by: date: federal aviation administration concept development & validation verification and...

14
By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development & Validation – Technical Center Branch October 10, 2012

Upload: cooper-finner

Post on 11-Dec-2015

222 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

By:

Date:

Federal AviationAdministrationConcept

Development &Validation

Verification and Validation Summit

Maureen MolzManager, Concept Development & Validation – Technical Center Branch

October 10, 2012

Page 2: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

Maureen Molz, Manager ANG-C43 2

Advanced Operational Concepts Division (ANG-C4)

October 10, 2012

John Marksteiner (A)ANG-C4

Concept AnalysisBranch

Mike PaglioneANG-C41

ConceptDevelopment &

Validation – Headquarters Branch

Cynthia MorrisANG-C42

ConceptDevelopment &

Validation – TechnicalCenter Branch

Maureen MolzANG-C43

Andrew CrowellAndrew Fabian

Doug FryeMarie Kee

Nicole NelsonAlbert Schwartz

Chu YaoChristina Young

Philip BassettCharles (Marc) Buntin

Donna CreasapKevin HattonLevent Ileri

Kristina CarrSteven FerraAnton Koros

Richard LanierSherri Magyarits

Lisa Smith

Page 3: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

Maureen Molz, Manager ANG-C43 3

Our Mission

The mission of the Concept Development & Validation Branch is to support concept development and validation activities including development of NAS Concept of Operations (ConOps) and requirements for future National Airspace Systems (NAS) operations and technologies.

October 10, 2012

Page 4: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

NAS Midterm ConOps Development

• Based on – Operational Sustainments– NextGen Midterm ConOps– Concept Gaps

• Intended to – Serve as baseline for new concepts/ideas entering i2i process– Provide foundation for developing operational requirements– Generate discussion with stakeholders– Identify areas for concept development and validation

4October 10, 2012 Maureen Molz, Manager ANG-C43

Page 5: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

NAS Conops - New Baseline• Based on

– Operational Sustainments– NextGen Midterm Conops– Concept Gaps

• Compilation of accepted artifacts– OIs/OSs– NextGen Midterm CONOPS– Annotated Outline for NAS CONOPS– Addendum of Proposed Changes

• Intended to – Serve as baseline for new concepts/ideas entering i2i process– Provide foundation for developing operational requirements– Generate discussion with stakeholders– Identify areas for concept development and validation

• This will be submitted for approval in first CSG Meeting 17 Oct 2012

October 10, 2012 Maureen Molz, Manager ANG-C43 5

Page 6: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

Library of Concepts by Level

• Level 2 (4 documents)

– Management and Distribution of Flight Data– Surveillance Broadcast Services– Integrated Arrival, Departure, and Surface Operations– UAS Integration into the NAS ConOps

October 10, 2012 Maureen Molz, Manager ANG-C43 6

Page 7: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

Library of Concepts by Level

• Level 3 (33 documents)

7

Page 8: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

Library of Concepts by Level (cont.)

Aeronautical Information Management, Segment 2 Meteorological and Aeronautical Planning System

Enroute Automation Capabilities_1.0_2008.pdf Network Enabled Weather and 4D Weather Data Cube

Reroute Impact Assessment NextGen Weather Processor

Time Based Flow Management NextGen Enterprise Information Systems Security

Go Button Security Integrated Tool Set

Multifunctional Phased Array Radar 3D Path for Arrival Management

Mobile Airport Surveillance Radar Conflict Resolution Advisories

Surface Trajectory Based Operations DST Expanding RNAV Operations with DME to DME Capabilities

STBO 2D Taxi Route Generation Lateral Offset

STBO Airport Configuration Mgmt Multisector Planner Specialist Function

STBO Collaborative Departure Queue Mgmt Oceanic Tailored Arrivals

STBO Departure Runway Asgmt System Wide Information Management Seg1

STBO Departure Runway Asgmt Aviation Safety Information and Analysis

STBO Surface Conformance Monitoring NAS Voice System

Surveillance Interface Modernization Precision Runway Monitor Replacement Acquisition

Tower Flight Data Manager Relative Position Indicator

Initial Tailored Arrivals

• Level 4 (33 documents)

October 10, 2012 Maureen Molz, Manager ANG-C43 8

Page 9: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

NextGen Mid-Term ConOps for the NAS

New Approach to Concept Hierarchy (Notional/Draft)

