BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January 27, 2017) B. Approval of the FY18 Plant Budget Proposal C. Approval of FY19 - FY23 State Capital Budget Proposal D. Approval of the Annual Facilities Condition Report E. Jamie L. Roberts Stadium Schematic Design Approval F. MD Rt. 5 Traffic Calming Phase II Design Approval G. Renaming of the Library Building to the Hilda C. Landers Library III. DISCUSSION ITEMS A. Trinity Church Road Sidewalk Concept Design Update B. New Campus Entrance Sign Update IV. INFORMATION ITEMS A. Cobb House Status Update B. Capital Project Status Update C. Historic St. Mary’s City Commission Report

Upload: others

Post on 08-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017

AGENDA

I. CALL TO ORDER

II. ACTION ITEMS

A. Approval of Minutes (Meeting of January 27, 2017) B. Approval of the FY18 Plant Budget Proposal C. Approval of FY19 - FY23 State Capital Budget Proposal D. Approval of the Annual Facilities Condition Report E. Jamie L. Roberts Stadium Schematic Design Approval F. MD Rt. 5 Traffic Calming Phase II Design Approval G. Renaming of the Library Building to the Hilda C. Landers Library

III. DISCUSSION ITEMS

A. Trinity Church Road Sidewalk Concept Design Update B. New Campus Entrance Sign Update

IV. INFORMATION ITEMS

A. Cobb House Status Update B. Capital Project Status Update C. Historic St. Mary’s City Commission Report

Page 2: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

N/A

BOARD OF TRUSTEES BUILDINGS AND GROUNDS COMMITTEE

REPORT SUMMARY

Date of Meeting: May 12, 2017 Date of Next Meeting: October 20, 2017 Committee Chair: Mike O’Brien ’68 Committee Members: Donny Bryan ’73, Sven Holmes, President Tuajuanda Jordan, Katherine Russell, Kevin Emerson Staff Members: Annie Angueira, Chip Jackson, Maury Schlesinger Dashboard Metrics: N/A

Executive Summary: Discussion and Information Items: Trinity Church Road Sidewalk Design Concept Update Update of final concept option for extending a sidewalk from MD Rt. 5 to Kent and Calvert Halls. New Campus Entrance Sign Update Update on progress and schedule for new campus entrance sign to be completed summer 2017. Cobb House Renovation Update Update on construction progress to provide a new home for the Alumni Affairs offices and space for campus hospitality events. Capital Project Status Update Status update on various capital projects. Historic St. Mary’s City Commission Report Commission Report to be provided by Historic St. Mary’s City representative.

Page 3: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

Action Item(s): Buildings and Grounds Committee Meeting Minutes of January 27, 2017 Approval of Buildings and Grounds Committee meeting of January 27, 2017. FY18 Plant Budget The Committee on Buildings and Grounds recommends to the Finance, Investment and Audit Committee that they approve a FY18 Plant Budget that provides funds in the amount of $1.33M FY19-FY23 State Capital Budget Proposal The Committee on Buildings and Grounds recommends to the Finance Investment, and Audit Committee that they approve the proposed FY19-FY23 State Capital Budget Proposal. Approval of the 2017 Annual Facilities Condition Report The Committee on Buildings and Grounds recommends to the Board of Trustees that they approve the 2017 Annual Facilities Condition Report. Jamie L. Roberts Stadium Schematic Design The Committee on Buildings and Grounds recommends approval of the Schematic Design for the Jamie L. Roberts Stadium. MD Rt. 5 Traffic Calming Phase II Design The Committee on Buildings and Grounds recommends approval of the MD Rt. 5 Traffic Calming Phase II Design. Renaming of the Library Building to the Hilda C. Landers Library The Committee on Buildings and Grounds recommends to the Board of Trustees to approve the renaming of the Library to the Hilda C. Landers Library. Committee Action Taken/Action in Progress: Recommendation to the Board:

Page 4: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IVIV

II.A.

BOARD OF TRUSTEES

BUILDINGS AND GROUNDS COMMITTEE MEETING OF JANUARY 27, 2017

ACTION ITEM II.A.

MINUTES

Date of Meeting: January 27, 2017 Status of Minutes: Committee Members Present: Committee Chair Mike O’Brien ’68, Donnie Bryan ’73, Kevin Emerson, Board Chair Sven Holmes, Katherine Russell, President Tuajuanda Jordan (by phone). Committee Members Absent: Others Present: Annie Angueira, Asst. Attorney Gen. Allison Boyle, David Boisvert, Leonard Brown, Cindy Broyles, Laura Cripps (by phone), Carolyn Curry, Vera Damanka ’17, Peter Bruns, Regina Faden, Kathy Grimes, Cynthia Gross, Mary Grube, Gail Harmon, Ann McDaniel, Jim McGuire, Kortet Mensah, Lisa Smith, Derek Thornton, Danielle Troyan, Allan Wagaman ’06, Mike Wick, Anna Yates, Derek Young, Chip Jackson (by phone). Executive Summary: Committee Chair Mike O’Brien called the meeting to order at 1:50 p.m. Jamie L. Roberts Stadium Status The College awarded a design-build contract to RAD Sports. Archaeology investigation is nearing completion and will inform the Schematic design. Trinity Church Road Sidewalk Design Concept A new design concept was shown to the Committee. The design presented consisted of Trinity Church Road becoming a one-way road with a sidewalk being placed in the location of the remaining lane currently. The College will continue to explore this new option. Capital Projects Status Report Update The Capital Projects Status Report was presented. No questions were raised. Governor’s FY18-FY22 Capital Improvement Program (CIP) The Governor’s 5-year CIP for FY18-FY22 has been released. The Governor’s budget advanced construction funding for the Jamie L. Roberts Stadium project from FY19 to FY18 as requested by the College with funding for Campus Infrastructure projects originally planned for FY18 deferred to FY19. An additional year of Infrastructure Project funding was added by the Governor in FY22. Funding for the New Academic Building/Auditorium Project remains unchanged in the Governor’s Capital Improvement Plan. Meeting of October 14, 2016 Minutes The minutes from the October 14, 2016, Buildings and Grounds Committee Meeting were approved by the Committee on December 20, 2016.

2 - 1

Page 5: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

Historic St. Mary’s City Commission Report The Commission Report was presented by Regina Faden of Historic St. Mary’s City (HSMC). Closing Questions Questions with regards to need for better campus signage were presented to the committee. Chair Mike O’Brien ’68 stated that this issue is a priority and will be added to the next Buildings and Grounds Committee meeting agenda for May 2017. Action Item(s): Renaming the White House to the Lucille Clifton House The proposed name change honors the legacy of Lucille Clifton who served as Distinguished Professor of Humanities at St. Mary’s College of Maryland from 1989 to 2005. The building is now home to the Title IX coordinator and the associate vice president of inclusion and diversity. If approved by the Board of Trustees, the College will seek final approval from the Board of Public Works on February 8, 2017, for the renaming the White House to the Lucille Clifton House.

Committee Action Taken/Action in Progress: The proposed action item was approved by the Buildings and Grounds Committee at its meeting on January 27, 2017. Recommendation to the Board: The Buildings and Grounds Committee recommends approval of the recommendation made by the Institutional Advancement Committee to rename the White House to the Lucille Clifton House by the Board of Trustees at their meeting on January 28, 2017. Meeting was adjourned at 2:32 p.m.

2 - 2

Page 6: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.B.

ST. MARY'S COLLEGE OF MARYLAND BOARD OF TRUSTEES

BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017

ACTION ITEM II.B.

APPROVAL OF THE FY18 PLANT BUDGET PRIORITIES

RECOMMENDED ACTION: The Committee on Buildings and Grounds establishes Priority A FY18 Plant Projects as shown in the attached schedule as the highest unfunded priorities. Further, the Committee on Buildings and Grounds recommends to the Finance, Investment, and Audit Committee and to the Board of Trustees that they approve a FY18 Plant Budget that provides funds for these Priority A projects.

RATIONALE: The Committee on Buildings and Grounds is charged with the responsibility to establish priorities for capital projects. These priorities are forwarded to the Finance, Investment, and Audit Committee for funding consideration. Pending action of the Finance, Investment, and Audit Committee on May 1, 2017, the amount of funding available for the FY18 Plant Budget is expected to be $1.33M. The sole source of funding comes from the student facility fee. The total revenues for the FY18 Student Facility Fee are based on a budgeted enrollment of 1,497 students. Background information is attached for information purposes. Included is a description of each Priority A project, a list of potential miscellaneous projects, and a summary of plant budget expenditures through March 31, 2017.

2 - 3

Page 7: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.B. ST. MARY’S COLLEGE OF MARYLAND FY18 PLANT PROJECT SUMMARY PRIORITY A PROJECTS LIST

Estimated Cost

Major Capital Projects Miscellaneous Capital Projects less than $200,000 $ 60,000

Subtotal $ 60,000 Maintenance and Repair Miscellaneous Maintenance and Repair Projects

less than $200,000 $ 616,000 Subtotal $ 616,000 Program Support Miscellaneous Projects less than $200,000 $ 307,827 Subtotal $ 307,827 Residence Hall Renewal Program Caroline – New Furniture $ 280,000 Miscellaneous Residence Hall Projects less than $200,000 $ 70,000 Subtotal $ 350,000 FY18 PRIORITY A PROJECTS $1,333,827 .

