chesterfield power station lower pond initial safety
TRANSCRIPT
Prepared for
Dominion 5000 Dominion Boulevard
Glen Allen, Virginia 23060
COAL COMBUSTION RESIDUALS INITIAL SAFETY FACTOR ASSESSMENT
for
VIRGINIA ELECTRIC AND POWER COMPANY CHESTERFIELD POWER STATION
LOWER ASH POND CHESTERFIELD COUNTY, VIRGINIA
Prepared by
Geosyntec consultants
t 11)',llll't'I' I "('it·111i."'h 111110\'lll(JI',
9211 Arboretum Parkway, Suite 200 Richmond, Virginia 23236
MV1373 October 2016
Coal Combustion Residuals Safety Factor Assessment Geosyntec C> Chesterfield Power Station Lower Ash Pond
consultants
TABLE OF CONTENTS
1. CERTIFICATION/STATEMENT OF PROFESSIONAL OPINION ....... .......... .1
2. INTRODUCTION ......... ........ .... ....... .......... .......... ... .............. ...... ... .. ......... .... ... ..... 2
3. PURPOSE............ .................................................................................................. 2
4. FACTOR OF SAFETY ASSESSMENT REQUIREMENTS ...............................2
5. FACTOR OF SAFETY ASSESSMENT ................................ ........ ... ... .. .... .... ..... ..3 5.1 Long-Term Maximum Storage Pool Loading Condition .... ... ..... ............ ... ..4
5.2 Maximum Surcharge Pool Loading Conditions ....................... ............. ...... .4
5.3 Seismic Factor of Safety...............................................................................5
5.4 Liquefaction Factor of Safety ........... .... ... .. ... ..... .......... ................... ............ ..5
6. CONCLUSION .. ..... .. ....... ... ................... ..... ... .... .............. ... ..................................5
7. REFERENCES ......................................................................................................5
LIST OF APPENDICES
Appendix A Slope Stability Results
CCR LAP Safety Factor Assessment Final October 2016
Coal Combustion Residuals Safety Factor Assessment Geosyntec C> Chesterfield Power Station Lower Ash Pond
consultants
1. CERTIFICATION/STATEMENT OF PROFESSIONAL OPINION
The Initial Safety Factor Assessment for the Chesterfield Power Station Lower Ash Pond was prepared by Geosyntec Consultants, Inc. (Geosyntec ). The Assessment was based on certain information that, other than for information Geosyntec originally prepared, Geosyntec has relied on but not independently verified. This Certification/Statement of Professional Opinion is therefore limited to the information available to Geosyntec at the time the Assessment was written. On the basis of and subject to the foregoing, . it is my professional opinion as a Professional Engineer licensed in the Commonwealth of Virginia that the Assessment has been prepared in accordance with good and accepted engineering practices as exercised by other engineers practicing in the same discipline(s), under similar circumstances, at the same time, and in the same locale. It is my professional opinion that the Assessment was prepared consistent with the requirements of Section 257.73(e) of the United States Environmental Protection Agency's "Disposal of Coal Combustion Residuals From Electric Utilities," published in the Federal Register on April 17, 2015 with an effective date of October 19, 2015 (40 CFR 257 Subpart D).
The use of the words "certification" and/or "certify" in this document shall be interpreted and construed as a Statement of Professional Opinion and is not and shall not be interpreted or construed as a guarantee, warranty or legal opinion.
Geosyntec Consultants, Inc.
1it:li,TH i~ · NNETH • SHERIDAN
\ 1 Lie. No. 045360 fJ,; •
•oA ,i!;I •• ~& e:,<f:~!
•••••••••• 810NAL~ e•
Scott Sheridan, P .E. Principal
•••••••o;•:;\
CCR LAP Safety Factor Assessment Final October 2016
Coal Combustion Residuals Factor of Safety Assessment Geosyntec C> Chesterfield Power Station Lower Ash Pond
consultants
2. INTRODUCTION
The Chesterfield Power Station (Station) is owned by Virginia Electric and Power Company d/b/a Dominion Virginia Power (Dominion) and is located in Chesterfield County, Virginia. The Station includes the Lower Ash Pond (LAP) impoundment, which is a component of the Station's wastewater treatment system utilized to manage and settle solids, including CCRs.
