carrier selection and contracting

Upload: saman-naqvi

Post on 04-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/30/2019 Carrier Selection and Contracting

    1/52

    What you need to know aboutyourself

    NMFC Lanes

    Origin points Destinations

    Volumes Order Size Order Frequency

    Contract Points What is important to your organization

    Rates Performance Security

  • 7/30/2019 Carrier Selection and Contracting

    2/52

    National MotorFreightClassification Guide

    Roots in regulation NMFC Guide is divided into various

    sections: A list of participating carriers. Indexes to assist in locating specific

    commodities. An index providing rules governing the use of

    the NMFC. Rules relating to the movement of commodities,

    including specific shipping, packaging, andtransporting requirements with which theshipper and carrier must adhere.

  • 7/30/2019 Carrier Selection and Contracting

    3/52

    NMFC Guide

    Examples of the Uniform Domestic Bill of Lading,

    its terms and conditions.

    Description and classifications for every

    commodity.

    Specifications for required packaging.

    Rules for overcharge, loss and damage claims.

  • 7/30/2019 Carrier Selection and Contracting

    4/52

    NMFC Codes

    All commodities are separated into one of18 different categories, or classifications,

    Ranging from class 50 to class 500.

    Four primary factors that determine the waya commodity is classified by the NMFC:

    Density,

    Value, Stowability and handling considerations and

    Susceptibility to damage.

  • 7/30/2019 Carrier Selection and Contracting

    5/52

    NMFC Codes

    NMFC items are further divided into subs,based on the density of the commodity

    Example

    Item 156600, Plastic Articles, NOI Ping pong and bowling balls: same

    classification? A trailer could be filled with only a few hundred pounds

    of ping pong balls (a class 500 item), The same trailer space could be occupied by over

    20,000 pounds of bowling balls (class 70)

  • 7/30/2019 Carrier Selection and Contracting

    6/52

    Freight Rate

    NMFC class is combined with the weight andlength of haul (from origin to destination) todetermine a base rate

    Usually stated in cents per hundred pounds (orhundredweight, "cwt").

    Due to various economies, such as reducedhandling, the per hundredweight rate generallydecreases as shipment weight increases.

    To determine the freight charges, the weight of theshipment is multiplied by the applicable rate.

  • 7/30/2019 Carrier Selection and Contracting

    7/52

    Example

    Rates shown in cents per hundredweight.

    L5C 5C 1M 2M 5M 10M 20M

    $0.6098 $0.5395 $0.4930 $0.4362 $0.3277 $0.2908 $0.2704

    SHIPPING 3,000 POUNDS To calculate the freight charges:

    Determine where the actual shipment weight would fall,3000 lbs. would fall between the 2M (2000 lbs.) and the

    5M (5000 lbs.) weight breaks. Multiply the actual weight by the 2M rate: 3000 lbs. @ 4362 cwt = $1308.60

    Then, multiply the next weight break by the 5M rate: 5000 lbs. @ 3277 cwt = $1638.50

  • 7/30/2019 Carrier Selection and Contracting

    8/52

    Example

    Rates shown in cents per hundredweight.

    L5C 5C 1M 2M 5M 10M 20M

    $0.6098 $0.5395 $0.4930 $0.4362 $0.3277 $0.2908 $0.2704

    SHIPPING 4,200 POUNDS To calculate the freight charges:

    Determine where the actual shipment weight would fall 4200 lbs. would fall between the 2M (2000 lbs.) and the

    5M (5000 lbs.) weight breaks. Multiply the actual weight by the 2M rate: 4200 lbs. @ 4362 cwt = $1832.04

    Then, multiply the next weight break by the 5M rate: 5000 lbs. @ 3277 cwt = $1638.50

  • 7/30/2019 Carrier Selection and Contracting

    9/52

  • 7/30/2019 Carrier Selection and Contracting

    10/52

    Elements of Pricing Program

    A rating system that is easy to: Understand

    Apply

    Compare Price stability for the shipper(for a given span of time)

    Volume stability for the carrier

    (for a given span of time) Simplified freight bill payment

    Ability to automate

  • 7/30/2019 Carrier Selection and Contracting

    11/52

    CarrierAssessment, Selectionand Management (CASM)

    Process improvement model to assesscarriers and LSPs in meeting usersperformance requirements.