2 - 4

Page 8: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.B. PRIORTIY A PROJECTS

Project: Miscellaneous Capital Projects Amount: $ 60,000 Scope: Various capital projects on campus. (See attached list of tentative projects) MAINTENANCE AND REPAIR: Project: Miscellaneous Maintenance and Repair Projects Amount: $ 616,000 Scope: Various maintenance and repair projects on campus. (See attached list of tentative projects) PROGRAM SUPPORT: Project: Miscellaneous Enhancement Projects Amount: $ 307,827 Scope: Various enhancement projects on campus.

(See attached list of tentative projects.) MAJOR RESIDENCE HALL RENEWAL PROJECTS: Project: Caroline Hall Furniture Replacement Amount: $ 280,000 Scope: Provide funding to replace furniture in Caroline Hall. The current furniture is 25 years old and shows sufficient signs of aging. RESIDENCE HALL RENEWAL PROGRAM: Project: Miscellaneous Residence Hall Renewal Projects Amount: $ 70,000 Scope: Various Residence Hall projects.

(See attached list of tentative projects.)

2 - 5

Page 9: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.B. ST. MARY'S COLLEGE OF MARYLAND FY18 PLANT PROJECT SUMMARY TENATIVE MISCELLANEOUS PROJECTS The following provides a list of miscellaneous projects that represents preliminary planning for funding within the FY18 plant budget. Implementation of specific projects is subject to change in the event of unforeseen circumstances.

PROJECT ESTIMATED COST

CAPITAL PROJECTS

Faculty/Staff Housing Programming 40,000

Bike Trail - Concept Study 20,000

TOTAL COST OF CAPITAL PROJECTS 60,000

MAINTENANCE & REPAIR

Miscellaneous maintenance and repair projects - unknown 51,000

Plant Contingency 70,000

Campus Wide - Slate roof repairs 20,000

Campus Wide - Building Automation Commissioning 25,000

Aquatic Center - Replace black rubber mats with new mats or permanent non-slip surface 135,000

Campus Center - Chiller Study 50,000

Campus Painting (Campus Center; Kent Hall, Library; Monty Hall) 80,000

Goodpaster Hall - Air Handling System Balancing 20,000

Goodpaster Hall - Replace rusted fume cabinets 30,000

Library - Egress Stairwell Code Improvements 45,000

Library - Replace 3rd Floor carpeting 14,000

Montgomery Hall - Install Monty Piano Climate Control 10,000

Muldoon River Center - Replace Front Door Closures 15,000

Schaefer Hall - DI Water System Replacement 11,000

Schaefer Hall - SH 106 Renovation Project 40,000

TOTAL COST OF MAINTENANCE AND REPAIR PROJECTS 616,000

PROGRAM SUPPORT - ACADEMIC AFFAIRS

Classroom Improvements - for Strategic Plan Initiatives 30,000

Library - Annex - Refurbish LI 112 20,000

Margaret Brent Hall - Replace chairs in MB 109 15,000

Montgomery Hall - MH 132 or 129 - Purchase & Install spray booth 6,000

Montgomery Hall - Soundproofing MH 102D 15,000

Schaefer Hall - SH 124 - Hazardous Waste Accumulation area add ventilation 5,000

Schaefer Hall - SH 151 Install High Density Storage 85,000

Schaefer Hall - SH 253 Renovation 10,000

TOTAL COST OF ACADEMIC AFFAIRS PROJECTS 186,000

2 - 6

Page 10: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.B.

PROJECT ESTIMATED COST

PROGRAM SUPPORT - STUDENT AFFAIRS

Chance Hall - Sound abatement for therapy offices 5,000

Campus Center - First floor upholstered furniture replacement 5,000

TOTAL COST OFSTUDENT AFFAIRS PROJECTS 10,000

PROGRAM SUPPORT - BUSINESS AND FINANCE PROJECTS

Misc. Enhancements - unknown 20,000

River Center - Modify existing and add additional electrical outlets on piers 4,000

TOTAL COST OF BUSINESS AND FINANCE PROJECTS 24,000

PROGRAM SUPPORT - ADVANCEMENT PROJECTS

DPC - Create on campus storage 8,000

TOTAL COST OF ADVANCEMENT PROJECTS 8,000

PROGRAM SUPPORT - ENROLLMENT MANAGEMENT

Admissions - Re-upholstery of furniture in living room and sunroom 15,000

TOTAL COST OF ENROLLMENT MANAGEMENT PROJECTS 15,000

CAMPUS IMPROVEMENT PROJECTS

Miscellaneous site improvements projects - unknown 24,827

Grounds - Queen Anne - Replace asphalt walk east of Queen Anne 10,000

Grounds - Removal of Willow Oak Tree 30,000

TOTAL COST OF CAMPUS IMPROVEMENT PROJECTS 64,827

RESIDENCE HALL RENEWAL PROGRAM

Miscellaneous residence hall repairs 20,000

ADA Units - Add bed shakers & Strobes 5,000

Caroline - Replace existing furniture with new furniture 280,000

Townhouses and Crescents - Re-Key to BEST lock or electronic locks 15,000

Traditional Halls - Refurbishment & Renovation front and back apartments 25,000

Waring Commons - ADA Upgrade 5,000

TOTAL COST OF RESIDENCE HALL PROJECTS 350,000

2 - 7

Page 11: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.B.

ProjectBudget

ExpendituresCommitments

BalanceActive Capital Projects>$200,000

Misc Maint & Repair508,674

202,115177,267

129,292Misc Small Enhancements

204,631128,322

72,1714,139

Misc Residence Hall Projects461,693

228,376218,912

14,405AA Hall Replacement - Misc

235,89886,958

7,954140,985

Cobb House Renovation220,000

2,486204,934

12,580

Total Projects <$200,000979,097

96,709128,904

753,484

Total Projects2,609,993

744,966810,143

1,054,884

PLANT PROJECT EXPENDITURE SUMMARYCumulative Project Budgets and Expenditures through March 31, 2017

2 - 8

Page 12: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.B.

Note: The transfer to plant in the amount of $600K no longer exists. In FY16 the transfer was reduced by $200K as part of the College wide budget reduction process. The remaining $400K was allocated (budgeted) to institutional debt service to pay for the Residence Hall Renewal Loan that was taken to advance maintenance projects in the residence halls.

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

3,500,000

Plant Budget: Sources of Funds FY09 - FY18

One Time

Parking Fee

Residence Hall Fee

Student Facility Fee

2 - 9

Page 13: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.B.

Capital/Other, $425,200

Departmental, $212,600

Maintenance, $653,400

Res Hall Renewal, $612,800

Average Plant Budget Funding FY13 - FY17

2 - 10

Page 14: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.C. BOARD OF TRUSTEES

ST. MARY’S COLLEGE OF MARYLAND COMMITTEE ON BUILDING AND GROUNDS

MEETING OF MAY 12, 2017 ACTION ITEM II.C.

FY19-FY23 STATE CAPITAL BUDGET PROPOSAL

RECOMMENDED ACTION The Buildings and Grounds Committee recommends approval by the Finance, Investment and Audit Committee and the Board of Trustees of St. Mary’s College of Maryland of the attached FY19–FY23 State Capital Budget Proposal. The proposed FY19-FY23 State funded capital budget is a continuation of the current capital budget and includes the New Academic Building and Auditorium (inclusive of the Jamie L. Roberts Stadium) and various Campus Infrastructure Improvements. RATIONALE The attached chart summarizes our FY19–FY23 State Capital Budget proposal and compares it to the Governor’s 5-year Capital Improvement Plan dated January 2017. New Academic Building and Auditorium The project constructs a new academic building to house music, educational studies, study space, and a 700-seat auditorium. Relocating Music and Educational Studies departments will enable the College to reallocate vacated space to the arts (Montgomery) and the sciences (Goodpaster). The new study space will provide a contemporary “Learning Commons” for student collaboration and research. The auditorium will provide an appropriately sized facility for concerts, lectures, and other uses which cannot now occur for lack of a suitable facility. This project requires the relocation of athletic fields to clear the site for the new building. The new athletic field’s component of the project includes a new grass playing field and a new artificial turf field with a running track. Support facilities include seating for 1,600 spectators (800 per field), team rooms, concessions, press box, parking for 75 cars. The total estimated cost for this project is $76M with the College providing $2.5M in FY19. The State has appropriated $ 11.6M to date for design and construction of Jamie L. Roberts Stadium and preliminary design of the New Academic Building. The College has completed its fund raising requirements. The FY19 proposal includes $ 3.0M for continued design of the New Academic Building. Campus Infrastructure Improvements This project will provide infrastructure improvements in multiple phases to include improvements to pedestrian safety (funded in FY17), building HVAC systems, building envelopes, and campus roadways. The Governor’s Capital Improvement Plan includes $13.1M from FY18 through FY22. The FY19 proposal includes $2.4M to replace the windows in Calvert Hall, Storm Water and Living Shoreline improvements, replacement of the controls in the Library, and repair roads on campus.

