to the installation role.

616 Install Building Block J66 – MTO Processing

6.16.1 Activation of Configuration

6.16.1.1 J66 Setting

UseIn this step, you install the Customizing settings in discrete manufacturing.

Procedure2. Start the following activity:

SAP R/3 Role Menu

J66 MTO Processing Activation of Configuration J66 setting

Transaction Code /SMB12/S001_J66_01

© SAP AG Page 210 of 257

Page 211: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

2.       Activate the BC Set /SMB12/MTO_S001_J66.

3.       If necessary, change the default value for the following variable fields:

Field Lang. BC Set Conts Value

Distribution Channel 01 01

Division 01 01

Plant BP01 BP01

Sales Organization BP01 BP01

4.       Complete the activation procedure for the BC Set and go back to the installation role menu.

When you activate the BC Set. If errors occur in the activation log, the BC Sets are marked in red. You should activate these BC Sets a second time.

Result You have activated the BC set of Assets.

6.16.2 Data Preparation

6.16.2.1 Create Characteristic (CHAR)

UseThe purpose of this activity is to create characteristics with character format to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CT04_C023_J30_J66_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create Characteristic (CHAR)

Transaction Code /SMB12/C023_J66_01

3. Enter the correct path for the file: SMB12_CT04_C023_J30_J66_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/CT04_C023_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created characteristic.

© SAP AG Page 211 of 257

Page 212: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.2 Create Characteristic (with Table Reference)

UseThe purpose of this activity is to create characteristics with a table reference to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CT04_C024_J30_J66_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create Characteristic (table ref.)

Transaction Code /SMB12/C024_J66_01

3. Enter the correct path for the file: SMB12_CT04_C024_J30_J66_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/CT04_C024_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created characteristic.

6.16.2.3 Create Class

UseThe purpose of this activity is to create classes to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB05_CL01_C033_J30_J66_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create class

Transaction Code /SMB12/C033_J66_01

3. Enter the correct path for the file: SMB05_CL01_C033_J30_J66_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CL01_C033_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created class.

© SAP AG Page 212 of 257

Page 213: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.4 Create Object Dependency

UseThe purpose of this activity is to create object dependencies to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CU01_C034_J30_J66_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create object dependency

Transaction Code /SMB12/C034_J66_01

3. Enter the correct path for the file: SMB12_CU01_C034_J30_J66_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CU01_C034_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created object dependency.

6.16.2.5 Create Materials Master

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J30_J66_01.txt.

4. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J66 MTO Processing Data Preparation Create Material Master Data

Transaction Code /SMB12/L001_J66_01

5. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 24.

6. Choose Execute to start the eCATT procedure.

7. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

© SAP AG Page 213 of 257

Page 214: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

8. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J30_J66_01.txt is stored.

9. If the eCATT procedure has been finished successfully, the dialog box Status: Completed please check the results is displayed.

10. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

11. The eCATT Log Display … screen is displayed. Check the results.

12. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

13. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

14. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J30_J66_01.txt.

6.16.2.6 Create Material Master Classification View

UseProcess this activity to create material master classification view.

Procedure6. Maintain the external CATT variant SMB12_MM01_C029_J30_J66_01.TXT.

7. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J66 MTO Processing ® Data Preparation ® Material Master Classif. View

Transaction Code /SMB12/C029_J66_01

8. Enter the correct path for the file: SMB12_MM01_C029_J30_J66_01.TXT.

9. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

10. Check the CATT procedure log file for errors.

11. Complete the CATT procedure and go back to the installation role.

ResultYou have created classification view.

© SAP AG Page 214 of 257

Page 215: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.7 Create BOM Header Data

UseThe purpose of this activity is to create bill of material to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CS01_C001_J30_J66_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create BOM Header Data

Transaction Code /SMB12/C001_J66_01

3. Enter the correct path for the file: SMB12_CS01_C001_J30_J66_01.TXT

4. Choose Execute to start the CATT procedure /SMB12/CS01_C001_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created BOM header.

6.16.2.8 Create BOM Item Data

UseThe purpose of this activity is to change bill of material to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CS02_C002_J30_J66_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create BOM Item Data

Transaction Code /SMB12/C002_J66_01

3. Enter the correct path for the file: SMB12_CS02_C002_J30_J66_01.TXT

4. Choose Execute to start the CATT procedure /SMB12/CS02_C002_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created BOM Item.

© SAP AG Page 215 of 257

Page 216: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.9 Change BOM (Add Dependency, Set Relevancy to Sales)

UseThe purpose of this activity is to change the bill of material by adding dependencies and setting the relevancy to sales to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CS02_C035_J30_J66_01.TXT

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Change BOM (add dep., sales-relev.)

Transaction Code /SMB12/C035_J66_01

3. Enter the correct path for the file: SMB12_CS02_C035_J30_J66_01.TXT

4. Choose Execute to start the CATT procedure /SMB12/CS02_C035_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have changed BOM.

6.16.2.10 Create Work Center

UseThe purpose of this activity is to create work center to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CR01_C017_J30_J66_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create work center

Transaction Code /SMB12/C017_J66_01

3. Enter the correct path for the file: SMB12_CR01_C017_J30_J66_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CR01_C017_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created work center.

© SAP AG Page 216 of 257

Page 217: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.11 Create Routing

UseThe purpose of this activity is to create routing to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CA01_C018_J30_J66_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create routing

Transaction Code /SMB12/C018_J66_01

3. Enter the correct path for the file: SMB12_CA01_C018_J30_J66_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CA01_C018_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created routing.

