Draft EIS and Draft Section 4(f) Evaluation 6B-1 June 2017 Chapter 6B: Property Acquisition 6B.1 INTRODUCTION This chapter identifies the property acquisition requirements of the Preferred Alternative, both for its construction and operation. This information is based on conceptual design completed as of the date of completion of this Draft Environmental Impact Statement (DEIS). The No Action Alternative would not require the acquisition of any property, and therefore is not discussed in this chapter. This chapter contains the following sections: 6B.1 Introduction 6B.2 Regulatory Context 6B.3 Property Acquisition Required 6B.3.1 New Jersey 6B.3.2 New York 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project must adhere to the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as codified in 42 USC §§ 4601 et seq., and the applicable implementing regulations set forth in 49 CFR Part 24 (collectively, “the Uniform Act”). The Uniform Act protects the rights of property owners and tenants of real property to be acquired to implement the Project. It intends to ensure that individuals do not suffer disproportionate injuries as a result of programs and projects designed for the benefit of the public as a whole, and to minimize the hardship of displacement on such persons. The Uniform Act recognizes that displacement of businesses often results in their closure, and aims to minimize the adverse impact of displacement to maintain the economic and social well-being of communities. The Uniform Act is designed to ensure that individuals do not suffer disproportionate injuries as a result of programs and projects designed for the benefit of the public as a whole, and minimize the hardship of displacement on such persons. In accordance with Federal and state law, owners of properties that would be acquired would be compensated at fair market value and would be provided all other benefits and assistance required by law. Residents of affected properties, whether owners or rental tenants, are also entitled to benefits in accordance with the Uniform Relocation Act. These benefits could include relocation payments and assistance in finding replacement housing that meets the needs of displaced residents in terms of size, price, rental, location, and timely availability. The Project Sponsor that will advance the Project through final design and construction, including acquisition of property and compliance with mitigation measures, has not yet been identified. The Project Sponsor may include one or more of the Port Authority of New York & New Jersey (PANYNJ), the National Railroad Passenger Corporation (Amtrak), New Jersey Transit Corporation (NJ TRANSIT), and/or another entity that has not yet been determined. Property acquisition must and will adhere to the applicable statutes and laws to which the acting entity is subject.

Upload: others

Post on 22-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

Draft EIS and Draft Section 4(f) Evaluation 6B-1 June 2017

Chapter 6B: Property Acquisition

6B.1 INTRODUCTION This chapter identifies the property acquisition requirements of the Preferred Alternative, both for its construction and operation. This information is based on conceptual design completed as of the date of completion of this Draft Environmental Impact Statement (DEIS). The No Action Alternative would not require the acquisition of any property, and therefore is not discussed in this chapter.

This chapter contains the following sections:

6B.1 Introduction 6B.2 Regulatory Context 6B.3 Property Acquisition Required

6B.3.1 New Jersey 6B.3.2 New York

6B.4 Measures to Avoid, Minimize, and Mitigate Impacts

6B.2 REGULATORY CONTEXT A Federally funded project must adhere to the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, as codified in 42 USC §§ 4601 et seq., and the applicable implementing regulations set forth in 49 CFR Part 24 (collectively, “the Uniform Act”). The Uniform Act protects the rights of property owners and tenants of real property to be acquired to implement the Project. It intends to ensure that individuals do not suffer disproportionate injuries as a result of programs and projects designed for the benefit of the public as a whole, and to minimize the hardship of displacement on such persons. The Uniform Act recognizes that displacement of businesses often results in their closure, and aims to minimize the adverse impact of displacement to maintain the economic and social well-being of communities. The Uniform Act is designed to ensure that individuals do not suffer disproportionate injuries as a result of programs and projects designed for the benefit of the public as a whole, and minimize the hardship of displacement on such persons.

In accordance with Federal and state law, owners of properties that would be acquired would be compensated at fair market value and would be provided all other benefits and assistance required by law. Residents of affected properties, whether owners or rental tenants, are also entitled to benefits in accordance with the Uniform Relocation Act. These benefits could include relocation payments and assistance in finding replacement housing that meets the needs of displaced residents in terms of size, price, rental, location, and timely availability.

The Project Sponsor that will advance the Project through final design and construction, including acquisition of property and compliance with mitigation measures, has not yet been identified. The Project Sponsor may include one or more of the Port Authority of New York & New Jersey (PANYNJ), the National Railroad Passenger Corporation (Amtrak), New Jersey Transit Corporation (NJ TRANSIT), and/or another entity that has not yet been determined. Property acquisition must and will adhere to the applicable statutes and laws to which the acting entity is subject.

