Case Study:I t t d C t l d N i l M d liIntegrated Conceptual and Numerical Modeling
Chemwest Industrial Site
ObjectivesDesign a conceptual model, consisting of
Geologic StructureHydrogeologic PropertiesHydrogeologic PropertiesBoundary conditions and wells
Simulate Groundwater Flow with MODFLOW and FEFLOWCompare simulated results with field dataCompare simulated results with field dataDemonstrate the value in having a grid and simulator-independent conceptual model that is integrated with the numerical model
2
Background - SiteChemWest Laboratories Ltd. manufactured inorganic and organic industrial chemicalsBenzene was found in the groundwater 25 years agoBenzene was found in the groundwater 25 years agoOriginated from an underground storage tank (UST) several hundred feet up-gradient of the well.A pump and treat recovery program was initiated to hydraulically contain the
benzene plume and to ultimately capture it. After more than ten years of continuous groundwater pumping substantially, the extent of the benzene plume has diminished substantiallyR li l d h l f i i ll i f h iRecent sampling revealed that only four monitoring wells in one area of the site contained benzene concentrations above the prescribed groundwater criteria. ChemWest proposed to the U.S. EPA that the pump and treat operations be terminated and allow natural biodegradation to eliminate the remainingterminated and allow natural biodegradation to eliminate the remaining benzene. SWS was asked to develop a numerical groundwater model to assess the feasibility of this plan
3
feasibility of this plan.
Steps for Conceptual Modeling1. Collect and Visualize Data2. Design Geologic Structure
D fi Fl P ti3. Define Flow Properties4. Define Hydrologic Boundaries
4
1. Collect and Visualize DataGIS Data:
Locations of water bodies, roads, plant and property boundariesPumping and Observation wellsPumping and Observation wells Borehole log data
Site Plan: DXF fileWater table (initial heads)Water table (initial heads)Cross-section interpretations
Combine to define geologic surfaces
5
2D Views
Locations of:•Norman RiverNorman River•Deer Creek•Bass Lake•Salmon Pond
6
Cross sectionsAA’AA’
BB’
AA’, Vert Exag. 10
BB’ V t E 10
7
BB’, Vert Exag. 10
Fence Diagrams
8
Generate Surfaces from XS and Log Data
Top Sand
Top BedrockGround Surface
9
2. Design Geologic StructureProvide the model boundary (polygon)Provide Geologic Surfaces as InputD fi H i R lDefine Horizon RulesInterpret 3D Geologic bodies
10
Convert Surfaces to Horizons
11
Generate 3D Structural Model
12
3. Define Flow PropertiesSelect the geometry (polygons, structural zones)Define the method (constant, shp attribute, 2D or 3D Grid)P id th l / tt ib t (C d ti it St ti it I iti lProvide the values/attributes (Conductivity, Storativity, Initial Heads, etc..)
13
Property Zones
1
4
23
4
Upper Formation: Constant Kx = 0.0006 m/s Lower Formation:
Using Polygons:1. 0.0009 m/s2 0 00025 /
14
2. 0.00025 m/s3. 0.0003 m/s4. 0.0012 m/s
4. Define Hydrologic BoundariesSelect the geometryDefine the method (constant,
h tt ib t 2D 3D G id)shp attribute, 2D or 3D Grid)Provide the values/attributes
Boundary Types Used:Constant head (west edge)River2 Ponds (modeled as Lakes)Recharge
15
Constant HeadNorman River modeled as a constant head:
602 m; above the dam
587 m; below the dam587 m; below the dam
16
RiverStage:
598 m stage at the eastern edge587 m at the discharge point to the western river boundary587 m at the discharge point to the western river boundary
River bottom is 1.5 m below the surface of the river.Conductance estimated to 10 m2/day
598 m
587 m
17
PondsThe 2 ponds as Type 3 Lake boundariesStage: 599.0 mB tt 597 5Bottom: 597.5 mLeakance: 100 m2/day,
18
RechargeUniform across top of model domain254 mm/yr
19
Steps for Numerical Modeling - MODFLOW
1. Define Uniform Grid2. Refine Grid3. Populate Grid with Conceptual Model Data4. Review, make cell based edits5 Translate to MODFLOW Packages5. Translate to MODFLOW Packages6. Run Simulation7. Analyze Results
V lid t ith C t l M d l d A ti8. Validate with Conceptual Model and Assumptions
20
MODFLOW Step 1: Generate MODFLOW GridInitial uniform grid of 100 m x 100 m,
=>Results in 40 columns, 85 rowsUpper formation is refined to create 2 layersUpper formation is refined to create 2 layersDeformed grid layers follow conceptual model horizons
Plan view of the grid Cross-sectional view of grid
21
MODFLOW Step 1: Generate MODFLOW Grid
22
Step 2: Refine MODFLOW GridThe grid is refined by a factor or 2 around area of interestR lti id i 119 R * 56 C lResulting grid is 119 Rows * 56 Col(Total 6664 cells)
23
Step 3: Populate Grid with Conceptual Model DataDefine Inactive CellsPopulate Cells with Properties and Boundary Conditions
Cell representation of
24
Kx values in 2D, XS, and 3D View Boundary conditions
Step 4: Review and Edit Cell Attributes
25
Step 5: Translate to MODFLOW Packages
26
Step 6: Run SimulationMODFLOW-2005with PCG Solver
27
Step 7: Analyze Results
Heads ContoursXS View: Row 75
Head Contours, ,Plan View: Layer2
28
Step 7: Analyze Results
Reasonable Calibration to Heads
Mass Balance <0.1%
29
Step 8: Compare Results with Field Data
Overlay heads (contours, colormap), pathlines, compare to p , p
conceptual model
30
Steps for Numerical Modeling - FEFLOW
1. Define Superelement Mesh; Add-Ins (Points, lines, polygons)
2. Generate Mesh3. Populate Mesh with Conceptual Model Data4 Review make element-based edits4. Review, make element based edits5. Run Simulation6. Analyze Results
V lid t ith C t l M d l d A ti7. Validate with Conceptual Model and Assumptions
31
FEFLOW Step 1: Define Superelement MeshProvide Line and PointAdd-Ins:
Calibration PointsCalibration PointsConstant Head BoundaryRiver and Lakes
32
Step 2: Generate MeshUsing Triangle Mesh generatorEst. 6500 elementsR fi d liRefine around linesand edge (flow boundaries)
33
Step 2: Generate Mesh
34
Step 3: Populate Mesh with Conceptual Model DataProvide run settings (date, type)Select the Options for representing boundaries
35
Step 4: Review Cell Attributes, and Adjustments
36
Step 5&6: Run Simulation and Analyze Results
37
Step 6: Analyze Results
38
Step 7: Compare Results with Field Data
Overlay heads (contours, colormap), pathlines, compare to
t l d lconceptual model
39
SummaryThe conceptual model provides the ability to:
understand the site conditions before running a simulationchoose between MODFLOW or FEFLOWchoose between MODFLOW or FEFLOWProvides ability to select different grid types
Grid and mesh is easily generated and populated from conceptual objectsobjectsThe MODFLOW and FEFLOW Simulation show reasonable likenessIntegrated Conceptual and Numerical Modeling allows for:
Effi i d i f l i l d l d iEfficient design of multiple models to reduce uncertaintyManage multiple modeling scenariosComparing simulated results with observed field data to improve model credibilitycredibility
40