6.16.2.12 Change Routing

UseThe purpose of this activity is to change routing to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CA02_C022_J30_J66_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Change routing

Transaction Code /SMB12/C022_J66_01

3. Enter the correct path for the file: SMB12_CA02_C022_J30_J66_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CA02_C022_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have changed routing.

© SAP AG Page 217 of 257

Page 218: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.13 Create Configuration Profile

UseThe purpose of this activity is to create a configuration profile to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_CU41_C036_J30_J66_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create Configuration Profile

Transaction Code /SMB12/C036_J66_01

3. Enter the correct path for the file: SMB12_CU41_C036_J30_J66_01.TXT

4. Choose Execute to start the CATT procedure /SMB12/CU41_C036_J30.

5. Run this CATT in foreground mode.

6. Check the CATT log (optional) and go back to the installation role.

ResultYou have created configuration profile.

6.16.2.14 Define Key

UseThe purpose of this activity is to define key to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_VK30_C037_J30_J66_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Define Key

Transaction Code /SMB12/C037_J66_01

3. Enter the correct path for the file: SMB12_VK30_C037_J30_J66_01.TXT

4. Choose Execute to start the CATT procedure /SMB12/VK30_C037_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created key.

© SAP AG Page 218 of 257

Page 219: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.15 Create Customer Master Data

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L002_J30_J66_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J66 MTO Processing Data Preparation Create Customer Master Data

Transaction Code /SMB12/L002_J66_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 26.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L002_J30_J66_01.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed please check the results is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_XD01_L002_J30_J66_01.txt.

© SAP AG Page 219 of 257

Page 220: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.16 Create Vendor Master Data

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XK01_L003_J30_J66_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J66 MTO Processing Data Preparation Create Customer Master Data

Transaction Code /SMB12/L003_J66_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 25.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XK01_L003_J30_J66_01.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed please check the results is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_XK01_L003_J30_J66_01.txt.

© SAP AG Page 220 of 257

Page 221: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.17 Create Condition Records - VA00

UseThe purpose of this activity is to create condition records for variant prices (VA00) to be used in scenarios.

Procedure1. Maintain the external CATT variant SMB12_VK11_C038_J30_J66_01.TXT.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create condition records - VA00

Transaction Code /SMB12/C038_J66_01

3. Enter the correct path for the file: SMB12_VK11_C038_J30_J66_01.TXT

4. Choose Execute to start the CATT procedure /SMB12/VK11_C038_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created condition record.

6.16.2.18 Create Customer Credit Management Data

UseThe purpose of this activity is to create customer credit management data to be used in the scenario.

Procedure1. Maintain the external CATT variant SMB12_FD32_C039_J30_J66_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create customer credit managem. data

Transaction Code /SMB12/C039_J66_01

3. Enter the correct path for the file SMB12_FD32_C039_J30_J66_01.txt

4. Choose Execute to start the CATT procedure /SMB12/FD32_C039_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created customer credit management data.

© SAP AG Page 221 of 257

Page 222: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.16.2.19 Create Initial Stock

UseThe purpose of this activity is to create initial stock to be used in the scenario.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C040_J30_J66_01.txt.

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu J66 MTO Processing ® Data Preparation ® Create initial stock

Transaction Code /SMB12/C030_J66_01

3. Enter the correct path for the file SMB12_MB1C_C040_J30_J66_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C030_J30.

5. Check the CATT log (optional) and go back to the installation role.

ResultYou have created initial stock.

617 Install Building Block J67 – Repetitive Manufacturing

6.17.1 Activation of Customizing

UseIn this activity, you activate the BC Sets to set up financial accounting configurations.

ProcedureThe activation is processed with the T-code SCPR20. The activation procedure of this building block is supported by the installation role.

Activation logs can help by error and warning messages.

By errors listed in the activation logs, the relevant BC-SETS must be processed separately again.

© SAP AG Page 222 of 257

Page 223: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.17.1.1 Repetitive Manufacturing Customizing

UseIn this activity, you activate the BC Sets to set up the repetitive manufacturing related configuration.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Activation of Configuration -> Product Cost by Period

Transaction Code /SMB12/S002_J67_01

2. Activate the BC Set /SMB12/0000_Reptitive_S001_67.

3. In the Enter Variable Field Values screen, change the values of the following fields:

Key field Lang. Value

Plant BP01

Plant BP0X

4. Complete the activation of the BC Set and go back to the installation role.

6.17.1.2 Batch Management for Repetitive Manufacturing

UseIn this activity, you activate the BC Sets to set up the organizational structure configuration.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> ->Activation of Configuration -> Batch Management

Transaction Code /SMB12/S003_J67_01

2. Activate the BC Set /SMB12/1400_Batch_S006_J67.

3. Complete the activation of the BC Set and go back to the installation role.

6.17.2 Completion Activities

UseIn this step you maintain addresses for sales organization and plants.

© SAP AG Page 223 of 257

Page 224: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ProcedureThis activity is supported by CATT procedures.

Refer to the installation role to start the T-Codes with external CATT variants.

6.17.2.1 Create Material Master

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J67.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing Data Preparation -> Cerate materials -> Create Material Master

Transaction Code /SMB12/L001_J67_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 21.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J67.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 224 of 257

Page 225: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J67.txt.

