Building the Next Major Iron Ore Mine in the Labrador Trough Corporate Presentation January, 2012 FSE: P02

Upload: shosein2011

Post on 08-May-2015

561 views

Category:

Investor Relations


1 download

TRANSCRIPT

Page 1: Champion Minerals Corporate Presentation Jan 16th 2012

Building the Next Major Iron Ore

Mine in the Labrador Trough Corporate Presentation

January, 2012

FSE: P02

Page 2: Champion Minerals Corporate Presentation Jan 16th 2012

2

FORWARD-LOOKING STATEMENTS

Certain information contained herein regarding Champion Minerals Inc., including

management’s assessment of future plans and operations, may constitute forward-looking

statements under applicable securities law and necessarily involve risks, including but not

limited to risks associated with mining exploration, operating costs, production costs, volatility

of share prices, currency fluctuations, imprecision of resource and reserve estimates,

environmental risks and ability to access sufficient capital from internal and external sources.

As a consequence, actual results may differ materially from those anticipated in any forward

looking statements. Plans, intentions or expectations disclosed in any forward-looking

statements or information should not be read as guarantees of future results or events, and will

not necessarily be accurate indications of whether or when or by which such results or events

will be achieved.

Except as required by law, Champion Minerals Inc., expressly disclaims any intention and

undertakes no obligation to update any forward looking statements or information as conditions

change.

The historical mineral resources mentioned are strictly historical in nature and are non-

compliant to National Instrument 43-101 mineral resources and mineral reserves standards,

and should therefore not be relied upon. A qualified person has not done sufficient work to

upgrade or classify the historical mineral resources as current National Instrument NI-43-101

compliant.

Page 3: Champion Minerals Corporate Presentation Jan 16th 2012

3

Fermont Projects (710 km2)

Over 17 projects in the Fermont Quebec mining camp

The flagship Fire Lake North Project is currently in feasibility stage

Over 2.2 Billion tonnes of NI 43-101 compliant iron ore resources

hosted in 3 projects in close proximity to one another

Champion Minerals holds an 82.5% direct interest, 3% NSR (C$3

million to buyback 1% of NSR)*

Fermont neighours are ArcelorMittal and Cliffs Resources

Attikamagen (310 km2)

Champion Minerals holds a

100% interest

Century Iron Mines Corp. has

option to earn up to a 60% interest

in the property by spending

C$13 million by May 2014**

Advanced iron ore exploration and development projects located in

Canada’s principal iron ore district, the Labrador Trough

About Champion Minerals

• Fancamp Exploration Ltd. holds remaining 17.5% interest; CHM can earn an

additional 2.5% interest upon completing a bankable feasibility study.

** Announced investment by WISCO of 25% ($60M) and Minmetals of 5% ($12M)

Page 4: Champion Minerals Corporate Presentation Jan 16th 2012

Quebec’s Next Major Iron Ore Mine

Fire Lake North (FLN) Development Project

Nov. 21 2011 PEA indicates ability to produce 8.7 million tonnes of

concentrate per annum for the first 25 years of a 40-year mine life the first

five years will average approximately 10 million tonnes of concentrate per annum

Net Present Value of $4 billion at a discounted cash flow rate of 8% with an

Internal Rate of Return of 41.5% and a payback period of 2.3 years

FLN Mineral Resource Estimate (Oct. 2011): 1.06 billion tonnes

− Measured and Indicated Resources of 400.1 million tonnes grading 30.6%

total iron

− Inferred Resources of 661.2 million tonnes grading 27.7% total iron

Established Iron Ore District

Canada’s produces 44 mtpy of iron ore concentrate in the southern end of the

Labrador Trough this is expected to grow to 200 mtpy over the next 10 years if

all proposed development projects are realized.

Established rail, power and port infrastructure

- Quebec’s Plan Nord: $80 billion investment over the next 25 years in

northern Quebec for various projects including infrastructure projects

- Competitive power rates: ~ $0.04 - $0.045; price to be negotiated in 2012

- Initiative for world-class port facilities underway

Proven Team

Strengthened advisory board and board of directors includes former Consolidated

Thompson Iron Mines management and officers

4

Page 5: Champion Minerals Corporate Presentation Jan 16th 2012

Capital Structure

Share Data and Cash Position as of December 31, 2011.

Shares Outstanding 88.0 million

Warrants 6.9 million @ C$1.50

(450,000 @ C$1.15 expiring 04/2012

2.7 million @ C$1.50 expiring 04/2012

2.9 million @ C$1.50 expiring 10/2012, of which 75%

are owned by insiders and advisors.)