The LAP is located on Dominion property at the Chesterfield Power Station in Chesterfield County, Virginia (coordinates 37.3737° North and 77.3795° West) and is bounded by the Old Channel of the James River and the Upper Pond on the south, Henricus Park Road on the east, Coxendale Road on the north, and the thermal channel to the west.
The LAP is regulated as an existing CCR surface impoundment under the Environmental Protection Agency's "Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments" [ 40 CFR 257 Subpart D] published in the Federal Register on April 17, 2015 with an effective date of October 19, 2015 (CCR Rule).
3. PURPOSE
This Initial Safety Factor Assessment (Assessment) 1s prepared pursuant to § 257.73(e)(l) of the CCR Rule [40 CFR § 257.73(e)(l)].
4. FACTOR OF SAFETY ASSESSMENT REQUIREMENTS
In accordance with § 257.73(e)(l), a CCR surface impoundment owner or operator "must conduct initial and periodic safety factor assessments for each CCR unit and document whether the calculated factors of safety for each CCR unit achieve the minimum safety factor for the critical cross section of the embankment."
Furthermore, § 257.73(e)(l) requires that safety assessments be conducted for the following conditions of the impoundment and that the safety factor assessments be supported by appropriate engineering calculations:
• The calculated static factor of safety under the long-term, maximum storage pool loading condition must equal or exceed 1.50;
CCR LAP Safety Factor Assessment Final 2 October 2016
Coal Combustion Residuals Factor of Safety Assessment Geosyntec t> Chesterfield Power Station Lower Ash Pond
consultants
• The calculated static factor of safety under the maximum surcharge pool loading condition must equal or exceed 1 .40;
• The calculated seismic factor of safety must equal or exceed 1.00; and
• For dikes constructed of soils that are susceptible to liquefaction, the calculated liquefaction factor of safety must equal or exceed 1.20.
This Assessment will document the factors of safety for the LAP as required by § 257.73(e)(l).
5. FACTOR OF SAFETY ASSESSMENT
The LAP receives CCR sluice water and other low volume wastewater streams from the Station. The western side of the LAP is operated to manage and settle solids prior to discharge of ponded surface water through the outfall structure. The LAP embankment along the western side of the pond, near the outfall, was determined to be the critical section for purposes of this Assessment. The material strength parameters used in the analyses were obtained from the Field Investigation and Laboratory Testing Report (Geosyntec, 2016a) which provides a compilation of historic and recent subsurface exploration and laboratory testing programs. The phreatic surface used in the analyses was dependent on the condition being assessed and is discussed for each analysis.
The factors of safety calculated for each condition are summarized in Table 1 and are summarized below.
Table 1 Calculated Factors of Safety
Factor of Safety Condition Minimum Factor of Safety Calculated Factor of Safety
Long-term, maximum storage pool loading
1.50 1.67
Maximum surcharge pool loading 1.40 1.44
Seismic factor of safety 1.00 1.03
Liquefaction factor of safety 1.20 1.21
Calculations results are included in Appendix A.
CCR LAP Safety Factor Assessment Final 3 October 2016
Coal Combustion Residuals Factor of Safety Assessment Geosyntec t> Chesterfield Power Station Lower Ash Pond
consultants
5.1 Critical Cross Sections
The critical cross sections are those on the western embankments (adjacent to the thermal channel) and the southern embankment. In the stability calculation package, Cross Sections B, D and E are identified as the critical cross sections: B is the critical cross section for liquefaction, D is the critical cross section for the maximum surcharge pool loading and E is the critical cross section for the drained and seismic conditions. Both cross sections have Factors of Safety within 10% of each other in all scenarios. The potential failure surfaces occur through the upper embankment and the lower embankment (Old Aiken Marsh Islet) layers, which consist of sandy silts and low and high plasticity clays; thus, these layers are considered the critical layers of the embankment.
5.2 Long-Term Maximum Storage Pool Loading Condition
According to the preamble of the CCR Rule, Section E.3.b.ii.b, the maximum storage pool loading is "the maximum water level that can be maintained that will result in full development of a steady-state seepage condition." The Rule goes on to state that "the maximum storage pool loading needs to consider a pool elevation in the CCR unit that is equivalent to the lowest elevation of the invert of the spillway, i.e., the lowest overflow point of the perimeter of the embankment."