6.17.2.2 Create BOM

6.17.2.2.1 Creating BOM Header

UseThe produced Material must be maintained as BOM Header

Prerequisites Material master data has been created.

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_CS01_C001_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation -> Cerate BOM -> Create BOM Header Data

Transaction Code /SMB12/C001_J67_01

3. Enter the correct path for the file: SMB12_CS01_C001_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/SM30_C002_J03.

5. Check the CATT log and go back to the installation role.

6.17.2.2.2 Creating BOM Items

UseThe components of produced material must be maintained as BOM items.

Prerequisites Material master data has been created.

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_CS02_C002_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation -> Cerate BOM -> Create BOM Item Data

© SAP AG Page 225 of 257

Page 226: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Transaction Code /SMB12/C001_J67_01

3. Enter the correct path for the file: SMB12_CS02_C002_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/C002_J67_01.

5. Check the CATT log and go back to the installation role.

6.17.2.3 Create Work Center

UseThe purpose of this activity is to create work center used in repetitive manufacturing. Repetitive manufacturing normally produces in one comparative stable production line, and has normally only one work center.

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_CR01_C017_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation -> Create Work Center -> Create Work Center

Transaction Code /SMB12/C017_J67_01

3. Enter the correct path for the file: SMB12_CR01_C017_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/C017_J67_01.

5. Check the CATT log and go back to the installation role.

6.17.2.4 Create Routing

6.17.2.4.1 Create rate routing header

UseThe purpose of this activity is to create routing used in repetitive manufacturing. Repetitive manufacturing normally produces in one comparative stable production line, and has normally only one production operation.

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_CA21_C019_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation ->Create Routing -> Create rate routing header

Transaction Code /SMB12/C019_J67_01

© SAP AG Page 226 of 257

Page 227: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. Enter the correct path for the file: SMB12_CA21_C019_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/CA21_C019_J30.

5. Check the CATT log and go back to the installation role.

6.17.2.4.2 Create operations

UseThe purpose of this activity is to create routing used in repetitive manufacturing. Repetitive manufacturing normally produces in one comparative stable production line, and has normally only one production operation.

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_CA22_C020_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation ->Create Routing -> Create operations

Transaction Code /SMB12/C020_J67_01

3. Enter the correct path for the file: SMB12_CA22_C020_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/CA22_C020_J30.

5. Check the CATT log and go back to the installation role.

6.17.2.4.3 Maintain standard values

UseThe purpose of this activity is to create routing used in repetitive manufacturing. Repetitive manufacturing normally produces in one comparative stable production line, and has normally only one production operation.

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_CA22_C021_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation ->Create Routing -> Maintain standard values

Transaction Code /SMB12/C021_J67_01

3. Enter the correct path for the file: SMB12_CA22_C021_J30_J67_01.txt.

© SAP AG Page 227 of 257

Page 228: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Choose Execute to start the CATT procedure /SMB12/CA22_C021_J30.

5. Check the CATT log and go back to the installation role.

6.17.2.5 Create Production Version

UseThe production version determines the different production techniques that can be used to manufacture a material.

Production versions allow you to cater for different situations:

Production using different resources (for example two different production lines).

Production using different processes or procedures (for example, different task lists). The reprocessing of qualitatively sub-standard products is also conceivable.

Prerequisites Following master data must has been maintained:

a production line.

a routing.

a BOM.

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_MM02_C013_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation -> Create Product Version -> Set production version

Transaction Code /SMB12/C013_J67_01

3. Enter the correct path for the file: SMB12_MM02_C013_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/MM02_C013_J30.

5. Check the CATT log and go back to the installation role.

6.17.2.6 Create Material: Classification View

UseThe purpose of this activity is to create the classification and plant/storage views for raw materials.

© SAP AG Page 228 of 257

Page 229: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Prerequisites The customizing settings of Batch Management in J05 have been activated, and the basic view for the materials must exist

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_MM01_C029_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation ->Create Material: Classification View -> Material Master Classif. View

Transaction Code /SMB12/C029_J67_01

3. Enter the correct path for the file SMB12_MM01_C029_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/MM01_C029_J30.

5. Check the CATT log and go back to the installation role.

6.17.2.7 Create Batch Search Strategy

UseThe purpose of this activity is to create, a search strategy with three main control elements: selection criteria, sort rule, and quantity proposal for raw and semi-finished materials.

Prerequisites The customizing settings of Batch Management in J05 have been activated, and the basic view for the materials must exist

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_MBC1_C025_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation -> Create Batch Search Strategy-> Search Strategy for Batch Determin.

Transaction Code /SMB12/C025_J67_01

3. Enter the correct path for the file SMB12_MBC1_C025_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/MBC1_C025_J30.

5. Check the CATT log and go back to the installation role.

Result You have created the search strategy for raw and semi-finished materials.

© SAP AG Page 229 of 257

Page 230: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.17.2.8 Create Initial Stock

UseThe purpose of this activity is to create initial stock for Building Block J67.

Procedure1. Maintain the parameters included in the external CATT variant with name

SMB12_MB1C_C030_J30_J67_01.txt using your data.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J67 Repetitive Manufacturing -> Data Preparation -> Create Initial Stock -> Create Initial Stock

Transaction Code /SMB12/C030_J67_01

3. Enter the correct path for the file SMB12_MB1C_C030_J30_J67_01.txt.

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C030_J30.

5. Check the CATT log and go back to the installation role.

Result Initial stock has been created.

