2

1 FOREWORD

The purpose of this Monthly Report is to record the major actions and issues taken place in the

report month and analyze the possible changes, delays and their effects on the COWASH

implementation. The nature of the report is TOTALLY UN-OFFICIAL information sharing

between the Ramboll staff and regional RSU Team Leaders and should not be referred in any

reports or documents. One of the functions of the report is to be a good “reminder” when

preparing the OFFICIAL Quarterly and Annual reports. The language and statements in this

report are not official statements and should therefore be understood only in terms of

“information sharing”.

2 MAJOR OUTPUTS ACHIEVED

2.1 PROJECT RELATED OUTPUTS (COMPONENT 1)

a) Updating the web page

The CMP website was updated several times in March. Many new documents on WASH and

relevant to COWASH and CMP approach were added to the web-page including news of the

latest developments and observations. Please visit the following site:

http://www.cmpethiopia.org/page/107

b) The 2006 EFY COWASH federal level plan

The Component 1 work plan of 2006 EFY was submitted to the competent authorities for

approval in July 2013. The 2006 plan was revised in March and approved in by the Steering

Committee on March 31, 2014.

c) Institutionalizing CMP into the One WASH Sector Implementation

In the meeting between MoWIE and Embassy of Finland in December 2014 it was agreed

that a CMP Implementation Manual using Public Finance and Procurement Management

System need to be prepared.

Accordingly, COWASH and SNV prepared joint ToR for the preparation of the CMP

Implementation Manual. SNV recruited IRC to carry out the task and COWASH recruited

Eyob Defere to support the financial part of the manual. The contract was commenced on

January 20, 2014 and the inception workshop was held on Feb 6, 2014. The revised road

map for the preparation of the Manual was endorsed and is as follows:

3

March 2014 April 2014 May 2014

CMP Implementation Manual preparation schedule

Draft CMPIM shared with COWASH, SNV,

UNICEF and Embassy of Finland

By March 26, 2014Done 26.4,2014

Consultants receive comments from

COWASH, SNV, UNICEF and Embassy of

FinlandBy

March 31, 2014

Consultants incorporate comments

to the manual by April 4, 2014

MoWIE with the help from COWASH will

share the Manual with the CMP stakeholders

including regionsBy

April 4, 2014

CMP Implementation Manual Validation

Workshop organized with the Federal and

Region level stakeholders on

April 29-30, 2014

Manual revision finalized by consultant

based on the Validation workshop

inputs by May 5, 2014

CMP Implementation Manual Edited and Final Edited version

completed by May 15, 2014

Deadline of the feedback from the

stakeholdersBy

April 18, 2014

On March 26, 2014 the consultant submitted the zero draft for COWASH comments. The

COWASH comments were provided back to the consultant on March 31, 2014.

d) CMP research results

i) Activities performed by PhD Student; Beshah Mogesse

During the month of March the PhD student carried out the data analysis from the

field surveys. In-depth discussions on the findings, research process and other

research technicalities were held in March with the FTAT and the PhD student.

ii) CMP research on training impacts closing was

The technical and financial tender evaluations were finalized and the winner was

announced. Lisan Management won the tender and the agreement with Lisan

Management was signed. The road map to complete the consultancy is presented

here below;

TIR consultancy milestones

March MayApril

Contract signed

March 20, 2014

Submittal of the Inception report March

31, 2014

Field work 1.4-30.4.2014

Draft Training Impact

Research Report May 5,

2014

Final Training Impact

Research Report May

17, 2014

Comments to the draft

report 5-10.5, 2014

4

iii) CMP case study

Discussions with the last MSc student (Mebit Mitiku) were held to conduct the case

study of a selected CMP project. At the end of March Mebit Mitiku prepared draft

proposal of the case study for FTAT consideration and decision.

iv) Mini Impact Research

CTA prepared a concept paper to carry out mini impact research. Oromia RSU

submitted three mini impact research papers for CTA to edit and finals to be

published on the CMP web site.

e) Technical Guidelines and Manuals development

i) Water Safety Planning

National Water Safety Planning Workshop held on March 5 in Addis Ababa.

29 water safety planning stakeholders gathered for one day to discuss the

Ethiopian experience on rural water safety planning and to explore how Ethiopia

should scale up the use of water safety planning as an instrument to improve

WASH sector performance. The event was organized by the Ministry of Water,

Irrigation and Energy in collaboration with the Finland Government supported

COWASH Project. The stakeholders were from Agriculture (1), Civil Society

Organizations (4), Donor organizations (10), Ministry of Water, Irrigation and

Energy (8), Private sector (2) and from COWASH (4).

The workshop started with an introduction to water safety planning by UNICEF

which included practical examples from outside Ethiopia. Thereafter the three

water safety planning experiences in Ethiopia were presented by the Help for a

Drop of Water (HfDW) from Tigray region, by the Welt, Hunger, and Hilfe (WHH)

from Oromia Region and by COWASH from Amhara Region. The HfDW WSP

intervention concentrated on baseline data collection, WHH focused on multi-

village water scheme based WSP intervention and COWASH presented

Kebele/micro-watershed based intervention. All presentations can be found

http://www.cmpethiopia.org/page/706. Important problems were highlighted

which related to a greater or lesser extent to catchment problems, risks in the

systems, risks in collection and storage including the use of non-protected

sources.

