    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 1-

    P U R I

    City Development Plan

    2006

    Puri Municipality

    Housing & UrbanDevelopment Department

    City ManagersAssociation Orissa

    City

    ManagersC M A OAssociationOrissa

    C M

    A O

  • 7/31/2019 CDP_Puri_Unlocked

    2/260

  • 7/31/2019 CDP_Puri_Unlocked

    3/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 0-

    Table of Contents

    City Development Plan ForewordAcknowledgementExecutive Summary

    1. City Development Plan Framework......................................................................... 1

    1.1. Introduction..............................................................................................................1

    1.2. Urbanization in India................................................................................................. 1

    1.2.1. Urban Governance in India a Steps towards Decentralization......................................1

    1.3. Urbanisation in Orissa ..............................................................................................2

    1.3.1. Level of Urbanisation .......................................................................................................2

    1.3.2. Urban Governance............................................................................................................3

    1.4. Need for Development of the Urban Sector. ................................................................3

    1.5. City Development Plan (CDP).....................................................................................5

    1.5.1. The Guiding Principles .....................................................................................................5

    1.5.2. Objectives of City Development Plan ...............................................................................7

    1.5.3. City Development Planning Process ................................................................................7

    2. Puri City Profile................................................................................................... 10

    2.1. City Introduction.....................................................................................................10

    2.2. Evolution of Puri Town ............................................................................................ 11

    2.3. Structure of the Town..............................................................................................13

    2.4. Topography of Puri Town.........................................................................................14

    2.5. Climate ................................................................................................................... 14

    2.6. Location & Linkages ................................................................................................ 15

    2.7. Area and Population................................................................................................ 15

    2.7.1. Socio-Economic Characteristics .....................................................................................16

    2.8. Tourism ..................................................................................................................17

    2.9. Development Plan Development Plan & Land use ..................................................... 17

    2.10. City Growth Direction............................................................................................18

    2.11. Administrative Boundaries and Areas ....................................................................18

    2.12. Land Use of Puri Town A General Picture............................................................. 19

    2.12.1. Trends of Development (1968 - 2004) .........................................................................20

    2.12.2. Statutory Provisions Made For Master Plans/ Development Plans ...........................21

    2.12.3. Emerging Issues ...........................................................................................................22

    2.13. Puri Today............................................................................................................. 23

  • 7/31/2019 CDP_Puri_Unlocked

    4/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 1-

    3. Temple Of Lord Jagannath ................................................................................... 24

    3.1. Evolution of Jagannath Temple Complex .................................................................24

    3.1.1. The Architecture of the abode of Lord Jagannath ........................................................24

    3.2. The Daily Rituals in the Temple...............................................................................25

    3.3. Revenue Generation and Expenditure of Jagannath Temple ..................................... 27

    3.3.1. The Shri Jagannath Temple Fund .................................................................................27

    3.3.2. The Temple Economy .....................................................................................................28

    3.4. The Administration of Shri Jagannath Temple, Puri ................................................. 28

    3.5. Temple as a main Source of City Income.................................................................. 30

    4. Rath Yatra & the City Life.................................................................................... 31

    4.1. Rath Yatra The Grand Car Festival ........................................................................ 31

    4.2. Activities Associated With Chariot Construction before Rath Yatra ........................... 32

    4.2.1. Collection of wood for Rath building .............................................................................32

    4.2.2. Construction of Chariots ................................................................................................32

    4.2.3. Activities associated:......................................................................................................33

    4.3. Description of the Three Raths................................................................................. 33

    4.4. Chronology of Rituals Associated With Rath Yatra.................................................... 34

    4.4.1. Snana Purnima...............................................................................................................34

    4.4.2. Anavasara Festival ........................................................................................................35

    4.4.3. Nibhrita Festival .............................................................................................................35

    4.4.4. Anga-Raga or Nava Yavana Festival ............................................................................35

    4.4.5. Netrotsava.......................................................................................................................35

    4.4.6. Rath Yatra.......................................................................................................................36

    4.4.7. Bahuda Yatra (The Return Of Rath) ..............................................................................36

    4.4.8. Suna Vesha.....................................................................................................................37

    4.5. Special Infrastructural Provisions during Rath Yatra................................................ 38

    4.5.1. Social Infrastructure.......................................................................................................38

    4.5.2. Health..............................................................................................................................38

    4.5.3. Security ...........................................................................................................................39

    4.5.4. Public facilities and Arrangements during for Rath Yatra ...........................................40

    4.6. Physical Infrastructure ............................................................................................ 40

    4.6.1. Solid Waste Management ..............................................................................................40

    4.6.2. Electricity ........................................................................................................................41

    4.6.3. Water Supply ..................................................................................................................41

    4.7. Significance of Rath Yatra in City Development Plan ................................................ 41

    5. Puri- The Heritage city......................................................................................... 42

  • 7/31/2019 CDP_Puri_Unlocked

    5/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 2-

    5.1. Regional Setting of Puri as Coastal Cultural Landscape............................................ 42

    5.2. Legal Framework of Heritage Development ............................................................... 43

    5.3. Institutional Framework ..........................................................................................44

    5.4. Identification and Categorization of Heritage Components ........................................ 44

    5.5. The Heritage Area.................................................................................................... 46

    5.5.1. Criteria for delineation ...................................................................................................46

    5.5.2. The Historic Delineation .................................................................................................47

    5.5.3. The Ritualistic Delineation .............................................................................................48

    5.6. Five Holy Tanks.......................................................................................................49

    5.6.1. The Sahi structure........................................................................................................50

    5.6.2. Mathas and Ashramas ..................................................................................................50

    5.6.3. The Four Ashrams..........................................................................................................53

    5.7. Cultural Heritage ....................................................................................................56

    5.7.1. Dola Yatra.......................................................................................................................56

    5.7.2. Chandan Yatra...............................................................................................................56

    5.7.3. Snana Yatra....................................................................................................................56

    5.7.4. The Chariots ...................................................................................................................57

    5.7.5. Ratha Yatra (Chariot Festival) .......................................................................................58

    5.7.6. Navakalevara .................................................................................................................59

    5.8. Fairs and Festivals ..................................................................................................60

    5.9. New Heritage Facilities ............................................................................................62

    5.9.1. Puris Heritage Gateway................................................................................................62

    5.10. Issues and Problems of Heritage in Puri ............................................................. 63

    6. City Management and Governance ....................................................................... 64

    6.1. Institutions ............................................................................................................. 64

    6.2. Legal Framework.....................................................................................................64

    6.3. Local Governments Framework................................................................................ 64

    6.4. City Management ....................................................................................................65

    6.5. About Puri Municipality........................................................................................... 66

    6.5.1. Organisational Structure................................................................................................66

    6.6. Organisastion Structure ..........................................................................................72

    6.6.1. Puri Municipality.............................................................................................................72

    6.6.2. WSS Institutional framework (Orissa) ...........................................................................73

    6.7. Key Issues...............................................................................................................73

    7. Urban Environment Infrastructure Services .......................................................... 75

  • 7/31/2019 CDP_Puri_Unlocked

    6/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 3-

    7.1. Urban Environment ................................................................................................. 75

    7.2. Solid Waste Management......................................................................................... 75

    7.2.1. Solid Waste Management System practice in Puri Municipality..................................75

    7.2.2. Quantity and Composition of Wastes............................................................................78

    7.2.3. Problems with the Existing Solid Waste Management System....................................79

    7.2.4. Performance Indicators ..................................................................................................79

    7.2.5. Issues:.............................................................................................................................80

    7.3. Preservation of Water Bodies ................................................................................... 80

    7.3.1. Issues:.............................................................................................................................81

    7.4. Beach Development .................................................................................................81

    7.4.1. Issues:.............................................................................................................................82

    7.5. City Beautification- Parks and Green Spaces ........................................................... 82

    7.5.1. Issues:.............................................................................................................................83