    Four Stages Mobilize Analyze

    Implement

    Realize

    Copyright: Edward J. Marien, Ph.D.

  • 7/30/2019 Carrier Selection and Contracting

    12/52

    Carrier/LSP Assessment, Selection and Management (CASM) Process

    1.0 2.0 3.0 4.0 5.0 6.0 8.0 9.0

    Identify

    CorporateMission,

    Vision, KRAs

    & Leadership

    Define

    logistical/SCM

    process

    mission, vision,

    and identify

    improvement

    opportunities.

    Define SOE -

    performance

    requirements

    of the

    logistics

    process.

    Establish

    criteria for

    selecting

    carriers and

    LSP services

    Identify

    potential

    suppliers/

    carriers/

    LSPs.

    Select

    carriers/

    LSPs &

    deliver the

    Requests

    Award the

    business and

    implement

    operation/

    pilot.

    Monitor

    for

    perform-

    ance

    Mobilize Implement Realize

    1.1 The

    Corporate

    mission/vision

    sets thedirection for

    the total

    mission.

    1.2 The

    logistics

    process must

    contribute to

    corporate

    mission,

    vision, and Key

    Result Areas

    (KRAs).

    1.3 Develop/implement a

    core, change

    leadership

    program &

    team.

    2.1 The

    logistical

    process

    mission,

    vision, KRAs

    set the

    direction for

    meeting mgmt

    goals & KRAs.

    2.2 Identify

    current/future

    customer

    and/or supplier

    requirements.

    2.3 Recognize

    changes in

    LSP base.

    2.4 Conduct

    GAP analysis

    and identify

    improvement

    opportunities.

    3.1 Recognize

    interfacing,

    relationship

    management

    processes.

    3.2 Define

    operational

    process

    requirements.

    3.3 Define

    initial

    statement of

    expectations

    (SOE).

    3.4 Select

    teams for

    analysis.3.5 Assure a

    CASM value

    and cost-of-

    quality process

    in place.

    4.1 Define

    criteria for

    selectingcarriers and

    LSPs.

    4.2 Identify

    key financial

    ratios and

    services of

    alternative

    service

    providers.

    4.3 Pre-quality

    LSPs.

    4.4 Identify alt.

    Commercial/

    contractual

    relationships.

    4.5 Design

    initial

    Requests for

    Information,

    Proposal, or

    Bid.

    5.1 Source

    potential

    suppliers,carriers, LSPs.

    5.2 Bring a few

    key carriers

    and LSPs

    together and

    review

    Request.

    5.3 Finalize

    Request for

    Proposal, Bid

    document.

    6.1 Call carriers/

    LSPs together

    and deliver therequests.

    6.2 Mail

    Requests to

    carriers/LSPs

    unable to attend

    meeting.

    8.1 Have legal

    review business

    relationshipsand contracts.

    8.2 Sign the

    contract.

    8.3 Celebrate

    8.4 Develop

    implementation

    plan and project

    schedule.

    8.5 Roll out

    plan.

    9.1 Performance

    charting and

    reporting onservice, costs,

    and asset

    management are

    implemented.

    9.2 CASM

    customer

    satisfaction &

    process

    measures are

    monitored.

    9.3 Hold

    quarterly

    leadership teammeetings to

    ensure criteria &

    services are

    being met.

    9.4 Recognize

    performance of

    all parties.Feedback Loops to

    Ensure Alignment

    with Corporate,

    SCM Goals &

    Resource

    Commitments

    Communications & Feedback Loops for Reporting Process Improvement Results -- Copyright: Edward J. Marien, Ph.D.