Page 2: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

June 2017 6B-2 Draft EIS and Draft Section 4(f) Evaluation

In New Jersey, acquisition of real property by NJ TRANSIT must also adhere to the New Jersey Eminent Domain Act of 1971 (NJSA 20:3-1 et seq.) and the Uniform Transportation Replacement Housing and Relocation Act (NJSA 27:7-72 et seq.). In New York, acquisition of real property by New York State entities must also adhere to the New York State Eminent Domain Procedure Law (EDPL), which seeks to establish the exclusive procedure by which property is acquired in New York State, ensure just compensation is paid, and establish opportunities for public participation in the planning of projects necessitating the exercise of eminent domain. Amtrak has the right to acquire property by eminent domain as set forth in 49 USC § 24311.

6B.3 PROPERTY ACQUISITION REQUIRED Temporary and permanent acquisition of privately owned commercial and industrial property is required for construction of the Preferred Alternative’s surface tracks in the Meadowlands, to accommodate construction activities in Hoboken, for the construction activities at the Twelfth Avenue shaft site in New York, and the permanent location of the tunnel, ventilation shaft, and fan plant in New York. For the most part, both the temporary and permanent acquisitions would be limited to easements on unused portions of industrial property. No acquisition of residential property would be required and no displacement or relocations of residents would occur. A full list of property acquisition requirements based on conceptual design (10 percent design) is presented in Appendix 6.

6B.3.1 NEW JERSEY

6B.3.1.1 SUBSURFACE EASEMENTS

Based on conceptual design, permanent subsurface property easements would be required at 117 properties (not including parcels previously acquired by NJ TRANSIT for the Access to the Region’s Core (ARC) Project) to accommodate the tunnel alignment (see Appendix 6). These properties are located in North Bergen and Union City on top of the Palisades, and in Hoboken east of the Palisades.

6B.3.1.2 SURFACE ACQUISITIONS

Based on conceptual design, a total of 11 temporary and 12 permanent surface property acquisitions (not including parcels owned by NJ TRANSIT, New Jersey Department of Transportation (NJDOT), or PANYNJ) would be required in Secaucus and North Bergen, primarily on portions of the properties that are vacant land or parking areas. For properties used during construction, the Project Sponsor would acquire easements; the permanent acquisitions would also likely be easements. Potential displacements in the vicinity of the Meadowlands would occur only during construction; operation of the Preferred Alternative would not result in any displacement to business activity (e.g., parking spaces, loading areas, or business operations). In addition, depending on the route for the temporary construction access road, one fee acquisition of an industrial property in Hoboken may be required.

The specific properties that are included within the Project site for the surface alignment of the Preferred Alternative are summarized in Table 6B-1. Figures 6B-1 through 6B-9 illustrate these properties and the potential acquisition areas required.

Page 3: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

PROJECTProperty Acquisition Key Map

Figure 6B-1

6/6/2017

Pe

nh

or n

Cr e

e k

Tonn

elle

Ave

£¤9North Bergen

Secaucus

6B-5

6B-8

6B-2

6B-6

6B-3

6B-7

6B-4

6B-9

Gran

d Av

e

Pate

rson

Pla

nk R

d

County Rd

16th St

SecaucusRd

Coun

ty A

ve

10th St

£¤1

§̈¦95

0 1,000 FEETProperties where property acquisition may be required (see Figures 6B-2 through 6B-9)

Page 4: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

5.29.17

PROJECT

Property Acquisition at County Road, Secaucus

Figure 6B-2

Cou

nty

Rd.

Location of New Building

Limits of New Building Parking Lot

> Address: County Road Secaucus, NJ

> Block: 44

> Lot: 2

> Property N/F County Road, LLC Owner: > Impacts: Locate retaining wall & piles. Provide vehicular access to access stairs.

> Construction October 2019 Schedule: – February 2024

AFFECTED PROPERTY DETAILS

MAP KEYExisting Property LinesStructure (Retaining Wall)Permanent Easement Area

Temporary Easement AreaExisting TracksProposed Hudson Tunnel Tracks

N

Page 5: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

5.29.17

PROJECT

Property Acquisition at 801 Penhorn Avenue, Secaucus

Figure 6B-3

> Address: 801/901 Penhorn Ave. Secaucus, NJ

> Block: 44

> Lot: 5.04

> Property N/F 801 Penhorn Owner: Avenue, LLC > Impacts: Locate piles for retaining wall, overhead platform for communications equipment, and site drainage system of pipes, manholes, catch basins. Provide vehicular access to access stairs.