    7.6. Public Toilets .......................................................................................................... 83

    7.6.1. Issues:.............................................................................................................................84

    7.7. Environmental quality............................................................................................. 84

    7.7.1. Air Quality.......................................................................................................................84

    7.7.2. Water pollution ...............................................................................................................85

    7.7.3. Environment in Festive Seasons....................................................................................85

    7.7.4. Issues of Concern ...........................................................................................................86

    7.8. Diasaster Management............................................................................................ 86

    7.8.1. Issues of Concern ...........................................................................................................87

    8. Urban Infrastructure Services............................................................................... 88

    8.1. Infrastructure services............................................................................................. 88

    8.2. Water Supply .......................................................................................................... 88

    8.2.1. Existing Infrastructure ...................................................................................................88

    8.2.2. Analysis of Current Situation ........................................................................................90

    8.2.3. Source .............................................................................................................................90

    8.2.4. Demand & Supply ..........................................................................................................91

    8.2.5. Revenue collection & Augmentation ..............................................................................93

    8.2.6. Performance Indicators ..................................................................................................94

    8.2.7. Issues and Problems ......................................................................................................94

    8.3. Sewerage System..................................................................................................... 95

    8.3.1. Existing Situation ...........................................................................................................95

    8.3.2. Performance Indicators ..................................................................................................97

    8.4. Storm water Drainage.............................................................................................. 97

  • 7/31/2019 CDP_Puri_Unlocked

    7/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 4-

    8.4.1. Analysis of the Current Situation ..................................................................................97

    8.4.2. Performance Indicators ..................................................................................................98

    8.4.3. Issues and Problems of Storm water Drainage ............................................................98

    8.5. Street Lighting......................................................................................................... 99

    8.5.1. Performance Indicators ..................................................................................................99

    8.5.2. Issues:.............................................................................................................................99

    8.6. Roads & Transport ................................................................................................ 100

    8.6.1. Grand Road ................................................................................................................. 101

    8.6.2. Performance Indicators ............................................................................................... 103

    8.6.3. Issues ........................................................................................................................... 103

    8.7. Cost Recovery on Infrastructure Services ............................................................... 103

    8.7.1. Water & Sanitation Sector........................................................................................... 104

    8.7.2. The challenge in WSS sector....................................................................................... 104

    8.7.3. Some of the steps undertaken on Water Sector Reform are: .................................... 105

    8.7.4. Some of the steps in proposal for Management improvements initiation include:... 105

    8.8. Waste Management ............................................................................................... 106

    9. Urban Poverty and Slum Development.................................................................107

    9.1. Institutional Framework on Poverty Allevation .......................................................107

    9.2. Existing Situation.................................................................................................. 107

    9.2.1. Growth Trends in Slums ............................................................................................. 108

    9.2.2. Socio-Economic Characteristics .................................................................................. 109

    9.2.3. Current Status of Services in Slums........................................................................... 109

    9.3. Growth Analysis & Information Gaps ..................................................................... 109

    9.4. Slum Improvement Programmes ............................................................................110

    9.4.1. National Slum Development Programme (NSDP)........................................................ 111

    9.4.2. Valmiki Ambedkar Awas Yojana (VAMBAY).............................................................. 111

    9.4.3. Swarna Jayanti Shehri Rojgar Yojna (SJSRY)........................................................... 112

    9.4.4. 6.2.4 Development of Women and Children In Urban Areas (DWCUA).................... 112

    9.4.5. Issues:.......................................................................................................................... 113

    10. Municipal Finance ............................................................................................114

    10.1. Legal Framework................................................................................................. 114

    10.2. Financial Status at a Glance................................................................................ 114

    10.2.1. Revenue Account ....................................................................................................... 115

    10.2.2. Revenue Income ........................................................................................................ 116

    10.2.3. Own Sources.............................................................................................................. 116

    10.3. Revenue Expenditure ..........................................................................................117

  • 7/31/2019 CDP_Puri_Unlocked

    8/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 5-

    10.4. Credit Worthiness................................................................................................ 118

    10.4.1. Issues ......................................................................................................................... 119

    11. Stakeholders Consultation ................................................................................120

    11.1. The Process......................................................................................................... 120

    11.1.1. Participation Techniques Used ................................................................................. 120

    11.2. Stakeholder Discussions...................................................................................... 123

    11.3. Results................................................................................................................ 126

    11.4. Key outcomes......................................................................................................127

    12. Vision and Strategic Direction...........................................................................128

    12.1. The Process......................................................................................................... 128

    12.2. VISION 2030 .......................................................................................................128

    12.2.1. Strategic directions for the City ................................................................................ 129

    12.3. Connected and Accessible City............................................................................. 131

    12.3.1. Strategic direction 1.1 ............................................................................................... 132

    12.3.2. Strategic direction 1.2 ............................................................................................... 134

    12.3.3. Strategic Direction 1.3............................................................................................... 135

    12.3.4. Strategic direction 1.4 ............................................................................................... 136

    12.3.5. Strategic direction 1.5 ............................................................................................... 137

    12.3.6. Strategic direction 1.6 ............................................................................................... 138

    12.3.7. Indicators for a Connected and Accessible City ...................................................... 139

    12.4. Innovative Heritage Tourism Business City .......................................................... 140

    12.4.1. Strategic direction 2.1 ............................................................................................... 141

    12.4.2. Strategic direction 2.2 ............................................................................................... 142

    12.4.3. Strategic direction 2.3 ............................................................................................... 143

    12.4.4. Strategic direction 2.4 ............................................................................................... 144

    12.4.5. Indicators for Innovative Heritage Tourism Business City ..................................... 145

    12.5. Inclusive and Engaging City................................................................................. 146

    12.5.1. Strategic direction 3.1 ............................................................................................... 147

    12.5.2. Strategic Direction 3.2............................................................................................... 148

    12.5.3. Strategic direction 3.3 ............................................................................................... 149

    12.5.4. Strategic direction 3.4 ............................................................................................... 150

    12.5.5. Strategic direction 3.5 ............................................................................................... 151

    12.5.6. Strategic direction 3.6 ............................................................................................... 152

    12.5.7. Strategic direction 3.7 ............................................................................................... 153

    12.5.8. Strategic direction 3.8 ............................................................................................... 154

    12.5.9. Strategic direction 3.9 ............................................................................................... 155

    12.5.10. Indicators for an Inclusive and Engaging City ...................................................... 156

  • 7/31/2019 CDP_Puri_Unlocked

    9/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 6-

    12.6. Environmentally Responsive City ......................................................................... 157

    12.6.1. Strategic direction 4.1 ............................................................................................... 158

    12.6.2. Strategic direction 4.2 ............................................................................................... 159

    12.6.3. Strategic direction 4.3 ............................................................................................... 160

    12.6.4. Strategic direction 4.4 ............................................................................................... 161

    12.6.5. Strategic direction 4.5 ............................................................................................... 162

    12.6.6. Indicators for an Environmentally Responsible City ............................................... 163

    13. Projects Identification ......................................................................................164

    13.1. The Project Development ..................................................................................... 164

    13.2. Population Projection........................................................................................... 164

    13.3. Project Identification & Prioritisation.................................................................... 165

    13.3.1. Preservation of heritage Project ................................................................................ 168

    13.3.2. Projects for Heritage Promotional Infrastructure ..................................................... 171

    13.3.3. Heritage-related City Level infrastructure Project ................................................... 175

    13.3.4. Heritage-development including Basic Services to Urban Poor Project .................. 179

    13.3.5. Tourism Infrastructure Project .................................................................................. 180

    13.3.6. Projects for Environment Infrastructure ................................................................... 182

    13.3.7. Projects for Strengthening Urban Governance......................................................... 183

    14. Financial Plan: Investment Estimate .................................................................186

    14.1. The Process......................................................................................................... 186

    14.2. Capital Investment Plan....................................................................................... 186

    14.2.1. Process....................................................................................................................... 187

