PARCEL 25KNEELAND STREET | BOSTON | MA
CENTRAL ARTERY | TUNNEL PROJECT
COMPONENT I : DEVELOPMENT PROPOSAL
04
.27
.12
Submitted to: Massachusetts Department of Transportation
Submitted by: Archstone New Development Holdings LP + Berkeley Investments, Inc.
1. PROPOSAL FORM: SCHEDULE 1 1
2. SECTION 40J DISCLOSURE STATEMENT: SCHEDULE 3 2
3. DEVELOPMENT TEAM DESCRIPTION
Development Entity 5
Other Key Development Team Members 7
4. DEVELOPMENT APPROACH
Building & Site Design 10
Conceptual Design Drawings 12
Program 17
Community Uses & Benefits 18
Permits & Approvals 19
Schedule 20
COMPONENT 1 : CONTENTS
SECTION 40J DISCLOSURE STATEMENT : SCHEDULE 32.1
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 2 OF 20
Ownership of Archstone New Development Holdings LP
• ArchstoneNewDevelopmentHoldingsGPLLC,0%GeneralPartnerofArchstoneNew Development Holdings LP
• ArchstoneMultifamilyHoldingsI(Borrower-A)LP,100%LimitedPartnerand100%memberofArchstoneNewDevelopmentHoldingsGPLLC
• ArchstoneMultifamilyHoldingsI(Borrower-A)GPLLC,0%GeneralPartnerofArchstoneMultifamilyHoldingsI(Borrower-A)LP
• ArchstoneMultifamilyHoldingsILP,100%LimitedPartnerofArchstoneMultifamilyHoldingsI(Borrower-A)LPand100%memberofArchstoneMultifamilyHoldingsI(Borrower-A)GPLLC
• ArchstoneNomineeLP,100%LimitedPartnerofArchstoneMultifamilyHoldingsILP
• ArchstoneMultifamilyHoldingsILLC,0%GeneralPartnerofArchstoneMultifamilyHoldings I LP
• ArchstoneMultifamilyParallelGuarantorLLC,100%memberofArchstoneMultifamily Holdings I LLC
• ArchstoneMultifamily(GP)LLC,0%GeneralPartnerofArchstoneNomineeLP• ArchstoneMultifamilyPrincipalLP,100%LimitedPartnerofArchstoneNomineeLP
and100%memberofArchstoneMultifamily(GP)LLC• ArchstoneMultifamilyGuarantorLLC,0.5%LimitedPartnerofArchstoneMultifamily
Principal LP• ArchstoneMultifamilyParallelGuarantorILLC,6.391%LimitedPartnerof
Archstone Multifamily Principal LP• ArchstoneMultifamilyGuarantorLP,93.109%LimitedPartnerofArchstone
Multifamily Principal LP• ArchstoneMultifamily(GP)LLC,0%GeneralPartnerofArchstoneMultifamily
GuarantorLP• ArchstoneEnterpriseLP,100%(a)memberofArchstoneMultifamilyParallel
GuarantorLLC,(b)LimitedPartnerofArchstoneMultifamilyGuarantorLP,(c)memberofArchstoneMultifamilyParallelGuarantorLLC,and(d)memberofArchstoneMultifamilyGuarantor(GP)LLC.
All of these entities are located at:9200 E. Panorama CircleEnglewood, Colorado 80112
SECTION 40J DISCLOSURE STATEMENT : SCHEDULE 32.2
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 3 OF 20
SECTION 40J DISCLOSURE STATEMENT : SCHEDULE 32.3
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 4 OF 20
Development Entity
Ato-be-formedJointVenture(“TheVenture”)betweenArchstoneNewDevelopmentHoldingsLP(“Archstone”),aDelawarelimitedpartnership,andBerkeleyKneeland25LLC,aMassachusettslimitedliabilitycompany(“Berkeley”).ArchstoneandBerkeleyhaveexecutedaLetterofIntentforformationofTheVentureinwhichtheywillbeco-developers.TheFormationAgreementwillbeexecutediftheVentureistheselecteddeveloper.TheVenturepairstwoexperienceddevelopmentteamswithsynergisticexpertise.Archstoneisadominantnationalplayerinthemultifamilyhousingbusiness,andBerkeley,aBoston-baseddevelopmentfirmwithanestablishedtrackrecordinplanning,permittingandbuildingcomplexmixed-useurbandevelopmentprojectsinthegreaterBostonarea.Asco-developers,bothcompanieswillparticipateintheprojectteamselections,designdecisions,andanticipatedfinancialdirectionofthejointventure.Withfeetonthegroundin Boston, Berkeley has a special knowledge of and focus on Boston zoning, permitting and other entitlements, and the public realm design decisions. Archstone brings to the table their detailed knowledgeofthespecificapartmentproduct(bothdesignandconstruction)andfinancingandinvestment relationships.
ARCHSTONE
As of March 31, 2012, Archstone owned or had an ownership position in 434 communities located in the United States and Europe, representing 73,135 units, including units under construction. Since 1991, Archstone has developed or purchased properties to create an unparalleled apartment
portfolio.Archstonecommunitiesallowtheirresidentstowalktoworkorthepark,relyonexceptionalservice,andenjoyspectacularviews.BostonmetromarketholdingsincludeArchstoneBostonCommon,ArchstoneAvenir(Boston),ArchstoneNorthPoint(Cambridge),ArchstoneKendallSquare(Cambridge),ArchstoneCambridgePark,ArchstoneWatertownSquare,ArchstoneCronin’sLanding(Waltham),ArchstoneBearHill(Waltham),ArchstoneQuincyandArchstoneQuarryHills(alsoQuincy).
As both the owner and operator/manager of each property, Archstone is committed to improving its portfolio every year, with every property developed or purchased. The process of continual improvement is one of the many things the company has pioneered in an industry that others have
nowadoptedas“industrystandard.”Archstone’spremiergoalistocontinuallyupgradethequalityofitsportfolio.Thisinfluencesallofthecompany’sinvestmentdecisions—fromsiteselectionanddesigntomarketingandmanagement—andservesasthefoundationofArchstone’ssuccessasthe company consistently outperforms its peers. Archstone invests for the long term, and the level of commitment to its properties supports this approach.