618 Install Building Block J70 – Procurement of Consumables

6.18.1 Business Configuration Sets Activation

6.18.1.1 Procurement of Consumables

UseThis section contains all the information needed to implement the general configurations of procurement of consumables.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J70 Procurement of Consumables ® Activation of Configuration ® Procurement of Consumables

Transaction Code /SMB12/S100_J70_01

2. Activate the BC Set /SMB12/1000_MM_PUR_CONS_S100_J70.

This BC Set is a hierarchical BC Set and consist of several BC Sets.

© SAP AG Page 230 of 257

Page 231: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

3. Complete the activation of the BC Set and go back to the installation role.

Result After performing this activity, the configuration settings of the procurement of consumables are installed in the system. The BC Set /SMB12/1000_MM_PUR_CONS_S100_J70 comprises the following BC Sets and settings:

Procurement of Consumables: /SMB12/1000_MM_PUR_CONS_S100_J70

Define PO Document Type /SMB12/VVC_T161_VF_B101_J70

Assign Partner Schemas to Document Types /SMB12/V_T161_P_B102_J70

6.18.2 Master Data

6.18.2.1 Create Vendor Master C7000

UseThe purpose of this activity is to create vendor C7000 using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XK01_L001_J70.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

J70 Procurement of Consumables ® Data Preparation ® Create Vendor

Transaction Code /SMB12/L001_J70_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 30.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XK01_L001_J70.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XK03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

© SAP AG Page 231 of 257

Page 232: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_XK01_L001_J70.txt.

619 Install Building Block J71 – Credit Control in Sales Order Process

6.19.1 Master Data Preparation

UseIn this step you prepare all the master data required for credit control in sales process.

ProcedureThis activity is supported by LSMW (Legacy System data Migration Workbench) or CATT procedures.

Refer to the installation role to start the T-Codes with external LSMW data files or CATT variants.

In the following description, you will find more information.

In case of CATT prompts error messages when executed with Background mode, try to execute it again with Foreground mode.

.

6.19.1.1 Create Credit Master via CATT

UseThe purpose of this step it to create the customer credit master via CATT method.

Procedure1. Maintain the external data file SMB12_FD32_C015_J30_J71_01.txt

© SAP AG Page 232 of 257

Page 233: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J71 Credit Control in Sales Order -> Data Preparation-> Create Credit Master

Transaction Code /SMB12/C015_J71_01

3. Enter the correct path for the file: SMB12_FD32_C015_J30_J71_01.txt

4. Choose Execute to start the CATT procedure /SMB12/FD32_C015_J30.

5. Check the CATT log and go back to the installation role.

ResultThe credit master of customer has been maintained.

620 Install Building Block J72 – Sales and Operations Planning

6.20.1 Create Master Data

6.20.1.1 Create Material Master via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J72.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J72 Sales and Operations Planning -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L001_J72_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 32.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J72.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

© SAP AG Page 233 of 257

Page 234: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J72.txt.

6.20.1.2 Create Product Group

UseCreate product group in plant BP01.

Procedure1. Maintain the external CATT variant SMB12_MC84_C062_J30_J72_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J72 Sales and Operations Planning -> Data Preparation-> Create Product Group

Transaction Code /SMB12/C062_J72_01

3. Enter the correct path for the file: SMB12_MC84_C062_J30_J72_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MC84_C062_J30.

5. Run the CATT foregroundly.

6. Check the CATT log (optional) and go back to the installation role.

This CATT can only be successfully processed foregroundly and confirm the information message during the CATT.

Result You have created product group.

© SAP AG Page 234 of 257

Page 235: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.20.1.3 Change the product group SOP_PG

UseChange the product group and set MRP flag for the product group members.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J72 Sales and Operations Planning -> Data Preparation-> Change Product Groups

Transaction Code MC86

2. In Change Product Group: Initial Screen enter the following data:

Field Name Description User action and values Comment

Product Group SOP_PG

Plant BP01

3. Press Enter to confirm your entries.

4. In screen Change Product Group: Maintain Members (Materials), select the member: SOP_FG, choose menu: Extras -> MRP flag (F8).

5. Make sure there’s a symbol “*” under the MRP flag column (M) for material SOP_FG.

6. Save the product group SOP_PG.

7. Choose pushbutton YES to confirm the popup information message.

Result You have assigned the MRP flag to the member of product group SOP_PG.

6.20.1.4 Change the product group SOP_PG

UseChange the product group and set MRP flag for the product group members.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J72 Sales and Operations Planning -> Data Preparation-> Change Product Groups

Transaction Code MC86

2. In Change Product Group: Initial Screen enter the following data:

Field Name Description User action and values Comment

Product Group SOP_PG1

Plant BP01

3. Press Enter to confirm your entries.

© SAP AG Page 235 of 257

Page 236: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. In screen Change Product Group: Maintain Members (Materials), select the member: SOP_FG01, choose menu: Extras -> MRP flag (F8).

5. Select another group member SOP_FG02, choose menu: Extras -> MRP flag (F8).

6. Make sure there’s a symbol “*” under the MRP flag column (M) for both members: material SOP_FG01and material SOP_FG02.

7. Save the product group SOP_PG1.

8. Choose pushbutton YES to confirm the popup information message.

Result You have assigned the MRP flag to the member of product group SOP_PG1.

6.20.1.5 Create Initial sales plan

UseTo ensure the BPP can be processed successfully, create the initial sales plan.