    CASMPhases.ppt7/9/01 revised

    Analyze

    7.0

    7.1 Conduct

    detailed ABM

    analysis ofprospects.

    7.2 Team

    analyzes

    proposals, data

    and selects

    carriers/LSPs.

    7.3 Conduct

    site visits, if

    required.

    7.4 Finalize

    SOE between

    parties.

    7.5 Finalizepricing for

    services.

    7.6 Agree upon

    Letter of intent/

    agreement/

    understanding

    (LOI/LOA/LOU)

    Analyze

    requests

    and

    negotiate

    Negotiate

  • 7/30/2019 Carrier Selection and Contracting

    13/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Identify

    Corporate Mission

    Vision

    Key Result AreasK.R.A.s

    Leadership

    1.1 The Corporate

    mission/vision sets the

    direction for the total

    process.

    1.2 The logistics process

    must contribute to

    corporate mission, vision,

    and K.R.A.s

    1.3 Identify/Develop/implement a core, change

    leadership program &

    team.

    1.0

  • 7/30/2019 Carrier Selection and Contracting

    14/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Define Logistical/SCM

    Process mission

    Vision

    Improvementopportunities

    2.1 The logistical process

    mission, vision, KRAs set

    the direction for meeting

    mgmt goals & KRAs.

    2.2 Identify current/futurecustomer and/or supplier

    requirements.

    2.3 Recognize changes in

    LSP base.

    2.4 Conduct GAP analysis

    and identify improvement

    opportunities.

    2.0

  • 7/30/2019 Carrier Selection and Contracting

    15/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Create Statement ofExpectations

    (SOE)

    Performancerequirements of

    the logisticsprocess.

    3.1 Recognize interfacing,

    relationship management

    processes.

    3.2 Define operational process

    requirements.

    3.3 Define initial SOE

    3.4 Select teams for analysis.

    3.0

  • 7/30/2019 Carrier Selection and Contracting

    16/52

    Sample RFI Handout

  • 7/30/2019 Carrier Selection and Contracting

    17/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Establish criteria forselecting carriers

    and LSP services

    4.1 Define criteria forselecting carriers andLSPs.

    4.2 Identify key financialratios and services ofalternative serviceproviders.

    4.3 Pre-qualify LSPs.

    4.4 Identify alt.

    Commercial/ contractualrelationships.

    4.5 Design initial RFI, RFP orBid.

    4.0

  • 7/30/2019 Carrier Selection and Contracting

    18/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Identify potentialsuppliers/ carriers/

    LSPs.

    5.1 Source potential suppliers,

    carriers, LSPs.

    5.2 Bring a few key carriers

    and LSPs together and

    review Request.

    5.3 Finalize Request for

    Proposal, Bid document.

    5.0

  • 7/30/2019 Carrier Selection and Contracting

    19/52

    RFI / RFQ / RFP

    A typical request for quotation consists of the following:

    Rationale for the request for quotation and carrier selection

    Revenue or tonnage history, prepaid and collect, for a given

    period of time by traffic lane or region and the prospectivecarrier(s) share during that period

    Projected revenue or tonnage available to successful carrier(s)

    by traffic lane or region for the term requested

    Request for carrier viability, insurance, safety rating, or annualreport from successful carrier(s)

    Miscellaneous - hazardous materials, included/not included

  • 7/30/2019 Carrier Selection and Contracting

    20/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Select carriers/ LSPs &issue Requests ForProposal (RFP-RFQ-

    RFI)

    6.1 Call carriers/ LSPs

    together and deliver the

    requests.

    6.2 Mail Requests to

    carriers/LSPs unable toattend meeting.

    6.3 Establish and

    communicate deadline and

    expectations.