Level 2(Service)

Level 1(Enterprise)

SSE• Flight & State Data Management• Environmental Management

TBO• Separation Management• Trajectory Management• Capacity Management• Flight & State Data Management

CATM• Flight & State Data Management• Flow Contingency Management• Capacity Management

FLEX• Separation Management• Trajectory Management• Flight & State Data Management

RWI• Trajectory Management• Flight & State Data Management

HD• Separation Management• Trajectory Management• Flight & State Data Management

FAC• Capacity Management• Flight & State Data Management

COMMON Services COMM

• A/G Voice & Data Services• Air/Air Data Services• G/G Voice & Data Services• Net-Centric ServicesNAV• Performance Based NavigationSURV• Surveillance & Broadcast

Services

Note: Mission Services (NAS EA SV-4) mapped to solution Sets

TBD – OI/Program level

October 10, 2012 Maureen Molz, Manager ANG-C43 9

Page 10: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

10

Concept Maturity Levels

October 10, 2012 Maureen Molz, Manager ANG-C43

Page 11: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

Maureen Molz, Manager ANG-C43 11

Concept Steering Group (CSG)

• Responsibilities include

– Approve NAS ConOps, lower level ConOps, and NAS ConOps change proposals

– Validate the need for new concepts/ ideas

– Determine validity and feasibility of proposed concepts/ideas

– Review and approve enterprise level shortfall analysis, new operational improvements, operational sustainments, and operational requirements

– Assess concept maturity during concept development lifecycle

October 10, 2012

Page 12: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

General Flow of New Idea/Proposal

12

Service Analysis Phase of the I2I Process

2.1 Collect & assess ideas

for NASConOps

determination and initiate

R&D (as needed)

• Strategic Inputs

?

2.2 Enter idea/request

into NAS ConOps

• 2.7 CRD readines

s/• capture

team determination

Sub-mission/Review

Validityand

feasibilityanalysis

NMBratificationof concept

CSGendorsement

of concept

Changeto the NAS?

Documentchangesto NASConOps

NMBRatifies NAS

ConOps

• Transition

2.6Prepare

forportfolio

allocation

DecomposeConOpschanges

into serviceneeds/

Developpreliminary

shortfall analysis

CSG approvesCML work

products andconducts

periodic reviewsfor continued

concept support

• 2.5• Allocate• service• needs to• OI/OS/OC

• 2.4 Condu

ct• initial

NAS• ConOp

s• decom

p &• develo

p• service• needs

&• shortfa

ll

2.3Document

ideasin NAS

ConOps

• Yes

• Yes

• Generalized Flow of CSG Scope

• Yes

• No

• No• No

Application returned to

PM w/ reasoning;

process ends

No

Assess

& Approve

Evaluate

October 10, 2012 Maureen Molz, Manager ANG-C43

Page 13: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

Maureen Molz, Manager ANG-C43 13

Concept Steering Group (CSG) (cont.)

• Concept Steering Group, Chair: ANG-C– Director level– Final decision on NAS ConOps changes – Brief NMB on NAS ConOps changes, as required

• Concept Steering Work Group (CSWG), Chair: ANG-C4– Front line managers; decision making authority– Gateway between CSG and service organizations– Advisory participation

• NATCA • Professional Aviation Safety Specialist (PASS)

• Kickoff meeting; 10/17/2012– Agreement of roles & responsibilities– Finalize CSG Standard Operating Procedures (SOP)

October 10, 2012

Page 14: By: Date: Federal Aviation Administration Concept Development & Validation Verification and Validation Summit Maureen Molz Manager, Concept Development

Federal AviationAdministration

FAA Concept of Operations for UAS Integration into the NAS

• Project Description

– Development of a Concept of Operations document for integration of UAS operations into the NAS

– Narrative aligned with end of Integration milestone in FAA Civil UAS Integration Roadmap

– Represents FAA position on how UAS may be safely integrated - written primarily from an air traffic management/air traffic control perspective

• Delivered Version 2.0 to JPDO Sep 28, 2012– For inclusion in the Congressionally-mandated UAS Comprehensive

Plan, due Nov 2012

October 10, 2012 Maureen Molz, Manager ANG-C43 14