    14.3. Project Identification............................................................................................ 187

    14.4. Strategies............................................................................................................ 187

    14.4.1. Strategic Capital Investment .................................................................................... 187

    14.4.2. Facility Siting............................................................................................................. 188

    14.4.3. Decision Making ........................................................................................................ 188

    14.4.4. Plan Funding ............................................................................................................. 188

    14.4.5. Agencies..................................................................................................................... 188

    14.5. Project Estimates................................................................................................. 190

    14.5.1. Sector Wise Estimates............................................................................................... 192

    14.5.2. Institution wise Investment Estimates..................................................................... 195

    14.6. Strategy for Project Funding ................................................................................197

    14.6.1. Broad Reforms Measure ........................................................................................... 197

    14.6.2. Holding Tax (Property Tax) ....................................................................................... 197

    14.6.3. Accounting and Auditing........................................................................................... 198

    14.6.4. Resource Mobilization and Revenue Enhancement................................................. 198

  • 7/31/2019 CDP_Puri_Unlocked

    10/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 7-

    14.6.5. Streamlining and Strengthening of Revenue Base of the Puri Municipality .......... 198

    14.6.6. UNDP-Government of India Project on Capacity Building for Decentralised Urban

    Governance (2005-2007). ..................................................................................................... 198

    14.6.7. Municipal Services Performance Measurement Programme ................................... 199

    14.6.8. Urban Environment Management............................................................................. 200

    14.6.9. Access of Urban Services to the Poor ....................................................................... 200

    15. Reform Agenda and Timeline ............................................................................202

    15.1. Agenda for Reform...............................................................................................202

    15.2. Agenda for Reform...............................................................................................202

    15.2.1. Mandatory Urban Reforms ....................................................................................... 203

    15.2.2. Reforms at ULB Level ................................................................................................ 204

    15.3. Issues placed for Approval of Govt. of Orissa ........................................................205

    15.4. State Preparedness.............................................................................................. 206

    15.4.1. Resource Mobilization and Revenue Enhancement................................................. 207

    15.4.2. Municipal Services Performance Measurement Programme ................................... 210

    15.4.3. New Municipal Law................................................................................................... 211

    15.4.4. City Managers Association Orissa .......................................................................... 211

    15.4.5. Annual Awards ......................................................................................................... 211

    15.4.6. Municipal Accounting ................................................................................................ 211

    15.4.7. Reform Agenda.......................................................................................................... 211

    16. Implementation Framework..............................................................................216

    16.1. Govt. of Orissa Reform Agenda............................................................................. 216

    16.2. Heritage Cell .......................................................................................................217

    16.3. Puri City Development Council ............................................................................217

    16.4. Centre for Excellence........................................................................................... 218

    16.5. Project Formulation & Management..................................................................... 218

    16.6. State Water Sector Reform...................................................................................219

    16.7. Poverty Alleviation and Community Development Programmess............................ 220

    16.8. Solid Waste Management..................................................................................... 220

    16.9. Local Government HIV/AIDS Programme ............................................................. 221

    16.10. City Level Disaster Management Plan................................................................. 221

    16.11. Participation in Clean Development Mechanism................................................. 222

    16.12. Networking........................................................................................................ 222

    16.13. Achieving the vision........................................................................................... 223

    16.14. Triple bottom line accountability along with MDG ..............................................223

  • 7/31/2019 CDP_Puri_Unlocked

    11/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 8-

    16.15. The Way Forward .............................................................................................. 224

    17. Overview of City Development Plan & Vision 2030.............................................225

    17.1. Quality of Life......................................................................................................225

    17.2. The Landscape .................................................................................................... 226

    17.3. Our Communities................................................................................................ 226

    17.4. Getting Around.................................................................................................... 227

    17.5. Livelihood............................................................................................................ 227

    17.6. Cooperation.........................................................................................................227

  • 7/31/2019 CDP_Puri_Unlocked

    12/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 0-

    City Development Plan Foreword

    I am very proud to present Puri City Development Plan. This is a very exciting, visionary

    document, which sets the agenda for the Council and the City for the next 20 years. We have

    identified our vision Puri as a vibrant sustainable city with unique heritage and rich

    legacy after several rounds of consultation with citizens, elected representatives, officials,

    tourists, and media etc.

    This CDP was prepared after extensive consultation with community and is the Puri

    Municipalitys most important strategic document, outlining key issues and objectives for the

    city as a whole.

    City Development Planensures that its objectives and strategic directions are appropriate to

    achieve the vision of our Citys position to address emerging issues and future challenges.

    We have many positive attributes and enduring assets which provide us with one of the most

    liveable city environments in India. These assets include a vibrant and diverse recreational,

    cultural and arts environment; world-class heritage site and sea beaches and our built

    heritage.

    By 2030 the City is anticipated to grow significantly with the development works under the

    JnNURM programmes. This is an exciting opportunity for the City to build on its proven

    record as a great place for Heritage, Culture and Tourism.

    Puri Municipality is committed to working towards the vision outlined in this document

    during its next few years.

    I dedicated this document to the people of Puri.

    Jai Jagannath

    Gourahari Pradhan

    Chairman,

    Puri Municipality

  • 7/31/2019 CDP_Puri_Unlocked

    13/260

  • 7/31/2019 CDP_Puri_Unlocked

    14/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 0-

    ExecutiveExecutiveExecutiveExecutive SummarySummarySummarySummary

    Introduction

    The worlds urban population has been growing rapidly. According to UN estimates; over 60

    percent of the world's population will live in cities by 2030. Indias urban population is 285.3million in the year 2001 which is 27.8 percentage of the total population. India hast 35

    million plus cities. Among these there are 7 mega cities of which 3 with population above 10

    million and 3 with population above 5 million. By the year 2021, it is expected that India will

    have the greatest concentration of mega cities in the Asian region.

    Urban Governance in India: step towards Decentralization

    Municipal Governance in India exists since 1687 with the formation of Madras Municipal

    Corporation and then Calcutta and Bombay Municipal Corporation in 1726. In early part of

    the nineteenth century, almost all towns in India witnessed some form of municipal

    Governance. In the year 1882 Lord Ripons resolution of local self-government laid the

    foundation of democratic forms of municipal governance in India. In 1919 Government of

    India Act incorporated the need of the resolution and the powers of democratically elected

    government were formulated. In 1935 Government of India Act brought local government

    under the purview of the state or provincial government and specific powers were given.

    In 1992, again a major step towards the decentralization and empowerment of local

    governments in India took place with the enactment of 74th Constitutional Amendment Act.

    The Amendment calls for greater responsibilities and authorities for local governments by

    recognizing it as a third tier government. Some of the important aspects include:

    Planning for economic and social development and role of municipal government in

    implementation of urban poverty alleviation projects

    Increased responsibility for urban planning at the district and metropolitan levels

    Greater authority to mobilize and use resources.

    Urbanisation in Orissa

    In Orissa out of the total population of 36,706,920 as on 1st March, 2001, 31,210,602 live in

    rural area and 5,496,318 in urban area. The net addition of population in rural areas during

    1991-2001 has been to the tune of 3685399 while in urban area it is 1261785. The

    percentage wise decadal growth of population in rural and urban area during the decade is

    13.8 and 29.78 percent respectively.

    The percentage of urban population to the total population of the states stands at 14.97. The

    percentage of urban population to total population in the 1991 Census was 13.33 percent.

    Thus, there has been an increase of 1.64 percentage points in the proportion of urban

    population in the state during 1991 2001.

  • 7/31/2019 CDP_Puri_Unlocked

    15/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 1-

    Urban Governance in Orissa

    The Housing and Urban Development Department is the apex institution of Government of

    Orissa responsible for urban sector development in Orissa. The department has three

    directorates i.e. Municipal Administration, Public Health Engineering and Town Planning.