> Construction October 2019 Schedule: – February 2024

AFFECTED PROPERTY DETAILS

MAP KEYExisting Property LinesDrainage FeaturesStructure Permanent Easement Area

Temporary Easement AreaExisting TracksProposed Hudson Tunnel Tracks

N

Retaining Wall Communications Equipment PlatformAccess Stairs

Access to Property

from Penhorn Ave.

Page 6: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

5.29.17

PROJECT

Property Acquisition at 401 Penhorn Avenue, Secaucus

Figure 6B-4

Retaining WallCommunications

Equipment PlatformAccess Stairs Access Stairs

Access to Property

from Penhorn Ave.

Access to Property

from Penhorn Ave.

> Address: 401 Penhorn Ave. Secaucus, NJ

> Block: 47

> Lot: 4.08

> Property Pantheon-JP Props Owner: IV, LLC > Impacts: Locate piles for retaining wall, overhead platform for communications equipment, and site drainage system of pipes, manholes, catch basins. Provide vehicular access to access stairs.

> Construction October 2019 Schedule: – February 2024

AFFECTED PROPERTY DETAILS

MAP KEYExisting Property LinesDrainage FeaturesStructurePermanent Easement Area

Temporary Easement AreaExisting TracksProposed Hudson Tunnel Tracks

N

Page 7: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

5.29.17

PROJECT

Property Acquisition at 301 Penhorn Avenue, Secaucus

Figure 6B-5

Access StairsCommunications Equipment Platform

Access Stairs

Retaining Wall

Access to Amtrak Property

from Penhorn Ave.

Access to Amtrak Property

from Penhorn Ave.

> Address: 301 Penhorn Ave. Secaucus, NJ

> Block: 47

> Lot: 3.01

> Property N/F 301 Penhorn Owner: Avenue, LLC > Impacts: Locate piles for retaining wall, and site drainage system of pipes, manholes, catch basins. Provide vehicular access to access stairs.

> Construction October 2019 Schedule: – February 2024

AFFECTED PROPERTY DETAILS

MAP KEYExisting Property LinesDrainage FeaturesStructure Permanent Easement Area

Temporary Easement AreaExisting TracksProposed Hudson Tunnel Tracks

N

Page 8: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

5.29.17

PROJECT

Property Acquisition at 201 Penhorn Avenue, Secaucus

Figure 6B-6

Penhorn Ave.

MAP KEYExisting Property LinesDrainage FeaturesStructure (Retaining Wall)Permanent Easement Area

Temporary Easement AreaExisting TracksProposed Hudson Tunnel Tracks

N

> Address: 201 Penhorn Ave. Secaucus, NJ

> Block: 47

> Lot: 2.01

> Property N/F Pantheon-JH Owner: Properties II, LLC > Impacts: Locate piles for retaining wall and drainage swale. Provide vehicular access to access stairs.

> Construction October 2019 Schedule: – February 2024

AFFECTED PROPERTY DETAILS

Page 9: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

5.29.17

PROJECT

Property Acquisition at 2806 Secaucus Road, North Bergen

Figure 6B-7

Seca

ucus

Rd.

Retaining Wall

Viaduct

Access Stairs TOW

N OF S

ECAUC

US

TOW

NSHIP

OF N

ORT

H BE

RGEN

N

> Address: 2806 Secaucus Rd. North Bergen, NJ

> Block: 449.01

> Lot: 1.02

AFFECTED PROPERTY DETAILS

MAP KEYExisting Property LinesDrainage FeaturesStructure Permanent Access Road

Permanent Easement AreaTemporary Easement AreaProposed Hudson Tunnel Tracks

> Property Keystone Freight Corp. Owner:

> Impacts: Locate access road and drainage culvert box.

> Construction October 2019 Schedule: – February 2024

Page 10: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

5.29.17

PROJECT

Property Acquisition at 2820 16th Street, North Bergen

Figure 6B-8

Retaining Wall

Viaduct

> Address: 2820 16th St. North Bergen, NJ

> Block: 449.01

> Lot: 1

> Property N/F 2820 16th St. Owner: Realty Assoc., LLC > Impacts: Locate access road and drainage culvert box. > Construction October 2019 Schedule: – February 2024

AFFECTED PROPERTY DETAILS

NMAP KEY

Existing Property LinesDrainage FeaturesStructure Permanent Access Road

Permanent Easement AreaTemporary Easement AreaProposed Hudson Tunnel Tracks

Page 11: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

5.29.17

PROJECT

Temporary Access Road from 16th Street, North Bergen

Figure 6B-9

> Address: N/A

> Block: 442

> Lot: 1.09

> Property Public Service Electric Owner: & Gas Company

AFFECTED PROPERTY DETAILS> Impacts: Locate bridge structure, tracks, embankment, cross culvert, access road and haul route.