    6.4 Establish feedback loop

    for asking/sharing

    questions

    6.0

  • 7/30/2019 Carrier Selection and Contracting

    21/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Analyze requestsand negotiate

    7.1 Conduct analysis ofprospects proposals, anddata

    7.2 Select carriers/LSPs.(Short list)

    7.3 Conduct site visits, ifrequired.

    7.4 Conduct reference check,if applicable.

    7.5 Finalize SOE betweenparties.

    7.6 Finalize pricing forservices.7.7 Agree upon Letter of

    intent/ agreement/understanding(LOI/LOA/LOU)

    7.0

  • 7/30/2019 Carrier Selection and Contracting

    22/52

    Selection Process

    Matrix

    Weighted Scale

    Team Review Consensus

  • 7/30/2019 Carrier Selection and Contracting

    23/52

    Negotiation

    Negotiation usually involves the followingsteps: identify underlying interests (as contrasted to

    positions)

    develop alternative scenarios to meetunderlying interests combine or further refine scenarios to meet as

    many interests as possible select a scenario via consensus.

    Working toward consensus by identifyinginterests rather than establishing positionsis a key skill

  • 7/30/2019 Carrier Selection and Contracting

    24/52

    Game Theory

    Zero Sum Game

    In order for me to win, you must lose.

    Non-Zero Sum Game

    Win-Win deal

  • 7/30/2019 Carrier Selection and Contracting

    25/52

    Negotiation Strategies

    With enough volume virtually anything isnegotiable.

    The flip-side may be that a little volume

    may result in very little flexibility The only thing that you absolutely cannot

    negotiate is the thing you dont mention.

    Always negotiate from a position ofstrength/ knowledge

  • 7/30/2019 Carrier Selection and Contracting

    26/52

    Negotiation Strategies

    Other things to Know about your business. How quickly you pay your bills What is the time your freight is available for

    pick-up

    Detailed description of the commodities you areshipping and their respective class ratings

    The percentage of prepaid vs. collect freight Prepaid freight is that paid by the shipper.

    Collect freight is that paid by the consignee. Carrier discounts may apply only to the payer of the

    freight bill.

  • 7/30/2019 Carrier Selection and Contracting

    27/52

    Negotiation Strategies

    Separate what you want from what you Need

    i.e. EDI, Security

    Be VERY CLEAR about expectations of what is

    included and what is accessorial. Good contracts make good partners

    Unbundle costs for Apples to Apples comparison.

    There are many other factors to consider

    The more information you can provide - The more

    accurately a carrier can assess your account.

  • 7/30/2019 Carrier Selection and Contracting

    28/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Award the businessand implement

    operation/ pilot.

    8.1 Have legal review

    business relationships and

    contracts.

    8.2 Sign the contract.

    8.3 Develop implementation

    plan and project schedule.

    8.4 Roll out plan.

    8.0

  • 7/30/2019 Carrier Selection and Contracting

    29/52

    Carrier/LSP Assessment, Selection andManagement (CASM) Process

    Monitor forperformance

    9.1 Performance charting andreporting on service, costs,and asset management areimplemented.

    9.2 CASM customersatisfaction & processmeasures are monitored.

    9.3 Hold quarterly leadershipteam meetings to ensurecriteria & services arebeing met.

    9.4 Recognize performance ofall parties.

    9.0

  • 7/30/2019 Carrier Selection and Contracting

    30/52

    Carrier Performance Tracking

  • 7/30/2019 Carrier Selection and Contracting

    31/52

    Carrier Performance Tracking

  • 7/30/2019 Carrier Selection and Contracting

    32/52

    In transportation reporting, you arelooking for exceptions and trends in:

    Flow volumes by:

    Business units

    Geographic location

    Customers Suppliers

    Service times

    OS&D losses and claims

    Budget variances

    Projected costs/unit

  • 7/30/2019 Carrier Selection and Contracting

    33/52

    Carrier/LSP Assessment, Selection and Management (CASM) Process

    1.0 2.0 3.0 4.0 5.06.0 8.0 9.0

    Identify

    Corporate

    Mission,Vision, KRAs

    & Leadership

    Define

    logistical/SCM

    processmission, vision,

    and identify

    improvement

    opportunities.