    The Urban Local Bodies (ULBs) are functioning under the Orissa Municipal Corporation Act

    2003 and Orissa Municipal Act 1950. Similarly Development Authorities are functioning

    under the Orissa Development Authority Act.

    Jawaharlal Nehru National Urban Renewal Mission (Jn NURM)

    Considering that state of cities is incompatible with the countrys socio-economic objectives

    and Indias growing role in the world economy, the Government of India launched,

    Jawaharlal Nehru National Urban Renewal Mission (JnNURM). Aimed at creating

    economically productive, efficient, equitable and responsive cities, the Urban Renewal

    Mission focuses on (i) improving and augmenting the economic and social infrastructure of

    cities; (ii) ensuring basic services to the urban poor including security of tenure at affordable

    prices; (iii) initiating wide-ranging urban sector reforms whose primary aim is to eliminate

    legal, institutional and financial constraints that have impeded investment in urban

    infrastructure and services; and (iv) strengthening municipal governments and their

    functioning in accordance with the provisions of the Constitution (seventy-fourth)

    Amendment Act, 1992. It provides for public disclosure of local spending decisions together

    with earmarking of budgetary allocations for basic services to the poor.

    The mission covers two Urban Local Bodies of Orissa namely Bhubaneswar and Puri. As

    formulation of City Development Plan (CDP) is a mandatory requirement for accessing Jn

    NURM funds, the Housing & Urban Development Department (H&UD) of Govt. of Orissa, as

    part of its agenda to address cities development challenges faced by Orissa cities, have

    initiated formulation of Puri CDP. In this context, the H&UD Department and Puri

    Municipality involved City Managers Association Orissa (CMAO) to prepare the CDP for Puri.

    Evolution of Puri Town

    Located on the East Coast of India overlooking Bay of Bengal, Puri is located on a 67 km

    stretch of sandy beach that extends from the Chilika Laketo the south of Puri town. The

    Sun Temple of Konark is located on this beach at a distance of 35km north of Purl.

    The town consists of the Temple of Lord Jagannath in its centre with eight quarters (Sahis)

    radiating from it. The town colonies were called 'Sahis'. The population of the town composed

    mostly priests and people attached to the various activities of the temple. Besides, there are

    large numbers ofmathaswhich chiefly cluster round the temple. As the rituals of the temple

    and Ratha Yatra became more elaborate, more people started living in Puri. Ordinary people

    who have no contribution to rituals have also started living.

    The town was originally built on sandy track which began from north and west towards

    Cuttack and Ganjam road where the Madhupur or Matia stream is lined with the largest

    tanks, Narendra, Mitiani, Markandeya and Siva Ganga. As the tributary of the river Matiani

    draining into the sea dried up, it paved the way for the new direction of development of the

    town in the southeast.

  • 7/31/2019 CDP_Puri_Unlocked

    16/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 2-

    Location & Linkages

    The town of Puri is located almost at the geographic centre of the District, and is bounded by

    sea on South east. Mauza Sipaurubilla on West, Mauza Gopinathpur on the North and

    Mauza Balukhand on the east surround it. Geographically Puri is located on 19 degree 18

    minutes North latitude and 85 degree 51 minutes East longitude.

    The Town is directly connected by broad gauge railway line with Khurda, a prominent

    Railway junction in S.E. railway. It is about 499 kms. from Calcutta and 468 kms from

    Vishakhapatnam. N.H.-203 connects the Town with the Capital city Bhubaneswar which is

    about 60 kms. Moreover, this town is also well connected with Satapada via Brahmagiri

    through N.H.-203 B and Konark through Marine drive road which comes under N.H.203 A.

    The nearest Airport is at Bhubaneswar, which is approx. 60 Kms from the town of Puri.

    Area and Population

    The administrative jurisdiction of Puri Municipal area spreads over 16.3268 sq kms and

    stretches along the sea-shore measuring about 5.00 kms. The entire municipal area is

    divided in to 30 wards. As per 2001 census the population of Puri Town was 1,57,610 with a

    growth rate of 26% during the period of 1991-2001. The growth rate of the town is less than

    that of the state (urban) which is 30.28 % for the period 1991-2001.

    Puri Today

    Puri today is the forerunner of the Jagannath culture in Orissa, which saw the flowering of

    several temples dedicated to Jagannath all over the world. It attracts millions of devotees

    through out the year on different occasion.

    Puri represents one of the four peethasestablished by Adi Sankaracharya, the other three

    being Sringeri in south India, Dwarka in Saurashtra, and Badrinath in the Himalayas.

    Chaitanya in 15th - 16th century popularized the worship of lord Jagannath.

    The temple dominates the town in every sphere physical, social, cultural and

    economic. The town of Puri has evolved around it so that an intricate web of relationship

    exists between the temple and the town dwellers. There are many ancient settlements around

    the temple precinct that are engaged in the temple activities and are responsible for providing

    different materials for management of temple. Elaborate worship services are carried out

    throughout the day here.

    Puri as a town is more than thousand years old and being a religious town, the town is

    based on Vaastu Purusha Mandalaand many meta-physical aspects have been interwoven

    in planning of the town. There are as many as24 festivals

    each year, the most importantbeing the Rath Yatra or the Car festival in the month June - July.

    Puri, known all around the world for its Rath Yatra the cumulating point of all the festivals,

    is celebrated in all pomp and grandeur. The annual Rath Yatra of Lord Jagannath is an

    event only of its kind, which attracts more than 1 million people. The grand festival is

    arranged with combined effort of Orissa Government and Temple Management committee.

    Today tourism provides livelihood for almost 80% people of the town. The total economy

    of town is depended on the inflow of tourist population. Rath Yatra being the most important

  • 7/31/2019 CDP_Puri_Unlocked

    17/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 3-

    festival is also the one, which has a strong environmental, social, cultural, economic and

    spatial impact on the town. The preparation for Rath Yatra starts months before the actual

    festival.

    The City Development Plan can never be complete without taking into consideration all the

    ritualistic aspects of the Grand Festival and without giving a complete profile of all activities

    and arrangement that are parts of Rath Yatra

    The Architecture of the abode of Lord Jagannath

    The temple of Jagannath built on an elevated ground about twenty feet above the level of the

    surrounding area, presents an imposing sight and can be seen from miles away. The height

    of the main temple or Vimana above the road level is 214. It is a fine specimen of

    Pancharatha style of Orissian temple architecture.

    The whole temple complex comprises of an area of 10.7 acres. The temple has four gates at

    the eastern, southern, western and northern mid-points of the outer wall, known as

    SINGHADWARA(Lions Gate), ASHWA DWARA( Horse Gate),VYAGHRA DWARA(Tigers Gate)

    and HATHI GATE(Elephants Gate) .they are said to represent Dharma, Jnana, Vairagya and

    Aishwarya. In front of the Singhadwara is installed the ARUNA STAMBHA made of single

    solid chlorite stone and upon it beautiful Arun Squats in obeisance.

    The Daily Rituals in the Temple

    The word 'Jagannath' literary means the Lord of the universe. He is also 'Devadhideva' (Lord

    of Lords) and Rajadhiraj (King of Kings) He is Purusottama the Supreme Purusa. The daily

    and periodical rituals observed and performed in His service and worship since time

    immemorial; bear the dignity and grandeur, which a supreme person is entitled to. The

    details of rituals have been specified in certain texts in Sanskrit and Oriya. Neeti or ritual

    signifies a particular type of religious rite.

    Temple as a main Source of City Income

    The whole region around Puri is influenced by the temple in various aspects as if the temple

    is the most important employer of the town. It is the main market for agricultural products of

    the whole region. For the preparation of mahaprasada the temple requires an immense

    quantity of agricultural products like rice, ghee, vegetables etc. Several settlements produce

    goods mainly for the temple and its pilgrims (pots, paintings etc).