Ponded surface water from the LAP is discharged through a concrete outfall structure. The weir in the outfall structure is maintained at elevation 15.8 feet, and the normal pool elevation in the LAP is 16 feet; therefore, the long term maximum storage pool loading condition will have a phreatic surface elevation of 16 feet. The phreatic surface through the embankment is based on piezometric data collected as part of geotechnical investigations described in Geosyntec, 2016a. The thermal channel water surface varies slightly due to tidal fluctuations; however, the water surface elevation is typically 4 feet.
The calculated static factor of safety is 1.67 for the embankment and meets the requirement for the long term maximum storage pool condition (1.50).
5.3 Maximum Surcharge Pool Loading Conditions
The water elevation for the maximum surcharge pool loading condition is based on the 1,000-year flood event. Based on the design storm, the phreatic surface was modeled to be elevation 18 feet (Geosyntec, 2016b ). The calculated static factor of safety is 1.44 for
CCR LAP Safety Factor Assessment Final 4 October 2016
Coal Combustion Residuals Factor of Safety Assessment Geosyntec e> Chesterfield Power Station Lower Ash Pond
consultants
the embankment and meets the requirement for the maximum surcharge pool condition (1.40).
5.4 Seismic Factor of Safety
The seismic factor of safety was analyzed with a seismic loading event with a 2% probability of exceedance in 50 years, based on United States Geological Survey (USGS) seismic hazard maps. A peak ground acceleration of 0.128g was used in the analyses (Geosyntec, 2016c).
The long term maximum storage pool loading condition was evaluated under seismic conditions. The calculated factor of safety of 1.03 for the embankment and meets the requirement for the maximum surcharge pool condition (1.00).
5.5 Liquefaction Factor of Safety
The liquefaction assessment includes an analysis of potentially liquefiable soils followed by a slope stability analysis using the residual shear strengths that result from a liquefied soil layer. Liquefaction analyses used boring logs from previous subsurface investigations and a design earthquake with a magnitude of 5.7. The calculated factor of safety of 1.21 for the soils in the embankment (Youd, 2001) meets the requirement (1.20).
6. CONCLUSION
In Geosyntec' s opinion, the LAP meets or exceeds the minimum factors of safety as required by§ 257.73(e)(l).
7. REFERENCES
Duncan, J.M. and Steven C. Wright (2005). "Soil Strength and Slope Stability", Hoboken, New Jersey. pp. 79.
Environmental Protection Agency (EPA) (2015). "Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule. 40 CFR Parts 257 and 261: Part II. EPA-HQ-RCRA2009- 0640; FRL-9919-44-OSWER.
Geosyntec Consultants Inc. Field Investigation and Laboratory Testing Report, Lower Ash Pond, Chesterfield Power Station, Chesterfield County, Virginia. 2016a.
CCR LAP Safety Factor Assessment Final 5 October 2016
Coal Combustion Residuals Factor of Safety Assessment Geosyntec C> Chesterfield Power Station Lower Ash Pond
consultants
Geosyntec Consultants Inc. Coal Combustion Residuals Inflow Design Flood Control System Plan, Lower Ash Pond, Chesterfield Power Station, Chesterfield County, Virginia. 2016b.
Geosyntec Consultants, 2016. Memorandum - LAP and L VWWTS Seismic Design Data Analysis. May 3, 2016c.
United States Environmental Protection Agency, 2015. 40 CFR Parts 257 and 261 Hazardous and Solid Waste Management System; Disposal ofCoal Combustion Residualsfrom Electric Utilities,· Final Rule. April 17, 2015.
Youd, T.L. et. al. "Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils." Journal of Geotechnical and Geoenvironmental Engineering. October 2001: 817-83 3.
CCR LAP Safety Factor Assessment Final 6 October 2016
C 0 C § '-' 0
A
B
C
D
JsE ' "' ~ ~ ~ ~
N ,-~
0 ('. 0 ~
" ~ ' " " 0
I " 5 >
" i"
"" I
~ 0 w ;", ~ w ~ ~
" > ::1F N
> 3, z 0 z "' 0 0
I
:l w C: ~
~ w I '-' 5-
-
· B-1A1
'<1~/ _ GSC-24 FFP-GSG-24
SJ •c, B(~
c7 =~ E-SPT6
o(;/; 0 (? (11
E-SPT1
'~Jl\\ E-SPT2
=
\ W\l 0
1 •
/o -~ ~ .. : , :~--~ 0
Q'.:) Q • ••
•
•
0
I • 0 .
