Page 1: Chapter 9:   JADE Intro Case

Material by Michael Watson, Sara Lewis, Jay Jayaraman, and Pete Cacioppi, 2012

NetworkDesignBook.com

Chapter 9: JADE Intro Case

Page 2: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Material Needed

Files needed: Zipped file called: JADE

Intro Case.zip

LNP XE Version 7.2.24 is the latest

If you click on the symbol in the upper left and click options, you can change the Excel settings

Page 3: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Opening the model

Unzip the file contents into a new directory

Open LogicNet Plus XE (LNP XE)

Click on the Open link and go find the directory you just installed the files into

Project should open

Page 4: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

JADE Paint and Coverings Background– Corporate Background

JADE Started Business in 1906 from the Nassau-Suffolk, NY area. They still have their main distribution center there (red triangle on the map)

They originally started just making paint, but now sell specialty paints, wood treatments, ready-mixed concrete for patching, and other such products

In their markets, they have a strong brands that command a premium and loyalty from the professional contractors

Within the last ten years, through acquisitions and strong execution, they have broken in the West Coast and greater Texas markets

Although these new markets helped grow revenue, they were not good from a transportation point of view. A new DC was put up in Phoenix to help handle these markets

The last VP of the Supply Chain just left the firm and the new one is under intense pressures to take costs out of the supply chain. It is not clear the company can stay in business with its current supply chain

Page 5: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

JADE’s Supply Chain

JADE has kept its east coast DC in the Nassau-Suffolk, NY area– although the east coast market extends into Florida and the Midwest

JADE sells four basic product families. Currently, each of the plants is set up to make just one of the product families.

JADE has three plants in the US and one plant in China. All China product comes into the port at Long Beach.

JADE’s manufacturing plants are known in the industry for their low cost and high quality

The plant in China was a bit of an experiment and the result of an acquisition. It is unusual for such a heavy product to be made so far away from its market. Competitors raised an eyebrow at this decision

Their plants and DC’s are set up to handle rail shipments, so the shipments from the plants to the warehouses are a mix of truck and rail

Page 6: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

JADE Case Study Objectives

Use LNP XE to help JADE reduce costs in their supply chain

Learn how to use LNP XE Learn basic navigation Learn the core set of key files to get models up and running Learn how this model was built Learn how to run and analyze scenarios

This model has some simplifications. Our primary objective, right now, is to learn LNP XE. We will add sophistication to the case as we progress through the exercises

Page 7: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Mapping JADE’s Supply Chain to LNP XE

ManufacturersAssembly PlantsVendorsPort of Entry

End CustomersRetailersDemand PointsProduct -Destinations

Distribution CentersPlant Direct ShipmentCross Dock FacilityTemporarily Leased Space

LNP XE will minimize the cost to get product from the plants to the customers, considering all business rules and choices you give it.

Page 8: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

When you are mapping a supply chain to LNP, you want to think about the following questions. Your answers to these will dictate how you set up the model, what data you will need to collect, and the type of results you’ll see What Costs do you want the model to consider when it runs?:

Most times it is to minimize cost and occasionally to maximize profits You need to decide what costs to include

What are your Business Rules, Constraints, or other Limits? When you minimize cost, a constraint is that you need to meet all demand You also define limits or constraints in terms of what can be made where,

how much can be made at each location, warehouse capacity, rules on which customers can serve other

What Choices or Decisions do you want the model consider? When the model runs, what choices do you want to give it. Can you make

Page 9: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Typical Methodology

In the kickoff, you will spend time mapping your supply chain to LNP XE and determining data that is required

In a typical project, your first model will be a baseline model. The baseline model is a model of your supply chain with last year’s data that has all the decisions fixed. This model is then used to compare against your financial records to make sure the model is running correctly.

In addition to the baseline model, you will also want to run an optimized baseline model. This is how your supply chain should have performed given your current structure and rules. The difference in cost between the baseline and optimal baseline is from unavoidable problems or

from execution issues. Often, you can find significant savings jus with this exercise It is always best to compare your scenarios to the optimal baseline to get a good sense of savings

potential

Kickoff & Data Collection

Data Analysis & Validation

Baseline Modeling

Analyze Alternative Scenarios

Final Summary and Recommendations

Page 10: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

JADE’s Kick-Off Results: JADE’s team is going to start the optimal baseline

What Costs do you want the model to consider when it runs?: We will consider the transportation costs from the plant to the warehouse

and from the warehouse to the customer. For the imported product from China, we will only consider the cost from Long Beach to the warehouses

For this initial model, we will not consider production costs, warehousing costs, inventory costs, etc.