    Rath Yatra The Grand Car Festival and City life

    The precise time when the Grand festival of Rath Yatra started as part of Jagannath Culture

    is not known. It is believed that during the reign of Ananga Bhima dev, when the temple was

    renovated and the town was restructured, the concept of Rath Yatra was propagated. The

    entire Rath Yatra is a symbolic humanisation of God. All rituals associated with the festival

    demonstrate an attempt to bring the God down from His pedestal of glory to a more human

    level. This annual festival has now acquired a grand scale and has become the identity

    of the Town of Puri.

    The Festival is celebrated in the June-July on the second day of the bright fortnight of the

    month of Ashadha. People from all across Orissa and from various parts of India come to take

  • 7/31/2019 CDP_Puri_Unlocked

    18/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 4-

    part in this auspicious occasion. Orissa witnesses the inflow of about 7 to 10 lakhs of

    pilgrims during this Car Festival.

    Significance of Rath Yatra in City Development Plan

    The grand festival of Rath Yatra is important not only for the people of Orissa but also a

    world famous event. It is a very important festival from the point of any development

    programme as almost all levels of Govt. are involved in this event. Attracting more than one

    million pilgrims & tourist on the festival and on an average of 5-6 Lakhs people during 10

    days of Rath Yatra puts a tremendous pressure on the resources of the town.

    City Management and Governance

    The responsibility of providing citizens of Puri with basic urban services like water supply,

    sewerage, waste management, street lighting, roads etc. are vested with various institutions

    such as Puri Municipality, Puri Konark Development Authority, Public Health Engineering

    Organisastion, Orissa Water Supply Sewerage Board etc.

    The Puri Municipality was established in 1864 as Puri Improvement Trust. Further in the

    year 1881 Puri Improvement Trust transformed into Puri Municipality. Post independenceperiod after the enactment of Orissa Municipal Act- 1950 the City administration is vested

    with Puri Municipality and it is represented by Chairperson and councilors elected by the

    people. The election is being conducted by the State Election Commission. Puri Municipality

    has an elected council comprising elected representatives (Councilors) of 30 wards within the

    Municipal area. The council is headed by Chairperson who is elected by the councilors. The

    council meeting of Municipality takes place every month to decide on issues and Governance.

    Duties entrusted to the Puri Municipality were to maintain cleanliness, arrangement for

    street light and maintenance of roads etc

    Infrastructure services

    Development of Infrastructure is an indispensable part of any settlement. Traditional

    settlement infrastructure consisted of water sources and storage, waste disposal, road

    network, security etc., decentralized to a large extent creating self-sufficient communities.

    Modern day urban areas are, on the other hand, heavily dependent on various networks of

    infrastructure, a failure or lack of which severely deteriorates the quality of life of the people.

    The high densities of the urban area require extensive, adequate infrastructure networks for

    the smooth functioning of the city. A lack of adequate road network, wastewater treatment or

    solid waste disposal system affects the natural environment through contamination of air,

    water and land the basic building blocks of life.

  • 7/31/2019 CDP_Puri_Unlocked

    19/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 5-

    Water Supply System Performance Indicators

    SlNo

    Parameter / Component Service Level Benchmark Commitment /Remarks

    1 Water Supply / Source 127 lpcd 150 lpcd (+15%losses)

    Low

    2 Treatment Capacity 100% groundwater sourceutilized

    100 percent Less

    3 Storage 15 % of dailywater demand

    33 percent Low

    4 Distribution SystemCoverage

    55 percent 85 percent Low

    5 Non-Revenue Water 33 percent 15 percent High.Uneconomical

    6 Cost Recovery 30 percent 85-90 percent

    nominal

    Significantly low

    Underground Sewerage Scheme Performance Indicators

    1 Collection SystemCoverage

    10 percent 75 percent Very Low

    2 STP Functionalitycharacteristics of Cities

    StabilizationPond of 5 MLD

    Capacity

    ActivatedSludge Process

    Inadequate andConventional

    3 Revenue / O&M cost ratio > 95 percent Uneconomical

    Storm Water Drains Performance Indicators

    1 Major Drains CatchmentsArea

    30 percent 100 percent Inadequate

    2 Minor Drains Coverage(Drain Length / RoadLength)

    40 percent 90 percent Inadequate

    3 Hydraulic ConveyingCapacity of Major drains

    Analysis notmade available

    100-yearreturn flood, 2-hrs rainfall, 4-

    hrs flow

    Inundation proneareas. Masterplan required

    Streetlight Performance Indicators

    1 Spacing between Lamp posts 80 m

  • 7/31/2019 CDP_Puri_Unlocked

    20/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 6-

    Preservation of Water Bodies

    The holy city of Puri has six important sacred tanks which is historically and spiritually

    important. Many tourists visit the sacred tank and take a dip during festivals and other

    occasions.

    1. Narendra tank2. Indradradumna tank

    3. Markandaya tank4. Swetaganga tank5. Parbati sagar tank6. Chudanga tank.

    Besides the above there are as many as sixty two ponds which have got an affiliation to the

    community place (Akhadas and Jagaghar). These ponds are used by the locality for their day

    to day needs. Musa river passes through Puri town and is in a very bad condition. The ponds,

    tanks and the rivers needs restoration and conservation, as their improvement shall lead to

    significant improvement of the environment quality.

    Beach Development

    Puri town has about 5 kms of natural sea beach. The magnificent sea beach at presentattracts considerable number of tourists round the year. Puri sea beach is home to world

    famous Sand Art & Sculpture.

    The city of Puri is bestowed with river mouth of River Mangala in its South & Nua Nai in its

    North. These rivers and sea beach need protection, conservation & development to maintain

    their uniqueness as well as to attract tourists for economic growth of the city.

    Slums

    Most of the slum dwellers of Puri belong to fisherman communities located at Penthakata,

    Balinolia Sahi, Baliapanda. There are altogether 46 slum pockets in Puri with a total

    population of 47,770. This constitutes almost 25% of the total population. Many of the slum

    pockets are inhabited by migrant population who came to Puri in search of employment.

    Basic character of the slum pockets are temporary houses, dilapidated structure, poor

    ventilation, over crowding, inadequate lighting, absence of sanitation facility and lack of basic

    physical and social services.

    For improvement of slum condition Puri Municipality has been striving hard to provide basis

    amenities. Various poverty alleviation programmes such as NSDP, SJSRY along with old age

    pension, Orissa Disability Pension, BPL, Annapurna Aantodaya Anna Yojana and Balika

    Samrdhi Yojana are implemented by Puri Municipality. Efforts have also been made by Puri

    Municipality to organize the urban poor in to several self help groups to improve their

    economic condition.

    Regional Setting of Puri as Coastal Cultural Landscape

    Considered to be one of the four holy 'Dhams'of India, the historic town of Puri is located on

    the Bay of Bengal coast, along a distinctive 67 km stretch of sandy beaches which extends

    from the Chilika lake to the south of Puri town to the delta of the Prachiriver to the north.

    This stretch of sandy beach is interspersed with a number of ridges, some of which enclose

    saltwater lagoons, & the World Heritage Site of Konark is also located along it towards the

    north.

  • 7/31/2019 CDP_Puri_Unlocked

    21/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 7-

    Legal Framework of Heritage Development

    The heritage component of the Puri city includes monuments, religious places and sacred

    sites, buildings of architectural significance or traditional values; history, any other. Various

    institutions identified heritage components of the city. The culture department of Govt. of

    Orissa has identified 387 Mathas, 4 Ashrams, 10 Dharmasalas and 200 temples. Similarly

    in 19986-88, INTACH identified 147 temples, mathas, civic buildings, etc. The District

    Gazetteer lists 130 Mathas or Monastic establishments, some believed to date from the

    century AD as well as information related to the sacred tank complexes & temple complexes;

    the list of 133 Mathas, 22 Jagaghars, 12 Dharamashala, 75 Lodging houses, traditional

    Libraries. According to the Archaeological Survey of India (ASI) about 157 unprotected, 2

    state protected and 2 ASI protected monuments are located within the city. The heritage

    components of the city are owned by both public and private sector.