Archstone’sdevelopmentpipelinecurrentlyincludes:• 5projectsunderconstruction($1.1billion,2,014units,185,000SFofretail,515,000SFof
office);• 22projectsinshorttermplanning($1.7billion,6,200units);and• 20projectsinlong-termplanning($2.2billion,5,844units).
KeyArchstonepersonnelworkingontheprojectincludeLeeBloch,VicePresident-Development;JoeEasley,GroupVicePresident-Production(Construction);andSamuelFuller,ExecutiveVicePresident-Development.Morecompletecompanyinformation,resumesandsampleprojectsareincluded in Component III.
DEVELOPMENT TEAM 3.1
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 5 OF 20
BERKELEY INVESTMENTS, INC.
BerkeleyInvestments,Inc.(www.berkeleyinvestments.com),isanSDO-certified100%Minority-OwnedBusinessEnterprisefoundedin1991andknownlocallyparticularlyforitsaward-winningre-positioningofhistoricproperties.BerkeleyKneeland25LLC,aMassachusettslimitedliabilitycompany,isaproperty-specificaffiliateofBerkeleyInvestmentsandofwhichBerkeleyInvestmentsis sole manager. Berkeley has acquired or developed nearly 17 million square feet of commercial office,flex,parkingandmultifamilyassets;multifamilyassetsconstituteabout5.3MSFofthetotal.The company currently owns and manages over 2 MSF and 2,400 structured parking spaces in Boston,Waltham,ProvidenceandWorcester.Verticallyintegrated,thefirmhasprovenin-houseproperty,asset,constructionanddevelopmentmanagementcapabilities.Berkeley’sportfolioisdiverse in location and content. Recentprojectsinclude:Fort Point Channel Portfolio (Boston, MA) • Purchased500,000SFin12buildings,2parkinggarages,50,000SFofinfilllots.• Managedcreationofsuccessfulvisioningplan.• Upgradedandsold300,000SFinfirst2yearsofownership.• Obtainedentitlementsfor348/354CongressStreetandavacantlot,anddevelopedtheaward-
winningFP3condominiums(92unitsincluding4artists’live/work,and1non-artistlive/work,studios),BarringtonCoffee,andthreeofferingsbystarChefBarbaraLynch(Menton,SportelloandDrink).
• Securedentitlementsfor368CongressStreetasaMarriott-flagged,extended-stayhotel(underconstruction;deliveryFall,2013).
• Currentlypermitting381Congressas44innovativeaptstargetingyoungprofessionalsworkingfor Innovation District companies.
Waltham Watch Factory (Waltham, MA)• Historicmixed-useprojecttransforminga400,000SFhistoricfactoryinto177,000SFofbrick
andbeamofficespace(delivered2009),and96apartmentunits(Spring2012delivery),with67more units to be delivered Summer 2013.
• Securedphasedentitlements,andBrownfieldsandhistorictaxcredits;performedenvironmentalclean-up;manageddesign,construction,andtenanting.
CitySquare (Worcester, MA)• AcquiredtwentyacresofpropertyintheheartofWorcester,includingtwoofficebuildings,three
garages, and a defunct mall.• Managedcreationofthesuccessfulmasterplan;permittedthepropertytobuilduptoanother
1.0 million square feet of modern office, retail and residential space.• Securedtenantinterestanddesigneda214,000SFLEEDSilverregionalheadquartersfor
UnumGroup.• AstheCity’sagentthroughspeciallegislation,manageddesignandplanningoffournewpublic
roadways and other public infrastructure improvements.• Securedover$90millionofpublicfinancingbenefitingtheproject.• SoldhalfoftheentitleddevelopablelandandtheUnumdealtoanaffiliateofHanoverInsurance
(2009);retained10acres(730,000squarefeetofexistingandtobedevelopedspace).
ForParcel25,Berkeley’steamwillincludeYoungK.Park,President,andBarbaraSmith-Bacon,VicePresidentandProjectManager.DetailedfirmandindividualresumesareincludedinComponent III.
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 6 OF 20
DEVELOPMENT TEAM 3.2
Other Key Development Team Members
Meaningful Partnerships, Growth and Development, and Supplier Diversity Plan
TheVenturecommitstotheMeaningfulEquityPartnershipandGrowthandDevelopmentrequirements of the RFP for Parcel 25. Our commitment is evidenced top down, starting at the ownershiplevel,bypartneringanexperiencedinternationaldeveloper(Archstone)withasmallerMBEdevelopmentfirm(Berkeley).Givenitssize,theParcel25ventureprovidesBerkeleywithanoutstandingopportunitytoworkonaproducttype(highriseluxuryapartments)withwhichithasnotpreviouslybeeninvolved.Whileallteamconsultantshavenotyetbeenselected,manyhavebeen;theOtherDevelopmentTeamMemberslistedbelowhaveallbeensecuredforthisprojectifTheVentureisselected.WebelievethisteamreflectsTheVenture’sjointdeepcommitmenttoformingmeaningfulbusinessrelationshipswithMBE’sandWBE’s,andnurturingopportunitiesforthesefirms. Complete firm and individual resumes, project samples, and contact information for each firm are included in Component III.OurSupplierDiversityPlan(describedinnarrativeformforeachfirmbelow)andourGrowthandDevelopmentPlan(below)outlineourapproachtofutureselections, including the contractor and subcontractors.
