Catawba Nuclear Station
Emergency Plan Implementing Procedures:
RP/O/A/5000/002, Rev 49
RP/O/A/5000/003, Rev 54
RP/O/A/5000/004, Rev 57
RP/O/A/5000/005, Rev 60
Attachment 4
EPIP lOCFR 50.54(q) Evaluations and screens
,~DUKE V!tENERGYI)
Duke Energy ACTION REQUEST - 02256570
I Action Request Details
Type Subject
Description
: EREG Orig Date : 02/07/2019 08:21
: RP/O/N5000/002 REV 49 Discovery Date
CONTACT SITE EP SUPERVISOR FOR ASSISTANCE IN PREPARING EP01, EP02, AND EP03. ENSURE EREG IS
CROSS-REFERENCED TO THE REG AR WHICH INITIATED IT. COMPLETE 50.54(0) SCREEN AND EVALUATION IF
REQUIRED
Notes
Priority Report To Status :APPROVED 02/07/2019
Severity Due Date : 03/10/2019 Event Date
Originator : 144004 Originator Group
Facility :CN Department : 13650 Organization
Owed To Owed To Group :QUALREVW
Owed To Fae :CN Department Discipline I Action Request Status History
. - -- - ·- - - --- - . - - - -. - -·· ... - - ·-- - -- - -Updated Date Updated By AR status AR Due Date
02/07/2019 144004 INPROG 02/11/2019
02/07/2019 144004 APPROVED
02/25/2019 144004 02/25/2019
02/25/2019 144004 '03/10/2019
I Action Request Attributes
Request Attribute Values Reqd Date -- -BOUNDED EREG AR N y 02/07/2019
Name : STACI N WHITE
Request Attribute Values Reqd Date -- -EREG AR CROSS XREF N y 02/07/2019
Name : STACI N WHITE
Request Attribute Values Reqd Date -- -REG AR CROSS XREF N y 02/07/2019
Name : STACI N WHITE
l Printed : 02/25/2019 Page : 1
,,DUKE vei ENERGY3
Duke Energy ACTION REQUEST - 02256570
I Action Request Notes
Action Request Routing/Return Comments
Routing Comments from the X601 Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel *** No Return Comments Found ***
I Action Request Approval Review
Route List : 001 Send
Passport Fae Group / Type Date
I Action Request Tr~nd/C~use
. I Action Request Keywords
Keyword Keyword Description
I Action Request Reference Doc~ments
Doc Sub
Send Action Time Taken
Minor
Updated On Updated By
Updated On Updated By
Route List Initiator : Action Date I Time Last Name
Facility Type Type Document Sheet Rev Rev Title
I Action Request Reference Equipment
Equip Equip Facility Unit System Type Number
l Printed : 02/25/2019
Equip Tag
Equip Rev Status Rev Status
Page : 2
ef,DUKE ~;ENERGY,
Duke Energy ACTION REQUEST - 02256570
I Action Request Cross References
Ref Ref Ref Ref Nbr Limit
Type Nbr Sub Type Status AR Cls Description - --AR 02218775 5AD COMP-NA N
AR 02256533 PRR COMPLETE N
AS. 02187203 1900 GNRL COMPLETE N
AS. 02194997 0200 Pl COMPLETE N
I Action Request Assignment Details
ASSIGNMENT NUMBER : 01 SUB :
Type : EP01 Due Date
Reschedule
: 02/11/2019
Status
Assigned To
Subject
Aff Facility
UCR
Organization
Est Manhrs
Description
: COMPLETE
: STACI N WHITE
: 50.54(Q) SCREEN
:CN Unit
Schedule Ref
Department : 13650
Ext Comp Date
COMPLETE 50.54(Q) SCREEN IN ACCORDANCE WITH AD-EP-ALL-0602.
Action Request Assignment Completion Notes
RP/O/N5000/002 - 0000215962
NOTIFICATION OF UNUSUAL EVENT
RP/O/N5000/002 rev 049
EP Excellence Plan - Action SD-EP-4.2
Revise AD-EP-ALL-0602 to improve
templates to focus on why a
Pri Resp Fae
Pri Resp Group
Sec Resp Fae
Sec Resp Group
System
Discipline
I have reviewed the 50.54 screen for RP/O/N5000/002 rev 49. I approve the screening.
Action Request Assignment Status History
Updated Date 02/07/2019 02/07/2019 02/07/2019
02/07/2019
Updated By 144004 144004 144004
144004
I Printed : 02/25/2019
Assgn Status INPROG
NTFY/ASG
ACC/ASG
Assgn Due Date
02/11/2019
Page : 3
,~DUKE v/ENERGYt
Duke Energy ACTION REQUEST - 02256570
02/07/2019 02/08/2019
144004 MEHARE
AWAIT/C COMPLETE
__ · I Action Request Assignment Attributes
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel *** No Return Comments Found ***
Action Request Assignment Completion Approval
Route List - : 001
Fae Group I Type A
Send Send Date Time - --02/07/2019 13:49
Updated On Updated By
Updated On Updated By
Route List Initiator : 144004 Action Action Taken Date I Time Last Name APPROVED 02/08/2019 14:12 BRUNSON
Passport DMBRUNS MEHARE A 02/08/2019 14:12 APPROVED 02/08/2019 15:40 HARE
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub Minor Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip Facility Unit System Type Number
I Printed : 02/25/2019
Equip Tag
Equip Rev Status Rev Status
Page :4
(/~DUKE ~;ENERGY~
Duke Energy ACTION REQUEST - 02256570
Action Request Assignment Cross References
Ref Ref Type Nbr
Ref RefNbr Sub Type
Action Request Assignment Appendices
APPENDIX 1
l Printed : 02/25/2019
Limit Status AS Cls Description
Page : 5
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
« 10 CFR 50.54(q) Screening Evaluation Form»
BNP
EREG #: __ 2256570 ______ _ CNS
CR3
HNP
MNS
5AD #:_2218775 ______ _ ONS
RNP
GO
Document and Revision RP/O/N5000/002, Notification of Unusual Event, Rev 49 (PRR 2256533)
Rev.5
ATTACHMENT 4 Page 1 of 8
D
X
D
D
D
D
D
D
Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan):
Enclosure 4.2, Command and Control Turnover Briefing Form, was revised to align with the Command and Control Turnover Form in AD-EP-ALL-0104, ERO Common Guidelines and Forms.
Specific Changes are: Added: "Mode Shutdown Date: ____ Time: ____ " to each of the Unit Status blocks Added: "Take Cover Order: YES NO TIME: ---Added: "Rapid Evacuation: YES NO TIME: ___ _ Added: "Last ENF Number: __
Added: "Continuous Communications with NRC Established: YES NO"
Deleted: "[] Stable [] Degrading [] Improving" from each of the Unit Status blocks Deleted: "EROS Activated: Yes No N/A" from each of the Unit Status blocks
Changed: ''Turnover: (From): [] CR/[] TSC" to "(From): [] CR/[] TSC/ [] EOF" Changed: "(TO) [] TSC / [] EOF" to "(TO) [] CR/ [] TSC/ [] EOF Changed: "Units(s) Affected (circle) [] All []1 []2 []3" to "Units(s) Affected (circle) []1 []2 []3" Changed: "Last ENF Sent (time): __ " to " Last Notification completed (time): ____ _ Changed: "Last Message Sent (time): " to "Notified (time): ___ _
Printed : 02/25/2019 Page :6
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev. 5
<< 10 CFR 50.54(q) Screening Evaluation Form>>
ATTACHMENT 4 Page 2 of 8
Rev 48 Enclosure 4.2
Printed
Enclosure 4.2
Command and Control TumoYer Briefing Form RP/0/A/5000/002 Pagel of2
Station: ( ) CNS ( ) MNS ( ) ONS ( ) BIIP { ) HrlP { l RID' Tmnover. (circle) (From): D CIR f a TSC
Unit(sJ Affected: (circle} ( } All ( ) 1 ( )2 ( P (TO) D TSC I D EOF
D Shift Change
EmergencyOassil"ication: Unusu31Eventdeclaradat ____ EAL#:___ MlrtDeclaredat ____ EAL#: __ _
Site Area Emergency declare,! a: ____ EAL#: ___ &!neral ErnergencyDecla.-edat ____ EAL#: __ _
I a Sla!J!e a Degrading a lmpro-mg
FPB Status (cfrcfe appropriate condition}
Fuel !Iilact Potemial Loss loss RCS Intact Pofernial l..oss loss Omt In.fad. Potenlial loss loss
Res;ronse Procedc!ies in Pmgress (opoonal}:
Sfle-Assemblj: YES OOW.!E: ___ _
, SiteEY3alalfon:\'ES W01F.',1E ___ _ : l.oca!ioo'Cc=l'..ms:
: 02/25/2019
a Sl:able a ileg1admg a !mpf<v;ing a Slahle a Degratfmg a Improving
FPB Sta1us (cfrcfe appropriate conditfon) FPB Status (circle apprOIJlriate condition)
FueC lnfad. PblsJl!fuJ loss Loss Fuel ln!act P"""1,lial Loss loss RCS ln!act ~ !Loss Loss RCS Wacl !?oom:lia!Loss Loss Cont Intact Poteoo.l loss Lliss Cont lnlacl i>otsmial Loss loss
Evo!u&ms in Progress:
• EOP/Af'sin Pr~ (oplioml}:
011lec Age,icy i.,vo!vemenJ!: 0 MEIJICAL o FIRE o I.ml ENFORCEMENT o OTHER ~ l'1lfrlmlafial {rr:pies}:
Page :7
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVEN~SS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Enclosure 4.2
Command and Contrnl Turnover Briefing Form
Raoroligical: EmeqiencyWomerdosef.'ffli!sappm-ml: YES NOWho
Release in Progress: YES NO FieldMooi!oraigTeamsDe~'ed: YES NO Numbe. ---Release Pallr,,ray: 11\'IND SPEED: WIND DIRECTION:
OF.site PARS Roo>mmemfed: YES NO Z'onesEvacm!ed: Zonss Shel!eed
Kl Recommended: YES NO Cmrenf Dose Rtin AYai!atie: YES NO H.r.ie Dose Assessoo;. cfisrussed Turnover? YES NO
Off.Site tlotffica1ions: last ENF Sent l)ime}: Next ENF Due (lime):
NRC ComllNlnication; Last Uess:age Sem {lime}:
Have Communica!ors olSCtlSSed T umo'le! wilh ru:qtriiii:,g lacilily Commmlicalilss? YES NO
Upon the transfer of Command and Conlsol, 1hE<iollo1'Jing will be prufonned !Jy:
Event aassificatton: OCR OTSC PAR Decision Making: 0 CR O TSC O EOF
State and Local No1ification: OCR a·TSCOEOF NRC Notincalions: DlCR 0TSC Emergency Exposure Coll!rols & l<I: [J CR O TSC CootmSofFMTs: OCR DTSCOEOF
Dose Assessment OCR OTSCDEOF
NameoflrnfMduaJtumiago·,eri:luties.:
T1Jma1et" Comptele-: YES tID !SC!i,:OF A<:liwred at
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 4 Page 3 of 8
RP/0/A/5000/002. Page2of2
(cfrcle) (ciid'e) lime Date Nrune m&oliooal assuming duties Adcfrtiona) Information:
Printed : 02/25/2019 Page : 8
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 4 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Rev 49 Enclosure 4.2
:Enclosnre 4.2
Command and Control Turnove.- Briefing Form
Station: { > CNS ( I MNS ( ) OHS ( ) BNP ( } HtlP l ) RNP
Unit{s) Affected: {circle) O 1 D 2 O 3
P.PiO/A/5000/002 Pagel of2
{From): [J CR / 0 TSC / [J EOF
(rO) D CR / 0 TSC / 0 EOF
0 Shrlt Change
Emergency Classllieation: IJl\usua! Event Dedaioo at ____ EA!. 'It. __ _ AleltDeclareda!: ____ EAL#:~--
Sile Area Br.ergeocy Declared at
Mooe __ ~tr!llmmEla!e: __ Time: __ Mllde Stiu!CIO'l,n Da1'e: __ T1me: F,Tooie __ Struroo\t,11 Date: __ Time:
FPB Stall!S· {cl1ele appropriate- tondluon) FPB Sl:rnis (weie apprcprlala c:ornrruon) FPS s~rus {cfrci'& ;;s,propnate condrnon)
Fuel flltlct f'O!enllal Loss toss Fuel lnlatt Polenli'al Loss toss Fuel l'll!ad Po!Enllal toss Loss
RCS lntad Potenlial loss !.oss RCS llllacl. Pofefilial Loss 11.oss RCS rmiu Polenlial Loss Loss
Cont rntact Pofal!ia! Loss !.oss Cont ln!act 1'11.eiml loss Loss Cont llltac1 R>tealia! loss Loss
Erolullons in Progress:
Printed : 02/25/2019 Page : 9
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Enclosure 4.2
Command ruuJ Control Imuoi,-er :Sl"iefmg Form
Site Assembly: YES NO TIME: locatfon!Commeols: other Agenc:y lnvolllemem:
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 5 of 8
RPi0JAi5000!002 Page2 of2
Sim Evacuation: YES NO TIME: !J l\lEDICA!.. !JARE !J LAW ENFORCEMENT OOIBER
Take cover Order: YES NO TIME: AddlllOllal rmoonaoon (Injuries}:
Rapid Evacuation: YES NO llM.E:
RadiologlcaJ: Bnergency WOiker dose llmils approve(!; YES 00 Fon,oorn:
Release fn Progress: YES NO Re!dMcmiloongTeamsDeplO'Jed: YES NO N\Jm!Jer ---Release Pathway: WINDSPEED: WIND DIRECTION:
Offsne PARS Recommended: YES NO Zooes Eltaa.ra!ed: 2ooesShellered:
Kl Recommended: YES NO Dose Assessm<>..nt Availa!Jle: YES NO !ia'Je !Jose:Assessors rnsaissJi Tumova? YES NO
Off·Site· tlotmcanons: last Nofflicalion Comp!E!ed (lime): Last ENF flllnmer.. -- !NeX1BJF lll.le{lime}:
NRC CommEmic.i1ion: Nolil:ed {lime): CoruilrulJus CommllnlcalfollS 11.ffll NHC Es!allflSllell: 'tES NO
H'a'.eCorn1mmocaforsdiscussedTumoves-v;illacqumgracilily<:mmumfralms? YES NO
Upon the trar.sfer of Command and Contn,I, tile follov;irr9 wilJ be. performed by:
Event C!assi!icat:oo: DcR 0Tsc PAR Det:fsfoo Ma~ ClCR 0TSC0EOF
Slale and Local r-lOlilicatm DcR 0TSC0EOF NRC N'ctf.'cat'foos: Om OTSC Brer~ ~ecor.liols&Kt DcR OTSC Corurol or Ff.H's: Dim 0Tsc0 EOF
, Dose Assessment: 0 CR 0TSC0EOF
Narne olf lrn!Mdml tumng D'IEf' Dulies:
Turnover Corn~le'.e: YES MO TSC l EOF Aciivi!fe.i at
' (circle} (circle} Time ~e Name ln!!Mooal assmmng dll'JeS'
. Aaa111onaI lnfom1'llion:
·- -.·. •.,. •. - - ~ ... ... .. -· - .. -· .. ., ·'· .~- .. , . . .. -
i
!
. :•:.~ .- ... -· - .. ... . -- ::" .. i -· ,\. _: ~ :~ - .- - . . . . - ...... - --.. - ~. .. ·--· - - .. . ' . - - --~ ~- V .,.,,. _,,_ :. ... '. -~-': __ : ...
~art II. Activity Previously Reviewed? . Yes I D No IX is this activity Fully bounded by an NRG approved 10 CFR 50.90 submittal or 10 CFR 50.54(q) Continue to Alert and Notification System Design Report? Effectiveness Attachment 4,
Evaluation is not 10 CFR If yes, identify bounding source document number or approval reference and required. Enter 50.54(q) ensure the basis for concluding the source document fully bounds the proposed justification Screening change is documented below: below and Evaluation
complete Form, Part Ill
Justification: Attachment 4, PartV.
Bounding document attached (optional) 10 . . .-1-- '• • r .- -.,. " ~ :, ~-- ,-,_-·, ... ·-·- - . . ·- - -- .. .• . . ;-:. ... ··:-. ;_-~ . ·-·-, ,,.,- . . .-.~ . --- ·. --~ .. ..
' ~-'"" . ~ . - - ·- ~ ····-·- --·-· --- - -· .. -- . - . ,_,._.., - ..
Printed : 02/25/2019 Page : 10
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 4 Page 6 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Part Ill. Editorial Change
Is this activity an editorial or typographical change only, such as formatting, paragraph numbering, spelling, or punctuation that does not change intent?
Justification:
Yes D
10 CFR 50.54(q) Effectiveness Evaluation is not required. Enter justification and complete Attachment 4, Part V.
SJ9!J !Jl. ~»:rf~JTIIyll~jijJi!f_~SJ:tW-iiJ~-11:mswJYt;·:;,·:;t:~+,i;;, 1 a Responsibility for emergency response is assigned.
1 b The response organization has the staff to respond and to augment staff on a continuing basis (24-7 staffing) in accordance with the emergency plan.
No X
Continue to Attachment 4, Part IV and address non editorial changes
X
D
f-==t=;;:;
~ :N!. ~llliR~~~1[:g~~~w~~~>,,:?>:-:;;~Af:)s'l:{t~~J'L.;Z:;;3~~ff:~~~~~/;:;;~ 2a Process ensures that onshift emergency response responsibilities are staffed and assigned D
D
D
D
~j~{~J~wJi;qah8h:MlBlMiii!illlWici~W@iL~·:' ... ;::Jt:±::.:::;~::;~L:S:::i:·:;:~::. 5a Procedures for notification of State and local governmental agencies are capable of alerting them of the D
declared emergency within 15 minutes (60 minutes for CR3) after declaration of an emergency and providing follow-up notification.
5b Administrative and physical means have been established for alerting and providing prompt instructions D to the public within the plume exposure pathway. (NA for CR3)
5c The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and D Notification Systems for Nuclear Power Plants, or complies with the licensee's FE MA-approved ANS design report and supporting FEMA approval letter. (NA for CR3)
Printed : 02/25/2019 Page : 11
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Cl)
<< 10 CFR 50.54(q) Screening Evaluation Form>>
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 7 of 8
1 Oa A range of public PARs is available for implementation during emergencies. (NA for CR3) D
1 Ob Evacuation time estimates for the .population located in the plume exposure pathway EPZ are available D to support the formulation of PARs and have been provided to State and local governmental authorities. (NA for CR3)
1 Oc A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.
1 Oct Kl is available for implementation as a protective action recommendation in those jurisdictions that D chose to provide Kl to the public.
====== o.?¥,t"f'_(tr-)-<1 ,l_,r_;,;.G';~O:-~..,.:,,,;
14a D
14b Drills, exercises, and training evolutions that provide performance opportunities to develop, maintain, D and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses.
14c Identified weaknesses are corrected. D
-~:~~ i~Jmt[fu~9IBi@31EID1~1flrni111miI 15a Training is provided to emergency responders.
Printed : 02/25/2019 Page : 12
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Part IV. Emergency Planning Element and Function Screen (cont.) {,
ill
PART IV. Conclusion If no Part IV criteria are checked, then provide Justification and complete Part V below. Justification:
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 4 Page 8 of 8
D
If any Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part IV criteria are checked, then complete Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part V and perform a 10 CFR 50.54(q) Effectiveness Evaluation. Program Element 4a requires final approval of Screen and Evaluation by EP CFAM. X
Preparer Name (Print): Staci White
Reviewer Name (Print): See CAS
Approver (EP Manager Name (Print): See CAS
Approver (EP CFAM, as required) Name (Print) N/A
QA RECORD
I Printed : 02/25/2019
Preparer Signature: Date: See CAS See CAS
Reviewer Signature: Date: See CAS See CAS
Approver Signature: Date: See CAS See CAS
Approver Signature: Date: N/A NIA
Page : 13
,,DUKE 'e'ENERGY~
Duke Energy ACTION REQUEST - 02256570
I Action Request Assignment Details
ASSIGNMENT NUMBER : 02 SUB :
Type
Status
Assigned To
Subject
: EP02
: COMPLETE
: STACI N WHITE
: 50.54(Q) EVALUATION
:CN
Due Date
Reschedule
Unit
Schedule Ref
: 02/11/2019
Aff Facility
UCR
Organization
Est Manhrs
Department : 13650
· Ext Comp Date
Description
COMPLETE 50.54(Q) EVALUATION IN ACCORDANCE WITH AD-EP-ALL- 0602.
Action Request Assignment Completion Notes
I approve the 50.54Q eval for RP/O/A/5000/002.
Action Request Assignment Status History
Updated Date Updated By Assgn Status Assgn Due Date
02/07/2019 144004 INPROG
02/07/2019 144004 02/11/2019
02/07/2019 144004 NTFY/ASG
02/07/2019 144004 ACC/ASG
02/07/2019 144004 AWAIT/C
02/08/2019 DMBRUNS ACC/ASG
02/08/2019 144004 AWAIT/C
02/08/2019 DMBRUNS ACC/ASG
02/08/2019 144004 AWAIT/C
02/08/2019 MEHARE COMPLETE
I Action Request Assignment Attributes
I Printed : 02/25/2019
Pri Resp Fae
Pri Resp Group
Sec Resp Fae
Sec Resp Group
System
Discipline
Page : 14
e(-,DUKE ~ ENERGYa
Duke Energy ACTION REQUEST - 02256570
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel Minor editorial comment. DMB
Minor editorial comment. DMB
Routing Comments from the X602 Panel
*** No Return Comments Found ***
Action Request Assignment Completion Approval
Route List : 001
Fae Group I Type
A
Send Send
Date Time - --02/08/2019 14:06
Updated On Updated By
20190208 DMBRUNS
20190208 DMBRUNS
Updated On Updated By
Route List Initiator : 144004
Action Action
Taken Date / Time Last Name
APPROVED 02/08/2019 14:13 BRUNSON Passport
DMBRUNS
DMBRUNS
DMBRUNS
MEHARE
A 02/08/2019 13:53 RETURNED 02/08/2019 14:02 BRUNSON
A 02/07/2019 13:52 RETURNED 02/08/2019 13:48 BRUNSON
A 02/08/2019 14:13 APPROVED 02/08/2019 15:44 HARE
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub Minor
Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip
Facility Unit System Type Number
Equip Tag
Action Request Assignment Cross References
Ref Ref Type Nbr
I Printed : 02/25/2019
Ref Ref Nbr Sub Type Status
Equip Rev
Status Rev Status
Limit AS Cls Description
Page : 15
ef~DUKE ~*ENERGY~
· Duke Energy ACTION REQUEST - 02256570
Action Request Assignment Appendices
APPENDIX 1
I Printed : 02/25/2019 Page : 16
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS _EVALUATIONS 10 CFR 50.54(0)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
EREG #:_2256570 ______ _
5AD #: ___ 2218775 ____ _
Document and Revision RP/O/A/5000/002, Notification of Unusual Event, Rev 49 (PRR 2256533)
Part I. Description of Proposed Change:
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 1 of 10
BNP D
CNS X
CR3 D
HNP D
MNS D
ONS D
RNP D
GO D
Enclosure 4.2, Command and Control Turnover Briefing Form, is being revised to align with the Command and Control Turnover Form in AD-EP-ALL-0104, ERO Common Guidelines and Forms.
Specific Changes are: Added: "Mode Shutdown Date: ____ Time: ____ " to each of the Unit Status blocks Added: "Take Cover Order: YES NO TIME: __ _ Added: "Rapid Evacuation: YES NO TIME: ___ _ Added: "Last ENF Number: __ Added: "Continuous Communications with NRC Established: YES NO"
Deleted: "[] Stable [] Degrading [] Improving" from each of the Unit Status blocks Deleted: "EROS Activated: Yes No N/A" from each of the Unit Status blocks
Changed: "Turnover: (From): [] CR/ [] TSC" to "(From): [] CR l [] TSC/ [] EOF" Changed: "(TO) [] TSC / [] EOF" to "{TO) [] CR/[] TSC/ [] EOF Changed: "Units(s) Affected (circle)[] All [11 [12 []3" to "Units(s) Affected (circle) [11 [12 []3" Changed: "Last ENF Sent (time): __ " to" Last Notification completed (time): ____ _ Changed: "Last Message Sent (time): " to "Notified (time): ___ _
Printed : 02/25/2019 Page : 17
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev. 5
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
ATTACHMENT 5 Page 2 of 10
Rev 48 Enclosure 4.2
Printed
Enclosure 4.2
Command and Control Tuma.er Briefing Form R.Pi01A1sooo1002 Page.I of2
Station: ( ) CNS ( } MNS ( ) ONS { ) BtJP ( J HNP ( } RfW Tmnover: (circle) lJ'°rom): a CJR / a TSC 1------------------------------t (£0) D TSC I aEOF Unit{s) Affeded:; (circle) ( ) All ( ) 1 ( }2( )3
0 Shilt Ch~nge
EmergencyClassnrcatlon: Unusual E:,rer;t declared at~,~--EAI.. iF.. __ _ Afertiledared at ____ EAL#: __ _
S?.e.AreaEmegencydedaredat ____ EAl#: ___ GeneralEme,gencyOeda,edat ____ EAl#: __ _
I, I I I I I I o Slabfe a llegraamg n lrnpro'i.ng
FPB S!atus {cli:de app,:opriafe condition! Fuel lnfad Pbl<>..mial loss I..Dss RCS, ln:act PoL~l loss loss Cont ln!ac( Pbtenfurl!.css I.ass Ma;orEqmprnentOut of Sen ice:
, Sfte•AssimibtJ: YES I!IDi1l\."e __ ~-1 SiteEvru:mnion:'liES li'OmlE:: ___ _ ·1 l«a!io~.!s:
-;,
: 02/25/2019
FPB Slaws [circle opprcpoote conditfan} FPS St'afus (circle app«li>•~-.t.e condition} Fuel lnlact Po!enfal Loss Loss Fuel Intact PoL"flfu!Loss loss RCS Intact Po!Ernia! i..oss Loss. RCS lnfad P~al Loss loss Cont !Iilacl Pot."f',ful loss Loos C<mt lniact I?~ Loss loss P.'1$< Eq,iipment Out of Se!Yice:
Evclutioos in i'mgress:
i EOP/APs in Prog;ass (op1ioml):
01.......- Agency!>,roM,melli: OMHl!CJ\L CIIFIRE DLAWEN:'OHCEMEMT OOfflER AdrlfficmHnfimnafim(.!$1'.es~
Page : 18
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Enclosure 4.2
Command and Control Turnover Briefing Form
Radfo}ogical: Emesgeocy Womer dose limits approved: YES NO Who
Release in Progress: YES NO Fiertl Moniloling T earns Dep!o'Jell: YES NO Number
Release Pallr11ay: WIND SPEED: WIND DIRECTION:
Offsile PARS Recommended: YES NO Zones. Evacoaled: Zones St.e!!ered:
Kl Recommended: YES NO CurrentDoseRunAvail:ID!e: YES NO HaveDoseAssessasaJScussedTumover? YES NO
Off.Site Notifications: last ENF Sent (lime): NeirtENF Due (lime):
NRC Communication: l.astllt~Sent(lime}:
Have Communicalora discussed T umover wilh acqtim,g faolil'1Con1municalilrs? YES NO
Upon the transfe£ of Command and Control, the following will be pelfornied by:
Event Classification: OCR OTSC PAR Decision Making: 0 CR O TSC O EOF
State and Local Notification: OCR OTSCOEOF. NRC No!ifrcmioos: OCR OTSC
Emergency Exposure Conlrols & Kl: 0 CR O TSC Control of FMTs: OCR OTSCO EOF
Dose Assessment OCR DTSC!JEOF
Name of lndM!lual lumingowr Du'Jes:
Turnover Comprefe: YES NO TSC I EOF A£1i-<a!ed at
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 3 of 10
RPJO/A/5000/002 Pa,,oe2of2
(clrcfe} (circle) Time IJ'ate flame iindMdual assummg duties Additional l'nformalion:
Printed : 02/25/2019 Page : 19
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 1 O CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
ATTACHMENT 5 Page 4 of 10
Rev 49 Enclosure 4.2
Printed
:Endosm:e 41.2
Command and Control Turnover Bril'fing Form PJ>/0iAl5000i002 Page I of2
station: ( } CNS ( } MNS I ) ONS, ( } BNP t l HNP l ) RNP
Unit(s] Affected: (circle} D 1 D 2 D 3
Emergency Classlfication: lJiltlsual Event Decrarea at ____ EAL #:. ___ _
Turnover: (From): [] CR / 0 TSC I D EOF
(i"O} OCR/OTSC/OEOF
a Shift Change
Alert Declared at ____ EAL#:~--
Sile/lsea EmergeocyDeclaredat ____ EAL#:___ GeneralErnergencylJed'aredat ____ EALt:: __ _
Mooe __ Shutd'oVl!IEJ0te: __ ,_Time:__ rJooe, ___ Sbuldm.11Da~ __ Tirne:__ 'Pl.ooe stillfd'oV;n Da!e: __ llme:
FPB St.llus (cfl'cle :ippraprfate condilfon} FPB Slatm (circle approprla1e comfruon} FPS S1.31Us (circle approp1r.1te coru!itton}
Fuel Jnfad Po!enlial Loss lDSS FUel lnlact Po!snlial Loss Loss Fuen Jn!act Pnfen!ief Loss lOss
RCS IIJ!acl Poten!ial loss loss RCS ln!act Po!eraal Loss loss RCS lnlact P'Ofen'.m Loss loss Cont rntact ~!Loss loss, Cont !n!act Polenllal loss Loss Cont Jlltid Polenli21. loss loss 11.t;Jllr Eqllfprnent Out of Servtce: f.laµ- Equiplr.ait OtJ1 OI senoce: MaJcr Equipment CM of sen.fee:
Broltl!Ioos in Progress:
I EOPJAPs in Progress (cplfooal}:
: 02/25/2019 Page :20
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Enclosure 4.2
Command and Control Tul"llovea· B1iefmg Form
Location/Comments: Other Agency lnvotvement
AD-EP-ALL-0602
Rev. s·
ATTACHMENT 5 Page 5 of 10
RPiO!AfS000/002 Page2 of2
Sl!eAssembly: YES NO TIME: ___ _ Site Evacuaffon: YES NO mE ___ _ Q !MEDICAL El FIRE ti f.AW ENFORCEMENT El OTHER
TakeCoverOrder. Y-t:S NO TIME: ___ _ A!!dilionat lnfoonalm (fajillles):'
Rapid Evacuation: 'IES NO TIME:
Radio!oglc:al: BnergencyVlcrker dose limits approved: YES NO For\,llom: ___________________ _
Release in Progress: YES NO Field M'onilOling Teams Deployed: YES NO Number __ _
ReleasePalh\\,ay:~-------- WIND SPEED: ___ _ WINDDIRECTlOlt ____ _
Ollsi'lePARSRecommerafeil: YES NO Zones Evaara!ed: ________ Zares-Sllellered: _______ _
Kl RecolnJirernled YES NO DoseAssessment Allailab!a: YES HO Ha'le Dose Assessor.; lf1scuss.Inumo'ref? YES HO
Off-Site Noffi!Catrons: lastNol/lii:alion COmple!ed (Ume}: ~-- lastENF Nuiiwer. __ Next Em=oue(1ime}: __ _
Notiffed (lime}: __ _
YES NO
Upon tile fmns'fer of Command and Conlrof, the foBf<ming wil1 be peifcrmec! by:
E'lrem Cfassilicalronc O CR O TSC PAA Dedsloo Ma~fng: 0 CR O TSC O EOF
Sla!e andlocaltlolmca!iom. D CR a TSC [] EOF ~ NoM!:aooos: OCR 0.Tsc , Emecgetr.cy Expesme Conli1Drs & Kt D CR O TSC Con!l:ol offt,'!fs: Om 0TSC0EOF
Om 0Tsc0EOF
RirneoffmlI~iO\ml!Jm:ng o~erDo!!es:: __________ _
TtrrnoverCompfeie: YES NO TSClEOF Actlvaleda!: ___ _ (clrcfef (cisele}
Acfditional lnformatton:
Attachment 6, 10 CFR 50.54(q) Initiating Condition (IC) and Emergency Action Level (EAL) and EAL Bases Validation and Verification 0,/&V) Form , is attached (required for IC or EAL change}
,• . .
Part II. Description and Review of Licensing Basis Affected by the Proposed Change:
Licensing Basis of the ERO
Yes D No X
The Assignment of Responsibilities is described in the originally approved CNS Emergency Plan, Revision 2 (dated January 1983), sections A.1.b, Concept of Operations, A.1.c, Block Diagram of Organization Interrelationships, and A.1.d, Key Decision Making.
The current licensing basis regarding Assignment of Responsibility is described in CNS Emergency Plan Section A, Revision 150 (dated September 2017) sections A.1.b, Concept of Operations, A.1.C, Block Diagram of Organization Interrelationships, and A.1.d, Key Decision Making.
Printed
During revisions to these sections, the titles of some of the Emergency Response personnel and facilities have changed (i.e., Shift Supervisor to Shift Manager, Crisis Management Center to Emergency Operations Facility), but the individuals responsible for Command and Control and the transfer process for Command and Control has remained the same. The summation of the incremental chan es over time do
: 02/25/2019 Page : 21
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
ATTACHMENT 5 Page 6 of 10
not reduce the effectiveness of the CNS Emergency Plan when compared to the NRG-approved Plan.
Section P, Responsibility for the Planning Effort, in the CNS Emergency Plan, Revision 2, lists RP/O/A/5000/002, as an implementing procedure. (AD-EP-ALL-0104 had not been created when the CNS Emergency Plan was initially approved by the NRC.)
Section P, Responsibility for the Planning Effort, in the CNS Emergency Plan, Revision 147, lists RP/O/A/5000/002, and AD-EP-ALL-0104 as implementing procedures.