Options 12.5 million @ C$1.04

Fully Diluted Shares Outstanding 107.6 million

Market Capitalization

(based on $1.30 share price)

C$114.4 million

Cash Position C$16.5 million

Fully Diluted Cash Position C$41.0 million

Management Ownership ~ 8%

Analyst Coverage Canaccord Genuity

Fraser Mackenzie

Haywood Securities

Jennings Capital

Macquarie Capital Markets

Paradigm Capital

RBC Capital Markets

Salman Partners

Stifel Nicolaus

5

Page 6: Champion Minerals Corporate Presentation Jan 16th 2012

Experienced Management Team

Board of Directors Management Team

Tom Larsen

Chairman

Tom Larsen

President and CEO

Alexander Horvath, P.Eng.

Director

Alexander Horvath, P.Eng.

Executive Vice President, Exploration

Jean Depatie, P.Geo.

Director

Martin Bourgoin, P. Geo.

Executive Vice President, Operations

Ashwath Mehra

Director

Jeff Hussey, P.Geo.

Executive Vice President, Development

Donald A. Sheldon, LLB., P.Eng.

Director

Bruce Mitton, P.Geo.

Vice President, Exploration

Paul Ankcorn

Director

Jean-Luc Chouinard, P.Eng.

Director of Projects

Francis Sauve

Director

Miles Nagamatsu, CA

Chief Financial Officer

Joseph S. C. Chan

Director

Jorge Estepa

Vice President, Secretary-Treasurer

Richard Quesnel: Senior Technical Advisor and Head of the Advisory Board

Advisory Board: Richard Quesnel, Mick McMullen, and Doug Bache

Project Finance Advisor: Marc Duchesne 6

Over 200 years of combined exploration and mine operations experience

Page 7: Champion Minerals Corporate Presentation Jan 16th 2012

Why invest in Champion Minerals?

7

Favourable Operating

Environment

• Established iron ore

mining district the

Labrador Trough

• Favourable tax

environment

(40% tax rebate on

exploration expenditures)

• Access to low-cost power

and close to rail and port

infrastructure

• Quebec`s Plan Nord

$80 billion over the next

25 years

• Quebec is known to be a

world class area to

develop mines

• Unprecedented Iron Ore

Price Range and Forecast

• Skilled Labor Work Force

Champion Minerals’

Competitive Advantage

• Fermont: 17 iron ore

(710 km2) brownfield

projects

• Feasibility Stage Fire

Lake North Surface

Deposits contain

coarse grained

specular hematite

Easier to liberate

Deleterious elements

are below industry

specifications limits

• Experienced team of

project developers and

mine builders

• Upside Potential for

Growth

• Several De-Risking

Initiatives Underway

Page 8: Champion Minerals Corporate Presentation Jan 16th 2012

8 8 8

Three Ports/

Stockpile

Locations

Cartier

Private

Rail

QNS&L

Rail

Common

Carrier

Cluster 3

Cluster 2

High

Voltage

Power

Lines

St Lawrence Seaway

Rail Infrastructure

Quebec North Shore & Labrador Railway (“QNS&L”)

QNS&L links to Sept-Iles and Pointe Noire

Bloom Lake and QNS&L railways are considered common carriers

Common carriers allocate capacity on a first-come, first-serve basis

Fire Lake North PEA Base Case connection to Bloom Lake railway requires 94 km of rail – includes turnaround loop and sidings

Participation in a private multi user rail solution as an alternative transportation / haulage option is also under study

Cartier Railway: Linked to Port-Cartier

Privately owned by ArcelorMittal

Adjacent to the west of Fire Lake North Proj.

Cluster 1

Attikamagen

Fermont

Page 9: Champion Minerals Corporate Presentation Jan 16th 2012

9 9

Multi-User Port Infrastructure Expanding to Meet Demand

Port of Sept-Iles

RTZ-IOC shipping facility

Pointe Noire

50Mtpy Multi User Port Project to be announced; Phase 2 Planning….

Cliffs Natural Resources shipping facility

New multi-user port to be expanded in two phases: phase one expansion of 40-50 Mtpy and phase two expansion of 100 Mtpy

Port-Cartier

ArcelorMittal shipping facility

$2.1B expansion is underway and will include concentrator expansion with port and rail infrastructure upgrades

Located 62 km west of Sept-Iles

Pointe Noire

Sept-Iles

Courtesy of the Port de Sept Isles

China Max ship capacity 300kt

Page 10: Champion Minerals Corporate Presentation Jan 16th 2012

Development: Fire Lake North Project

Oil Can Project 6 km

from FLN Concentrator

Page 11: Champion Minerals Corporate Presentation Jan 16th 2012
Page 12: Champion Minerals Corporate Presentation Jan 16th 2012

PEA indicates ability to produce 8.7 million tonnes of concentrate per annum for the first 25 years of a 40-year mine life the first five years will average almost 10 million tonnes of concentrate per annum

Net Present Value of $4 billion at a discounted cash flow rate of 8% with an Internal Rate of Return of 41.5% and a capital payback period of 2.3 years.

