CHAPTER SIX
Computational Facility Layout
The Facility Layout Problem Given the activity relationship as well as the
space of the department, how to construct plan the layout of the facility
The basis of the layout planning is the closeness ratings or material flow intensities
minimize the flow times distance Maximize the closeness (adjacency)
For most practical real world instances, the computational complexity has results in various heuristics
What is heuristic? Construction Heuristic Improvement Heuristic
Heuristic and Optimality Consider the knapsack problem
Z = max 5 x1 + 7 x2 + 11 x3 + 12 x4 + 17 x5 Subject to 2 x1 + 3 x2 + 4 x3 + 5 x4 + 7 x5 <= 10
Heuristic: An intuitive problem solving method/procedure
Constructive Heuristic 1, Pick sequentially the ones with the best benefit Heuristic 2, Pick sequentially the ones with the best benefit per
unit Greedy Improvement:
Exchange two items in a solution Meta-Heuristic: Simulated Annealing, Genetic Algorithm
Optimal Solution Mathematical Programming and Optimization Linear Programming, Integer Programming, Nonlinear
Programming
A Simple Facility Layout Problem
Suppose we have 10 identical sized departments and the flow intensity between these 10 department is fij
Find the best arrangement of the 10 department along an aisle so that the total travel (flow intensity times distance) is minimized
A Quadratic Assignment Model is necessary to Optimally solve the problem
1 2 3 4 5 6 7 8 9 10
Position
Department
A Quadratic Assignment Model Decision Variables
X(i,j) -- 1: Department I will be located at position j 0: Otherwise Constraints Each one position can hold exactly one department SUM( i in 1…10) x(i,j) = 1 Each department has to be assigned exactly one
position SUM( j in 1…10) x(i,j) = 1 Objective SUM(I, j, m, n, all in 1..10 ) x(i,j)*
x(m,n)*f(i,m)*d(j,n)
This is an integer quadratic assignment problem.
Pair-Wise Exchange Heuristic
From\To 1 2 3 4
1 -- 10 15 20
2 -- 10 5
3 -- 5
4 --
• Phase I: Construct Phase Initial Solution (1,2,3,4)
• Phase II: Improvement – Pair Wise Exchange
• a) Exchange two departments
• b) If results in better solution, accept; go to a)
• otherwise stop
Pair Wise Exchange Heuristic
Pair Wise Exchange Heuristic
Pair Wise Exchange Heuristic
Pair Wise Exchange Heuristic
Pair-Wise Exchange Heuristic
Limitations No guarantee of optimality,
The final solution depends on the initial layout Leads to suboptimal solution
Does not consider size and shape of departments Additional work has to be re-arrange the department if
shaper are not equal
Graph Based Method Graph based method dates back to the later
1960s and early 1970s. The method starts with an adjacency relationship
chart Then, we assign weight to the adjacency
relationships between departments A graph, called adjacency graph is constructed
Node: to represent department Arc : to represent adjacency, weight on arc
represents the adjacency score Goal: To find a graph with maximum sum of arc
weights However, not all the adjacency relations can be
implemented in such a graph, that is the graph may not be planar.
A Planar Graph Planar graph: A graph is a planar if it can be
drawn so that each edge intersects no other edges and passes through no other vertices
Intuitively, a planar graph is a graph where there is no intersection of arcs (flow of material)
To find a maximum weight planar graph
Procedure to Find Maximum Weight Adjacent Planar Graph Step 1: Select a department pair with largest weight
Step 2: Select a third department based on the sum of the weights with the two departments selected.
Step 3: Select next unselected department to enter by evaluating the sum of weights and place the department on the face of the graph.
Here, a face of a graph is a bounded region of a graph Step 4: Continuing the Step 3 until all departments
are selected Step 5: Construct a block layout from the planar
graph
From Graph to Block Design Let us “blow” air into each node in the planar
graph Nodes explode Interior faces becomes a dot The edge in primal graph becomes the boundary
between departments Dual Graph
Nodes in dual faces in primal Edge in dual : if two faces connects in the primal
graph The faces in dual represents the department
Draw Block Design
Limitation of Graph Based Method Limitations
The adjacency score does not account for distance, nor does it account for distance other than adjacent department
Although size is considered in this method, the specific dimension is not, the length between adjacent departments are also not considered.
We are attempting to construct graphs, called planar graphs, whose arcs do not intersect.
The final layout is very sensitive to the assignment of weights in the relationship chart.
Graph-based Method
Graph-based Method
Graph-based Method
Graph-based Method
Graph-based Method
Graph-based Method
Computer Relative Allocation of Facility Techniques (CRAFT)
• Discrete or Continuous Representation
• Discrete Representation
• A two-dimension array with numbers
• Each cell represents a unit area & numbers represent the department occupied the cell
A Sample Problem
Valid Discrete Representation
Valid Representation Contiguous: If an activity is
represented by more than one unit, every unit of the must share at least one edge with at least one other unit
Connectedness: The perimeter of an activity must be a single closed loop
No Enclosed Void: No activity shape shall contain an enclosed void
3
3 3
3 3
3 3
3
3 3
3 3 3
3 3
3 3 3
Computer Relative Allocation of Facility Techniques -- CRAFT (1963)
Algorithm 1) Any Incumbent Layout Describe a tentative layout in blocks Determine centroids of each department Cost= distance (in the from-to matrix) X unit
cost Distance can be Euclidian or Rectilinear
2) Improvement: make pair wise or three way exchanges
equal area only adjacent (generally)
3) If better solution exists; Choose the best, go to 1) Otherwise Stop
CRAFT
CRAFT
CRAFT
CRAFT
CRAFT
CRAFT In the original design, exchange has to be
departments of equal area or adjacent departments.