    Define SOE -

    performance

    requirementsof the

    logistics

    process.

    Establish

    criteria for

    selectingcarriers and

    LSP services

    Identify

    potential

    suppliers/carriers/

    LSPs.

    Select

    carriers/

    LSPs &deliver the

    Requests

    Award the

    business and

    implementoperation/

    pilot.

    Mobilize Implement Realize

    1.1 The

    Corporate

    mission/vision

    sets thedirection for

    the total

    mission.

    1.2 The

    logistics

    process must

    contribute to

    corporate

    mission,

    vision, and Key

    Result Areas

    (KRAs).

    1.3 Develop/

    implement a

    core, change

    leadership

    program &

    team.

    2.1 The

    logistical

    process

    mission,vision, KRAs

    set the

    direction for

    meeting mgmt

    goals & KRAs.

    2.2 Identify

    current/future

    customer

    and/or supplier

    requirements.

    2.3 Recognize

    changes in

    LSP base.2.4 Conduct

    GAP analysis

    and identify

    improvement

    opportunities.

    3.1 Recognize

    interfacing,

    relationship

    managementprocesses.

    3.2 Define

    operational

    process

    requirements.

    3.3 Define

    initial

    statement of

    expectations

    (SOE).

    3.4 Select

    teams for

    analysis.3.5 Assure a

    CASM value

    and cost-of-

    quality process

    in place.

    4.1 Define

    criteria for

    selecting

    carriers andLSPs.

    4.2 Identify

    key financial

    ratios and

    services of

    alternative

    service

    providers.

    4.3 Pre-quality

    LSPs.

    4.4 Identify alt.

    Commercial/

    contractualrelationships.

    4.5 Design

    initial

    Requests for

    Information,

    Proposal, or

    Bid.

    5.1 Source

    potential

    suppliers,

    carriers, LSPs.

    5.2 Bring a few

    key carriers

    and LSPs

    together and

    review

    Request.

    5.3 Finalize

    Request for

    Proposal, Bid

    document.

    6.1 Call carriers/

    LSPs together

    and deliver the

    requests.

    6.2 Mail

    Requests to

    carriers/LSPs

    unable to attend

    meeting.

    8.1 Have legal

    review business

    relationshipsand contracts.

    8.2 Sign the

    contract.

    8.3 Celebrate

    8.4 Develop

    implementation

    plan and project

    schedule.

    8.5 Roll out

    plan.

    Analyze

    7.0

    7.1 Conduct

    detailed ABM

    analysis ofprospects.

    7.2 Team

    analyzes

    proposals, data

    and selects

    carriers/LSPs.

    7.3 Conduct

    site visits, if

    required.

    7.4 Finalize

    SOE between

    parties.

    7.5 Finalize

    pricing for

    services.

    7.6 Agree upon

    Letter of intent/

    agreement/

    understanding

    (LOI/LOA/LOU)

    Analyze

    requests

    andnegotiate

    Feedback Loops to

    Ensure Alignment

    with Corporate,

    SCM Goals &

    Resource

    Commitments

    Communications & Feedback Loops for Reporting Process Improvement Results -- Copyright: Edward J. Marien, Ph.D.

    CASMPhases.ppt7/9/01 revised

    Negotiate

    9.1 Performance

    charting and

    reporting onservice, costs,

    and asset

    management are

    implemented.

    9.2 CASM

    customer

    satisfaction &

    process

    measures are

    monitored.

    9.3 Hold

    quarterly

    leadership team

    meetings to

    ensure criteria &

    services are

    being met.

    9.4 Recognize

    performance of

    all parties.

