Page 1 of 8 Fax: 0522-2465754 e-male: [email protected] No. EL/3.1.35/2 Elect. Dated: 02.02.2016 Chief Electrical Engineer, 1. Central Railway, Mumbai, CST-400 001. 2. East Central Railway, Hazipur-844101. 3. Eastern Railway, Fairlie Place, Kolkata-700001. 4. Northern Railway, Baroda House, New Delhi-110001. 5. South Central Railway, Rail Nilyam, Secunderabad-500 071. 6. South East Central Railway, Bilaspur-495004. 7. South Eastern Railway, Garden Reach, Kolkata -700 043. 8. Southern Railway, Park Town, Chennai-600 003. 9. West Central Railway, Jabalpur-482001. 10. Western Railway, Churchgate, Mumbai-400 020 11. Chittaranjan Locomotive Works, Chittaranjan – 713 331 TECHNICAL CIRCULAR No. RDSO/2016/EL/TC/0133, Rev. ‘0’, DATED:01.02.2016 Sub: Instructions to form Multiple Unit of Three Phase Electric locomotives. 1.0 Introduction 1.1 In multiple operation a maximum of two locomotives can be operated. Both must be directly coupled to one another. They must not be separated by a carriage. 1.2 While in motion, the front driver's cab is usually activated. 1.3 When linking up or in unusual situations, it is also possible to control the locomotives from another driver's cab. 1.4 The train bus configuration for multiple operation is only possible from the driver's cab at the uncoupled end. A configuration from a rear driver's cab is referred to as single-unit traction. 1.5 The train bus automatically checks the configuration. 1.6 The leading manned locomotive is called the master locomotive and the other one is called the slave locomotive. 1.7 The two locomotives are correctly linked together once the mechanical and pneumatic systems and the UIC cable have been connected. 1.8 Commands are transmitted down the UIC cable. 2.0 Steps to be followed during the coupling of locomotives 2.1 Both locomotives must be deactivated.

Upload: tranliem

Post on 22-Mar-2018

244 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Chief Electrical Engineer, - WELCOME TO RDSOrdso.indianrailways.gov.in/works/uploads/File/TC_133_Rev...Chief Electrical Engineer, Chittaranjan Locomotive Works, For information Chittaranjan-713331

Page 1 of 8

Fax: 0522-2465754 e-male: [email protected] No. EL/3.1.35/2 Elect. Dated: 02.02.2016

Chief Electrical Engineer,

1. Central Railway, Mumbai, CST-400 001. 2. East Central Railway, Hazipur-844101. 3. Eastern Railway, Fairlie Place, Kolkata-700001. 4. Northern Railway, Baroda House, New Delhi-110001. 5. South Central Railway, Rail Nilyam, Secunderabad-500 071. 6. South East Central Railway, Bilaspur-495004. 7. South Eastern Railway, Garden Reach, Kolkata -700 043. 8. Southern Railway, Park Town, Chennai-600 003. 9. West Central Railway, Jabalpur-482001. 10. Western Railway, Churchgate, Mumbai-400 020 11. Chittaranjan Locomotive Works, Chittaranjan – 713 331

TECHNICAL CIRCULAR No. RDSO/2016/EL/TC/0133, Rev. ‘0’, DATED:01.02.2016

Sub: Instructions to form Multiple Unit of Three Phase Electric locomotives.

1.0 Introduction

1.1 In multiple operation a maximum of two locomotives can be operated. Both must

be directly coupled to one another. They must not be separated by a carriage.

1.2 While in motion, the front driver's cab is usually activated.

1.3 When linking up or in unusual situations, it is also possible to control the locomotives from another driver's cab.

1.4 The train bus configuration for multiple operation is only possible from the

driver's cab at the uncoupled end. A configuration from a rear driver's cab is referred to as single-unit traction.

1.5 The train bus automatically checks the configuration.

1.6 The leading manned locomotive is called the master locomotive and the other

one is called the slave locomotive.

1.7 The two locomotives are correctly linked together once the mechanical and pneumatic systems and the UIC cable have been connected.

1.8 Commands are transmitted down the UIC cable.

2.0 Steps to be followed during the coupling of locomotives 2.1 Both locomotives must be deactivated.

Page 2: Chief Electrical Engineer, - WELCOME TO RDSOrdso.indianrailways.gov.in/works/uploads/File/TC_133_Rev...Chief Electrical Engineer, Chittaranjan Locomotive Works, For information Chittaranjan-713331

Page 2 of 8

2.2 The key switch must be in position "0".

2.3 Couple both locomotives mechanically, pneumatically and connect the UIC cable.

2.4 Close the isolating cock on the brake supply line (on pneumatic manifold) of the

locomotives as below.