Architectural Design—ICON architecture, inc. (WBE), and Hacin + Associates Inc.Parcel 25 design services are being provided through a strong partnership between two talented Boston firms, ICON architecture, inc.(ICON),aWBE,andHacin + Associates Inc.(Hacin).ICONisanSDO-certifiedWomen-OwnedBusiness,recentlyranked#68onBoston Business Journal’sListofMassachusetts’Top100Women-LedBusinesses.TheICONteamisledbyNancyLudwig,FAIA,LEEDAP(President),joinedbyJanisMamayek,AIA,LEEDAP(Principal,DirectorofArchitecture),RichardO’Dwyer(SeniorPrincipal),andMatthewZyrkowski,AIA(Associate).Hacin+Associates will act as consulting design architect for Parcel 25, bringing a keen urban vision tothisGatewayParcel.TheH+AteamisledbyfounderDavidHacin(Principal,andamemberoftheBostonCivicDesignCommission),withDavidTabenken(SeniorAssociate)andScottThomson(SeniorAssociate).
ICON architecture, inc.isaBoston-basedfirmof35staffwithaward-winningworkfocusedonsustainableurbandevelopment—creatingnewparadigmsforcitylivinginnumeroustransit-oriented,high-risedevelopments.Thefirm’sprojectsmixuses—high-endmarkethousingwithworkforceunits,artistlive/workcommunitieswithretail/officeincubatorenvironments,andmixed-use developments engaging their neighborhood edges. ICON has been responsible for the design of over 15,000 units of multifamily housing, many in Boston, with over 2,000 units currently in the permitting, design and construction pipeline.
Hacin + Associates Inc.isaBoston-basedarchitectureanddesignstudiowithabroadportfolioofawardwinningprojectsrangingfromadaptivereusetonewconstruction,fromurbandesigntointeriordesign.Withapracticedeeplyrootedinthepublicrealm,H+Aiscommittedtomodernurbanismatallscales.Thefirmdesignscivicspaces,vibrantretail,mixed-useinfill,andlandmarkbuildings that define communities. H+A often works at the boundaries between urban districts to connect, revitalize, and build meaningful places.
Landscape Architecture—Mikyoung Kim Design (M/WBE), Boston, MAMikyoungKimDesignisanSDO-certified,MinorityandWomen-OwnedBusinessEnterprise,andanaward-winninginternationallandscapearchitecturegroupwhoseworkfocusesonmergingsculptural vision with the urban landscape. As principal and design director, Mikyoung Kim has brought her background in sculpture and music, as well as her design vision as a landscape architect,tothefirm’sdiversework.Projectsarecomprisedofdesignsthatmeldsustainableinitiatives with urban form to develop engaging and poetic landscapes. The team includes Mikyoung Kim,BillMadden(SeniorAssociate),RyanShubin,andBryanChou.
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 7 OF 20
DEVELOPMENT TEAM 3.3
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 8 OF 20
Civil and Traffic—Nitsch Engineering, Inc. (WBE), Boston, MANitschEngineering,acertifiedWomen-OwnedBusinessEnterprisefoundedin1989asacivilengineeringfirm,hasgrownintoamulti-disciplinaryfirmwithadeepunderstandingofhowtosucceedonchallengingprojects.Thefirmnowalsoprovideslandsurveying,traffic/transportationengineering,GIS,andplanningservices.UsingNitschEngineeringforbothcivilandtrafficconsultingengineeringfortheParcel25projectstreamlinesourteam,whilepromotingthecontinuedgrowthofthisLeatherDistrictbasedfirm.ThiswillbeTheVentureteam’sfirstexperiencewith Nitsch Engineering for traffic/transportation services. Nitsch Engineering team members includeJohnSchmid,DeborahKatzman,andBradStaples(civil),andFayssalHusseiniandJeffBandini(trafficandtransportation).
Structural Engineers—LeMessurier Consultants, Cambridge, MA; and LY Consulting Engineers, Inc. (MBE), Bedford, MAAchallenginghigh-riseprojectsuchasParcel25demandsanexperienced,ingeniousstructuralengineer. For that reason, The Venture has selected LeMessurier. To foster an opportunity for asmallerfirmtobeengagedonaprojectofthisscale,LeMessurierhaspartneredwithLYConsultingEngineers,Inc.,a100%MBEfirmfoundedin1992,forthespecificationsandQA/QCportionsofthework.PastprojectsforLYConsultingEngineersincludeU.S.Embassyhousingatvariouslocationsworld-wide,newresidentialunitsfortheCambridgeHousingAuthority,andstudent residences at UMass Amherst. Key LeMessurier team members include Peter Cheever, PE(President)andCraigBlanchet,PE(Principal).
Surveying—Bryant Engineers (MBE), Boston, MAFoundedin1976,BryantAssociates,Inc.isaself-certifiedveteran-ownedsmallbusiness(VOSB)andaMassachusettsSDO-certifiedMinority-OwnedBusinessEnterpriseprovidingprofessionalconsultingengineeringservices.Thefirmhasaccomplishedmajorsurveysforvariousfederal,municipalandprivateclients.TheBryantteamwillbeledbyGaryHamilton,PLS(ChiefofSurvey),whosesurveyingprojectsincludetheBRABostonConventionandExhibitionCenterinSouthBostonandaproposed14-storyresidentialmixed-usebuildingindowntownBoston.
MEP—Cosentini Associates, Inc., Cambridge, MA;and Fernandez Associates (MBE), Byfield, MAAswithstructuralengineering,a400+/-unitsustainableapartmentbuildingdemandsanestablishedandcreativefirmtomanagethedesignandcoordinationoftheprojectmechanical,electricalandplumbingengineering.Cosentinibringsalonghistoryofexperiencelocallyandabroad,providingexposuretonewtechniquestogetherwiththecertaintyofpracticalfunctionality.BobLeber,PE,LEEDAP,VladimirYarmarkovich,PE,LEEDAP,MichaelUtera,RandallDuke,PE, LEED AP, and Anthony Petrillo will work with the Parcel 25 team. Cosentini will partner with Fernandez&Associates,anMBEfireprotectionengineeringfirmwithover16yearsofexperience,who will provide full service Building Code Consulting. The Fernandez team is led by Luis Fernandez, PE.