  • 7/30/2019 Carrier Selection and Contracting

    34/52

    TransportationManagement

    BUS 305

    WEEK 5

    Transportation Contracting

  • 7/30/2019 Carrier Selection and Contracting

    35/52

    Good Fences make

    Good Neighbors.

    and

    Good Contracts makeGood Partners.

  • 7/30/2019 Carrier Selection and Contracting

    36/52

    Any area that you wish to preemptfrom carriers common law provisions

    Operations

    Responsibilities

    Measures/Metrics

    Dispute resolution

    Areas in Contracting

  • 7/30/2019 Carrier Selection and Contracting

    37/52

    Standard Contract Points

    Rates

    Origins and destinations

    Commodities to be transported Freight document (whose)

    Volume guarantees (if applicable)

    Which business? Measuring technique

  • 7/30/2019 Carrier Selection and Contracting

    38/52

    Standard Contract Points

    Specification of carrier equipment

    Type (if applicable)

    Condition

    Shipper indemnification

    Not liable for Carrier negligence

    Confirmation of status as independent

    Contractor

    Carrier liability

  • 7/30/2019 Carrier Selection and Contracting

    39/52

    Standard Contract Points

    Force majeure clause

    Schedule for payments (i.e. terms)

    Guarantee of contract confidentiality Protection of other proprietary

    information

  • 7/30/2019 Carrier Selection and Contracting

    40/52

    Standard Contract Points

    Provision governing assignment of thecontract (rights granted cannot betransferred)

    Example: 3rd

    party payment services Termination clause

    Specification for measure of loss

    Replacement value Wholesale? Retail?

    Collateral

  • 7/30/2019 Carrier Selection and Contracting

    41/52

    Standard Contract Points

    Provision for modifying contract

    Statement of jurisdiction (which states laws

    will govern the contract)

    Severability provision

    If a clause is invalid all others remain intact

    Renewal Provision

    Evergreen

  • 7/30/2019 Carrier Selection and Contracting

    42/52

    Accessorial charges

    In transportation, those charges madefor additional, supplemental, or specialservices performed in addition to the

    basic transportation service.

  • 7/30/2019 Carrier Selection and Contracting

    43/52

    Accessorial ChargesTruck Example

    ACCESSORIAL CHARGESFuel Price in cents per gallon Surcharge % of Rate

    $ .92 to $ .989 0%$ .99 to $1.159 1%$1.16 to $1.219 2%

    $1.22 to $1.279 3%$1.28 to $1.339 4%$1.34 to $1.399 5%$1.40 to $1.459 6%$1.46 to $1.519 7%

    $1.52 to $1.579 8%$1.58 to $1.639 9%$1.64 to $1.699 10%

    For each 6 cents fuel price increase above $1.699, a 1% additional charge willapply.

    Note: The fuel surcharge will be adjusted weekly in accordance with theNational Fuel Price Average put out by the Department of Energy on

    TUESDAY.

  • 7/30/2019 Carrier Selection and Contracting

    44/52

    Accessorial ChargesTruck Examples

    Minimum Charge on all types of Cargo is $550.00 unless otherwisenoted.

    FLATBED SPECIAL CHARGES: Standard Tarp = $55.00 - Lumber Tarp = $75.00

    SPECIAL REEFER CHARGES: Bulkhead Loads (divided to maintain 2 temps. in trailer) 5 cents per mile

    extra over standard reefer rates. THESE CHARGES APPLY TO ALL TYPES OF EQUIPMENT: Stop-Off/Extra Pickup Charge:

    $50.00 each stop up to 4 stops -Stops 5-7 = $80.00 each - 8or more Stops = $120.00 each

    Truck ordered but not used: $250.00

    Detention Charges: $75.00 per Hour Minimum Chargeable 2 Hours 2 hours free loading or unloading, except with appointments,

    then it is 1 hourEAGLE H LOGISTICS

  • 7/30/2019 Carrier Selection and Contracting

    45/52

    Shipping Exceptions

    Haz-Mat

    Personal Belongings

  • 7/30/2019 Carrier Selection and Contracting

    46/52

    Freight Terms

    In routine transactions, drafting specific contract

    terms [delivery and risk] would delay the making

    and consummation of the contract.

