chapter 4 control charts for measurements with subgrouping (for one variable)

29
Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable)

Upload: teagan-rich

Post on 30-Dec-2015

37 views

Category:

Documents


4 download

DESCRIPTION

Chapter 4 Control Charts for Measurements with Subgrouping (for One Variable). 4.9 Determining the Point of a Parameter Change. 4.10 Acceptance Sampling and Acceptance Control Chart. Acceptance sampling is not a process control technique. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

Chapter 4

Control Charts for Measurements with Subgrouping

(for One Variable)

Page 2: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.9 Determining the Point of a Parameter Change

Page 3: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.10 Acceptance Sampling and Acceptance Control Chart

• Acceptance sampling is not a process control technique.• Acceptance sampling plan specifies the sample size that is

to be used and the decision criteria that are to be employed in determining whether a lot or shipment should be rejected.

• “You cannot inspect quality into a product” Harold F. Dodge• Studies show that only 80% of non-confirming units are

detected during 100% final inspection.• Acceptance sampling should be used only temporarily.• Problems with acceptance sampling plans include the fact

that the producer’s risk and the consumer’s risk can both be unacceptably high.

Page 4: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.10.1 Acceptance Control Chart

• Acceptance control limits are determined from the specification limits (Far from 3 range)

• APL (Acceptable Process Level): the process level that yields product quality to be accepted 100(1-)%

: Probability of rejecting an APL• RPL (Rejectable Process Level): the process level that

yields product quality to be rejected 100(1-)% : Probability of accepting an RPL• p1: acceptable % of units falling outside the spec.• p2: rejectable % of units falling outside the spec.

Page 5: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.10.1 Acceptance Control Chart

(4.4)

(4.5)

(4.6)

(4.7)

Page 6: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)
Page 7: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.10.1.1 Acceptance Chart Example

Page 8: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

Table 4.2 Data in Subgroups Obtained at Regular Intervals

Subgroup X1 X2 X3 X41 72 84 79 492 56 87 33 423 55 73 22 604 44 80 54 745 97 26 48 586 83 89 91 627 47 66 53 588 88 50 84 699 57 47 41 46

10 13 10 30 3211 26 39 52 4812 46 27 63 3413 49 62 78 8714 71 63 82 5515 71 58 69 7016 67 69 70 9417 55 63 72 4918 49 51 55 7619 72 80 61 5920 61 74 62 57

X-bar R S71.00 35 15.4754.50 54 23.6452.50 51 21.7063.00 36 16.8557.25 71 29.6881.25 29 13.2856.00 19 8.0472.75 38 17.2347.75 16 6.7021.25 22 11.3541.25 26 11.5342.50 36 15.7669.00 38 16.8767.75 27 11.5367.00 13 6.0675.00 27 12.7359.75 23 9.9857.75 27 12.4268.00 21 9.8363.50 17 7.33

Page 9: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.11 Modified Limits

• If the specification limits were at k, the limits would be widened by (k-3)

Page 10: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.12 Difference Control Charts

• The general idea is to separate process instability caused by uncontrollable factors from process instability due to assignable causes.

• This is accomplished by taking samples from current production and also samples from what is referred to as a reference lot.

• The reference lot consists of units that are produced under controlled process conditions except for possibly being influenced by uncontrollable factors.

• Since both samples are equally influenced by uncontrollable factors, any sizable differences between sample means should reflect process instability due to controllable factors.

Page 11: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.12 Difference Control Charts

Page 12: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.12 R-chart of Difference

Page 13: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.12 Paired Difference Control Charts

Page 14: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.13 Other Charts

Page 15: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.14 Average Run Length (ARL)

• If the parameters were known, the expected length of time before a point plots outside the control limits could be obtained as the reciprocal of the probability of a single point falling outside the limits when each point is plotted individually.

• The expected value is called the Average Run Length (ARL).

• It is desirable for the in-control ARL to be reasonably large.

• The parameter-change ARL should be small.

Page 16: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.14 Average Run Length (ARL)

Page 17: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.14.1 Weakness of the ARL Measure

• The run length distribution is quite skewed so that the ARL will not be the typical run length

• The standard deviation of the run length is quite large

Page 18: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.15 Determining the Subgroup Size

• By convenience: 4 or 5• Economic design of control charts• Using graphs (such as given by Dockendorf, 1992)

• The larger the subgroup, the more power a control chart will have for detecting parameter changes.

• Survey showed most respondents used subgroup size of about 6.

Page 19: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.15.1 Unequal Subgroup Sizes

• May caused by missing data• Minitab (with 2 columns)

Variable Sample Size (VSS)• Smaller sample sized is used if the sample mean

falls within “warning limits” (2-sigma limits)• Larger sample sized is used if the sample mean

falls between warning limits (2-sigma limits) and control limits.

• Superior in detecting small parameter changes

Page 20: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.16 Out-of-Control Action Plans(OCAPs)

A flow chart with•Activator: out-of-control signal (limits + run rules)•Checkpoint: potential assignable causes•Terminator: action taken to resolve the condition

Page 21: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.17 Assumptions for Control Charts

Page 22: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.17.1 Normality

• For R-, S-, and S2-charts, the basic assumptions are the individual observations are independent and normally distributed.

• The distributions of R, S, and S2 differ considerably from a normal distribution.

• Many process characteristics will not be well approximated by normal distribution. (diameter, roundness, mold dimensions, customer waiting time, leakage from a fuel injector, flatness, runout, and percent contamination)

• Non-normality is not a serious problem unless there is a considerable deviation from normality.

Page 23: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.17.2 Independence

Page 24: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.17.2 Example of Invalid Assumption of Independence

Page 25: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

1.30 0.06 -1.63 1.28 0.521.59 -1.46 0.03 0.48 -0.290.17 -1.75 0.52 -0.50 2.220.01 -1.46 1.21 0.99 1.210.07 0.19 0.87 1.00 -0.20-1.18 -0.60 1.23 -0.05 0.59-3.36 -0.67 0.78 -1.55 0.42-3.35 1.10 0.86 -0.88 0.630.50 1.15 2.71 0.79 0.52-0.26 1.30 1.68 1.04 -0.89-2.07 1.61 -0.52 2.52 -0.50-2.02 0.12 -1.40 1.79 -0.99-1.77 1.11 -0.59 3.72 -2.02-0.12 0.76 -1.15 2.65 -1.400.32 -0.21 -0.48 1.92 0.39-1.16 -0.73 0.13 0.90 1.36-0.89 0.17 0.33 -0.60 1.24-0.80 0.45 0.07 -1.70 -1.100.08 0.27 0.34 -0.75 -1.981.74 -0.78 0.78 0.76 -0.41

Page 26: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

Figure 4.7

Page 27: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.17.2 Remedy for Correlated Data

Page 28: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.18 Measurement Error

• Assume measurement variability is independent of product variability, and that repeatability variability and reproducibility variability are independent, then

observations =

product + repeatability + reproducibility

• Reproducibility variability: Determined by the performance of the measurement process under changing conditions (DOE)

• Using control chart to determine if reproducibility is in a state of statistical control

• Repeatability variability: Estimated using at least a moderately large number of measurements under identical conditions. Var(S2) = 24/(n-1)

Page 29: Chapter 4 Control Charts for  Measurements with Subgrouping  (for One Variable)

4.18.1 Monitoring Measurement Systems

• Separate monitoring of variance components for repeatability and reproducibility, or a simultaneous procedure.