    Public heritages are being owned by Shri Jaganath Temple Administration and

    Commissioner of Endowment Govt. of Orissa

    Private ownership belongs to Sahis, Aakhadaand Jagagharas, etc.

    Moveable Heritage i.e Palm Tree Pothis, Yatri Records of Pandas covering

    undivided India & Nepal,

    Natural Heritage Natural Sea Beach, Rivers, water bodies

    Legal Framework

    Ancient Monument and Preservation Act, 1904

    Ancient Monuments and Archeological Sites and Remains Act, 1958

    The Orissa Ancient Monuments Preservation Act, 1956

    Institutional Framework

    The maintenance of Heritage monuments are done by the ASI, State Archeology and Temple

    Trusts. Where as waste cleaning, street lighting, water supply and other infrastructure to the

    heritage sites are being maintained by the Puri Municipality and PHEO. Similarly OrissaTourism Development Corporation, Department of Tourism and Culture of Govt. of Orissa are

    the agencies responsible for the promotion and publicity of the Heritage Monuments.

    Although the Puri Municipality has no direct role in preservation of heritage but it along with

    Puri Konark Development Authority are responsible to restrict un-authorized encroachments,

    safety of the building and protection of heritage area.

    Five Holy Tanks

    There are 5 important tanks in the town; in addition there are a number of smaller ponds

    strewn along the periphery of the town. The main tanks are

    Narendra tank

    Markandeya tank Shwetaganga tank

    Indradyumna tank

    Parvatisagar tank

    These tanks are fed by rainwater as well as groundwater and are therefore perennial sources

    of water. The waters are used for bathing, washing, various household requirements in

    addition to religious ceremonies and rites. They are an intrinsic part of the life of the town

  • 7/31/2019 CDP_Puri_Unlocked

    22/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 8-

    The Sahi structure

    The 'Sahis' of Puri; are characterized by a distinctive settlement pattern & cohesive

    communities, open spaces, water harvesting & storage elements, a concentration of

    heritage buildings & complexes, streetscapes & street network with 'chhakas' or chowk

    intersections & two types of mainly residential narrow streets & mixed use Sahis with

    wider streets. These 'Sahls' are Harachandi Sahi & Basel! Sahi on the west; Goudabada

    Sahi on the south-west; Bali Sahi and Manikarnika Sahi on the south; Matimandapa

    Sahi with Kalaikadevi Sahi on the south-east; Dolamandapa Sahi on the east;

    Markandeswar Sahi & Chudang Sahi on the north.

    Mathas and Ashramas

    Centering round the great temple of Lord Jagannath, many a Matha (Monasteries) grew up

    gradually in course of time in this holy town. In the past, many Saints and Sadhus had come

    to Puri to have darshan of Lord Jagannath. They came in contact with and influenced the

    Gajapati Kings through their philosophical doctrines. The saints and sadhus establishedtheir monasteries on the lands donated to them by the kings and wealthy persons. The Maths

    continued preaching their respective doctrines and also performed certain ritual services in

    the Jagannath Temple. With endowed properties and lands, the heads of the Maths were able

    to maintain their institutions. Lands were donated to the Maths for `Amritmanohi'- the

    proceeds thereof were spent in offering `Bhoga' to Lord Jagannath and the `Mahaprasad' thus

    obtained, were distributed among the pilgrims, pupils, ascetics, and beggars.

    The Four Ashrams

    Connected with certain rituals of the temple of Jagannath, there are four Ashrams

    (hermitages) in Puri town. These are Angira Ashram, Pandu Ashram, Markandeya Ashram

    and Parasara (Ugrasena) Ashram.

    Fairs and Festivals

    It is popularly said Puri City celebrates thirteen important festivals in twelve months.

    However, in reality the city has various festivals all across the year. Importantly all these

    festivals are not only linked with the culture and heritage of Orissa but also of India. These

    activities are directly and indirectly linked with the cities employment and economic

    development potential. It is estimated that around 80% of cities income is linked with

    heritage related activities.

  • 7/31/2019 CDP_Puri_Unlocked

    23/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 9-

    Major Fair and Festival

    Sl.No. Major Festivals Oriya Month Month Days Visitors

    1 DevasnanPurnima

    Jyestha Purnima June 1 100000

    2 Shree Gundicha(Car Festivals)

    Asadha SuklaDwitiya to Dasami

    June &July

    1 1200000

    2 i Shree Gundicha(Car Festivals) Asadha SuklaDwitiya to Dasami June &July 8 1600000

    3 Bahuda Asadha SuklaDasami

    July 1 800000

    4 Suna Vesa Asadha SuklaEkadasi

    July 1 1500000

    5 DakshinayanYatra

    Karkata Sankranti July-Aug 1 80000

    6 ParsvaParivartan Yatra

    Bahadrab SuklaEkadasi

    August 1 200000

    7 DebothapanYatra

    Kartika SuklaEkadasi

    Oct. 1 60000

    8 Odhan Sasthi Margasira Sukla

    Sasthi

    Nov. 1 50000

    9 Pusyabhisekh Pausa Purnima Dec. 1 100000

    10 Uttarayan Yatra Makar Sankranti Jan. 1 200000

    11 Dolo Yatra Falguna SuklaDasami to Purnima

    March 5 500000

    12 Damanak Yatra Chaitra SuklaChaturdasi

    April 1 50000

    13 Chandan Yatra Akshay TritiyaBaisakha SuklaTrutiya

    May 21 1200000

    Municipal Finance

    For the purpose of financial assessment, financial data pertaining to the last five years (2000-

    01 to 2004-05) were analysed. The Puri Municipality maintains & approves its budget as per

    the rules laid down in Orissa Municipal Act 1950. The current accounting system is on a

    cash basis and income and expenditure heads are also maintained on a cash basis. All the

    expenses towards regular maintenance are treated as revenue expenditure, and all income as

    Revenue Receipt.

    Financial Status at a Glance

    The finances of Puri Municipality have been reviewed for the five-year period ending in FY

    2004-05. The items of both receipts and expenditure are classified under revenue income and

    expenditure as per their sources and uses. In 2004-05, the revenue income of Puri

    Municipality was Rs. 4, 89, 37,777. In absolute terms the revenue expenditure in 2004-05

    was Rs. 4, 50, 44,724 and the revenue account surplus in 2004-05 was Rs. 38, 93,053

  • 7/31/2019 CDP_Puri_Unlocked

    24/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 10-

    Performance of Key Financial Indicators

    Indicators 2000-

    1

    2001-

    2

    2002-

    3

    2003-

    4

    2004-

    5

    Average Benchmark Remarks

    Operating Ratio 99.94 100.80 99.40 102.14 92.04 98.86 Less than

    1

    Satisfactory

    Share of Own Sources toTotal Income

    15.58 14.87 16.43 24.20 22.76 18.77 More than30-40

    percent

    NotSatisfactory

    Establishment

    Expenditure as compare

    to total revenue income

    46.81 40.3 45.01 45.28 49.79 45.44 Less

    than30-40

    percent

    Not

    Satisfactory

    Establishment

    Expenditure as compare

    to total revenue

    expenditure

    53.89 46.01 40.72 45.06 45.28 46.19 Less

    than40 -

    45 percent

    Not

    Satisfactory

    Holding Tax Collection

    Performance

    45% 50% 55% 55% 60% 53% More than

    85 percent

    Not

    Satisfactory

    Outstanding Loan to

    revenue income

    - - - - - - Less than

    25 percent

    Vision and Strategic Direction

    Puri City Development Plan envisages conservation and preservation of its glorious Heritage

    with a vision for future reflecting the aspirations of the city and its stakeholders to present a

    new story through interaction and debate in deciding

    what we want,

    what weve done,

    and what we have to do to create the sustainable future we want.