Recent mineral resource update announced (October 6, 2011)

− Measured and Indicated Resources of 400.1 million tonnes grading 30.6% total iron

− Inferred Resources of 661.2 million tonnes grading 27.7% total iron

Metallurgy indicates coarse liberation grind size similar to RTZ/IOC and ArcelorMittal operations nearby

Feasibility Study underway; Several project studies initiated in 2011

Fire Lake North Project Growth through Development

12 See www.championminerals.com for reports maps and assays

Page 13: Champion Minerals Corporate Presentation Jan 16th 2012

13 High Grade - Coarse Specular Hematite Typical Quartz-Specular

Hematite-Magnetite Mineralization

Fire Lake North - Metallurgy

Deposits are coarser grained; at -24 to -28 mesh the SiO2 content is low (3-4%) ;

SPI tests indicate a relatively soft ore; 2nd Phase of tests underway

Gravity separation is the typical beneficiation technique in the Fermont mining

camp; magnetic separation is not included in the current mill design

Deposits of quartz specularite iron ore are typical of the Fermont area

− Coarse liberation grind size (600-850 microns / 20 to 28 mesh) ; product will

be sold as sinter fines ; 80% of the global iron ore market seeks this product

− Low deleterious elemental levels will help to secure market share

Page 14: Champion Minerals Corporate Presentation Jan 16th 2012

Fire Lake North Development Project

14

Page 15: Champion Minerals Corporate Presentation Jan 16th 2012

Fire Lake North Development Project

15

Page 16: Champion Minerals Corporate Presentation Jan 16th 2012

16

Based upon the following assumptions:

Key Results Pre-Tax Basis

Internal Rate of Return (IRR) (8% Discount Rate) 41.5%

Undiscounted Cash Flow US$10.9B

Net Present Value @ 5% Discounted Cash Flow US$5.6B

Net Present Value @ 8% Discounted Cash Flow US$4.0B

Net Present Value @ 10% Discounted Cash Flow US$3.2B

Payback Period (8% Discount Rate) 2.3 Years

Capital Costs:

Operating Costs:

Price assumptions:

Mine-Life:

Exchange rate:

Total Resources(1):

In Pit Resources

US$1,368 million (includes rail and port infrastructure)

US$51.01 per tonne (average 25 years);

US$39.46 per tonne (average years 1 to 5)

US$115 per tonne of concentrate at 65% Fe

40 years (average of 8.7 million tonnes/year for the first 25 years)

$1.00 USD to $1.00 CDN

400 million tonnes grading 30.6% Fe (NI43-101 Measured and Indicated Resources)

661 million tonnes grading 27.7% Fe (NI43-101 Inferred Resources)

921.8 million tonnes grading 28.8% Fe at an 8% cut-off grade

Fire Lake North Development Project November 2011 Preliminary Economic Assessment Update – Highlights

Page 17: Champion Minerals Corporate Presentation Jan 16th 2012

17

OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE)

COST PARAMETERS AVERAGE 25 YEARS AVERAGE YEARS 1 TO 5

Mining 22.56 12.13

Concentrating, crushing and processing 4.52 3.97

Site infrastructure, sales and general administration 4.40 3.39

Environmental tailings and management 0.29 0.26

Rail transport 15.52 16.14

Port facilities 3.72 3.57

Total 51.01 39.46

Equipment Lease Cost (not included in above total) 1.67 5.17

Fire Lake North Project Preliminary Economic Assessment Study

CAPITAL EXPENDITURES (US$ MILLIONS)

COST CENTRES $ MILLIONS

Pre-stripping of open pit areas 97.5

Concentrator and site infrastructure including loadout facilities 682.3

Railway (62km distance and 94km total including turnaround loop and sidings) 228.8