2 - 11

Page 15: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.C.

2 - 12

Page 16: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.C.

2 - 13

Page 17: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D. ST. MARY’S COLLEGE OF MARYLAND

BOARD OF TRUSTEES COMMITTEE ON BUILDINGS AND GROUNDS

MEETING OF MAY 12, 2017 ACTION ITEM II.D.

ANNUAL FACILITIES CONDITION REPORT APPROVAL

RECOMMENDED ACTION: The Committee on Buildings and Grounds recommends approval by the Board of Trustees of the Annual Facilities Condition Report (attached). RATIONALE: The Committee on Buildings and Grounds is charged with conducting an annual evaluation of the campus facilities and reporting its findings to the Board of Trustees. The Committee presents the attached annual report to the Board for approval.

2 - 14

Page 18: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

ST. MARY’S COLLEGE OF MARYLAND BOARD OF TRUSTEES

COMMITTEE ON BUILDINGS AND GROUNDS MEETING OF MAY 12, 2017

ACTION ITEM II.D. ANNUAL FACILITIES CONDITION REPORT

The attached report provides summary information for each building and major infrastructure asset on campus. The format is as follows: Also attached to this report are a variety of charts and other information related to the condition of the Physical Plant:

a. Facility List of Campus Buildings b. Building Age c. Inventory of Existing Buildings – sorted by Facility Condition Index (FCI) d. Top Ten Highest FCI e. Top Ten Deferred Cost f. Condition of the Physical Plant – Trends g. Deferred Maintenance Projections – 2015 through 2034 h. Deferred Maintenance Projections – Current Reinvestment Levels

Note 1: Facilities Condition Index: The Facilities Condition Index (FCI) is a comparative indicator of the relative condition of facilities. The FCI is expressed as a ratio of the cost of maintenance deficiencies to the current replacement value.

FCI = (deferred maintenance cost ÷ building replacement cost) × 100

Note 2: Deferred Maintenance Costs: The total dollar amount of existing major maintenance repairs and replacements, identified by a comprehensive facilities condition audit of buildings, grounds, and infrastructure needs. It does not include projected maintenance and replacements or other types of work, such as program improvements or new construction; these items are viewed as separate capital needs.

Building Year Built (Year Renovated) Net Assignable Square Feet Function: A brief description of the building use. Condition: (FCI) 1

A brief description of recent improvements and current maintenance issues

Deferred Cost: estimated value of deferred Maintenance2

Future: A brief description of recommended projects and/or major changes to the facility

2 - 15

Page 19: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

ST. MARY’S COLLEGE OF MARYLAND BOARD OF TRUSTEES

COMMITTEE ON BUILDINGS AND GROUNDS MEETING OF MAY 12, 2017

ACTION ITEM II.D.

ANNUAL REPORT ON THE CONDITION OF CAMPUS FACILITIES 1. St. Mary’s Hall 1906 (1994) 3,227 NASF

Function: Small auditorium seating 216. The facility primarily supports music events and lectures.

Condition: Fair (FCI = 8.5%) Deferred Cost: $181K

A project to repoint deteriorated mortar joints was completed in 2015. Carpeting was replaced in 2014. Water infiltration problems that caused mold growth in the basement were corrected in 2013 and basement restoration was completed in 2014. Upholstered seating repairs are ongoing to address deterioration.

Future: Seating re-upholstery to be addressed through maintenance initiatives and window replacements to be addressed through the plant budget.

2. St. Mary’s Hall Annex (Animal House) 1907 (2012) 119 NASF

Function: Unisex bathroom to support St. Mary’s Hall and outdoor events in the Garden of Remembrance and lab space for the Department of Anthropology.

Condition: (FCI = 0.0%) Deferred Cost: $0 No work in the last five years. Future: No future work is currently planned.

3. May Russell Lodge 1909 1,422 NASF Function: Guest lodging and meeting facility.

Condition: Good (FCI = 1.6%) Deferred Cost: $9K

The windows were replaced in 2014. The floors were repaired and refinished, and the screened porch was repaired and painted in 2013. The HVAC system was replaced in 2017. New system will provide both heating and cooling

Future: Porch repairs will be needed in the future.

2 - 16

Page 20: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

4. Calvert Hall 1924 (1987) 16,428 NASF

Function: Administrative offices on the main (1st) and second floors. The ground floor (basement) was renovated in 2012 and houses a classroom, archives and offices for members of Planning and Facilities and two faculty members.

Condition: Fair (FCI = 9.7%) Deferred Cost: $1,508K

Windows, doors, heating systems, finishes, masonry, and electrical systems are all in deteriorated condition. Floor tiles in both stair towers were replaced in 2013. Doors and asbestos floor tiles on the 2nd and 3rd floors are in need of replacement. Bathroom facilities on the 2nd and 3rd floors are in need of renovation. There remains a need for Americans with Disabilities Act (ADA) access to the classroom on the basement level. Both north and south porch roofs and substrates were renovated in 2013. Exterior brick, fascia and window trims were painted and fire doors on the 1st floor were replaced in 2014. Bathrooms in the basement and on the 1st floor were converted to ADA compliant restrooms, stair towers were renovated and the second floor was converted to office and lounge space in support of Advancement and Alumni operations in 2015. The third floor is not in use at this time. In 2017 replacement of 3.5 ton split system that services a portion of the first floor was replaced.

Future: The building will at some point require a complete renovation. No specific plans have been developed at this point. The State Infrastructure Improvements Capital Project will fund the replacement of the windows (FY19) and the HVAC system (FY20).

5. Lucille Clifton House (White House) 1928 (2017) 1,233 NASF

Function: The facility is currently occupied by Diversity and Inclusion and Title IX offices.

Condition: Good (FCI = 3.7%) Deferred Cost: $10K

Exterior siding and substrates were replaced in 2014. Water infiltration problems exist in the basement (unoccupied). An interior finish renovation with ADA upgrades was completed in 2016. In addition, a new entry portico was added to the building.

Future: No future work is currently planned.

6. Admissions 1936 (1986) 2,032 NASF Function: Offices and support space.

Condition: Good (FCI = 4.1%) Deferred Cost: $68K

Gutters and downspouts were repaired in 2015. Basement windows and interior walls were sealed to address water infiltration problems and exterior walkways were refurbished in 2014. A geothermal heat pump system was installed, which included new attic and crawl space insulation in 2013. Asbestos flooring abatement and carpet replacement were

2 - 17

Page 21: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

completed in and around the kitchen area in 2013. Minor repointing was complete on the building foundation in 2016.

Future: A complete cleanout and renovation of the basement is recommended. Planned re-upholstery of living room and sunroom furniture. Refurbishment of window frames and associated trim and seals are needed.

7. Kent Hall 1940 (1998) 11,668 NASF

Function: Office and instructional space for the departments of history, economics, sociology, anthropology, and political science. Condition: Good (FCI = 0.06%) Deferred Cost: $67K

Vinyl Composition Tile (VCT) on the 2nd and 3rd floors and the columns at the west entrance were replaced in 2016. In 2017, first floor corridors, stairwells and classroom flooring replaced. Upgrades to variable air volume boxes in the ventilation system were completed in 2011. The fuel-fired domestic hot water heater was replaced with an electric hot water heater in 2008. R-22 availability is no longer produced and has become very expensive for packaged AC units that support data closets. Although these units are functional, replacements should be considered in the near future.

Future: Replacement of the classroom carpets and Vinyl Composition Tile (VCT) on the 1st floor to be addressed through the plant budget.

8. Cobb House 1948 (2017) 2,879 NASF

Function: currently vacant to include Alumni Affairs in the future.

Condition: Fair (FCI = 9.2%) Deferred Cost: $146K

The building is currently undergoing a partial interior finish upgrade, roof replacement, addition of entry vestibule and deck, and ADA improvements. Storm windows were replaced in 2009. The floors in the basement are delaminating in various areas as a result of a major pipe leak and needs repairs. One heat pump system was replaced in 2013. Repairs and painting of sections of the soffits, fascia, and substrates were completed in 2016. Gutters require repair or replacement.

Future: Current renovation aside, there is no future work planned.

9. Margaret Brent Hall 1950 (2011) 2,903 NASF Function: The building includes a classroom and office space for the Department of Philosophy and Religious Studies. The fire alarm system was repaired and connected to the Building Automation System (BAS) 2015.

Condition: Good (FCI = 0.6%) Deferred Cost: $11K

Future: No future work is currently planned.

2 - 18

Page 22: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

10. Queen Anne Hall 1965 (2005) 23,343 NASF

Function: Female traditional residence hall.