List Commitments Associated with the Change
A search to identify site specific commitments related to the ERO positions and their assigned responsibilities was performed. No site specific commitments were identified aside from those in the Emergency Plan. RG 1.219 Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors, Rev 1. (July 2016) 3.5 Emergency Plan
Printed
a. "Emergency plan" means the document(s) that the licensee prepared and maintains that identifies and describes its methods for maintaining emergency preparedness and responding to emergencies. An emergency plan includes the plan that the NRC originally approved and all subsequent changes that the licensee made with and without prior NRC review and approval under 10 CFR 50.54(q). See 10 CFR 50.54(q)(1)(ii) for additional information.
b. This definition highlights that "emergency plan" includes the documents that describes the programmatic methods that the licensee uses to maintain emergency preparedness and to respond to emergencies. These methods, or program elements, are the implementation aspects of the planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50 and generally correspond to the evaluation criteria of NUREG-0654 or approved alternatives that supply specific acceptable methods for complying with the planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50. Such programmatic documents are subject to the 10 CFR 50.54(q) change process. Non-programmatic documents, such as training rosters, equipment and maintenance test reports, lesson plans, and other documents that "document the performance" of the program elements, as opposed to those that "establish" the program elements, are not included.
c. Ordinarily, sub-tier documents such as emergency plan implementing procedures (EPIPs) are not considered to be part of an emergency plan for the purpose of evaluating proposed changes. If a licensee relocates a programmatic description from the emergency plan to a sub-tier document, that programmatic description continues to be subject to the 10 CFR 50.54(q) change process. For example, licensees have relocated the details of emergency classification schemes from the emergency plan to an EPIP or to large wall charts maintained in the control room. Because the EPIP or wall chart is now the means to demonstrate compliance with the planning standards in 10 CFR 50.47(b)(4), these sub-tier documents are subject to 10 CFR 50.54(q). Repeating, as opposed to relocating, program element descriptions in sub-tier documents do not necessarily make the sub-tier documents subject to the 10 CFR 50.54(q) change process. However, the descriptions in the various documents must remain consistent.
e. This definition also highlights the need to consider the NRG-approved plan and the subsequent changes in reviewing against 10 CFR 50.54(q) to ensure that a series of incremental changes (each determined not to reduce the effectiveness of the plan) do not reduce the effectiveness of the plan when compared to the
: 02/25/2019 Page : 22
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
NRG-approved plan.
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 7 of 10
The differences in approved revisions and the current revisions of the Emergency Plans have been reviewed and they have been determined to meet the regulatory requirements required during revisions. Each revision has been reviewed by the NRC during the inspection process. ·
Part Ill. Description of How the Proposed Change Complies with Regulation and Commitments. If the emergency plan, modified as proposed, no longer complies with planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50, then ensure the change is rejected, modified, or processed as an exemption request under 10 CFR 50.12, Specific Exemptions, rather than under 10 CFR 50.54(q):
The changes made to the Command and Control Turnover Briefing Form continue to support the assignment of responsibility by aligning the Command and Control Turnover Briefing Form between the two procedures currently used by the Shift Manager, TSC Emergency Coordinator and EOF Director. Aligning the content of these two forms to be identical contributes to each individual understanding the status of the emergency in an efficient manner, and reduces the potential for human error during the turnover process.
The changes described continue to meet NRC requirements as described in 10 CFR 50.47(b) and 10 CFR 50, Appendix E and Emergency Plan Sections A and P.
Printed : 02/25/2019 Page : 23
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10_CFR 50:54(0)
AD-EP-ALL-0602
Rev.5
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
ATTACHMENT 5 Page 8 of 10
Part IV. Description of Emergency Plan Planning Standards; Functions and Program Elements Affected by the Proposed Change (Address each function identified in Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part IV of associated Screen):
The following portion of planning standard §50.47(b)(1) is related to the change: Primary responsibilities for emergency response by the nuclear facility licensee have been assigned, and each principal response organization has staff to augment its initial response on a continuous basis.
The function for §50.47(b}(1) related to this change are:
a. Responsibility for emergency response is assigned.
Appendix E to Part 50 lists the following: IV. Content of Emergency Plans A. Organization The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency. Specifically, the following shall be included:
1. A description of the normal plant operating organization. 2. A description of the onsite emergency response organization (ERO) with a detailed discussion of:
a. Authorities, responsibilities, and duties of the individual(s) who will take charge during an emergency;
The NUREG-0654 Part II.A elements for §50.47(b)(1) related to this change are:
A.1.d. Each organization shall identify a specific individual by title who shall be in charge of the emergency response.
· A.2. Each principal organization shall be capable of continuous (24-hour) operations for a protracted period. The individual in the principal organization who will be responsible for assuring continuity of resources (technical, administrative, and material) shall be specified by title.
Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan Functions:
The changes made to the Command and Control Turnover Briefing Form continue to support the assignment of responsibility by aligning the Command and Control Turnover Briefing Form between the two procedures currently used by the Shift Manager, TSC Emergency Coordinator and EOF Director. Aligning the content of these two forms to be identical contributes to each individual understanding the status of the emergency in an efficient manner, and reduces the potential for human error during the turnover process.
The description of the authorities, responsibilities and duties of the individual(s) who will take charge in an emergency is maintained. There is no reduction in effectiveness of the CNS Emergency Plan.
Printed : 02/25/2019 Page :24
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
Part VI. Evaluation Conclusion. Answer the following questions about the proposed change.
1 Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E?
2 Does the proposed change maintain the effectiveness of the emergency plan (i.e., no reduction in effectiveness)?
3 Does the proposed change maintain the current Emergency Action Level (EAL) scheme?
4 Choose one of the following conclusions:
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 9 of 10
YesX No D
YesX NoD
YesX NoD
a The activity does continue to comply with the requirements of 10 CFR 50.47(b) and 10 CFR 50, Appendix E, and the activity does not constitute a reduction in effectiveness or change in the current Emergency Action Level (EAL) scheme. Therefore, the activity can be implemented without prior NRC approval.
X
b The activity does not continue to comply with the requirements of 10 CFR 50.47(b) or 10 CFR 50 Appendix E or the activity does constitute a reduction in effectiveness or EAL scheme change. Therefore, the activity cannot be implemented without prior NRC approval.
Part VII. Disposition of Proposed Change Requiring Prior NRC Approval
D
Will the proposed change determined to require prior NRC approval be either revised or Yes D No D rejected?
If No, then initiate a License Amendment Request in accordance 10 CFR 50.90, AD-LS-ALL-0002, Regulatory Correspondence, and AD-LS-ALL-0015, License Amendment Request and Changes to SLC, TRM, and TS Bases, and include the tracking number:
Printed : 02/25/2019 Page : 25
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 10 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Part VIII. Signatures: EP CFAM Final Approval is required for changes affecting risk significant planning standard 10 CFR 50.47(b)(4) (i.e., Emergency Action Levels and Emergency Action Level Bases). If CFAM approval is NOT required, then mark the CFAM signature block as not applicable (N/A) to indicate that signature is not required. Preparer Name (Print): Preparer Signature: Date: Staci White See GAS 2/7/2019
Reviewer Name (Print): Reviewer Signature: Date: See GAS See GAS See GAS
Approver (EP Manager) Name (Print): Approver Signature: Date: See GAS See GAS SeeCAS
Approver (CFAM, as required) Name (Print): Approver Signature: Date: N/A N/A N/A
If the proposed activity is a change to the E-Plan or implementing procedures, then create two EREG General Assignments. If required by Section 5.6, Submitting Reports of Changes to the NRG, then create two EREG General Assignments. • One for EP to provide the 10 CFR 50.54(q) summary of the analysis, or the completed 10 CFR 50.54(q),
to Licensing. • One for Licensing to submit the 10 CFR 50.54(q) information to the NRG within 30 days after the change
is put in effect.
QA RECORD
X
X
I Printed : 02/25/2019 Page : 26
((,DUKE '1!; ENERGY1:
I Action Request Details
Duke Energy ACTION REQUEST - 02256620
Type : EREG Orig Date : 02/07/2019 11 :05 Discovery Date Subject : RP/O/A/5000/003 Rev 54 Description CONTACT SITE EP SUPERVISOR FOR ASSISTANCE IN PREPARING EP01, EP02, AND EP03. ENSURE EREG IS
CROSS-REFERENCED TO THE REG AR WHICH INITIATED IT. Perform 50.54(q) screen and evaluation Notes
Priority Report To· Status : APPROVED 02/07/2019 Severity Due Date : 03/10/2019 Event Date
Originator : 144004 Originator Group Facility :CN Department : 13650 Organization
Owed To Owed To Group :QUALREVW OwedToFac :CN" Department Discipline
I Action Request Status History
Updated Date Updated By AR Status AR Due Date 02/07/2019 144004 INPROG 02/11/2019 02/07/2019 144004 APPROVED 02/25/2019 144004 02/25/2019 02/25/2019 144004 03/10/2019
I Action Request Attributes
Request Attribute Values Reqd Date -- -BOUNDED EREG AR N y 02/07/2019 Name : STACI N WHITE
Request Attribute Values Reqd Date -- -EREG AR CROSS XREF N y 02/07/2019 Name : STACI N WHITE
Request Attribute Values Reqd Date -- -REG AR CROSS XREF N y 02/07/2019 Name : STACI N WHITE
I Printed : 02/25/2019 Page : 1
/,DUKE vi ENERGY~
Duke Energy ACTION REQUEST - 02256620
I Action Request Notes
Action Request Routing/Return Comments
Routing Comments from the X601-Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel *** No Return Comments Found ***
I Action Request Approval Review
Route List : 001
Send Passport Fae Group / Type Date
~~~~~-I Action Request Trend/Cause
______ I Action Request Keywords
Keyword Keyword Description
I Action Request Reference Documents
Doc Sub Facility Type Type Document
I Action Request Reference Equipment
Equip Equip Facility Unit System Type Number
I Printed : 02/25/2019
Send Action Time Taken
Minor Sheet Rev Rev Title
Equip Tag
Updated On Updated By
Updated On Updated By
Route List Initiator : Action Date I Time Last Name
Equip Rev Status Rev Status
Page :2
j,DUKE -v!' ENERGY$
Duke Energy ACTION REQUEST - 02256620
I Action Request Cross References
Ref Ref Ref RefNbr Limit Type Nbr Sub Type Status AR Cls Description --AR 02214028 5AD COMP-NA N AR 02256534 PRR COMPLETE N AS 02187203 1900 GNRL COMPLETE N AS 02194997 0200 Pl COMPLETE N
I Action Request Assignment Details
ASSIGNMENT NUMBER : 01 SUB
Type : EP01 Due Date Reschedule
: 02/11/2019 Status Assigned To Subject
: COMPLETE : STACI N WHITE . : 50.54(Q) SCREEN
Aff Facility : CN UCR I: Organization Est Manhrs
Description
Unit Schedule Ref
Department : 13650
Ext Comp Date
COMPLETE 50.54(Q) SCREEN IN ACCORDANCE WITH AD-EP-ALL-0602.
Action Request Assignment Completion Notes
I approve the 50.54Q screen for RP/O/A/5000/003 rev.54
Action Request Assignment Status History
RP/O/A/5000/003 - 0000215963 ALERT RP/O/A/5000/003 rev 054 EP Excellence Plan - Action SD-EP-4.2 Revise AD-EP-ALL-0602 to improve templates to focus on why a
Pri Resp Fae Pri Resp Group Sec Resp Fae Sec Resp Group
System
Discipline
Updated Date Updated By Assgn Status Assgn Due Date 02/07/2019 144004 INPROG 02/07/2019 144004 02/11/2019 02/07/2019 144004 NTFY/ASG 02/07/2019 144004 ·ACC/ASG 02/07/2019 144004 AWAIT/C
j Printed : 02/25/2019 Page : 3
e_(,DUKE ~;ENERGY~
Duke Energy ACTION REQUEST - 02256620
02/08/2019 MEHARE COMPLETE
I Action Request Assignment Attributes
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel *** No Return Comments Found***
Action Request Assignment Completion Approval
Route List : 001
Passport DMBRUNS MEHARE
Fae Group I Type A A
Send Send Date Time - --02/07/2019 13:57 02/08/2019 14:14
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub
r
Updated On Updated By
Updated On Updated By
Route List Initiator : 144004 Action Action Taken Date / Time Last Name APPROVED 02/08/2019 14:14 BRUNSON APPROVED 02/08/2019 15:47 HARE
Minor
Facility Type . Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip Facility Unit System Type Number
I Printed : 02/25/2019
Equip Tag
Equip Rev Status Rev Status
Page :4
el_,DUKE 'V!; ENERGY,
Duke Energy ACTION REQUEST - 02256620
Action Request Assignment Cross References
Ref Ref Type Nbr
Ref RefNbr Sub Type
I Action Request Assignment Appendices
APPENDIX 1
I Printed : 02/25/2019
Limit Status AS Cls Description
!
Page : 5
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 1 of 8
« 10 CFR 50.54(q) Screening Evaluation Form»
BNP D
EREG #: _____ 2256620 ____ _ CNS X
CR3 D
HNP D
MNS D
5AD #:_2214028 ______ _ ONS D
RNP D
GO D
Document and Revision RP/O/Af5000/003, Alert, Rev 54 (PRR 2256534)
Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan):
Deleted the following steps:
2.8 Initiate Emergency Response Data System (EROS) transmission by performing the following: 2.8.1 Logan to the· SRO, BOP or OAC Room business computer on either unit. 2.8.2 Click the "EROS" Icon on the desktop. 2.8.3 Once the EROS logon window appears, enter the password (erds). 2.8.4 Once the EROS window appears, ensure the "Current Mode" value for the affected unit is "Disconnect". 2.8.5 Click on the "Connect (Activate)" button for the unit. 2.8.6 Click on "Yes" in the message box that appears. 2.8.7 The value of "Status" for the unit should soon change to "Transmitting Data" and the value of "Messages Sent" should begin incrementing. 2.8.8 IF EROS transmission will not co"nnect to the NRC, inform the NRC using ENS. The TSC Data Coordinator will troubleshoot and initiate ERS transmissi_on upon arrival in the TSC.
Enclosure 4.2, Command and Control Turnover Briefing Form, was revised to align with the Command and Control Turnover Form in AD-EP-ALL-0104, ERO Common Guidelines and Forms.
Specific Changes are: Added: "Mode Shutdown Date: ____ Time: ____ .. to each of the Unit Status blocks Added: "Take Cover Order: YES NO TIME: ___ _ Added: "Rapid Evacuation: YES NO TIME: ___ _ Added: "Last ENF Number: __ Added: "Continuous Communications with NRC Established: YES NO"
Deleted: "[] Stable [] Degrading [] Improving" from each of the Unit Status blocks Deleted: "EROS Activated: Yes No N/A" from each of the Unit Status blocks
Printed : 02/25/2019 Page : 6
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 2 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Changed: "Turnover: (From): [] CR/[] TSC" to "(From): [] CR/[] TSC/ [] EOF" Changed: "(TO) [] TSC / [] EOF" to "(TO) [] CR/[] TSC/ [] EOF Changed: "Units(s) Affected (circle) [] All [11 [12 [13" to "Units(s) Affected (circle) []1 []2 []3" Changed: "Last ENF Sent (time): __ " to" Last Notification completed (time):. ____ _ Changed: "Last Message Sent (time): " to "Notified (time): ___ _
Rev 53 Enclosure 4.2
En~losure 4.2
Command and Control Turnover Briefing Form izyi01A1sooo1003 Page 1 of2
Station:_( )CHS ,( ) MflS < joris ( ) BHP ( I Hl'IP ( )RNP Turnover. (circle) (From):· 0 CIR
(TO) 0 TSC
IO TSC
I OEOF Unit(s) Affected: (circle) ( )f,11 ( ) 1 ( 12{ )3 a ShiftChange
Emergency Classification: Unusual Event declared at EAL#;___ Alert Declared at EAL#: ___
Site Area Emergency declared at EAL t:: ___ General Emergency Declared at EAL#: ___
·, l .:· ,' ,
}.qriiff i. ,· t :. '.' .·:/' ,·, }/,: ... :· 'U!!!t~: • ,: .. ",",.\ •,..'" .:;:: :· \t .u11.ii3.:· ,:: , ,:' .. , ·: .. ,,>-~ ;. ,
RxPower Coot. RxCool Rx Cool
Rx Power Cont Rx Cool I Rx Cool Press Rl<Power
Cont. RxCool Rx Cool Press
Press ·Temp PreSS Press Temp Press Temp
0 Stable a Degrading a Improving
FPB Status (circle appropriate condltlon)
fuel lnt>ct Po!enllal loss loss
RCS Intact Po!enlial loss loss Cont Intact Potenllalloss Loss MajorEqui~t Out of Service:
Evo!uiioro in Progress:
ERDS Activated: Yes No NIA
Response Pioce<!ures iii Progress (optional):
stamm Prtorities:
SiteAssembly: YES NOTIME: ___ _ SiteEvacuation:YES NOTIME: ___ _
loca!!on/Comments:
Printed : 02/25/2019
'I 0 Stable a Degrading (:' Improving 0 Stable ~ Degra<frng a Improving
FPB Status (circle appropriate condiiion) FPB Status (circ[e appropriate condition)
Fuel Intact Polenlial Loss loss Fuel Intact Potential loss Loss
RCS Intact Potential Loss l<JSS RCS Intact Potential l<JSS Loss Ci>nt Intact Potenlial Loss Loss Cont Intact Potential Loss Loss Major Equipment out of Service: Major Equipment out of Service:
Evolutions in Progress:
ERDS Activated: Yes
Evolutions in Progress:
No tlfA EROS Acfivaied: Yes No NIA EOP/APs in Progress (cplional):
Ottler Agency !nvolven\ent:
IJ MEDICAL fl FIRE IJ lAW ENFORCEMENT IJ OTHER Ad<lilional lnformafion (Injuries):
Page :7
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Printed
Enc~osun• 4.2
,command and Control Tumo,·er Bl'iefing Form
Radiological: Emergency Woll<er dose rllllits aJ?Proved: YES NO Who
Release in Progre= YES NO ReldMoniloringTeamsDeployed: YES NO Number ___
Release Pa1mvay: WIND SPEED: lfollNO DIRECTION:
Offsite PARS Recommended: YES. NO.Zones Evaeuated: Zones Shel!ered:
RPIO!A/5000/003 Page2of2
Kl Recommended: YES NO Curren! Dose Run Available: YES NO Have Dooe Assessors discussed Turnover? YES NO
OH-Sile Notifications: last ENF Seni {lime}: Next ENF Due (time):
l'IRC Communication: Last Message Sent {time):
Have Cornmunica!O<s (!iscussed Tumove, With acquiring facility Communicators? YES t.O
Upon the transf~r of Command and Control, th·e following w/11 be performed by:
Event Cf<!ssificatt.?n: CJ CR CJTSC pAR Decision Making: CJ CR CJ TSC CJ EOF
state and Local Nofilicatioil: CJ CR CJ TSC CJ EOF NRC Notifications: El CR CJTSC
Emergency Exposure controls & Kt: CJ c~ CJ TSC Control of FMrs: CJ CR CJ TSC CJ EOF '. Dose Assessment CJ CR CJ TSC CJ EOF
Name of rmrlVidtia1 turning .,.,.,. Duties:
Tumm-er Complete: YES NO TSC I EOF Activated at ·(cire!e) (circle) Time Date Haine individual assuming duties
Adclruonal lnfonnation:
: 02/25/2019
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 3 of 8
Page : 8
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 4 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Rev 54 Enclosure 4.2
Enclosure 4.2
Command and Control Tmnover Briefing Fonn RP;()/A/5000/003
Page00of~
I Station: a BNP DCNS a HNP DMNS DONS [] RNP Turnover: (From): a CR I [] TSC I a EOF
(TO) a CR I [] TSC I a EOF Unit(s) Affected: [] 1 [] 2 []J a Shift Change
Emergency Classification: Unusual Ewnt Dedared at EAL#: Alert Dedared at EAL#:
Site P.ea Emergency Declared at EAL#: General Emergency Dedared at EAL#: ___
;· ','_ ,·,/ .,::. , ; .i'.;Uni!f ; ; .. ,,> :, '\ :s ,. ·-,• > ~, ~,, ::: :-·· ',Unl(2'·1: .•. ,... ··- ,, ..
I'· ;:_ •.t; ";;5 •. :untt;;i .,,; ,, _C'''•: J wp:,· :'It ''';')< . ' ,. .. ·. . ,·: . . . .. .• . '
RxPower Cont RxCool RxCool RxPower
Cont Rx Cool Rx Cool Press RxPower Cont Rx Cool Rx Cool Press Press Temp Press Press Temp Press Temp
Mode --- Shutdown Date: __ Time: __ Mode --- Shutdown Date: __ Time: __ Mode --- Shutdown Date: __ Time: __
FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) FPB Status (circle appropriate condition)
Fllel Intact Potenfial Loss Loss Fllel Intact Polenfial Loss Loss Fllel Intact Potenfial Loss Loss
RCS Intact Potenfial Loss Loss RCS Intact Potenfial Loss Loss RCS Intact Potenfial Loss Loss Cont Intact Potenfial Loss Loss Cont Intact Potenfial Loss Loss Cont Intact Potenfial Loss Loss Major Equipment out of Service: Major Equipmentout of Service: Major Equipmentout of Service:
Ewlufions in Progress: Ewlufions in Progress: Ewlufions in Progress:
EROS Activated: Yes No NIA ERDS Acfivated: Yes No N/A ERDS Acfivated: Yes No N/A
Response Procedures in Progress (opfional): EmergencyfAbnormal Procedures in Progress (opfional):
Slafion Priorifies:
Printed : 02/25/2019 Page : 9
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 5 of 8
Site Assembly: YES
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Enclosure 4.2
Command and Control Turnover Briefing Form
NO TIME: Location/Comments:
RPIO/NS000/003
Page~of~
otller Agency Involvement:
Site Evacuation: YES NOTIME: a ~DICAI.. a FIRE a LAW ENFORCEMENT a OTHER AddiJ;onal lnformafion (Injuries): Take Cover Order: YES NO TIME:
Rapid Evacuation: YES NOTIME:
Radiological: EmergencyWorker dose limits approved: YES NO For whom:
Release in Progress: YES NO Field Monitoring Teams Deployed: YES NO Number
Release Pathway: WIND SPEED: WIND DIRECTION:
Offsite PARS Recommended: YES NO Zones Evacuated: Zones Sheltered:
Kl Recommended: YES NO Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES NO
Off-Site Notifications: Last Notification Completed (fime): Last ENF Number: -- NeJ<! ENF Due (time):
NRC Communication: Notified (time): Continuous Communications with NRC Established: YES NO
Have Communicators discussed Turnover with acquiring facilit;, Communicators? YES NO
Upon the transfer of Command and Control, the following will be performed by:
Event Classificafion: DcR DTsc PAR Decision Making: DcR DTscDEoF
State and Local Nofificafion: DcR DTscDEoF NRC Notifications: DcR DTsc
Site Emergency8qlosure Controls & Kl: DcR DTsc Control ofFMTs: DcR DTscDEoF
Dose Assessment DcR DTscDEoF
Name of Individual turning over Duties:
Turnover Complete: YES NO TSC/EOF Activated at
(circle) (circle) Time Date Name individual assuming duties
Aclclitional Information:
Part II. Activity Previously Reviewed? Is this activity Fully bounded by an NRC approved 10 CFR 50.90 submittal or Alert and Notification System Design Report?
If yes, identify bounding source document number or approval reference and ensure the basis for concluding the source document fully bounds the proposed change is documented below:
Justification:
Bounding document attached (optional)
Printed : 02/25/2019
D
10 CFR 50.54(q) Effectiveness Evaluation is not required. Enter justification below and complete Attachment 4, Part V.
Continue to Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part III
Page : 10
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 6 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Part Ill. Editorial Change
Is this activity an editorial or typographical change only, such as formatting, paragraph numbering,-spelling, or punctuation that does not change intent?
Justification:
Yes D
10 CFR 50.54(q) Effectiveness Evaluation is not required. Enter justification and complete Attachment 4, Part V.
No X
Continue to Attachment 4, Part IV and address non editorial changes
Part IV. Emergency Planning Element and Function Screen (Reference Attachment 1, Considerations for Addressing Screening Criteria) Does this activity involve any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II? If answer is yes, then check box.
Responsibility for emergency response is assigned.
The response organization-has the staff to respond and to augment staff on a continuing basis (24-7 staffing) in accordance with the emergency plan.
3a Arrangements for requesting and using off site assistance have been made.
3b State and local staff 9an be accommodated at the EOF in accordance with the emergency plan. (NA for CR3)
X
D
Sa Procedures for notification of State and local governmental agencies are capable of alerting them of the D declared emergency within 15 minutes (60 minutes for CR3) after declaration of an emergency and providing follow-up notification.
Sb Administrative and physical means have been established for alerting and providing prompt instructions D to the public within the plume exposure pathway. (NA for CR3)
Sc The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. (NA for CR3)
D
Printed : 02/25/2019 Page :11
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 7 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Part IV. Emergency Planning Element and Function Screen (cont.)
6a Systems are established for prompt communication among principal emergency response organizations.
6b Systems are established for prompt communication to emergency response personnel.
7a Emergency preparedness information is made available to the public on a periodic basis within the plume exposure pathway emergency planning zone (EPZ). (NA for CR3)
D
D
D
7b Coordinated dissemination of public information during emergencies is established. D
z'$}i:; .. /Jq~¢~~-~~::17Jb,){~j:}~_rrietg·~:n'.cy'.f~9!!.iJi~sa'.@:~g~'.iR}h'eof.;;}Jfit:t, '. ·-:~·):,. •·_,,,::t::·f. ·. ·/Ji/··";;,0:}ir:, ~. ·1 iFi . ·:'{~,,;,' ., Ba Adequate facilities are maintained to support emergency response. D
8b Adequate equipment is maintained to support emergency response. D
9a Methods, systems, and equipment for assessment of radioactive releases are in use. D
1 Oa A range of public PARs is available for implementation during emergencies. (NA for CR3) D
1 Ob Evacuation time estimates for the population located in the plume exposure pathway EPZ are available D to support the formulation of PARs and have been provided to State and local governmental authorities. (NA for CR3)
1 Oc A range of protective actions is available for plant emergency workers during emergencies, including D
10d
those for hostile action events.
Kl is available for implementation as a protective action recommendation in those jurisdictions that chose to provide Kl to the public.
D
11a The resources for controlling radiological exposures for emergency workers are established. D
.Jt. , 19:ifR: §q:1i(1:>)d?tJvlec;ti¢~1:.ahc1 .• ~~-~rJc !{~~1th §~PP,9rt,: / ./ .\; . · /.,:·: ,. ,.,,: ~:/ , . 2 •.• : i.>· ".:·; .:: . ,: .~: .. 12a Arrangements are made for medical services for contaminated, injured individuals. D
13a
14
14a
14b
Plans for recovery and reentry are developed.
,,,
A drill and exercise program (including radiological, medical, health physics and other program areas) is established.
Drills, exercises, and training evolutions that provide performance opportunities to develop, maintain, and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses.
D
D
D
14c Identified weaknesses are corrected. D
;.,,
)s/i~ ::19:qtR5Q':41;(p)(15)):hl~rIJ~hcy,:R~~po6se,1irair:,i119'.J!I' '' ··~f:y; ,,{){;'::,::' '.:j;;:"r \•(,:}!/' ., ': ·!':15~," >,)Jt'., '' (,::{,j;:Z, 15a Training is provided to emergency responders. D
Printed : 02/25/2019 Page : 12
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 8 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Part IV. Emergency Planning Element and Function Screen (cont.)
16a Responsibility for emergency plan development and review is established.
16b Planners responsible for emergency plan development and maintenance are properly trained . .• ·, ,. :·;< ·- ••
PART IV. Conclusion If no Part IV criteria are checked, then provide Justification and complete Part V below.
If any Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part IV criteria are checked, then complete Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part \J and perform a 10 CFR 50.54(q) Effectiveness Evaluation. Program Element 4a requires final approval of Screen and Evaluation by EP CFAM.
Duke Energy has transitioned to an "always-on" mode of EROS transmission, making the steps to activate EROS unnecessary. A Controlled Support Document (CSD) for EROS troubleshooting has replaced the steps to activate EROS. Deletion of the EROS Activation steps does not affect any of the 50.47(b) emergency planning standards, as EROS is addressed in 10 CFR Appendix E to Part 50 in section VI, Emergency Response Data System, not in the 50.47(b) Planning Standards.
With regard to 10 CFR Appendix E to Part 50 in section VI, EROS remains a direct near real-time electronic data link between the licensee's onsite computer system and the NRG Operations Center, and the features listed in Section VI are maintained: the testing method and frequency; the software and hardware; the selected plant parameters; and the transmission rate.
No further evaluation of the removal of the EROS steps is required by 50.54(q).
D
D
D
X
Part V: Sigoature~: · ,· · · ··. > ·. ·· ·· ·· :· ·. '/ '. EP CFArv(Final Approval i$ .required fdr gh~riges.affecting J~rbgra,m_ EIJm.ept 4a:- If CFAM ~pprciva,I· is. NOT'.requjred;
.Jh¢~:m~r~::th.e,1=P·.9E/.\f){f §i9J?~Wte blc,~k.~§~g/2t.13p:p1ic~~1t:t~!t9-t<?'Jrtdis~!f tr~L~Jgrt~(qt~:!.~~:~:2t J(:iquir~A,,: ::;tfr: :; ,' ' .. Preparer Name (Print): Staci White
Reviewer Name (Print): See GAS
Approver (EP Manager Name (Print): See GAS Approver (EP CFAM, as required) Name (Print) N/A
QARECORO
Printed : 02/25/2019
Preparer Signature: Date: See GAS See GAS Reviewer Signature: Date: See GAS SeeCAS Approver Signature: Date: See GAS See GAS Approver Signature: Date: N/A N/A
Page : 13
el_,DUKE 'V!i ENERGY*
Duke Energy ACTION REQUEST - 02256620
-~IA_m_io_n_R_eq_u_e_s_t_A_s_s_ig_n_m_e_n_t_D_e_ta_n_s _____ ,_ _________________ ~I ASSIGNMENT NUMBER : 02 SUB :
Type Status Assigned To Subject
Aff Facility UCR
: EP02 : COMPLETE : STACI N WHITE
: 50.54(0) EVALUATION
:CN
Due Date Reschedule
Unit Schedule Ref
: 02/11/2019
. Organization
Est Manhrs Department : 13650 Ext Comp Date
Description COMPLETE 50.54(0) EVALUATION IN ACCORDANCE WITH AD-EP-ALL- 0602.
Action. Request Assignment Completion Notes
I approve the 50.540 eval for RP/O/A/5000/003 rev 54.
Action Request Assignment Status History
Updated Date . Updated By Assgn Status Assgn Due Date 02/07/2019 144004 INPROG 02/07/2019 144004 02/11/2019 02/07/2019 144004 NTFY/ASG 02/07/2019 144004 ACC/ASG 02/07/2019 144004 AWAIT/C 02/08/2019 DMBRUNS ACC/ASG 02/08/2019 144004 AWAIT/C
02/08/2019 MEHARE COMPLETE
. I Action Req~est Assignment Attributes
I Printed : 02/25/2019
Pri Resp Fae
Pri Resp Group Sec Resp Fae Sec Resp Group
System
Discipline
Page : 14
(-,DUKE "e ENERGYt
Duke Energy ACTION REQUEST - 02256620
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel Minor editorial comments. -DMB
Routing Comments from the X602 Panel *** No Return Comments Found ***
Action Request Assignment Completion Approval
Route List : 001
Fae Group I Type A
A
Send Send
Date Time -- --02/07/2019 14:03
02/08/2019 14:14
Action Action
Updated On 20190208
Updated On
Updated By DMBRUNS
Updated By
Route List Initiator : 144004
Taken Date / Time Last Name RETURNED 02/08/2019 13:52 BRUNSON
APPROVED 02/08/2019 15:50 HARE
Passport DMBRUNS
MEHARE DMBRUNS A 02/08/2019 13:56 APPROVED 02/08/2019 14:14 BRUNSON
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub Minor · Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip
Facility Unit System Type Number
Equip
Tag
Action Request Assignment Cross References
Ref Ref Type Nbr
I Printed : 02/25/2019
Ref RefNbr Sub Type Status
Limit
Equip
Status
AS Cls Description
Rev
Rev Status
. Page : 15
ef,DUKE vlENERGYo
Duke Energy ACTION REQUEST - 02256620
Action Request Assignment Appendices
APPENDIX 1
I Printed : 02/25/2019 Page : 16
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
EREG #:_2256620 ______ _
SAD #: _____ 2214028 ____ _
Document and Revision RP/O/A/5000/003, Alert, Rev 54 (PRR 2256534)
Part I. Description of Proposed Change:
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 1 of 10
CNS X
CR3 D HNP D MNS D ONS D
RNP D
GO D
Enclosure 4.2; Command and Control Turnover Briefing Form, is being revised to align with the Command and Control Turnover Form in AD-EP-ALL-0104, ERO Common Guidelines and Forms.