What are your Business Rules, Constraints, or other Limits? For the optimal baseline, we will not allow the plants to change, the plant’s

mix of product to change, or the warehouse locations to change All product has to move from a plant to a warehouse and then to the

customer. The customers require a mix of product and JADE is not set up for plant direct shipments

All customers should get all products from a single warehouse

What Choices or Decisions do you want the model consider? For the optimal baseline, we are allowing the model to determine which

customer should be served from the two warehouses. As a side benefit, this will determine the total tons moving on each of the lanes

Page 11: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Here is a minimum set of files to build a model.* These are the core files you will need to get any model built. Within in the forms and with other forms, you can add as much sophistication as you like

Sites & Products Transportation

PlantID

WHID

CustomerID

ProductionInfo

ProductID

Demand

Plant to WH Lanes

WH to WH Lanes

WH to Customer

Lanes

Carriers

Plant to Plant Lanes

WH to Plant Lanes

* If you have plants shipping to customers, you can even get rid of the warehouses

Page 12: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Let’s See How JADE’s Data was loaded into LNP

Open LNP XE To Open JADE Project

Either click on “Open” in the middle right, click the Open Icon (the standard folder) in the upper left

Go to the folder where you unzipped the file and click on the project.ilnp file

To get to the input data, you need to either go to the ribbon at the top or the Navigation panel to the left. When you click on Data, you see the menu of data input elements.

We will focus on the six major elements shown in the ribbon

Page 13: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Scenario Preferences

Click Data Ribbon, go to Preferences and select Scenario Preferences

For JADE, we are going to keep things simple and set up everything in terms of total tons. So, all units of measure will just be in tons

Page 14: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Products

Click on Products in the Ribbon or Product Details in the Navigation panel

Here are the four product families for JADE. Note that all products are active. Since we are only using tons for units of measure these fields are set to 1.00.

Page 15: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Customers

Click on Customers in the Ribbon or Customer Details in the Navigation panel These are the market areas that JADE services Note that that we see a constraint here--- “Single Source” is checked for these

customers. This ensures that all customers get all their product from a single warehouse

Page 16: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Demand

In the Navigation panel, under Customers, click on Demand This shows the total demand for each of the four product

families at each customer. This is JADE’s annual demand from last year

Page 17: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Demand– Some Facts

If you click on the Graph Icon at the end of the row of Icons on the demand form, you can get some additional insight into the demand numbers.

First, we’ll select “By Product” under the Pareto Chart Type.

Next, we’ll come back and select “By Customer” and show the top 15 customers

Page 18: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

This shows JADE’s breakdown in volume by product family. Click on “Graph Options” to go back and select another view

Page 19: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Here are the Top 15 Customers

Page 20: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Warehouses

Click on Warehouses in the ribbon or Warehouse Details in the Navigation panel Under Warehouses Here is a list of the existing two warehouses, along with some others JADE wants to consider In the first model, they want the model to use only the two existing warehouses. So, you can see that

no warehouse is active, except Phoenix and New York. Note that those are also set to “Fixed.” This tells the model that it has to have these warehouses in the solution.

Page 21: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Warehouse Capacity

In the Warehouse Navigation Panel, click Warehouse Capacity By default, once a warehouse is set up, it has infinite capacity and no

costs For JADE, we are not including these cost numbers in the initial

analysis, so we can leave this as it is

Page 22: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Plants

Click on Plants in the ribbon or Plants Details in the Navigation panel Under Plants

We use the term “Plant” generically. It refers to the sources of products. So, the plants could be owned by the companies, could be suppliers, or in some cases (like for JADE), could represent the port of entry.

Initially, JADE is not interested in changing plant locations. So, all four of these plants are fixed

When you set up a Plant, you can specify its type as either “Supplier” or “Mfg Plant.” The distinction only determines how much detail you want to model inside the plant. Supplier type requires a lot fewer details. JADE was not interested in doing detailed plant modeling, so we set the type to “Supplier.”

