AC- AC- DI DIU DPS IC- LA MC- MH RX VI- ACP ACS DVR HE K MON NVR RIO SBP SR VE WS XLP XCP XDP AN AP EL IR KP MD- PB- SI ST VBS X C-X CAM-XX-XXX X X X X X X C-X C-X J J1 J2 J3 J4 J5 A - AMPERES AC - ABOVE COUNTER AFF - ABOVE FINISHED FLOOR AWG - AMERICAN WIRE GAUGE C - CONDUIT CAT - CATALOG CB - CIRCUIT BREAKER CCTV - CLOSED CIRCUIT TELEVISION CKT - CIRCUIT CL - CENTER LINE CLG - CEILING COND - CONDUCTOR CU - COPPER DVR - DIGITAL VIDEO RECORDER DWG - DRAWING EC - EMPTY CONDUIT EM - EMERGENCY EX - EXISTING FA - FIRE ALARM FACP - FIRE ALARM CONTROL PANEL G - GROUND HC - HUNG CEILING HZ - HERTZ IDF - INTERMEDIATE DISTRIBUTION FRAME JB - JUNCTION BOX LV - LOW VOLTAGE MAX - MAXIMUM MDF - MAIN DISTRIBUTION FRAME MER - MECHANICAL EQUIPMENT ROOM MIN - MINIMUM MTD - MOUNTED MTG - MOUNTING MTS - MANUAL TRANSFER SWITCH N - NEUTRAL NC - NORMALLY CLOSED NIC - NOT IN CONTRACT NO - NORMALLY OPEN No. - NUMBER NTS - NOT TO SCALE PA - PUBLIC ADDRESS PNL - PANEL POE - POWER OVER ETHERNET PTZ - PAN/TILT/ZOOM RM - ROOM MTG - MOUNTING MTS - MANUAL TRANSFER SWITCH N - NEUTRAL NC - NORMALLY CLOSED NIC - NOT IN CONTRACT NO - NORMALLY OPEN No. - NUMBER NTS - NOT TO SCALE PA - PUBLIC ADDRESS PNL - PANEL POE - POWER OVER ETHERNET 1. DRAWINGS ARE NOT TO BE USED FOR ARCHITECTURAL OR ENGINEERING PURPOSES. THE SECURITY DRAWINGS SHOULD ONLY BE USED FOR SECURITY SYSTEMS INSTALLATION AND COORDINATION. 2. ALL MOUNTING SPECIFICS SHALL BE AS INDICATED IN THE LEGEND UNLESS OTHERWISE NOTED IN THE SECURITY DRAWINGS. MOUNTING CONDITIONS IDENTIFIED ON THE SECURITY DRAWINGS SHALL TAKE PRECEDENCE OVER THE LEGEND DESACIPTIONS. 3. VERIFY AND COORDINATE THE EXACT MOUNTING LOCATION OF ALL DEVICES PRIOR TO INSTALLATION. 4. THE MOUNTING HEIGHTS ARE TO THE CENTERLINE OF THE DEVICE UNLESS OTHERWISE NOTED. 5. THE SECURITY CONTRACTOR SHALL RESTORE CEILINGS AND WALLS AND ANY OTHER SURFACES AFFECTED BY HIS WORK WITH LIKE MATERIALS TO MATCH EXISTING CONSTRUCTION UPON COMPLETION OF HIS WORK. 6. FIRE STOPPING OF ALL PENETRATIONS SHALL BE PROVIDED BY THE SECURITY CONTRACTOR AS REQUIRED BY CODE. 7. ALL DEVICES, WIRING, TERMINATIONS, AND OTHER REQUIRED ROUGH-IN NOT DESIGNATED "BY OTHERS" ARE TO BE PROVIDED BY THE SECURITY CONTRACTOR. 8. COORDINATE ALL EXTERIOR CAMERA LOCATIONS WITH THE LANDSCAPE TO ENSURE THAT CAMERA VIEW ARE NOT OBSTRUCTED. 1. ALL CONDUIT AND BACKBOXES SHALL CONFORM TO BUILDING STANDARD ELECTRICAL SPECIFICATIONS. ALL CABLES SHALL BE PLENUM RATED WHERE REQUIRED. 2. ALL CONDUIT SHALL BE 3/4" UNLESS OTHERWISE NOTED. 3. ALL CONDUIT USED IN POTENTIALLY DAMP OR WET LOCATIONS, EXPOSED OUTDOORS, OR IN HAZARDOUS AREAS SHALL BE INTERMEDIATE STEEL CONDUIT (IMC). ALL EXTERIOR CONDUIT IN SLAB SHALL BE PVC. ALL CONDUIT OTHER THAN SPECIFIED TO BE IMC OR PVC SHALL BE ELECTRICAL METALLIC TUBING (EMT). 4. ALL CONDUIT SHALL BE ROUTED ABOVE CEILINGS, BELOW FLOORS, OR WITHIN WALLS. NO CONDUIT SHALL BE EXPOSED UNLESS APPROVED BY THE ARCHITECT. 5. PROVIDE PULL STRINGS IN ALL CONDUIT AND PULLBOXES AS REQUIRED. ALL CONDUITS SHALL HAVE PLASTIC BUSHINGS INSTALLED AT OPEN ENDS PRIOR TO PULLING WIRE. 6. ALL BACKBOXES SHALL BE FLUSH MOUNTED UNLESS OTHERWISE NOTED. 7. ALL BACKBOXES MOUNTED WITHIN FIRE RATED PARTITIONS SHALL MEET THE FIRE RATING OF THE PARTITION AS REQUIRED BY CODE. 8. COORDINATE THE EXACT LOCATION OF ALL PULL AND BACKBOXES WITH ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS. 9. ALL JUNCTION AND PULLBOXES SHALL BE PROVIDED WITH ACCOMPANYING BLANK COVER PLATE. 