> Construction October 2019 Schedule: – February 2024

N

MAP KEYExisting Property LinesDrainage FeaturesStructure (Abutment)Temporary Haul Route

Permanent Access RoadPermanent Easement AreaTemporary Easement AreaProposed Hudson Tunnel Tracks

16TH

ST

Page 12: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

Chapter 6B: Property Acquisition

Draft EIS and Draft Section 4(f) Evaluation 6B-3 June 2017

Table 6B-1 Surface Property Acquisitions for the Preferred Alternative, New Jersey

Property Acquisition Address Block/Lot

County Road to Secaucus Road, Secaucus County Road, Secaucus Block 44, Lot 2 Temporary easement for construction access

Permanent easement for retaining wall and access to new tracks, in paved parking area and landscaped area at an industrial / warehousing facility

801 Penhorn Avenue Block 44, Lot 5.04 Temporary easement for construction access Permanent easement for access to new tracks and for below-grade drainage beneath paved area providing access to warehouse loading docks

401 Penhorn Avenue Block 47, Lot 4.08 Temporary easement for construction access Permanent easement for access to new tracks and for below-grade drainage beneath paved parking area and landscaped area

301 Penhorn Avenue Block 47, Lot 3.01 Temporary easement for construction access Permanent easement for access to new tracks and to accommodate below-grade drainage beneath paved parking area

201 Penhorn Avenue Block 47, Lot 2.01 Temporary easement for construction access Permanent easement for access to new tracks and for below-grade drainage beneath paved area with parking spaces and truck maneuvering area for loading docks

Secaucus Road to Tonnelle Avenue, North Bergen 2806 Secaucus Road, North Bergen

Block 449.01, Lot 1.02 Permanent easement of vacant land and edge of paved area, to accommodate new above-ground drainage feature and permanent access road

2820 16th Street, North Bergen

Block 449.01, Lot 1 Temporary easement for construction access Permanent easement in paved area to accommodate below-grade drainage and adjacent permanent access road; no effect to adjacent spaces used for parking and storage of tractor trailers, containers, and equipment

2400 16th Street, North Bergen

Block 449.01, Lot 4 Temporary easement for construction access Permanent easement in paved area with approximately five spaces for parking or container storage and in undeveloped wetland area to accommodate permanent access road and track embankment

NA Block 442, Lot 1.01 Temporary easement for construction access Permanent easement in undeveloped wetlands area to accommodate track embankment

NA Block 442, Lot 1.09 Temporary easement for construction access Permanent easement in undeveloped wetlands area to accommodate track embankment and permanent access road; Permanent acquisition across wetland area being created and beneath PSE&G aerial high-tension power lines

NA Block 485, Lot 1 Temporary easement for construction access Permanent easement across NYSW freight right-of-way for bridge structure

NA Block 486, Lot 1 Temporary easement for construction access Permanent easement across Conrail freight railroad right-of-way for bridge structure

Willow Avenue, Hoboken 1714 Willow Avenue Block 146, Lot 2 Possible permanent acquisition to accommodate haul route (for

truck turning radius on southbound Willow Avenue service road) Notes: NA = not applicable; NYSW = New York, Susquehanna & Western Railway.

Page 13: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

June 2017 6B-4 Draft EIS and Draft Section 4(f) Evaluation

The permanent and temporary easements that would be required include the following:

• A 1.5-acre permanent easement and 0.2-acre temporary easement would be required at 278 County Road (Block 44, Lot 2), a light industrial property in Secaucus, to provide Amtrak with vehicular access to a stairway to the track level and construct and maintain a retaining wall along the right-of-way.

• A 0.5-acre permanent easement and 0.15-acre temporary easement would be required at 801/901 Penhorn Avenue (Block 44, Lot 5.04), a light industrial property in Secaucus, to provide Amtrak with vehicular access to a stairway to the track level and construct and maintain a retaining wall, drainage system, manholes, and catch basins along the right-of-way.

• A 0.1-acre permanent easement and 0.04-acre temporary easement would be required at 401 Penhorn Avenue (Block 47, Lot 4.08), a light industrial property in Secaucus, to provide Amtrak with vehicular access to a stairway to the track level and construct and maintain a retaining wall, drainage system, manholes, and catch basins along the right-of-way.