Two groups were formed to discuss respectively 1) the strategic and institutional

development needed to scale-up WSP in Ethiopia and 2) the approach and actors

needed to implement rural WSP.

The first group concluded that a National WSP strategy and National WSP

Implementation Guideline needs to be developed for Ethiopia. They also pointed

out that the WSP is not an issue of drinking water alone, but a much broader

concept where integrated catchment development and household level hygiene

and sanitation issues including household water treatment and safe storage also

need to be addressed. The group outlined a process with key responsibilities for

the WSP strategy and Implementation Guideline development in Ethiopia.

5

The rural WSP group confirmed the need for a national strategy and suggested

that it would be practical to initiate WSP at the lowest formal government level

and start with one micro-watershed in a Kebele and then move on to the others.

This however is not a blue print approach as conditions may vary for example in

the case of multi-Kebele systems. It was stressed that the actual WSP

implementation should use existing WASH structures reinforced and integrated

with existing other structures established by the agriculture and health sector,

specifically the watershed committees and health extension workers structures

respectively. Another point stressed by the group concerned the need for capacity

building and experience sharing. The testing of Water Safe Kebele approach in

Yilmana Densa Woreda was ongoing during February 2014. A debriefing workshop

on the experience of Yilmana Densa woreda water safety planning piloting was

carried out in Bahir Dar on February 13-14, 2014. COWASH CBS and 2 experts

from MoWIE were present in the workshop facilitated by MetaMeta.

A report of the assessments made on nine improved water supply systems within

a micro catchment system was presented by the Yilmana Densa woreda Water

Safety Team. The findings of the assessment were evaluated in groups and it was

further elaborated. A proposal on Water Safety Action plan for one water point was

worked out as a sample in response to the findings and risks identified during the

assessment. The approach and institutional arrangement was also discussed and

was decided that a member WASHCOS from each water point must be represented

into the micro catchment committee who were involved in the assessment and

action planning. One of the major outcomes of the workshop was that sanitary

survey was not done as per the WHO guideline and thus it was agreed that the

survey will be done for all the water points. The inclusion of water quality testing

was also debated and decided that it should be in the action plan. It is believed

now the woreda will finalize the action plans and final results will later be

communicated.

Furthermore on March 25, 2014 MetaMeta submitted the draft Kebele Water

Safety Plan guideline and related 7 power point presentations for FTAT comments.

COWASH took the WSP institutionalization and process development further and

discussed with the WHO on the WSP development and as agreed in these

discussions submitted a memo to main WSP stakeholder in MoWIE in order to

implement the WSP workshop recommendations.

ii) Generic Combined Rural Water Supply O&MM Manual for Rural Piped Schemes and

Point Water Schemes and Generic O&MM Strategic Framework

The consultant carried out field trips to Tigray, Benishangul-Gumuz and Amhara

regions. Only one visit to RPS scheme in Oromia was anymore missing from the

field survey. The consultant started the process of assessment report preparation.

iii) Development of Climate Risk Screening Guideline

There was no further development of the guideline in March 2014. The ODI visit

was expected to take place in March, but no information was received from ODI.

6

f) WaSH Supply Chain

Two Indian consultants from M2i consultancy company arrived to Ethiopia and started the

Water.org finance MFI landscape market assessment in Ethiopia. Meeting was also

conducted with COWASH and the field investigations are planned to be completed by April

7, 2014. It was agreed with the Water.org that a workshop to discuss the research findings

with the MFI/WASH stakeholders will be organized in April 2014.

g) WaSH sector development

1) OWNP Task Force meetings

No TF meetings held since July.

2) Fiduciary Risk Assessment (FRA)

Draft FRA Mitigation Plan was prepared by NWCO and MoFED. The plan was submitted

for stakeholders’ comments on March 25, 2014. The draft FRA mitigation plan included

the preparation of the CMP Implementation Guideline to take the CMP to the scale.

3) The Joint Financing Agreement (JFA)/Code of Conduct

There was no reported progress on the finalization of the Code of Conduct for OWNP.

4) Memorandum of understanding

The final draft WASH MoU between development partners and GoE was submitted for

stakeholders’ comments end of March 2014 by JICA.

5) Program Operational Manual (POM)

The draft POM was submitted for stakeholders’ comments by the NWCO in the Middle of

March. COWASH commented the POM extensively. The POM included the preparation of

CMP Implementation Manual to take the CMP to the scale.

6) MSF 6

CTA and NWCO Coordinator finalized the MSF 6 summary proceedings and the “full

proceeding” was also finalized by the reported hired by COWASH (Blen Gedion).

COWASH assisted NWCO in drafting the action plan for the implementation of

undertakings. The action plan was also presented to DPs in the WTWG meeting on

February 27, 2014. DPs promised to provide inputs to the action plan in 2 weeks time.

So far no comments in arch received from stakeholders.

7) WSWG

WSWG establishment has not progressed as planned. Now WSWG secretariat has

invited the WSWG kick-of meeting to be conducted on April 1, 2014. COWASH will

participate.

8) World Bank

World Bank Project Appraisal Document for the Water Supply, Sanitation and Hygiene

Project in Ethiopia was approved. The total project costs are estimated to be USD 234

MUSD from which IDA financing is 205 MUSD. Project implementation started on March

20, 2014 and it will end on June 30, 2019. The project objective is “to increase access

to improved water supply and sanitation services for residents in participating

woredas/towns and communities in Ethiopia.” The Components are:

7

Rural Water Supply, Sanitation and Hygiene, MUDS 109.30

Urban Water Supply, Sanitation and Hygiene, MUSD 84.70

Project Management Monitoring and Evaluation, MUSD 11.00

The project will provide benefits in the form of improved water supply service and

sanitation and hygiene education to an estimated 2.62 million people (1.62 million rural

and 1 million urban).