10. JUNCTION BOXES LOCATED ABOVE DOORS WITH NO ACCESSIBLE CEILING SHALL BE SECURED WITH TAMPER PROOF SCREWS. 11. PROVIDE WATERTIGHT SEALING ASSEMBLIES WITH PRESSURE BUSHING AS REQUIRED FOR EXTERIOR PENETRATIONS. 12. JUNCTION AND PULLBOXES IN EXTERIOR LOCATIONS SHALL BE WATERPROOF. 13. ALL CABLE RUNS IN CEILING AREAS WHERE CONDUIT OR CABLE TRAY IS NOT SPECIFIED SHALL BE SUPPORTED WITH SIMILAR SUPPORT OR WITH THE USE OF J-HOOKS AT 5' INTERVALS ABOVE CEILING TILES. 14. COORDINATE WITH DESIGN BUILD CONTRACTOR FOR SECURITY DEVICE AND CONTROL PANEL POWER REQUIREMENTS. 15. WIRE SHEATH SHALL BE MAINTAINED TO FINAL TERMINATION. ALL TERMINATIONS SHALL MAINTAIN TWIST OF INDIVIDUAL PAIRS TO WITHIN 0.5" OR LESS OF FINAL TERMINATION. ALL WIRES SHALL BE LABELED WITHIN 6.5" OF FINAL TERMINATION. ALL LABELS SHALL BE MACHINE PRINTED OR STENCILED. NO HAND LETTERED LABELS SHALL BE USED. 16. ANY CONDUIT ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO REPRESENT INSTALLED PATHS OR DISTANCES. ACTUAL ROUTING AND BOX LOCATIONS SHALL BE FIELD VERIFIED AND COORDINATED WITH OTHER DISCIPLINES BY THE INSTALLING CONTRACTOR. 1. SECURITY DEVICES AND WIRING SHALL BE PROVIDED BY OTHERS AND ARE SHOWN FOR COORDINATION ONLY. DESIGN BUILD TEAM SHALL CONTINUE TO SHOW FOR COORDINATION. CONDUIT, BOXES, PULL STRINGS, AND OTHER REQUIRED ROUGH-IN SHALL BE PROVIDED BY THE DESIGN BUILD CONTRACTOR. 2.SECURITY DEVICES AND WIRING PROVIDED BY OTHER ARE SHOWN FOR COORDINATION ONLY. DESIGN BUILD TEAM SHALL CONTINUE TO SHOW FOR COORDINATION. NOTES BELOW INDICATE WORK BY THE DESIGN BUILD CONTRACTOR. 3. PROVIDE 4" X 4" X 2-1/4" DEEP BOX WITH SINGLE GANG DEVICE RING JB FLUSH MOUNTED 48" A.F.F WITH 3 /4" CONDUIT STUBUP TO J1 BY DESIGN BUILD CONTRACTOR. 4. STUB 3/4" CONDUIT OR GREENFIELD DOWN DOOR FRAME ON THE HINGE SIDE OF THE DOOR BACK BOX EL TO JUNCTION BOX J1 LOCATED ABOVE ACCESSIBLE CEILING, BY DESIGN BUILD CONTRACTOR. 5. STUB 3/4" CONDUIT OR GREENFIELD DOWN DOOR FRAME ON THE STRIKE SIDE OF THE DOOR ES TO JUNCTION BOX J1 LOCATED ABOVE ACCESSIBLE CEILING, BY DESIGN BUILD CONTRACTOR. DEVICE DETAIL NUMBER DETAIL NUMBER DEVICE TYPE CAM = CCTV CAMERA DEVICE TYPE LEVEL DEVICE RISER POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR TO PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A EMERGENCY CIRCUIT DEDICATED TO SECURITY IN EACH RISER LOCATION WITHIN A 4" X 4" BOX SURFACE MOUNTED 18" A.F.F. WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS RISER POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR TO PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY IN EACH RISER LOCATION WITHIN A 4" X 4" BOX SURFACE MOUNTED 18" A.F.F. WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. SECURITY CONTROL/EQUIPMENT ROOM POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR TO PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A UNINTERRUPTIBLE POWER CIRCUIT DEDICATED TO SECURITY WITHIN A 4" X 4" BOX SURFACE MOUNTED BEHIND THE CONSOLE/RACK AT 18" AFF WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. MAGNOTOMETER/X-RAY SCANNER POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE AN UN-SWITCHED DUPLEX OUTLET CONNECTED TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE OUTLET SHALL BE FLUSH MOUNTED IN THE FLOOR. EXTERIOR CAMERA POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE CIRCUIT CONNECTION SHALL BE PROVIDED WITHIN A 4" X 4" BOX MOUNTED ABOVE ACCESSIBLE CEILING ON