Code—Rolf Jensen Associates, Boston, MAAchievinglifesafetyinahigh-risebuildingrequiresrapidegressforoccupantsandopenaccessforfirefightersinanemergencysituation.Mixed-usebuildingswithretail,residentialandparkingusescreatetheneedforaspecialintegratedapproach.RolfJensenprovidestheexpertiseandtechnicaltalentforasafeandsuccessfulproject.TheParcel25RJAteamwillincludeJonathanEisenberg,PE(VicePresident)andCarlNelson,PE(SeniorConsultant).
Permitting - Epsilon Associates, Maynard, MAEpsilonisamulti-disciplinaryfirmofengineers,environmentalscientistsandplannerswithafullrange of environmental analysis, permitting and compliance services. They are regarded as the “goto”permittingfirmwithgoodreason–theygettime-efficient,successfulresultsusingpracticalstrategies.BerkeleyhasworkedwithEpsilononnumerouscomplexprojects,includingCitySquareinWorcesterandvariedassetsinFortPointChannel.PeggyBriggs(ManagingPrincipal)willleadEpsilon’sParcel25team.AsdescribedunderPermitsandApprovals,Epsilonwillbesupportedbyother consultants, such as legal, civil engineering, traffic, environmental, etc.
63 Larkin Road • Byfield, MA 01922
Tel: 978-499-0172 Fax: 978-465-2371
www.fernandezassoc.com
DEVELOPMENT TEAM 3.4
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 9 OF 20
DEVELOPMENT TEAM 3.5Selected Interior Design—THEREdesign (MBE/WBE/DBE), Allston, MATHEREdesign,anMBE/WBEfirm,hasa14-yearhistoryofinteriorarchitecturespecialization.Thefirmhasextensiveexperienceincollaborationwitharchitectsandownersindevelopingsimple,clear ideas that further the architectural concepts of the buildings being designed. For Parcel 25,THEREdesign’sinteriorsteamwillbeledbyPrincipalKatyFlammia,AIA,LEEDAP,whoseexperienceincludesurbanlofts,condos,andretailspaces.
GROWTH AND DEVELOPMENT
TheVenture’sfocusinformingitsteam,above,hasbeencurrentopportunitycreationandexpansionofbusinessrevenueforbothqualifiedemergingandthrivingMBE’sandWBE’s.Goingforward,ourfocuswillcontinuetobeonahighlevelofM/WBEdiversity.Whileourexpectationisthat the actual milestones and timetables, and goals and a compliance plan, will be crafted with input from MassDOT, key impactive milestones include:
1. Pre-ConstructionMilestone:Theconstructionbudgetformsthelargestpartofanydevelopmentprojectafterarchitectureandengineering.Inourexperience,itisessentialtodothefollowing:(i)craftpercentagegoalsandguidelinesforconstructionhiringparticipation,(ii)insurethatthosegoalsandguidelinesbecomepartofthebiddocumentsfortheproject,and(iii)insurethatallpre-qualifiedMassachusettsSDO-certifiedMBEandWBEentitiesareonthesubcontractorbidlist.Pre-constructionandpre-bidding,wewouldreachouttocommunityagenciesandlocal(Boston)communitygroupstoheightenBostonneighborhoodresidentawarenessoftheupcomingprojecthiring,andtounionbusinessrepresentativestoencourageminorityandwomen construction apprenticeship program participation and hiring.
2. Construction Reporting Milestones: During construction, there must be effective oversight of the contractor/CM, weekly tracking of workforce reports, regular site visits, and monthly meetings and monthly documentation of compliance with the goals and guidelines. At agreed intervals, invoiceswillbetrackedtoinsurethatMBE’sandWBE’sareactuallydoingtheworkrepresented.
3. Team Selection Finalization Milestone: In making each team selection, The Venture will work to insure(asithaswiththeinitialselections)thatmeaningfulrolesaremadeavailabletoqualifiedwomen and minorities on each team. In our view, this would not necessarily require new hiring, buttheoptimizationofskilldevelopmentofexistingemployees.Inaddition,TheVenturewouldencourageeachfirmtoofferprojectexposuretominorityandwomeninternsatappropriateintervalsduringtheprojectduration.
4. OngoingMBE/WBESupportMilestone:ThegoalofthismilestoneistofostersuccessfulWBE/MBEbusinessrelationshipsleadingtoadditionalfutureopportunitiesamongtheprojectpartnersand with others. To advance that goal, The Venture will:a. ConnectteamMBE’sandWBE’stoexistingbusinesssupportandconsultingservices
provided by organizations such as:i. CenterforWomenandEnterprise(www.cweboston.org),ii. MassachusettsMinorityContractorsAssociation(www.massmca.org),iii. BostonMBDACenter(www.mbda.gov/businesscenters/boston),andiv. SBABoston(www.sba.gov/about-offices-content/2/3162)
b. In furtherance of the foregoing, The Venture has had preliminary discussions with the the BostonMinorityBusinessDevelopmentAgencyBusinessCenter(“BostonMBDACenter”)regardingtheaMemorandumofAgreementtosourcepre-qualifiedMBE’sandWBE’s,andtoworkwiththeselectedMBE’sandWBE’salreadyontheteamtoinsurethattheservicesofferedbytheBostonMBDACenterareavailabletointerestedMBEandWBEfirmsonaproactive basis to make them better business partners.
c. Workthrough-outtheprojecttoinsurethatteamMBE’sandWBE’s(i)areanintegralpartoftheteamandtreatedwithrespectbytheirprojectpartnersandcolleagues,and(ii)haveopen lines of communication with The Venture relating to any issues arising out of partnering or engagement.
Building & Site Design
MarkinganimportantnexusbetweenDowntownBostonandtheSouthBay,Chinatown,and Leather District neighborhoods, Parcel 25 sits as a distinct gateway into the city fromthesouth.Ourdesignintegratesaniconic24-storymixed-usebuildingandadynamiclandscapeintothisuniquesite,respondingtoitschallenges.Thismixed-usedevelopmentproposesstreetlevelretail,amajornewlandscapedcivicplaza,438rentalapartmentswithassociatedamenities(andincludingaffordableunitstomeettheCityofBostonInclusionaryHousingguidelinesof15%ofmarketrateunits),and227parkingspacesinamulti-levelundergroundgarageaccessedfromLincolnStreet.