    Objectives of City Development Plan

    The main objective of the CDP is to have a planned growth of the city in the desired direction

    and to project Puri as a Global Tourism Business City of Eastern India, guided by a shared

    vision for citys development. The CDP makes basic policy choices and provides a flexible

    framework for adapting to real conditions over time. The objective includes:

    Preserve & Conserve Heritage & Culture

    Improve urban services to facilitate development of Heritage and promote tourism

    Improve Environmental Conditions

    Improve Conditions of Urban Poor

    Image Building of the city

    Strengthen Preparedness for Citys Disaster Management

    The City Development Plan has included: (1) an identification of needs based on a review of

    existing plans and policies, interviews with local citizens, business owners and other

  • 7/31/2019 CDP_Puri_Unlocked

    25/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 11-

    stakeholders, and an analysis of existing conditions, including field reconnaissance surveys

    of the communitys physical fabric; (2) the preparation of potential alternatives for

    consideration; and (3) the development of broad directives and specific recommendations.

    Community input has been central to the planning process. Each phase of the process has

    been organized around a public meeting to ensure the Plan is well-informed with public

    sentiment and opinion.

    o Situation Analysis

    o Stakeholder Consultations

    o Public Forum

    o Vision Identification

    o Formulation of Goals & Strategies

    o City Finance Plan

    o Reform Agenda

    o Approval by the Council along with Draft MoA

    Community input has been central to the planning process. Each phase of the process has

    been organized around a public meeting to ensure the Plan is well-informed with publicsentiment and opinion. The meetings included a kick of meeting and four subsequent

    workshops with the public. Simeltounsly consultations were held at the policy, legislative and

    state levels.

    City Development Plan 2030 is Puri Citys primary planning strategy. It sets out what we

    believe must happen over the years to achieve our vision for the City of Puri in 2030. Our

    vision for the City of Puri to bePuri as a vibrant sustainable city with unique heritage

    and rich legacy.

    Strategic directions for the City

    The strategic directions for the City are outlined under four inter-related themes. Each

    strategic direction has a set of objectives to achieve it. These strategic directions are also the

    basis of the Citys Corporate Plan, known as City Development Plan, which guides Councils

    operations and activities. Issues may be addressed under more than one theme. For example,

    transport is addressed under the Connected and Accessible City, Inclusive and Engagement

    and Environmentally Responsible City themes. These directions are organized around four

    themes:

    Theme 1 Connected and accessibility

    Theme 2 Environmentally Responsive City

    Theme 3 Inclusive and Engaging City

    Theme 4 Innovative Heritage Tourism Business City

    Achieving the vision

    Puri Municipal Council understands that realising the vision will require the cooperation of

    all those who have a stake in the City of Puris future. Puri Municipal Council will develop

    and maintain strong relationships with Government of Orissa, the business and wider

    community, and other key stakeholders to take opportunities to achieve our vision. Puri

    Municipal Council will contribute by providing:

  • 7/31/2019 CDP_Puri_Unlocked

    26/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 12-

    o Strong municipal governance;

    o Leadership, support and education;

    o Delivery of a range of key city services;

    o Maintenance of city infrastructure and assets (for example, its heritage, parks,

    gardens, roads, and social infrastructure);

    o An efficient and effective integrated regulatory environment;

    o Marketing of the citys culture, characteristics, advantages and abilities;

    o Innovative and integrated strategic and corporate planning;

    o Advocacy on the needs of the residential and business communities;

    o Networks of businesses, agencies and community groups;

    o Partnerships, agreements and alliances with key stakeholders; and

    o Sponsorship of events, businesses, festivals and other initiatives.

    The Project DevelopmentPuri Municipality and its stakeholders identified Cities vision Puri as a vibrant sustainable

    city with unique heritage and rich legacywith healthy, sustainable future and celebrate

    its strengths as a vibrant, diverse City of natural beauty nestled around Lord Jagannath

    Temple and Seashore of Bay of Bengal and able to achieve our full potential through access

    to clean air, safe water and food, shelter, education, satisfying employment, spirituality and

    culturally by weigh of social, health, economic and environmental costs, benefits and risks

    equally when making decisions. Puri Municipal Council will work with all who have a stake in

    the City of Puris future to realize this vision and will simultaneously pursue:

    Preservation of Heritage

    Improvement of Environmental quality

    Economic prosperity

    Social equity.

    Project Identification & Prioritisation

    The projects identification has been done based on the VISION identified by the Municipal

    Council through various detailed stakeholders consultation and discussion with various

    levels of Govt. Utmost concern is given Puri as Heritage city and all its projects must linked

    the development heritage and must benefit poorest of the Poor in the city.

    The stakeholders of the city combined its all projects for the Mission to ensure that city comeup as an international Heritage city as desired in its vision. All stakeholders are committed to

    implement respective projects in a combined effort. The projects were shared by various

    stakeholders including Puri Municipality, Shri Jagannath Temple Trust, Orissa Tourism

    Development Corporation, Department of Tourism / Culture / Handicrafts, District

    Administration, National Highway Authority and Works Department etc. Similarly, like a

    share vision stakeholders have taken responsibility of various projects to overcome financial

    and institutional issues of the city. Some of the activities and institution includes:

  • 7/31/2019 CDP_Puri_Unlocked

    27/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 13-

    Institutional Activities in Puri CDP

    Areas Institutions

    Heritage Preservation and Promotion Shri Jagannath Temple Administration,Archaeological Survey of India, StateArchaeology

    Heritage Promotional Infrastructure Puri Municipality

    Awareness Campaign Shri Jagannath Temple Administration, Puri

    Municipality

    City Level Infrastructure Puri Municipality, PHED, Works Departmentetc

    Slum Development Puri Municipality

    Tourism Infrastructure Orissa Tourism Development Corporation /Department of Tourism

    Disaster Management Puri Municipality, District Administration

    Promotion of Handicrafts Department of Industries

    Project Estimates

    The total estimated investment required for providing efficient services to the present

    population and future population of Puri city by the year 2031 is about Rs. 1828 Crores at

    present prices. The table below presents the identified and the reason that led to

    prioritisation of the projects. About 54.65 percent of the total investment has been worked

    out for programmes like inner city revitalisation, preservation & conservation of heritage

    structures etc. They account for Rs. 999.00 Crores. However the detailed estimates of all

    projects would be finalised only after preapration of Detailed Project Rport (DPRs) of each

    projects during the mission period.

    Summary of sector wise Invest estimate

    Sl.No Sector

    Projects Total Funding( InCrore)

    %

    A Heritage Preservation

    1 Preservation of ancient temples, Mathas /Monasteries and other Built Heritage

    100.005.47

    2 Preservation of ancient and sacred WaterBodies

    30.001.64

    3 Preservation of Community OwnedJagaghara, sacred water bodies andimmovable heritage

    18.00

    0.98

    4 Heritage Museum inside Shri Gundichatemple

    5.000.27

    5 Upgradation & Development of the HeritageGarden (42acre )of Shri Jagannatha Temple

    at Jagannatha Balav Matha

    10.00

    0.55

    6 Development of Parikrama around ShriJaganath Temple and Shri Gundicha Templecomplexes

    0.50

    0.03

    7 Development of Parikrama around ShriGundicha Temple complexes

    0.500.03

    8 Landscaping around Heritage area 3.00 0.16

    9 Development of Swargadwar 2.00 0.11

    10 Heritage Awareness IEC 1.00 0.0511 Sea and River front Development 100.00 5.47

    B Heritage Promotional Infrastructure

    1Security Measures in Shri Jagannath Templeand Heritage Places

    4.00

    0.22

    2 Viewing Tower for Foreign Tourists 5.00 0.27

  • 7/31/2019 CDP_Puri_Unlocked

    28/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 14-

    Sl.No Sector

    Projects Total Funding( InCrore)