9) African Development Bank

African Development Bank Appraisal ended in March 2014. The following is concuded

from the appraisal report:

The proposed intervention by the AfDB will contribute to the CWA and will aim at

supporting Rural and Pastoral WASH, Institutional WASH and Program

Management and Capacity Building

The AfDB financial support will amount to MUSD 92.1

The agreement is planned to be signed on June 10, 2014 and the program is

planned to start August 30, 2014. First Disbursement is made on September 15,

2014

10) DFID

There were no details available for this report

11) NWCO

COWASH was informed that Ethiopian Civil Service Commission approved NWCO as an

official structure of the MoWIE. The NWCO staffing includes 1) a Coordinator, 2) Water

Expert, 3) Sanitation Expert, 4) Monitoring and Evaluation Expert, 5) Finance Expert

and 6) Capacity Building Expert

h) Development of simple water quality monitoring equipment

No progress reported from VTT Finland during the report period.

i) GIS map development

First M&E / GIS training was held in Hawassa on 25-28.3. First part of training was

teaching of the data collection and reporting process generally. A total of 18 trainees (1

female) attended in defining of the process together with M&E specialist.

Second part of the training was about basic computer usage. Third part consisted of

general data management and GIS. Training was conducted using Open Office Calc and

Quantum GIS open source software. As a result all trainees created a map of their

woredas. Maps included the newly collected data of their water points.

Three GPS-devices were bought for training purposes and for delivering to those woredas

where there is no GPS device (there is at least 1 known woreda where there is no working

GPS) or where the device is in too poor condition.

j) JPO Employment

The JPO employment is postponed. Ramboll is not able to employ the JPO for short period

as the present Ramboll agreement ends July 2014. Therefore, the JPO can be employed

8

once the consultant for the remaining 2 years has been selected or if MFA provides a

guarantee that the employed JPO continues whoever is the consultant after July 2014. This

was presented to the MFA in February 2014. So far MFA has not responded to this request.

k) Technical Assistance to the regions

Technical assistance to the regions was provided by FTAT as follows:

Oromia:

The region is making preparation for the Training of Trainers in WASHCO CMP

management in the first week of April 2014 hence the CMP specialist of the FTAT has

helped the RSU in preparing the training schedules and provided of the revised training

manual for duplication and ready for presentation.

The RSU staff of the region has made visit to all the 5 old and 3 new COWASH woredas,

and 2 old and 2 new COWASH zones on the status of implementation of the 2006 EFY. As

the procurement of vehicle for the RSU is on progress the Federal COWASH office has

provided car for the RSU during the visit.

SNNPR:

SNNPR/RSU has been preparing for the GIS training funded by COWASH federal office.

COWASH FTAT has provided technical assistance in

- reviewing and correcting the COWASH inventory data of Water Points and Latrines collected from

the 4 old woredas of SNNPR;

- the development of proposal for estimating the cost of the training;

- training of the GIS trainees on Water Points and Latrines data collection source of data required

for the GIS training.

Tigray:

Annual regional WASH Steering Committee meeting was conducted in Tigray region on

March 11, 2014. The Bureau of Plan and Finance Head and Embassy of Finland Councilor

have co-chaired the meeting. Water and Agriculture Growth Advisor from Embassy, Tigray

Region Water Bureau deputy head, Health Bureau case team Leader, Bureau of Education

planning Head, Finance Bureau aid coordinator, WASH accountant, RSU Team Leader and

Financial Specialist, COWASH Federal CTA and CBS were all in attendance. The Federal TA

has given support to the RSU in the preparation of some of the reports specially the

financial progress report of the region. More over the minutes of the Steering Committee

meeting was prepared by the Federal COWASH TA and sent to the region.

l) Monitoring for Safe Water Project financed by Aquaya

Aquaya contacted CTA and told that Adama water supply is not responding to Aquaya as

per the agreement. Adama do not pick up telephone calls and does not response to e-mails

from Aquaya. Aquaya is planning to terminate Adama contract. CTA requested advice from

Oromia Water Bureau, WHO and the State Minister.

9

m) Preparation of 2006 EFY COWASH semi-annual report and 9-months report 2006

EFY

COWASH 6-months report was finalized and submitted to COWASH stakeholders.

MFA commented on the COWASH semi-annual report. Main comment was that the report

does not follow the guideline provided in the Manual for Bi-Lateral Programs (MFA 212).

After communicating with the MFA it was agreed that COWASH do not need to change its

reporting in Phase I of COWASH. Starting from Phase II the reporting is to be adjusted to

follow the MFA bi-lateral project guideline 2012. Other comments will be addressed in the

COWASH 9-month report of 2006 EFY

Guideline to prepare the COWASH 9-monts report of 2006 EFY was prepared and sent to

the regions.

n) Sanitation Marketing Platform (SMP)

No progress in March.

o) Embassy of Finland issues

No special issues to report in this month.

p) COWASH Steering committee meeting on March 31, 2014

COWASH Steering Committee meeting was held on March 31, 2014. The participation in

the meeting was very good. Only MoH representative was missing. The main decisions

made in meeting were:

Include into COWASH sanitation performance reporting the basic and improved sanitation

access.