Procedure1. Maintain the external CATT variant SMB12_MC81_C063_J30_J72_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J72 Sales and Operations Planning -> Data Preparation-> Create Initial Sales Plan

Transaction Code /SMB12/C063_J72_01

3. Enter the correct path for the file SMB12_MC81_C063_J30_J72_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MC81_C063_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have created the initial sales plan.

6.20.1.6 Create Routing Header

UseTo create routing header for the relevant materials.

Procedure1. Maintain the external CATT variant SMB12_CA01_C018_J30_J72_01.TXT

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J72 Sales and Operations Planning -> Data Preparation-> Create Routing Header

Transaction Code /SMB12/C018_J72_01

3. Enter the correct path for the file SMB12_CA01_C018_J30_J72_01.TXT

© SAP AG Page 236 of 257

Page 237: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Choose Execute to start the CATT procedure /SMB12/CA01_C018_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have created routing header for material SOP_FG, SOP_FG01 and SOP_FG02.

6.20.1.7 Change Routing Item

UseCreate operations for routing.

Procedure1. Maintain the external CATT variant SMB12_CA02_C022_J30_J72_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J72 Sales and Operations Planning -> Data Preparation-> Create Initial Sales Plan

Transaction Code /SMB12/C022_J72_01

3. Enter the correct path for the file SMB12_CA02_C022_J30_J72_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CA02_C022_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have created the operations for the routing.

621 Install Building Block J74 – Product Cost Planning

6.21.1 Activation of Configuration

UseThis activity configures the settings required for Cash Management.

Procedure1. Access the transaction using:

SAP R/3 Role Menu User menu J74 Product Cost Planning Activation of Configuration Configuration Process Order Settings

Transaction Code /SMB12/S100_J74_01

2. Activate the BC Set /SMB12/PROCESSORDER_S100_J65.

3. In the Enter Variable Field Values screen, the default values for the field Plant are:

Field Value

Plant BP01

© SAP AG Page 237 of 257

Page 238: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Plant BP02

Plant BP03

Production scheduler 065

4. Complete the activation of the BC Set and go back to the installation role.

ResultAfter processing this activity, the configuration for the Process Order is installed in the system.

The BC Set /SMB12/PROCESSORDER_S100_J65 comprises the following BC Sets and settings:

Configuration Process Order Settings: /SMB12/PROCESSORDER_S100_J65

Define PP - PI Order Types /SMB12/V_T003O_40_B005_J65

Define PP - PI Order Type-Dependent Parameters /SMB12/V_T399X_40_B006_J65

Define Process Instruction Categories (General) /SMB12/O12C_B003_J65

Define Production Scheduler /SMB12/V_T024F_B002_J65

Define and Setup Control Recipe Destinations /SMB12/V_TC52_B004_J65

Define Production Scheduling Profile /SMB12/V_TCO43_40_B001_J65

Define Scheduling Parameters for Production Orders /SMB12/OPU3_B211_J65

Define checking control /SMB12/V_TCO11_B270_J65

6.21.2 Data Preparation

6.21.2.1 Material

6.21.2.1.1 General Views

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J74.txt.

2. Access the activity using one of the following navigation options:

© SAP AG Page 238 of 257

Page 239: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3Role Menu

User menu J74 Product Cost Planning Data Preparation Material Create Material Master - Gen View

Transaction Code /SMB12/L001_J74_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 19.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J74.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J74.txt.

6.21.2.2 BOM

6.21.2.2.1 Create BOM Header Data

UseIn this step, you create BOM Header for materials.

Procedure1. Process the external CATT variant SMB12_CS01_C001_J30_J74_01.TXT.

2. Start the following activity:

© SAP AG Page 239 of 257

Page 240: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation BOM Create BOM Header Data

Transaction Code /SMB12/C001_J74_01

3. Enter the correct path for file SMB12_CS01_C001_J30_J74_01.TXT.

4. Click Execute to start CATT run /SMB12/CS01_C001_J30.

5. Check the CATT log (optional) and return to the installation role.

6.21.2.2.2 Create BOM Item Data

UseIn this step, you create BOM Item data for materials.

Procedure1. Process the external CATT variant SMB12_CS02_C002_J30_J74_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation BOM Create BOM Item Data

Transaction Code /SMB12/C002_J74_01

3. Enter the correct path for file SMB12_CS02_C002_J30_J74_01.TXT.

4. Click Execute to start CATT run /SMB12/CS02_C002_J30.

5. Check the CATT log (optional) and return to the installation role.

6.21.2.3 Resources

6.21.2.3.1 Create Resources

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_CRC1_L002_J74.txt.

2. Access the activity using one of the following navigation options:

© SAP AG Page 240 of 257

Page 241: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3Role Menu

User menu J74 Product Cost Planning Data Preparation Resources Create Resources

Transaction Code /SMB12/L002_J74_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 20.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_CRC1_L002_J74.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as CRC3.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_CRC1_L002_J74.txt.

6.21.2.4 Recipes

6.21.2.4.1 Create recipe group

UseIn this step, you create recipe group 10000 for finished goods and 30000 for three semi-finished goods.

Procedure1. Process the external CATT variant SMB12_C201_C006_J30_J74_01.TXT.