Specific Changes are: Added: "Mode · -·· · Shutdown Date:_. ___ Time: ____ " to each of the Unit Status blocks Added: "Take Cover Order: YES NO TIME: __ _ Added: "Rapid Evacuation: YES NO TIME: ---Added: "Last ENF Number: __ Added:"Continuous Communications with NRC Established: YES NO"
Deleted:"[] Stable [] Degrading [] Improving" from each of the Unit Status blocks Deleted: "EROS Activated: Yes No N/A" from each of the Unit Status blocks
Changeg: "Turnover: (From): [] CR/ [] TSC" to "(From): [] CR/ [] TSC/ [] EOF" Changed: "(TO) [] TSC / [] EOF" to "(TO) [] CR/ [] TSC/ [] EOF Changed: "Units(s) Affected (circle) [] All []1 []2 []3" to "Units(s) Affected (circle) []1 []2 []3" Changed:·"Last ENF Sent (time): __ " to" Last Notification completed (time): ____ _ Changed: "Last Message Sent (time): " to "Notified (time):. ___ _
I Printed : 02/25/2019 Page : 17
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 2 of 10
Rev 53 Enclosure 4.2
Printed
Endosme4.2
Command and Control Turno,er Briefing Form RPIO/A/SQ00/003 Pagel of2 .
station: ( I CIIS I )MNS t 1011s ( )BU~
Unit(s) Affected: (circle! ( )All I 11 ( )2( j3
Emergency Classification: Unusual Event de.Jared at
Sile Area Emergencydeclaredat
un1t·1 RxPower
Cont Rx Cool Rx Cool Press Temp Press
a Stable a Degrading a lf1llll0¥ing
FPB Status (circle appropriate condition) Fuel Intact Potenlial Les<> loss RCS Intact Potenli:?I Loss Loss Cont Intact Potential Loss Loss Major Equipment Out of Se!Vice:
Evo!uli'ons in Progress:
EROS Activated: Yro No NIA Response Procedures in Progress (optional):
station Priorities:
SiteAssembly: YES IIOTIME: ___ _ Site Evacuation:YES NO TIME: ___ _ lcicalion/Comments:
: 02/25/2019
( )HllP ( )RflP Turnover. (circle! (From): a CIR / 0 TSC
{TO) 0 TSC I DEOF
a Shift Change EAL#: ___ Alert Declared at EAL#c ___
EAl #: ___ General Emergency Declared at EAL#: ___
Unit~ .Qn~J Rx Power Cont Rx Cool
Rx Cool Press Rx Power Cont Rx Cool
Rx Cool Press Press Temp Press Temp
a S1able a ~ding a Improving 0 Stable a Degrading a Improving FPS Status (circle appropriate condition) FPB Status (circle a11propriate conaltion) Fuel Intact Potenllal Loss Loss Fuel Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Po!enfia!Loss Loss Cont Intact Po!entiaJ Loss Loss Cont Intact Potenlial loss Loss Major Equipment.Out of Service: Major Equipment Out of Service:
Evolutions in Progress: Evolutions in Progress:
EROS Actiw!ed: Yro No NIA EROS Activated: Yes No NIA EOPIAPs in Progress (oplfonal):
Other Agency [nvolvement a MEDICAL a FIRE a LAW ENFORCEMENT a OlttER Addraonal lnformalion (Injuries};
Page : 18
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Printed
Endosun, 4.2
-Command and Control Turnonr Btiefing Form
Radiological: Eme,gency Wor!cer dose limits approved: YES NO Who
Release in Progress: YES NO Field Monilllling Teams Deployed: YES NO Number ___
Release Pa111way: WINDSPEED: WIND DIRECTION:
Offsite PARS Recommended: YES NO Zones EYl!?Ja!ed: Zones Shellered:
Iq>/O/A/5000/003 Page2of2
Kl Recommended: YES NO Cwrent Dose Run Availab!e: YES NO Have Dose Assessors discussed Turnover? YES NO
Off-Site Notifications: Last ENF Sent (time): Next ENF Due (fime):
IIRC Communication: Last Message Sent (lime):
Have Communicators discussed Turnover witt, acquiring facility Communica!ors? YES NO
Upon the transfer of Command and Control, the folloWing w_iD be performed by: Event Classification: OCR [J TSC PAR Decision Making: [J CR 1:1 TSC [J EOF State and Local Notification: [J CR [J TSC [J EOF NRC Notifications: 1:1 CR 1:1 TSC Emergency Exposure Controls & Kl: 1:1 CR [J TSC Control of FMTs: [J CR [J TSC [J EOF Dose Assessment [J CR [J TSC [J EOF
Name of !n<fr.idual lnming cr;er Duties:
TW1l0\'er Complete: YES NO TSC / EOF Activated at (cm:reJ (circle) r1me Date Harne individual assuming duties
Adcfllional Information:
: 02/25/2019
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 3 of 10
Page : 19
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 4 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Rev 54 Enclosure 4.2
Enclosure 4.2
Command and Control Turnover Briefing Form RP/0/A/5000/003 Page00of~
I Station: a BNP OCNS OHNP DMNS DONS ORNP Turnover: (From): a CR I a TSC I a EOF
(TO) a CR I a TSC / a EOF Unit{s) Affected: 01 02 03 a ShiftChange
Emergency Classification: Unusual Ewnt Dedared at EAL#: Alert Dedared at EAL#:
Sile Plea Emergency Dedared at EAL#: General Emergency Dedared at EAL#: ___ ,,,, .~,<':·" 'r-?: ~r·· ;· .:"'un« 1_,_ ;,;, '·-·.· ,'' '"_i,,_;"·'',4'' ·' •, ~·. ,,~, .. , ~r ,•;;,, '.llruf2., :;,!•,,-_--~--- •";r--· ·r_"!"' ", .,,,, '."'"· ·:< ' ')ilftts:1
,, ,. ... ·"•' .. ·.,.,,._ . ' Rx Power Conl Rx Cool RxCool RxPower
Conl RxCool Rx Cool Press RxPower Conl Rx Cool
Rx Cool Press Press Temp Press Press Temp Press Temp
Mode --- Shutdown Date: __ Time: __ Mode --- Shutdown Dale: __ Time: __ Mode --- Shutdown Date: __ Time: __ FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Polenti al Loss Loss Cont Intact Potential Loss Loss Major Equipment out of Service: Major Equipment Out of Service: Major Equipment Out of Service:
E\JOlutions in Progress: E\JOIUfions in Progress: E\JOIUfions In Progress:
EROS Activated: Yes No NIA EROS Activated: Yes No NIA EROS Activated: Yes No NIA Response Procedures in Progress (optional): Emergency/Abnormal Procedures in Progress (optional):
Station Priorities:
Printed : 02/25/2019 Page : 20
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 5 of 10 << 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Site Assembly: YES NOTIME:
Enclosure 4.2
Command and Control Turnover Briefing Fonn
Location/Comments:
RP/O!A/5000/003 Page~of!
other Agency Involvement: Site Evacuation: YES NO TIME: CJ MFl:ICAL CJ FIRE CJ LAW ENFORCEMENT CJ OTHER Take Cover Order: YES NOTIME: Addi nal Information (Injuries): Rapid Evacuation: YES NOTIME:
Radiological: Emergency Worker dose limits approved: YES NO Forwhom:
Release in Progress: YES NO Field Monitoring Teams Deployed: YES NO Number
Release Pathway: WIND SPEED: WIND DIRECTION: Ollsite PARS Recommended: YES NO Zones Ewcuated: Zones Sheltered:
Kl Recommended: YES NO Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES NO Off-Site Notifications: Last Notification Completed (time): LastENF Number: -- Ne:<! ENF Due (time): NRC Communication: Notified (time): Continuous Communications with NRC Established: YES NO Have Communicators discussed Turnover with acquiring facility Communicators? YES NO Upon tile transfer or Command and Control, the following will be performed by: Event Classification: DcR DTsc PAR Decision Making: DcR 0Tsc0EoF State and Local Notification: DcR 0Tsc0EOF NRC Notifications: DcR 0Tsc Site EmergencyElqlosure Controls & Kl: DcR DTsc Control of FMTs: DcR DTscDEoF Dose Assessment DcR DTscDEoF
Name oflndi~dual turning over Duties:
Turnover Complete: YES NO TSC/EOF Activated at (circle) (circle) Time Date Name individual asswning duties Additiona I Information:
Attachment 6, 10 CFR 50.54(q) Initiating Condition (IC) and Emergency Action Level (EAL) and EAL Bases Validation and Verification (V&V) Form , is attached (required for IC or EAL change) Yes D No X
Part II. Description and Review of Licensing Basis Affected by the Proposed Change:
Licensing Basis of the ERO
The Assignment of Responsibilities is described in the originally approved CNS Emergency Plan, Revision 2 (dated January 1983), sections A.1.b, Concept of Operations, A.1.c, Block Diagram of Organization Interrelationships, and A.1.d, Key Decision Making.
The current licensing basis regarding Assignment of Responsibility is described in CNS Emergency Plan Section A, Revision 150 (dated September 2017) sections A.1.b, Concept of Operations, A.1.C, Block Diagram of Organization Interrelationships, and A.1.d, Key Decision Making.
Printed
During revisions to these sections, the titles of some of the Emergency Response personnel and facilities have changed (i.e., Shift Supervisor to Shift Manager, Crisis Management Center to Emergency Operations Facilit ), but the individuals res onsible for Command and Control and the transfer rocess for
: 02/25/2019 Page :21
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 6 of 10
Command and Control has remained the same. The summation of the incremental changes over time do not reduce the effectiveness of the CNS Emergency Plan when compared to the NRG-approved Plan.
Section P, Responsibility for the Planning Effort, in the CNS Emergency Plan, Revision 2, lists RP/O/Af5000/003, as an implementing procedure. (AD-EP-ALL-0104 had not been created when the CNS Emergency Plan was initially approved by the NRC.)
Section P, Responsibility for the Planning Effort, in the CNS Emergency Plan, Revision 147, lists RP/O/Af5000/003, and AD-EP-ALL-0104 as implementing procedures.
List Commitments Associated with the Change A search to identify site specific commitments related to the ERO positions and their assigned responsibilities was performed. No site specific commitments were identified aside from those in the Emergency Plan. RG 1.219 Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors, Rev 1. (July 2016) 3.5 Emergency Plan
Printed
a. '.'Emergency plan" means the document(s) that the licensee prepared and maintains that identifies and describes its methods for maintaining emergency preparedness and responding to emergencies. An emergency plan includes the plan that the NRC originally approved and all subsequent changes that the licensee made with and without prior NRC review and approval under 10 CFR 50.54(q). See 10 CFR 50.54(q)(1 )(ii) for additional information.
b. This definition highlights that "emergency plan" includes the documents that describes the programmatic methods that the licensee uses to maintain emergency preparedness and to respond to emergencies. These methods, or program elements, are the implementation aspects of the planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50 and generally correspond to the evaluation criteria of NUREG-0654 or approved alternatives that supply specific acceptable methods for complying --' - with the planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50. Such programmatic documents are subject to the 10 CFR 50.54(q) change process. Non-programmatic documents, such as training rosters, equipment and maintenance test reports, lesson plans, and other documents that "document the performance" of the program elements, as opposed to those that "establish" the program elements, are not included.
c. Ordinarily, sub-tier documents such as emergency plan implementing procedures (EPIPs) are not considered to be part of an emergency plan for the purpose of evaluating proposed changes. If a licensee relocates a programmatic description from the emergency plan to a sub-tier document, that programmatic description continues to be subject to the 10 CFR 50.54( q) change process. For example, licensees have relocated the details of emergency classification schemes from the emergency plan to an EPIP or to large wall charts maintained in the control room. Because the EPIP or wall chart is now the means to demonstrate compliance with the planning standards in 10 CFR 50.47(b)(4), these sub-tier documents are subject to 10 CFR 50.54(q). Repeating, as opposed to relocating, program element descriptions in sub-tier documents do not necessarily make the sub-tier documents subject to the 10 CFR 50.54(q) change process. However, the descriptions in the various documents must remain consistent.
e. This definition also highlights the need to consider the NRG-approved plan and the subsequent changes in reviewing against 1 O CFR 50.54(q) to ensure that a series of incremental changes (each determined not to reduce the effectiveness of the plan) do not reduce the effectiveness of the plan when compared to the
: 02/25/2019 Page :22
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
NRG-approved plan.
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 7 of 10
The differences in approved revisions and the current revisions of the Emergency Plans have been reviewed and they have been determined to meet the regulatory requirements required during revisions. Each revision has been reviewed by the NRC during the inspection process.
Part Ill. Description of How the Proposed Change Complies with Regulation and Commitments. If the emergency plan, modified as proposed, no longer complies with planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50, then ensure the change is rejected, modified, or processed as an exemption request under 10 CFR 50.12, Specific Exemptions, rather than under 10 CFR 50.54( q):
The changes made to the Command and Control Turnover Briefing Form continue to support the assignment of responsibility by aligning the Command and Control Turnover Briefing Form between the two procedures currently used by the Shift Manager, TSC Emergency Coordinator and EOF Director. Aligning the content of these two forms to be identical contributes to each individual understanding the status of the emergency in an efficient manner, and reduces the potential for human error during the turnover process.
The changes described continue to meet NRC requirements as described in 10 CFR 50.47(b) and 10 CFR 50, Appendix E and Emergency Plan Sections A and P. ·
Printed : 02/25/2019 Page :23
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 8 of 10
Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change (Address each function identified in Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part IV of associated Screen):
The following portion of planning standard §50.47(b)(1) is related to the change: Primary responsibilities for emergency response by the nuclear facility licensee have been assigned, and each principal response organization has staff to augment its initial response on a continuous basis. The function for §50.47(b)(1) related to this change are: a. Responsibility for emergency response is assigned.
Appendix E to Part 50 lists the following: IV. Content of Emergency Plans A. Organization The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency. Specifically, the following shall be included: 1. A description of the normal plant operating organization.
2. A df}scription of the onsite emergency response organization (ERO) with a detailed discussion of: a. Authorities, responsibilities, and duties of the individual(s) who will take charge during an emergency;
The NUREG-0654 Part II.A elements for §50.47(b)(1) related to this change are: A.1.d. Each organization shall identify a specific individual by title who shall be in charge of the emergency response. A.2. Each principal organization shall be capable of continuous (24-hour) operations for a protracted period. The individual in the principal organization who will be responsible for assuring continuity of resources (technical, administrative; and material) shall be specified by title.
Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan Functions:
The changes made to the Command and Control Turnover Briefing Form continue to support the assignment of responsibility by aligning the Command and Control Turnover Briefing Form between the two procedures currently used by the Shift Manager, TSC Emergency Coordinator and EOF Director. Aligning the content of these two forms to be identical contributes to each individual understanding the status of the emergency in an efficient manner, and reduces the potential for human error during the turnover process.
The description of the authorities, responsibilities and duties of the individual(s) who will take charge in an emergency is maintained. There is no reduction in effectiveness of the CNS Emergency Plan.
Printed : 02/25/2019 Page : 24
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< ·10 CFR 50.54(q) Effectiveness Evaluation Form>>
Part VI. Evaluation Conclusion. Answer the following questions about the proposed change. 1 Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E? 2 Does the proposed change maintain the effectiveness of the emergency plan (i.e., no reduction in effectiveness)?
3 Does the proposed change maintain the current Emergency Action Level (EAL) scheme? 4 Choose one of the following conclusions:
AD-EP-ALL-0602
Rev. 5
ATIACHMENT5 Page 9 of 10
YesX NoD
YesX No D
YesX No D
a The activity do13s continue to comply with the requirements of 10 CFR 50.47(b) and 10 CFR 50, Appendix E, and the activity does not constitute a reduction in effectiveness or change in the current Emergency Action Level (EAl-) scheme. Therefore, the activity can be implemented without prior NRC approval. X
b The activity does not continue to comply with the requirements of 10 CFR 50.47(b) or 10 CFR 50 Appendix E or the activity dc;>es constitute a reduction in effectiveness or EAL scheme change. Therefore, the activity cannot be implemented without prior NRC approval.
Part VIL Disposition of Proposed Change Requiring Prior NRC Approval
D
Will the proposed change determined to require prior NRC approval be either revised or Yes D No D rejected?
ff No, then initiate a License Amendment Request in accordance 10 CFR 50.90, AD-LS-ALL-0002, Regulatory Correspondence, and AD-LS-ALL-0015, License Amendment Request and Changes to SLC, TRM, and TS Bases, and include the tracking number:
Printed : 02/25/2019 Page :25
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
5'. :· t :.::::"~ " '·, / .,. ' " .. ,, .. "li .,,, ,.;· -~, ' if ·'J ,, . :, ··i·. . ... , ~~-. .... - ··, ...... ,;·. ·- .. ,· ": . . ·. ,,,··•·r •: ."' ... ,.· ...
-s• . . . . .. . ~-- ~ - .. 0 •' . .. ,.
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 10 of 10
-.· ., .... -;: , '. ~
-· - '" .. .... Part VIII. Signatures: EP CFAM Final Approval is required for changes affecting risk significant planning standard 10 CFR 50.47(b)(4) (i.e., Emergency Action Levels and Emergency Action Level Bases). If CFAM approval is NOT required, then mark the CFAM signature block as not applicable (N/A) to indicate that signature is not required. Preparer Name (Print): Preparer Signature: Date: Staci White See GAS 2/7/2019
Reviewer Name (Print): Reviewer Signature: Date: See CAS See GAS See CAS
Approver (EP Manager) Name (Print): Approver Signature: Date: SeeCAS See CAS See GAS
Approver (CFAM, as required) Name (Print): Approver Signature: Date: NIA N/A NIA • -;s~ .. . .
·' ·,:; ... . ;,
•' ·., .. · ... , .. ,< ,· . . . ·: . .. ., .. - -,, . . .. '.. ·.; {";; /.,
,, . ·. - ,;:, . ·.,·.: , ' .• ,:', .,; ,.,, ,:.' t: ; ·; •. .'L ·; .. ·~-·:,; If the proposed activity is a change to the E-Plan or implementing procedures, then create two EREG General Assignments. If required by Section 5.6, Submitting Reports of Changes to the NRG, then create two EREG General Assignments.
• One for EP to provide the 10 CFR 50.54(q) summary of the analysis, or the completed 10 CFR 50.54(q), X to Licensing.
-• One for Licensing to submit the 10 CFR 50.54(q) information to the NRC within 30 days after the change is put in effect. X
QA RECORD
I Printed : 02/25/2019 Page :26
Duke Energy ACTION REQUEST - 02256620
I Action Request Assignment Details
ASSIGNMENT NUMBER : 04 SUB :
Type status Assigned To Subject
Aff Facility UCR Organization EstManhrs
Description
:GNRL :ACC/ASG -~ : STACI N WHITE ·
Due Date Reschedule
: 02/25/2019
: PROVIDE 50.54(Q) INFO TO LICENSING FOR NRC 30 DAY SUBMITTAL
:CN Unit Schedule Ref Department : 13650 Ext Comp Date
Pri Resp Fae Pri Resp Group Sec Resp Fae Sec Resp Group
System
Discipline
THE REGULATION AT 10 CFR 50.54(Q)(5) REQUIRES THE LICENSEE TO SUBMIT, AS SPECIFIED IN 10 CFR 50.4(8)(5)(11), A REPORT OF EACH CHANGE TO THE EMERGENCY PLAN MADE WITHOUT PRIOR NRC APPROVAL, . ' INCLUDING A SUMMARY OF ITS ANALYSIS, WITHIN 30 DAYS AFTER THE CHANGE IS PUT IN EFFECT. THE NRC HAS STATED THAT THE SUMMARY REPORT OR A FULL COPY OF THE COMPLETED 50.54(Q) MAY BE SUBMITTED TO SATISFY THIS REQUIREMENT. SUBMIT TO LICENSING, A SUMMARY, AS DESCRIBED IN AD-EPALL- 0602, OR THE FULL 50.54(Q) REVIEWING ALL CHANGES TO THE EMERGENCY PLAN MADE WITHOUT PRIOR ·- NRC APPROVAL FOR SUBMITTAL TO THE NRC'S DOCUMENT CONTROL DESK, WITH A COPY TO THE APPROPRIATE REGIONAL OFFICE, AND A COPY TO THE APPROPRIATE NRC RESIDENT INSPECTOR. IF THE COMMUNICATION IS ON PAPER, THE SUBMISSION TO THE DOCUMENT CONTROL DESK MUST BE THE SIGNED· ORIGINAL.
Action Request Assignment Completion Notes
Action Request Assignment Status History
Upd~ted Date.·' 02/07/2019 02/25/2019 02/25/2019 .
Updated By 144004 144004 144004
l Printed : 02/25/2019
Assgn Status INPROG
ACC/ASG
Assgn Due Date
02/25/2019
Page :27
e._{,DUKE V:~ENERGY,
Duke Energy ACTION REQUEST - 02256620
I Action Request Assignment Attributes
Request Attribute 1A COMMITTED Name :
Request Attribute · 1 B CHANGE BASIS Name :
Request Attribute 2ACOMMENTS Name :
Request Attribute BENEFIT REALIZED Name :
Request Attribute FINAL ISSUE Name :
Request Attribute _ IMPORTANT TO NRC Name :
Request Attribute . IT LABOR ESTIMATE Name :
Request Attribute L TAM ISSUE ID Name :
I Printed : 02/25/2019
Values
Values
Values
Values
Values
Values
Values
Values
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Date
Date
Date
Date
Date
Date
Date
Date
Page : 28
Duke Energy ACTION REQUEST - 02256620
Request Attribute PHC DUE DATE Name :
Request Attribute PLANT HEAL TH ISSUE ? Name :
Request Attribute RTTQ
Name :
Request Attribute T +1 CRITIQUE Name :
Request Attribute WBS Name :
Values
Values
Values·
Values
Values
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel *** No Return Comments Found ***
Action Request Assignment Completion Approval
Action Request Assignment Cause/Action
I Printed : 02/25/2019
Reqd N
Reqd
N
Reqd N
Reqd N
Reqd
N
Date
Date
Date
Date
Date
Updated On Updated By
Updated On Updated By
Page : 29
(r,DUKE v: ENERGY~
Duke Energy ACTION REQUEST - 02256620
Action Request Assignment Reference Documents
Doc Sub Minor Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip Facility Unit System Type Number
Equip Tag
Action Request Assignment Cross References
Limit
Equip Status
Rev Rev Status
Ref Ref Type Nbr
Ref RefNbr Sub Type Status AS Cls Description
Action Request Assignment Appendices
I Action Request Assignment Details
ASSIGNMENT NUMBER : 05 SUB :
Type :GNRL : NTFY/ASG : TONYA S LOWERY
Due Date Reschedule
: 03/10/2019 Status Assigned To Subject : LICENSING SUBMIT 50.54(Q) TO NRC WITHIN 30 DAYS OF
CHANGE Aff Facility UCR Organization Est Manhrs
Description
:CN Unit Schedule Ref Department : 10380 Ext Comp Date
Pri Resp Fae Pri Resp Group Sec Resp Fae Sec Resp Group
System
Discipline
THE REGULATION AT 10 CFR 50.54(0)(5) REQUIRES THE LICENSEE TO SUBMIT, AS SPECIFIED IN 10 CFR 50.4(8)(5)(11), A REPORT OF EACH CHANGE TO THE EMERGENCY PLAN MADE WITHOUT PRIOR NRC APPROVAL, INCLUDING A SUMMARY OF ITS ANALYSIS, WITHIN 30 DAYS AFTER THE CHANGE IS PUT IN EFFECT. THE NRC HAS STATED THAT THE SUMMARY REPORT OR A FULL COPY OF THE COMPLETED 50.54(Q) MAY BE
I Printed : 02/25/2019 Page : 30
e__(~DUKE ~ ENERGY~
Duke Energy ACTION REQUEST - 02256620
SUBMIITED TO SATISFY THIS REQUIREMENT. SUBMIT, WITHIN 30 DAYS OF IMPLEMENTING THE CHANGE, THE FULL 50.54(Q) OR SUMMARY (AS DESCRIBED IN AD-EP-ALL-0602) FOR ALL CHANGES TO THE EMERGENCY PLAN MADE WITHOUT PRIOR NRC APPROVAL TO THE NRC'S DOCUMENT CONTROL DESK, WITH A COPY TO THE APPROPRIATE REGIONAL OFFICE, AND A COPY TO THE APPROPRIATE NRC RESIDENT INSPECTOR. IF THE COMMUNICATION IS ON PAPER, THE SUBMISSION TO THE DOCUMENT CONTROL DESK MUST BE THE SIGNED ORIGINAL.
Action Request Assignment Completion Notes
Action Request Assignment Status History
Updated Date 02/07/2019 02/25/2019 02/25/2019
Updated By 144004 144004 144004
Assgn Status INPROG
NTFY/ASG
I Action Request Assignment Attributes
Request Attribute 1ACOMMIITED Name :
Request Attribute -18 CHANGE BASIS Name :
Request Attribute 2ACOMMENTS Name :
Request Attribute BENEFIT REALIZED Name :
Request Attribute
I Printed : 02/25/2019
Values
Values
Values
Values
Values
Assgn Due Date
03/10/2019
Reqd N
Reqd N
Reqd N
Reqd N
Date
Date
Date
Date
Date
Page : 31
/~DUKE ~'ENERGY*
FINAL ISSUE Name :
Request Attribute IMPORTANT TO NRC Name :
Request Attribute IT LABOR ESTIMATE Name :
Request Attribute LTAM ISSUE ID Name :
Request Attribute PHC DUE DATE Name :
Request Attribute PLANT HEAL TH ISSUE ? Name :
Request Attribute RTIQ Name :
Request Attribute T+1 CRITIQUE Name :
Request Attribute WBS Name :
j Printed : 02/25/2019
Duke Energy ACTION REQUEST - 02256620
Values
Values
Values
Values
Values
Values
Values
Values
N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Date
Date
Date
Date
Date
Date
Date
Date
Page : 32
e__(,,DUKE ~ ENERGY~
Duke Energy ACTION REQUEST - 02256620
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel *** No Return Comments Found ***
Action Request Assignment Completion Approval
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub Minor Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip Facility Unit System Type Number
Equip Tag
Action Request Assign,ment Cross References
Limit
Updated On Updated By
Updated On Updated By
Equip Status
Rev Rev Status
Ref Ref Type Nbr
Ref Ref Nbr Sub Type Status AS Cls Description
Action Request Assignment Appendices
j Printed : 02/25/2019 Page : 33
***END OF REPORT***
201!
l~DUKE ~;ENERGY,
I Action Request Details
Duke Energy ACTION REQUEST - 02256648
Type - : EREG Orig Date : 02/07/2019 12:20 Discovery Date Subject : RP/O/A/5000/004 rev 57 Description CONTACT SITE EP SUPERVISOR FOR ASSISTANCE IN PREPARING EP01, EP02, AND EP03. ENSURE EREG IS
CROSS-REFERENCED TO THE REG AR WHICH INITIATED IT. Perform 50.54(q) screen and evaluation Notes
Priority Report To Status : APPROVED 02/07/2019 Severity Due Date : 03/10/2019 Event Date
Originator : 144004 Originator Group Facility :CN Department : 13650 Organization
Owed To Owed To Group :QUALREVW Owed To Fae : CN __ Department Discipline
I Action Request Status History
Updated Date Updated By AR Status AR Due Date 02/07/2019 144004 INPROG 02/11/2019 02/07/2019 144004 APPROVED 02/25/2019 144004 02/25/2019 02/25/2019 144004 03/10/2019
I Action Request Attributes
Request Attribute Values Reqd Date -- --BOUNDED EREG AR N y 02/07/2019 Name : STACI N WHITE
Request Attribute Values Reqd Date -- --EREG AR CROSS XREF N y 02/07/2019 Name : STACI N WHITE
Request Attribute Values Reqd Date -- --REG AR CROSS XREF N y 02/07/2019 Name : STACI N WHITE
! Printed : 02/25/2019 Page : 1
1.,ouKE ~ ENERGY*
Duke Energy ACTION REQUEST - 02256648
I Action Request Notes
Action Request Routing/Return Comments
RQuting Comments from the X601 Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel *** No Return Comments Found ***
I Action Request Approval Review
Route List .: 001
Send -- Passport . Fae -Group / Type . -Date
I Action Request Trend/Cause
_ ~ _, Action Request Keywords
Keyword Keyword Description
I Action Request Reference Documents
Doc Sub Facility Type Type Document
I Action Request Reference Equipment
Equip Equip Facility Unit System Type Number
I Printed : 02/25/2019
Send Action Time Taken
Minor Sheet Rev Rev Title
Equip Tag
I
Updated On Updated By
Updated On Updated By
Route List Initiator : Action Date I Time Last Name
,,
Equip Rev Status Rev Status
Page : 2
tf,DUKE ¥!' ENERGY*
Duke Energy ACTION REQUEST - 02256648
I Action Request Cross References
Ref Ref Ref Ref Nbr Limit Type Nbr Sub Type Status . AR Cls Description --AR 02214108 5AD COMP-NA N
AR 02256535 PRR COMPLETE N AS 02187203 1900 GNRL COMPLETE N AS 02194997 0200 Pl COMPLETE N
I Action Request Assignment Details
ASSIGNMENT NUMBER : 01 SUB :
Type : EP01 Due Date Reschedule
: 02/11/2019 Status Assigned To Subject
Aff Facility UCR Organization Est Manhrs
Description
: COMPLETE
: STACI N WHITE : 50.54(Q) SCREEN
:CN Unit
Schedule Ref Department : 13650 Ext Comp Date
COMPLETE 50.54(Q) SCREEN IN ACCORDANCE WITH AD-EP-ALL-0602.
Action Request Assignment Completion Notes
I approve the 50.54Q screening for RP/O/A/5000/004 rev 57.
Action Request Assignment Status History
RP/O/A/5000/004 - 0000215964 SITE AREA EMERGENCY RP/O/A/5000/004 rev 057 EP Excellence Plan - Action SD-EP-4.2 Revise AD-EP-ALL-0602 to improve templates to focus on why a
Pri Resp Fae Pri Resp Group Sec Resp Fae
Sec Resp Group
System
Discipline
Updated Date 02/07/2019 02/07/2019 02/07/2019 02/07/2019
Updated By 144004 144004 144004 144004
Assgn Status INPROG
Assgn Due Date
I Printed : 02/25/2019
NTFY/ASG
ACC/ASG
02/11/2019
Page : 3
l___,DUKE ~'ENERGY~
Duke Energy ACTION REQUEST - 02256648
02/07/2019 02/08/2019
144004 MEHARE
AWAIT/C COMPLETE
. __ _ I Action Request Assignment Attributes
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel *** No Return Comments Found ***
Action Request Assignment Completion Approval
Route List : 001
Fae Group I Type A
Send Send Date Time - --02/07/2019 14:14
Updated On Updated By
Updated On Updated By
Route List Initiator : 144004 Action Action Taken Date / Time Last Name APPROVED 02/08/2019 14:15 BRUNSON
Passport DMBRUNS MEHARE - A 02/08/2019 14:15 APPROVED 02/08/2019 15:52 HARE
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub Minor Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip Facility Unit System Type Number
I Printed : 02/25/2019
Equip Tag
Equip Rev status Rev status
Page :4
l_~DUKE ¥!'ENERGY~
Duke Energy ACTION REQUEST - 02256648
Action Request Assignment Cross References
Ref Ref Type Nbr
Ref Ref Nbr Sub Type
I Action Request Assignment Appendices
APPENDIX 1
I Printed : 02/25/2019
Limit Status AS Cls Description
Page : 5
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 4 Page 1 of 8
« 10 CFR 50.54(q) Screening Evaluation Form»
BNP D
EREG #: ____ .2256648 ____ _ CNS X
CR3 D
HNP D
MNS D
SAD #:_2214108 ______ _ ONS D
RNP D
GO D
Document and Revision RP/O/A/5000/004, Site Area Emergency, Rev 57 (PRR 2256535)
Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the emergency plan or affect the implementation of the emergency plan):
Deleted the following steps:
2.8 Initiate Emergency Response Data System (ERDS) transmission by performing the following: 2.8.1 Logan to the SRO, BOP or OAC Room business computer on either unit. 2.8.2 Click the "ERDS" Icon on the desktop. 2.8.3 Once the ERDS logon window appears, enter the password (erds). 2.8.4 Once the ERDS window appears, ensure the "Current Mode" value for the affected unit is "Disconnect". 2.8.5 Click on the "Connect (Activate)" button for the unit. 2.8.6 Click on "Yes" in the message box that appears. 2.8.7 The value of "Status" for the unit should soon change to "Transmitting Data" and the value of "Messages Sent" should begin incrementing. 2.8.8 IF ERO$ transmission will not connect to the NRC, inform the NRC using ENS. The TSC Data Coordinator will troubleshoot and initiate ERS transmission upon arrival in the TSC.
Enclosure 4.3, Command and Control Turnover Briefing Form, was revised to align with the Command and Control Turnover Form in AD-EP-ALL-0104, ERO Common Guidelines and Forms.
Specific Changes are: Added: "Mode Shutdown Date: ____ Time: ____ " to each of the Unit Status blocks Added: 'Take Cover Order: YES NO TIME: __ _ Added: "Rapid Evacuation: YES NO TIME: ___ _ Added: "Last ENF Number: __ Added: "Continuous Communications with NRC Established: YES NO"
Deleted: "[] Stable [] Degrading [] Improving" from each of the Unit Status blocks Deleted: "ERDS Activated: Yes No N/A" from each of the Unit Status blocks
Printed : 02/25/2019 Page : 6
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 2 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Changed: "Turnover: (From): [] CR/ [] TSC" to "(From): [] CR/[] TSC/ [] EOF" Changed: "(TO) [] TSC / [] EOF" to "(TO) [] CR/[] TSC/ [] EOF Changed: "Units(s) Affected (circle) [] All []1 []2 []3" to "Units(s) Affected (circle) []1 []2 []3" Changed: "Last ENF Sent (time): __ " to" Last Notification completed (time): ____ _ Changed: "Last Message Sent (time): " to "Notified (time): ___ _
Rev 56 Enclosure 4.3
Printed
Enc~osure ,1;3
Command and Control T1U,"llonrBriefing Form 'RP/0/A/5~00/004 ·Page I oft
Statio!):_( ) CtlS I ) WlS I ) OHS ( )BtlP ( ~ HIIP [ ) !UIP Turnover: (circle) (From): ·a CIR· / ·D TSC l---'-------'---'-'--'--------'-----'----------1 (TO) a TSC / a EOF
Unit(s)Aft;ected:(circle) ( )All ( )1 ( )2( 13 . D•~hiftChange
Emergency Classification_: Unusu;,J.Eventd~ at ___ EAL#:~-- AI.,rtOecfared at ____ EAL#: __ _
Site Area Emergency declared at ____ EAL#: ___ General ~encyDeclruedat ____ EAL#: __ _
Rx Power Coill' 'Rx Cool Press Temp
a_ Slable a D_egraa111g . a Improving.
FPB Sb~ (circle appropliate condition)
Fuel Intact Poterilial Loss . Loss
RCS Intact Potenlial Loss Loss Cont .Intact Po!enlial Loss loss Major Equipment Out of Service:
Eyo!ufions in Progress:
EROS Activated: Yes No WA
Response Procedures in Progress (optional):
Slalion Priorities:
: 02/25/2019
Rx Cool Press RxPower
Cont RxCool Press Temp Rx_Cool Press
I a stable a Degrading .ti !inprovmg FPB Status (circle appropriate conodion)
fuel lnt,,,ct Potential.Loss loss RCS lnbi:t Pctenlial loss loss Cont lnbct Potential loss Loss Major Equipment Out of S~:
Evo!uticns in Progress:
RxPowef ·Cont Press
RxCool Temp Rx Cool Press
a stable a Degrading. q lmprowig
FPB Status \circle appropriate condition)
Fuel Intact !'lllential loss l.oos
RCS Intact Potential Loss Loss eont intact Potential Loss Loss Major Equipment Out of Service:
Evolutions in Progress:
ERDSAcli'<llled: Yes No tuA ERDSAl:fivaled: Yes No NIA
EOP/APs in Progress {cptional):
Page : 7
Printed
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Enclosure 4.3
C(lmmau,d and Control Turnover Briefing Fo~
Site Ass_enibly: YES NOTIME: O~r Agency lnvoJvement:
Site Evacuation: YES NOTIME: OMEDICAL OFIRE 0 lAW ENFORCEMENT
loi:alioniComnients: Alldilionai lnfonnalion (Injuries):
'T
Radiological: Enie,gency Worker dose limits approved: YES ~
NO Who
Release in Progress: YES NO Fiekl Monitoring Teams Deployed: YES NO Number ---Release Pathway: . WIND SPEED: WIND DIRECTION:
Offsile PARS Recoll)lllended: YES NO Zones Evacuated: ZOnes Sheltered:
Kl Recommended: YES NO current Dose Run Available: YES NO Have Dose Assessors discussed Tumover? YES !'l0
Off-Site Hotifications: last ENF Sent (lime): Next ENF Due (lime):
tlRC Communication: Last Message Sent (lime):
Have Communicator.> discussed Tumover wi111 acqumng raalily Communica1ors? ·YES NO
Upon the transfer of Command arid Control, the following will be performed by:
Event Classification: [J CR CITSC PAR Decision Making: [J CR CJ TSC [J EOF
Slate and Local Notification: .Cl CR [J TSC [J EOF NRC Notifications: [J CR CIT~C
Emergency Exposure con1r91s ~.Kt [J ·cR [J TSC Control of FMTs: [J CR [J TSC O EOF
Dose Assessment [J CR [J TSC [J EOE
~lame of ln<fr.ridtml turning aver Duties:
Tumover Coqip!ete: ~ .NO. TSC ~ EOF Acliv3ied at . (cirele) (circle) Tune Date tlame inawidual ~uming duties
Additional Information:
: 02/25/2019
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 4 Page 3 of 8
RP/0/A/5000/004 Page2of1
COTHER
Page : 8
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Screening Evaluation Form >>
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 4 of 8
Rev 57 Enclosure 4.3
I Station: a BNP DCNS
Unit(s)AffeciEd: Df
Emergency Classification:
'· .. unit1 "
Enclosure 4.3
Command and Control Turnover Briefing Form RP10/At5000!004 Pagefflor~
DHNP DMNS DONS DRNP Turnover. Jrom):D CR / a TSC / a EOF
{JO) a CR , a ISCJ a EOF D2 D3 a ShittChange
Unusual Event Declared at EAU: Aled Declared at EAL#:. ___
Sile Area Emergency Declared at EALL General Emergency Declared at EAL#:
,",· _c; ,l. •, Unit~ , .: '' ... Unit3;. ,, ',"'
'' ,.