Port Facilities: Railcar unloading, stacker/reclaimer, conveyors 96.8

Environmental and Tailings Management 27.9

Other Pre Production Costs 34.0

Sub-total 1,167

Contingency 201

Total 1,368

Page 18: Champion Minerals Corporate Presentation Jan 16th 2012

18

Fire Lake North Project Schedule Development, Construction, and Production

Diamond Drilling

Scoping Study

Feasibility Study

Environmental / Social Studies

Community Consultation

Permitting

Construction

Production

Q1

2011 2012

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q2 Q3 Q4

2014 2015

Q1 Q2 Q3 Q4

2013

Q1 Q2 Q3 Q4

Page 19: Champion Minerals Corporate Presentation Jan 16th 2012

19

Oil Can Project Exploration Upside

First three drill holes of 8,000 metres planned program intersected magnetite-

hematite iron formation from 191 metres to 402 metres in length

Drill hole OC11-02 intersected 401.5 metres grading 30.7% Total Iron including

a 213.5 metres interval grading 33.1% Total Iron

TABLE 1 – SELECTED* COMPOSITE ASSAY RESULTS (HOLES OC11-01 to OC11-03)

HOLE-ID HOLE LENGTH AZIMUTH DIP FROM TO INTERVAL** GRADE***

metres degrees degrees metres metres metres Total Fe%

OC11-01 396 260 -45 185.42 376.31 190.89 30.6

OC11-02 594 310 -45 188.53 590.03 401.50 30.7

including 246.86 460.40 213.54 33.1

OC11-03 372 250 -45 40.58 264.60 224.02 28.1

including 76.58 216.58 140.00 30.0

* Selected Composite Assay Resultsare stated only for results recently received. The Selected Composites are not necessarily representative of the average grade

or thickness of the mineral zones or potential resource.

** Intervals are down-hole lengths and not true widths of the mineral zones.

*** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High Grade/Ores Method” and XRF analysis.

Page 20: Champion Minerals Corporate Presentation Jan 16th 2012

20

TABLE 2 - SELECTED* COMPOSITE ASSAY RESULTS (HOLES OC11-04 to OC11-08)

HOLE-ID HOLE LENGTH AZIMUTH DIP FROM TO INTERVAL** GRADE***

metres degrees degrees metres metres metres Total Fe%

South Zone

OC11-05 545.00 020 -45 241.56 545.00 303.44 34.7

including 407.24 538.00 130.76 36.5

OC11-07 370.67 250 -45 83.82 281.00 197.18 26.8

including 83.82 229.36 145.54 28.1

OC11-08 616.00 180 -50 67.00 612.73 545.73 33.7

Including 67.00 509.34 442.34 36.4

North Zone

OC11-04 543.00 360 -45 Assay results pending

OC11-06 520.00 290 -45 Assay results pending

Selected Composite Assay Results are stated only for results recently received. The Selected Composites are not necessarily representative of the average grade

or thickness of the mineral zones or potential resource.

** Intervals are down-hole lengths and not true widths of the mineral zones.

*** Grades are calculated from Total Fe% sample assays completed by ALS Chemex Laboratories using the “High Grade/Ores Method” and XRF analysis.

Oil Can Project Exploration Upside

Four drill holes completed on the South Zone at Oil Can were drilled on

sections spaced approximately 400 metres (m) apart, along the estimated

1,300 m strike length of a crescent-shaped magnetic anomaly

2011 drill program completed at Oil Can ; Mineral Resource Estimate Q1 2012

Page 21: Champion Minerals Corporate Presentation Jan 16th 2012

500

meters

Moire Lake Project Exploration Upside

21

Arc

elo

r Mitta

l Pro

pe

rty B

ou

ndary

• 2011: 10,400m drill program completed

• Mineral Resource Estimate Q1 2012

• Drill results include: 503 metres

grading 31% total iron (LM11-12)

• Potential to significantly increase

Historical Resource: 101 million tonnes

grading 31% iron

• Kilometric Synform with

Hematite and Magnetite

outcrops at surface

• Adjacent to the East of

ArcelorMittal Mont Wright Mine

• 10 km from QNS&L Railway

Page 22: Champion Minerals Corporate Presentation Jan 16th 2012

215

661

947

0

100

200

300

400

500

600

700

800

900

1000

MeasuredandIndicated(M&I)

Fermont Project Resource Base Current NI 43-101 Compliant Resources

22

Over 2.2 Billion Tonnes of

NI 43-101 Compliant Iron Ore Resources

Project Bellechasse Fire Lake North Harvey Tuttle

Location Quebec, Canada Quebec, Canada Quebec, Canada

Grade 28.7% 30.6% (M&I)

27.7% (Inferred)

23.2%

Mineralization Magnetite Specular Hematite Magnetite

Historical

Resources

91 Mt @ 30.0% Iron 41 Mt @ 31.0% iron n/a

* 15 % cut-off grade

400

Page 23: Champion Minerals Corporate Presentation Jan 16th 2012

23

Milestones

Fire Lake North Definition Drilling Ongoing

Updated PEA on Fire Lake North Completed

Initial NI 43-101 Mineral Resource

Estimate for Moire Lake Project Q1 2012

O’Keefe Purdy Drill Results Remaining Q1 2012

Initial NI 43-101 Mineral Resource

Estimate for Oil Can Project

(adjacent to Fire Lake North Project)

Q1 2012

Metallurgical results at Fire Lake North,

Moire Lake, and Oil Can Projects Q1-Q2 2012

Fire Lake North Feasibility Study Q3 2012

Fire Lake North Construction Start Q4 2013

Fire Lake North Production 2015

Page 24: Champion Minerals Corporate Presentation Jan 16th 2012

Why Invest in

Champion Minerals?