COWASH should also support the execution and development of the ODF verification process

and capacity

Plan and conduct more research, especially cost-benefit analysis, which justifies the importance

of the CMP modality on One WASH.

COWASH shall report also non-functionality of the ALL rural water supplies in COWASH

woredas and not only CMP water supplies. The COWASH finance for rehabilitation shall not be

used for maintenance as in the Ethiopian Water Resources Management Policy, operation and

maintenance (O&M) of Water Points is left for the beneficiary population. This has to be made

clear in the woreda level planning.

The financing of O&M (who pays and for what) shall be made clear in the RWS O&MM

Manual, under preparation

MFA will keep MoWIE informed of the Mid-Term Evaluation preparations.

COWASH is to encourage and facilitate the ALL WAH facility data updating in the COWASH

woredas and not only the updating of CMP financed WASH facilities. This is to be included into

the woreda annual plans starting from 2007 EFY and planned to be carried out as a routine

activity instead of special project activity. In this way, the budgetary implications could be

avoided.

MoWIE will submit the CMP Implementation Manual to MoFED to be included as a part of

POM.

10

Ministry for Foreign Affairs of Finland will provide the tendering documents for MoWIE

comments and invite MoWIE representatives to participate in the tender evaluation in Finland.

Embassy to take strong stand in the use of RSU members to carry other assignments in the

bureau.

Integrate the RSU into PMU as much as possible.

Embassy of Finland will take strong stand in regards the preparation of audit reports and

demand audit reports from the regional BoFEDs.

The 2006 Annual Plan was approved with the condition that errors in the budgetary tables shall

be corrected and submitted to the Embassy of Finland and MoWIE after corrections.

q) Regional Agreements signed

The signing of most regional financing agreement extensions took place in March. The

agreements were signed as follows:

Region Signed by BoFED Signed by the Embassy

Amhara February 25, 2014 February 20, 2014

Oromia February 28, 2014 February 20, 2014

Tigray March 12, 2014 March 3, 2014

SNNPR March 14, 2014 February 20, 2014

Benishangul-Gumuz March 21, 2014 Not yet signed on March 28

r) International Women’s Day celebrated

The International Women’s Day was colorfully celebrated in the MoWIE on March 8, 2014.

The celebration event was planned by the Women Affairs Directorate of MoWIE and

financially also supported by COWASH. COWASH support to International Women’s Day

celebration was a total of Birr 41,289 an included the printing of the Women’s Day

Magazine, payment of the drama entertainment and purchase of prizes and banners.

s) World Water Day celebrated

The International World Water Day was celebrated on March 21-22, 2014. One day

workshop on the World Water Day theme “Water and Energy Nexus” was organized on

March 21, 2014. This event was financed by the Hilton Foundation. In the workshop

presentations from water and energy were presented by different actors and an exhibition

on Water & Energy was also organized. The actual World Water Day celebration event was

organized on March 22, 2014 in MoWIE. COWASH was also supporting financially this

event by printing the banner, posters, fliers and stickers and by procuring the medals

given for the best performers in the event. COWASH total contribution was Birr 51,214.21.

t) CTA fee invoicing

It was agreed with the Ramboll and MFA that CTA fee invoicing can continue within the

limits of the Phase I total TA budget although the sealing of the CTA fee-days in COWASH

Phase 1 will be exceeded.

11

u) Value for Money research

DFID has launched Value For Money (VFM) research in Ethiopia. The VFM research

concentrates for the DFID financed WASH. More than 15 people are working for the

research in 6 countries (Bangladesh, Ethiopia, Mozambique, Nigeria, Pakistan and

Zambia). There are several consultant companies and universities associated. The

objectives of the research are on how to improve VFM using operational research and

operational sustainability. The research is from August 2013 to September 2015.

The consultant presented that the study will also capture who is financing and what and

how much in Ethiopia’s ASH sector. The research also will see what building blocks are

needed to make VFM in One WASH.

The study will use the following sustainability definition as a starting point: “Sustainability

is about whether or not WASH services and good hygiene practices continue to work and

deliver benefits over time. No time limit is set on those continued services behavior

change and outcomes.”

The consultants to carry out the research in Ethiopia are:

1. Seifu Kebede from UNESCO and AAU

2. Ian Ross, Oxford Policy Management consultant company

3. Marie-Alix Prat from Tremolet Consulting company

v) Assessment of WASH Facilities Service Delivery at Decentralized Level

A ToR for the Assessment of WASH Facilities Service Delivery at Decentralized Levels in

Ethiopia was prepared by the PBS Program. World Bank requested CTA’s review of the

ToR. In order to assess the effectiveness, quality, and document best practices in the

delivery of services in the water supply and sanitation sub-sector the following broad

categories of activities will be implemented:

Assessing Service Delivery Models with their Management Structures and Quality in

delivery of WASH services to communities.

To identify and discover innovative ways of WaSH service delivery at local levels.

This will assess the type of collaborations that exist between community, public and

private sector that contribute to improving access, quality and efficiency of service

delivery;

To review the extent of linkages between sectors (education, health, MoFED and

water) in delivering WaSH services. It will also look at the extent of integration of

the Management Information Systems of these sectors in capturing, storing, and

analyzing integrated geo-referenced data for WASH, education, and Health services

at local levels; and

Provide recommendation on the way forward to enhance access, improve quality

and efficiency of WaSH services. The report will also include lessons learned,

identify strengths and weaknesses, opportunity and threats/risks across regions for

experience sharing and scaling up good practices as well as documenting best

practices that improve synergies between the sectors and help in improving

planning and delivering quality and quantity WASH services at all level.

w) MoWIE capacity building

12

The LCD projector, which was procured by COWASH for MoWIE and installed to the Ground

floor meeting hall, was moved from this hall to the First floor meeting hall based on the

request from MoWIE.

x) Advertisement of Specialists

Ramboll advertised the Crosscutting Specialist and Communications Officer vacancies in

the local newspapers. The deadline of submitting the applications is April 14, 2014.

y) Collaboration with sector stakeholders

Millennium Water Alliance Ethiopia Program (MWA-EP) conducted its bi-annual Program

Management Group (PMG) meeting, which was a learning and experience sharing platform

among MWA-EP partners during 24th to 25th March, 2014 at Kombolcha. COWASH

Capacity Building Specialist participated the event and introduced the Water Safety Plan

(WSP) concept based on COWASH experience in Amhara.

In the presentation concept of WSP and its processes and steps to be followed were

presented. The approaches followed and the progress so far of the WSP in Amhara region

was presented and discussed. The results of the national workshop held in Addis Ababa on

WSP were also discussed. One of the major feedback given from the participants were the

inclusion in the presentation of actual results on the ground either from the country or

outside regarding WSP could be very much important for others to be convinced and take

up the approach further. There were about 25 people in attendance of the meeting (6

female).

z) Secondary data collection formats and indicator plan development

COWASH FTAT has been revising the baseline data collection checklists and distributing to

regions with new woredas. The revised baseline data collection checklists were sent to

Amhara, Oromia and SNNPR RSU to collect the data and prepare consolidated baseline

reports before the end of the fiscal year.

Besides, Indicator Monitoring Plan template has been prepared and distributed to COWASH

FTAT to collect the required data from the regions. The indicator monitoring plan is

necessary to set the targets of the project (in the LFA) for each implementation year as

per the different indicators of the project - Overall Objective, Purpose and Outputs. The

data required from the regions is expected to reach COWASH FTAT in the first week of

April so that the data will be consolidated and included in the revised COWASH project

document.

2.2 PROJECT RELATED OUTPUTS (COMPONENT 2)

2.2.1 Oromiya

a) 2005 EFY Audit

The 2005 EFY audits of the investment and capacity building budget unitization of COWASH

project has been completed in North Shoa zone and its two woredas. The audit has been

made by ZoFED and the report has been submitted to BoFED. The audit of Jimma zone and

its three woredas has been in progress and will be completed in early April 2014. The

complete report of the two zones audit will be complied into English by BoFED and will be

submitted to the Embassy of Finland in April 2014.

13

b) Fund request

The second and fourth quarter fund requests of the GoF contribution has been submitted to

the Embassy of Finland in March after incorporating the comments given by the Embassy

on the request submitted in February 2014.

c) Employment of CMP specialist

The CMP specialist in the RSU has been employed after one and half years of effort.

d) Supportive supervision

The regional support unit (RSU) staff have made supportive supervision visit to all the 5 old

woredas and 2 zones, and the 3 new woredas & 2 zones. The objective of the visit was to

see the progress of planned activities in the fiscal year and those activities rolled over from

the 2005EFY.

e) Procurement of vehicle for the RSU

The process for the procurement of vehicle for the RSU has been started by the Water,

Mines and Energy Bureau.

f) Signing of the COWASH Phase II financing agreement

The Agreement of COWASH Phase II for 2014-2016 has been signed between the Embassy

of Finland and BoFED.

g) Progress of activities at woredas & zones

In many of the woredas, trainings and preparatory activities to start the construction of

water points have gone well and even some woredas have already started the construction

of number of water points. The following are the major activities of the month in the

woredas.

Progress in trainings

in Jeldu woreda, 39 (9 females) KWT members have been trained in the CMP

promotion and application preparation to assist communities in the kebeles to be

beneficiaries of the CMP approach.

in Tole woreda, 40 (13 females) KWT members have been trained in the CMP

promotion and application preparation to assist communities in the kebeles to be

beneficiaries of the CMP approach.

in Ilfata woreda, 43 KWT members have been trained in the CMP promotion and

application preparation to assist communities in the kebeles to be beneficiaries of the

CMP approach.

in Gumay woreda, 7 water points WASHCOs have been trained in CMP management.

in Jidda woreda, 10 water points WASHCOs have been trained in CMP management.

Progress in construcion

in Gumay woreda, 5 water points (3 springs and 2 hand dug wells) construction

completed and 6 water points (3 hand dug wells and 3 springs) construction on

progress. In addition number of water points WASHCOs have started procurement of

construction materials.

14

in Kersa woreda, 28 water points WASHCOs have made contract agreement with

artisans for the construction of water points of which 3 water points (2 hand dug wells

and 1 springs) construction completed, 9 water points construction on progress and 17

of the WASHCOs have started procurement of construction materials and tools.

in Abichu gena woreda, the construction of 30 water points (9 springs and 21 hand

dug wells) construction is on progress.

in Nono benja woreda, the construction of 27 water points (14 springs and 13 hand

dug wells) is on progress.

in Jidda woreda, the construction of 40 water points (2 springs and 38 hand dug

wells) is on progress and number of WASHCOs have started procurement of

construction materials and tools.

In the three new woredas appraisal and approval of projects and preparations for

the procurement of some planned office equipments and special construction tools have

been the major activities performed in March.

2.2.2 Tigray

1. Regional WASH Steering Committee Meeting

Tigray Region WASH Steering Committee meeting convened in the region on March 11,2014.

The major issues discussed and decided were

a) Six months progress report of the COWASH in the region

The need to visit Benishangul-Gumuz in high technologies

The committee will organize networking meeting with WWT and evaluate

Report presented by RSU TL need to be improved

b) 2006EFY annual plan approval

The plan was approved except the financial documentation which was pended

Information given on remaining budget balance of GOF for the region is to be

rechecked

c) Auditing of grant from GOF

Tigray Bureau of Finance will conduct audit for 2004 and 2005EFY and submit to

Embassy soon

d) Amendment of bilateral agreement.

Tigray Bureau of Finance will prepare a response letter to the Embassy of Finland

confirming its acceptance to the amendment agreement.

2. Applications received

Up to present the WASHCO applications received in two woredas were reported. In Ofla

woreda a total of 20 projects applications were received, appraised and were approved by

WWT. The construction of 6 HDW has already started. The projects were consisting of 12

hand-dug wells and 8 springs.

Similarly in Tahtay Maichew woreda 16 hand-dug wells and 11 springs were received and

apprised but the approval is not yet signed by WWT. There is a need to monitor the

process followed by the woreda.

3. Training of WASHCOs

WASHCO training was conducted in two woredas of Tigray region. The training was on a

total of 47 schemes (28 hand-dug wells and 19 springs). This information needs further

investigation.

15

4. Shallow Wells

There were 44 shallow wells whose study completed in the 2005 EFY. The contract

agreements of these wells were signed with the Water Bureau as the delegation of

WASHCOS - WWT-Water Bureau was completed. The drilling work of 12 wells is already

started.

5. Procurement

The tender process of procurement of motor bikes for the new three woredas was

completed and the region is now expecting 12 motorbikes in April.

2.2.3 Southern region (SNNPRS)

SNNPR woredas are facing serious fund shortages to accomplish the capacity building activities

(human and physical). Due to this reason, many activities have not been conducted in the

woredas in March; all the woredas are eagerly waiting the funds requested for the 3rd quarter

of the fiscal year. Anyhow, some activities performed in the month of March 2014 are indicated

hereunder:

a) Signing of the amended COWASH Financing Agreement

The amended financing agreement of COWASH has been signed between the Embassy of

Finland and BoFED of SNNPR.

b) WPs and Institutional Latrines Data Collection and GIS training

The four COWASH old woredas (Arbaminch Zuria, Chencha, Misha and Duna) have completed

the collection of data on WPs and Institutional Latrines built with the support of COWASH/CMP

and made ready for the GIS training as per the revised formats from COWASH FTAT. The data

were further refined and consolidated by RSU staff so that it is appropriate for mapping of the

water points and latrines.

Besides, a total of 17 old woredas, old zones and regional sector offices staff have been trained

on basic computer skills and GIS for 4 days at Hawassa city. The trainees have been also

trained on the data collection tools and source of the data required for the GIS training and

mapping of the facilities. The GIS training was based on the Yilmana Densa woreda NWI data

and each woreda staff practiced on their own facilities data. As a result of the training,

participants have managed to produce their own maps of water points and understood the

power of GIS in planning and decision making in their respective woredas and zones.

c) Facilities construction

SNNPR has been waiting for the release of the capacity building funds from MFA to transfer the

investment funds to the woredas. This has hampered the construction of the facilities in the

woredas. Anyhow, all of the woredas have completed the promotion in the kebeles and

appraisal of applications and approval process is being speeded up. Though the third quarter is

peak construction period, only 2 water points are being constructed in Arbaminch Zuria woreda

and only 2 On-Spot Springs benefiting 483 rural people has been completed in Chencha

woreda in March 2014.

16

2.2.4 Benishangul-Gumuz Region (BSGR)

COWASH Launch workshop in Benishangul-Gumuz Region was organized on March 14-15,

2014 in Assosa. Participants in the launch workshop were from Bureau of Finance and

Economic Development (6), Water Bureau (3), Health Bureau (2), Women, Children and Youth

Bureau (4), Education Bureau (2), Ministry of Water, Irrigation and Energy (1), Embassy of

Finland (1), FinnWASH (4) and COWASH (5).

The objectives of the launch workshop were

• Officially launch of COWASH in BSGR,

• Increase the understanding of COWASH in BSGR in general,

• Achieve common understanding and awareness of the content of the Regional

financing agreement of COWASH

• Increase awareness of the CMP approach in general and its promotion

• Conclude the FinnWASH inputs into COWASH implementation in BSGR

• Increase the understanding on how COWASH is linked and harmonized with One

WASH

• Deepen the understanding on the COWASH implementation principles

• Achieve common understanding on the establishment of the RSU, its roles and

responsibilities

• Discuss the principles of the COWASH woreda selection

• Increase the understanding on baseline data collection

• Deepen the understanding of the M&E in COWASH

• Increase understanding on the COWASH capacity building principles

• Increase understanding on the core planning process and its applicability in

COWASH planning

• Conclude the principles, units, unit prices and scale of the core plan for 2006

EFY

• Finalize the core plan for 2006 EFY

• Draft the road map with major milestones for the coming 3 months

The Agreement between the Benishangul-Gumuz Region and Government of Finland is for 2.5

years (January 2014-July 2016) having following contributions:

• Government of Finland Euro:2,262,629

• Regional Government Birr: 20,800,000

With these inputs, the project plans to achieve the institutionalization of the CMP in

Benishangul-Gumuz region and to bring 100,000 people to the new water supply services and

to change the behavior of 260,000 people in hygiene and sanitation by July 2016.

Several issues were raised by the participants. The discussions were held on

• RSU establishment and RSU staff responsibilities, especially the need of

accountant in BoFED

• Financial issues and auditing

• Harmonization with One WASH

• Possibilities with high technology use in CMP approach

• Capacity building package

• Non-functionality of the One WASH committees

One major issue was the channeling of funds to WASHCOs. The following 3 options were

discussed:

17

a) BoFED---Water Bureau---MFI---WASHCO

b) BoFED---MFI---WASHCO

c) BoFED---WoFED---WASHCO

Another issue which needs decision is the modality for the division of investment funds to

woredas from GoF and GoE. GoE has allocated 17 METB for investments and GoF 26 METB. It

has to be decided how these funds are channeled between the 4 selected woredas in the

coming 2 years.

Finally, at the end the Core plan was prepared and road map for the next 4,5 months was

prepared. The road map is presented hereunder.

Regional equipment procured

15/6Action By WMERDB

Experience sharing visit to Amhara

JulyFacilitation

by WMERDB

Select CMP coordinator

21/3Action ByWMERDB

2007 EFY detailed plan

prepared31/7

Action ByWMERDB

WWTs trained for ToT in CMP

30/8Action ByWMERDB

Baseline data collected

30/6Action ByWMERDB

Decision on GoE/GoF

Investment financing Division

JulyAction By

BoFED

March April May June

Region level Road Map for the next 4,5 months in 2014

July

Agreement signed21/3

Action ByBoFED

Open CMP account

21/3Action By

BoFED

RSU staff employed

2/5Action ByWMERDB

Woredas selected

28/3Action ByWMERDB

CORE plan approved by RWSC

and Embassy

15/4Action By

BoFED

First fund request

prepared16/4

Action ByBoFED

RSU Account opened

15/5Action ByWMERDB

Decision on

Investment fund flow

JulyAction By

BoFED

Finance and

Procurement manual

JulyAction By

BoFED

From this core plan the agreement signing and opening of the CMP account were completed as

planned. The selection of the woredas did not progress as planned as the Region had no idea

of the agreed baseline made based on the NWI. The unawareness of the baseline was due to

the fact that all personnel in the region have changed. Simultaneously, the region is going to

select 4 woredas for COWASH and 6 woredas for the World Bank.

2.2.5 Amhara Region

The progresses during the month of March 2014 are:

o Two RSU staffs and one Yilmana Densa Woreda Agriculture office staff participated in the

Water Safety Planning experience share workshop which was organized by Federal COWASH

and held on March 5, 2014 at Addis Ababa.

o Field visits were conducted to support CMP zones and woredas in the 2006 EFY annual plan

implementations.

o Reminder letter sent and discussion made with WRDB for the soonest need of starting the

process of 17 vehicles procurement planned for the 2006 EFY (for 3 of Zones and for 14 of

the woredas).

18

o Assistance was given to the training on the use of finance guide to 89 CMP zone and woreda

finance staffs (50 males and 39 females) at the two venues of Injibara and Woldia. This

activity was conducted at the end of February.

o Intensive communications made with BoH and BoE to support and remind on the

transferring process of the Institutional latrine Investment budget and GoE Operational

budget.

o Assistance given to West Gojjam Zone WRDO when it gives training on CMP management;

promotion, application preparation, appraisal; and WASHCO ToT to woredas.

o Support has been given to BoFED Auditors while they are auditing the 2005 EFY COWASH

Amhara financial utilization and management as per the planning and budgeting principles

of the project.

o Quarters I-III budget of Birr 54,618,047.92 (EUR 2,034,798) with the exchange rate of

Birr 26.842 have been received from Finland on the date of March 20, 2014. The received

budget has been transferred to partners based on the cash flow of the 2006 EFY annual

plan.

o Bureaus of Water, Education, and have been communicated to fulfill the base line secondary

data requested by Federal COWASH.

o The CMP water points’ construction progress as per the project cycle management is

tabulated below.

Investment

budget

source

2006

EFY

plan

Applications Desk

appraisal

Field

appraisal

WWT

approval

Under

construction

Construction

Completed

GoE 1004 1892 1817 1619 1146 834 85

3 PROJECT COORDINATION WITH KEY STAKEHOLDERS

The staff of the COWASH C-1 technical assistance team participated in the following WaSH

sector meetings during the month of February, 2014

o Several unofficial discussions were held with MoWE/WSSD/NWCO/GIS directorate

on the development of OWNP and GIS-based mapping of water points

o WSP workshop was conducted on March 5, 2014 and CTA and CBS participated this

event

o International Women’s Day was celebrated on March 6 and CTA took part in this

event

o Tigray region Steering Committee meeting was conducted on March 11, 2014. CTA

and CBS from FTAT took part in it.

o Training Impact Research Financial tenders opening meeting was held on March 12,

2014

o Benishangul-Gumuz COWASH Launch Workshop was held in Assosa on March 14-

15, 2016. Whole FTAT team, Embassy of Finland and CMP Coordinator, Ato Tamene

Hailu from MoWIE took part in this event

o Meeting with the PhD student Beshah Mogesse was held on March 19, 2014 with

whole Federal TA team

o Training Impact research consultancy agreement signing meeting was conducted on

March 20, 2014. CTA and CBS took part in this meeting.