RxPower Cont. I RxCool I RxCool
RxP~,er I Cont I RxCool I Rx ca~ Press RxPower I Cont I RxCool I Rx Cool Press Press T"""' . ·Press Press TemD Press Temp
I I I I I I I I Mede Shnfdfflwa Date: Time: Mode Sh11fdm•m Date· Tune: Mode Sb11fdmtm Date: Tune:
FPB Status (circle appropria1e comfltion) FPB Status (circle appropriate condition) FPB Status (ciJcle appropriate comfdion)
Fuel lnfal:t._ Polealial Loss Loss Fuel lnfal:t._ Polenlial Loss Loss Fuel 111!a!:L_ Polenlial Loss Loss RCS Intact Potential Loss---.Lll:I:!; RCS Intact Polenlial Loss----1.os$ RCS Intact Po!enlial Loss--1.osll Cnnt Intact Polenlial Loss Loss Cont Intact Potential Loss L°""' Cont Intact Polenlial Loss~ Major Equipment out or Service: Major Equipment Out of Service: Major Equipment Out of Service:
Ewlutions in Progress: Evolutions in Progress: Evolutions in Progress:
EROS Aclivaled: Yes No NIA BIDS Al:fivated: Yes fin___ NIA EROS Aclivaled: Yes No NIA Response Proce<fures in Progress (oplional): I Emergency/Abnormal Prncedures in Prngress (optional):
stmon Priolilies:
Printed : 02/25/2019 Page : 9
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 5 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Enclosure 4.3
Command and Control Turnover Briefing Form R.PAl!.A/5000/004 Pagef?lof~
Site Assembly: YES NOTIME: Localion/Commenls: ottmcAi;iency Involvement
Site Evacuation: YES NOTIME: IJMEDICAL DARE IJ lAW ENFORCEMENT IJ OTHER
TakeCovet"Order: YES NOTIME: Additional lnfomralion (lnjuJies):
Rapid Evacuation: YES NOTIME:
Radiological: EmergencyWmkerdose fimils approved: YES NO For whom:
Release ill Progress: ----YES NO Field Monitoring Teams Deployed: YES NO Number
Release Palhway: WINDSPEED: WIND DIRECTION:
Offsile PARS Recommended: YES NQ Zones Evacuated: Zones Sl!ellered:
Kl Realmmended: YES r,ro_____ Dose Assessment Available: YES NO Have Dose Assessors lfJSCUSSed Twnover? YES NO
Off.Sile Notifications: Last Nolific:alion Completed (lime): Last ENF Ntnnbel: -- Next ENF Due (lime):
NRC Communication: Nolilied (lime}: Continuous Communicafions v:ilh NRC Established: YES NO
Have Communicators 01SCUssed Tumover"'.lilh acquiring facilily Communica!ors? YES NO
Upon tile lransferof Command and Control, the following will be performed by:
Event Classification: i:J CR i:J TSC PAR Decision Mal<ing: i:J CR t:J lSC i:J EOF
Stale and Local Noli1ica!ion: i:J CR i:J TSC i:J EOF NRC No!ilica!ions: i:JCR l:Jtsc Sile Emergency EiqK]sure Coilllols & Kl: i:J CR i:J TSC Control of FMf s: i:J CR t:J TSC CJ EOF
Dose Assessment: CJ CR t:J lSC i:J EOF
Name of lnlfNidual turning over Du!ies:
Turnover Complete: YES NO TSC/EOF Aciivaled at (~ (circle) Tnne Dale flame individual assuming dufies
Additional lnfonnation:
· Part II. Activity Previously Reviewed? D . Is this activity Fully bounded by an NRC approved 10 CFR 50.90 submittal or Alert and Notification System Design Report?
If yes, identify bounding source document number or approval reference and ensure the basis for concluding the source document fully bounds the proposed change is documented below:
Justification:
Printed : 02/25/2019
10 CFR 50.54(q) Effectiveness Evaluation is not required. Enter justification below and complete Attachment 4, Part V.
Continue to Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part Ill
Page : 10
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
<< 10 CFR 50.54(q) Screening Evaluation Form>>
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 6 of 8
Part Ill. _Editorial Change Yes D No X
Is this activity an editorial or typographical change only, such as formatting, -- paragraph numbering, spelling, or punctuation that does not change intent?
Justification:
10 CFR 50.54(q) Effectiveness Evaluation is not required. Enter justification and complete Attachment 4, Part V.
Continue to Attachment 4, Part IV and address non editorial changes
Part IV. Emergency Planning Element and Function Screen (Reference Attachment 1, Considerations for Addressing Screening Criteria) Does this activity involve any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II? If answer is yes, then check box.
--;~fo.=~11R,::§074~(~f (1~'A§si~:rfn~rtt\i?ll~~~µ;animiitty}qirg}n(t~!i2ff ftg~J~§J)~:.~i-C.;;2, ?\::1'.~:::;1~1;, ____ ~~,;: ;;~:; .#;,·· ,~~:;::-~1;: ~-:~&-~ ;}~,:·c 1 a Responsibility for emergency response is assigned. X
-The response organization has the staff to respond and to augment staff on a continuing basis (24-7 staffing) in accordance with the emergency plan.
"cti1:¢f9~J~:10·~1VlqI~i~:~~~i!~lsrri-~rgir,i§yi¢J:g~oi~~f!qr:!:V:<2::,·.:)(·j,i,t,,i:,~?:r:~r·,it1{::~;,;,;ft,2s;·.~si:1i:11i-'~i;;{:tiI,1!i?:f;03· Process ensures that onshift emergency response responsibilities are staffed and assigned
The process for timely augmentation of onshift staff is established and maintained.
D
Sa Procedures for notification of State and local governmental agencies are capable of alerting them of the D declared emergency within 15 minutes (60 minutes for CR3) after declaration of an emergency and providing follow-up notification.
Sb Administrative and physical means have been established for alerting and providing prompt instructions D to the public within the plume exposure pathway. (NA for CR3)
Sc The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and Notification Systems for Nuclear Power Plants, or complies with the licensee's FE MA-approved ANS design report and supporting FEMA approval letter. (NA for CR3)
D
Printed : 02/25/2019 Page :11
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Screening Evaluation Form>>
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 7 of 8
Part IV. Emergency Planning Element and Function Screen (cont.)
Systems are established for prompt communication among principal emergency response organizations.
Systems are established for prompt communication to emergency response personnel.
;jg1t!f~5§g\j;i{ijj{f:I.~HRllR,1~§~,9.,~f\gl~u~}iJ~/g;tWi~tt~R}:JsL,/fl{,:,~;fi;,;;::t;;i~{ _,};Jt~:5,\<?~. =,,....,...,,,=~,,...,.....===
Emergency preparedness information is made available to the public on a periodic basis within the plume exposure pathway emergency planning zone (EPZ). (NA for CR3)
Coordinated dissemination of public information during emergencies is established.
1 Oa A range of public PARs is available for implerrientation during emergencies. (NA for CR3) D
1 Ob Evacuation time estimates for the population located in the plume exposure pathway EPZ are available D to support the formulation of PARs and have been provided to State and local governmental authorities. (NA for CR3)
1 Oc A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.
1 Od Kl is available for implementation as a protective action recommendation in those jurisdictions that D chose to provide Kl to the public.
14a A drill and exercise program (including radiological, medical, health physics and other program areas) D is established.
14b Drills, exercises, and training evolutions that provide performance opportunities to develop, maintain, D and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses.
14c Identified weaknesses are corrected. D
15a Training is provided to emergency responders.
Printed : 02/25/2019 Page : 12
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 4 Page 8 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Part IV. Emergency Planning Element and Function Screen (cont.)
PART IV. Conclusion If no Part IV criteria are checked, then provide Justification and complete Part V below.
If any Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part IV criteria are checked, then. complete Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part V and perform a 10 CFR 50.54(q) Effectiveness Evaluation. Program Element 4a requires final approval of Screen and Evaluation by EP CFAM.
The changes to the Command and Control Turnover Briefing Form will be further evaluated in an Effectiveness Evaluation.
Duke Energy has transitioned to an "always-on" mode of EROS transmission, making the steps to activate EROS unnecessary. A Controlled Support Document (CSD) for EROS troubleshooting has replaced the steps to activate EROS. Deletion of the EROS Activation steps does not affect any of the 50.47(b) emergency planning standards, as EROS is addressed in 10 CFR Appendix E to Part 50 in section VI, Emergency Response Data System, not in the 50.47(b) Planning Standards.
With regard to 10 CFR Appendix E to Part 50 in section VI, EROS remains a direct near real-time electronic data link between the licensee's onsite computer system and the NRG Operations Center, and the features listed in Section VI are maintained: the testing method and frequency; the software and hardware; the selected plant parameters; and the transmission rate. No further evaluation of the removal of the EROS steps is required by 50.54(q).
Reviewer Name (Print): See GAS Approver (EP Manager Name (Print): See GAS Approver (EP CFAM, as required) Name (Print) N/A
QA RECORD
Reviewer Signature: Date: See GAS See GAS Approver Signature: Date: See GAS See GAS Approver Signature: Date: N/A N/A
D
X
Printed : 02/25/2019 Page : 13
e(er,DUKE ~ ENERGYt
Duke Energy ACTION REQUEST - 02256648
I Action Request Assignment Details
ASSIGNMENT NUMBER : 02 SUB :
Type Status
Assigned To Subject
:EP02
: COMPLETE : STACI N WHITE : 50.54(Q) EVALUATION
:CN
Due Date Reschedule
Unit
Schedule Ref
: 02/11/2019 '
Aff Facility UCR
Organization Est Manhrs
Department : 13650
Ext Comp Date
Description COMPLETE 50.54(Q) EVALUATION IN ACCORDANCE WITH AD-EP-ALL- 0602.
Action Request Assignment Completion Notes
I approve the 50.54Qeval for RP/O/A/5000/004 rev 57.
Action Request Assignment Status History
Updated Date Updated By Assgn Status Assgn Due Date 02/07/2019 144004 INPROG 02/07/2019 144004 02/11/2019 02/07/2019 144004 NTFY/ASG 02/07/2019 144004 ACC/ASG
02/07/2019 144004 AWAIT/C 02/08/2019 DMBRUNS ACC/ASG 02/08/2019 144004 AWAIT/C 02/08/2019 MEHARE COMPLETE
Pri Resp Fae Pri Resp Group Sec Resp Fae
Sec Resp Group
System
Discipline
----------' I Action Request Assignment Attributes
! Printed : 02/25/2019 Page : 14
l_,~DUKE ~ ENERGYa
Duke Energy ACTION REQUEST - 02256648
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel Minor editorial comments. -DMB
Routing Comments from the X602 Panel *** No Return Comments Found ***
Action Request Assignment Completion Approval
Route List : 001
Passport DMBRUNS MEHARE DMBRUNS
Fae Group I Type A
A A
Send Send Date Time - --02/07/2019 14:18 02/08/2019 14:15 02/08/2019 14:01
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub
Action Taken --RETURNED APPROVED APPROVED
Minor Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipr:nent
Equip Equip Facility Unit System Type Number
Equip Tag
Action Request Assignment Cross References
Limit
Action
Updated On 20190208
Updated On
Route List Initiator
Updated By DMBRUNS
Updated By
: 144004
Date I Time Last Name 02/08/2019 13:53 BRUNSON 02/08/2019 15:55 HARE 02/08/2019 14:15 BRUNSON
Equip Status
Rev Rev Status
Ref Ref Type Nbr
Ref Ref Nbr Sub Type Status AS Cls Description
j Printed : 02/25/2019 Page : 15
ef_,DUKE 'V!' ENERGY®
Duke Energy ACTION REQUEST - 02256648
Action Request Assignment Appendices
APPENDIX 1
! Printed : 02/25/2019 Page : 16
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
EREG #:_2256648 ______ _
5AD#: ___ 2214108 ____ _
Document and Revision RP/O/A/5000/004, Site Area Emergency, Rev 57 (PRR 2256535)
Part I. Description of Proposed Change:
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 1 of 10
BNP D
CNS X
CR3 D
HNP D
MNS D
ONS D
RNP D
GO D
Enclosure 4.3, Command and Control Turnover Briefing Form, is being revised to align with the Command and Control Turnover Form in AD-EP-ALL-0104, ERO Common Guidelines and Forms.
Specific Changes are: Added: "Mode Shutdown Date: ____ Time: ____ " to each of the Unit Status blocks Added: "Take Cover Order: YES NO TIME: ---Added: "Rapid Evacuation: YES NO TIME: ___ _ Added: "Last ENF Number: __ Added: "Continuous Communications with NRG Established: YES NO"
Deleted: "[] Stable [] Degrading [] Improving" from each of the Unit Status blocks Deleted: "ERDS Activated: Yes No N/A" from each of the Unit Status blocks
Changed: "Turnover: (From): [] CR/ [] TSC" to "(From): [) CR/ [) TSC/ [) EOF" Changed: "(TO} [] TSC / [] EOF" to "(TO) [] CR/[] TSC/ [) EOF Changed: "Units(s) Affected (circle) [) All [)1 []2 [)3" to "Units(s) Affected (circle) []1 [)2 []3" Changed: "Last ENF Sent (tinie): __ " to" Last Notification completed (time): ____ _ Changed: "Last Message Sent (time): " to "Notified (time):, ___ _
I Printed : 02/25/2019 Page : 17
EMERGENCY PLAN CHANGE SCREENING AND AD-EP-ALL-0602 . EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q) Rev.5
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
ATTACHMENT 5 Page 2 of 10
Rev 56 Enclosure 4.3
Printed
En~losure 4.3
Command.and Control Turnov~ Briefing Forni
static':': ( ) CNS ( I ~s ( I ?,!'.J-S ()BNP Tutnmiec (circleJ
Unit(si Affected: (circie) I I All I ) 1 I 121 13
{From}:
(T.0)
RPiOIA!?<J00/004 Page I ofl
0 CIR /0 TSC
D TSC ) Oi;OF . . . a ShiltChange
Emergency Classjfi,;ation: Unusual Event declared at ____ EAl#: __ _ .Alert Declared at ____ EAL#: __ . __
Sire Area ~cy ~"!rued at ____ EAL #: ___ Genera!. Emeigency Oei:l"f"4.at ____ EAL#: ___ .
Rx Power Cont. Rx Cool Rx Cool Rx Power Cont Rx Cool Ric ~~, P Rx Pov.. · ,er Cool Rx Cool . Press Temp Press Press Temp · '"""· ress Press Temp. Ric Cool. Press
I [i Siable µ ~egrndin!j a ~ a stable a Degrad/aj Q Improving
FPB .status {circle appropriate condition) :FPB Status (circle appropriale conilifioii) FJ>e· Status (circle a.ppropriate comfrlion)
Fuel ' Intact Potential Loss Loss RCS Intact ,Po!eritial Los,; Less cont, 1n1act Poliinlla1 Giss Lciss
Fuel intact Poteilliai loss Loos RCS · Intact f'.(>t~irtial loss Loss C:oilt .intact Potential Loos loss
Fuel ln!act Polenlial Loss ' L,oss
Rcs 1n1act i>ci~ntia1 Loss 1..oss Cont Intact Pciteiitial less . Less
Major Equipment out o1 semce: Major Equipment Out of Service: Major~Qutof Ser\lice:
Eyoiullons in Progress: Evolulions in Progress: Evolutions in Progress:
EROS Activated: Yes Ho. NIA EROS Acilvared: Yes No NIA Respcnse Procedures in progress (optional}: EOP/APs in Progress {cptional}:
Slatioil,Priorilies:
: 02/25/2019 Page : 18
Printed
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
·Enclosure 4:3
Command lllld Co~trol Turnover Briefing F.onn
Site Assem\Jly: · YES NOTIME: OOer Age_ncy ln"'.olvement:
Site Evacuation: YES NOTIME: Cl MEDICAL Cl FIRE Cl LAW ENFORCEMENT
Location/Comments: Ado~onal Information (l?julies):
y .,.. Radiological: Emergency Worker dose limits :jpproved: YES NO Who
Release in Progress: YES ·No Field Moniloring Teams Deployed: YES : NO .Numller ---Reie~ Pa~ay: WIND SPEED: WIND DIRECTION:
Offsite PARS Recommended: YES NO· Zones Evacuated: · ZDnes Sheltered:
Kl Recommend"!!: YES NO Ctment Dose Run Available: YES NO Have Dose Assessors discussed Turnover? YES NO
Off-Sile Notifications: last ENF Sent (time): Next ENF Due (lime}:
tJRC Communication: LasfM~ge Sent (lime):
Have Communicators discussed Turnow.-~ acquiring facilily Communicator.I? YES NO
Upon the transfer of Command and Control, the following_ will be performed by:
Event Classification: [J CR [Jtsc PAR Decision Making: Q CR · CJ TSC [J EOF
Slate and °Local Notification: CJ CR CJ Tse· [J EOF NRC.Notlfications: l:J CR [J TSC
Emergfillo/ Exposure Controls.& Kt [J CR [J TSC Control of FMfs: [J CR [J TSC [J EOF
Dose Assessment [J CR [J TSC [J EOF
Name or"!nowidual turning o,,-er Duties:
TumoverComplete: YES NO TSC I EOF Activated at: ·(circle) (circle) Tune Dale flame ind'widual_ assuming duties
Additi(!llal Information:
: 02/25/2019
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 3 of 10
RP/0/A/5000/004 i>a;e2ofl
ti OTHER
Page : 19
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 4 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Rev 57 Enclosure 4.3
I Station: i:J BNP DCNS
Unit(s) Affected: D1
Emergency Classification:
~.' "" :! ' bnit1
Enclosnre 4.3
Command and Control Turnover Briefing Form RP10/A!5000!004 Pagefflor!
DHNP DMNS DONS DRNP Turnover. JromJ:D CR / a TSC / a EOF
(TO) a CR , a ISC...l a EOF D2 D3 a Shilt Change
Unusual Event Declared at EALtt Aled Declared at EAL#: ___
S~e Area Emergency Declared at EAL#;,,. General Emergency Declared at EAL#:
' . ' . ' ;• Uni12 '·· : linit3 '
,.• .. '
•,
RxPower Cont I RxCool I RxCool RxPower I Cont I RxCool 1 Rx eoo1 Press RxPower I Cont I RxCool I Rx Cool Press Press T"mn Press Press TemD Press Tmnn
I I I I I I I I Mode Sb11fdmun Date: l!rne: Mode Sbntdal'm Date· lime: Mode Sb11tdmtm Dafe: Tone·
FPB Status (cin:le appropriate cornfrtion) FPB Status (circle appropriate con<frtion) FPB Status (cin:le appropriate ccn<frtion)
Fuel fnlal:L_ Polenlial Loss Loss Fuel fnlal:L_ Potential Loss Loss Fuel fnlal:L_ Polenlial Loss Loss RCS Intact Polenlial Loss----1.1!:!li RCS Intact Potential Loss---1.!xili RCS Intact Potential Loss---1.!m t'nnt Intact Polential Loss Loss f"_nnt Intact Potential Loss r.,... r.nnt Intact Potential Loss_Loss Major Equipment Out or Service: Major Equipmenl Out of Senrice: Major Equipment Out of Service:
Evolutions in Progress: E110ltrtions in Progress: Evolutions in Progress:
ERDS Acliva!ed: Yes No NIA ERDS Al:livafed: Yes No__ NIA ERDS Al:livafed: Yes No NIA Response Procedures in Progress {opllonal): I Emergency/Abnormal Procedures in Progress (opllonal):
sta!ion Priorities:
Printed : 02/25/2019 Page : 20
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 5 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Enclosure 4.3 RPIO!A/5000/004 Command and Control Turnover Briefing Form Page~of~
Site Assembly: YES NOTIME: LocalionJCommenls: otll!:I: Agency Involvement
Site Evacuation: YES NOTIME: CJ MEDICAL OARE CJ lAW ENFORCEMENT O OIBER
Take Cover Onler: YES NOTJME: Additional lnfonnalion (Injuries):
Rapid Evacuation: YES NOTJME:
Radiological: Emergency Worker dose fimils approved: YES NO Forvmom:
Release in Progress: ---.YES NO Field Monitoling Teams Deployed: YES NO Humber
Release Pathway: WIND SPEED: WIND DIRECTION:
Offsile PARS Recommended: YES NO..___Zones Evacuated: Zones Shellered:
Kl Recommended: YES ua._ Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES rm
Off.Site Notifications: Last Nolilication Completed (lime): Last ENF Numbec -- Next ENF Due (lime):
NRC Communication: Holified (lime}: Cominuous Communicalions Y,ilh NRC Established: YES rm
Have Communicators discussed Tumoverwilh acquiling facilily Communicalors? YES NO
Upon tile transfer of Command and Confrol, the following will be performed by:
Event Classilicalion: CJCRCJTSC PAR Decision Making: CJCR CJTSCCJEOF
stale and Local Nolfficalion: CJCR CJTscDEoF NRC Nolifcalions: CJCR CJTSC
Sile Emergency Exposure Controls & Kt CJCRDTsc Control of FMfs: CJCR CJTSCCJEOF
Dose Assessment CJCR CJTSC0EOF
Name of Individual fuming over Duties:
Turnover Complete: YES NO TSC/EOF Activaled at ~ (cin:le) Tmie Date Name individual assuming duties
Additional lnfonmation:
Attachment 6, 10 CFR 50.54(q) Initiating Condition (IC) and Emergency Action Level (EAL} and EAL I Yes D Bases Validation and Verification (V&V) Form , is attached (required for IC or EAL change) No X
-·- -, . •'' - ·, .·,. - ··.; ·:.- .- ,_. - . ,J' ~ ,-,, .. -' > ; . - - J :·-,;--,.-
, ,<;, ... ' ,.: .:,: •' •:• ' ': ' .: ; ,:: '.( - :,/i ,•.:. ... -.:;<:.,. . ,•,,. .. ,: . - . .. : v:, ····.:, ~ - , ,. ,_ <c', ;,, __ -'. ..
Part II. Description and Review of Licensing Basis Affected by the Proposed Change:
Licensing Basis of the ERO
The Assignment of Responsibilities is described in the originally approved CNS Emergency Plan, Revision 2 (dated January 1983}, sections A.1.b, Concept of Operations, A.1.c, Block Diagram of Organization Interrelationships, and A.1.d, Key Decision Making.
The current licensing basis regarding Assignment of Responsibility is described in CNS Emergency Plan Section A, Revision 150 (dated September 2017) sections A.1.b, Concept of Operations, A.1.C, Block Diagram of Organization Interrelationships, and A.1.d, Key Decision Making.
During revisions to these sections, the titles of some of the Emergency Response personnel and facilities have changed (i.e., Shift Supervisor to Shift Manager, Crisis Management Center to Emergency Operations Facility), but the individuals responsible for Command and Control and the transfer process for Command and Control has remained the same. The summation of the incremental changes over time do
Printed : 02/25/2019 Page :21
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 6 of 10
not reduce the effectiveness of the CNS Emergency Plan when compared to the NRC-approved Plan.
Section P, Responsibility for the Planning Effort, in the CNS Emergency Plan, Revision 2, lists RP/O/A/5000/004, as an implementing procedure. (AD-EP-ALL-0104 had not been created when the CNS Emergency Plan was initially approved by the NRC.)
Section P, Responsibility for the Planning Effort, in the CNS Emergency Plan, Revision 147, lists RP/O/A/5000/004, and AD-EP-ALL-0104 as implementing procedures.
List Commitments Associated with the Change
A search to identify site specific commitments related to the ERO positions and their assigned responsibilities was performed. No site specific commitments were identified aside from those in the Emergency Plan.
RG 1.219 Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors, Rev 1. (July 2016) 3.5 Emergency Plan
Printed
a. "Emergency plan" means the document(s) that the licensee prepared and maintains that identifies and describes its methods for maintaining emergency preparedness and responding to emergencies. An emergency plan includes the plan that the NRC originally approved and all subsequent changes that the licensee made with and without prior NRC review and approval under 10 CFR 50.54(q). See 10 CFR 50.54(q)(1 )(ii) for additional information.
b. This definition highlights that "emergency plan" includes the documents that describes the programmatic methods that the licensee uses to maintain emergency preparedness and to respond to emergencies. These methods, or program elements, are the implementation aspects of the planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50 and generally correspond to the evaluation criteria of NUREG-0654 or approved alternatives that supply specific acceptable methods for complying with the planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50. Such programmatic documents are subject to the 10 CFR 50.54(q) change process. Non-programmatic documents, such as training rosters, equipment and maintenance test reports, lesson plans, and other documents that "document the performance" of the program elements, as opposed to those that "establish" the program elements, are not included.
c. Ordinarily, sub-tier documents such as emergency plan implementing procedures (EPIPs) are not considered to be part of an emergency plan for the purpose of evaluating proposed changes. If a licensee relocates a programmatic descr.iption from the emergency plan to a sub-tier document, that programmatic description continues to be subject to the 10 CFR 50.54(q) change process. For example, licensees have relocated the details of emergency classification schemes from the emergency plan to an EPIP or to large wall charts maintained in the control room. Because the EPIP or wall chart is now the means to demonstrate compliance with the planning standards in 10 CFR 50.47(b)(4), these sub-tier documents are subject to 10 CFR 50.54(q). Repeating, as opposed to relocating, program element descriptions in sub-tier documents do not necessarily make the sub-tier documents subject to the 10 CFR 50.54(q) change process. However, the descriptions in the various documents must remain consistent.
e. This definition also highlights the need to consider the NRG-approved plan and the subsequent changes in reviewing against 10 CFR 50.54(q) to ensure that a series of incremental changes (each determined not to reduce the effectiveness of the plan) do not reduce the effectiveness of the plan when compared to the
: 02/25/2019 Page : 22
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
NRG-approved plan.
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 7 of 10
The differences in approved revisions and the current revisions of the Emergency Plans have been reviewed and they have been determined to meet the regulatory requirements required during revisions. Each revision has been reviewed by the NRG during the inspection process.
Part Ill. Description of How the Proposed Change Complies with Regulation and Commitments. If the emergency plan, modified as proposed, no longer complies with planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50, then ensure the change is rejected, modified, or processed as an exemption request under 10 CFR 50.12, Specific Exemptions, rather than under 10 CFR 50.54(q):
The changes made to the Command and Control Turnover Briefing Form continue to support the assignment of responsibility by aligning the Command and Control Turnover Briefing Form between the two procedures currently used by the Shift Manager, TSC Emergency Coordinator and EOF Director. Aligning the content of these two forms to be identical contributes to each individual understanding the status of the emergency in an efficient manner, and reduces the potential for human error during the turnover process.
The changes described continue to meet NRG requirements as described in 10 CFR 50.47(b) and 10 CFR 50, Appendix E and Emergency Plan Sections A and P.
Printed : 02/25/2019 Page : 23
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 8 of 10
Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change (Address each function identified in Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part IV of associated Screen):
The following portion of planning standard §50.47(b)(1) is related to the change: Primary responsibilities for emergency response by the nuclear facility licensee have been assigned, and each principal response organization has staff to augment its initial response on a continuous basis.
The function for §50.47(b)(1) related to this change are:
a. Responsibility for emergency response is assigned.
Appendix E to Part 50 lists the following: IV. Content of Emergency Plans A. Organization The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for notification of such individuals in the event of an emergency. Specifically, the following shall be included:
1. A description of the normal plant operating organization. 2. A description of the onsite emergency response organization (ERO) with a detailed discussion of:
a. Authorities, responsibilities, and duties of the indjvidual(s) who will take charge during an emergency;
The NUREG-0654 Part II.A elements for §50.47(b)(1) related to this change are:
A.1.d. Each organization shall identify a specific individual by title who shall be in charge of the emergency response.
A.2. Each principal organization shall be capable of continuous (24-hour) operations for a protracted period. The individual in the principal organization who will be responsible for assuring continuity of resources (technical, administrative, and material) shall be specified by title.
Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan Functions:
The changes made to the Command and Control Turnover Briefing Form continue to support the assignment of responsibility by aligning the Command and Control Turnover Briefing Form between the two procedures currently used by the Shift Manager, TSC Emergency Coordinator and EOF Director. Aligning the content of these two forms to be identical contributes to each individual understanding the status of the emergency in an efficient manner, and reduces the potential for human error during the turnover process.
The description of the authorities, responsibilities and duties of the individual(s) who will take charge in an emergency is maintained. There is no reduction in effectiveness of the CNS Emergency Plan.
Printed : 02/25/2019 Page :24
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
Part VI. Evaluation Conclusion. Answer the following questions about the proposed change.
1 Does the proposed change comply with .10 CFR 50.47(b) and 10 CFR 50 Appendix E?
2 Does the proposed change maintain the effectiveness of the emergency plan (i.e., no reduction in effectiveness)?
3 Does the proposed change maintain the current Emergency Action Level (EAL) scheme?
4 Choose one of the following conclusions:
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 9 of 10
YesX No D
YesX No D
YesX No D
a The activity does continue to comply with the requirements of 10 CFR 50.47(b) and 10 CFR 50, Appendix E, and the activity does not constitute a reduction in effectiveness or change in the current Emergency Action Level (EAL) scheme. Therefore, the activity can be implemented without prior NRG approval.
X
b The activity does not continue to comply with the requirements of 10 CFR 50.47(b) or 10 CFR 50 Appendix E or the activity does constitute a reduction in effectiveness or EAL scheme change. Therefore, the activity cannot be implemented without prior NRG approval.
Part VII. Disposition of Proposed Change Requiring Prior NRG Approval
D
Will the proposed change determined to require prior NRG approval be either revised or Yes D No D rejected?
If No, then initiate a License Amendment Request in accordance 10 CFR 50.90, AD-LS-ALL-0002, Regulatory Correspondence, and AD-LS-ALL-0015, License Amendment Request and Changes to SLC, TRM, and TS Bases, and include the tracking number:
Printed : 02/25/2019 Page :25
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 10 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
Part VIII. Signatures: EP CFAM Final Approval is required for changes affecting risk significant planning standard 10 CFR 50.47(b)(4) (i.e., Emergency Action Levels and Emergency Action Level Bases). If CFAM approval is NOT
required, then mark the CFAM signature block as not applicable (N/A) to indicate that signature is not required.
Preparer Name (Print): Preparer Signature: Date: Staci White See GAS 217/2019
Reviewer Name (Print): Reviewer Signature: Date: See GAS See GAS See GAS
Approver (EP Manager) Name (Print): Approver Signature: Date: See GAS See GAS See GAS
Approver (CFAM, as required) Name (Print): Approver Signature: Date: N/A N/A N/A
If the proposed activity is a change to tlie E-Plan or implementing procedures, then create two EREG General Assignments. If required by Section 5.6, Submitting Reports of Changes to the NRG, then create two EREG General Assignments.
• One for EP to provide the-10 CFR 50.54(q) summary of the analysis, or the completed 10CFR 50.54(q), to Licensing.
• One for Licensing to submit the 10 CFR 50.54( q) information to the NRG within 30 days after the change is put in effect. · ·
QA RECORD
X
X
Printed : 02/25/2019 Page : 26
J_,DUKE ~JENERGY~
Duke Energy ACTION REQUEST - 02256648
. I Action Request Assignment Details
ASSIGNMENT NUMBER : 04 SUB :
Type
Status
Assigned To
Subject
Aff Facility
UCR
Organization
Est Manhrs
Description
:GNRL
: NTFY/ASG
: STACI N WHITE
Due Date
Reschedule
: 02/25/2019
: PROVIDE 50.54(Q) INFO TO LICENSING FOR NRG 30 DAY
SUBMITTAL
:CN Unit
Schedule Ref
Department : 13650
Ext Comp Date
Pri Resp Fae
Pri Resp Group
Sec Resp Fae
Sec Resp Group
System
Discipline
THE REGULATION AT 10 CFR 50.54(Q)(5) REQUIRES THE LICENSEE TO SUBMIT, AS SPECIFIED IN 10 CFR
50.4(8)(5)(11), A REPORT OF EACH CHANGE TO THE EMERGENCY PLAN MADE WITHOUT PRIOR NRG APPROVAL,
INCLUDING A SUMMARY OF ITS ANALYSIS, WITHIN 30 DAYS AFTER THE CHANGE IS PUT IN EFFECT. THE NRG
HAS STATED THAT THE SUMMARY REPORT OR A FULL COPY OF THE COMPLETED 50.54(0) MAY BE
SUBMITTED TO SATISFY THIS REQUIREMENT, SUBMIT TO LICENSING, A SUMMARY, AS DESCRIBED IN AD-EP
ALL- 0602, OR THE FULL 50.54(Q) REVIEWING ALL CHANGES TO THE EMERGENCY PLAN MADE WITHOUT PRIOR
NRC APPROVAL FOR SUBMITTAL TO THE NRC'S DOCUMENT CONTROL DESK, WITH A CO.PY TO THE
APPROPRIATE REGIONAL OFFICE, AND A COPY TO THE APPROPRIATE NRG RESIDENT INSPECTOR. IF THE·
COMMUNICATION IS ON PAPER, THE SUBMISSION TO THE DOCUMENT CONTROL DESK MUST BE THE SIGNED
ORIGINAL.
Action Request Assignment Completion Notes
Action Request Assignment Status History
Updated Date
02/07/2019
02/25/2019
02/25/2019
Updated By
144004
144004
144004
! Printed : 02/25/2019
Assgn Status
INPROG
NTFY/ASG
Assgn Due Date
02/25/2019
Page :27
ef_,DUKE Vii ENERGY~
Duke Energy ACTION REQUEST - 02256648
I Action Request Assignment Attributes
Request Attribute 1A COMMITTED
Name :
Request Attribute 1 B CHANGE BASIS
Name :
Request Attribute 2ACOMMENTS Name :
Request Attribute BENEFIT REALIZED
Name :
Request Attribute FINAL ISSUE
Name :
Request Attribute IMPORTANT TO NRC
Name :
Request Attribute IT LABOR ESTIMATE Name :
Request Attribute LTAM ISSUE ID Name :
I Printed : 02/25/2019
Values
Values
Values
Values
Values
Values
Values
Values
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Reqd N
Date
Date
Date
Date
Date
Date
Date
Date
Page :28
,~DUKE ~'ENERGY*
Duke Energy ACTION REQUEST - 02256648
Request Attribute
PHC DUE DATE
Name :
Request Attribute
PLANT HEAL TH ISSUE ?