    %

    3 Development of Bicycle Lanes and PedestrianNetwork

    7.000.38

    4 Development of Heritage Circuits 1.00 0.05

    5 Divine Discourse Convention Centre 10.00 0.55

    6 Construction of Night Shelters (for 10000Pilgrims)

    20.001.09

    7 Urban Hatt & Amphitheater 10.00 0.55

    8 Heritage Gateway & Interpretation Centre 2.00 0.11

    9 Street Furniture, City Beautification (signage,traffic lights, landscaping, etc)

    1.000.05

    10 Provision of Public Toilets near Heritage Sites 3.00 0.16

    11 Water Supply 450.00 24.62

    12 Major Roads / Bridges / Flyovers 156.00 8.53

    13 Inner City Revitalization 60.00 3.28

    C City Level Infrastructure

    1 Street lighting 10.00 0.55

    2 Municipal Roads 50.002.74

    3 Subways 40.00

    2.194 Sewerage 45.00 2.46

    5 Development of Storm Water Drain System 90.00 4.92

    6 Social Infrastructure 100.00 5.47

    7 Animal Protection 8.00 0.44

    8 Slaughterhouse & Ghosala 2.00 0.11

    9 Upgradation of Town Hall 2.00 0.11

    D Basic Services to Urban Poor 0.00 0.00

    1 Housing & Infrastructure 90.00 4.92

    2 Livelihood Support Programme 40.00 2.19

    3 Economic Opportunity Complex 10.00 0.55

    4 Social Amenities (Community Toilets, Halls

    etc)

    25.00

    1.37E Environment Infrastructure

    1 Green Infrastructure 5.00 0.27

    2 Environment Monitoring Infrastructure 10.00 0.55

    3 Solid Waste Management 35.001.91

    F Tourism Infrastructure 0.00 0.00

    1 Dev. of Bus & Truck Terminus 25.00 1.37

    2 Development of Parking Lots 20.00 1.09

    3 Development of Heritage (Urban) Villages 22.00 1.20

    4 Beach Cleaning Mechanism 5.00 0.27

    5 Tourism Information Centre 15.00 0.82

    6 Eco Friendly Tourist Vehicle 8.00 0.44

    7 Capacity Building & Database Dev.Information System

    2.000.11

    8 Water Sports & Maritime Aquarium &Museum

    120.006.56

    9 International Convention Centre 30.00 1.64

    G Urban Governance 0.00 0.00

    1 e-Governance 3.00 0.16

    2 Capacity Building 3.00 0.16

    3 Disaster Management Mechanism 4.00 0.22

    4 Research & Development 10.00 0.55

  • 7/31/2019 CDP_Puri_Unlocked

    29/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 15-

    Heritage

    Preservation,

    14.77

    Urban

    Governance,

    1.09

    Heritage

    Promotional

    Infrastructure,

    39.88

    City Level

    Infrastructure,

    18.98

    Basic Serices

    to Urban Poor,

    9.03

    Tourism

    Infrastructure,

    13.51

    Environment

    Infrastructure,

    2.74

    Sl.No Sector

    Projects Total Funding( InCrore)

    %

    Total 1828.00 100.00

    Sector Wise Estimates

    59.88% of the total identified investment is proposed in the Heritage Promotional

    Infrastructure sector. Some of the projects includes towards up-gradation, Inner City

    Revitalization, new construction, widening and strengthening works, bridges, flyovers, traffic

    management systems and junction improvements. Among the total investments 14.97%

    accounts for Heritage Preservation. Some of the projects includes in this category are

    Preservation of ancient temples, Mathas / Monasteries and other Built Heritage, Preservation

    of ancient and sacred Water Bodies, Heritage Museum inside Shri Gundicha temple,

    Upgradation & Development of the Heritage Garden (42acre )of Shri Jagannath Temple at

    Jagannath Balav Matha, Development of Parikrama around Shri Jaganath Temple

    complexes, Development of Parikrama around Shri Gundicha Temple complexes,

    Landscaping around Heritage area, Development of Swargadwar, Heritage Awareness IEC

    and Sea and River front Development.

    Sector wise InvestmentsCode Sector Sector Total %

    A Heritage Preservation 270.00 14.77

    B Heritage Promotional Infrastructure 729.00 39.88

    C City Level Infrastructure 347.00 18.98

    D Basic Serices to Urban Poor 165.00 9.03

    E Environment Infrastructure 50.00 2.74

    F Tourism Infrastructure 247.00 13.51

    G Urban Governance 20.00 1.09

    (A-G) Total 1828.00 100.00

    Similalry 18.98%

    investments accounts for

    City level infrastructure.

    9.03% of the total

    investment is proposed for

    Basic Services for Urban

    Poor, involving urban poor

    and the slums

    development. Tourism

    Infrastructes counts for

    13.51% and Environemnt

    Infrastructure for 2.74%.

    Institution wise Investment Estimates

    The total estimated investment required for providing efficient services to the present

    population and future population of Puri city by the year 2031 is about Rs. 1828 Crores at

    present prices. The table below presents the identified Institution wise Investment Estimates

    of the projects. Of the total invest JnNURM share is 80%, Govt. of Orissa 8.33%, Puri

    Municipality 2.63%, Jagannath Temple Administration 1.09%, OTDC / Dept. Tourism /

    Culture 0.71%, PHEO 2.71%, National Highway 0.22%, Works Dept. 0.91%, Industries Dept.

  • 7/31/2019 CDP_Puri_Unlocked

    30/260

    Puri Municipality Puri City Development Plan

    City Managers Association Orissa - 16-

    Year wise capital utilisastion

    26.5

    310.4

    357.9

    374.6

    347.3

    274.65

    136.65

    0

    50

    100

    150

    200

    250

    300

    350

    400

    2006-

    07

    2007-

    08

    2008-

    09

    2009-

    10

    2010-

    11

    2011-

    12

    2012-

    13

    Year

    Funds

    0.05% and Peoples Public Private Patnership (PPPP-P4) will have share of 3.35%. P4 will

    basically substitute the stae Govt and certain institions investments in total share i.e Water

    Sports & Maritime Aquarium & Museum, International Convention Centre etc.

    Institution wise Investments

    Funding Source Investment inCrore %

    JNNURM 1462.40 80.00GOO 152.20 8.33

    Puri Municipality 48.10 2.63

    Jagannath Temple Trust 20.00 1.09

    OTDC / Dept. Tourism / Culture 13.00 0.71

    PHED 49.50 2.71

    National Highway 4.00 0.22

    Works Dept. 16.60 0.91

    Industries Dept. 1.00 0.05

    PPPP 61.20 3.35

    Total Funding 1828.00 100.00

    Agency wise Capital Investment Plan 2006-2013

    Agency 06-07 07-08 08-09 09-10 10-11 11-12 12-13 Total

    Puri

    Municipality 9.5 97.4 114.9 92.9 84.1 62.35 19.85 481

    JagannathTemple Trust 5.5 39.5 55 36 22.5 26 15.5 200

    OTDC / Dept.Tourism /Culture 0 18.5 27 31.7 28.2 12.3 12.3 130

    PHED 6 60 60 110 110 104 45 495

    NationalHighway 0 10 10 10 10 0 0 40

    Works Dept. 5 30 20 31 30 30 20 166

    IndustriesDept. 0 1.5 2.5 2.5 2.5 1 0 10

    PPPP 0.5 53.5 68.5 60.5 60 39 24 306

    Total 26 256.9 289.4 314.1 287.3 235.65 112.65 1828

    The Capital Investment

    Plan (CIP) has been

    prepared for a period of 7

    years (FY 2006-07 to FY

    2012-13). The phasing has

    been worked out based on

    the priorities assigned by

    the stakeholders and

    preparedness of the

    service providing agencies

    to prepare the DPR and

    initiate implementation of

    the proposals. The chart

    besides provides an

    insight into the year-wise utilization of the capital during the Plan period.