bushwick neighborhood bicycle network€¦ · post-implementation street ambassador outreach...

20
Bushwick Neighborhood Bicycle Network Fall 2017 Update Presented to Community Board 4, October 18, 2017

Upload: others

Post on 12-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Bushwick Neighborhood Bicycle Network Fall 2017 Update

Presented to Community Board 4, October 18, 2017

Page 2: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

2

Community Bicycle Network Development Process

2014-2015 Community Engagement • Established steering committee • Public workshops, mobile workshops • Online surveying, public surveying, bike shop visits

2016 Phase I Bicycle Network Expansion • Presented outcome of community engagement process and Phase I proposed projects

to CB 4 • CB 4 supported Phase I projects • Implemented Phase I projects: Knickerbocker Ave, Irving Ave, Jefferson St, Hancock

St

2017 Phase I Follow-up, Phase II Proposals • Street Ambassador Post-implementation Outreach at Irving Square Park • Post-implementation data collection • Bicycle Safety Study • Develop Knickerbocker Ave loading zone proposal • Present Phase II proposed projects to CB 4

Page 3: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

2017 Cycling Safety Study

3

Community District 4 - Priority Bicycle District • High number of cyclists killed or severely injured

• 3 cyclists killed (2010-2014) • 48 cyclists severely injured (2010-2014)

• Medium density bicycle network coverage • Most cyclist fatalities occur on streets without bike

facilities (89%)

DOT has committed to creating or enhancing 75 lane miles of bike facilities in Priority Bicycle Districts by 2022

Page 4: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

14,660 12,845

19,073

27,356 30,282

28,592

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

2011 2012 2013 2014 2015 2016 4

NYPD: Bicycle Moving Violations

Bike lights, bell, and Bike Smart giveaway: While distributing giveaways, NYPD and DOT have the chance to talk to cyclists about traffic laws and safe cycling

2017 Cycling Safety Study Educational Programs and Enforcement

Action Plan • DOT, NYPD, and NYC DOHMH developed a

comprehensive set of enforcement and education initiatives to continue to improve bicycle safety

• Focus and deploy enforcement resources to intersections with high rates of cyclist KSI

• Tailor enforcement to address the most dangerous driver and cyclist behaviors

Page 5: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

5

Williamsburg Bridge

Eastern Parkway

Jamaica Bay Greenway

Manhattan Bridge Brooklyn Bridge

Brooklyn Waterfront Greenway

Forest Park

Highland Park CB 4

Where Can You Bike in 15, 30 Minutes? Existing Bicycle Network

Prospect Park

Page 6: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Biked for Transportation in the Past 7 days

Who Rides? Community Health Survey Data (2014)

Percentage of Brooklyn Residents Who Rode a Bicycle in the Past Year

18 16.1 10.3

5.8 4.7

2.7

21.2

11.3

4

0

5

10

15

20

25

30

35

40

45

50

18-24 25-44 45-64

A Few TimesPer Year

At Least OncePer Month

Several TimesPer Month

Age Group

Perc

enta

ge o

f Bro

okly

n R

esid

ents

14,000

14.7 9.3

16

8

2.9

3.9

2.6

3.5

8.9

8.1

8.6

6.8

0

5

10

15

20

25

30

White Black Latino Asian/PacificIslander

A Few TimesPer Year

At Least OncePer Month

Several TimesPer Month

Perc

enta

ge o

f Bro

okly

n R

esid

ents

Race / Ethnicity

Age Group Race / Ethnicity

14,000 Number of Williamsburg-Bushwick residents reported riding a bicycle to get to and from places in the past 7 days

Page 7: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

7

• 5.9 miles added to the bike network • Pedestrian safety improvements added at Myrtle Ave

• High visibility crossing at Irving Ave • Upgraded ped island at Knickerbocker Ave

2016 Phase I Bicycle Network Expansion Projects Implemented

Page 8: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Safety NYC DOT Initiatives

Street Ambassadors • Education through bike lights, bell

giveaways, bike maps, and Bike Smart guide

• Outreach initiatives and workshops

Page 9: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

“I don’t bike, but I noticed the cars go a lot slower now”

April 2017 Earth Day at Irving Sq Park

2017 Phase I Follow-up Post-implementation Street Ambassador Outreach Deployments

June 2017 Shape Up Bushwick at Irving Sq Park

Page 10: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

10

552 727

Weekday Weekend

Weekday Weekend

2015 2017

629 577

308 258

486 589

113 108

357 444

500 410

439 429

312 205

514 494

137 126

328 343

2015-2017 • 51% growth in weekday cycling on Knickerbocker Ave • 71% growth in weekend cycling on Irving Ave • Over 400% growth in weekday/weekend cycling on Hancock St

2017 Phase I Follow-up Post-implementation Data Collection: 12 Hour Before and After Bike Counts Conducted in June*

51 65

280 341

*Hancock St Counts conducted in August

Page 11: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

11

2017 Phase I Follow-up Post-implementation Data Collection: 12 Hour Before and After Bike Counts Conducted in June*

After Counts – Knickerbocker Ave & Irving Ave • A Majority of Cyclists Use the Bike Lanes (84%+) • A Majority of Cyclists on the Street Travel With Traffic (87%+) • Biking Against Traffic Decreased or Remained the Same • Biking on the sidewalk decreased to below 5%

• Knickerbocker - weekend decreased from13% to 3%

Page 12: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

12

2016 Phase I Bicycle Network Expansion Knickerbocker Ave

Before

After

Page 13: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Before

After

2016 Phase I Bicycle Network Expansion Knickerbocker Ave

Page 14: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Before

After

2016 Phase I Bicycle Network Expansion Irving Ave

Page 15: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Before

After

2016 Phase I Bicycle Network Expansion Hancock St

Page 16: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

16

2017 Phase II Proposed Projects Hancock St

Page 17: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Existing Conditions

17

Troutman Ave

Central Ave

Central Ave

Troutman Ave, Starr St, Evergreen Ave Himrod St, Harman St

No Dedicated Space for Cyclists

Page 18: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Proposed Improvements

18

Hancock St

Irving Ave

Troutman Ave, Starr St, Evergreen Ave Himrod St, Harman St

Central Ave

No Parking Loss Number of Travel Lanes

Remain The Same

Page 19: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

BENEFITS OF DESIGN ELEMENTS Summary

Roadway markings Vehicles Organize the roadway Improves safety Improve alignment, and visibility Establish standard width; discourage speeding Cyclists Dedicated space for cyclists Increase predictability of cyclists location Direct connections to existing network Provide wayfinding

Organized roadway

Dedicated space for cyclists

Page 20: Bushwick Neighborhood Bicycle Network€¦ · Post-implementation Street Ambassador Outreach Deployments . June 2017 . Shape Up Bushwick at Irving Sq Park . 10 552 727 . Weekday

Questions?

THANK YOU!

20

NYC DOT NYC DOT nyc_dot NYC DOT