Name :
· Request Attribute
RTTQ
Name :
Request Attribute
T +1 CRITIQUE
Name :
Request Attribute -
WBS
Name :
Values
Values
Values
Values
Values
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel *** No Routing Comments Found ***
Routing Comments from the X602 Panel ~** No Return Comments Found ***
Action Request Assignment Completion Approval
Action Request Assignment Cause/Action
I Printed : 02/25/2019
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Date
Date
Date
Date
Date
Updated On Updated By
Updated On Updated By
Page :29
e/_,DUKE 'V!f ENERGY,
Duke Energy ACTION REQUEST - 02256648
Action Request Assignment Reference Documents
Doc Sub Minor
Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip
Facility Unit System Type Number
Equip
Tag
Action Request Assignment Cross References
Limit
Equip Rev
Status Rev status
Ref Ref
Type Nbr
Ref RefNbr
Sub Type Status AS Cls Description
Action Request Assignment Appendices
-, Action Request Assignment Details
ASSIGNMENT NUMBER : 05 SUB :
Type
Status
' Assigned To
Subject
Aff Facility
UCR Organization
Est Manhrs
Description
:GNRL
:ACC/ASG
: TONYA S LOWERY
Due Date
Reschedule
: 03/10/2019
: LICENSING SUBMIT 50.54(Q) TO NRG WITHIN 30 DAYS OF
CHANGE
:CN Unit
Schedule Ref Department : 10380
Ext Comp Date
Pri Resp Fae
Pri Resp Group
Sec Resp Fae
Sec Resp Group
System
Discipline
THE REGULATION AT 10 CFR 50.54(Q)(5) REQUIRES THE LICENSEE TO SUBMIT, AS SPECIFIED IN 10 CFR
50.4(8)(5)(11), A REPORT OF EACH CHANGE TO THE EMERGENCY PLAN MADE WITHOUT PRIOR NRG APPROVAL,
INCLUDING A SUMMARY OF ITS ANALYSIS, WITHIN 30 DAYS AFTER THE CHANGE IS PUT IN EFFECT. THE NRG
HAS STATED THAT THE SUMMARY REPORT OR A FULL COPY OF THE COMPLETED 50.54(Q) MAY BE
j Printed : 02/25/2019 Page : 30
l'!aDUKE V!;ENERGY(t
Duke Energy ACTION REQUEST - 02256648
SUBMITTED TO SATISFY THIS REQUIREMENT. SUBMIT, WITHIN 30 DAYS OF IMPLEMENTING THE CHANGE, THE
FULL 50.54(Q) OR SUMMARY (AS DESCRIBED IN AD-EP-ALL-0602) FOR ALL CHANGES TO THE EMERGENCY
PLAN MADE WITHOUT PRIOR NRG APPROVAL TO THE NRC'S DOCUMENT CONTROL DESK, WITH A COPY TO
THE APPROPRIATE REGIONAL OFFICE, AND A COPY TO THE APPROPRIATE NRG RESIDENT INSPECTOR. IF THE
COMMUNICATION IS ON PAPER, THE SUBMISSION TO THE DOCUMENT CONTROL DESK MUST BE THE SIGNED
ORIGINAL.
Action Request Assignment Completion Notes
Action Request Assignment Status History
Updated Date 02/07/2019
02/25/2019
02/25/2019
02/25/2019
Updated By 144004
144004
144004 TSLOWER
Assgn Status
INPROG
NTFY/ASG
ACC/ASG
.. I Action Request Assignment Attributes
Request Attribute
1A COMMITTED
Name·:
Request Attribute
1 B CHANGE BASIS
Name ·:
Request Attribute
2A COMMENTS
Name :
Request Attribute
BENEFIT REALIZED
Name :
I Printed : 02/25/2019
Values
Values
Values
Values
Assgn Due Date
03/10/2019
Reqd
N
Reqd
N
Reqd
N
Reqd N
Date
Date
Date
Date
Page :31
el,DUKE "'f!' ENERGYa
Request Attribute ~ FINAL ISSUE
Name :
Request Attribute .
IMPORTANT TO NRC
Name :
Request Attribute
IT LABOR ESTIMATE
Name :
Request Attribute
L TAM ISSUE ID
Name :
Request Attribute PHC DUE DATE
Name :
Request Attribute PLANT HEAL TH ISSUE ?
Name :
Request Attribute RTTQ
Name :
Request Attribute T +1 CRITIQUE
Name :
Request Attribute WBS
Name :
I Printed : 02/25/2019
Duke Energy ACTION REQUEST - 02256648
Values
Values
Values
Values
Values
Values
Values
Values
Values
Reqd N
Reqd N
Reqd N
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Reqd N
Date
Date
Date
Date
Date
Date
Date
Date
Date
Page : 32
/,DUKE· ~iENERGY~
Duke Energy ACTION REQUEST - 02256648
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel
*** No Routing Comments Found ***
Routing Comments from the X602 Panel
*** No Return Comments Found ***
Action Request Assignment Completion Approval
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub Minor
Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip
Facility Unit System Type Number
Equip Tag
Action Request Assignment Cross References
Limit
Updated On Updated By
Updated On Updated By
Equip Status
Rev
Rev Status
Ref Ref
Type Nbr
Ref Ref Nbr
Sub Type Status AS Cls Description
Action Request Assignment Appendices
I Printed : 02/25/2019 Page : 33
***END OF REPORT***
20H
e._(~DUKE ~;ENERGYs
I Action Request Details
Duke Energy ACTION REQUEST - 02256656
Type : EREG Orig Date : 02/07/2019 12:51 Discovery Date
Subject : RP/O/A/5000/005
Description CONTACT SITE EP SUPERVISOR FOR ASSISTANCE IN PREPARING EP01, EP02, AND EP03. ENSURE EREG IS
CROSS-REFERE:N_CED TO THE REG AR WHICH INITIATED IT. Perform 50.54(q) screen and evaluation
Notes
Priority
Severity
Originator Facility
Owed To
: 144004
:CN
Owed To Fae : CN
I Action Request Status History
Updated Date
02/07/2019
02/07/2019
02/25/2019
02/25/2019
Updated By
144004
144004
144004
144004
. I Action Request Attributes
Request Attribute ,
BOUNDED EREG AR
Name : STACI N WHITE
Request Attribute
EREG AR CROSS XREF
Name : STACI N WHITE
Request Attribute·
REG AR CROSS XREF
Name : STACI N WHITE
! Printed : 02/25/2019
Values
N
Values
N
Values
N
Report To Due Date
Originator Group
: 03/10/2019
Department : 13650
Owed To Group : QUALREVW
Department
AR status
INPROG
APPROVED
AR Due Date
02/11/2019
02/25/2019
03/10/2019
Reqd y
Reqd y
Reqd y
Status : APPROVED 02/07/2019
Event Date
Organization
Discipline
Date
02/07/2019
Date
02/07/2019
Date 02/07/2019
Page : 1 I
J~DUKE ~;ENERGY~
Duke Energy ACTION REQUEST - 02256656
I Action Request Notes
Action Request Routing/Return Comments
Routing Comments from the X601 Panel
*** No Routing Comments Found ***
Routing Comments from the X602 Panel
*** No Return Comments Found ***
I Action Request Approval Review
Route List : 001 Send
Passport Fae Group / Type Date
I Action Request Trend/Cause
I Action Request Keywords
Keyword Keyword Description
I ~ction Request Reference Documents
Doc Sub
Facility Type Type Document
I Action Request Reference Equipment
Equip Equip
Facility Unit System Type Number
I Printed : 02/25/2019
Send Action Time Taken
Minor Sheet Rev Rev Title
Equip Tag
Updated On Updated By
Updated On Updated By
Route List Initiator :
Action Date I Time Last Name
Equip Rev Status Rev status
Page :2
l_,DUKE ~;ENERGYt
Duke Energy ACTION REQUEST - 02256656
I Action Request Cross References
Ref Ref Ref Ref Nbr Limit
Type Nbr Sub Type Status AR Cls Description - --
AR 02214116 SAD COMP-NA N
AR 02256536 PRR COMPLETE N
AS 02187203 1900 GNRL COMPLETE N
AS 02194997 0200 Pl COMPLETE N
I Action Request Assignment Details
ASSIGNMENT NUMBER : 01 SUB :
Type : EP01 Due Date
Reschedule
: 02/11/2019
Status Assigned To Subject
Aff Facility UCR Organization Est Manhrs
Description
: COMPLETE
: STACI N WHITE
: 50.54(Q) SCREEN
:CN Unit
Schedule Ref
Department : 13650
Ext Comp Date
COMPLETE 5Q.54(Q) SCREEN IN ACCORDANCE WITH AD-EP-ALL-0602.
Action Request Assignment Completion Notes
I approve the 50.54Q screen for RP/0/NSOOOiOOS.
Action Request Assignment Status History
RP/O/NS000/005 - 0000215965 GENERAL
EMERGENCY
RP/O/NS000/005 rev 060
EP Excellence Plan - Action SD-EP-4.2
Revise AD-EP-ALL-0602 to improve
templates to focus on why a
Pri Resp Fae
Pri Resp Group
Sec Resp Fae
Sec Resp Group
System
Discipline
Updated Date 02/07/2019
02/07/2019
02/07/2019
02/07/2019
Updated By
144004
144004
144004
144004
Assgn Status
INPROG
Assgn Due Date
02/11/2019
j Printed : 02/25/2019
NTFY/ASG
ACC/ASG ·
Page : 3
ef~DUKE 'Vi; ENERGYa
Du~e Energy ACTION REQUEST - 02256656
02/07/2019
02/08/2019
144004
MEHARE
AWAIT/C
COMPLETE
I Action Request Assign·ment Attributes
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel
*** No Routing Comments Found ***
Routing Comments from the X602 Panel
*** No Return Comments Found ***
Action Request Assignment Completion Approval
Route List : 001
Passport
DMBRUNS
MEHARE
Fae Group I Type
A
A
Send Send
Date Time - --02/07/2019 14:21
02/08/2019 14:16
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub
Updated On Updated By
Updated On Updated By
Route List Initiator : 144004
Action Action
Taken Date / Time Last Name
APPROVED 02/08/2019 14:16 BRUNSON
APPROVED 02/08/2019 15:57 HARE
Minor
Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip
Facility Unit System Type Number
J Printed : 02/25/2019
Equip
Tag
Equip Status
Rev
Rev Status
Page :4
e._(~DUKE VB' ENERGY~
Duke Energy ACTION REQUEST - 02256656
Action Request Assignment Cross References
Ref Ref Type Nbr ·
Ref Ref Nbr Sub Type
I Action Request Assignment Appendices
APPENDIX 1
I Printed. : 02/25/2019
Limit Status AS Cls Description
Page : 5
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 4 Page 1 of 8
« 10 CFR 50.54(q) Screening Evaluation Form»
BNP D
EREG #: ____ 2256656 ___ ~- CNS X
CR3 D
HNP D
MNS D
5AD #:_2214116 ______ _ ONS D
RNP D
GO D
Document and Revision
RP/O/A/5000/005, General Emergency, Rev 60 (PRR 2256536)
Part I. Description of Activity Being Reviewed (event or action, or series of actions that may result in a change to the
emergency plan or affect the implementation of the emergency plan):
Deleted the following steps:
2.8 Initiate Emergency Response Data System (EROS) transmission by performing the following:
2.8.1 Logan to the SRO, BOP or OAC Room business computer on either unit.
2.8.2 Click the "EROS" Icon on the desktop.
2.8.3 Once the EROS logon window appears, enter the password (erds).
2.8.4 Once the EROS window appears, ensure the "Current Mode" value for the affected unit is
"Disconnect".
2.8.5 Click on the "Connect (Activate)" button for the unit.
2.8.6 Click on "Yes" in the message box that appears.
2.8.7 The value of "Status" for the unit should soon change to "Transmitting Data" and the value of
"Messages Sent" should begin incrementing.
2.8 .. 8 IF EROS transmission will not connect to the NRG, inform the NRG using ENS. The TSC Data
Coordinator will troubleshoot and initiate ERS transmission upon arrival in the TSC.
Enclosure 4.5, Command and Control Turnover Briefing Form, was revised to align with the Command and Control
Turnover Form in AD-EP-ALL-0104, ERO Common Guidelines and Forms.
Specific Changes are: Added: "Mode Shutdown Date: ____ Time: ____ " to each of the Unit Status blocks
Added: "Take Cover Order: YES NO TIME: __ _
Added: "Rapid Evacuation: YES NO TIME: ---
Added: "Last ENF Number: __
Added:· "Continuous Communications with NRG Established: YES NO"
Deleted: "[] Stable [] Degrading [] Improving" from each of the Unit Status blocks
Deleted: "EROS Activated: Yes No N/A" from each of the Unit Status blocks
Printed : 02/25/2019 Page :6
EMERGENCY PLAN CHANGE SCREENING AND
EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q) AD-EP-ALL-0602
Rev. 5
ATTACHMENT 4 Page 2 of 8
<< 1 O CFR 50.54(q) Screening Evaluation Form >>
Changed: "Turnover: (From): [] CR/ [] TSC" to "(From): [] CR/ [] TSC/ [] EOF"
Changed: "(TO) [] TSC I [] EOF" to "(TO) [] CR / [] TSC/ [] EOF
Changed: "Units(s) Affected (circle)[] All [11 [12 [13" to "Units{s) Affected (circle) [11 [12 []3"
Changed: "Last ENF Sent (time): __ " to" Last Notification completed (time): ____ _
Changed: "Last Message Sent (time): " to "Notified (time): ___ _
Rev 59 Enclosure 4.5
Enclosnre 4.5
.Command and.Contro, Tum,oni· Briefing Form
station': ( )CNS ( )MNS (JONS- ( )BNP (·)HNP ( fRNP Turnover: (Circle} (From):
Unit{s) Affected:· (circle) ( )All ( ) 1 ( )2()3 (TO)
RP10JNS000/005
Page 1 of2
a CJR / I] :rsc
DTSC /OEOF
a Shift c11ange
Emergency Classilicati~ Unusual Evenl declared at EAL#: Alert Dedarecl at EAL#: ___
Site Area Emergency (ledare(I at EAL#: General anergency Declared at EAL#: __
.. · ·,u~1t11 ,:,
. ., .. ,i,Jn1t~'. ·U~it-~
"D
RxPoWer Cont RxCool RxCOOI R><Pm'M COOL RxCool Rx Cool Press RxPowef" Cont RxCool Rx Cool Press
Press TP11m Press Press TemD Press Temn
a Slable a DegradirrJ a Improving a stable c:i Degradillg a lmproVing a stalJle a Degrading a !mproving
FPB Status (circle appropriate condition) FPB ~ (Cfrcle appropriate conditl(!nJ FPB status (clr~e appropr13te condition)
Fuel lnlacl Polenlialloss ~ Fuel lnlad Po!enlial Loss Loss Fuel lnlact Polenlialtoss Loss
RCS Intact Potential i.oss . Loss RCS lnlact Potentiai Loss Loss RCS Intact PolenliaJLoss Loss
Cont lnlacl Potential Loss ,Loss Cont Intact Potential Loss Loss cont Intact PolentialLoss Loss
Major Eqllipment out ot sennce: Mal_or Equipment out of Service: Major Equipment out Of SelV!ce:
Evolutions in Progress: EVOlu!ions in Progress: ElllllU!ioos in Progress:-
EROS AdiVated: Yes No NIA ERD.S Adiviifed: Yes No NIA ERDSAdivaled: Yes No NfA
Response Procedures in Progress (opliOnal): EOP/APs In Plllgess_ (optional):
station Pliolities:
Printed : 02/25/2019 Page :7
Printed
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Enc:iosul"e 4.5
Command. ancf Control Twnovel" Briefing F~nii
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 3 of 8
RP10!A!so<iotoos Page2of2
Site'Assembly: · YES
site Evacri:ition:YES Locatiorilciimmenis:''
NOTIME:. ___ _ !'l{)TJME: ___ _
,other .\'9enc:y lnVolvement Q l\fil>ICAL a FIRE a LAW ENFORCEMENT a'oriiER AM~ Information {lnjulies):
Radiological: ·l:illergeiicyWoikeniosellml1sapproved:, ~ NO wno ___________ _
ReieaseinProgress: YES 'NO fleldl'_.1ollttOlingTeainsDeployed: YES NONumbei' __ _
Release Palllway: WIND SPEED:____ .WIND OIRECTI~-----
·Olfsile pARS Roo,>~ ~ N<;) Zo,nes!c~ed:-------~ Zo,nesSllellere.11: _______ _
·Off-Site Notific:a11ons: Last ENF Sent (time): __ _ Neirt'ENi= oue.{lime):' __ _
NRC Comrnunic:ation: Last Message Sent lliffle): __ _
upon tiie trailster of command and con1r0~ ilie iouovi'ins wi'u be. pel'fOnlled by:
Event Classification: 0 CR O TSC PAR Deci.sion Making: 0 CR O TSC O EOF
State arid Local !'lotification: d CR O TSC O EOF NRC Notifications: 0 CR O TSC
Emergency Exposure Controls & Ki": 0 CR O TSC Control of FMTs: 0 CR 0TSC O EOF
Dose.Assessment: 0 CR O TS.CO EOF
Name of ln<!Mdualtuming ()~ Duties: _________ ---',_
TumoverCompiete: YES NO TSCIEOF Adivatedat ___ _
(c:irc:fe) (circle) Tune 'oate Name individual ~urning duties
Adartional lnfomiation:
: 02/25/20_19 Page : 8
EMERGENCY PLAN CHANGE SCREENING AND
EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q) AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 4 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Rev 60 Enclosure 4.5
Enclosure 45
Command and Control Turnover Brieifug Form
RP/()/A/5000/005
Page~of~
Station: a BNP DCNS DHNP OMNS DONS DRNP Turnover: (From): a CR / a TSC / a EDF
(TO) OCR/DTSC/DEOF
Unit(s) Affected: 01 02 03 a ShiftChange
Emergency Classification: Unusual Event Dedared at EAL#: Alert Dedared af EAL#:
Sile l'lea Emergency Declared at EAL#: General Emergency Dedared }t EAL#: ___
I:, ' .;,,:;;' ~,. ,··:·:;:, . 'Qmi1c;'.Fi: · .1( _ :, c 3;•,'.'.'7: 1:: • .,, ··::. / ·.;-:··.;!J!}Un1W' ~,.:',/>:;~;"'}'i.'.'o· ''.; ;,, .· ' }}j'."';"t ,, : JfoiiJ': .. ' E.\ 2'. 'f:,'.'ic'·':>.,'i:,
Rx Power Conl RxCool RxCool RxPower
Cont RxCool Rx Cool Press RxPower Conl RxCool Rx Cool Press
Press Temp Press Press Temp Press Temp
Mode ___ Shutdown Date: __ Time: __ Mode --- Shutdown Date: __ Time: __ Mode --- Shutdown Date: __ Time: __
FPB Status (circle appropriate condition) FPB Status (circle appropriate comrrtion) FPB Status (circle appropriate condition)
Fuel Intact Potenfial Loss Loss Fuel Intact Potenfial Loss Loss Fuel Intact Potenfial Loss Loss
RCS Intact Polenfial Loss Loss RCS Intact Potenfial Loss Loss RCS Intact Potenfial Loss Loss
Cont Intact Potenfial Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss
Major Equipment Out of Service: Major Equipment Out of Service: Major Equipment Out of Service:
Evolutions in Progress: Evolutions in Progress: Evolutions in Progress:
EROS Activated: Yes No N/A EROS Activated: Yes No NIA EROS Activated: Yes No N/A
Response Procedures in Progress (optional): I Emergency/Abnormal Procedmes in Progress {optional):
Stafion Priorities:
Printed : 02/25/2019 Page : 9
EMERGENCY PLAN CHANGE SCREENING AND
EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q) AD-EP-ALL-0602
Rev .. 5
ATTACHMENT 4 Page 5 of 8
<< 10 CFR 50.54{q) Screening Evaluation Form>>
Enclosure 4.5
Command and Control Turnover Briefing Form RPiOt.A/5000/005 Page;orB]
Site Assembly: YES NOTIME: Location/Comments: other Agency Involvement:
Site Evacuation: YES NOTIME: OMEDICAL DFIRE a LAW ENFORCEMENT a OTHER
Take Cover Order: YES NO TIME: Additional Information (Injuries):
Rapid Evacuation: YES NO TIME:
Radiological: EmergencyWorker dose limits approved: YES NO Forwhom:
Release in Progress: YES NO Field Monitoring Teams Deployed: YES NO Number
Release Palhway: WIND SPEED: WIND DIRECTION:
Offsite PARS Recommended: YES NO Zones Evacuated: Zones Sheltered:
Kl Recommended: YES NO Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES NO
Off-Site Notifications: Last Notification Completed (time): Last ENF Number: -- Next ENF Due (time):
NRC communication: Notified (time): Continuous Communications with NRC Established: YES NO
Have Communicators discussed Tumoverwilh acquiring facility Communicators? YES NO
Upon the transfer of command and Control, the following wm be performed by:
Event Classification: DcR DTsc PAR Decision Making: DcR 0Tsc0EoF
State and Local Notification: DcR 0Tsc0EoF NRC Notifications: DcR 0Tsc
Site Emergency E;q>os ure Controls & Kl: DcR DTsc Control ofFMTs: DcR 0Tsc0EoF
Dose Assessment DcR DTscOEoF
Name of Individual turning over Duties:
Turnover Complete: YES NO . TSC/EOF Activated at
(circle) (circle) Time Date Name individual assmning duties
Adlfltional Information:
Part II. Activity Previously Reviewed?
Is this activity Fully bounded by an NRC approved 10 CFR 50.90 submittal or
Alert and Notification System Desig'n Report?
If yes, identify bounding source document number or approval reference and
ensure the basis for concluding the source document fully bounds the proposed
change is documented below:
Justification:
Printed : 02/25/2019
10 CFR 50.54(q) Effectiveness Evaluation is not required. Enter justification below and complete Attachment 4, Part V.
Continue to Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part Ill
Page : 10
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 6 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Part Ill. Editorial Change
Is this activity an editorial or typographical change only, such as formatting,
paragraph numbering, spelling, or punctuation that does not change intent?
Justification:
Yes 0
10 CFR 50.54(q) Effectiveness Evaluation is not required. Enter justification and complete Attachment 4,
Part V.
No X
Continue to Attachment 4, Part IV and address non editorial
·changes
Part IV. Emergency Planning Element and Function Screen (Reference Attachment 1, Considerations for Addressing
Screening Criteria)
Does this activity involve any of the following, including program elements from NUREG-0654/FEMA REP-1 Section
II? If answer is yes, then check box.
Responsibility for emergency response is assigned.
The response organization has the staff to respond and to augment staff on a continuing basis
(24-7 staffing) in accordance with the emergency plan.
Arrangements for requesting and using off site assistance have been made.
State and local staff can be accommodated at the EOF in accordance with the emergency plan.
(NA for CR3) ==,..,,,,,.=====~===,..,,,.., ~~;gt¢l~~· ,!~~>:(~),i§ff\~r~¢~s9lw1~~siff~~i1~~!:§'~~t , A standard scheme of emergency classification and action levels is in use.
(Requires final approval of Screen and Evaluation by EP CFAM.)
Sa Procedures for notification of State and local governmental agencies are capable of alerting them of the 0
declared emergency within 15 minutes (60 minutes for CR3) after declaration of an emergency and
providing follow-up notification.
Sb Administrative and physical means have been established for alerting and providing prompt instructions D
to the public within the plume exposure pathway. (NA for CR3)
Sc The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and
Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS
design report and supporting FEMA approval letter. (NA for CR3)
0
Printed : 02/25/2019 Page :11
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
<< 10 CFR 50.54(q) Screening Evaluation Form >>
Part IV. Emergency Planning Element and Function Screen (cont.)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 7 of 8
1 Oa A range of public PARs is available for implementation during emergencies. (NA for CR3) D
1 Ob Evacuation time estimates for the population located in the plume exposure pathway EPZ are available D
to support the formulation of PARs and have been provided to State and local governmental
authorities. (NA for CR3)
1 Oc A range of protective actions is available for plant emergency workers during emergencies, including D
those for hostile action events.
1 Od Kl is,available for implementation· as a protective action recommendation in those jurisdictions.that D
chose to provide Kl to the public.
Arrangements are made for medical services for contaminated, injured individuals.
t119(9Jiiei$,Q:;~Z:<e1c~;21tB~sP:V~rY;~!~Q,t1!ng:itt<:i:1~i?-~k,~9£is!'.~nt:m'eift~,t2~§: Plans for recovery and reentry are developed.
14a A drill and exercise program (including radiological, medical, health physics and other program areas) D
is established.
14b Drills, exercises, and training evolutions that provide performance opportunities to develop, maintain, D
and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses.
14c Identified weaknesses are corrected. D
15a Training is provided to emergency respor:iders.
Printed : 02/25/2019 Page : 12
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(0)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 4 Page 8 of 8
<< 10 CFR 50.54(q) Screening Evaluation Form>>
Part IV. Emergency Planning Element and Function Screen (cont.)
PART IV. Conclusion
If no Part IV criteria are checked, then provide Justification and complete Part V be!ow.
If any Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part IV criteria are checked, then complete
Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form, Part V and perform a 10 CFR 50.54(q)
Effectiveness Evaluation. Program Element 4a requires final approval of Screen and Evaluation by EP
CFAM.
The changes to the Command and Control Turnover Briefing Form will be further evaluated in an
Effectiveness Evaluation.
Duke Energy has transitioned to an "always-on" mode of EROS transmission, making the steps to activate
EROS unnecessary. A Controlled Support Document (CSD) for EROS troubleshooting has replaced the
steps to activate EROS. Deletion of the EROS Activation steps does not affect any of the 50.47(b)
emergency planning standards, as EROS is addressed in 10 CFR Appendix E to Part 50 in section VI,
Emergency Response Data System, not in the 50.47(b) Planning Standards.
With regard to 10 CFR Appendix E to Part 50 in section VI, EROS remains a direct near real-time electronic
data link between the licensee's onsite computer system and the NRG Operations Center, and the features
listed in Section VI are maintained: the testing method and frequency; the software and hardware; the
selected plant parameters; and the transmission rate. No further evaluation of the removal of the EROS
steps is required by 50.54(q).
Preparer Name (Print): Staci White
Reviewer Name (Print): See GAS
Approver (EP Manager Name (Print): See GAS
Approver (EP CFAM, as required) Name (Print) N/A
QA RECORD
Preparer Signature: Date: See GAS See GAS
Reviewer Signature: Date: See GAS See GAS
Approver Signature: Date: See GAS See GAS
Approver Signature: Date: N/A N/A
D
X
j Printed : 02/25/2019 Page : 13
j,DUKE ~JENERGY*
Duke Energy ACTION REQUEST - 02256656
. I Action Request Assignment Details
ASSIGNMENT NUMBER : 02 SUB
Type
Status
Assigned To
Subject
: EP02
: COMPLETE
: STACI N WHITE
: 50.54(0) EVALUATION
:CN
Due Date
Reschedule
Unit
Schedule Ref
:02/11/2019
Aff Facility
UCR
Organization
Est Manhrs
Department : 13650
Ext Comp Date
Description COMPLETE 50.54(0) EVALUATION IN ACCORDANCE WITH AD-EP-ALL- 0602.
Action Request Assignment Completion Notes
I approve the 50.540 eval for RP/O/A/5000/005.
Action Request Assignment Status History
Updated Date Updated By Assgn Status Assgn Due Date
02/07/2019 144004 INPROG
02/07/2019 144004 02/11/2019
02/07/2019 144004 NTFY/ASG
02/07/2019 144004 ACC/ASG
02/07/2019 144004 AWAIT/C
02/08/2019 DMBRUNS ACC/ASG
02/08/2019 144004 AWAIT/C
02/08/2019 MEHARE COMPLETE
I Action Request Assignment Attributes
I Printed : 02/25/2019
Pri Resp Fae
Pri Resp Group
Sec Resp Fae
· Sec Resp Group
System
Discipline
Page : 14
Duke Energy ACTION REQUEST - 02256656
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel
Minor editorial comments. -DMB
Routing Comments from the X602 Panel
*** No Return Comments Found ***
Action Request Assignment Completion Approval
Route List : 001
Fae Group I Type A
Send Send Date Time - --02/07/2019 14:24
Action Action
Updated On 20190208
Updated On
Updated By DMBRUNS
Updated By
Route List Initiator : 144004
Taken Date / Time Last Name
RETURNED 02/08/2019 13:54 BRUNSON Passport DMBRUNS MEHARE
DMBRUNS
A 02/08/2019 14:16 APPROVED 02/08/2019 15:58 HARE
A - 02/08/2019 14:09 APPROVED 02/08/2019 14:16 BRUNSON
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub Minor
Facility Type Type Document Sheet Rev . Rev Title
Action Request Assignment R_eference Equipment
Equip Equip
Facility Unit System Type Number Equip Tag
Action Request Assignment Cross References
Ref Ref Type Nbr
I Printed : 02/25/2019
Ref RefNbr Sub Type Status
Limit
Equip Status
ASCls Description
Rev Rev Status
Page : 15
l~DUKE "'e; ENERGY,
Duke Energy ACTION REQUEST - 02256656
I Action Request Assignment Appendices
APPENDIX 1
l Printed : 02/25/2019 Page : 16
EMERGENCY PLAN CHANGE SCREENING AND
EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form >>
EREG #:_2256656 ______ _
5AD #: __ """""2214116 ____ _
Document and Revision
. RP/O/A/5000/005, General Emergency, Rev 60 (PRR 2256536)
Part I. Description of Proposed Change:
AD-EP-ALL-0602
Rev,5
ATTACHMENT 5 Page 1 of 10
BNP D
CNS X
CR3 D
HNP D
MNS D
ONS D
RNP D
GO D
Enclosure 4.5, Command and Control Turnover Briefing Form, is being revised to align with the Command and
Control Turnover Form in AD-EP-ALL-0104, ERO Common Guidelines and Forms.
Sp_ecific Changes are: Added: "Mode - -Shutdown Date: ____ Time: ____ " to each of the Unit Status blocks
Added: "Take Cover Order: YES NO TIME: __ _
Added: "Rapid Evacuation: YES NO TIME: ___ _
Added: "Last ENF Number: __
Added: "Continuous Communications with NRG Established: YES NO"
Deleted:"[] Stable [] Degrading [] Improving" from each of the Unit Status blocks
Deleted: "EROS Activated: Yes No N/A" from each of the Unit Status blocks
Changed: "Turnover: (From): [] CR/[] TSC" to "(From): [] CR/[] TSC/ [] EOF"
Changed: "(TO) [] TSC / [] EOF" to "(TO) [] CR/[] TSC/ [] EOF
Changed: "Units{s) Affected (circle) [] All []1 []2 []3" to "Units(s) Affected (circle) []1 []2 []3"
Changed: "Last ENF Sent (time): __ " to " Last Notification completed (time):. ____ _
Changed: "Last Message Sent (time): " to "Notified (time): ___ _
I Printed : 02/25/2019 Page : 17
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
<< 10 CFR 50.54{q) Effectiveness Evaluation Form>>
Rev. 5
ATTACHMENT 5 Page 2 of 10
Rev 59 Enclosure 4.5
Station: [ ) CNS (fMNS · ( ) ONS
Enclos1.1re 4,5
Coinm~nd a~d.Control,Tu~'llOVei• Briefmg Form RP/0/A!SOQ0/005 Page 1 of2
( ) BNP {} HNP ( ) 'RNP TUrnover:'(citcle) (From): D CJR , D TSC
1-----------------------------1 (TO) p T~C / DEOF
Unit(s) Affected: (circle} ( ) All ( ) 1 ( i2(. )3 t;J siittt~bange
Printed
EmergencyCtassificatron: UnusualEvenldec~.at ____ EAL#:~-- AlertDedaredat ____ EAi._tt~--
Si!e Area Emergency <!edared at ____ ·EALft. ___ ,Gener.ll En1ffi.!ency Declare<I at. ____ . EAL#: __ _
' ·,,,.·, '·""' Ri<Power
Cont . Rx Cool Rx COOi Press Terno Press ·
D stalile D Degra<lillg D IJTI!lf9Ving
FPS Status (circle appropriate condition).