2.4.1 Setting- up Control stand

a. E-70 brake system

Fig 1- Brake controller of E-70 Remove A-9 handle from Slave Loco on Neutral position and fix A-9 handle only on Master Loco leading cab.

b. Computer Controlled Brake System (CCB)

Fig 2 - Brake Controller of CCB (i) Setting lead/trail switches for multiple loco operation in Master loco

Non-working cab

Auto Brake Handle – Full Service (FS) & Lock Direct Brake Handle – release (REL) Selector Switch – TRAIL

Selector Switch

Auto Brake Handle

Direct Brake Handle

Page 3: Chief Electrical Engineer, - WELCOME TO RDSOrdso.indianrailways.gov.in/works/uploads/File/TC_133_Rev...Chief Electrical Engineer, Chittaranjan Locomotive Works, For information Chittaranjan-713331

Page 3 of 8

Working cab

Auto Brake Handle – RUN Direct Brake Handle – FULL when stopped & REL for moving the Locomotive Selector Switch – LEAD

(ii) Setting lead/trail switches for multiple loco operation in Slave loco

On both cab (Both are Non-Working) Auto Brake Handle – Full Service (FS) & Lock Direct Brake Handle – Release (REL) Selector Switch – TRAIL

2.4.2 Setting up of Control panel

a. E-70 Brake Panel

MODE

ISOLATING COCK POSITION

47 DEAD ENGINE

74 (EMERGENCY/

VIG)

136 (BRAKE FEED

PIPE)

70 (E70 BRAKE

PIPE)

MULTIPLE UNIT

LEAD (LIVE)

CLOSED (OUT)

OPEN (VERTICAL)

OPEN (HORIZONTAL)

OPEN (VERTICAL)

TRAIL (LIVE)

CLOSED (OUT)

OPEN (VERTICAL)

CLOSED (VERTICAL)

OPEN (VERTICAL)

TRAIL (DEAD)

CLOSED (OUT)

CLOSED (HORIZONTAL)

CLOSED (VERTICAL)

CLOSED (HORIZONTAL)

Fig 3 - E-70 brake panel

COCK 47

COCK 136

COCK 70

COCK 74

Page 4: Chief Electrical Engineer, - WELCOME TO RDSOrdso.indianrailways.gov.in/works/uploads/File/TC_133_Rev...Chief Electrical Engineer, Chittaranjan Locomotive Works, For information Chittaranjan-713331

Page 4 of 8

b. CCB Brake Panel

MODE

ISOLATING COCK POSITION

47 DEAD ENGINE

74 (EMERGENCY/

VIG)

136 (BRAKE FEED

PIPE) PER COS

MULTIPLE UNIT

LEAD (LIVE)

CLOSED (OUT)

OPEN (VERTICAL)

OPEN (HORIZONTAL)

CLOSED (HORIZONTAL)

TRAIL (LIVE)

CLOSED (OUT)

CLOSED (HORIZONTAL)

CLOSED (VERTICAL)

CLOSED (HORIZONTAL)

TRAIL (DEAD)

CLOSED (OUT)

CLOSED (HORIZONTAL)

CLOSED (VERTICAL)

CLOSED (HORIZONTAL)

Fig 4 - CCB brake panel

COCK-74

COCK-136

COCK- PER COS

COCK-47

Page 5: Chief Electrical Engineer, - WELCOME TO RDSOrdso.indianrailways.gov.in/works/uploads/File/TC_133_Rev...Chief Electrical Engineer, Chittaranjan Locomotive Works, For information Chittaranjan-713331

Page 5 of 8

2.5 Move the key switch on the slave locomotive into position "D and, as soon as the light test starts (display Node-504), turn back to position"0". The MCE on the slave locomotive is now in self-hold mode (for 10 minute).

2.6 During the self-hold mode of the slave locomotive, move key switch into Pos."D

on the master locomotive. The control electronics starts to configure the trainbus. 2.7 After the configuration procedure, screen on the display shows the serial

numbers of the master and slave locomotives.

Example:

Train Configuration

Loco 3XXXX Loco 3XXXX

3.0 Problem in formation of Multi

3.1 If configuration proves impossible (or if no slave locomotive is available)

locomotive number 00000 appears.

3.2 If more than one driver's cab is activated in both locomotives, one loco will be shut down and a corresponding message appears on the displays in both locomotives.

3.3 If the multi is formed and for any reason the train bus link is interrupted then

system protection initiates a monitored shut down of the slave locomotive. Due to interruption of train bus the pantograph of the slave locomotive is lowered and a corresponding fault message appears on the screen of the master locomotive. In case of 3.1, 3.2 and 3.3 above initiate procedure from clause 2.0. If still the multi is not forming then follow steps as per clause 4.0 below.

4.0 In case the multiple unit is not working even after adopting the above procedure following should be insured: 4.1 All sub - D connectors have 9 pin hence care should be taken that each sub D

connected at proper place on Train Bus-coupler XVB708.