Page 23: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Supply Details

In the Plant’s Navigation Panel, go to Supply Details This form shows us the constraints on what can be made where. By setting up the max supply as

greater than 0, it shows where a product can be made. A “0” indicates that this plant cannot make the product. Note that JADE is not yet modeling production costs.

Page 24: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

We’ve now set up all the “Sites & Products” for JADE

Sites & Products Transportation

PlantID

WHID

CustomerID

ProductionInfo

ProductID

Demand

Plant to WH Lanes

WH to WH Lanes

WH to Customer

Lanes

Carriers

Plant to Plant Lanes

WH to Plant Lanes

* If you have plants shipping to customers, you can even get rid of the warehouses

Page 25: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Lane Visualization– Showing the Possible Paths Through the Supply Chain

Click on Lanes in the Ribbon and then the

In JADE’s case, we have a simple set up. All plants can ship to all warehouses. And, all warehouses can ship to all customers. If you do not see a lane type, that move is not possible. So, there are no lanes from plants to customers since JADE cannot do this

Note that the groups “All Plants, All Warehouses, and All Customers” are default groups . When the model runs, LNP XE will automatically calculate the unique Origin/Destination pairs for individual sites. You can also create new groups to build new rules.

In the details in the bottom right, you can see which carrier is assigned to each of the lanes.

Page 26: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Carriers--- Rate Structures

Click on Data | Transportation | Carriers To start, JADE used high level estimates for their

transportation costs. They used a cost of $0.07 per ton/mile for moves from plants to warehouses and $0.12 per ton/mile for moves from the warehouses to customers.

Since some customers were very close to warehouses, they put in a min charge to capture the short move.

Page 27: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

We’ve now have a complete model for JADE

Sites & Products Transportation

PlantID

WHID

CustomerID

ProductionInfo

ProductID

Demand

Plant to WH Lanes

WH to WH Lanes

WH to Customer

Lanes

Carriers

Plant to Plant Lanes

WH to Plant Lanes

* If you have plants shipping to customers, you can even get rid of the warehouses

Page 28: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Now, Let’s Run JADE’s Baseline

Go to the Optimize Tab and click on Parameters

Keep all the default settings

Click “Run” on the bottom right

Page 29: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

High-Level Analysis– Go to Solutions Ribbon and click Compare Solutions to see the total cost

Go to the Navigation Panel and click on Customer Service, then by Distance, then by

the 2nd Tab

Page 30: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Summary Reports

In the Solutions Ribbon, click on Summary Reports, 1st tab This has some information you saw on the Comparison report It also provides the average distance for the different types of moves

Page 31: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Warehouse Summary Report

Go over to the 2nd Tab This shows the total tons (Throughput) going through each

DC. New York handles about 2X the volume of Phoenix It also shows the weighted distance to the customer and the

inbound and outbound transportation costs

Page 32: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Plant Details

In the Solutions Ribbon, click on Plant Details This reports shows which plant made which product and

how much it made

Page 33: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Transportation Reports

Go to Solutions in the Navigation Panel and click on Transportation Report

This report gives you detailed information for each of the individual lanes– (each line on the map).

Page 34: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Landed Cost Report

Go to Solutions in the Navigation Panel and click on Trans | Standard Reports | Landed Cost Output

This report shows the landed cost to get a product to a customer

Page 35: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Now, Let’s Try to Improve JADE’s Supply Chain:The most obvious question the new VP of Supply Raised was whether the 2 warehouses were in the right location and whether 2 was the right number. Here is how we now want to set up the model….

What Costs do you want the model to consider when it runs?: – We will consider the transportation costs from the plant to the warehouse and from the

warehouse to the customer. For the imported product from China, we will only consider the cost from Long Beach to the warehouses

– For this initial model, we will not consider production costs, warehousing costs, inventory costs, etc.