Fuel Intact Potential Loss Loss
RCS 1niact Polenttal Loss Loss Cont Intact Potenlial Loss Loss Major Equipment Out Of Selvice:
· EvoluliOIIS in Progress:
~ Ac!iV3led: Yes No NIA
~esponse Procedures in Progress (optional):
station Pliorilies:
: 02/25/2019
RxPower Cont: Press
Rx COOi cont 'Rx Cool Terno Rx Cool Press Rx PoWer Press TPmn Rx Cool Press
D stable D Degrading D lml)llMng D Slallle D Oegraelillg D lmprOving
FP.B Status (circle ;:ippropriate conallion)
Fuel Intact P~ Loss Loss
~PB Status [circle appropria~ cond~n}
FUel Intact Po!elltial Loss Loss
RCS Intact Poteniiat Loss Loss RCS Intact Po!entlal Loss Loss
Cont Intact Potential Loss Loss eont Intact Porernrai'Loss Loss
Major Equipment Out Of Service:
Evo!Ufions in Progress:
ERDS_Acliva!ed: Yes No WA ERDS'i:\ctiiialed: Yes No NIA
EOP/APs in Progress {opttonal):
Page : 18
Printed
EMERGENCY PLAN CHANGE SCREENING AND
EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
-<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Enclosure 4.5
Command and Control Turn\)\·er Briefing Form
s~ Assembly: :ves NOTIME:· Other_Agen,cy ~olvement
Site-Evacuation: YES NOTIME: Cl MEDICAL O FIRE Cl LAW ENFORCEMENT
Locatioo'Col)1ments: A<l<fltional lilfonnalion (lnJUlies):
Ramo1og1ca1: Emergency Worker dose llmits approved:· YES NO WllO
Release in Progress: YES NO Rekl Monttoling Teams Deployed: YES NO·Number ---Release Palllway: V,IJNDSPEED: WJND DIRECTION:
Olfsite P~ Recommeooed: 'tE5 NO Zones !cya,cuate<t Zones Sllelte~
!<I Recommelllled: ;YES NO CWrel!I oose·Rtm Avallable: YES NO Have Dose Assessols disruised Tmnovei? YE~ NO
Off-Site Notifications: Last ENF Sent (IJlne): Next ENF Due (limei:
NRC communication: Last Message Sent (lime):
. Have Communicators discussed Tmnaverwilii acqulling facilily Communicatols? YES NO
Upon the transfer of Command and eoritroi.-ttiefoDovJ!ngYIDI be.performed by;
Event Classification: OCR OTSC PAR Decision Making: OCR 0TSC0EOF
State and Local Notification: OCR 0TSC0EOF NRC Notifications: OCR oi-sc Emergency Exposure Controls & Kl: 0 CR O TSC Control of FMTs: t:J CR O TSC O EOF
Dose Assessment: OCR 0TSC0EOF
Name of Individual tuniing over Duties:
Turnover complete: YES NO TSC I EOF Adiva1ed at -(circle) (circle) Tmte Date Name incflVidual assuming d~
Adcfltional Information:
: 02/25/2019
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 3 of 10
RP10/AIS000/005 Pagc2of2
ao1t1ER
Page : 19
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 4 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Rev 60 Enclosure 4.5
Enclosure 4.5
Command and Control Turnover Briefing Form
RPiO/A/5000/005
P~ge~of~
Station: a BNP OCNS DHNP DMNS DONS DRNP Turnover: (From): a CR / a TSC / a EOF
(TO) a CR / a TSC / a EOF
Unit(s) Affected: 01 02 OJ a ShiftChange
BnergencyClassilication: Unusual Event Declared at EAL#: Alert Declared at EAL#:
Site Area Emergency Declared at EAL#: General EmergencyDeclared}t EAL#: ___
,. .oi~ .,, .: 1c •• ,· llni\,f''';; ~",,· '.?~ }:: . .{ '.'/: .t,·:" .:; ·c· ;•,':liiiif21' w. "'. ''C'"?!\;''.';; ,.,;•I .. ,·~J/ii'·':"fc·e,·4:f'·#j("'i,um,..;:~::,g., . ,:Z'2·Z:%iJiiii:flv'\
Rx Power Cont RxCool RxCool Rx Power Cont RxCool Rx Cool Press RxPower
Cont RxCool .· Rx Cool Press Press Temp Press Press Temp Press Temp
Mode --- Shutdown Date: __ Time: __ Mode --- Shutdown Dale: __ Time: __ Mode --- Shutdown Dale: __ Time: __
FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) FPB Status (circle appropriate condition)
Fuel Intact Potential loss Loss Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss
RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss
Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss
Major Equipment Out of service: Major Equipment out of Service: Major Equipment Out of service:
E\IOlufions in Progress: E\IOlufions in Progress: E\IOlufions in Progress:
EROS Activated: Yes No NIA EROS Activaled: Yes No NIA EROS Activated: Yes No NIA
Response Procedures in Progress {optional): Emergency/Abnormal Procedures in Progress (optional):
station Priorities:
Printed : 02/25/2019 Page :20
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 5 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Site Assembly: YES NOTIME:
Enclosure 4.5
C-Ommand and C-Ontrol Turnover Briefing Fonn
Location/Comments: other Agency lnvotvement:
RPtOtA/5000/005
Page~of~
Site Evacuation: YES NOTIME: OMEDICAL OFIRE a LAW ENFORCEMENT [l OTHER
Take Cover Order: YES NO TIME: Additional Information (lnjulies):
Rapid Evacuation: YES NO TIME:
Radiologlcal: EmergencyWorker dose limits approved: YES NO Forwhom:
Release in Progress: YES NO Field Monitoring Teams Deployed: YES NO Number
Release Pathway: WIND SPEED: WIND DIRECTION:
Offsite PARS Recommended: YES NO Zones Evacuated: Zones Sheltered:
Kl Recommended: YES NO Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES NO
Off-Site Notifications: Last Notification Completed (fime): Last ENF Number: -- Nel<l ENF Due (time):
NRC communication: Notified (time): Continuous Communications with NRC Established: YES NO
Have Communicators discussed Turnover with acquiring facility Communicators? YES NO
Upon the Ira nsfer of Comma ml and Control, the following will be performed by:
Event Classification: OcR DTsc PAR Decision Making: OcR 0Tsc0EoF
Slate and Local Notification: OcR 0Tsc0EoF NRC Notifications: DcR DTsc
Site Emergency El<posure Controls & Kl: DcR Orsc Control of FMTs: OcR 0Tsc0EoF
Dose Assessment OcR 0Tsc0EoF
Name of Individual turning over Duties:
Turnover Complete: YES NO TSC/EOF Activated at
(circle) (circle) Time Date Name individual assuming duties
Additional Information:
Attachment 6, 10 CFR 50.54(q) Initiating Condition (IC) and Emergency Action Level (EAL) and EAL
Bases Validation and Verification (V&V) Form , is attached (required for IC or EAL change) Yes D No X
Part II. Description __ and Review of Licensing Basis Affected by the Proposed Change:
Licensing Basis of the ERO
The Assignment of Responsibilities is described in the originally approved CNS Emergency Plan, Revision 2 (dated
January 1983), sections A.1.b, Concept of Operations, A.1.c, Block Diagram of Organization Interrelationships, and
A.1.d, Key Decision Making.
The current licensing basis regarding Assignment of Responsibility is described in CNS Emergency Plan Section A,
Revision 150 (dated $eptember 2017) sections A.1.b, Concept of Operations, A.1.C, Block Diagram of
Organization Interrelationships, and A.1.d, Key Decision Making.
Printed
During revisions to. these sections, the titles of some of the Emergency Response personnel and facilities
have changed (i.e., Shift Sµpervisor to Shift Manager, Crisis Management Center to Emergency
Operations Facility), but the individuals.responsible for Command and Control and the transfer process for
Command and Control has remained the same. The summation of the incremental chan es over time do
: 02/25/2019 Page : 21
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q} Effectiveness Evaluation Form>>
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 6 of 10
not reduce the effectivene.ss of the CNS Emergency Plan when compared to the NRG-approved Plan.
Section P, Responsibility for the Plannirig Effort, in the CNS Emergency Plan, Revision 2, lists RP/O/Af5000/005, as
an implementing procedure. (AD-EP-ALL-0104 had not been created when the CNS Emergency Plan was initially
approved by the NRC.)
Section P, Responsibility for the Planning Effort, in the CNS Emergency Plan, Revision 147, lists RP/O/Af5000/005,
and AD-EP-ALL-0104 as implementing procedures.
List Commitments Associated with the Change
A search to identify site specific commitments related to the ERO positions and their assigned responsibilities was
performed. No site specific commitments were identified aside from those in the Emergency Plan.
RG 1.219 Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors, Rev 1. (July 2016)
3.5 Emergency Plan
Printed
a. "Emergency plan" means the document(s) that the licensee prepared and maintains that identifies and
describes its methods for maintaining emergency preparedness and responding to emergencies. An
emergency plan includes the plan that the NRC originally approved and all subsequent changes that the
licensee made with and without prior NRC review and approval under 10 CFR 50.54(q). See 10 CFR
50.54(q)(1 )(ii) for additional information.
b. This definition highlights that "emergency plan" includes the documents that describes the programmatic
methods that the licensee uses to maintain emergency preparedness and to respond to emergencies.
These methods, or program elements, are the implementation aspects of the planning standards in 10 CFR
50.47(b) and the requirements in Appendix E to 10 CFR Part 50 and generally correspond to the evaluation
criteria of NUREG-0654 or approved alternatives that supply specific acceptable methods for complying
with the planning standards in 10 CFR 50.47(b) and the requirements in Appendix E to 10 CFR Part 50.
_ Such programmatic documents are subject to the 10 CFR 50.54(q) change process. Non-programmatic
documents, such as training rosters, equipment and maintenance test reports, lesson plans, and other
documents that "document the performance" of the program elements, as opposed to those that "establish"
the program elements, are not included.
c. Ordinarily, sub-tier documents such as emergency plan implementing procedures (EPIPs) are not
considered to be part of an emergency plan for the purpose of evaluating proposed changes. If a licensee
relocates a programmatic description from the emergency plan to a sub-tier document, that programmatic
description continues to be 'subject to' the 10 CFR 50.54(q) change process. For example, licensees have
relocated the details of emergency classification schemes from the emergency plan to an EPIP or to large
wall charts maintained in the control room. Because the EPIP or wall chart is now the means to
demonstrate compliance with the planning standards in 10 CFR 50.47(b)(4), these sub-tier documents are
subject to 10 CFR 50.54(q). Repeating, as opposed to relocating, program element descriptions in sub-tier
documents do not necessarily make the sub-tier documents subject to the 10 CFR 50.54(q) change
process. However, the descriptions in the various documents must remain consistent.
e. This definition also highlights the need to consider the NRG-approved plan and the subsequent chan.ges
in reviewing against 10 CFR 50.54(q) to ensure that a series of incremental changes (each determined not
to reduce the effectiveness of the plan) do not reduce the effectiveness of the plan when compared to the
: 02/25/2019 Page : 22
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
NRG-approved plan.
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 7 of 10
The differences in approved revisions and the current revisions of the Emergency Plans have been reviewed and
they have been determined to meet the regulatory requirements required during revisions. Each revision has been
reviewed by the NRG during the inspection process.
Part Ill. Description of How the Proposed Change Complies with Regulation and Commitments.
If the emergency plan, modified as proposed, no longer complies with planning standards in 10 CFR 50.47(b) and
the requirements in Appendix E to 10 CFR Part 50, the_n ensure the change is rejected, modified, or processed as
an exemption request under 10 CFR 50.12, Specific Exemptions, rather than under 10 CFR 50.54( q):
The changes made to the Command and Control Turnover Briefing Form continue to support the assignment of
responsibility by aligning the Command and Control Turnover Briefing Form between the two procedures currently
used by the Shift Manager, TSC Emergency Coordinator and EOF Director. Aligning the content of these two forms
to be identical contributes to each individual understanding the status of the emergency in an efficient manner, and
reduces the potential for human error during the turnover process.
The changes described continue to meet NRG requirements as described in 10 CFR 50.47(b) and 10 CFR 50,
Appendix E and Emergency Plan Sections A and P.
Printed : 02/25/2019 . Page : 23
EMERGENCY PLAN CHANGE SCREENING AND EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q)
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 8 of 10
Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the
Proposed Change (Address each function identified in Attachment 4, 10 CFR 50.54(q) Screening Evaluation Form,
Part IV of associated Screen):
The following portion of planning standard §50.47(b)(1) is related to the change:
Primary responsibilities for emergency response by the nuclear facility licensee have been assigned, and each
principal response organization has staff to augment its initial response on a continuous basis.
The function for §50.47(b)(1) related to this change are:
a. Responsibility for emergency response is assigned.
Appendix E to Part 50 lists the following:
IV. Content of Emergency Plans
A. Organization
The organization for coping with radiological emergencies shall be described, including definition of authorities,
responsibilities, and duties of individuals assigned to the licensee's emergency organization and the means for
notification of such individuals in the event of an emergency. Specifically, the following shall be included:
1. A description of the normal plant operating organization.
2. A description of the onsite emergency response organization (ERO) with a detailed discussion of:
a. Authorities, responsibilities, and duties of the individual(s) who will take charge during an emergency;
The NUREG-0654 Part II.A elements for §50.47(b)(1) related to this change are:
A.1.d. Each organization shall identify a specific individual by title who shall be in charge of the emergency
response.
A.2. Each principal organization shall be capable of continuous (24-hour) operations for a protracted period.
The individual in the principai organization who will be responsible for assuring continuity of resources
(technical, administrative, and material) shall be specified by title.
Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan Functions:
The changes made to the Command and Control Turnover Briefing Form continue to support the assignment of
responsibility by aligning the Command and Control Turnover Briefing Form between the two procedures currently
used by the Shift Manager, TSC Emergency Coordinator and EOF Director. Aligning the content of these two forms
to be identical contributes to each individual understanding the status of the emergency in an efficient manner, and
reduces the potential for human error during the turnover process.
The description of the authorities, responsibilities and duties of the individual(s) who will take charge in an
emergency is maintained. There is no reduction in effectiveness of the CNS Emergency Plan.
Printed : 02/25/2019 Page : 24
EMERGENCY PLAN CHANGE SCREENING AND
EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q) AD-EP-ALL-0602
Rev. 5
ATTACHMENT 5 Page 9 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Part VI. Evaluation Conclusion.
Answer the following questions about the proposed change.
1 Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E? YesX NoO
2 Does the proposed change maintain the effectiveness of the emergency plan (i.e., no Yes X
reduction in effectiveness)?
3 Does the proposed change maintain the current Emergency Action Level (EAL) scheme? Yes X
4 Choose one of the following conclusions:
a The activity does continue to comply with the requirements of 10 CFR 50.47(b) and 10 CFR 50,
Appendix E, and the activity does not constitute a reduction in effectiveness or change in the current
Emergency Action Level (EAL) scheme. Therefore, the activity can be implemented without prior NRG
approval.
b The activity does not continue to comply with the requirements of 10 CFR 50.47(b) or 10 CFR 50
Appendix E or the activity does constitute a reduction in effectiveness or EAL scheme change.
Therefore, the activity cannot be implemented without prior NRG approval.
Part VII. Disposition of Proposed Change Requiring Prior NRG Approval
NoO
NoO
X
D
Will the proposed change determined to require prior NRG approval be either revised or Yes D No D
rejected?
If No, then initiate a License Amendment Request in accordance 10 CFR 50.90, AD-LS-ALL-0002, Regulatory
Correspondence, and AD-LS-ALL-0015, License Amendme~t Request and Changes to SLC, TRM, and TS Bases,
________________ _i,~nd include the tracking number:
Printed : 02/25/2019 Page :25
EMERGENCY PLAN CHANGE SCREENING AND
EFFECTIVENESS EVALUATIONS 10 CFR 50.54(Q) AD-EP-ALL-0602
Rev.5
ATTACHMENT 5 Page 10 of 10
<< 10 CFR 50.54(q) Effectiveness Evaluation Form>>
Part VIII. Signatures: EP CFAM Final Approval is required for changes affecting risk significant planning standard
10 CFR 50.47(b)(4) (i.e., Emergency Action Levels and Emergency Action Level Bases). If CFAM approval is NOT
required, then mark the CFAM signature block as not applicable (N/A) to indicate that signature is not required.
Preparer Name (Print): Preparer Signature: Date:
Staci White See GAS 217/2019
Reviewer Name (Print): Reviewer Signature: Date:
See GAS See GAS See GAS
Approver (EP Manager) Name (Print): Approver Signature: Date:
See GAS See GAS See GAS
Approver (CFAM, as required) Name (Print): Approver Signature: Date:
N/A N/A N/A
If the proposed activity is a change to the E-Plan or implementing procedures, then create two EREG General
Assignments. If required by Section 5.6, Submitting Reports of Changes to the NRG, then create two EREG General
Assignments.
• One for EP to provide the 10 CFR 50.54(q) summary of the analysis, or the completed 10 CFR 50.54(q),
to Licensing.
• One for Licensing to submit the 10 CFR 50.54(q) information to the NRG within 30 days after the change
is put in effect.
· QA RECORD
X
X
I Printed : 02/25/2019 Page :26
e.(-,DUKE ~ ENERGYo
Duke Energy ACTION REQUEST - 02256656
, I Action Request Assignment Details
ASSIGNMENT NUMBER : 04 SUB :
Type
status
Assigned To
Subject
Aff Facility
UCR
Organization
Est Manhrs
Description
:GNRL
: NTFY/ASG
: STACI N WHITE
Due Date
Reschedule
: 02/25/2019
: PROVIDE 50.54(Q) INFO TO LICENSING FOR NRC 30 DAY
SUBMITIAL
: CN Unit
Schedule Ref
Department : 13650
Ext Comp Date
Pri Resp Fae
Pri Resp Group
Sec Resp Fae
Sec Resp Group
System
Discipline
THE REGULATION AT 10 CFR 50.54(Q)(5) REQUIRES THE LICENSEE TO SUBMIT, AS SPECIFIED IN 10 CFR
50.4(8)(5)(11), A REPORT OF EACH CHANGE TO THE EMERGENCY PLAN MADE WITHOUT PRIOR NRC APPROVAL,
INCLUDING A SUMMARY OF ITS ANALYSIS, WITHIN 30 DAYS AFTER THE CHANGE IS PUT IN EFFECT. THE NRC
HAS STATED THAT THE SUMMARY REPORT OR A FULL COPY OF THE COMPLETED 50.54(Q) MAY BE
SUBMITIED TO SATISFY THIS REQUIREMENT. SUBMIT TO LICENSING, A SUMMARY, AS DESCRIBED IN AD-EP
ALL- 0602, OR THE FULL 50.54(Q) REVIEWING ALL CHANGES TO THE EMERGENCY PLAN MADE WITHOUT PRIOR
--- NRC APPROVAL FOR SUBMITTAL TO THE NRC'S DOCUMENT CONTROL DESK, WITH A COPY TO THE
APPROPRIATE REGIONAL OFFICE, AND A COPY TO TH!= APPROPRIATE NRC RESIDENT INSPECTOR. IF THE
COMMUNICATION IS ON PAPER, THE SUBMISSION TO THE DOCUMENT CONTROL DESK MUST BE THE SIGNED
ORIGINAL.
Action Request Assignment Completion Notes
Action Request Assignment Status History
Upd~ted Date
02/07/2019
02/25/2019
02/25/2019
Updated By
144004
144004
144004
I Printed : 02/25/2019
Assgn Status
INPROG
NTFY/ASG
Assgn Due Date
02/25/2019
Page :27
ef_~DUKE ~iENERGYt
Duke Energy ACTION REQUEST - 02256656
I Action Request Assignment Attributes
Request Attribute
· 1A COMMITIED
Name·:
Request Attribute
1 B CHANGE BASIS
Name :
Request Attribute
2ACOMMENTS
Name :
Request Attribute ·
BENEFIT REALIZED
Name :
Request Attribute
FINAL ISSUE
Name :
Request Attribute
IMPORTANT TO NRG
Name,:
Request Attribute
IT LABOR ESTIMATE
Name
Request Attribute
L TAM ISSUE ID
Name :
I Printed : 02/25/2019
Values
Values
Values
Values
Values
Values
Values
Values
Reqd
N
Reqd
N
Reqd
N
Reqd N
Reqd
N
Reqd
N
Reqd
N
Reqd N
Date
Date
Date
Date
Date
Date
Date
Date
Page :28
ef_~1
DUKE ~ ENERGY~_
Duke Energy ACTION REQUEST - 02256656
Request Attribute
PHC DUE DATE
Name :
Request Attribute -
PLANT HEAL TH ISSUE ?
Name :
Request Attribute
RTTQ
Name :
Request Attribute
T +1 CRITIQUE
Name :
Request Attribute
WBS
Name :
Values
Values
Values
Values
Values
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel
*** No Routing Comments Found ***
Routing Comments from the X602 Panel
*** No Return Comments Found ***
Action Request Assignment Completion Approval
Action Request Assignment Cause/Action
I Printed : 02/25/2019
Reqd N
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Date
Date
Date
Date
Date
Updated On Updated By
Updated On Updated By
Page :29
ef~DUKE ~ ENERGY~
Duke Energy ACTION REQUEST - 02256656
Action Request Assignment Reference Documents
Doc Sub Minor
Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip
Facility Unit System Type Number
Equip Tag
Action Request Assignment Cross References
Limit
Equip
Status
Rev
Rev status
Ref Ref
Type Nbr
Ref Ref Nbr
Sub Type Status AS Cls Description
Action Request Assignment Appendices
I Action Request Assignment Details
ASSIGNMENT NUMBER : 05 SUB :
.Type :GNRL
: NTFY/ASG
: TONYA S LOWERY
Due Date
Reschedule
: 03/10/2019
status Assigned To
Subject : LICENSING SUBMIT 50.54(Q) TO NRC WITHIN 30 DAYS OF
CHANGE
Aff Facility
UCR Organization
Est Manhrs
Description
:CN Unit Schedule Ref
Department : 10380
Ext Comp Date
Pri Resp Fae
Pri Resp Group
Sec Resp Fae
Sec Resp Group
System
Discipline
THE REGULATION AT 10 CFR 50.54(Q)(5) REQUIRES THE LICENSEE TO SUBMIT, AS SPECIFIED IN 10 CFR
50.4(8)(5)(11), A REPORT OF EACH CHANGE TO THE EMERGENCY PLAN MADE WITHOUT PRIOR NRG APPROVAL,
INCLUDING A SUMMARY OF ITS ANALYSIS, WITHIN 30 DAYS AFTER THE CHANGE IS PUT IN EFFECT. THE NRG
HAS STATED THAT THE SUMMARY REPORT ORA FULL COPY OF THE COMPLETED 50.54(Q) MAY BE
l Printed : 02/25/2019 Page : 30
ef_,DUKE ~tENERGY$
Duke Energy ACTION REQUEST - 02256656
SUBMITTED TO SATISFY THIS REQUIREMENT. SUBMIT, WITHIN 30 DAYS OF IMPLEMENTING THE CHANGE, THE
FULL 50.54(Q) OR SUMMARY (AS DESCRIBED IN AD-EP-ALL-0602) FOR ALL CHANGES TO THE EMERGENCY
PLAN MADE WITHOUT PRIOR NRC APPROVAL TO THE NRC'S DOCUMENT CONTROL DESK, WITH A COPY TO
THE APPROPRIATE REGIONAL OFFICE, AND A COPY TO THE APPROPRIATE NRC RESIDENT INSPECTOR. IF THE
COMMUNICATION IS ON PAPER, THE SUBMISSION TO THE DOCUMENT CONTROL DESK MUST BE THE SIGNED
ORIGINAL.
Action Request Assignment Completion Notes
Action Request Assignment Status History
Updated Date
02/07/2019
02/25/2019
02/25/2019
Updated By 144004
144004
144004
Assgn Status
INPROG
NTFY/ASG
I Action Request Assignment Attributes
Request Attribute~
1A COMMITTED
Name :
Request Attribute·
1 B CHANGE BASIS
Name :
Request Attribute
2ACOMMENTS
Name :
Request Attribute
BENEFIT REALIZED
Name :
Request Attribute
j Printed : 02/25/2019
Values
Values
Values
Values
Values
Assgn Due Date
03/10/2019
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Date
Date
Date
Date
Date
Page : 31
e/,DUKE V!'ENERGY~
FINAL ISSUE
Name :
Request Attribute
IMPORTANT TO NRG
Name
Request Attribute ·
IT LABOR ESTIMATE
Name :
Request Attribute -
L TAM ISSUE ID
Name :
Request Attribute -· ·
PHC DUE DATE
Name :
Request Attribute
PLANT HEAL TH ISSUE ?
Name :
Request Attribute
RTTQ
Name :
Request Attribute
T +1 CRITIQUE
Name :
Request Attribute
WBS
Name :
I Printed : 02/25/2019
Duke Energy· ACTION REQUEST - 02256656
Values
Values
Values
Values
Values
Values
Values
Values
N
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Reqd
N
Reqd N
Date
Date
Date
Date
Date
Date
Date
Date
Page : 32
e/,DUKE . ~;ENERGYa
Duke Energy ACTION REQUEST - 02256656
Action Request Assignment Routing/Return Comments
Routing Comments from the X601 Panel
*** No Routing Comments Found ***
Routing Comments from the X602 Panel
*** No Return Comments Found ***
Action Request Assignment Completion Approval
Action Request Assignment Cause/Action
Action Request Assignment Reference Documents
Doc Sub Minor
Facility Type Type Document Sheet Rev Rev Title
Action Request Assignment Reference Equipment
Equip Equip
Facility Unit System Type Number
Equip
Tag
Action Request Assignment Cross References
Limit
Updated On Updated By
Updated On Updated By
Equip
Status
Rev
Rev Status
Ref ·Ref
Type Nbr
Ref Ref Nbr
Sub Type Status AS Cls Description
I Action Request Assignment Appendices
! Printed : 02/25/2019 Page : 33
l _____ **_*E_N_D_O_F_R_E_P_O_R_T_**_* ____ I
20H
Duke Energy Procedure No.
Catawba Nuclear Station RP/0/ A/5000/002 Revision No.
Notification of Unusual Event 049
Reference Use Electronic Reference No.
CN005GNL
REVISION REMARKS Rev 049 Reference AR(s): 02256533
RP/0/ A/5000/002 Page 2 of 6
Revised Enclosure 4.2 (Command and Control Turnover Briefing Form) to match AD-EP-ALL-0104.
Specific changes for Enclosure 4.2
Deleted ALL from Units affected block
Unit Status blocks: deleted stable, degrading and improving added shutdown date and time
Procedures in progress box: replaced EOP/APs with Emergency/Abnormal Procedures
Site assembly block: · Added Take Cover Order (yes/no) and time Added Rapid Evacuation (yes/no) and time.
Radiological block: Replaced current dose run with dose assessment
Notification/ Communications block Replaced ENF Sent with Notification Completed and Last ENF Number __ Added Continuous communications with NRC Established (yes/no)
I '1
"--' .I Notification of Unusual Event
1. Symptoms
RP/0/ A/5000/002 Page 3 of 6
1.1 This condition exists when events are in process or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated.
2. Immediate Actions
NOTES: 1. Lines in left margin are for place keeping. Immediate actions may be performed simultaneously.
2. Only the Emergency Coordinator can complete Item 13 of the Emergency Notification Form to approve message for transmission
2.1 Notify off-site agencies within 15 minutes of Emergency declaration time using Emergency Notification Form. Refer to the appropriate notification procedure:
• RP/O/A/5000/006A, "Notifications to States and Counties from the Control Room"
• AD-EP-ALL-0304, "State and County Notifications."
2.2 Notify the NRC using RP/O/B/5000/013, "NRC Notification Requirements." Notification shall be made immediately after notification to the Off-Site Agencies and shall be completed within one hour of the emergency declaration time.
2.3 IF there is an indication of a radioactive release AND the TSC is not activated, contact Dose Assessment Qualified Individual to perform off-site dose assessment per AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.
2.4 IF a radioactive releas~ or hazardous material spill is occurring or has occurred AND the TSC is not activated, contact Environmental Management (EM), ext. 3333 for assistance inreporting to state, local or federal authorities. After hours, contact the Environmental Duty person by phone or pager. IF no answer, dial 9+ 1 +800-777-3853 (then enter pager number 777-3333) to activate the Environmental Management group pager. Include area code with call-back number.
2.5 IF a Security Event exists, perform the following:
RP/0/ A/5000/002 Page4 of6
• Discuss the need to make the following announcement over the PA system with Security at extension 5364:
"This is the Shift Manager. A Security Event is in progress. Do not move about the site. Remain at your present location until further notice. Report any suspicious activities to the SAS at extension 5765 or 5766." Repeat announcement.
• IF the security event involves a CREDIBLE THREAT to the site, implement 2-person rule for access to all vital areas.
NOTE: Normally the Emergency Response Organization (ERO) is not activated at the Unusual Event (UE) classifi~ation; however, the Shift Manager or Station Manager may decide to activate at the UE classification.
2.6 IF a decision is made to activate the Emergency Response Organization (ERO), consider the following prior to activating the ERO:
2.6.1 IF Security has closed access to the site, activate the ERO per RP/O/B/5000/026, Enclosure 4.3.
2.6.2 IF access to the site is permitted, perform the following:
A. Notify site personnel to staff the TSC, OSC and EOF by making the following announcement twice over the public address system:
"This is the Shift Manager. A notification of unusual event has been declared. Units(s) is (are) affected. Activate the TSC, OSC and EOF. "
NOTE: Enclosure 4.1 is formatted to allow step performance in sequence or simultaneously based on available resources ( one activation method per page).
B. Activate the Emergency Response Organization per Enclosure 4.1 of this procedure.
2.7 . IF the ERO is NOT activated, notify the Public Affairs duty person by pager.
RP/0/ A/5000/002 Page 5 of 6
NOTE: 1. Turnover of command and control to the TSC relieves the SM/Emergency Coordinator of classification, Notification and Protective Action Recommendation (PAR) responsibilities.
2. Turnover to the EOF relieves the SM/Emergency Coordinator of Notification and Protective Action Recommendation (PAR) responsibilities ONLY.
2.8 Tumoverthe responsibility of command and control for the emergency as follows:
2.8.1 IF the emergency situation does NOT prevent activation of the TSC within 75 minutes, provide turnover to the TSC Emergency Coordinator using Enclosure 4.2.
2.8.2 IF the emergency situation prevents activation of the TSC within 75 minutes of declaration, contact the EOF Director and perform the following:
• A turnover for Notification and Protective Action Recommendation (PAR) ONLY using Enclosure 4.2.
• Maintain command and control of classification until TSC is capable of .accepting turnover.
2.8.3 IF neither facility can take turnover, maintain command and control until the facility is capable of accepting turnover.
3. Subsequent Actions
NOTE: Subsequent Actions are not required to be followed in any particular sequence.
3.1 IF ERO has not been activated, notify Duty Station Manager (see current duty list).
3.2 Perform Follow-up Notifications using applicable "Notifications to States and Counties" procedure:
• Every hour until the emergency is terminated.
OR
• If there is any significant change to the situation.
OR
• As agreed upon with an Emergency Management official from each individual agency.
RP/0/A/5000/002 Page 6 of6
3 .3 IF Security Event announcement, discussed above, was made over the PA system, make the following announcement over the PA system after the Security Event has been terminated:
"This is the Shift Manager. The Security Event has been terminated. Return to normal work activity. " Repeat announcement.
3 .4 Augment shift resources to assess and respond to the emergency situation as needed.
3.5 Close out the Emergency by a verbal summary to county and state authorities. Document this summary using Enclosure 4.3.
3.6 Assign an individual to provide a written summary to state and county authorities within thirty days. This report could be an LER or written report if an LER is not required.
Person assigned responsibility ____________ _
4. Enclosures
4.1 Emergency Organization Activation
4.2 Command and Control Turnover Briefmg Form
4.3 · Unusual Event Close Out Briefing with States and Counties
Enclosure 4.1
Emergency Organization Activation RP/0! A/5000/002 Page 1 of 3
1. Activate the ERO using the Emergency Response Organization Notification System (ERONS)
NOTE: 1. Emergency Response Organization Notification System (ERONS) instructions for drills and actual emergencies are located in AD-EP-ALL-0301, Activation of the Emergency Response Organization Notification System (ERONS).
2. A Job Aid for ERONS is located in the communicator's area that directs the Operator to notify Security to activate the ERO.
3. The ERO NS will deliver a confirmation call to the confirmation phone in the Control Room (803-831-7332) or Simulator (803-701-3167) which is verification that the activation was successful.
D 1.1 IF ERONS is NOT available, immediately GO TO Step 2.
D 1.2 Activate the ERO per AD-EP-ALL-0301, Activation of the Emergency Response Organization Notification System (ERONS).
2. Activate the ERO using the Nuclear Callout System
D 2.1 IF the Nuclear Callout System is NOT available via the computer (DAE Link), immediately GO TO Step 2.3.
D 2.1.1
D 2.1.2
Start the Nuclear Callout System as follows:
D A. Select or Search for Nuclear Callout System from the DAE.
D B. Select "Run Application".
At the Nuclear Callout System Login Screen, perform the following:
D A. Refer to the Password Card located in the Control Room, Central Alami Station (CAS) or Secondary Alarm Station (SAS) to obtain the usemame and password.
D B. Enter Usemame.
D C. Enter Password.
DD. Select Create Job from the Start page pull down menu.
D E. Click the Login button.
D 2.1.3
Enclosure 4.1
Emergency Organization Activation RP/0/ A/5000/002 Page 2 of 3
Select the appropriate message to be sent from the Select Template/Saved Job drop down menu as follows:
D A. For an ERO Drill, select !5 CNS Drill.
DB. For an actual Emergency event, select !6 CNS Emergency.
· DC. Click the Review & Send button at the bottom of the page.
DD. Click the Submit button at the bottom of the page.
NOTE: The Nuclear Callout system will deliver a call to the confirmation phone in the Control Room (803-831-7332) or Simulator (803-701~3167) which is verification that the activation was successful.
D 2.2 Verify the Nuclear Callout System activation is successful.
D 2.3
Enclosure 4.1
Emergency Organization Activation RP/0/ A/5000/002 Page 3 of3
IF the Nuclear Callout system activation via the computer was NOT successful, perform an activation via the telephone (VoiceREACH) per the following:
D 2.3.1
D 2.3.2
D 2.3.3
D 2.3.4
D 2.3.5
Call 866-515-0663 (The system will play the VoiceREACH greeting).
D A. Refer.to the Password Card located in the Control Room, Central Alarm Station (CAS), or Secondary Alarm Station (SAS) to obtain the user number and numeric password.
D B. Enter the User Number followed by the# key.
D C. Enter the Numeric Password followed by the # key.
D D. You will be prompted to "wait while we verify your ID and Password."
D E. Press 1 to create a message.
D F. Press 1 to enter a list distribution number.
D G. . Enter 4. (Distribution List Number) followed by the # key.
D H. Press 1 to confirm your list distribution number.
D I. Press 2 to select your message.
D J. Press # to play the same message for both live and answering machine recipients.
D K. Press 2 to specify your script.
D L. Press 1 to select a script number.
Select the appropriate message to be sent:
. D A. For a1i ERO Drill, press 5.
DB. For an actual Emergency event, press 6.
Press 1 to confirm.
Press 1 for immediate delivery (The system will give you a job number. It may take -20 seconds.).
Press 9 to end the call and send the voice broadcast.
Enclosure 4.2
Command and Control Turnover Briefing Form RP/0/A/5000/002 Page 1 of2
Station: D BNP OCNS OHNP DMNS DONS ORNP Turnover: (From):D CR/ D TSC / D EOF
(TO) D CR/ D TSC / D EOF Unit(s) Affected: 01 02 03
D Shift Change
Emergency Classification: Unusual Event Declared at: EAL#: Alert Declared at: EAL#:
Site Area Emergency Declared at: EAL#: General Emergency Declared at: EAL#:
:(, •> :,i j:f!{ " ,, . ;:,, , ':·\{1:r;i,~i)lr:}t ,::;·: .::::,.:':.:.Y::\,, :/' ,' •; •:"'"' . ·' ,;,; i ..... . '.-,.· ':'. .. ;/_.');'U'.ri/(2,'.:'· ":·. _::;?~)t,;; __ .·/: ,,,_.: ;;;: IJ; • _:\ ·· ;, . ·,\, :;.:};\ ; :~,:- , ;U~jt~a'~{ff;;':,> . .'(: i 'f\:~t ' ·,.: ,, ::::.- .
Rx Power Cont. Rx Cool Rx Cool Rx Power Cont. Rx Cool Rx Cool Press Rx Power Cont. Rx Cool
Rx Cool Press Press Temp Press Press Temp Press Temp
Mode Shutdown Date: --- Time: ___ Mode Shutdown Date: --- Time: --- Mode Shutdown Date: --- Time: ---FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Major Equipment Out of Service: Major Equipment Out of Service:. Major Equipment Out of Service:
Evolutions in Progress: Evolutions in Progress: Evolutions in Progress:
..