Check the continuity between UIC Socket pin and connector F of connecting box trainbus (Train Bus-coupler XVB708).

Loco coupled on side UIC Socket pin no. connector F of

connecting box train bus pin no.

Cab -1 10 1 & 2

11 3 & 4

Cab - 2 10 6 & 7

11 8 & 9

Cab - 1 or 2 13 Body of connector

Page 6: Chief Electrical Engineer, - WELCOME TO RDSOrdso.indianrailways.gov.in/works/uploads/File/TC_133_Rev...Chief Electrical Engineer, Chittaranjan Locomotive Works, For information Chittaranjan-713331

Page 6 of 8

Fig 5 - Train Bus-coupler

4.2 Position of Sub-D connector on connecting box trainbus (Train Bus-coupler XVB708) a. ‘H’ connected to XG of Central Electronic-1 (CEL-1). b. ‘D’ for power supply for Train Bus-coupler XVB708. c. ‘F’ connected to UIC Socket.

4.3 If labeling not available on the connecter, procedure to find right connector

S. No.

Connector on connecting box trainbus(Train Bus-coupler XVB708). Remove all the connectors from the connecting box. Type of coupler

Procedure to check correctness

1 D (Power Supply)

Check the voltage between following pin Pin no. Pin no voltage

1 4 The voltage should be

85 to 110 V

1 5 2 4 2 5

2 F (UIC Socket)

Short the UIC Socket pin no 10 & 11 of cab-1. Check the continuity at the following pin of connector F

Pin no. Pin no continuity

1 3 There

should be between

pair of pins

1 4

2 3

2 4

Short the UIC Socket pin no 10 & 11 of cab-2. Check the continuity at the following pin of connector F

From CEL

To UIC Socket

Power Supply

Page 7: Chief Electrical Engineer, - WELCOME TO RDSOrdso.indianrailways.gov.in/works/uploads/File/TC_133_Rev...Chief Electrical Engineer, Chittaranjan Locomotive Works, For information Chittaranjan-713331

Pin no. Pin no continuity

1 3 There1 4 should be

continuity2 3 between

2 4 pair of pins

Remove the Sub D connector XG from cell 1. Checkthe continuity between XG pin no 1and H pin no 1.

Pin no. ofPin no. of H

XGconnector

continuityconnector

1 12 2

3 H (CEL) 3 34 4 There

5 5should bebetween

6 6pair of pins

7 78 89 9

4.4 In case of message no. F1901 P1 "TRAIN BUS ISLATED' appears on DDU (orPIXY) then follow the following:a. Switch off MCE and then Switch on MCE.b. If the message appears again then check ZVB card and its peri-card LA A424

C01.c. If ZVB card is Ok then 411 YC (adopter coding key) may be defective.

Change the same and follow the procedure as per clause 2.

4.5 In c<;lsethe multiple unit is not working even after adopting the above procedureZVB card and its Peri-Card LA A424 C01 should be checked.

5.0 The above procedures apply for WAP-5, WAP-7, WAG-9 and WAG-9H class oflocomotives.

~~lb o'V\D

(Suresh Kumar)for Director General Electrical

Secretary (Electric Traction), For kindRailway Board, informationRail Bhavan, New Delhi-11 0001. please.1. Chief Electrical Engineer, Chittaranjan Locomotive Works, For information

Page 8: Chief Electrical Engineer, - WELCOME TO RDSOrdso.indianrailways.gov.in/works/uploads/File/TC_133_Rev...Chief Electrical Engineer, Chittaranjan Locomotive Works, For information Chittaranjan-713331

Chittaranjan-713331.Chief Works Manager, Electric Loco Workshop, Central Railway,Bhusawal-425 201.Chief Works Manager, Electric Loco Workshop, Eastern Railway,Kancharapara, 24 Pargana (N) - 743145 (W.B.)Chief Works Manager, Loco, Carriage & Wagon Works, WesternRailway, Dahod, P.O. Freeland Gank - 389160 (Gujrat)Sr. DEE (TRS), Electric Loco Sheds,

Central Railway, Ajni (Nagpur)-440008.South East Central Railway, BMY Complex, Bhilai,Durg-490 025.

West Central Railway, Tughlakabad, New Delhi-110 044.Northern Railway, Ghaziabad (UP)-201 001.East Central Railway, Gomoh-828 401South Central Railway, Lallaguda, Secunderabad - 500 017.Eastern Railway, Howrah-.South Eastern Railway, Tatanagar-831 002.Western Railway, Vadodara-390 002.Southern Railway, Royapuram, Chennai-600 013.Central Railway, Kalyan-421304 (Maharashtra)

and necessaryaction please.

~~~O'l.-\\bO'VI

(Suresh Kumar)for Director General Electrical