© SAP AG Page 241 of 257

Page 242: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

2. Start the following activity:

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation Recipes Create recipe group

Transaction Code /SMB12/C006_J74_01

3. Enter the correct path for file SMB12_C201_C006_J30_J74_01.TXT.

4. Click Execute to start CATT run /SMB12/C201_C006_J30.

5. Check the CATT log (optional) and return to the installation role.

6.21.2.4.2 Create operations and phases

UseIn this step, you create Operations and Phases for recipe group 10000 and 30000.

Procedure1. Process the external CATT variant SMB12_C202_C007_J30_J74_01_.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation Recipes Create operations and phases

Transaction Code /SMB12/C007_J74_01

3. Enter the correct path for file SMB12_C202_C007_J30_J74_01_.TXT.

4. Click Execute to start CATT run /SMB12/C202_C007_J30.

5. Check the CATT log (optional) and return to the installation role.

6.21.2.4.3 Create standard values per phase

UseIn this step, you define the standard values for each phase of the recipes.

Procedure1. Process the external CATT variant SMB12_C202_C010_J30_J74_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation Recipes Create standard values per phase

Transaction Code /SMB12/C010_J74_01

3. Enter the correct path for file SMB12_C202_C010_J30_J74_01.TXT.

© SAP AG Page 242 of 257

Page 243: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Click Execute to start CATT run /SMB12/C202_C010_J30.

5. Check the CATT log (optional) and return to the installation role.

6.21.2.4.4 Maintain relationships of phases

UseIn this step, you maintain the relationships among the phases in the recipe.

Procedure1. Process the external CATT variant SMB12_C202_C011_J30_J74_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation Recipes Maintain relationships of phases

Transaction Code /SMB12/C011_J74_01

3. Enter the correct path for file SMB12_C202_C011_J30_J74_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C011_J30.

5. Check the CATT log (optional) and return to the installation role.

6.21.2.4.5 Allocation material-recipe-production version

UseIn this step, you allocate the material recipe production version.

Procedure1. Process the external CATT variant SMB12_C202_C012_J30_J74_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation Recipes Allocation material-recipe-prod. ver

Transaction Code /SMB12/C012_J74_01

3. Enter the correct path for file SMB12_C202_C012_J30_J74_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C012_J30.

5. Check the CATT log (optional) and return to the installation role.

© SAP AG Page 243 of 257

Page 244: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.21.2.4.6 Set production version

UseIn this step, you create the production versions for finished goods and semi-finished goods.

Procedure1. Process the external CATT variant SMB12_MM02_C013_J30_J74_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation Recipes Set production version

Transaction Code /SMB12/C013_J74_01

3. Enter the correct path for file SMB12_MM02_C013_J30_J74_01.TXT.

4. Click Execute to start CATT run /SMB12/MM02_C013_J30.

5. Check the CATT log (optional) and return to the installation role.

6.21.2.4.7 Allocation of material components

UseIn this step, you allocate the material components used in the production to the recipe operations.

Procedure1. Process the external CATT variant SMB12_C202_C014_J30_J74_01.TXT.

2. Start the following activity:

SAP R/3 Role Menu User menu J74 Product Cost Planning Data Preparation Recipes Allocation of material components

Transaction Code /SMB12/C014_J74_01

3. Enter the correct path for file SMB12_C202_C014_J30_J74_01.TXT.

4. Click Execute to start CATT run /SMB12/C202_C014_J30.

5. Check the CATT log (optional) and return to the installation role.

© SAP AG Page 244 of 257

Page 245: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

622 Install Building Block J75 – Third-Party Procurement, Subcontracting and External Processing

6.22.1 Activation of Customizing

6.22.1.1 Activation of Basic Setting

UseIn this activity, you activate the BC Sets to set up basic data.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J75 Third-Party Procurement, Subcontracting and External Processing ->Activation of Configuration -> PP Basic Settings

Transaction Code /SMB12/S001_J75_01

2. Activate the BC Set /SMB12/PP_BASIC_B001_J75.

3. In the pop up screen: Enter Variable Field Values, enter the following data:

Field BC Set Conts Value

Person responsible BP1 BP1

Person responsible BP2 BP2

Plant BP01 BP01

4. Press Enter to confirm your entry.

5. Complete the activation of the BC Set and go back to the installation role.

6.22.1.2 Activation of Shop Floor Control Settings

UseIn this activity, you activate the setting in shop floor control.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J75 Third-Party Procurement, Subcontracting and External Processing ->Activation of Configuration -> PP Shop Floor Control Settings

© SAP AG Page 245 of 257

Page 246: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

Transaction Code /SMB12/S002_J75_01

2. Activate the BC Set /SMB12/PP_SFC_B007_J75.

BC Set /SMB12/PP_SFC_B007_J75 is a hierarchy BC set, which includes the following BC sets:

BC Set Description

Production Scheduling Profile /SMB12/OPKP_B008_J75

Define Production Scheduler /SMB12/V_T024F_B009_J75

Define routing control key /SMB12/V_T430_B010_J75

Define order type of production order /SMB12/V_T003O_PP_B011_J75

Define production order type dependent parameters /SMB12/V_T399X_B012_J75

Define scheduling parameters for production order /SMB12/V_TCX00_FAUF_B013_J75

Define availability checking control for operations /SMB12/V_TCO11_B014_J75

Define order confirmation parameters /SMB12/V_TCORU_B015_J75

Define single screen entry for prod order confirmation /SMB12/V_TCORUSSDEF_B016_J75

3. In the pop up screen: Enter Variable Field Values, enter the following data:

Field BC Set Conts Value

Business function 1 1

Business function 2 2

Function area

Order Group 3 3

Order type YB01 YB01

Order type YB01 YB01

Plant BP01 BP01

Prod.Sched.Profile YB_J75 YB_J75

Production scheduler * *

Production scheduler Y75 Y75

SubProductionSchedlr

Substitute MRP ctrl.