EROS Activated: Yes No N/A EROS Activated: Yes No N/A EROS Activated: Yes No NIA Response Procedures in Progress (optional): Emergency/Abnormal Procedures in Progress (optional):
Station Priorities:
f
Site Assembly: YES NO TIME:
Enclosure 4.2
Command and Control Turnover Briefing Form
Location/Comments: Other Agency Involvement:
RP/0/A/5000/002 Page 2 of2
Site Evacuation: YES NO TIME: D MEDICAL D FIRE D LAW ENFORCEMENT D OTHER
Take Cover Order: YES NO TIME: Additional Information {Injuries):
Rapid Evacuation: YES NO TIME:
Radiological: Emergency Worker dose limits approved: YES NO For whom:
Release in Progress: YES NO Field Monitoring Teams Deployed: YES NO Number
Release Pathway: WIND SPEED: WIND DIRECTION:
Offsite PARS Recommended: YES NO Zones Evacuated: Zones Sheltered:
Kl Recommended: YES NO Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES NO
' Off-Site Notifications: Last Notification Completed (time): Last ENF Number: -- Next ENF Due (time):
NRC Communication: Notified (time): Continuous Communications with NRC Established: YES NO
Have Communicators discussed Turnover with acquiring facility Communicators? YES NO
Upon the transfer of Command and Control, the following will be performed by:
Event Classification: D CR DTsc PAR Decision Making: D CR D TSC D EDF
State and Local Notification: D CR D TSC D EDF NRC Notifications: D CR DTsc
Site Emergency Exposure Controls & Kl: DcR DTsc Control of FMTs: D CR D TSC D EDF
Dose Assessment: D CR D TSC D EDF
Name of Individual turning over Duties:
Turnover Complete: YES NO TSC/ EDF Activated at: (circle) (circle)
... Time Date Name individual assuming duties
Additional Information:
Enclosure 4.3
Unusual Event Close Out Briefing with States and Counties
RP/0/ A/5000/002 Page 1 of 1
Person Providing Verbal Summary:---------------------
Brief Event Description:--------------------------
Agency
South Carolina
North Carolina
York County
Gaston County
Mecklenburg County
Person Contacted Date/Time
I
I
I
I
I
Comments/Questions from States and Counties: -----------------
Duke Energy Procedure No.
Catawba Nuclear Station RP/0/ A/5000/003 Revision No.
Alert 054
Ref ere nee Use Electronic Reference No.
CN005GNM
REVISION REMARKS Rev 054
RP/0/ A/5000/003 Page 2 of7
Reference AR(s) 02256534; 02223554
Deleted step 2.8 for initiating ERDS
Revised Enclosure 4.2 (Command And Control Turnover Briefing Form) to Match AD-EP-ALL-0104 Attachment 2 (Command And Control Turnover Briefing Form)
Enclosure 4.2 changes:
Deleted ALL from Units affected block
Unit Status blocks: deleted stable, degrading and improving added shutdown date and time
Procedures in progress box: replaced EOP/APs with Emergency/Abnormal Procedures
Site assembly block: Added Take Cover Order (yes/no) and time Added Rapid Evacuation (yes/no) and time.
Radiological block: Replaced current dose run with dose assessment
Notification/ Communications block Replaced ENF Sent with Notification Completed and Last ENF Number __ Added Continuous communications with NRC Established (yes/no)
Alert
RP/0/ A/5000/003 Page 3 of?
1. Symptoms
1.1 Events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of HOSTil,E ACTION.
2. Immediate Actions
NOTE: l. Lines in left margin are for place keeping. Immediate actions may be performed simultaneously.
2. Security events may require the suspension of access to and movement about the site. Staffing and activation of the on-site emergency response facilities could complicate or interfere with security operations resulting in unwarranted casualties.
2.1 IF a security event exists, discuss the feasibility of conducting a site assembly and activating the TSC/OSC with the Security at 3255 or 5766. ·
2.1.1 IF site assembly and activation of the TSC/OSC are not feasible, refer to RP/O/B/5000/026, "Site Response to Security Events", for guidance and N/A the associated steps in this procedure under Immediate Actions concerning site assembly and ERO. activation:
2.1.2 IF the security event involves a CREDIBLE THREAT to the site, implement 2-person rule for access to all vital areas.
2.1.3 Consider delaying other actions in this procedure that could endanger site personnel until the security threat is terminated.
2.2 IF TSC, OSC and EOF have NOT been previously activated, notify the ERO to staff emergency · response facilities by performing the following steps (2.2.1 and 2.2.2):
· 2.2.1 Notify site personnel to activate the TSC and OSC by making the follow~ng announcement twice over public address system:
· "This is the Shift Manager. An Alert has been declared. Unit(s) ______ _ is (are) affected. Activate the TSC, OSC, and EOF."
2.2.2 Activate Emergency Response Organization by completing Enclosure 4.1 of this procedure.
Notify off-site agencies within 15 minutes of Emergency declaration time using an Emergency Notification Forin. Refer to one of the following notification procedures for instructions:
• RP/O/A/5000/006A, "Notifications to States and Counties from the Control Room"
• AD-EP-ALL-0304, "State and County Notifications"
RP/0/ A/5000/003 Page 4 of7
2.4 Notify the NRC using RP/O/B/5000/013, "NRC Notification Requirements." Notifications shall be made immediately after notification to the Off-Site Agencies and shall be completed within one hour of the emergency declaration time.
2.5 IF there is an indication of a radioactive release AND the TSC is not activated, contact Dose Assessment Qualified Individual to perform off-site dose assessment per AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.
2.6 IF a radioactive release or hazardous material spill is occurring or has occurred AND the TSC is not activated, contact Environmental Management (EM), ext. 3333 for assistance in reporting to state, local or federal authorities. After hours, contact the Environmental Duty person by phone or pager. IF no answer, dial 9+ 1 +800-777-3853 (then enter pager number 777-3333) to activate the Environmental Management group pager. Include area code with call-back number.
2.7 Conduct a Site Assembly using RP/O/A/5000/010, "Conducting a Site Assembly or Preparing the Site for an Evacuation."
3. Subsequent Actions
RP/0/ A/5000/003 Page 5 of7
NOTE: Subsequent Actions are not required to be followed in any particular sequence.
3.1 IF a security event has occurred, perform the following to account for site personnel:
3 .1.1 WHEN Security notifies the SM that the security threat has been terminated, make the following announcement twice over the public address system:
"This is the Shift Manager. The security event has been terminated. The security event has been terminated."
3 .1.2 Conduct a site assembly per RP/0/ A/5000/10, "Conducting a Site Assembly or Preparing the Site for an Evacuation."
3.2 Ensure RP has dispatched On-Site monitoring and Off-Site Monitoring Teams with associated communications equipment per AD-EP-ALL-0106, "Activation and Operation of the Operations Support Center".
3.3 Perform Follow-up Notifications using applicable "Notifications to States and Counties" procedure.
• Every hour until the emergency is terminated.
OR
• If there is any significant change to the situation.
OR
• As agreed upon with an Emergency Management official from each individual agency.
3.4 AD-EP-ALL-0205, "Emergency Exposure Controls" shall be used to authorize emergency worker doses expected to exceed normal occupational exposure limits during a declared emergency evenf or exceed blanket dose extension limits authorized by the Radiation Protection Manager.
3.5 Augment shift resources to assess and respond to the emergency situation as needed.
3.6 Announce over the plant public address system the current emergency classification level and summary of plant status.
RP/0/ A/5000/003 Page 6 of7
3.7 Assess emergency conditions and the corresponding emergency classification. See RP/0/ A/5000/001, "Classification of Emergency," then:
Remain in an Alert.
Escalate to a more severe emergency classification.
Reduce to a less severe emergency classification.
(Refer to Enclosure 4.3)
Terminate the emergency (Refer to AD-EP-ALL-0101, "Emergency Classification").
\
3.8 Announce any emergency classification level changes over the plant public address system, including a summary of plant status.
NOTE: 1. Turnover of cqnimand and control to the TSC relieves the SM/Emergency Coordinator of Classification, Notification and Protective Action Recommendation (PAR) responsibilities.
2. Turnover to the EOF relieves the SM/Emergency Coordinator of Notification and Protective Action Recommendation (PAR) responsibilities ONLY.
3 .9 Turnover the responsibility of command and control for the emergency as follows:
3.9.1 IF the emergency situation does NOT prevent activation of the TSC within 75 minutes, provide turnover to the TSC Emergency Coordinator using Enclosure 4.2.
3.9.2 IF the emergency situation prevents activation of the TSC within 75 minutes of declaration, contact the EOF Director and perform the following:
• A turnover for Notifications and Protective Action Recommendation (PAR) ONLY using Enclosure 4.2.
• ·Maintain command and control of classification until TSC is capable of accepting turnover.
3.9.3 IF neither facility can take turnover, maintain command and control until the facility is capable of accepting turnover.
RP/0/ A/5000/003 Page 7 of7
3.10 In the event that a worker's behavior or actions contributed to an actual or potential substantial degradation of the level of safety of the plant (incidents resulting in an Alert or higher emergency declaration), the supervisor must consider and establish whether or not a for cause drug/alcohol screen is required. The FFD Program Administrator or designee is available to discuss/assist with the incident.
3 .11 Close out the emergency with a verbal summary to county and state authorities. Document this summary using Enclosure 4.4.
3.12 Assign an individual tci provide a written report to county and state authorities within thirty days. This report could be an LER or a written report if an LER is not required.
Person assigned responsibility ______________ _
4. Enclosures
4.1 Emergency Organization Activation
4.2 Command and Control Turnover Briefing Form
4.3 Criteria for Downgrading an Emergency Level
4.4 Alert Close Out Briefing with States and Counties
Enclosure 4.1
Emergency Organization Activation RP!O!A/5000/003 Page 1 of3
1. Activate the ERO using the Emergency Response Organization Notification System (ERONS)
NOTE: 1. Emergency Response Organization Notification System (ERONS) instructions for Drills and actual Emergencies are located in AD-EP-ALL-0301, Activation of the Emergency Response Organization Notification System (ERONS).
2. A Job Aid for ERONS is located in the communicator's area that directs the Operator to notify Security to activate the ERO .
3. The ERONS will deliver a confirmation call to the confirmation phone in the Control Room (803-831-7332) or Simulator (803-701-3167) which is verification that the activation was successful.
D 1.1 IFthe ERONS is NOT available, immediately GO TO Step 2.
D 1.2 · Activate the ERO per AD-EP-ALL-0301, Activation of the Emergency Response Organization Notification System (ERONS).
2. Activate the ERO using the Nuclear Callout System
D 2.1 IF the Nuclear Callout System is NOT available via the computer (DAE Link), immediately GO TO Step 2.3.
... D 2.1.1
D 2.1.2
Start the Nuclear Callout System as follows:
D A. Select or Search for Nuclear Callout System from the DAE.
D B. Select "Run Application".
At the Nuclear Callout System Login Screen, perform the following:
D A. Refer to the.Password Card located in the Control I,loom, Central Alarm Station (CAS) or Secondary Alarm Station (SAS) to obtain the usemame and password.
DB. EnterUsemame.
D C. Enter Password.
DD. Select Create Job from the Start page pull down menu.
D E. Click the Login button.
D 2.1.3
Enclosure 4.1
Emergency Organization Activation RP/0/ A/5000/003 Page 2 of3
Select the appropriate message to be sent from the Select Template/Saved Job drop down menu as follows:
D A. For an ERO Drill, select !5 CNS Drill.
DB. For an actual Emergency event, select !6 CNS Emergency.
D C. Click the Review & Send button at the bottom of the page.
DD. Click the Submit button at the bottom of the page.
NOTE: The Nuclear Callout system will deliver a call to the confirmation phone in the Control Room (803-831-7332) or Simulator (803-701-3167) which is verification that the activation was successful.
D 2.2 Verify the Nuclear Callout System activation is successful.
D 2.3 IF the Nuclear Callout system activation via the computer was NOT successful, perform an activation via the telephone (VoiceREACH) per the following:
D 2.3.1 Call 866-515-0663 (The system will play the VoiceREACH greeting).
D A. Refer to the Password Card location in the Control Room, Central Alarm Station (CAS) or Secondary Alarm Station (SAS) to obtain the user number and numeric password.
D B. Enter the User Number followed by the # key.
_ D C. Enter the Numeric Password followed by the # key.
D D. You will be prompted to "wait while we verify your ID and Password."
D E. Press 1 to create a message . . •
D F. Press 1 to enter a list distribution number.
D G. Enter 4 (Distribution List Number) followed by the# key.
D H. Press 1 to confirm your list distribution number.
D I. Press 2 to select your message.
D J. Press # to play the same message for both live and answering machine recipients.
D K. Press 2 to specify your script.
D L. Press 1 to select a script number.
D 2.3.2
D 2.3.3
D 2.3.4
D 2.3.5
Enclosure 4.1
Emergency Organization Activation
Select the appropriate message to be sent:
D A. For an ERO Drill, press 5.
D B. For an actual Emergency event, press 6.
Press 1 to confirm.
RP/0/ A/5000/003 Page 3 of3
Press 1 for immediate delivery (The system will give you a job number. It may take -20 seconds.).
Press 9 to end the call and send the voice broadcast.
(
Enclosure 4.2
Command and Control, Turnover Briefing Form RP!O!A/5000/003 Page 1 of2
Station: D BNP DCNS DHNP DMNS DONS DRNP Turnover: (From):D CR / D TSC / D EOF
(TO) D CR / D TSC / D EOF Unit(s) Affected: 01 02 03
D Shift Change '•
Emergency Classification: Unusual Event Declared at: EAL#: Alert Declared at: EAL#:.
Site Area Emergency Declared at: EAL#: General Emergency Declared at: EAL#: ., ,..,
""';.':';}~}i;tfJl:11]} ...•• - •;:;•/;•t:J.'';i ,,.,_; fl,;\;f;;i;j,\}'E,;[\\:.\); ;)@'i;rtt:';,Ccf:,;/Jj';\L'il~})•'"""-'-"'··" "··-•"-,DV'•,i; '"''!C,>l-<,,;'.,.,;:;,<J';'cc:' :;{:i;\/';/'i'.l'l'.'itl - -·-· '" l'n(t!3~~J1ii't'!;~t~~iitt11v{;,,, •e ""'&!' ;·,· .\~;. •! i;5::,::.'."/ll/,~.-.- .:•.• ,,,.•,•: ;,;. , .. ·,;y V '" ,,:•;].:;,'ii·'" ''",/j"S
Rx Power Cont. Rx Cool Rx Cool Rx Power Cont. Rx Cool Rx Cool Press Rx Power Cont. Rx Cool Rx Cool Press Press Temp Press Press Temp Press Temp
Mode Shutdown Date: --- Time: ___ Mode Shutdown Date: ___ Time: --- Mode Shutdown Date: --- Time: ---FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) FPB Status (circle appropriate condition)
Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Major Equipment Out of Service: Major Equipment Out of Service: Major Equipment Out of Service:
Evolutions in Progress: Evolutions in Progress: Evolutions in Progress:
ERDS Activated: Yes No N/A ... EROS Activated: Yes . No N/A ERDS Activated: Yes No N/A
Response Procedures in Progress (optional): Emergency/Abnormal Procedures in Progress (optional):
Station Priorities:
Site Assembly: YES NO TIME:
Enclosure 4.2
Command and Control Turnover Briefing Form
Location/Com men ts:
RP/0/A/5000/003 Page 2 of2
Other Agency Involvement:
Site Evacuation: YES NO TIME: D MEDICAL D FIRE D LAW ENFORCEMENT
Take Cover Order: YES NO TIME: Additional Information (Injuries):
Rapid Evacuation: YES NO TIME:
Radiological: Emergency Worker dose limits approved: YES NO For whom:
Release in Progress: YES NO Field Monitoring Teams Deployed: YES NO Number
Release Pathway: WIND SPEED: WIND DIRECTION: ..
Offsite PARS Recommended: YES NO Zones Evacuated: Zones Sheltered:
Kl Recommended: YES NO Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES NO
Off-Site Notifications: Last Notification Completed (time): Last ENF Number: -- Next ENF Due (time):
NRC Communication: Notified (time): Continuous Communications with NRC Established: YES NO
Have Communicators discussed Turnover with acquiring facility Communicators? YES NO
Upon the transfer of Command and Control, the following will be performed by:
Event Classification: D CR DTsc PAR Decision Making: D CR D TSC D EOF
State and Local Notification: D CR D TSC D EOF NRC Notifications: DcR DTsc
Site Emergency Exposure Controls & Kl: DcR 0Tsc Control of FMTs: D CR D TSC D EOF
Dose Assessment: D CR D TSC D EOF
Name of Individual turning over Duties:
Turnover Complete: YES NO TSC/ EOF Activated at: (circle) (circle) Time Date Name individual assuming duties
Additional Information: ..
D OTHER
Date
Initial/Time
Enclosure 4.3
Criteria for Downgrading an Emergency Level RP/0/ A/5000/003 Page 1 of 1
______ 1. The probability that plant conditions will continue to improve is evident.
--------'2. All .emergency action level notifications have been completed.
______ 3 Emergency response facility staffing may be reduced.
______ 4. The criteria established for the emergency classification has been evaluated. Conditions warrant a lower emergency action level.
5. The event related release of radioactive material to the environment is ------terminated.
______ 6. The control of any fire, flood, earthquake or similar emergency condition is acceptable.
______ · 7. · Any corrective actions specified by the Emergency Coordinator to place · ·the plant in a safe condition have been completed and the plant has been
placed in the appropriate operating mode.
______ 8. The Emergency Coordinator has evaluated the plant status with respect to the Emergency Action Levels and recommends downgrading the emergency classification.
______ 9. Emergency classification level downgraded to
10. Brief the Off site Agencies at the Emergency Operations Facility (EOF) or by phone if necessary.
__ York County
__ Mecklenburg County
__ Gaston County
South Carolina
North Carolina
Enclosure 4.4
Alert Close Out Briefing with States and Counties
RP/0! A/5000/003 Page 1 of 1
Person Providing Verbal Summary:-----------------------
Brief Event Description:---------------------------
Agency
South Carolina
North Carolina
York County
Gaston County
Mecklenburg County
Person Contacted Date/Time
Comments/Questions from States and Counties: __________________ _
\ Duke Energy Procedure No.
Catawba Nuclear Station RP/0/ A/5000/004 Revision No.
Site Area Emergency 057
Reference Use Electronic Reference No.
CN005GNN
L
) '" .
Rev57 REVISION REMARKS
Reference AR(s) 02256535; 02223555
Deleted step 2.8 for initiating ERDS
RP/0/ A/5000/004 Page 2 of7
Revised Enclosure 4.3 (Command And Control Turnover Briefing Form) to Match AD-EP-ALL-0104 Attachment 2 (Command And Control Turnover Briefing Form)
Specific changes for Enclosure 4.3
Enclosure 4.3 changes:
Deleted ALL from Units affected block
Unit Status blocks: deleted stable, degrading and improving added shutdown date and time
Procedures in progress box: replaced EOP/APs with Emergency/Abnormal Procedures
Site assembly block: · Added Take Cover Order (yes/no) and time Added Rapid Evacuation (yes/no) and time.
Radiological block: Replaced current dose run with dose assessment
Notification/ Communications block Replaced ENF Sent with Notification Completed and Last ENF Number __ Added Continuous communications with NRC Established (yes/no)
Site Area Emergency
1. Symptoms
RP!O! A/5000/004 Page 3 of7
1.1 Events are in process or have occurred which involve actual or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION that results in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to the likely failure of or; (2) that prevent effective access to equipment needed for the protection of the public.
2. Immediate Actions
NOTE: 1. Lines in left margin are for place keeping. Immediate actions may be performed simultaneously.
2. Security events may require the suspension of access to and movement about the site. Staffing and activation of the on-site emergency response facilities could complicate or interfere with security operations resulting in unwarranted casualties.
2.1 IF a security event exists, discuss the feasibility of conducting a site assembly and activating the TSC/OSC with the Security at 3255 or 5766.
2.1.1
2.1.2
-- 2.1.3
IF site assembly and activation of the TSC/OSC are not feasible, refer to RP/O/B/5000/026, "Site Response to Security Events", for guidance and NIA the associated steps in this procedure under Immediate Actions concerning site assembly and ERO activation.
IF the security event involves a CREDIBLE THREAT to the site, implement 2-person rule for access to all vital areas.
Consider delaying other actions in this procedure that could endanger site personnel until the security threat is terminated.
2.2 IF TSC, OSC and EOF have NOT been previously activated, notify the ERO to staff emergency response facilities by performing the Steps 2.2.1 and 2.2.2.
2.2.1 Notify site personnel to activate the TSC and OSC by making the following announcement twice over public address system:
-- 2.2.2
"This is the Shift Manager. A Site Area Emergency has been declared. Unit(s) is (are) affected. Activate the TSC, OSC, and EOF."
Activate Emergency Response Organization by completing Enclosure 4.1 of this procedure.
RP/0/A/5000/004 Page 4 of7
2.3 Notify off-site agencies within 15 minutes of Emergency declaration time using Emergency Notification Form. Refer to ONE of the following notification procedures for instructions:
• RP/O/A/5000/006A, "Notifications to States and Counties from the Control Room"
• AD-EP-ALL-0304, "State and County Notifications"
2.4 Notify the NRC using RP/O/B/5000/013, "NRC Notification Requirements." Notification shall be made immediately after notification to the Off-Site Agencies and shall be completed within one hour of the emergency declaration time.
2.5 IF there is an indication of a radioactive release AND the TSC is not activated, contact Dose Assessment Qualified Individual to perform off-site dose assessment per AD-EP'...ALL-0202, Emergency Response Offsite Dose Assessment.
2.6 IF a radioactive release or hazardous material spill is occurring or has occurred AND the TSC is not activated, contact Environmental Management (EM), ext. 3333 for assistance in reporting to state, local or federal authorities. After hours, contact the Environmental Dutypersonbyphone or pager. IF no answer, dial 9+1+800-777-3853 (then enter pager number 777-3333) to activate the Environmental Management group pager. Include area code with call-back number.
2.7 Conduct a Site Assembly using RP/O/A/5000/010, "Conducting a Site Assembly or Preparing the Site for an Evacuation".
3. Subsequent Actions
RPl01 A/50001004 Page 5 of7
NOTE: Subsequent Actions are not required to be followed in any particular sequence .
. 3 .1 IF a security event has occurred, perform the following to account for site personnel:
3 .1.1 WHEN Security notifies the OSM that the security threat has been terminated, make the following announcement twice over the public address system:
"This is the Shift Manager. The security event has been terminated. The security event has been terminated. "
3.1.2 Conduct a site assembly per RPIOIA/5000/10, "Conducting a Site Assembly or Preparing the Site for an Evacuation".
3.2 Ensure RP has dispatched On-Site Monitoring and Off-Site Field Monitoring Teams with associated communications equipment per AD-EP-ALL-0106, "Activation and Operation of the Operations Support Center".
3.3 Perform Follow-up Notifications using applicable "Notifications to States and Counties" procedure:
• Every hour until the emergency is terminated.
• If there is any significant change to the situation.
• As agreed upon with an Emergency Management official from each individual agency.
,. 3.4 Make follow-up Protective Actions on-site as needed.
3 .4.1 Consider evacuation of nonessential station personnel using RP IOI A/50001010, "Conducting a Site Assembly or Preparing the Site for an Evacuation".
3.4.2 Consider relocating affected personnel to a safe location on site by directing them using the public address system.
3.5 AD-EP-ALL-0205, "Emergency Exposure Controls" shall be used to authorize emergency worker doses expected to exceed normal occupational exposure limits during a declared emergency event or exceed blanket dose extension limits authorized by the Radiation Protection Manager.
3.6 Augment shift resources to assess and respond to the emergency situation as needed.
RP/0/ A/5000/004 Page 6 of7
3. 7 Announce over the plant public address system the current emergency classification level and summary of plant status.
3.8 Assess the emergency conditions and the corresponding emergency classification. See RP/O/A/5000/001, "Classification of Emergency", then:
Remain in a Site Area Emergency.
Escalate to a more severe emergency classification.
Reduce to a less severe emergency classification (Refer to Enclosure 4.2).
Terminate the emergency (Refer to AD-EP-ALL-0101, "Emergency Classification".)
3 .9 Announce any emergency classification level changes over the plant PA, including a summary of plant status.
NOTE: 1. Turnover of command and control to the TSC relieves the SM/Emergency Coordinator of classification, Notification and Protective Action Recommendation (PAR) responsibilities.
2. Turnover to the EOF relieves the SM/Emergency Coordinator of Notification and Protective Action Recommendation (PAR) responsibilities ONLY.
3 .10 Turnover the responsibility of command and control for the emergency as follows:
3.10.1
3.10.2
IF the emergency situation does NOT prevent activation of the TSC within 75 minutes, provide turnover to the TSC Emergency Coordinator using Enclosure 4.3.
IF the emergency situation prevents activation of the TSC within 75 minutes of declaration, contact the EOF Director and perform the following:
• A turnover of Notifications and Protective Action Recommendation (PAR) ONLY using Enclosure 4.3.
• Maintain command and control of classification until TSC is capable of accepting turnover.
RP/0/ A/5000/004 Page 7 of7
3.10.3 IF neither facility can take turnover, maintain command and control until the facility is capable of accepting turnover.
3 .11 In the event that a worker's behavior or actions contributed to an actual or potential substantial degradation of the level of safety of the plant (incidents resulting in an Alert or higher emergency declaration), the supervisor must consider and establish whether or not a for cause drug/alcohol screen is required. The FFD Program Administrator or designee is available to discuss/assist with the incident.
3.12 Close out of the emergency with a verbal summary to State and Country authorities. Document the close out briefing using Enclosure 4.4.
3.13 Assign an individual to provide a written report within thirty days. This report could be an LER or a written report if an LER is not required.
3.14 Person Assigned Responsibility _________________ _
4. Enclosures
4.1 Emergency Organization Activation
4.2 Criteria For Downgrading An Emergency Level
4.3 Command and Control Turnover Briefing Form
4.4 Site Area Emergency Close Out Briefmg with States and Counties
'
Enclosure 4.1
Emergency Organization Activation RP/0/ A/5000/004 Page 1 of 3
1'----, / 1. Activate the ERO using the Emergency Response Organization
Notification System (ERONS)
NOTE: 1. ERO NS instructions for Drills and actual Emergencies are located in AD-EP-
D 1.1
D 1.2
ALL-0301, Activation of the Emergency Response Organization Notification System (ERONS).
2 A Job Aid for ERONS is located in the communicator's area that directs the Operator to notify Security to activate the ERO
3. The ERONS will deliver a confirmation call to the confirmation phone in the Control Room (803-831-7332) or Simulator (803-701-3167) which is verification that the activation was successful.
IF ERONS is NOT available, immediately GO TO Step 2.
Activate the ERO per AD-EP-ALL-0301, Activation of the Emergency Response Organization Notification System (ERONS).
2. Activate the ERO using the Nuclear Callout System
D 2.1 IF the Nuclear Callout System is NOT available via the computer (DAE Link), immediately GO TO Step 2.3.
D 2.1.1
D 2.1.2
Start the Nuclear Callout System as follows:
D A. Select or Search for Nuclear Callout System from the DAE.
D B. Select "Run Application".
At the Nuclear Callout System Login Screen, perform the following:
D A. Refer to the Password Card located in the Control Room, Central Alanri Station (CAS) or Secondary Alarm Station (SAS) to obtain the usemame and password.
D B. Enter Usemame.
D C. Enter Password.
DD. Select Create Job from the Start page pull down menu.
D E. Click the Login button.
D 2.1.3
Enclosure 4.1
Emergency Organization Activation RP/0/ A/5000/004 Page 2 of3
Select the appropriate message to be sent from the Select Template/Saved Job drop down menu as follows:
D A. For an ERO Drill, select !5 CNS Drill.
DB. For an actual Emergency event, select !6 CNS Emergency.
D C. Click the Review & Send button at the bottom of the page.
DD. Click the Submit button at the bottom of the page.
NOTE: The Nuclear Callout system will deliver a call to the confirmation phone in the Control Room (803-831-7332) or Simulator (803-701-3167) which is verification that the activation was successful.
D 2.2 Verify the Nuclear Callout System activation is successful.
D 2.3 IF the Nuclear·Callout system activation via the computer was NOT successful, perform an activation via the telephone (VoiceREACH) per the following:
D 2.3.1 Call 866-515-0663 (The system will play the VoiceREACH greeting).
D A. Refer to the Password Card located in the Control Room, Central Alarm Station (CAS) or Secondary Alarm Station (SAS) to obtain the user number and numeric password. ·
D B. Enter the User Number followed by the# key.
D C. Enter the Numeric Password followed by the # key.
D D. You will be prompted to "wait while we verify your ID and Password."
D E. Press 1 to create a message.
D F. Press 1 to enter a list distribution number.
D G. Enter 4 (Distribution List Number) followed by the # key.
D H. Press 1 to confirm your list distribution number.
D I. Press 2 to select your message.
D J. Press# to play the same message for both live and answering machine recipients.
D 2.3.2
D 2.3.3
D 2.3.4
D 2.3.5
Enclosure 4.1
Emergency Organization Activation
D K. Press 2 to specify your script.
D L. Press 1 to select a script number.
Select the appropriate message to be sent:
D A. For an ERO Drill, press 5.
DB. For an actual Emergency event, press 6.
Press 1 to confirm
RP/0/ A/5000/004 Page 3 of3
Press 1 for immediate delivery (The system will give you a job number. It may take -20 seconds.).
Press 9 to end the call and send the voice broadcast.
Enclosure 4.2 RP/0/A/5000/004 Criteria for Downgrading an Emergency Level Page 1 of 1
Date Initial/Time
------1. The probability that plant conditions will continue to improve is evident.
------2. All emergency action level notifications have been completed.
------3. Emergency response facility staffing may be reduced.
______ 4 The criteria established for the emergency classification has been evaluated. Conditions warrant a lower emergency action level.
5. The event related release of radioactive material to the environment is terminated. ------
------6. The control of any fire, flood, earthquake or similar emergency condition is acceptable.
______ 7. Any corrective actions specified by the Emergency Coordinator to place the plant in a safe condition have been completed and the plant has been placed in the appropriate operating mode.
______ 8. The Emergency Coordinator has evaluated the plant status with respect to the Emergency Action Levels and recommends downgrading the emergency classification.
9. Emergency classification level downgraded to ------ ---------------
_____ 10. Brief the Off-site Agencies at the Emergency Operations Facility (EOF) or by phone, if necessary
__ York County
__ Mecklenburg County
__ Gaston County
South Carolina
North Carolina
Station: D BNP OCNS
Unit(s) Affected: 01
Emergency Classification:
Enclosure 4.3
Command and Control Turnover Briefing Form RP!O!A/5000/004 Page 1 of 2
DHNP DMNS DONS DRNP Turnover: (From):D CR/ D TSC / D EOF
(TO) D CR/ D TSC / D EOF 02 03
D Shift Change
Unusual Event Declared at: EAL#: Alert Declared at: EAL#:
Site Area Emergency Declared at: EAL#: General Emergency Declared at: EAL#:
1::,, ! :);,?:+\\? ;;;,< ,, ;s,:·' .;, . .' >r ·~;'.'.:;; ::i'.§ :':::i{ ... , , . ; : .. ,, :lll1:11t:1;~:/. , : :,: •,. /i'{';, ?f :: \'.;, · ,.'..? ,;::;u~itf2'"'{C' · )t 'a ;'\ , ... :)}.( -,,; "' .. _'.. "' .::. j ·:;: ;( ''· :::; . . r}:/ . U""t'3 . . .. .'.. ' .·! ··:/; _n_r, ,: ~,/': .. f,i;,': ;:t,, :):,,:: . ' .;::::-;.;:
Rx Power Cont. Rx Cool Rx Cool Rx Power Cont. Rx Cool Rx Cool Press Rx Power Cont. Rx Cool
Rx Cool Press Press Temp Press Press Temp Press Temp
Mode Shutdown Date: Time: Mode Shutdown Date: Time: Mode Shutdown Date: Time: --- --- --- --- --- ---FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) FPB Status (circle appropriate condition)
Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Major Equipment Out of Service: Major Equipment Out of Service: Major Equipment Out of Service:
Evolutions in Progress: Evolutions in Progress: Evolutions in Progress:
EROS Activated: Yes No · NIA EROS Activated: Yes No NIA EROS Activated: Yes No NIA Response Procedures in Progress (optional): Emergency/Abnormal Procedures in Progress (optional):
Station Priorities:
Site Assembly: YES NO TIME:
Enclosure 4.3
Command and Control Turnover Briefing Form
Location/Comments: Other Agency Involvement:
RP/0/A/5000/004 Page 2 of2
Site Evacuation: YES NO TIME: D MEDICAL D FIRE D LAW ENFORCEMENT D OTHER
Take Cover Order: YES NO TIME: Additional Information (Injuries):
Rapid Evacuation: YES NO TIME:
Radiological: Emergency Worker dose limits approved: YES NO For whom:
Release in Progress: YES NO Field Monitoring Teams Deployed: YES NO Number
Release Pathway: WIND SPEED: WIND DIRECTION:
Offsite PARS Recommended: YES NO Zones Evacuated: Zones Sheltered:
Kl Recommended: YES NO Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES NO
Off-Site Notifications: Last Notification Completed (time): Last ENF Number: -- Next ENF Due (time):
NRC Communication: Notified (time): Continuous Communications with NRC Established: YES NO
Have Communicators discussed Turnover with acquiring facility Communicators? YES NO
Upon the transfer of Command and Control, the following will be performed by:
Event Classification: DcR_DTsc PAR Decision Making: D CR D TSC D EOF
State and Local Notification: D CR D TSC D EDF NRC Notifications: D CR DTsc
Site Emergency Exposure Controls & Kl: D CR DTsc Control of FMTs: D CR D TSC D EOF
Dose Assessment: D CR-D TSC D EOF
Name of Individual turning over Duties:
Turnover Complete: YES NO TSC/ EOF Activated at:
(circle) (circle) Time Date Name individual assuming duties
Additional Information:
Enclosure No. 4.4
Site Area Emergency Close Out Briefing with States and Counties
RP/0/ A/5000/004 Page 1 of 1
Person Providing Verbal Summary:----------------------
Brief Event Description:---------------------------
Agency
South Carolina
North Carolina
York County
Gaston County
Mecklenburg County
Person Contacted
Comments/Questions from States and Counties:
Date/Time
I
I
I
I
I
/ ·,
.·, \
Duke Energy Catawba Nuclear Station
General Emergency
Ref ere nee Use
Procedure No.
RP/0/ A/5000/005 Revision No.
060
Electronic Reference No.
CN005GNO
\., /
REVISION REMARKS Rev 060 Reference AR(s): 02256536; 02223556 Deleted Step 2.10 to initiate ERDS
RP/0/ A/5000/005 Page 2 of 8
Revised Enclosure 4.5 (Command and Control Turnover Briefing Form) to match AD-EP-ALL-0104.