Condition: Good (FCI = 2.1%) Deferred Cost: $369K

New HVAC system, including central air-conditioning, was completed in 2016. The gutters were replaced, a foundation drain tile system was installed and 21 windows on the west side of the building were replaced in 2013. The remaining original windows were replaced and exterior brick repointing and sealing to reduce moisture absorption were completed in 2014. Repainting of the interior of the building, replacing ceilings, replacing exterior doors, upgrading recreation room furniture, lobby restorations, and study furniture, wireless internet were also completed in 2014. Installation of a new HVAC system, including central air-conditioning was completed in summer 2016. The roof is in fair condition.

Future: The replacement of the roof has been designed and will be replaced within the next 5 years. Also, minor interior renovation is planned for the next 1-3 years to refurbish the front and back apartments.

11. Campus Center 1966 (2000) 31,672 NASF

Function: The facility includes food service, campus bookstore, lounges, meeting rooms, a theater, campus mailboxes, student and staff offices, and space for student organizations.

Condition: Good (FCI = 0.5%) Deferred Cost: $150K

A gender neutral bathroom was created on the first floor across the hall from the Cole Cinema in 2016. Upgrades to Variable Air Volume box (VAV) controllers were completed in 2012-2014. The controllers for the building air handlers are in need of an upgrade. The loading dock concrete deck and block walls showed deterioration at various joints and were repaired in 2014. Repairs to the flat roof were completed in 2014; however an inspection report completed in 2013 suggest a replacement will be needed in the next few years. Chimney flashing and cap repairs were assessed in 2015 and appear to be resolved. Floors in the dish room were repaired in 2016 to address the water infiltration problems. Two roof top R-22 AC condensing units are recommended for replacement. Replacement of the Daily Grind flooring is recommended.

Future: Common area painting planned for 2018 12. Library 1968 (1990) 38,006 NASF

Function: This facility includes the library, media services, a writing center, and the office of information technology.

Condition: Fair (FCI = 5.8%) Deferred Cost: $2,031K

In 2017 the building Fire Alarm system & Air Handler 5 was replaced. Lighting and bathroom fixture upgrades under the campus energy performance contract were completed in 2006 and a new boiler installation was completed in 2007. Repairs to the copper roof were completed in 2007. The built up roofing systems are approaching the end of their

2 - 19

Page 23: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

useful life in the next few years. A new emergency generator was installed in 2008. The chiller and the second floor carpet were replaced in 2011 and 2012. Pneumatic to digital controls conversion and the fire alarm panel replacement is needed. Air Handler Unit 5 needs refurbishment or replacement. Two condenser units for the server room were replaced in 2012. Carpets and upholstery were replaced in the media room (321) and the wood stairs were refinished in 2014. Additional classrooms, offices and 3rd floor carpets are in need of replacement.

Future: Upgrades to the building control system in FY19 and built-up roof system replacement in FY 22 will be funded by the State Infrastructure Improvements Capital Project. The second floor will repainted.

13. Dorchester Hall 1968 (1988) 22,742 NASF

Function: All male traditional residence hall.

Condition: Good (FCI = 0.4%) Deferred Cost: $87K

Stair tower renovations, entrance door replacement, window replacement and masonry waterproofing were completed in 2013. Gutters were replaced and a drain tile system was installed in 2014. Replacing ceilings, replacing asbestos floor tiles, replacing exterior doors, upgrading recreation room furniture, lobby restorations, and study furniture and wireless internet upgrades was completed in 2014. The removal of the remaining asbestos insulation in heating piping, replacing interior doors, and installation of a new HVAC system, including central air-conditioning, were completed in 2015. Building Automation system upgrades completed in 2017. Bathroom ceramic tile floors are in poor condition. Future: Replacement of ceramic tile floors to be considered under future plant budgets. Also, minor interior renovation is planned for the next 1-3 years to refurbish the front and back apartments.

14. Maintenance 1968 (1981) 9,202 NASF

Function: Physical Plant administrative offices and support space, art storage and classrooms in support of the Art Department.

Condition: Good (FCI = 2.2%) Deferred Cost: $71K

The building HVAC system is in poor condition. The building is inadequate for current levels of maintenance and grounds operations.

Future: All deficiencies are to be considered for funding through the plant budget. The draft 2012-2027 Master Plan recommends that the existing Maintenance Building be converted to joint use by Public Safety and Maintenance after construction of a new Maintenance Building. Art studios and art storage should be moved to Montgomery Hall after the department of Music moves to the New Academic Building.

2 - 20

Page 24: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

15. Michael P. O’Brien Athletic and Recreation Center 1968 (2005) 81,680 NASF

Function: Athletic and recreational facility.

Condition: Fair (FCI = 6.4%) Deferred Cost: $2,226K

The Pool filtration system was repaired and main arena floor resurfaced. The tennis courts were resurfaced in 2013 with minor repairs completed in 2015. The exterior double doors to the recreation court were replaced and repairs to the pool chemical and acid rooms were completed in 2014. An elevator system to facilitate chemical transport to the pool mechanical deck was installed in 2015. The flooring around the pools and seating in the natatorium is in need of replacement. The recreation court floors need to be repainted and resealed. Bleachers in the recreation gym are in fair condition. Portions of the original building that were not re-roofed during the 2005 expansion project will have to be replaced in 2-4 years. A feasibility study to add air-conditioning to the recreational gym was completed in 2011. An upgrade of select HVAC equipment and controls is needed

Future: A project to install a slip resistant coating on pool deck is scheduled for completion in 2017. The old gym roof will be replaced in FY21. Additionally, Pool Pak ventilation system and overall building controls will be replaced in FY22. These projects will be funded by the State Infrastructure Improvements Capital Project. All other deficiencies will be addressed under the plant budget

16. Ethel Chance Hall 1968 (1994) 2,449 NASF

Function: College Wellness Center.

Condition: Good (FCI = 3.6%) Deferred Cost: $50K

In 2017, all the windows were replaced. A handicap accessible restroom and sound abatement for exam rooms are needed. A flush sink for the lab was installed in 2013. Carpets in an exam room and the reception area were replaced in 2015. Windows and additional carpeting need to be replaced in the next 2-3 years. The need for additional therapy space has become apparent with the increase of available services.

Future: Renovation to provide a handicapped accessible bathroom is approved for State funding in 2017 under the program Access Maryland. All other deficiencies will be considered through the plant budget.

17. Caroline Hall 1970 (1987) 24,829 NASF Function: Co-ed traditional residence hall.

Condition: Good (FCI = 1.5%) Deferred Cost: $303K

Replacement of the underground fuel tank, lighting, and bathroom upgrades under the campus energy performance contract, replacement of study room carpets, dormer painting,

2 - 21

Page 25: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

and repair and replacement of heating/cooling fan coil units in student rooms were completed within the past 5 years. Window replacement, masonry waterproofing, foundation repairs were completed in 2012. A make-up ventilation system was installed in 2013. The boiler is in need of replacement. Recreation and study furniture upgrades, lobby restorations and wireless internet upgrades were completed in 2014. Fire alarm systems have reached the end of their lifecycle and will need replacement within 1-3 years. Repainting the interior of the building and replacing interior and exterior doors were completed in the summer of 2015.

Future: All other deficiencies to be considered through maintenance initiatives and the plant budget. The complete replacement of all dorm room furniture is planned for 2018. Also, minor interior renovation is planned for the next 1-3 years to refurbish the front and back apartments.

18. Prince George Hall 1970 (1987) 22,741 NASF

Function: Co-ed traditional residence hall.

Condition: Good (FCI = 2.0%) Deferred Cost: $346K

Replacement of the underground fuel tank, lighting, and bathroom upgrades under the campus energy performance contract, replacement of study room carpets, dormer painting, and repair and replacement of heating/cooling fan coil units in student rooms were completed within the past 5 years. Window replacement, masonry waterproofing, foundation repairs were completed in 2012. A make-up ventilation system was installed in 2013. The boiler is in need of replacement. Repainting the interior of the building, replacing exterior doors, upgrading recreation room furniture, lobby restorations, and study furniture and wireless internet upgrades were completed in 2014.

Future: Replacing interior doors is planned in summer 2019. All other deficiencies to be considered through maintenance initiatives and the plant budget. The complete replacement of all dorm room furniture is planned for 2019. Also, minor interior renovation is planned for the next 1-3 years to refurbish the front and back apartments.

19. Montgomery Hall 1979 36,041 NASF

Function: Fine Arts building including a theater, classrooms, music and art studios, faculty offices, and support space for the departments of English, Music, Theater and Media Studies, and Art and Art History.

Condition: Good (FCI = 4.8%) Deferred Cost: $2,426K

The all phases of HVAC mixing box replacements were completed in 2013 through 2016. Also, the main chiller coil was replaced. Cedar siding/fascia/soffits were repaired in some locations in 2012, but should be considered for replacement within the next few years. The elevator has reached the end of its lifecycle and needs major renovation/replacement. Vinyl tile on the second floor, gutters and exterior doors require repair and/or replacement. Bathrooms renovations are recommended. Mechanical systems, except the chiller and cooling tower, are in poor condition. The boilers were replaced in 2013 and 2015.