What are your Business Rules, Constraints, or other Limits?– For the optimal baseline, we will not allow the plants to change, the plant’s mix of product

to change, or the warehouse locations to change (this last part is no longer true)– All product has to move from a plant to a warehouse and then to the customer. The

customers require a mix of product and JADE is not set up for plant direct shipments– All customers should get all products from a single warehouse

What Choices or Decisions do you want the model consider?– For the optimal models, we are allowing the model to determine which customer should

be served from the two warehouses. As a side benefit, this will determine the total tons moving on each of the lanes

– We now want the model to determine the optimal two, three, four, and five warehouses

Page 36: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Running the Optimal Two Warehouses

Right click on the scenario and create a copy of the scenario

Right click on the copy and rename the scenario S2 Optimal 2 WH

Right click on the new scenario and click “Set as Active” NOTE: It is important that you make sure

the red checkmark is on the scenario you want to work on

Page 37: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Running the Optimal Two Warehouses: Giving the Model Warehouses to Choose From

Go to Warehouses Remember, in the previous run, only the existing warehouses were

active and set to fixed We now want to open up all 25 warehouses for consideration Click on the Excel Button in Warehouse Details Form (upper left, 3rd

button from the left). This will take this form out to Excel for editing Once in Excel, set the active column to TRUE for all 25 warehouses

and copy the status of “Potential” over the two warehouses set to “Fixed.”

Save and close the Excel file Back in LNP XE, click “OK” to accept your changes In the Warehouse form, we are now giving the model choices on

warehouses

REMEMBER: We already set up our transportation so that the model knows how to get from All Plants to All Warehouses and from All Warehouses to All Customers.

Page 38: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Running the Optimal Two Warehouses: Telling it to Pick Just Two

In the Navigation Panel, go to Constraints, and Group Constraints Click on New and then name the constraint “WH Limit” have it apply to warehouses, and “All

Warehouses” Then set a min and max of 2 warehouses Close this form and back on the Parameters form, hit “Run” Analyze the same set of reports we did previously to understand the solution

Page 39: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Optimal 2 DC’s

In the customer service report, click on Advanced, and do a Side by Side comparison with the baseline

Page 40: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Questions on the Optimal 2 DC’s

What is different between this scenario and the baseline scenario?

How did the mix in volume change between the east and west DC change?

How did the average distance change between the scenarios?

What didn’t change between the scenarios?

Where did the savings come from?

Page 41: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Running the Best 3, 4, and 5 DC’s

Right click on scenario “S2” and make three copies. Make sure you copy this scenario and not the baseline

Rename them: S3 Opt 3 WH S4 Opt 4 WH S5 Opt 5 WH

In turn, do the following Set the scenario to active Go to Optimize | Parameters | Min/Max Group of Sites Change the Min/Max warehouses to 3 and 3, 4 and 4, and 5 and 5 (HINT–

change the Max first) Don’t run yet. Once you made all the changes, don’t forget to hit Save

Go to Optimize | Batch Run Select the three new scenarios and click to run the batch

Page 42: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

A Side Analysis on the Optimal Two DC Solution

Someone on the JADE team pointed out that in the 2 DC solution the move from New York to Columbus seemed much more significant than the one from Phoenix to Las Vegas. So, now the team wants to run another scenario with Phoenix instead of Las Vegas

Make a copy of S2, rename the copy “S2a Columbus and Phoenix,” and make this new scenario active.

Go to the Warehouse form

For the Status of Phoenix and Columbus, set to Fixed

Now, run this scenario Since this is a copy of S2, the model can only pick 2 location. Since we

fixed both Phoenix and Columbus, those will be the 2 that the model chooses

Page 43: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Comparison of all the Solutions

Page 44: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Case Study Questions

What new locations did the model pick as it from 2 to 5 optimal DC’s

How much impact did the change from Phoenix to Las Vegas have? Why?

What is the rate of change in the savings?

In the 5 DC solution, even though the Columbus DC is very close to the plants, it still chooses to serve customers from the additional DC’s, why? In other words, why not save on inbound transportation and serve most customers from Columbus?

Even though we don’t have the cost of opening a warehouse in the model, what information does the model give us in terms of what this cost needs to be for these solutions to be effective?

Page 45: Chapter 9:   JADE Intro Case

Material by Watson, Lewis, Jayaraman, and Cacioppi

Independent Exercises

What are the optimal 3 warehouses and cost if all product comes from China (enters in Long Beach)? Hint– to make all product in China, you want to go to the Supply Details

and set the Max Supply to zero for all plants but the one for China. For this plant, make sure the max supply allows it to make all four products

What would have been the cost if they moved all production to China, but kept the original 3 warehouses from scenario S3?

What is the value if all plants could make all 4 products? How much better of a solution could you derive?