Our design has been conceived to:
1. Establish a landmark gateway into the city from the south—JustastheZakimBridge over the Charles River captures attention traveling into Boston from the North,ourdesignestablishesacontemporary,gatewayimageforBoston’ssouthernentry.Thedesignunveiledonapproachwillbea24-storytowerrisingto300’,itsnarrow southern face emphasizing its height and presenting a memorable graphic compositionagainstthecityskyline.Thebuilding’sarchitecturalexpressionisemphatically modern, with high performance façades tailored to specific orientation andviewsasaniconforBoston’ssustainableagenda:• Thewestfaçade’scurtainwallextendsovertherooftoframeanopenairrooftop
terraceasastrongarchitecturalgestureonthecityskyline;framesdoubleassun shades on the west and south facades, then transition horizontally to artfully cover the highway below.
• Ontheeastfaçade,metalpanelscreateasinuousfoldingframethatdefinesavertical slot of deep windows facing south, and a more solid panelized volume facing east.
• ApedestrianscaledbaseengagesthearchitectureoftheLeatherDistrict,establishing a rhythm with masonry bays infilled with windows that, in turn, relate to the tower above. The plaza entry pavilion is light and transparent, to engage the public plaza beyond.
The broad face of the tower aligns with the angle of the highway below, creating a counterpointtotheadjacentcityblocks.
2. Celebrate the southern terminus of the Rose Kennedy Greenway with a broad public plaza—CreatingaciviccanvasforthisgatewaybuildingandagracefulterminusoftheRoseKennedyGreenway,theurbanlandscapewillnotonlyconnectthe southernmost limits of the Leather District and Chinatown, but also highlight the green connection to greater Boston. Occupying the northwest corner of the site, a pedestrian-scaled,publicspacewillaccommodateprogrammedevents,linkingtheLeather District and Chinatown neighborhoods. The plaza will blend hardy, urban site furnishings and pavements with softer native landscape elements, providing comfortablepedestrianspacesforgatheringwhilesimultaneouslyextendingthestrongcharacteroftheGreenway.
3. Extend the urban fabric of the Leather District along Lincoln Street—Theintegrated masonry and metal façades along Lincoln and Kneeland Streets align withtheheightofadjacenthistoricbuildings,extendingthescale,rhythm,andmaterials of the Leather District onto this site. A second residential entrance for bothpedestriansandautomobilesislocatedmid-blockonLincolnStreet,providing
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 10 OF 20
DEVELOPMENT APPROACH4.1
offstreetdrop-offatalobbymezzaninelevelconnectedtothelobbyandverticalcirculation and encouraging pedestrian activity along its length.
4. Create an active street wall along Kneeland Street to strengthen neighborhood connections—ThisnewstreetwalllinesKneelandwithactivecommercialspaceandarichpedestrianexperience.(NotethatthedesigncontemplatesrelocatingtheexistingFireDepartmentPumpHousebelowgrade;discussionsregardingthisrelocationwillbeadvancedwiththeCityattheappropriatetime.)
5. Provide an artistic and memorable cover over the highway tunnel—Morethana simple concrete cover, the trellis frame creates an evocative opportunity to engage iconic public art as part of the MassDOT system. The design envisions the vertical buildingexpressionwrappingintothelandscapeandextendingthetrellis-likestructureoverthevoidoftheramp,reducingnoiseandenhancing(transforming?Obscuring?)viewtothehighway.Combiningcolor,texture,andlight,thispublicart“cover”willbeexperiencedinmultipleways—fromthebuildingabove,attheplazalevel,andalongthehighwaybelow.Beyondthiscover,theexistingbroadsidewalkalongAlbanyStreetwillbelandscapedasaconnectiontotheParcel24Park.(Ifdesignated,theprojectteamwillengageinconversationswiththeCityofBoston,MassDOT, and the Federal Highway Administration and develop the design in fullcompliancewithallCA/TProjectcommitmentsandMassDOTrequirements.)Alternately,afull“cover”couldbedesignedtoprovideanimpervioussurface–inthis option, the paving and landscaping emanating from the building façade will highlight crossing paths leading to the front entry in this important urban space, and the design would alter the financial terms of the ground lease.
6. Retain a below grade connection to Parcels 26 and 27—AsrequiredbyMassDOT,ourdesignpreservesaccesstotheexistingundergroundconnectorbelowLincolnStreetisaccommodatedadjacenttotheLincolnStreetdrop-offandentrance to the parking garage. The ramp system in the garage accesses two additionallevelsofparkingbelow;andessentialaccessforDOTvehiclestotravelunderLincolnStreettoParcel26.
The proposed design assumes the completion of Phase II of the South Bay Planning Study and subsequent adoption of the PDA, which would allow for the building to have amaximumheightof300’andFARof10(currentdesignguidelinesinArticle43oftheZoningCodelimitbuildingheightto100’andFARto6).TheProjectTeamiscommittedtomeetingalloftheHistoricConsiderationsforJointDevelopmentguidelinesandtheCityofBoston’ssustainabledesignguidelines.
OurParcel25designenvisionsalandmarkGatewayintoBoston,whiletransformingachallengingsiteintoanintegralpartofBoston’sdynamicurbanfabric.Boundingneighborhoodswilldirectlybenefitfromtheartfulre-knittingofthehighwaygap,andtheextensionofrealpedestrianactivityontoKneeland,LincolnandAlbanyStreets.AnewcivicplazawillcelebratetheterminusoftheGreenway,embracingafutureBostonanditsworld-classsustainableagenda.
