PROCEDURE FOR CARD BOARD BURSTING / AIR
BLOWING
1. OBJECTIVE
To clean the permanent and temporary pipes being erected by
cardboard bursting with compressed air.
2. PROCEDURE
Items such as control valves, flow measuring elements, orifices,
NRV flaps etc which are likely to get damaged during air
bursting or which may restrict the flow during the process
should be removed and spool pieces erected in place. The
removed fittings are stored with proper identification tags.
Availability of air compressor with sufficient capacity is
ensured.
A pressure gauge of !" kg#cm$range is installed in the line
near air supply connection.
%ne end of the pipe system to be cleaned is fitted with suitable
arrangement for connecting compressed air hose and a dummy
cardboard is fi&ed at the other flanged end.
The system is pressuri'ed with compressed air up to ( ! )
kg#cm$.
-
8/13/2019 Card Board Bursting
2/3
*udden release of air at very high velocity due to rupturing of
cardboard causes removal of foreign particles present in the
system.
Thickness of the cardboard should be such that it bursts afterattaining a pressure of ( ! ) kg#cm$.
The air stream coming out of the pipeline during bursting of
card board is observed for presence of any foreign material.
The card board bursting process is repeated using new
cardboard every time till the air stream coming out of the
pipeline is visually clean.
+rouping of pipings is decided at site for ease in carrying out
the cardboard bursting activity.
herever card board bursting is not possible due to constrains
of the system such as non availability of flanged connection forfi&ing cardboard or si'e of pipe being small, the lines are to be
air blown continuously for ) to" minutes.
3. LINES INCLUDED IN PROCESS
All lube oil, -ontrol oil, acking oil and *eal oil lines
/temporary and permanent0 shall be included.
After cardboard bursting of all the systems is completed the
whole system shall be filled with compressed air and all
instrument tapping points /wherever applicable0 shall be blown
one by one keeping air pressure at appro&imately ( kg#cm$.
-
8/13/2019 Card Board Bursting
3/3
4. SAFETY PRECAUTIONS
The area of potential danger should be cordoned off and 1anger
sign boards prominently displayed.
Temporary connections should be able to withstand a pressure
of 2 ! 3 kg#cm$.
hile bursting the diaphragm care should be taken that the air
4et is not directed towards any e5uipment.
5. COMPLETION CRITERIA
-ard board bursting of a section is declared complete once the
stream of air coming out from the pipe is visually clean.