Specific changes for Enclosure 4.5
Deleted ALL from Units affected block
Unit Status blocks: deleted stable, degrading and improving added shutdown date and time
Procedures in progress box: replaced EOP/APs with Emergency/Abnormal Procedures
Site assembly block: Added Take Cover Order (yes/no) and time Added Rapid Evacuation (yes/no) and time.
Radiological block: Replaced current dose run with dose assessment
Notification/ Communications block Replaced ENF Sent with Notification Completed and Last ENF Number __ Added Continuous communications with NRC Established (yes/no)
\, __ ) General Emergency
1. Symptoms
RP/0/ A/5000/005 Page 3 of 8
1.1 Events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity or HOSTILE ACTION that results in an actual loss of physical control of the facility.
2. Immediate Actions
NOTE: 1. Lines in left margin are for place keeping. hnmediate actions may be performed simultaneously,
2. Security events may require .the suspension of access to and movement about the site. Staffing and activation of the on-site emergency response facilities could complicate or interfere with security operations resulting in unwarranted casualties.
2.1 IF a security event exists, discuss the feasibility of conducting a site· assembly and activating the TSC/OSC with the Security at 3255 OR 5766.
2.1.1
2.1.2
-- 2.1.3
IF site assembly and activation of the TSC/OSC are not feasible, refer to RP/O/B/5000/026, "Site Response to Security Events", for guidance and N/A the associated·steps in this procedure under Immediate Actions concerning site assembly and ERO activation.
IF the security event involves CREDIBLE THREAT to the site, implement 2-person rule for access to all vital areas.
Consider delaying other actions in this procedure that could endanger site personnel until the security threat is contained.
2.2 IF TSC, OSC and EOF have NOT been previously activated, notify the ERO to staff . emergency response facilities by performing the following Steps 2.2.1 and 2.2.2:
2.2.1 Notify site personnel to activate the TSC and OSC by making the following announcement twice over public address system:
-- 2.2.2
"This is the Shift Manager. A General Emergency has been declared. Unit(s) . · is (are) affected. Activate the TSC, OSC, and EOF."
Activate Emergency Response Organization by completing Enclosure 4.1 of this procedure.
2.3 Make Initial Protective Action Recommendations (PAR) on Line 5 of the Emergency Notification Form per Enclosure 4.3, page 2 of 3.
RP/0! A/5000/005 Page 4 of 8
2.4 Notify off-site agencies within 15 minutes of Emergency declaration time using an Emergency Notification Form. Refer to one of the following procedures for instructions:
• RP/O/A/5000/006A, "Notifications to States and Counties from the Control Room"
• AD-EP-ALL-304, "State and County Notifications"
2.5 Notify the NRC using RP/O/B/5000/013, "NRC Notification Requirements." Notification shall be made immediately after notification to the Off-Site Agencies and shall be completed within one hour of the emergency declaration time.
2.6 IF there is an indication of a radioactive release AND the TSC is not activated, contact Dose Assessment Qualified Individual to perform off-site dose assessment per AD-EP-ALL-0202, Emergency Response Offsite Dose Assessment.
2. 7 IF a radioactive release or hazardous material spill is occurring or has occurred AND the TSC is not activated, contact Environmental Management (EM), ext. 3333, for assistance in reporting to state, local or federal authorities. After hours, contact the Environmental Duty person by phone or pager. IF no answer, page 999-777-3333 which will page all Environmental Management personnel.
2.8 Conduct a Site Assembly using RP/O/A/5000/010, "Conducting a Site Assembly or Preparing the Site for an Evacuation".
2.9 Conduct a Site Evacu·ation using RP/0/ A/5000/010, "Conducting a Site Assembly or Preparing the Site for an Evacuation".
3. Subsequent Actions
RP/0/ NS000/005 Page 5 of 8
NOTE: Subsequent Actions are not required to be followed in any particular sequence.
3.1 IF a security event has occurred, perform the following to a1ccount for site personnel:
3 .1.1 WHEN Security notifies the OSM that the security threat has been terminated, make the following announcement twice over the public address system:
"This is the Shift Manager. The security event has been terminated. The security event has been terminated. "
3.1.2 Conduct a site assembly per RP/O/NS000/10, "Conducting a Site Assembly or Preparing the Site for an Evacuation".
3.2 Ensure RP has dispatched On-Site Monitoring and Off-Site Field Monitoring Teams with associated communications equipment per AD-EP-ALL-0106 "Activation and Operation of the Operations Support Center".
3.3 Evaluate specific plant conditions, off-site dose projections, field monitoring team data, and assess need to update Protective Action Recommendations made to states and counties in previous notification. Refer to:
• Enclosure 4.3, page 3 of 3, Guidance for Protective Actions, Protective Action Recommendation Flowchart - Expanded PAR.
• Enclosure 4.4, Evacuation Time Estimates for Catawba Plume Exposure EPZ
3.4 Make follow-up notifications using applicable "Notifications to States and Counties" procedure:
• Every hour until the emergency is terminated.
• If there is any significant change to the situation.
• As agreed upon with an Emergency Management official from each individual agency.
3.5 AD-EP-ALL-0205, "Emergency Exposure Controls" shall be used to authorize . emergency worker doses exp<:!cted to exceed normal occupational exposure limits during a declared emergency event or exceed blanket dose extension limits authorized by the Radiation Protection Manager.
3.6 Augment shift resources to assess and respond to the emergency situation as needed.
RP/0/ A/5000/005 Page 6 of 8
3. 7 Announce over the plant public address system the current emergency classification level and summary of plant status.
3.8 Assess the emergency conditions and the corresponding emergency classification. See RP/O/A/5000/001, "Classification of Emergency", then:
• Remain in a General Emergency.
• Terminate the emergency (Refer to AD-EP-ALL-0101, "Emergency Classification").
3 .9 Announce any emergency classification level changes over the plant public address system, including a summary of plant status.
NOTE: 1. Turnover of command and control to the TSC relieves the SM/Emergency Coordinator of classification, Notification and Protective Action Recommendation (PAR) responsibilities.
2. Turnover to the EOF relieves the SM/Emergency Coordinator of Notification, and Protective Action Recommendation (PAR) responsibilities ONLY.
3 .10 Turnover the responsibility of command and control for the emergency as follows:
3.10.1
3.10.2
3.10.3
IF the emergency situation does NOT prevent activation of the TSC within 75 minutes, provide turnover to the TSC Emergency Coordinator using Enclosure 4.5. -
IF the emergency situation prevents activation of the TSC within 75 minutes of declaration, contact the EOF Director and perform the following:
• A turnover for Notifications and Protective Action Recommendation (PAR) ONLY using Enclosure 4.5.
• 'Maintain command and control of classification until TSC is capable of accepting turnover.
IF neither facility can take turnover, maintain command and control until the facility is capable of accepting turnover.
3 .11 In the event that a worker's behavior or actions contributed to an actual or potential substantial degradation of the level of safety of the plant (incidents resulting in an Alert or higher emergency declaration), the supervisor must consider and establish whether or not a for cause drug/alcohol screen is required. The FFD Program Administrator is available to discuss/assist with the incident.
i .._I
RP/0/ A/5000/005 Page 7 of 8
3.12 Terminate the emergency and recommend entry into Recovery by briefing the off-site ·authorities at the Emergency Operations Facility or if necessary by phone. Document the termination briefing using Enclosure 4.6.
3 .13 Assign an individual to provide a written report within thirty days. This report could be an LER or a written report if an LER is not required.
Person Assigned Responsibility __________________ _
',
\ ' ..___)
4. Enclosures
4.1 Emergency Organization Activation
RP/0/ A/5000/005 Page 8 of 8
4.2 10 Mile Emergency Planning Zone (EPZ) Map and Protective Action Zone Determination Tables
4.3 Guidance for Protective Actions
• Page 1 of 3, Protective Action Guides
• Page 2 of 3, Protective Action Recommendation Flowchart - Initial PAR
• Page 3 of 3, Protective Action Recommendation Flowchart - Expanded PAR
4.4 Evacuation Time Estimates for Catawba Plume Exposure EPZ
4.5 Command and Control Turnover Briefing Form
4.6 General Emergency Termination Briefing with States and Counties
\ I '- .)
Enclosure 4.1 RP/0/ A/5000/005
Emergency Organization Activation Page 1 of 4
1. Activate the ERO using the Emergency Response Organization Notification System (ERONS)
NOTE: 1. ERONS instructions for Drills and actual emergencies are located in AD-EP-ALL-0301,
D 1.1
D 1.2
Activation of the Emergency Response Organization Notification System (ERONS).
2. A Job Aid for ERONS is located in the communicator's area that directs the Operator to notify Security to activate the ERO.
3. The ERO NS will deliver a confirmation call to the confirmation phone in the Control Room (803-831-7332) or Simulator (803-701-3167) which is verification that the activation was successful.
IF ERONS is NOT available, immediately GO TO Step 2.
Activate the ERO per AD-EP-ALL-0301, Activation of the Emergency Response Organization Notification System (ERONS).
2. Activate the ERO using the Nuclear Callout System
D 2.1 IF the Nuclear Callout Systein is NOT available via the computer (DAE Link), immediately GO TO Step 2.3.
D 2.1.1
D 2.1.2
Start the Nuclear Callout System as follows:
D 2.1.1.1 ·
D 2.1.1.2
Select or Search for Nuclear Callout System from the DAE.
Select "Run Application".
. At the Nuclear Callout System Login Screen, perform the following:
D 2.1.2.l
D 2.1.2.2
D 2.1.2.3
D 2.1.2.4
D 2.1.2.5
Referto the Password Card located in the Control Room, Central Alarm Station (CAS) or Secondary Alarm Station (SAS) to obtain the usemame and password.
Enter Usemame.
Enter Password.
Select Create Job from the Start page pull down menu.
Click the Login button.
, I \.J
D 2.1.3
Enclosure 4.1 RP/0! A/5000/005
Emergency Organization Activation Page 2 of 4
Select the appropriate message to be sent from the Select Template/Saved Job drop down menu as follows:
D 2.1.3.1
D 2.1.3.2
D 2.1.3.3
D 2.L3.4
For an ERO Drill, select !5 CNS Drill.
For an actual Emergency event, select !6 CNS Emergency.
Click the Review & Send button at the bottom of the page.
Click the Submit button at the bottom of the page.
NOTE: The Nuclear Callout system will deliver a call to the confirmation phone in the Control Room (803-831-7332) or Simulator (803-701-3167) which is verification that the activation was successful.
D 2.2 · Verify the Nuclear Callout System activation is successful.
D 2.3
Enclosure 4.1 RP/0/ A/5000/005
Emergency Organization Activation Page 3 of 4
IF the Nuclear Callout system activation via the computer was NOT successful, perform an activation via the telephone (VoiceREACH) per the following:
D 2.3.1 Call 866-515-0663 (The system will play the VoiceREACH greeting).
D 2.3.1.1
D 2.3.1.2
D 2.3.1.3
D 2.3.1.4
D 2.3.1.5
D 2.3.1.6
D 2.3.1.7
D 2.3.1.8
D 2.3.1.9
D 2.3.1.10
D 2.3.1.11
D 2.3.1.12
Refer to the Password card located in the Control Room, Central Alarm Station (CAS) or Secondary Alarm Station (SAS) to obtain the user number and numeric password.
Enter the User Number followed by the# key.
Enter the Numeric Password followed by the # key.
You will be prompted to "wait while we verify your ID and Password."
Press 1 to create a message.
Press 1 to enter a list distribution number.
Enter 4 (Distribution List Number) followed by the# key.
Press 1 to confirm your list distribution number.
Press 2 to select your message.
Press # to play the same message for both live and answering machine recipients.
Press 2 to specify your script.
Press 1 to select a script number.
\ I '---/
D 2.3.2
D 2.3.3
D 2.3.4
D 2.3.5
Enclosure 4.1
Emergency Organization Activation
Select the appropriate message to be sent:
D 2.3.2.1
D 2.3.2.2
For an ERO Drill, press 5.
For an actual Emergency event, press 6.
Press 1 to confirm.
RP/0! A/5000/005
Page4 of4
Press 1 for immediate delivery (The system will give you a job number. It may take -20 seconds.).
Press 9 to end the call and send the voice broadcast.
Enclosure 4.2 RP/0/A/5000/005
10 Mile Emergency Planning Zone (EPZ) Map Page 1 of 3 and Protective Action Zone Determination Tables
Gaston Co.
N
-t
Enclosure 4.2 RP/0/A/5000/005
10 Mile Emergency Planning Zone (EPZ) Map Page 2 of3 and Protective Action Zone Determination Tables
Use the table on the next page to determine the recommended zones for Protective Action Recommendation per Enclosure 4.3.
NOTE: 1. Upper tower wind direction (OAC Pt. CJP0250) is preferred. If not available, use lower tower wind direction (OAC Pt. CJP0252). Use wind direction from National Weather Service if site meteorological information is not available. Duke Met. Lab: 704-382-0139NWS: Primary: 800-268-7785 Backup: 864-879-1085
2. Wind direction indicator in Control Room has a scale ofO to 540 degrees. Both O and 360 degrees indicate North.
3. Subtract 3 60 from wind direction indications greater than 3 60 degrees to arrive at wind direction for table below.
Enclosure 4.2 RP/0/ A/5000/005
10 Mile Emergency Planning Zone (EPZ) Map Page 3 of 3 and Protective Action Zone Determination Tables
CAUTION: A short term release is any release that can be projected to be 3 hours or less in duration. An example would be a "puff release." A controlled release is one that can be started and stopped at the licensee's discretion, such as the venting of Containment for pressure control. IF a release is short term and controlled, sheltering in lieu of evacuation should be considered.
Table 1 Protective Action Zones
Wind Direction 2 Mile Radius 2-5 Miles Downwind 5-10 Miles Downwind
348.75 - 11.25 AO Bl, Cl, Dl B2,C2,D2 11.26 - 33.75 AO Cl,Dl C2,D2 33.76 - 56.25 AO Cl, Dl, El C2, D2,E2 56.26 - 78.75 AO Cl, Dl, El, Fl C2, D2, E2, F2
78.76 - 101.25 AO Cl, Dl, El, Fl D2,E2, F2 101.26 - 123.75 AO Dl, El, Fl D2, E2, F2, F3 123.76 - 146.25 AO El, Fl E2,F2,F3 146.26 - 168.75 AO Al, El, Fl A2, E2, F2, F3 168.76 - 191.25 AO Al, El, Fl A2, F2, F3 191.26 - 213.75 AO Al, Bl, El, Fl A2, A3, B2, F2, F3 213.76 - 236.25 AO Al, Bl, Fl A2, A3, B2, F2, F3 236.26 - 258.75 AO Al, Bl, Fl A2, A3, B2, F3 258.76.- 281.25 AO Al, Bl, Cl A2, A3, B2, C2 281.26 - 303.75 AO Al, Bl, Cl A2, A3, B2, C2 303.76 - 326.25 AO Bl, Cl A3,B2, C2 326.26 - 348.74 AO Bl, Cl, Dl B2, C2, D2
' I,
Enclosure 4.3
Guidance for Protective Actions Protective Action Recommendation Flowchart
RP/0/ A/5000/005 Page 1 of3
NOTE: Protective Action Recommendations (PARs) for the public apply during a General Emergency, and include sheltering, evacuation and consideration of KI use. P ARs are based on plant conditions independent of projected dose, and can also be based on projected dose. Protective Action Guides (P AGs) are levels of radiation dose at which prompt protective actions should be initiated and ar~ based on EPA-400-R-92-001, Manual of Protective Action,Guides and Protective Actions for Nuclear Incidents. The projected dose PARs specified in this enclosure are based on the PAGs listed below. The PAG for KI is taken from Potassium Iodide as a Thyroid Blocking Agent in Radiation Emergencies, FDA Guidance, November 2001 and Guidance for Industry, KI in Radiation Emergencies, Questions and Answers, FDA, December 2002.
PROTECTIVE ACTION GUIDES (PAGs) (Projected Dose or Field Measurements)
Total Effective Dose Committed Dose Equivalent (TEDE) Equivalent (CDE)
Thyroid >l Rem >5Rem
GE Has Been Declared
(See Note 1) • EVACUATE 2-mile Radius
• EVACUATE 2-5 miles Downwind • SHELTER 5-10 miles Downwind
Recommend the consideration of Kl use by the public
Go to Enc. 4.3, Page 3 of 3 for EXP ANDED PAR
No
No
:,p:; t.A:'. \f{'
/
Enclosure 4.3
Guidance for Protective Actions Protective Action Recommendation Flowchart
Protective Action Recommendation Flowchart - Initial PAR NOTE 1: For all PARs, affected Protective Action Zones are defined in Enclosure 4.2, Page 3 of3 NOTE 2: RPSA criteria: Only applicable to first PAR after GE declaration and the following exist:
RP/0/ A/5000/005 Page 2 of3
LOSS of Containment Barrier per RP/O/A/5000/00l(EAL Wallchart) as indicated on Table F-1 (Fission Product Barrier Threshold Matrix). • A leaking or RUPTURED SG·is FAULTED outside of containment • Containment isolation is required AND EITHER
o Containment integrity has been lost based on Emergency Coordinator judgment o UNISOLABLE pathway from Containment to the environment exists
• Indications ofNCS leakage outside of Containment AND EITHER: 1) POTENTIAL LOSS of the Containment Barrier per RP/O/A/5000/001 (EAL Wallchart Table F-2) as indicated by Containment Radiation Monitor EMF53A or 53B reading at time since shutdown
Time after SID CMT Potential Loss Ohr-lhr 5500 R/hr lhr-2hr 4000 R/hr 2hr to 8hr 1600 R/hr > 8hr I 000 R/hr
OR 2) There is a significant radiological release projected to exceed PAGs at the site boundary within an hour as indicated by RP/O/A/5000/001 (EAL Wallchart RG 1.1, RG 1.2 or RG 1.3).
• Valid reading on 1/2 EMF 36H effluent radiation monitor> 2.2IE+4 cpm for 2: 15 min. • Dose assessment using actual meteorology indicates doses > 1000 rnrem TEDE or 5000 rnrem thyroid CDE at or beyond the SITE
BOUNDARY. • Field survey results indicate EITHER of the following at or beyond the SITE BOUNDARY:
o Closed window dose rates> 1 OOOmR/hr expected to continue for 2: 60 min o Analyses of field survey samples indicate thyroid CDE > 5000 rnrem for 60 min. of inhalation.
IF RPSA Conditions CANNOT be confirmed, THEN answer NO.
(See Note 1)
• SHELTER 2-mile Radius • SHELTER 2~5 miles Downwind
:p'c :',&\ L_R f\; ":,;
Recommend the consideration of KI
use by the public
(See Note 1) • EVACUATE 2-mile Radius
• EVACUATE 2-5 miles Downwind
:jf ,:A\ :l;R.;
Enclosure 4.3
Guidance for Protective Actions Protective Action Recommendation Flowchart
RP/0/ A/5000/005 Page 3 of3
Protective Action Recommendation Flowchart - Expanded PAR
X&tt! 1: For all ·PARs, llff ected Prot«tive Aetion Zones{Zon(S) Me de.fi.ned in Endosure 4.2, .Page 3 oCt lF .11 looe has b«ti aecurarcly sel«ted for evawatioo, it thall·remrun selected.
Not(> 2: A sh0tue1m tdeate is 01u that ¢:m be Jeenrntely projeeted te be < three hours ,md controlled by the licensee. This C®$ideratioo woold typkJlly apply to ,:;onttol!ed venting« containmenc
i'<oti'l: · Plant contlitiou ex!st.whith woold •~ite the<l~sifiutioo of a Geneml Enietgttl<:y pet" tlle nALSc. This does NOT indnde coosiderntfon of offsitedose-ba:Sed EALi.
(See Noto1} • SHELTER 2•mile Radius (St!e Note l}
From I~ITIAL PAR
P:ige2<>f3
Continuous Assc,ssment
'Evahmte PAR.pated oo changes in any of thefolfowing: • lncrense iu doseasse:rni:ien! proj¢ctedva!uei. • focrease.lu field measurement values. • Shift in 15-ruitmte evernge wiud direeti-011 resulting in
additfonru zones being arr etted. • T ennination of ru:tive' hostile nctio1uigcin!lt the sire. • lf R.PSA, ,vllen safer todo so eoosider evacuation of
. sheltered zones hascd upon radiofogica! a~ment and diffl!ssfons with Offsite Agencies.
No
Yes
• SHELTER 2•5 mllo$ Dowriwlnd .P.Y J\;': • EVACUATE2•mllelfadlus
EVACUATE Zones that exceed PAGs;. If projected dose or field· me:m.1rcmcnt:.: 5 rem COE Thyroid then recommeod the consldcr.ltlon of Kl use by thtt
• SHELTER .:tdditional Zones tln1t e:Kceed PAGs
c:1F' -~ "" • £V'ACUATE2•Smiles
Oownwfnd
public. · ·
Enclosure 4.4
Evacuation Time Estimates for Catawba Plume Exposure EPZ (Evacuation Time in hours and minutes)
RP /0/ A/5000/005 Page 1 of3
.·summer ___ , ..... 1----------•----·-W_i.n .. te~r--.. ·---,---·--w_ln_te_r ___ ·--+-"""~-+_:_;:c;;;;_,._-+-'-'.;...;.;.=--i
Reglon
[AO, Al, Ill, Cl, 01, 4:35 4:35 El,Fll
. :c·eRo:t•· ,.. ,siio l· :e:00. !Al!ian;.,r:
R04 (AO, Bl, 82, Cl, C2, S:lO S:3S
4:3$ 4:35
4:35 4:35
4:35
4:40
4:35 5:10
Midweek Weekend
4:35 4:3S 4:35 4:35
r,,oo:; · iG.:00 4:45
S:30 6:00 4:35 4:3S
Ice
4:3S
4:35
4:30
4:35
4:35 Dl, 02, El, E2, F2J • I Ii
ROS , . 4:35; ! 4:35 ·.4:;l?, 4:35' . 4:35. 4:35: 4:35, 4:35 . ···4:35 4:35 ·4:35. . 4:~s· :· / .. 4:35
4:35
6:20
5:50
(AO;M;Al;A.3}\ .. I J 1---"ni.;J3
6..._ _ _..._4_,J_s_ .... l __ "_':._s _ _.__4·_.1_s_ .......... 4:3S ____ 4_:3_s_.;......_t._:3_s_..__4,_3_s_..__·c.,.a,_:L_"_,_. __ 4_.:._J_s ___ .. ··'-·-4-·B_s __ ... , .......... 11_, .. 3 ... s_~_4:!_5_1_ __ 4,_J_s_, __ ..... 4:35
1-------..---....... ----,,----,..----,----2-·.,.M..,.ile .. Re~ion and Ke hole to S Miles . RQ7,: .. 4:35 4:35 . ~:35 4:)5i : 4i;l5 4:35 4i3f 4:3$ I · 4:35, ,(Ao,a, 01t ...
ROS i 4:35 4:35 r 4:35 4:35 4:35 ! . 4 35 1 4 35 IA<~t~t:1) ·· I ''11,.;s' 4:35 ;,,:ss 4::is 4:35 '4:Js: 4:is\ a,;s ·. 4:3S 4:~5 ·I 4:35
11!~~
11 4:ss 4:as 4:3s 4:35 11,35 4:3s 4:35 .i,:is 4:35 11,as i
4: 4:35 4:35 4:35
{Al:1\i1 ,4:35 4:35 485' . . 4:35. 4:35, 4:3S. 4:35; 4:35' 4':3S 1·. 4:35 1·
RlZ 4:35 4:35 A:3S 4:35 4:35 4:35 4:35 4:35 4:35 ,· 4:3S ,1·
(AO, Al, El, HI
ru.3 4:35' 4,,5 4·3~ 4,,5 4:35 4:35 4:35: 4:35 4:3S J 4·35. .(AO,Al,Fl) "' • ~. '",· ,ii • 1
'---"'"""R""14
<=,____,,_4_:3_s_-'---4-:3_s_..,_,_4 •• :3 ... ,, .... _ .... , ............ 11 .. : .. 3 ..... s ......................... 4 .. ' .. 3 .. s ............ >-.......... 4 ... , ... 3 ... , ....... -.~ ....... 4_,_:,s _ _,,_,_4_:_Js _ _,__4_,3_· s_...l,.._ ,i :35 .... .. .... AO, Al, 111 __
4:35
4:35'
4:35.
4:35
.. 4:a:s
ll:3S
4:35
4:3S
4:35
4:35
fl:35
4:35
4:35
4:35
4:35
4:35
4:35
4:35
4:35
Enclosure 4.4
Evacuation Time Estimates for Catawba Plume Exposure EPZ (Evacuation Time in hours and minutes)
Summer Summer Summer Winter Winter
~ Midweek Weekend
~ Midweek Weekend
Midday Midday
d
Midday Midday
Region Good Rain
Good Rain
Good Good R.iin Ice
Good [ Rain lc:e Weather Weather Weather Weather Weather I
Rl~ 4:35. 4:35 4:35 4:35 ··4:35, 4:35:0 4:35 .. 4:35 . 4:35 4:35 4:35 ;, ;. : {AO, Alilll; Cl)
Rl6 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:3S 4:35 (A0,81.Cl)
S·Mlle Rngion and Keyhole to Ef'Z Boundary ,,..,.,_.
Ri7 ' >
., ··.l !, !Ao;A1),i'1i,.c1; ii; , . 4\~0 ·:5:00 A:40 4:40 ·. ' ~ ,4:40 :5;00'' ·. :s,os., 's:is 4:40 4:40 4;40
::01;J,2/e1; i:11: : :: .
I R18 {AO, Al, ax, Cl, 01, 4:40 4:40 .. ,4:40 4:40 4:40 I 4:40 4:40 4:40 4:40 4:40 4:40
Dl, Sl, £2, F1J - ,-- lii!i .
,'./ .·'4:40' ,(AO,:A1;,li1;oo, o:i:, 4:40' 4:40 . :··'4:40 '4:40 ,: 4:,10 , 4:40:.,,· 4;40 .,• 4:40 4;4(), 4::JO· ·
i. D2, El/E2,. Fl,· F2) RZO
!AO, Al, 81, Cl, Dl, 4:40 4:40 4;40 4:40 4:40 4:40 4:40 4:40 4:40 4:40 4:40
El, E2, Fl, F2, F3) '" Rii . .
':4,40 4:40' ·,,
'(AO, Al; Bl.JO, Pt';.• .4:40 :,, .
'4:40' . ,,i<,4:40, . 4:40 4:40 4:4Ct 4:40 '4:40 ''·4:40 ,;; ;.
, El: fl,F.i, Flf .,.
ll2'2 {AO, Al,. A2, Bl, Cl, 4:40 4:40 4:40 4:40 4:40 4:40 4:40 4:40 4:40 4:40 4:40
01, El,_~1, f2, F3) , ,,R23 , '·.' ·,' ... (Ao; A1/:.i;A1,cs1,
.. '.,· ;
4:45 4:SO 4:40 .4,40 4:40 4:40' 4:50 S:15 4:40 4:40 ·• 4:40 , 112, Cl, o~;;El, Fl, 1,- L
,F3}, ,_
R24 !AO, Al, A2. Al, JU, 4:45 4:SO 4:40 4:40 4:40 4:40 4:50 5:15 4:40 4:40 4:40
BZ. Cl, Dl, El, Fl! Ris .
!AO, A2; Al, 81, 82, s·:os ·5:30 :4:40 4:40 4:40
'.ci;a. oi; 1:1, i:1J 5:10 5:15 5:40 4:40, 4:40 4,4()
R26 (AO, AZ, 81, B2, Cl, 5:05 5:30 4:40 4:40 4:40 5:10 5:15 5:40 4:40 4:40 4:40
cz, 01 U,fl\
RP/0/ A/5000/005 Page 2 of3
Winter ! Summer Summer Midweek
Weekend Midweek Weekend ... Evening Midday Midday
Good Special Roadway Weather Event Impact
4:35 •4:35 4:35
4:35 4:35 4:35
4:40: ·Ji ~:40, 4';50
.
4:40 4:40 4:40
4,:40, .4(40 ,4:40
4:40 4:40 4:40
4:40 ' ',, / 4:40 4:40
4:40 4:40 4:40
4:40i 4:40 -4:SO
4:40 4:40 4:50
4:40 4:40 S:50
4:40 4:40 5:50
Enclosure 4.4 RP/0/A/5000/005 Evacuation Time Estimates for Catawba Plume Exposure EPZ (Evacuation Time Page 3 of3
in hours and minutes)
Summer Summer Summer Winter Winter Summer Summer
Midweek Weekend Midweek
Weekend Midweek
Weekend MldWllllk Weekend Weekend
Midday Midday Midday Evening Midday Midday Region Good
Rain Good
Rain Good Good
Rain Ice Good
Rain lee Good Special Roadway
Weather Weathe Weather Weather Event Impact
Staged Evacuation • :M,llle Region and Keyhole to 5 MHes R27 ...
(AO,Al; Ill, Cl, 01, • 4:3}c 4:35.· 4:35· . .4:3.5 · :.4;3S 4:35 4:35 4:35 4:35 4:35 , 4:35' 4:35 4:35 4:35 El, Fl) .
< ,;_'1; RZ8 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35
IAO, Cl,01) ·:fi29 ,,,
4:35·' 4:35. ,4:35 .:iss 4:35' . 4:35 '4:35 . 4:35' ·4:35, 1¢:35 4:35 4:35 .•. 4:35 4:35 ... (AO,,Cl;.Dl;'El), ,.•,
R30 4:35 4:35 4;35 4:35 4:35
J. 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35
. (I\O, Pli El) <
~ •,, ···"·. ,. -~ . .,.
,R3t. '4:35' 4:35 • 4:3!V. ·4;;1s: <4:3S ·':4:35 4:35 4:35 4:35 4:35 4:JS, A:35 .· 4:35 4:35
[AO, 1:1!· R32 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35
(AO, El,.Fl) "
..... ,,.-u., ..
R33· :4:35'.. 4:3°5. 4:35
.. .· ... 4:35· .'4:35: (AO,it1;E1>fif,, .·, :'4:35:.,: 4:35 .. ·4:35. .4:35 4:35 , 4:35 ;4;35, <4:35 4:35
R34 4,3S 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4;35 4:35 4:35 4:35 4:35 4:35 {AO,Al,Fl)
R3s o• 1.-,·
4:35 '4:35 "'4:35 -4:35,: 4:35 4:35:. 4:35 •, . 4:35· ... 4:35 4:35 '.4;35 (AO, Al, Ill) ·
4:35<: 4:35 · 4:35 : >"
R36 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 4:35 . (AO, 1\1, Bl_. Cl)
R37 4:35:· · '4:3.S 4:35 4:35 :4:3S ,4:35 ·,4,35 .· 4:35 .· .4:35 ,fas. 4:35 ,'4:35 •. 4:35 ,4:35 . (AO; Bl. Cl) . -
Enclosure 4.6
General Emergency Termination Briefing
with States and Counties
RP/0/ A/5000/005
Page 1 of 1
Person providing Verbal Summary: ----------------------
Brief Event Description: ---------------------------
Agency
South Carolina
North Carolina
York County
Gaston County
Mecklenburg County
Person Contacted
Comments/Questions from States and Counties:
Date/Time
I
I
I
I
I
Station: D BNP DCNS DHNP
Unit(s) Affected: 01 02
Enclosure 4.5
Command and Control Turnover Briefing Form
DMNS DONS DRNP Turnover:
03
RP/0/A/5000/005 Page I of2
(From):D CR / D TSC / D EOF
(TO) D CR / D TSC / D EOF
D Shift Change
Emergency Classification: Unusual Event Declared at: EAL#: Alert Declared at: EAL#:
Site Area Emergency Declared at: EAL#: General Emergency Declared at: EAL#:
: \:H' );~(;:'})/ .. ~ '.':~F:! 1L ~it~f:Ji/ }i;:::' ,:~ \,.)! :::l;: ; }\! l't:'::.rt • )f :·,,:.~,, : ii(''."'·::9:@12'1:if:'. ,'''( ,, .. ,},F }i;;J;<:"}:) l::t''. ··,,,r·r::J/f' ···,:';1(···,:.';(;f 'it'Jr'J~i;,:t,;s,:.!s:,,,;,:·?:/2),;,''',,'t(.>i ,, ; ,,, ' .. ·;-}'.I,,':,;, .... , " : ,'
Rx Power Cont. Rx Cool Rx Cool Rx Power Cont. Rx Cool Rx Cool Press Rx Power Cont. Rx Cool Rx Cool Press Press Temp Press Press Temp Press Temp
',
Mode Shutdown Date: Time: Mode Shutdown Date: Time: Mode Shutdown Date: Time: --- --- --- --- --- ---FPB Status (circle appropriate condition) FPB Status (circle appropriate condition) FPB Status (circle appropriate condition)
Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss Fuel Intact Potential Loss Loss
RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss RCS Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Cont Intact Potential Loss Loss Major Equipment Out of Service: Major Equipment Out of Service: Major Equipment Out of Service:
Evolutions in Progress: Evolutions in Progress: Evolutions in Progress:
EROS Activated: Yes No N/A EROS Activated: Yes No N/A EROS Activated: Yes No N/A
Response Procedures in Progress (optional): Emergency/Abnormal Procedures in Progress (optional):
Station Priorities:
Site Assembly: YES NO TIME:
Enclosure 4.5
Command and Control Turnover Briefing Form
Location/Comments: Other Agency Involvement:
RP !0! A/5000/005 Page 2 of2
Site Evacuation: YES NO TIME: D MEDICAL D FIRE D LAW ENFORCEMENT D OTHER
Take Cover Order: YES NO TIME: Additional Information (Injuries):
Rapid Evacuation: YES NO TIME:
Radiological: Emergency Worker dose limits approved: YES NO For whom: C
Release in Progress: YES NO Field Monitoring Teams Deployed: YES NO Number
Release Pathway: WIND SPEED: WIND DIRECTION:
Offsite PARS Recommended: YES NO Zones Evacuated: Zones Sheltered:
Kl Recommended: YES NO Dose Assessment Available: YES NO Have Dose Assessors discussed Turnover? YES NO
Off-Site Notifications: Last Notification Completed (time): Last ENF Number: -- Next ENF Due (time):
NRC Communication: Notified (time): Continuous Communications with NRG Established: YES NO
Have Communicators discussed Turnover with acquiring facility Communicators? YES NO
Upon the transfer of Command and Control, the following will be performed by:
Event Classification: DcR··DTsc PAR Decision Making: D CR D TSC D EOF
State and Local Notification: D CR D TSC D EOF NRG Notifications: D CR DTsc
Site Emergency Exposure Controls & Kl: DcR DTsc Control of FMTs: D CR D TSC D EOF
Dose Assessment: D CR D TSC D EOF
Name of Individual turning over Duties:
Turnover Complete: YES NO TSC/ EOF Activated at: (circle) (circle) Time Date Name individual assuming duties
Additional Information: