EROSION CONTROL PLAN C-500
PROPOSED LIMITS OF DISTURBANCE
PROPOSED CONTOUR (MAJOR)
PROPOSED CONTOUR (MINOR)
PROPOSED INLET PROTECTION
EX. CONTOUR (MAJOR)
EX. CONTOUR (MINOR)
PROPOSED SILT FENCE
XXX
PROPOSED CONSTRUCTION ENTRANCE
PROPOSED TREE PROTECTION FENCE
XXX
PROPOSED SILT FENCE OUTLET
PROPOSED DIVERSION DITCH/BERM
PROPOSED ROCK FILTER DAM
EROSION CONTROL NOTES1. REFER TO GENERAL NOTES SHEET C100.
2. A PRE-CONSTRUCTION MEETING IS REQUIRED FOR THIS PROJECT.
3. EROSION CONTROL MEASURES SHALL BE MAINTAINED DURING THE ENTIRE LIFE OF THE PROJECT.
4. CONTRACTOR SHALL CONDUCT GRADING OPERATIONS IN A MANNER THAT ENSURES NO SEDIMENT IS ALLOWED OFF-SITE. IT IS THE
CONTRACTOR'S SOLE RESPONSIBILITY TO ENSURE THAT NO SEDIMENT IS ALLOWED OFF-SITE. IF ADDITIONAL MEASURES ARE REQUIRED, THE
CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY TO DISCUSS DESIGN MODIFICATIONS.
5. ALL STREETS ADJACENT TO AND IN FRONT OF THE PROJECT SHALL BE KEPT CLEAN AT ALL TIMES OR A WASH STATION MAY BE REQUIRED AT THE
CONTRACTOR'S EXPENSE.
6. CONTRACTOR SHALL CONSTRUCT DIVERSION DITCHES AND BERMS TO ENSURE ALL RUN-OFF IS DIRECTED TO AN EROSION CONTROL MEASURE.
DIVERSIONS SHALL STAY IN PLACE AT LEAST UNTIL PIPE DRAINAGE SYSTEM IS COMPLETED.
7. GROUND COVER SHALL BE ESTABLISHED PER UPDATED NPDES REQUIREMENTS. REFER TO DETAIL THIS SHEET STABILIZATION TIME FRAMES.
8. CUT AND FILL SLOPES THAT ARE TWO TO ONE (2:1) OR GREATER SHALL BE STABILIZED WITH PERMANENT SLOPE RETENTION DEVICES OR A
SUITABLE COMBINATION OR PLANTINGS AND RETENTION DEVICES. SLOPES GREATER THAN THREE TO ONE (3:1) SHALL NOT BE STABILIZED WITH
TURF GRASS BUT MUST BE STABILIZED WITH VEGETATION THAT REQUIRES MINIMAL MAINTENANCE SUCH AS WEEPING LOVE GRASS, RED FESCUE
OR OTHER APPROVED VARIETY.
9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION IS
SCHEDULED PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY (CO). THE FENCING SHALL BE REMOVED IMMEDIATELY PRIOR TO THE
FINAL SITE INSPECTION FOR THE SITE.
10. TREE PROTECTION FENCING SHALL NOT BE MOVED AND THERE SHALL BE NO ENCROACHMENT INTO SUCH PROTECTED AREA(S) WITHOUT
WRITTEN AUTHORIZATION OF THE TOWN’S ZONING COMPLIANCE STAFF. ANY ACTIVITY (LANDSCAPING, FENCING, OR UTILITY INSTALLATION)
SHOWN ON THE APPROVED PLANS IN A TREE PROTECTION AREA, SHALL ALSO NOT OCCUR WITHOUT WRITTEN AUTHORIZATION FROM THE
TOWN’S ZONING COMPLIANCE STAFF. ANY UNAUTHORIZED ENCROACHMENT OR DISTURBANCE WITHIN THE BOUNDARIES OF A TREE
PROTECTION AREA SHALL AUTOMATICALLY RESULT IN FINES AND THE REPLACEMENT OF ANY DAMAGED VEGETATION IN ACCORDANCE WITH
THE LAND DEVELOPMENT ORDINANCE.
11. ALL CATCH BASINS SHALL BE PROTECTED PER TOC DETAIL 04000.014, UNLESS NOTED OTHERWISE.
12. TOPSOIL SHALL BE STRIPPED AND STOCKPILED AND MAY BE PLACED IN NON STRUCTURAL FILL AREAS.
13. PERMANENT GOUNDCOVER SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER IS SHORTER.
14. CONSTRUCTION ENTRANCES MUST BE MODIFIED TO ACHIEVE ADA COMPLIANCE WHERE APPLICABLE.
15. CONTRACTOR SHALL CONSTRUCT DIVERSION BERM OUTSIDE OF THE RIGHT OF WAY ALONG E PARK STREET TO ENSURE THAT ALL RUNOFF
DURING THE GRADING PHASE IS KEPT ON SITE. AS THE SITE IS BROUGHT TO GRADE AND THE STORM STRUCTURES ARE INSTALLED, THE DIVERSION
MAY BE MODIFIED/REMOVED AS INSTRUCTED BY THE EROSION CONTROL INSPECTOR.
16. A GRADING PERMIT SHALL NOT BE ISSUED FOR THIS PROJECT UNTIL THE FOLLOWING HAS OCCURED:
A. THE RISER STRUCTURES AND BARRELS MUST BE DELIVERED AND ON SITE.
B. THE TREE PROTECTION FENCING ON THIS PROJECT MUST BE INSTALLED AND INSPECTED.
C. THE TOWN OF CARY HAS RECEIVED NOTIFICATION FROM THE ECOSYSTEM ENHANCEMENT PROGRAM OR AN APPROVED NUTRIENT OFFSET
BANK THAT A RECEIPT HAS BEEN ISSUED TO THE DEVELOPER AND THE LOCAL GOVERNMENT STATING THE NITROGEN BUY DOWN HAS BEEN
COMPLETED.
SEEDBED PREPARATION
SEEDING SCHEDULE
MAR 1. - JUN. 1
AND MAR 1. - APR. 15
OR MAR. 1 - JUN. 30
JUN. 1 - SEP. 1
SEP. 1 - MAR. 1
NOV. 1 - MAR. 1
1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF THEY
OCCUR. AFTER ALL ROUGH GRADING IS COMPLETED, TILL SOIL AREAS TO BE SEEDED AND PLANTED TO A DEPTH
OF FIVE INCHES.
2. REMOVE ALL LOOSE ROCKS, ROOTS, DIRT CLODS, AND OTHER OBSTRUCTIONS LEAVING GROUND SURFACE
SMOOTH AND UNIFORM.
3. TO PREPARE UNIFORM SEEDBED, INCORPORATE AGRICULTURAL LIME FERTILIZER AND SUPERPHOSPHATE INTO
SOIL AREAS TO BE VEGETATED. DISK NUTRIENTS INTO SOIL UNTIL WELL PULVERIZED.
4. SEED ON PREPARED SEEDBED AND COVER LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK. APPLY
TEMPORARY SEEDING TO SOIL STOCKPILE AREAS THAT WILL BE DISTURBED WITHIN 30 DAYS. APPLY PERMANENT
SEEDING TO WHERE FINISH GRADES ARE ESTABLISHED.
5. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR WITH LIQUID ASPHALT AT 400 GAL./ACRE OR EMULSIFIED
ASPHALT AT 300 GAL./ACRE.
6. MULCH ALL SEEDED AREAS WITH SMALL GRAIN STRAW AT 90 LBS./1000 SF AND SPREAD UNIFORMLY. GROUND
SURFACE SHOULD BE VISIBLE TO ALLOW SUNLIGHT PENETRATION.
7. MULCH AROUND SHRUBBERY AND TREES WITH SHREDDED HARDWOOD TO A DEPTH OF 3 INCHES.
8. AFTER WORK IS COMPLETED AND AREAS ARE STABILIZED, CALL EROSION CONTROL OFFICER FOR SITE
INSPECTION AND RECEIVE CERTIFICATE OF COMPLETION. REMOVE ALL TERMPORARY EROSION CONTROL
MEASURES, INSTALL RIP-RAP, AND SEED AND MULCH ANY REMAINING BARE AREAS.
SHOULDERS, SIDE DITCHES, SLOPES (MAX. 3:1)
DATE
AUG. 15 - NOV. 1 TALL FESCUE
TYPE
300 LBS/ACRE
PLANTING RATE
NOV. 1 - MAR. 1
MAR 1. - APR. 15
JUL. 1 - AUG. 15
TALL FESCUE
ABRUZZI RYE
TALL FESCUE
TALL FESCUE AND
***BROWNTOP MILLET OR
SOUGHNUM-SUDAN HYBRID
SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2:1)
PLANTING RATEDATE TYPE
SERICEA LESPEDESA
ADD TALL FESCUE
ADD WEEPING LOVEGRASS
***TALL FESCUE AND
***BROWNTOP MILLET OR
ERICEA LESEDESCA AND
ADD ABRUZZI RYE.
SOUGHNUM-SUDAN HYBRID
TALL FESCUE
300 LBS/ACRE
25 LBS/ACRE
300 LBS/ACRE
125 LBS/ACRE
35 LBS/ACRE
30 LBS/ACRE
50 LBS/ACRE
120 LBS/ACRE
10 LBS/ACRE
120 LBS/ACRE
25 LBS/ACRE
30 LBS/ACRE
70 LBS/ACRE
120 LBS/ACRE
25 LBS/ACRE
CONSULT EROSION CONTROL ENGINEER OR SOIL CONSERVATION SERVICES
FOR OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE
VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS.
OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE.
***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED
PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROWN
OVER 12-INCHES IN HEIGHT BEFORE MOWING. OTHERWISE FESCUE MAY BE
SHADED OUT.
PERIMETER DIKES, SWALES, DITCHES, SLOPES 7 DAYS NONE
SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS
HIGH QUALITY WATER(HQW) ZONES 7 DAYS NONE
SLOPES STEEPER THAN 3:1 7 DAYS
SLOPES 3:1 OR FLATTER 14 DAYS
ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 14 DAYS
IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE
NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED.
7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH.
NONE, EXCEPT FOR PERIMETERS AND HQW ZONES.
STABILIZATION TIME FRAMES
1. REQUEST PRE-CONSTRUCTION MEETING;
2. OBTAIN GRADING PERMIT. TREE PROTECTION FENCING MUST BE INSTALLED AND INSPECTED BY THE TOWN OF CARY SITE INSPECTOR PRIOR TO
A GRADING PERMIT BEING ISSUED;
3. INSTALL ALL EROSION CONTROL MEASURES AS SHOWN WITH SILT FENCE INSTALLED BEHIND EXISTING SIDEWALK;
4. OBTAIN CERTIFICATE OF COMPLIANCE THROUGH ON-SITE INSPECTION BY EROSION CONTROL OFFICER;
5. PROCEED WITH GRADING;
6. CONSTRUCT NEW SUBDIVISION IMPROVEMENTS;
7. CLEAN SEDIMENT BASIN WHEN ONE-HALF FULL;
8. SEED AND MULCH DENUDED AREA PER NCDWQ STABILIZATION REQUIREMENTS (SEE TABLE THIS SHEET);
9. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL PERMANENT GROUND COVER IS ESTABLISHED. DIVERSIONS SHALL REMAIN IN PLACE UNTIL
THE STORM DRAINAGE SYSTEM IS INSTALLED, FUNCTIONAL, AND DISCHARGING ALL STORMWATER TO BASINS;
10. REMOVE AND RELOCATE SILT FENCE TO BEHIND PROPOSED SIDEWALK ALONG E PARK STREET TO ALLOW FOR INSTALLATION OF NEW
SIDEWALK AND CURBING IN THE RIGHT OF WAY. MAINTAIN INLET PROTECTION MEASURES WITHIN THE RIGHT OF WAY.
11. REQUEST FINAL APPROVAL BY EROSION CONTROL OFFICER;
12. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS.
CONSTRUCTION SEQUENCE
Filter
Basin
Drainage
Area
(Ac.) Q10 (cfs) SKIMMER SIZE ORIFICE SIZE
DEPTH LENGTH WIDTH PROP. REQ'D PROP. REQ'D PROP. REQ'D
(FT) (FT) (FT) (CF) (CF) (SF) (SF) (FT.) (FT.)
SB #1 0.95 2.7436 3 150 60 3435 1724 1800 1195 10 2.59 1.5" 1.5"
NOTES: 10
"-I10 7.22 IN/HR
-C 0.40
-REQUIRED SURFACE AREA BASED ON .01 * Q10 * 43,560 SF/AC
-REQUIRED VOLUME BASED ON 1815 CF/ ACRE OF DRAINAGE AREA
-VOLUMES SHOWN ARE FOR SEDIMENT STORAGE ZONE FLOOD STORAGE ZONE IS ONE FOOT ABOVE SEDIMENT STORAGE ZONE.
-EROSION CONTROL INSPECTOR CAN REQUIRE ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY.
SB IS TOC STD. 04000.03
WEIRBASIN DIMENSIONS VOLUME AREA
SEDIMENT BASIN SUMMARY
GRAPHIC SCALE
NORTH
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF CARY
STANDARDS, SPECIFICATIONS AND DETAILS IN PLACE AT TIME OF PLAN
APPROVAL
PROPOSED LIMITS OF PROPERTY LINE =
DISTURBANCE
TREE PROTECTION FENCE@ 1.0' FROM LOD
SILT FENCE@ 1.0' FROM TP FENCE
LOD / TP FENCE / SILT FENCE TYPICAL DETAIL
TOTAL SITE AREA = 2.06 ACRES
TOTAL ON-SITE DISTURBANCE = 2.06 ACRES
TOTAL OFF-SITE DISTURBANCE = 0.35 ACRES
TOTAL DISTURBANCE = 2.41 ACRES
)
77
7
7 7
7
7
MA
YTO
N V
IEW
LA
NE
(60' W
IDTH
PU
BLI
C R
/W)
1 2 3 4 5 6 7 8 9 10 11 12 13 14
15
16
17
18
19
20
21
2230
27
28
29
26
23
24
25
−
MA
YTO
N V
I EW
LA
NE
FLAT RAIL TRAIL
PA
RK
STA
TIO
N
LAN
E
SB #1
WA
LKER
STR
EET
AC
AD
EM
Y S
TREET
E PARK STREET(30' EX. R/W
(38.5' PROPOSED R/W)
APPROVED by the Town of CaryDevelopment Review Committee
07/23/2018By: dlovelan
18-DP-0132