19

o Meeting with Water.org and two Indian consultants carrying out the WASH/MFI

potential landscape assessment was held on March 21, 2014. CTA and CMPS took

part in this meeting.

o World Water Day workshop on Water and Energy Nexus was organized on March 21,

2014 and CTA and CMPS took part in this event

o World Water Day celebration was organized on March 22, 2014 and CTA took part in

this event

o Millennium Water Alliance Ethiopia Program (MWA-EP) conducted its bi-annual

Program Management Group (PMG) meeting during 24-25 March, 2014 at

Kombolcha. CBS took pat in this meeting.

o Value for Money research meeting was held on March 25, 2014 in DFID. CTA took

part in this meeting.

o GIS training seminar was conducted in Hawassa on March 25-28, 2014. The training

was facilitated by the COWASH GIS Expert and M&E Expert and MoWIE GIS expert.

o Several meetings with the consultant developing the CMP Implementation Manual

were held by the CTA and CMPS

o COWASH Federal Steering Committee meeting was conducted on March 31, 2014

4 ACTIONS FROM THE WORK PLAN

The COWASH Project Document Revision was completed in June 2013 and it was approved by

MoFED in July 2013. The Document was again revised in September 30, 2013 as per the

phasing request from MFA and the document was again approved by MoFED on October 21,

2013. The amendment to the actual country level Framework Agreement on COWASH was

finally made on Jan 20, 2014 between the Embassy of Finland and MoFED. The delay of the

COWASH Framework Agreement further has delayed the revisions of the regional financing

agreements. This furthermore has delayed the approval of the regional 2006 EFY plans and

thus impacts to the actual fund transfers and implementation. Tigray, SNNPR, Oromia and

Benishangul-Gumuz Agreements were signed in March 2014. Amhara region financing

agreement was signed in February 2014.

5 EFFECTS CAUSED BY DEVIATIONS TO THE WORK PLAN

The COWASH framework agreement signing delayed to Jan 20, 2014 and regional agreements

signings delayed to March 2014. This delayed the start up of 2006 EFY capacity building and

construction and planned targets of 2006 EFY will not be achieved.

6 SCHEDULED FEDERAL TECHNICAL ASSISTANCE TEAM MAIN ACTIVITIES

AND TARGETS FOR THE NEXT MONTH OF MARCH 2014

Complete the indicator monitoring plan with set targets of the COWASH revised PD

Organize and conduct CMP Implementation Manual Workshop once the draft Manual has

been submitted by the consultant

Receive the Training Impact Research Inception report and launch the field

investigations

Assist the Water.org in the landscape MFI market assessment

20

Participate in the WSWG kick-off workshop on April 1, 2014

Update the cmpethiopia.org web-page

Prepare the SNNPR GIS training report

Assist Tigray and Oromia regions in the ToT of WASHCO CMP management.

Participate in the SNNPR WASH steering committee meeting

Facilitate the PhD candidate field data collection from control woredas

Take the WSP workshop recommendations ahead in the MoWIE

Participate the WSP program NAC meeting on April 8, 2014

Plan the 2006 EFY field supervision schedule, check lists and start supervision

Analyze the Crosscutting Specialist and Communications Officer applications

7 IMPORTANT POLITICAL/ECONOMIC TRENDS IN COUNTRY AND THEIR

EFFECTS TO PROJECT IMPLEMENTATION

European financial crisis is fluctuating. Euro towards Birr is floating up and down and thus

influencing the funds available in Ethiopia for project implementation. The below chart

illustrates the change of ETB-EUR. On April 6, 2014 one Euro was ETB 26,66.

8 ACTIONS NEEDED BY THE RAMBOLL HOME OFFICE OR MINISTRY FOR

FOREIGN AFFAIRS OF FINLAD

a) Freeze the employment of a new JPO, once the MFA has approved the possible continuation

of the JPO agreement beyond July 2014. Check from MFA the status on approving the JPO

before the Ramboll agreement is extended.

b) Follow-up MTE ToR development in the MFA

c) Discuss with Niras joint issues

Date and place: Addis Ababa on March 7, 2014

Report Prepared: Arto Suominen, CTA of COWASH

21

Distribution:

Mulugeta Mussie, SNNPRS CMP Coordinator

Abrham Kebede, Amhara RSU Team Leader

Solomon Gebresadik, Tigray RSU Team Leader

Malkamu Dalju, Oromia RSU Team Leader

Beshah Mogesse, PhD Student

Eyob Defere, Financial Consultant

Kai Vakkila, Ramboll

Irmeli Turunen, Ramboll

Elis Karsten, Ramboll

Harri Mattila, Ramboll

Melaku Worku, Ramboll

Yohannes Melaku, Ramboll

Abebaw Getachew, Ramboll

Kimmo Koivumaki, Ramboll

John Butterworth, IRC

Kari Leminen, Ramboll

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected];

[email protected]; [email protected]; [email protected]