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 11 OF 20
DEVELOPMENT APPROACH4.2
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 12 OF 20
DEVELOPMENT APPROACH4.3DESIGN CONCEPTS : Views, neighborhood connections, continuation of street wall, sustainable elements, building heights, access
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 13 OF 20
LANDSCAPE CONCEPT
LEATHER DISTRICT
CHINA TOWN
Landscape Diagram
The Parcel 25 Landscape is conceived as the civic canvas for the Boston Gateway Building, a terminus for the Rose Kennedy Greenway, and a southern gateway to the city of Boston. This urban enviornment will connect the southernmost limits of the Leather District and China Town, while also highlighting the connection to the greater landscape. The exposed roadway to the west is obscured with a canopy extension of the architecture and is conceived as an armiture for public art. This artistic expres-sion is intended to highlight the project as a gateway. The landscape will be composed of spaces for passage and gathering while establishing an iconic civic destination for the Leather District and China Town.
Landscape Character
DEVELOPMENT APPROACH4.4
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 14 OF 20
DEVELOPMENT APPROACH4.5clockwise from right:
locus plan indicating view locations; view along Kneeland Street from the
Leather District; view along Kneeland Street from Chinatown; view from I-93 N exit
TYPICAL PARKING LEVEL
GROUND FLOOR PLAN
MEZZANINEFLOOR
TYPICAL BASE BUILDING FLOOR
TYPICAL TOWER FLOOR
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 15 OF 20
DEVELOPMENT APPROACH4.6
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 17 OF 20
Loft Levels Average NSF # Units
Mass DOT Parcel 25UNITSFloor Level ST 1BR 1BR + 2BR 3BRParking (3) - - - 82 Parking SpacesParking (2) - - - 79 Parking Spaces1st (Parking(1)/Retail) - - - 32 Parking SpacesMezz. Parking 34 Parking Spaces2nd 3 14 1 7 1 263rd 3 14 1 7 1 264th 3 14 1 7 1 265th 3 14 1 7 1 266th 3 14 1 7 1 267th 3 14 1 7 1 268th 3 14 1 7 1 269th 2 8 0 5 1 1610th 2 8 0 5 1 1611th 2 8 0 5 1 1612th 2 8 0 5 1 1613th 2 8 0 5 1 1614th 2 8 0 5 1 1615th 2 8 0 5 1 1616th 2 8 0 5 1 1617th 2 8 0 5 1 1618th 2 8 0 5 1 1619th 2 8 0 5 1 1620th 2 8 0 5 1 1621st 2 8 0 5 1 1622nd 2 8 0 5 1 1623rd 2 8 0 5 1 1624th 2 8 0 5 1 1625th
53 226 7 129 23 43812.10% 51.60% 1.60% 29.45% 5.25%
Parking SpacesResidential Parking 227 0.52
GSFFloor Level Service/Mech. Parking Retail Amenity Circulation Residential TotalParking (3) 0 33,437 0 0 0 0 33,437Parking (2) 0 33,437 0 0 0 0 33,4371st (Parking(1)/Retail) 5,715 14,512 3,378 9,764 258 0 33,627Mezz. Parking 0 18,452 0 2,593 0 0 21,0452nd 362 0 0 0 3,024 22,513 25,8993rd 362 0 0 0 3,024 22,513 25,8994th 362 0 0 0 3,024 22,513 25,8995th 362 0 0 0 3,024 22,513 25,8996th 362 0 0 0 3,024 22,513 25,8997th 362 0 0 0 3,024 22,513 25,8998th 362 0 0 0 3,024 22,513 25,8999th 80 0 0 0 2,205 13,963 16,24810th 80 0 0 0 2,205 13,963 16,24811th 80 0 0 0 2,205 13,963 16,24812th 80 0 0 0 2,205 13,963 16,24813th 80 0 0 0 2,205 13,963 16,24814th 80 0 0 0 2,205 13,963 16,24815th 80 0 0 0 2,205 13,963 16,24816th 80 0 0 0 2,205 13,963 16,24817th 80 0 0 0 2,205 13,963 16,24818th 80 0 0 0 2,205 13,963 16,24819th 80 0 0 0 2,205 13,963 16,24820th 80 0 0 0 2,205 13,963 16,24821st 80 0 0 0 2,205 13,963 16,24822nd 80 0 0 0 2,205 13,963 16,24823rd 80 0 0 0 2,205 13,963 16,24824th 80 0 0 0 2,205 13,963 16,24825th 7,821 0 0 1,712 2,554 0 12,087
17,350 99,838 3,378 14,069 59,260 380,999 574,894 GSF
* FAR GSF 490,670PARCEL SF 72,440
6.77* Excludes mechanical and below grade parking
GSFFloor Level Service/Mech. Parking Retail Amenity Circulation Residential TotalParking (3) 0 33,437 0 0 0 0 33,437Parking (2) 0 33,437 0 0 0 0 33,4371st (Parking(1)/Retail) 5,715 14,512 3,378 9,764 258 0 33,627Mezz. Parking 0 18,452 0 2,593 0 0 21,0452nd 362 0 0 0 3,024 22,513 25,8993rd 362 0 0 0 3,024 22,513 25,8994th 362 0 0 0 3,024 22,513 25,8995th 362 0 0 0 3,024 22,513 25,8996th 362 0 0 0 3,024 22,513 25,8997th 362 0 0 0 3,024 22,513 25,8998th 362 0 0 0 3,024 22,513 25,8999th 80 0 0 0 2,205 13,963 16,24810th 80 0 0 0 2,205 13,963 16,24811th 80 0 0 0 2,205 13,963 16,24812th 80 0 0 0 2,205 13,963 16,24813th 80 0 0 0 2,205 13,963 16,24814th 80 0 0 0 2,205 13,963 16,24815th 80 0 0 0 2,205 13,963 16,24816th 80 0 0 0 2,205 13,963 16,24817th 80 0 0 0 2,205 13,963 16,24818th 80 0 0 0 2,205 13,963 16,24819th 80 0 0 0 2,205 13,963 16,24820th 80 0 0 0 2,205 13,963 16,24821st 80 0 0 0 2,205 13,963 16,24822nd 80 0 0 0 2,205 13,963 16,24823rd 80 0 0 0 2,205 13,963 16,24824th 80 0 0 0 2,205 13,963 16,24825th 7,821 0 0 1,712 2,554 0 12,087