2 - 22

Page 26: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

Replacement of sculpture studio windows, exterior trim repair and painting was completed in 2014. Some carpets in faculty offices are in need of replacement. Given the building age, maintenance needs will grow over the next decade. Significant space shortages exist in all of the departments.

Future: The state-funded infrastructure improvements project will fund the replacement of the elevator in FY21, replacement of the windows and exterior doors in FY20, underground storage tank in FY22 and replacement of the HVAC controls in FY20. The 2012-2027 draft Master Plan recommends renovation of the entire building for use by the Art and Art History Departments, Theater, Film, and Media Studies Department, and the English Department after the construction of the New Academic Building and Auditorium.

20. Greenhouse 1986 320 NASF Function: Greenhouse to support grounds.

Condition: Poor (FCI = 10.3%) Deferred Cost: $5K

Building has not been used by the Grounds Department for many years now. The glass is broken in many places and the framing is deteriorated.

Future: is the greenhouse is to be demolished.

Townhouse Green

21. E.D. Harrington 1987 4,816 NASF Condition: Good (FCI = 0.2%) Deferred Cost: $5K

22. G. Boone 1987 4,128 NASF Condition: Good (FCI = 0.2%) Deferred Cost: $5K

23. H.L. Dodge 1987 5,712 NASF Condition: Good (FCI = 2.2%) Deferred Cost: $77K

24. M.W. Dodge 1987 5,712 NASF Condition: Good (FCI = 2.7%) Deferred Cost: $80K

25. A.B. Morsell 1987 4,180 NASF Condition: Good (FCI = 3.4%) Deferred Cost: $87K

26. B. Trueschler 1987 4,128 NASF Condition: Good (FCI = 2.9%) Deferred Cost: $62K

2 - 23

Page 27: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

Function: All of the above are townhouse buildings.

All the remaining bedroom carpet has been removed and replaced with a factor finished vinyl tile 2017. All remaining exterior doors were replaced. Roof and gutter repair/replacement and bathroom renovations were completed in 2011-2012. All heat pumps were replaced in 2014 and sixty four (64) front and back exterior doors were replaced in 2014 and 2015.

Future: All exterior door hardware is scheduled to be replaced in 2018. Furniture in Homer Dodge, Maggie Dodge, and Trueschler will need replacement in 3 – 4 years.

27. Daugherty-Palmer Commons 1988 2,914 NASF

Function: Great room, laundry, and offices for the events and conferences staff.

Condition: Good (FCI = 1.0%) Deferred Cost: $26K

Gutter repairs/replacement completed in 2012. Ceiling sound attenuation panels and floor repairs and interior painting were completed in 2013. Lighting fixtures were re-lamped in 2013 eliminating the requirement for additional lighting. The underground storage tank was replaced in 2015.

Future: In the next 3-5 years, replacement of the wood floor should be implemented.

28. Admissions Annex 1992 560 NASF

Function: Admissions offices.

Condition: Good (FCI = 2.6%) Deferred Cost: $7K

An upgrade to the security alarm system was completed in 2012. A vestibule at the entrance was installed in 2012 and a new geothermal heat pump system was installed in 2013.

Future: No future work is currently planned.

29. Schaefer Hall 1993 32,925 NASF

Function: Laboratory and classroom building for the departments of biology, physics, and math and computer science.

Condition: Good (FCI = 4.0%) Deferred Cost: $1,919K

Foundation waterproofing and drain tile system was completed in 2013 to address the water infiltration problems in the south side of the north wing basement. HVAC controls upgrade was complete in 2014. The flat roofs are in need of replacement, river pit pumps should be evaluated for sustainable replacement, and various ceilings, window and light replacements are recommended. The 80 ton chiller has reached the end of its lifecycle and

2 - 24

Page 28: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

costs of repairs exceed the value. A design was recommended for replacement with a larger capacity system; however, supplemental cooling was installed in 2014 in critical laboratories eliminating the need. The replacement of the burner for boilers and additional window replacements were completed in 2014 and 2015. Initiatives to complete system balancing/commissioning were complete in 2015. New ceilings in labs and classrooms are recommended. Additional window replacements and upgrades to the river water circulation system were completed in 2016 and 2017.

Future: The retrofit of approximately 100 lights is scheduled for completion in the spring of 2019. The state-funded infrastructure improvements project will fund the replacement of the building flat roofs in FY19, and replacement of the buildings chillers and cooling tower in FY20.

30. Townhouse Crescent 1994 28,605 NASF

Function: 40 townhouse units.

Condition: Fair (FCI = 6.2%) Deferred Cost: $894K

All the remaining twenty heat pumps units were replaced in 2016. Nineteen (19) exterior entry and Eighteen (18) French doors were replaced in the spring of 2016. The replacements of forty-four (44) windows was also complete in 2017. Renovations were completed to the patio doors and 23 windows were replaced in 2012. A larger project to renovate those bathrooms not done during past initiatives (34) will be needed in the next 1-3 years to eliminate potential drainage and floor leaks into kitchen areas. Additional windows replacements are needed. Twenty (20) heat pumps and air handlers were replaced under the student funded Green St. Mary’s Revolving Fund (GSMRF) in 2015.

Future: In 2018, all exterior door hardware will be replaced. 31.-34. Edward T. Lewis Quadrangle 2001 29,033 NASF

Function: Suite-style residence halls and commons.

Condition: Good (FCI = 1.8%) Deferred Cost: $195K

Slate roof repairs were completed in 2007. Upgrades to the existing building HVAC automation system were completed in 2009. The recreation room was converted to a late night food venue in 2011. Additional bathroom renovations are recommended. Invensys HVAC control system should be converted to campus standard system (Automated Logic). Complete interior painting, replacement of vinyl cove base and stair refinishing of the facility was complete in 2016 and 2017.

Future: Facility renovation of some bathrooms to include floors, showers, and ventilation continues to be addressed on a case-by-case basis as necessary.

2 - 25

Page 29: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

35. H. Thomas Waring Commons Phase I/II 2003 44,705 NASF Function: Suite and apartment-style residence halls and commons.

Condition: Good (FCI = 0.4%) Deferred Cost: $156K

Future: No future work is currently planned. 36. H. Thomas Waring Commons Phase III 2007 14,168 NASF Function: Suite and apartment-style residence halls and commons.

Condition: Good (FCI = 0.0%) Deferred Cost: $0

Future: No future work is currently planned.

37. Goodpaster Hall 2008 32,239 NASF

Function: Multi-use facility includes classrooms, offices, and laboratories for the departments of chemistry, educational studies, and psychology.

Condition: Good (FCI = 0.0%) Deferred Cost: $0

Wood floor repairs and walk off grate completed in 2012. The sewage ejector pumps were rebuilt in 2014. The lab air compressors were repaired in 2012. The building automated lighting system is in need of replacement. Some building walls have leaked in prolonged wind driven rains. The Department of General Services pursued the repairs to faulty wall flashings with the contractor which was completed in summer of 2015.

Future: The draft 2012-2027 Master Plan recommends that the Educational Studies Department be relocated to the New Academic Building and Auditorium, and that the vacated space be converted to laboratory space.

38. Glendening Hall 2009 14,575 NASF Function: Multi-use facility includes a conference center, and offices for residence life, academic services, human resources, financial aid, registrar, core curriculum, and the business office.

Condition: Good (FCI = 0.0%) Deferred Cost: $0

Future: No future work is currently planned. 39. Muldoon River Center 2009 4,984 NASF

Function: Multi-use facility includes offices for waterfront and biology, a multi-purpose room with an adjacent catering kitchen, classroom, biology lab, seminar room, and a boat repair facility.

Condition: Good (FCI = 0.0%) Deferred Cost: $0

2 - 26

Page 30: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

Future: Replacement of existing door systems will be completed in 2018. 40. Rowing Center 2008 2,628 NASF

Function: Storage facility to house crew shells, kayaks, student water related clubs, and other recreational gear.

Condition: Good (FCI = 0.0%) Deferred Cost: $0

Future: No future work is currently planned.

41. Artist House 2,000 SF Function: Houses visiting artists with a separate studio adjacent to the residence.

Condition: Good (FCI = 0.2%) Deferred Cost: $663

Replacement of the roof and heating/cooling system should be considered in the near future.

Future: Replacement of the roof, windows, and HVAC system to be considered through the plant budget in next 3-5 years.

42. Cawood House

Function: Undetermined at this time – to be evaluated during master planning.

Condition: Poor (FCI = 30.5%) Deferred Cost: $100K

Future: Disposition to be determined. 43. Joint Storage Facility 2011 7,200 SF

Function: Joint storage facility SMCM physical plant and HSMC. The building is owned by SMCM and it resides on HSMC property. Each organization occupies 3,600 square feet in support of their maintenance operations.

Condition: Good (FCI = 0.0%) Deferred Cost: $0

Future: No future work is currently planned.

2 - 27

Page 31: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

Infrastructure 1. Campus Sanitary Sewer System: The system is in good condition. A rehabilitation project

which included relining the piping was completed in 2006. The system is operated and maintained under an agreement with the Maryland Environmental Service.

