Mission Overview:
Goal: Test the functionality of the communication protocol to be used on MIT’s CASTOR satellite
• Data transmission
- Telemetry data from sensors
- Image data
- Command log of operations that have been performed
• Verify proper system functionality
- Transmit commands to actuators
- Automatically generate commands to actuators
- Log all commands
SHOT II / UN-6 Connection:
Preliminary version of avionics and communications subsystems
• Utilize components that will be incorporated into CASTOR satellite
- Avionics: PIC processors, SD card, camera
- Communications: Transceiver
- ACS: IMU, Magnetometer, Torque Coil design
- Thermal: Sensor suite
- Power: Current and Voltage Sensors
• Preliminary test of operating code and ground station processing - Interface coding to be utilized on the CASTOR satellite
- Ground Station post-processing of data to be performed on all of CASTOR’s telemetry data
SHOT II Design and Test Details:
Design:
• Structure: small and simple, similar to SHOT I design
• Avionics Code: Interrupt-based command processing
• Test-devices:
- Magnetometer and Torque Coil: to measure Earth’s magnetic field and the local magnetic field generated from the coil
- IMU: to measure the angular rate about the flight cord and accelerations before and after balloon rupture/ground impact
- Camera: to record sample images of the balloonsat’s flight
- Temperature Sensors: to measure critical component temperatures, measure external temperature, and regulate activation of the heater
SHOT II Design and Test Details:
IMU
Batteries
Processor
SD Card
Heater
Magnetometer
Torque Coil
Antenna Mount
Camera
SHOT II Design and Test Details:
Testing:
• Operations
- Complete dry-runs of the test procedures to ensure all members are familiar with the CONOPS before flight
- Ensure all systems operate as expected
• Environmental Testing
- Structural whip test
- Thermal environment test
-20 degrees F in freezer
SHOT II Design and Test Details:
Operations:• Pre-launch
- Initialize system, ensure operation of all test systems
• Flight- Continuously collect data
- Query balloonsat from ground station for critical data
- Command actuators from ground station
• Post-flight- Process all data recorded on the
SD Card
- Perform analysis of command log
Expected Results:
Camera:
• 128 x 164 pixel image taken every 15 minutes
IMU:
• Acceleration and rotation data taken every 15 seconds
Magnetometer:
• Magnetic field readings taken every 15 seconds that reflect commands given to the torque coil
Thermal Sensors:
• Data including component and environment temperatures taken every 15 seconds
• Heater operation based upon temperatures