  • 8/13/2019 Card Board Bursting

    1/3

    PROCEDURE FOR CARD BOARD BURSTING / AIR

    BLOWING

    1. OBJECTIVE

    To clean the permanent and temporary pipes being erected by

    cardboard bursting with compressed air.

    2. PROCEDURE

    Items such as control valves, flow measuring elements, orifices,

    NRV flaps etc which are likely to get damaged during air

    bursting or which may restrict the flow during the process

    should be removed and spool pieces erected in place. The

    removed fittings are stored with proper identification tags.

    Availability of air compressor with sufficient capacity is

    ensured.

    A pressure gauge of !" kg#cm$range is installed in the line

    near air supply connection.

    %ne end of the pipe system to be cleaned is fitted with suitable

    arrangement for connecting compressed air hose and a dummy

    cardboard is fi&ed at the other flanged end.

    The system is pressuri'ed with compressed air up to ( ! )

    kg#cm$.

  • 8/13/2019 Card Board Bursting

    2/3

    *udden release of air at very high velocity due to rupturing of

    cardboard causes removal of foreign particles present in the

    system.

    Thickness of the cardboard should be such that it bursts afterattaining a pressure of ( ! ) kg#cm$.

    The air stream coming out of the pipeline during bursting of

    card board is observed for presence of any foreign material.

    The card board bursting process is repeated using new

    cardboard every time till the air stream coming out of the

    pipeline is visually clean.

    +rouping of pipings is decided at site for ease in carrying out

    the cardboard bursting activity.

    herever card board bursting is not possible due to constrains

    of the system such as non availability of flanged connection forfi&ing cardboard or si'e of pipe being small, the lines are to be

    air blown continuously for ) to" minutes.

    3. LINES INCLUDED IN PROCESS

    All lube oil, -ontrol oil, acking oil and *eal oil lines

    /temporary and permanent0 shall be included.

    After cardboard bursting of all the systems is completed the

    whole system shall be filled with compressed air and all

    instrument tapping points /wherever applicable0 shall be blown

    one by one keeping air pressure at appro&imately ( kg#cm$.

  • 8/13/2019 Card Board Bursting

    3/3

    4. SAFETY PRECAUTIONS

    The area of potential danger should be cordoned off and 1anger

    sign boards prominently displayed.

    Temporary connections should be able to withstand a pressure

    of 2 ! 3 kg#cm$.

    hile bursting the diaphragm care should be taken that the air

    4et is not directed towards any e5uipment.

    5. COMPLETION CRITERIA

    -ard board bursting of a section is declared complete once the

    stream of air coming out from the pipe is visually clean.