2. Campus Potable Water Distribution and Treatment System: The system is in good

condition. The water tower replacement was completed in 2005. The system is operated by the Maryland Environmental Service who is planning to expand the system in order to eliminate dead ends in the pipe runs. Rerouting and enlargement of a section of water main have been completed under the Anne Arundel Hall project.

3. Campus Electrical Distribution System: Ownership and responsibility to maintain the primary system transferred to SMECO in 2012. SMECO invested $760K to upgrade the system.

4. Campus Early Warning System: Recommendation to integrate Blackboard for emergency

communications was implemented in 2014.

5. Roadways: The state-funded infrastructure improvements project will fund a first and second phase of roadway repairs in FY19 & FY21. The Dorchester Circle storm water drainage in FY22 will also be funded through the state-funded infrastructure improvements project. The circle in front of DPC was repaired in 2013. A review is recommended of signage requirements on campus to determine adequacy and consistency.

6. Sidewalks: Installation of sidewalks along MD Rt. 5 was completed in 2015 from new

Anne Arundel to St. John’s pond. The second phase of MD Rt. 5 sidewalks will be completed in 2018 and will extend the side walk from St. John’s pond to North Field. Various sections of concrete and asphalt walkways on campus are in need of repair. It is recommended that damaged sections be replaced with brick.

2 - 28

Page 32: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

Facility List

Facility Number Facility Name Gross SF Year Built

Facilit ies, St. M ary 's College

5/2/2017

Category

Site: St. Marys College of Maryland

01 4,712 1906 General Support

02 451 1907 General Support

03 1,931 1909 General Support

04 28,488 1924 M ix ed Use

05 1,351 1928 A dministrative

06 4,324 1936 A dministrative

07 21,900 1940 A cademic

08 4,567 1948 A cademic

09 4,510 1950 A cademic

10 39,000 2016 A cademic

11 33,681 1965 Housing

12 48,070 1966 Aux iliary

13 60,641 1968 A cademic

14 33,681 1968 Housing

15 12,379 1968 General Support

16 103,900 1968 A thletic

16b 375 1970 A thletic

17 3,525 1968 General Support

18 33,681 1970 Housing

19 33,681 1970 Housing

20

St. M ary 's Hall

St. M ary 's Hall A nnex

M ay Russell Lodge

Calvert Hall

Lucille Clifton House

A dmissions

Kent Hall

Cobb House

M argaret Brent Hall

A nne A rundel Hall

Queen A nne Hall

Campus Center

Library

Dorchester Hall

M aintenance

M ichael P. O'Brien A RC

Field House

Ethel Chance

Caroline Hall

Prince George Hall

M ontgomery Hall 67,157 1979 A cademic

of 31Page©1996-2017 Diversified Intelligence, LLC Report 8/1

2 - 29

II.D.

Page 33: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

Facility List

Facility Number Facility Name Gross SF Year Built

Facilit ies, St. M ary 's College

5/2/2017

Category

Site: St. Marys College of Maryland

21 Greenhouse 320 1986 General Support

22 E.D. Harrington 7,713 1987 Housing

23 G. Boone 6,636 1987 Housing

24 H.L. Dodge 9,092 1987 Housing

25 M .W . Dodge 9,092 1987 Housing

26 A .B. M orsell 6,698 1987 Housing

27 B. Trueschler 6,636 1987 Housing

28 Daugherty -Palmer Commons 4,998 1987 General Support

29 A dmissions A nnex 868 1992 A dministrative

30 Schaefer Hall 58,176 1993 A cademic

31 Townhouse Crescent 44,880 1994 Housing

32 Lewis Quad - W est 14,481 2001 Housing

33 Lewis Quad - North 12,546 2001 Housing

34 Lewis Quad - East 14,481 2001 Housing

35 Lewis Quad - Commons 5,239 2001 Housing

36A W aring A - Commons 2,236 2003 Housing

36B W aring B - Units 1-8 9,430 2003 Housing

36C W aring C - Units 13-20 10,700 2003 Housing

36D W aring D - Units 21-25 9,660 2003 Housing

36E W aring E - Units 9-12 4,800 2003 Housing

36F W aring F - Units 26-33 10,650 2003 Housing

of 32Page©1996-2017 Diversified Intelligence, LLC Report 8/1

II.D.

2 - 30

Page 34: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

Facility List

Facility Number Facility Name Gross SF Year Built

Facilit ies, St. M ary 's College

5/2/2017

Category

Site: St. Marys College of Maryland

36G W aring G - Units 34-37 5,380 2003 Housing

36H W aring H - Units 38-49 16,880 2003 Housing

37A W aring I - Units 50-57 11,080 2007 Housing

37B W aring J - Units 58-63 8,120 2007 Housing

38 Goodpaster Hall 57,289 2007 A cademic

39 M uldoon River Center 11,181 2008 M ix ed Use

40 Rowing Center 2,925 2007 A thletic

41 Glendening Hall 26,754 2008 A dministrative

42 A rtist House 2,000 1960 Housing

43 Cawood 1,800 1950 Un-Occupied

44 Joint Storage Building 4,250 2011 General Support

INFRA infrastructure 0 0 Other

938,996Total

of 33Page©1996-2017 Diversified Intelligence, LLC Report 8/1

II.D.

2 - 31

Page 35: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

0-25 years old 23

100+ years old 4

76-100 years old 4

50-75 years old 6

26-50 years old 17

23 0-25 years old

17 26-50 years old

6 50-75 years old

4 76-100 years old

4 100+ years old

Facilities Grouped By Age

II.D.

2 - 32

Page 36: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

Summary Data Sorted by FCI Value for all Facilities

Current through 2017

II.B.

Facility Replacement Value (RV)

Deferred Components

(DC)

Selected Projects

(SP)

Deferred Value

Facilities Condition

Index (FCI)

43-Cawood $327,595 $0 $100,000 $100,000 30.50%

21-Greenhouse $48,582 $0 $5,000 $5,000 10.30%

04-Calvert Hall $15,607,068 $283,808 $1,224,000 $1,507,808 9.70%

08-Cobb House $1,592,981 $32,924 $113,000 $145,924 9.20%

01-St.Mary's Hall $2,125,911 $125,684 $55,000 $180,684 8.50%

35-LewisQuad-Commons $1,688,493 $2,159 $140,000 $142,159 8.40%

16-Michael P. O'Brien ARC $34,662,131 $473,168 $1,753,116 $2,226,284 6.40%

31-TownhouseCrescent $14,464,510 $404,359 $490,000 $894,359 6.20%

13-Library $35,174,563 $636,723 $1,394,190 $2,030,913 5.80%

20-Montgomery Hall $50,923,179 $1,812,039 $614,121 $2,426,160 4.80%

06-Admissions $1,639,602 $67,721 $0 $67,721 4.10%

30-SchaeferHall $48,526,242 $847,863 $1,071,115 $1,918,978 4.00%

05-Lucille Clifton House $278,662 $10,423 $0 $10,423 3.70%

17-Ethel Chance $1,375,088 6,158 $44,000 $50,158 3.60%

26-A.B.Morsell $2,539,790 $26,547 $60,000 $86,547 3.40%

27-B.Trueschler $2,138,736 $2,406 $60,000 $62,406 2.90%

25-M.W.Dodge $2,930,288 $19,635 $60,000 $79,635 2.70%

29-AdmissionsAnnex $279,750 $7,411 $0 $7,411 2.60%

36A-WaringA-Commons $984,193 $5,177 $20,000 $25,177 2.60%

15-Maintenance $3,191,986 $70,511 $0 $70,511 2.20%

24-H.L.Dodge $3,447,562 $17,246 $60,000 $77,246 2.20% 33-LewisQuad-North $4,043,488 $22,790 $65,000 $87,790 2.20%

11-Queen Anne Hall $17,366,183 $339,006 $30,000 $369,006 2.10%

19-Prince George Hall $17,366,183 326839 $25,000 $351,839 2.00%

32-LewisQuad-West $5,490,997 $26,040 $65,000 $91,040 1.70%

34-LewisQuad-East $5,490,997 $26,040 $65,000 $91,040 1.70%

03-May Russell Lodge $572,536 $9,095 $0 $9,095 1.60%

18-Caroline Hall $20,432,821 278208 $25,000 $303,208 1.50%

28-Daugherty-PalmerCommons

$2,652,936 $6,239 $20,000 $26,239 1.00%

07-Kent Hall $11,856,734 $62,805 $4,000 $66,805 0.60%

09-Margaret Brent Hall $1,860,496 $0 $11,000 $11,000 0.60%

2 - 33

Page 37: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

Summary Data Sorted by FCI Value for all Facilities

Current through 2017

II.B.