REV
TITLE:
PROJECT:
SITE:
( SIGNATURE
DATE
J LEGEND
B-1A-4- - EXISTING SPT
GSB-1-4- - AS-BUILT GEOSYNTEC LAP SPT
GSB-12+ - AS-BUILT GEOSYNTEC LVWWTS SPT
GSC-1 )8( - AS-BUILT GEOSYNTEC LAP CPT
GSC-lF )8( - AS-BUILT GEOSYNTEC LAP FFP CPT
150 300 --0 150
SCALE IN FEET -- -
DESCRIPTION
Geosyntec0 consultants
10220 OLD COI.UIIBIA ROAD, SUllE A COI.UlolllA, IIAR'd.AND 210411 USA
PHONE: 4-10.381.4,l33
DOMINION VIRGINIA POWER CHESlERFIEI.D POWER STATION CHESlER, VIRGINA
CHESTERFIELD POWER STATION CHESTER, VIRGINIA
DESIGNED BY: DATE:
DRAWN BY: JOC PROJECT NO.:
CHECKED BY: FILE:
REVIEWED BY:
APPROVED BY: FIGURE NO.:
A
B
C
D
E
DRN APP
F
.:J -+---------------....... ------------------.----------------,-----------------...-----------------,------------------,------------'------....,..-------...... ---------+-L:\0chesterfield-dom
inion\M
V1222\FIG
URES\G
EO
TECH
SITE IN
V\FIG
6-1.dw
g
CROSS SECTION LOCATIONS
LOWER ASH POND - CCR RULE REQUIREMENTS
September 2016
MV1373-08
KGW
KGW
-75
-50
-25
025
5075
Safety Factor 0.000 0.250 0.500 1.2081.2081.2081.2081.2081.208 0.750 1.000 1.250 1.500 1.750 2.000 2.250 2.500 2.750 3.000
Post-liquified layer of FGA (only 5-ft thick)3.250 Su_residual = 59 psf640.00 lbs/ft23.500 3.750 4.000 4.250 4.500 4.750 W 5.000 5.250 5.500 5.750 6.000+
1200 1225 1250 Project
1275 1300 1325 1350 1375 1400
Chesterfield Power Station - Lower Ash Pond
1425 1450 1475
SLIDEINTERPRET 7.017
Analysis Description
Drawn By
Date
KGW
10/15/2016
Cross Section B -Po st Liquefaction (Undrained) Scale Company1:359 Geosyntec Consultants
File Name Cross Section B - Post Liquefaction Undrained.slim
-50
050
100
Safety Factor 0.000 0.250 0.500 0.750 1.000 1.250 1.500 1.750 2.000 2.250 2.500 2.750 3.000 3.250 3.500 3.750
1.4401.4401.4401.4404.000 640.00 lbs/ft2
4.250 4.500 4.750 5.000 5.250 5.500 5.750 6.000+
1275 1300 1325 1350 1375 1400 1425 1450 1475 1500 1525 1550 1575 Project
Analysis Description
Drawn By
Date SLIDEINTERPRET 7.017
Chesterfield Power Station - Lower Ash Pond
Cross Section D -Undrained Scale CompanyDJW 1:387 Geosyntec Consultants
File Name5/25/2016, 5:00:52 PM Cross Section D - Undrained_max pool.slim
1.6721.6721.6721.672
-50
050
100
150
W
1300 1350 1400 1450 1500 1550 1600 1650 170 Project
Chesterfield Power Station - Lower Ash Pond
Analysis Description Cross Section E -Undrained Drawn By Scale CompanyDJW 1:504 Geosyntec Consultants Date File Name5/25/2016, 5:00:52 PM Cross Section E - Drained.slimSLIDEINTERPRET 7.017
Safety Factor 0.000 1.0301.0301.0301.030
-100
-5
00
5010
0 0.250 0.1280.500
0.750 1.000 1.250 1.500 1.750 2.000 2.250 2.500 2.750 3.000 3.250 3.500 3.750 4.000 4.250 4.500 4.750 5.000 W 5.250 5.500 5.750 6.000+
1350 1400 Project
1450 1500 1550
Chesterfield Power Station - Lower Ash Pond
1600 1650
Analysis Description Cross Section E -Undrained
SLIDEINTERPRET 7.017
Drawn By
Date
DJW
5/25/2016, 5:00:52 PM
Scale 1:430 Company
File Name
Geosyntec Consultants
Cross Section E - Undrained Seismic.slim