17,350 99,838 3,378 14,069 59,260 380,999 574,894 GSF
* FAR GSF 490,670PARCEL SF 72,440
6.77* Excludes mechanical and below grade parking
Studio 607 3 18211BR 761 14 106541BR+ 878 1 8782BR 1006 7 70423BR 1184 1 1184
26 21579 NSF/Floorx 7
151053 NSF 364,909 NSF471,678 GSF**
Tower Levels Average NSF # Units 77.36%Studio 608 2 12161BR 762 8 6096 **Excludes Retail & Parking1BR+ 0 0 02BR 974 5 4870 833 Average Unit SF3BR 1184 1 1184
13366 NSF/Floorx 16
213856 NSF
2012-04-24--Unit Mix.xlsx
Mass DOT Parcel 25UNITSFloor Level ST 1BR 1BR + 2BR 3BRParking (3) - - - 82 Parking SpacesParking (2) - - - 79 Parking Spaces1st (Parking(1)/Retail) - - - 32 Parking SpacesMezz. Parking 34 Parking Spaces2nd 3 14 1 7 1 263rd 3 14 1 7 1 264th 3 14 1 7 1 265th 3 14 1 7 1 266th 3 14 1 7 1 267th 3 14 1 7 1 268th 3 14 1 7 1 269th 2 8 0 5 1 1610th 2 8 0 5 1 1611th 2 8 0 5 1 1612th 2 8 0 5 1 1613th 2 8 0 5 1 1614th 2 8 0 5 1 1615th 2 8 0 5 1 1616th 2 8 0 5 1 1617th 2 8 0 5 1 1618th 2 8 0 5 1 1619th 2 8 0 5 1 1620th 2 8 0 5 1 1621st 2 8 0 5 1 1622nd 2 8 0 5 1 1623rd 2 8 0 5 1 1624th 2 8 0 5 1 1625th
53 226 7 129 23 43812.10% 51.60% 1.60% 29.45% 5.25%
Parking SpacesResidential Parking 227 0.52
Loft Levels Average NSF # UnitsStudio 607 3 18211BR 761 14 106541BR+ 878 1 8782BR 1006 7 70423BR 1184 1 1184
26 21579 NSF/Floorx 7
151053 NSF 364,909 NSF471,678 GSF**
Tower Levels Average NSF # Units 77.36%Studio 608 2 12161BR 762 8 6096 **Excludes Retail & Parking1BR+ 0 0 02BR 974 5 4870 833 Average Unit SF3BR 1184 1 1184
13366 NSF/Floorx 16
213856 NSF
2012-04-24--Unit Mix.xlsx
DEVELOPMENT APPROACH4.8
Community Uses & Benefits
InadditiontointegratingMinorityandWomenBusinessEnterprisesintotheprojectteamsduringthepre-developmentandconstructionphasesoftheproject,botheco-nomicandurbanbenefitsaccruefromtheParcel25project.Economicbenefitscanbespecifically quantified if The Venture is the selected Developer.
ECONOMIC BENEFITS include the following:
Construction Period• DirectandIndirectEmployment:DirectEmploymentincludesproject-relatedhiring;
and Indirect Employment includes less directly measurable hiring, such as workers producing construction supplies and materials, employees at food and beverage facilities feeding construction workers, etc.
• IncreasedIncomeTaxesfromDirectandIndirectEmployment• IncreasedSalesTaxesontaxablebuildingmaterials
Post-Construction Period Benefits • Projectrelatedhiringfortheresidentialandretailservicesonsite• IncomeTaxEmployment(netneworretained)• SalesTaxonretail/restaurantsales• IncreasingthestockofaffordablehousingconformingtoCityguidelines• Returningavacantparceloflandtoproductiveuse• RealEstatetaxes
URBAN BENEFITS
Parcel 25 presents the opportunity to enhance the transformation of the South Bay areaandadjacentdistrictsthroughimprovementsthatwouldchangeanareadefinedbytransportationinfrastructureintoavibrantmixed-useneighborhood,includingamixofhousingoptions,neededneighborhoodservices,destinationusesinjectingnewrev-enue, and meaningful community space. Bringing additional people to the area to live, work and play supports the optimal 18 hour day, enlivening and stabilizing the neigh-
borhoodandincreasinglocalinvestment.Leveragingaccesstoexistingpublictranspor-tation assists in limiting the impacts of additional traffic in this already congested area.
Public meetings during Phase II of the South Bay Planning Study, and BRA Article 80 meetings,willhelptofurtherclarifycurrentcommunityconcernsandwhattheadjacentcommunities’valueintermsofcommunityspaceoramenities.InTheVenture’sview,several key urban benefits of Parcel 25 include the following:
• Creatingavibrant,pedestrian-friendlytransitionzonefromChinatownthroughtheLeatherDistricttoSouthStationandtowardstheFortPointdistrict;
• CompletingtherevitalizationoftheLeatherDistrict;• Healingthescarcreatedbythetransportationinfrastructurenetwork;• Reinforcingresidentialneighborhoodsbycreatinganurbanstreetscapealongits
edges;• Providingopportunitiesforneighborhoodserviceretail;• EstablishingalandmarkgatewaytotheCityforcommutersandvisitorsarrivingfrom
theSouth;• EstablishingalogicalterminustotheGreenway.and• CoveringtherampleadingtotheSoutheastExpresswayandmitigatingitsimpact.