12-Campus Center $29,755,056 $18,501 $132,000 $150,501 0.50%

14-Dorchester Hall $20,432,821 $57,031 $30,000 $87,031 0.40%

22-E.D.Harrington $2,924,664 $5,175 $0 $5,175 0.20%

23-G.Boone $2,138,736 $5,166 $0 $5,166 0.20%

36E-WaringE-Units9-12 $2,112,758 $4,314 $0 $4,314 0.20%

42-ArtistHouse $311,995 $663 $0 $663 0.20%

36C-WaringC-Units13-20 $4,709,690 $6,004 $0 $6,004 0.10%

36D-WaringD-Units21-25 $4,251,925 $5,585 $0 $5,585 0.10%

36B-WaringB-Units1-8 $4,150,689 $3,629 $0 $3,629 0.10%

36H-WaringH-Units38-49 $7,429,865 $8,000 $0 $8,000 0.10%

39-MuldoonRiverCenter $6,149,192 $4,449 $0 $4,449 0.10% 36F-WaringF-Units26-33 $4,687,682 $3,909 $0 $3,909 0.10%

36G-WaringG-Units34-37 $2,368,050 $1,957 $0 $1,957 0.10%

02-St.Mary's Hall Annex $116,293 $23 $0 $23 0.00%

10-Anne Arundel Hall $14,195,778 $0 $0 $0 0.00%

16b-Field House $54,736 $0 $0 $0 0.00%

38-GoodpasterHall $46,711,600 $2,864 $0 $2,864 0.00%

41-GlendeningHall $19,116,538 $1,338 $0 $1,338 0.00%

37A-WaringI-Units50-57 $4,146,029 $554 $0 $554 0.00%

37B-WaringJ-Units58-63 $3,038,425 $406 $0 $406 0.00%

40-RowingCenter $647,459 $0 $0 $0 0.00%

44-JointStorageBuilding $360,528 $0 $0 $0 0.00%

INFRA-infrastructure $0 $0 $0 $0 0.00%

SITE_WIDE-St.MarysCollegeofMaryland

$0 $0 $1,696,433 $1,696,433 0.00%

490,563,197 6,078,592 $9,331,975 $15,410,567

2 - 34

Page 38: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

2 - 35

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

Facilities Condition Index (FCI)

FCI

Page 39: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

2 - 36

$0

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

$3,000,000

Current Deferred ValueTop 10 Facilities

Page 40: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Condition of the Physical PlantAll Buildings

Interiors < 10 years

Exteriors in good condition

HVAC in Good Condition

Condition of the Physical Plant

All Buildings

II.D.

2 - 37

Page 41: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.D.

2 - 38

Page 42: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

Deferred Maintenance Funding

College Funds + State Funds

II.D.

2 - 39

Page 43: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E. ST. MARY’S COLLEGE OF MARYLAND

BOARD OF TRUSTEES COMMITTEE ON BUILDINGS AND GROUNDS

MEETING OF MAY 12, 2017 ACTION ITEM II.E.

JAMIE L. ROBERTS STADIUM

SCHEMATIC DESIGN APPROVAL

RECOMMENDED ACTION: The Committee on Buildings and Grounds recommends approval of the schematic design for the Jamie L. Roberts Stadium site plan. RATIONALE: The project is to be constructed in two phases. The first phase is installation of an artificial turf field and track, and the second phase the construction of the stadium building, grass field, parking and other site improvements. In order to maintain the proposed schedule, the site plan and schematic design for both phases are being developed simultaneously. An archaeology study has discovered 18th and 19th century sites within the project area, including two probable slave dwellings. After consultation with Historic St. Mary’s City, the Maryland Historic Trust, as well as internal and external stakeholders, the fields and stadium have been relocated on the site to avoid and preserve archaeological features to the greatest extent practical. Additional consultation is underway to develop concepts to commemorate the history of the site. The schematic design is consistent with the approved facilities program and takes into consideration the functional requirements of a National Collegiate Athletic Association Division III athletics program. The cost estimate is within the approved budget of $8.6M. The schematic design also includes potential additional scope beyond the approved program and budget that may be achievable due to the College’s successful fund raising efforts that exceeded the $2.5M commitment required by the State of Maryland. The College will prioritize and consider these additional features as the design moves forward.

2 - 40

Page 44: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 41

Page 45: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 42

Page 46: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 43

Page 47: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 44

Page 48: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 45

Page 49: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 46

Page 50: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 47

Page 51: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 48

Page 52: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 49

Page 53: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 50

Page 54: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 51

Page 55: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.E.

2 - 52

Page 56: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.F. ST. MARY’S COLLEGE OF MARYLAND

BOARD OF TRUSTEES COMMITTEE ON BUILDINGS AND GROUNDS

MEETING OF MAY 12, 2017 ACTION ITEM II.F.

MD RT. 5 TRAFFIC CALMING PHASE II DESIGN APPROVAL

RECOMMENDED ACTION: The Committee on Buildings and Grounds recommends approval of the design of the Maryland Route 5 Traffic Calming Phase II project. The project includes a bicycle and pedestrian trail from St. John’s Pond to the North Field. RATIONALE: The project is intended to improve safety by providing a dedicated path along MD Rt. 5 from St. John’s Pond to North Fields. The project consists of a paved bicycle and pedestrian pathway from St. John’s Pond on the south, running parallel to MD Rt. 5 to a point just north of College Drive where the path traverses Fisher’s Creek as a boardwalk. North of Fisher’s Creek, the paved path resumes, terminating at the driveway into the North Field. The College obtained a Transportation Alternatives Program grant (TAP) from the Federal Highway Administration. The College’s match to the TAP grant is contained in the state’s FY18 Capital Budget. These sources fund the estimated $2.17M budget for the project. The project was presented to the public at the College’s Capital Design Advisory Committee (CDA) meeting on March 30, 2016 where concerns were expressed regarding the height of the boardwalk as it crossed Fisher’s Creek. A revised design, which lowers the boardwalk, was presented to the CDA on April 27, 2017. There were no concerns expressed from the public during this meeting. The project is subject to regulatory oversight and permitting by multiple state and federal agencies, and continues through that process.

2 - 53

Page 57: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.F.

2 - 54

Page 58: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.F.

2 - 55

Page 59: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.F.

2 - 56

Page 60: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.F.

2 - 57

Page 61: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.F.

2 - 58

Page 62: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.F.

2 - 59

Page 63: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

II.G.

BOARD OF TRUSTEES ST. MARY’S COLLEGE OF MARYLAND

BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017

ACTION ITEM II.G.

RENAMING OF THE LIBRARY TO THE HILDA C. LANDERS LIBRARY

RECOMMENDED ACTION The Building and Grounds Committee recommends approval by the Board of Trustees, St. Mary’s College of Maryland, to rename The Library to the Hilda C. Landers Library because of Mrs. Landers’ enduring commitment to St. Mary’s College before and after her death in 1998. The naming recommendation is coming to the Buildings and Grounds Committee after approval by the Institutional Advancement Committee, per the process outlined in the Board of Trustees Naming Opportunities Policy—Gifts or Honorarium. If approved by the Buildings and Grounds Committee, the recommendation for the Hilda C. Landers Library will be forwarded by the Institutional Advancement Committee to the full Board of Trustees for its consideration. RATIONALE Hilda C. Landers was a 1923 graduate of the seminary. Her husband, Arthur (d.1984), graduated from St. John’s College in Annapolis. Mrs. Landers began giving to her alma mater out of love for the College cultivated by former President Ted Lewis and a shared passion for poetry. She and her husband created two trusts---the Hilda C. Landers Trust, and the Arthur E. Landers Jr. and Hilda C. Landers Trust—of which St. Mary’s College is one of the beneficiaries. These trusts continue to benefit the College today. Support to date from Hilda and Arthur Landers, during their lifetime and through their trusts, is estimated at $6.4 million. This support includes the establishment of an endowed chair in the liberal arts, an endowed scholarship fund for merit and financial need, a special fund to assist students from the Baltimore area with financial need, support for Baltimore students participating in the DeSousa-Brent program, and a donation to the recently completed $2.5 Building Challenge. Almost 2,000 students have received merit and financial through these gifts. A plaque currently in The Library in honor of Hilda Combs Landers, Class of 1923, best captures the impact of her philanthropy: “Her generosity of spirit and kindness of heart will ensure that students for generations to come who use this library will be given the gift of knowledge at St. Mary’s College of Maryland.”

2 - 60

Page 64: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.A. ST. MARY’S COLLEGE OF MARYLAND

BOARD OF TRUSTEES COMMITTEE ON BUILDINGS AND GROUNDS

MEETING OF MAY 12, 2017 DISCUSSION ITEM III.A.

TRINITY CHURCH ROAD DESIGN APPROVAL

OVERVIEW: The College has evaluated multiple scenarios for constructing a pedestrian path along Trinity Church Road. The alignment of the path adjacent to the western edge of the road (River Center side) is the only viable option. This alignment will require the removal of the mature Willow Oak Tree across the road from the Lucille Clifton House. RATIONALE: The proposed new walkway will provide a safe pedestrian path along Trinity Church Road north of Kent Hall. Students, who cross MD Rt. 5 near the River Center heading to Kent or Calvert Halls, have nowhere to walk but in the road. The project consists of a brick sidewalk which will begin at the existing brick paved landing area on the northwest side of the intersection of MD Rt. 5 and Trinity Church Road. The path will continue along the west side of Trinity Church Road, past the River Center and terminating at Kent Hall. The project requires the removal of a large willow oak in order to construct the sidewalk just west of the existing roadway. Among other alternatives studied include a pathway along the eastern edge of the Trinity Church Road, placing the path in the roadbed and turning much of Trinity Church Road into one-way traffic, and realigning the road to the east. The alternatives were discussed in a variety of community settings including the Trinity Church Vestry, with staff of Historic St. Mary’s City, and the Capital Design Advisory Committee meeting on April 27, 2017. In each of these meetings, the overall consensus was that pedestrian safety outweighs preservation of the Willow Oak Tree.