© SAP AG Page 246 of 257

Page 247: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Press Enter to confirm your entry.

5. Complete the activation of the BC Set and go back to the installation role.

6.22.1.3 Activation of Material Management Settings

UseIn this activity, you activate the BC Sets to set up MM relevant settings.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J75 Third-Party Procurement, Subcontracting and External Processing ->Activation of Configuration -> MM Settings

Transaction Code /SMB12/S003_J75_01

2. Activate the BC Set /SMB12/MM_B025_J75.

BC Set /SMB12/MM_B025_J75is a hierarchy BC set, which includes the following BC sets:

BC Set Description

Define plant parameters for Inventory Management /SMB12/V_159L_B022_J75

Set up subcontracting order /SMB12/V_161V_L_B017_J75

Carry Out Overall Maintenance of MRP Groups /SMB12/T438M_B027_J75

Define MRP Controller /SMB12/V_T024D_B018_J75

3. In the pop up screen: Enter Variable Field Values, enter the following data:

Field BC Set Conts Value

Business Area

Del. type f. subcon. LB LB

MRP Controller Y01 Y01

MRP Controller Y02 Y02

MRP Group YB01 YB01

MRP Group YB02 YB02

MRP Group YB03 YB03

Plant BP01 BP01

Supplying plant BP01 BP01

© SAP AG Page 247 of 257

Page 248: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

4. Press Enter to confirm your entry.

5. Complete the activation of the BC Set and go back to the installation role.

6.22.1.4 Activation of Sales and Distribution Settings

UseIn this activity, you activate the BC Sets to set up SD relevant settings.

Procedure1. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J75 Third-Party Procurement, Subcontracting and External Processing ->Activation of Configuration -> SD Settings

Transaction Code /SMB12/S004_J75_01

2. Activate the BC Set /SMB12/SD_B026_J75.

BC Set /SMB12/SD_B026_J75 is a hierarchy BC set, which includes the following BC sets:

BC Set Description

Sales Document Type /SMB12/V_TVAK_B019_J75

Delivery Type /SMB12/V_TVLK_B020_J75

Item Categories /SMB12/V_T184_B023_J75

Billing Document type /SMB12/V_TVFK_B021_J75

Copying Control /SMB12/V_TVCPLAK_B024_J75

3. In the pop up screen: Enter Variable Field Values, enter the following data:

Field BC Set Conts Value

Billing type YBMO YBMO

Delivery Type YBMO YBMO

Sales document type YBMO YBMO

4. Press Enter to confirm your entry.

5. Complete the activation of the BC Set and go back to the installation role.

© SAP AG Page 248 of 257

Page 249: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.22.2 Create Master Data

6.22.2.1 Create Material Master via eCATT/LSMW

UseThe purpose of this activity is to create the Material Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_MM01_L001_J75.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J75 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L001_J75_01

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 33.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_MM01_L001_J75.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as MM03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 249 of 257

Page 250: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_MM01_L001_J75.txt.

6.22.2.2 Create Customer Master J75 via eCATT/LSMW

UseThe purpose of this activity is to create the Customer Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XD01_L001_J75.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J75 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Customer Master

Transaction Code /SMB12/L001_J75_02

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 34.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XD01_L001_J75.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XD03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 250 of 257

Page 251: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_XD01_L001_J75.txt.

6.22.2.3 Create Vendor Master via eCATT/LSMW

UseThe purpose of this activity is to create the Vendor Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_XK01_L001_J75.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J75 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Vendor Master

Transaction Code /SMB12/L001_J75_03

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 35.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_XK01_L001_J75.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as XK03.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 251 of 257

Page 252: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_XK01_L001_J75.txt.

6.22.2.4 Create Condition Master data via eCATT/LSMW

UseThe purpose of this activity is to create the Condition Master using LSMW in an automated process supported by eCATT.

For more information about using the LSMW with or without the eCATT tool, see the section Legacy System Migration Workbench in Essential Information.

Procedure1. Maintain the external LSMW variant file SMB12_PR00_L001_J75.txt.

2. Access the activity using one of the following navigation options:

SAP R/3Role Menu

Installation Menu: J75 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Material Master

Transaction Code /SMB12/L001_J75_04

3. On the /SMB12/START_ECATT screen, ensure that the Test Configuration field contains the value /SMB12/LSMW_FRAME_T000_J30, and the Variant field contains the variant for the relevant master data file, such as 36.

4. Choose Execute to start the eCATT procedure.

5. If the dialog box saplogon concerning the SAP GUI is displayed by the system, choose OK.

6. On the Browse for Folder pop-up window, specify the path where the variant file SMB12_PR00_L001_J75.txt is stored.

7. If the eCATT procedure has been finished successfully, the dialog box Status: Completed is displayed.

8. Check if the corresponding master data has been imported as indicated in the dialog box either with transaction SM35 or by using the relevant transaction depending on the master data object, such as VK13.

9. The eCATT Log Display … screen is displayed. Check the results.

10. Green symbols show that the eCATT procedure has been executed without errors.

This does not indicate that the LSMW has successfully imported the master data. To check the actual master data import, see step 8.