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 18 OF 20
DEVELOPMENT APPROACH4.9
Permits + Approvals
Entitlements generally occur in three somewhat overlapping stages: impact reviews, discretionaryapprovals,andconstruction-relatedpermits.LayeredontopofthisforParcel 25 is completion of Phase II of the South Bay Planning Study and creation of the PDA, as discussed below. Once chosen as the selected developer, The Venture will work with their consultants to prepare a comprehensive permits and approvals strategy
andscheduletoinsurethatallentitlementsaresecuredinatimeandcost-efficientmanner, and that nothing is missed. This planning would include at minimum Epsilon Associates,Goulston&Storrs,ICONArchitecture,Hacin+Associates,NitschEngineer-ing, and our selected environmental consultant.
TheVentureisexperiencedwithBostonpermittingandhasselectedteamconsultantswiththeexpertisetoseektimelyandpracticalresults.ArchstoneandBerkeleyhavebothpreviouslymanagedentitlementsforothercomplicatedurbanprojectswithmul-tiplecompetingconstituencies,includingArticle80,BCDC,BoardofZoningAppeals,BWSC,BPIC,BTD,BostonLandmarksCommission,MassachusettsHistoricCommis-sion,Massportapprovals,FAA,Chapter91,MEPA/NEPA/DEP,etc.Whileit’stooearlytoprepareaschedule,samplesfromotherprojectscanbeprovidedtodemonstratefacility with process.
TheVenturebelievesthatthebestlong-termfinancialresultforMassDOTandforthe site requires the completion of Phase II of the South Bay Planning Study with an attendantincreaseinheightanddensityforParcel25.AsindicatedbyPeterGoriofthe BRA at the MassDOT Parcel 25 meeting and site tour on February 1, 2012, the BRAappearsreadytolaunchPhaseIIsimultaneouslywithMassDOT’sselectionofadeveloper for Parcel 25. The Venture anticipates that Phase II will take at least the eight monthsindicatedintheSouthBayStudyPhaseIReporttofinalizethetextoftheSouthBay District Plan. The Venture members anticipate participating actively in these meet-ings to glean a complete understanding of the key issues of concern.
DuringthePhaseIIstudy,TheVenturewouldexpecttomeetwiththeCityofBostonregardingTheVenture’sdesiredre-locationon-siteofwhatisbelievedtobetheBostonFire Department pumping station, and with MassDOT and others regarding the air qual-ity and other facilities serving the highways, as both of these items will influence the finaldesignoftheproject.Inaddition,preliminarymeetingswouldbeheldwithprivateutilities,BostonWaterandSewer,andotherCitydepartmentstofacilitateopencom-municationaboutallissuesthatcouldimpacttheprojectdesign,scheduleandcost.
Article80andMEPA(includingenvironmental,traffic,andcivilstudies)willbelaunchedin parallel at the appropriate time based on the progress of the Phase II study. The VenturefullyunderstandsthatthisisafullMEPAprocess,andthattheprojectwillneedtoundergoArticle80LargeProjectReview.
CoordinationwiththeFederalHighwayAdministration(FHWA)istypicallyinitiatedbyMassDOT during design, however, we suggest a kickoff meeting among the Venture teammembers/consultants,andMassDOTandFHWA,todiscussdesigndirection,siteconstraints, submittal contents, and other procedural issues. This will help to eliminate potentialconfusionregardingexpectations,avoidwastedtime,andinformallastodirectionandnextsteps.
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 19 OF 20
DEVELOPMENT APPROACH4.10
Parc
el 2
5 Pr
ojec
t Pr
elim
inar
y Sc
hedu
le o
f Maj
or It
ems
04-2
5-20
12
Prelim
inary Design, Permitting
, and
Con
struction
Sche
dule (04
/27/20
12)
Mo 1
Mo 2
Mo 3
Mo 4
Mo 5
Mo 6
Mo 7
Mo 8
Mo 9
Mo 10
Mo 11
Mo 12
Mo 13
Mo 14
Mo 15
Mo 16
Mo 17
Mo 18
Mo 19
Mo 20
Mo 21
Mo 22
Mo 23
Mo 24
Mo 25
Mo 26
Mo 27
Mo 28
Mo 29
Mo 30
Mo 31
Mo 32
Mo 33
Mo 34
Mo 35
NOTE: This Sample Sche
dule is provide
d to illustrate activites con
ducive to
being
con
ducted
on a pa
rallel track; a
ctua
l detailed project sche
dule detailed after selection; dates will vary.
Develop
er Selectio
n
Negotiatio
n of Dev'm
t Agm
t and
Grd Lease
Design
Concep
tual Design
Sche
matic Design
MassDOT, FHWA reviews
CM Pric
ing Exercise
Design Develop
men
tMassDOT, FHWA reviews
CM Pric
ing Exercise
Constructio
n Docum
ents
MassDOT, FHWA reviews
CM 90%
Set Pric
ing Exercise
BRA Sou
th Bay Phase II Study
/ Re‐Zoning
Due
Diligence, env
testing, survey, etc.
Inform
al m
eetin
gs with
MassDOT/FH
WA, B
RA, B
LC etc
Negotiate Develop
men
t Team Con
tracts
Detailed pe
rmits and
app
rovals sched
ule
Traffic Study
Launch Discussion re sup
pressing
City
pum
p station
Article 80 ‐ Large Project Review
Boston
Civic Design Co
mmission
MEPA (File PNF to Final Certificate Issued
Section 10
6/ State Register Re
view
Boston
Landm
arks Com
mission
FAA App
roval
Other App
rovals
Parking Freeze
Utilities
BWSC, B
uilding Pe
rmit, etc
Constructio
n (26 ‐ 3
0 mon
ths total)
Award Long
Lead Item
s (Early Steel Pkg?)
Bid & Award
Mob
ilizatio
nCo
nstruction
Start (2
6‐30
mos dep
on site
XX
Review
of site
and
land
use con
straints & refinem
ent o
f prelim
inary de
velopm
ent con
cept
Ber
kele
y P
arce
l 25_
0425
2012
PARCEL 25 | COMPONENT 1: DEVELOPMENT PROPOSAL | PAGE 20 OF 20
DEVELOPMENT APPROACH4.11Schedule