Fire Lake North NPV: $4 Billion @ 8% DCF & adjacent Oil Can

17 Brownfield Projects (710 km2) near 5 operating mines

Experienced Management Team: Developers & Mine Builders

Good cash position Favourable tax environment

Quebec`s Plan Nord: $80 billion over 25 years

Access to low-cost power and close to rail and port

Multi User Port is planned ; Trans-Shipping is an option

Several Railway options are under study

Iron Price Range and Forecasts is Unprecedented

Upside Potential of Adjacent Fermont Projects & Attikamagen

Several De-Risking Initiatives Underway for Fire Lake North

Project

24

Page 25: Champion Minerals Corporate Presentation Jan 16th 2012

Exploration Projects

Fire Lake North

Exploration Camp

Coarse Grained

Specular Hematite

Page 26: Champion Minerals Corporate Presentation Jan 16th 2012

O’Keefe Purdy Project Exploration Upside

26

o November 30, 2011 Press Release; O’Keefe NW Occurrence:

Drill hole OP11-06 intersected 124 metres of specular hematite-rich iron

formation grading 34.1% Total Iron; including 109 m grading 37% FeT.

o Drill Hole OP11-08, located 200m away intersected 155.6 m grading

29.7% FeT including an 87.4 m interval grading 37.1% FeT.

2 km

Page 27: Champion Minerals Corporate Presentation Jan 16th 2012

Harvey Tuttle Project NI 43-101 Inferred Resource Estimate:

717Mt @ 25% iron; magnetite rich

Intersected multiple significant iron formation

intervals in 2010 drill program

Total of 13,165m of drilling completed

Less than 50% of the kilometric scale

magnetic anomalies have been tested

Metallurgical tests underway

Located 25 km NW of Fire Lake North

Within conveying distance from Fire Lake

North planned concentrator (20-30km)

27

Advanced Exploration

Bellechasse Project

NI 43-101 Inferred Resource Estimate: 215Mt @

29% Iron; Magnetite Rich iron formation

Historical Resources increased from 91Mt

remaining upside potential.

Adjacent to Hwy 389; 10km from Fire Lake North

Synform Geometry is good for Open Pit

Page 28: Champion Minerals Corporate Presentation Jan 16th 2012

Labrador Trough Annual Production Iron Ore Production Upside

Company Current Annual

Production

Projected

Annual Forecast

IOC/RTZ 17 mtpy 26 mtpy1

ArcelorMittal 13 mtpy 24 mtpy2

Cliffs Natural Resources

(Wuhan)

12 mtpy 28 mtpy

Labrador Iron Mines 2 mtpy 5 mtpy

Adriana Resources (Wuhan) 0 50 mtpy

New Millennium (Tata) 0 27 mtpy

Century Iron Mines (Wuhan) 0 ~20 mtpy

Champion Minerals 0 ~18 mtpy

Alderon Iron Ore Corp. 0 ~8 mtpy

Total current and forecasted

production

44 ~ 200 mtpy

1. Possibility of expanding production up to 50 mtpy

2. Possibility of expanding production to 50 mtpy 28

Page 29: Champion Minerals Corporate Presentation Jan 16th 2012

29

-

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

1,600,000

1980 1985 1990 1995 2000 2005 2010

China

Japan

Rest of theWorld

Global Steel Production Shows

Continued Demand for Iron Ore

China’s CAGR* is 9.88% over

the last 30 years vs. 2.30% for

total global steel production

over the same period.

Source: World Steel Association website

* Compound annual growth rate

Page 30: Champion Minerals Corporate Presentation Jan 16th 2012

Thank You

30

30

Page 31: Champion Minerals Corporate Presentation Jan 16th 2012

31

Iron Ore Types

Coarse Grained Specular Hematite

Direct Shipping Ore

Magnetite Rich Taconite

Coarse Grained Specular Hematite

Page 32: Champion Minerals Corporate Presentation Jan 16th 2012

Fermont Iron

Ore District

(“FIOD”)

32