• A 0.1-acre permanent easement and 0.04-acre temporary easement would be required at 301 Penhorn Avenue (Block 47, Lot 3.01), a light industrial property in Secaucus, to provide Amtrak with vehicular access to a stairway to the track level and construct and maintain a retaining wall, drainage system, manholes, and catch basins along the right-of-way.

• A 0.2-acre permanent easement and 0.1-acre temporary easement would be required at 201 Penhorn Avenue (Block 47, Lot 2.01), a light industrial property in Secaucus, to provide Amtrak with vehicular access to a stairway to the track level and construct and maintain a retaining wall and drainage swale.

• A 0.05-acre permanent easement would be required at 2806 Secaucus Road (Block 449.01, Lots 1.02), an industrial property in North Bergen, to provide Amtrak with access to the tracks and a drainage culvert box.

• A 0.5-acre permanent easement and 0.05-acre temporary easement would be required at 2820 16th Street (Block 449.01, Lot 1), an industrial property in North Bergen, for installation and maintenance of a drainage culvert box and access road.

• A 4.1-acre permanent easement and 1.5-acre temporary easement would be required at 2400 16th Street (Block 449.01, Lot 4), a commercial property in North Bergen, for the installation and maintenance of embankments, access road, and cross culverts.

• A 0.4-acre permanent easement and 0.02-acre temporary easement would be required on an undeveloped portion of PSE&G property on West Side Avenue (Block 442, Lot 1.01), for the installation and maintenance of bridge structure, tracks, embankment, an cross culvert.

• A 0.4-acre permanent easement and 1.3-acre temporary easement would be required on an unused portion of PSE&G property on 16th Street (Block 442, Lot 1.09), for installation and maintenance of bridge structure, tracks, embankment, cross culvert, permanent access road and temporary haul road.

• A 0.15-acre permanent easement and 0.2-acre temporary easement would be required on an undeveloped portion of NYS&W property (Block 485, Lot 1) for the installation and maintenance of a bridge structure.

• A 0.15-acre permanent easement and 0.1-acre temporary easement would be required on an undeveloped portion of Lackawanna Railroad Company property (Block 486, Lot 1) for the installation and maintenance of a bridge structure.

Potential displacements in the vicinity of the Meadowlands would occur only during construction; operation of the Preferred Alternative would not result in any displacement to business activity (e.g., parking spaces, loading areas, or business operations).

Page 14: Chapter 6B: Property Acquisition - Hudson Tunnel Project Property Acquis… · 6B.4 Measures to Avoid, Minimize, and Mitigate Impacts 6B.2 REGULATORY CONTEXT A Federally funded project

Chapter 6B: Property Acquisition

Draft EIS and Draft Section 4(f) Evaluation 6B-5 June 2017

If the construction access route that brings southbound trucks to the site along southbound Willow Avenue is selected (rather than using southbound Park Avenue), fee acquisition of 1714 Willow Avenue (Block 146, Lot 2), a warehouse structure in Hoboken, would be required. This would facilitate construction of a curve in the road that could accommodate the turning radius of construction vehicles.

6B.3.2 NEW YORK

6B.3.2.1 SUBSURFACE EASEMENTS Permanent subsurface easements would be required in New York for the new tunnel alignment between the New York State line and Dyer Avenue (see Appendix 6).

6B.3.2.2 SURFACE ACQUISITIONS

In New York, private property must be acquired and/or permanent easements obtained for the below-grade Hudson River Tunnel alignment and above-grade Twelfth Avenue fan plant on Manhattan Block 675 (the block between Eleventh and Twelfth Avenues and West 29th and West 30th Streets). This includes a portion or all of Lot 1 on Block 675, where the tunnel and fan plant would be located and where construction staging activities would occur. A temporary construction easement would also be required on a portion of Lot 12, which would be used for construction staging.

An existing easement would be used for the fan plant in space beneath and within the Lerner Building; this easement would be modified if necessary.

In addition, a temporary easement would be required on a portion of Hudson River Park, including the West 30th Street Heliport property.

6B.4 MEASURES TO AVOID, MINIMIZE, AND MITIGATE IMPACTS

All relevant property acquisition procedures will be followed for the property acquisitions required for the Preferred Alternative’s construction and operation. Potential displacements in the vicinity of the Meadowlands would occur only during construction; operation of the Preferred Alternative would not result in any displacement to business activity (e.g., parking spaces, loading areas, or business operations). Analysis of these displacements is provided in Chapter 7, “Socioeconomic Conditions,” Section 7.7.