Shape Consideration Shape Consideration
Shaper Ratio Rule: The ratio of a feasible shape should be with specified limits
Corner Counter: The number of corners for a feasible shaper may not exceed specified maximum
Excel Add-ins for facility Planning
The Excel Add-In Written by Prof. Paul Jensen (UT-Austin) Contains an implementation of CRAFT and
can be downloaded at http://www.me.utexas.edu/~jensen/ORMM/frontpage/jensen.lib/index_omie.html#ormm
Sequence Create a Plant Define the Facility Optimum Sequence Craft Method Fixed Point Optimize
Mixed Integer Program The work begins latterly in the 1990s by
Montreuil The departments are assumed to be rectangular
within a rectangular plant. Plant
Length Bx, Width By Shape consideration:
Area, The (minimum, maximum) width of a department The (minimum, maximum) length of a department
Decisions: Where to put the Departments (Centroid) and the shape (length,width) of the department
Objective = flow_intensity* cost *distance
MIP(Mixed Integer Program)•Parameters
MIP(Mixed Integer Program )
• Decision variables
MIP model setup
MIP model setup II
• Constraint (6.15) ensures that no two departments overlap by forcing a separation at least in the east-west or north-south direction.
• Constraint (6.13) ensures the upper corner of j is less than the lower corner of i if z_ij(x) =1 . i.e., to the east of i. Note if z_ij(x) = 0, (6.13) is redundant.
• Constraint (6.14) ensures to the north-south relationship
MIP Models Benefit of MIP Model
Department shapes as well as their area can be modeled through individually specified lower and upper limits !!!
It might be able to control length-width ratio as well (xi’’ – xi’ ) <= R (yi’’-yi’) or (yi’’ – yi’ ) <= R (xi’’-xi’)
Heuristically, we can combine CRAFT with MIP. Get a initial layout using CRAFT, use MIP to find the
best rectangular layout design
Solving the problem exactly (optimal solution) is hard
8~10 are the typical size solvable in a reasonable amount of time
Commercial Facility Layout Packages
In the Instructor’s Opinion, there is no commercial package that will suit all the needs, partly due to the difficult of the problem, but more due to the fact that Facility Layout is a combination of Science and Art.
There has been a trend to combine optimization techniques with interactive graphic procedures, especially people have an unique pattern reorganization capability than computers.
We encourage the reader to use the web to keep abreast of new developments, resort to professional publications, which periodically publish survey of software packages for facilities planning, and new techniques
References Literature – Presentation topics
General Survey Meller, R.D. and K. Gau, “The Facility Layout Problem:
Recent and Emerging Trends and Perspective,” Journal of Manufacturing Systems, 15:5, 351-366,1996
Kusiak, A. and S. S. Heragu, “The Facility Layout Problem,” European Journal of Operational Research, v29, 229-251, 1987
Mixed Integer Programming Montreuil, B., “A Modeling Framework for Integrating
Layout Design and Flow Network Design,” Proceedings of the Material Handling Research Colloquium, Hebron, KY, 1990
Assignment Problem and the Location of Economic Activities, Econometrica,
Reference Reference (Continue)
Graph Based Approach Hassan, M. M. D and G. L. Hogg, “On Constructing a
Block Layout by Graph Theory,” International Journal of production Research, 29:6, 1263-1278, 1991
Irvine, S. A. and I. R. Melchert, “A New Approach to the Block Layout Problem,” International Journal of Production Research, 35:8, 2359-2376, 1997
Computerized Layout Design Bozer, Y.A., R.D. Meller and S.J. Erlebacher, “An
Improvement Type Layout Algorithm for Single and Multiple Floor Facilities,” Management Science, 40:7, 451-467 1994
Tate, D.M. and A. E. Smith, “Unequal Area Facility Layout Using Genetic Search,” IIE Transactions, 27:4, 465-472, 1995
Your Contribution In The Future !!
Assignments Using Excel Add-ins as well as graph based
method to solve the following problems 6.8, 6.9, 6.10, 6.11 6.14, 6.15, 6.19, 6.20 Compare the results and see if they make sense
or not.
Work in group, select one of the papers and present it in class at the end of the quarter.
Thanks
BLOCPLAN
Set up all departments in bands (2or3)
Continuous areas not blocks Use From to or a relationship chart Uses two way exchanges
BLOCPLAN
BLOCPLAN
BLOCPLAN
MIP(Mixed Integer Program) Generally a construction type model Requires some knowledge of linear and
integer programming Solutions to these types of problems are difficult
We will examine the general formulation
LOGIC Layout Optimization with Guillotine Induced Cuts Slice the area to partition the plant between
departments Supersedes BLOCPLAN, because all BLOCPLANS are
LOGIC plans Improved by pair wise exchange or simulated annealing
LOGIC
LOGIC
LOGIC
LOGIC
LOGIC
LOGIC
LOGIC