3 - 1

Page 65: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.A.

3 - 2

Page 66: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.A.

3 - 3

Page 67: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.A.

3 - 4

Page 68: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.A.

3 - 5

Page 69: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.A.

3 - 6

Page 70: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.A.

3 - 7

Page 71: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.A.

3 - 8

Page 72: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.B.

ST. MARY’S COLLEGE OF MARYLAND BOARD OF TRUSTEES

COMMITTEE ON BUILDINGS AND GROUNDS MEETING OF MAY 12, 2017

DISCUSSION ITEM III.B.

NEW CAMPUS ENTRANCE SIGN UPDATE

OVERVIEW The Project will provide a new announcement sign at St. Mary’s College of Maryland. The sign will be located on the south side of College Drive, in the grassy area near the bottom of the hill west of the Admissions Building, at the intersection with MD Rt. 5. The sign will be constructed of a brick base with an engraved slate slab on both sides containing the St. Mary’s College logotype. The sign will be illuminated. The project is being designed consistent with illustrations shown at the January 29, 2016 meeting of this committee, as may be further refined. Solicitation of bids for construction is anticipated in June with construction completed late summer ’17.

3 - 9

Page 73: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.B.

3 - 10

Page 74: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

III.B.

3 - 11

Page 75: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IV.A. ST. MARY’S COLLEGE OF MARYLAND

BOARD OF TRUSTEES COMMITTEE ON BUILDINGS AND GROUNDS

MEETING OF MAY 12, 2017 INFORMATION ITEM IV.A.

COBB HOUSE STATUS UPDATE

BACKGROUND: Cobb House is currently under renovation to become the new Alumni Center this June. The plans include a new dining and reception room, an Americans with Disabilities Act (ADA) restroom, refreshed flooring and new paint, a new roof and improved heating, ventilation, and air conditioning (HVAC). A large front deck and new entry vestibule are also being added to the front of Cobb House which incorporates ADA access to the building. The Cobb House will be home to the alumni affairs offices and programs. The main floor will provide hospitality space for the campus for a variety of events, dinners, and programs.

4 - 1

Page 76: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IV.A.

4 - 2

Page 77: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IV.A.

4 - 3

Page 78: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IV.A.

4 - 4

Page 79: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IV.B.

ST. MARY’S COLLEGE OF MARYLAND BOARD OF TRUSTEES

COMMITTEE ON BUILDINGS AND GROUNDS MEETING OF MAY 12, 2017 INFORMATION ITEM IV.B.

CAPITAL PROJECTS STATUS REPORT

The current status of each on-going Capital Project is provided below. A copy of the Capital Projects Status Report is attached. Anne Arundel Hall Replacement: Construction and commissioning is complete. Final closeout expected early June.

Maryland Heritage Interpretive Center (HSMC): Design is complete. This project remains in the Governor’s 5-year Capital Improvements Plan and is slated for construction to begin in FY20.

Route 5 Traffic Calming Phase II (bike path): The permit process continues with various regulatory agencies. Adjustments to the design are being made in response to both permit agencies and public feedback.

Chancellor’s Point ADA Parking and Viewing Deck: The project was awarded on September 30th. Construction is complete.

New Academic Building and Auditorium: Architect selection for the New Academic Building and Auditorium has begun with the short listed firm interviews.

Jamie L. Roberts Stadium and Relocation of Athletic Fields: Schematic Design is complete. Phase II archaeology is nearing completion for submission to Maryland Historical Trust (MHT). Community engagement is underway.

Cobb House Renovation: Construction is in progress and renovations will be complete by end of May 2017.

4- 5

Page 80: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IV.B. ST. MARY’S COLLEGE OF MARYLAND MAY 2017 CAPITAL PROJECTS STATUS REPORT – MILESTONES Note: Bold type indicates completed action

PROJECT

FUNDING SOURCE/

FIRST YEAR (FY)

DESIGN START/

COMPLETE

CONSTRUCTION START/

COMPLETE COMMENTS

Anne Arundel Hall STATE 2006/2009

Winter ’09 Spring ’12

Summer ’13 Spring ’17

The building is complete. Project closeout underway.

Maryland Heritage Interpretive Center (HSMC)

STATE/CITY 2007/2009

Winter ’09 Spring ’12

Summer ’20 Winter ’22

Architectural design is 100% complete. This project is now in the Governor’s 5-year Capital Improvement Plan for construction in summer FY20.

MD Rt. 5 Traffic Calming Phase II, Fisher Creek Bridge

Federal/State 2014/2016

Spring’ 15 Winter ’17

Summer ’17 Fall’18

Permitting proceeding. Adjustments to the design are made in response to public feedback and permit agency comments. Expect bid late fall.

Chancellor’s Point ADA Access STATE 2013

Summer ’13 Summer ’15

Fall ’16 Winter’17 Construction is complete.

New Academic Building and Auditorium STATE 2017

Summer ’17 Summer ’19

Winter ’20 Winter ’22 Selection of the design team is in progress.

Jamie L. Roberts Stadium and Relocation of Athletic Fields

STATE 2017/2018

Winter ’17 Summer ’17

Summer ’17 Summer ’18

Schematic Design is complete. A report on Phase II archaeology is nearing completion.

Cobb House Renovation College Funds 2017

Winter ’16 Summer ’16

Winter ’17 Spring ’17

Construction is underway and renovations will be complete by end of May 2017.

4 - 6

Page 81: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IV.C.

MUSEUM UPDATE

FOR ST. MARY’S COLLEGE OF MARYLAND MEETING OF THE BOARD OF TRUSTEES

MAY 12, 2017 INFORMATION ITEM IV.C.

• HSMC, together with its partners Triton Metals, Inc. and Bob Taylor Engineering, Inc.,

received an award from the Maryland Historical Trust in the category of “Project Excellence in Preservation Partnerships” for the Lead Coffin exhibit project. The award recognizes individuals, organizations, governments, agencies and/or institutions that have collaborated during a project’s planning, development and/or execution. The intent of this award is to acknowledge and honor the unique and mutually beneficial relationships that are often vital to a preservation project’s successful implementation.

• The museum’s Foundation will provide funds for the purchase of digital mapping equipment, including a new Total Station and data collector. This will enable staff archaeologists to capture information in the field digitally and transfer it directly to a GIS system. The new tools will greatly enhance the museum’s capability to manage archaeological data.

• The Foundation will purchase two custom, eight-seat people movers to help us serve visitors who have mobility problems and to give personalized guided tours for small groups.

• The Chancellor’s Point enhancement projects will be complete by June 30th. The road and parking lot have been repaired, and the ADA compliant parking and paths are installed. Picnic tables are on site awaiting placement at camping sites soon to be under construction. The College helped kick-off use of the enhanced site by holding its annual Bottom County Festival there on April 29th. We look forward to welcoming guests to the site by mid-summer for “primitive” camping.

• The museum hosted the memorial and Campus Garden dedication to Kate Chandler on May 4th. She proposed the Garden to HSMC and has worked closely with staff to manage and improve the garden, by installing a green house and a cistern as a water source. Professor Chandler was a member of the Chancellor’s Point Core Committee the created a plan for the site’s enhancement and use. The Garden and Chancellor’s Point have helped strengthen our partnership with the College and will benefit both institutions for many years to come.

• DGS has transferred project management authority to HSMC for: o Replacement of the Dove Pier, funded by a grant from the National Parks Service

for maritime heritage education and a state bond bill o Replacement of the Visitors Center exterior with the support of a state bond bill

4 - 7

Page 82: BUILDINGS AND GROUNDS COMMITTEE MEETING …...BUILDINGS AND GROUNDS COMMITTEE MEETING OF MAY 12, 2017 AGENDA I. CALL TO ORDER II. ACTION ITEMS A. Approval of Minutes (Meeting of January

IV.C.

The College’s Finance staff will provide support for the projects through procurement and funds management.

• The Maryland Dove trip continued her tour with a visit to Annapolis during legislative session. We are grateful to our host, the National Sailing Hall of Fame (NSHF), for allowing us to tie up at its pier. We welcomed school tours aboard and hosted legislators and members of the NSHF during an invitation only evening about the Dove.

• We are very grateful to Senator Steve Waugh who sponsored a Bond Bill for FY2018 to begin design of a new Dove. We will be working with Chesapeake Bay Maritime Museum on this project, as they have a fully equipped boatyard and highly qualified marine construction crew.

State House

4 - 8