11. If the eCATT procedure has not been finished successfully, the eCATT Log Display … screen displays red symbols indicating the eCATT errors. In this case, import the master data using the LSMW directly without the eCATT procedure. To do this, refer to the section Legacy System Migration Workbench in Essential Information.

12. Choose Back to return to the installation role.

© SAP AG Page 252 of 257

Page 253: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

ResultYou have maintained material master data using the following LSMW file via ECATT: SMB12_PR00_L001_J75.txt.

6.22.2.5 Create Initial Stock for Material

UseTo ensure that the sales process runs smoothly, sufficient quantities of the materials HT2-1300, HT2-1120 and HT2-1210 should be posted to unrestricted-use stock before MRP run.

Procedure1. Maintain the external CATT variant SMB12_MB1C_C030_J30_J59_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Initial Stock

Transaction Code /SMB12/C059_J75_01

3. Enter the correct path for the file: SMB12_MB1C_C030_J59_J75_01.txt

4. Choose Execute to start the CATT procedure /SMB12/MB1C_C059_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have posted the materials to unrestricted stock.

6.22.2.6 Create Info record

UseCreate source list for material HT2-1100, HT2-1110 and HT2-1200.

Procedure1. Maintain the external CATT variant SMB12_ME11_C032_J30_J75_01.txt for material HT2-

1200

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Info Record

Transaction Code /SMB12/C032_J75_01

3. Enter the correct path for the file: SMB12_ME11_C032_J30_J75_01.txt

4. Choose Execute to start the CATT procedure /SMB12/ME11_C032_J30

5. Check the CATT log (optional) and go back to the installation role.

6.

© SAP AG Page 253 of 257

Page 254: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

7. Maintain the external CATT variant SMB12_ME11_C051_J30_J75_01.txt for material HT2-1100 and HT2-1110

8. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Info Record (STD)

Transaction Code /SMB12/C051_J75_01

9. Enter the correct path for the file: SMB12_ME11_C051_J30_J75_01

10. Choose Execute to start the CATT procedure /SMB12/ME11_C051_J30

11. Check the CATT log (optional) and go back to the installation role.

Result You have created the info record.

6.22.2.7 Create Source List

UseCreate source list for material HT2-1100 and HT2-1110.

Procedure1. Maintain the external CATT variant SMB12_ME01_C60_J30_J75_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Source List

Transaction Code /SMB12/C060_J75_01

3. Enter the correct path for the file: SMB12_ME01_C60_J30_J75_01.txt

4. Choose Execute to start the CATT procedure /SMB12/ME01_C060_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have created the source list.

6.22.2.8 Create BOM

UseCreate BOM via two step’s CATT, first to create the BOM header, then create the BOM item.

Procedure1. Maintain the external CATT variant SMB12_CS01_C001_J30_J75_01.txt

2. Access the activity using one of the following navigation options:

© SAP AG Page 254 of 257

Page 255: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create BOM Header

Transaction Code /SMB12/C001_J75_01

3. Enter the correct path for the file: SMB12_CS01_C001_J30_J75_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CS01_C001_J30

5. Check the CATT log (optional) and go back to the installation role.

6. Maintain the external CATT variant SMB12_CS02_C002_J30_J75_01.txt

7. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create BOM Item

Transaction Code /SMB12/C002_J75_01

8. Enter the correct path for the file: SMB12_CS02_C002_J30_J75_01.txt

9. Choose Execute to start the CATT procedure /SMB12/CS02_C002_J30

10. Check the CATT log (optional) and go back to the installation role

Result You have created the BOM.

6.22.2.9 Create Work Center

UseCreate Work center.

Procedure1. Maintain the external CATT variant SMB12_CR01_C017_J30_J75_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Work Center

Transaction Code /SMB12/C017_J75_01

3. Enter the correct path for the file: SMB12_CR01_C017_J30_J75_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CR01_C017_J30

5. Check the CATT log (optional) and go back to the installation role.

Result You have created the work center.

© SAP AG Page 255 of 257

Page 256: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

6.22.2.10 Create Routing

UseCreate routings via two step’s CATT, first to create the routing header, then create the operations.

Procedure1. Maintain the external CATT variant SMB12_CA01_C018_J30_J75_01.txt

2. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Routing Header

Transaction Code /SMB12/C018_J75_02

3. Enter the correct path for the file: SMB12_CA01_C018_J30_J75_01.txt

4. Choose Execute to start the CATT procedure /SMB12/CA01_C018_J30

5. Check the CATT log (optional) and go back to the installation role.

6. Maintain the external CATT variant SMB12_CA02_C061_J30_J75_01.txt

7. Access the activity using one of the following navigation options:

SAP R/3 Role Menu Installation Menu: J51 Third-Party Procurement, Subcontracting and External Processing -> Data Preparation-> Create Routing Operation

Transaction Code /SMB12/C061_J75_03

8. Enter the correct path for the file: SMB12_CA02_C061_J30_J75_01.txt

Run this step only at foreground, and ignore the error message during the CATT.

9. Choose Execute to start the CATT procedure /SMB12/CA02_C061_J30

10. Check the CATT log (optional) and go back to the installation role

Result You have created the routing.

© SAP AG Page 256 of 257

Page 257: China Baseline Package Master Building

SAP Best Practices China Core Master Building Block (J01): Installation Guide

© SAP AG Page 257 of 257