    Detailed terms may be included in the parties' saleand purchase forms, but the terms in the two forms

    often fail to coincide and generate problems

    The use of standardized freights terms (terms of

    sale) can speed agreement and avoid divergent

    contract provisions

  • 7/30/2019 Carrier Selection and Contracting

    47/52

    Freight Terms

    The FOB terms represent a number ofdifferent factors concerning how a sale ismade

    they affect who is responsible for the freightcharges,

    where the title to the goods passes

    who has responsibility for loss and damage

    claims. Normally established in contract of sale

    Impacts Transportation

  • 7/30/2019 Carrier Selection and Contracting

    48/52

    Freight Terms

    There are six basic FOB designations.. FOB Origin - The title passes at origin (shippers dock) and the

    consignee is responsible for the freight charges. The freight isshipped on a collect basis.

    FOB Origin, Freight Prepaid - Same as #1 only the shipperpays the freight.

    FOB Origin, Freight Prepaid and Charged Back - Same as#1, but the shipper pays the carrier for the freight and theninvoices the consignee for the freight charges.

    FOB Destination - The title passes at destination (consigneesdock) and the shipper is responsible for the freight charges. Thefreight is shipped on a prepaid basis.

    FOB Destination, Freight Collect - Same as #4 only the

    consignee pays the freight. FOB Destination, Freight Collect and Allowed - Same as #4,

    but the consignee pays the carrier for the freight charges andthen deducts those charges from the sellers invoice for thegoods.

  • 7/30/2019 Carrier Selection and Contracting

    49/52

    INternational COmmercial TERMS

    The international standard calledIncotermshas largely replaced the olderFOB designations

    I t d R l t d

  • 7/30/2019 Carrier Selection and Contracting

    50/52

    Incoterms and RelatedBuyer/Seller Responsibilities

    Abbreviation

    Incoterms

    SupplierCountry

    InlandFreight

    SupplierCountry

    InlandInsurance

    SupplierCountry

    Export/Customs

    Clearing

    International

    ShipmentLoading

    InternationalFreight

    International

    Insurance

    International

    ShipmentUnloading

    BuyerCountryImpor

    CustomsClearance

    BuyerCountryInlan

    Freight

    BuyerCountryInlan

    Insurance

    EXW Ex WorksFCA Free Carrier

    FAS Free Alongside

    FOB Free Onboard

    CFR Cost and Freight

    CPT Carrier Paid to

    CIFCost, Insurance and

    Freight

    CIP Carriage andInsurance Paid to

    DAF Delivered at Frontier

    DES Delivered Ex Ship

    DEQ Delivered Ex Quay Depends

    DDUDelivered Duty

    Unpaid

    DDP Delivered Duty Paid

    Supplier Responsibility Buyer Responsibility

  • 7/30/2019 Carrier Selection and Contracting

    51/52

    Critical aspects of Cargo Loss&Damage Liabilities

    Shippers burden of proofand responsibilitiesare: Shipped clean and right count

    Arrived Over, Short, and Damaged (OS&D)?

    Amount of Claimowner to be made whole

    Filed within stated time limits

    Covers amounts beyond carriers stated liabilities

  • 7/30/2019 Carrier Selection and Contracting

    52/52

    Carriers responsibilities and liabilities: Covers OS&D for areas beyond carriers 5

    exceptions:

    Acts of God Public Authority

    Public Enemy

    Shipper Negligence

    Inherent Vice

    Plus within carriers stated coverages

    Check carriers tariffs.

    Critical aspects of CargoLoss& Damage Liabilities