INTERIOR OF BUILDING WITH WIRE ENDS TERMINATED INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL CAMERAS BUT SHALL NOT EXCEED 2 CONNECTIONS TOTAL. EACH CAMERA'S ACTUAL LOAD SHALL BE 5A AT 120VAC. FOR EXTERIOR LOCATION PROVIDE POWER IN 4"X4"OUTDOOR RATED BOX POLE MOUNTED CAMERA POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY PROVIDED WITHIN A NEMA 4X ENCLOSURE MOUNTED AT THE BASE OF THE POLE WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL CAMERAS BUT SHALL NOT EXCEED 15 CONNECTIONS TOTAL. EACH CAMERA'S ACTUAL LOAD SHALL BE 1A AT 120VAC. ELECTRIC EXIT DEVICE POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A EMERGENCY CIRCUIT DEDICATED TO SECURITY AT DOORS UTILIZING ELECTRIC EXIT DEVICES PROVIDED WITHIN A 4" X 4" BOX MOUNTED ABOVE ACCESSIBLE CEILING ADJACENT TO THE DOOR OR AS SHOWN ON DRAWINGS WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL ELECTRIC EXIT DEVICES BUT SHALL NOT EXCEED 10 CONNECTIONS TOTAL. EACH DEVICE'S ACTUAL LOAD SHALL BE 1.5A AT 120VAC. X-RAY/METAL DETECTOR POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE AN UN-SWITCHED DUPLEX OUTLET TO A 120VAC 20A EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE OUTLET SHALL BE FLUSH MOUNTED IN FLOOR. ELEVATOR SECURITY EQUIPMENT POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTIONS TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY IN THE ELEVATOR MACHINE ROOM(S) AS INDICATED ON THE DRAWINGS. TYPICAL LOAD FOR EACH CIRCUIT SHALL BE 10A. PROVIDE CONNECTION IN A SURFACE MOUNTED BOX MOUNTED AT 8' A.F.F. WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS UPS POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 240VAC 65A EMERGENCY CIRCUIT DEDICATED TO SECURITY AS INDICATED ON THE DRAWINGS. THE CONNECTION SHALL BE PROVIDED WITHIN A 4" X 4" BOX SURFACE MOUNTED IN THE BACK OF THE SECURITY EQUIPMENT RACK, 18" A.F.F. AND SHALL HAVE WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. VEHICLE GATE POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A DEDICATED 120V AC HARD WIRED 20AMP CIRCUIT WITHIN THE GATE HOUSING. THE JUNCTION BOX SHALL BE OUTDOOR RATED. THE DESIGN BUILD CONTRACTOR SHALL PROVIDE SURGE PROTECTION FOR THE CIRCUIT EACH GATE SHOULD HAVE A DEDICATED CIRCUIT MULTIPLE GATES SHOULD NEVER SHARE CIRCUIT. SITE POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE AN UN-SWITCHED DUPLEX OUTLET TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE OUTLET SHALL BE WALL MOUNTED 12" AAF. ELECTRIC EXIT DEVICE POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A UN-SWITCHED CIRCUIT DEDICATED TO SECURITY AT DOORS UTILIZING ELECTRIC EXIT DEVICES PROVIDED WITHIN A 4" X 4" BOX MOUNTED ABOVE ACCESSIBLE CEILING ADJACENT TO THE DOOR OR AS SHOWN ON DRAWINGS WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL ELECTRIC EXIT DEVICES BUT SHALL NOT EXCEED 10 CONNECTIONS TOTAL. EACH DEVICE'S ACTUAL LOAD SHALL BE 1.5A AT 120VAC. SECURITY EMERGENCY CALL STATION POWER (EMERGENCY CIRCUIT) HARD WIRE TO 120VAC 20A CIRCUIT EMERGENCY CIRCUIT DEDICATED FOR EMERGENCY CALL STATIONS. MOUNTING HT OF CALL BOX TO BE 36" AFF TO BOTTOM OF UNIT. POWER TO BE BROUGHT DOWN IN COLUMN TO 4" X 4" BOX TO ALIGN WITH 3/4" KO ON BACK OF UNIT. 5 UNITS CAN BE POWERED FROM SAME CIRCUIT. ELEVATOR CAMERA POWER (NON-EMERGENCY CIRCUIT) ELEVATOR CONTRACTOR SHALL PROVIDE AN UN-SWITCHED DUPLEX OUTLET TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED FOR THE SECURITY CAMERA. THE OUTLET SHALL BE MOUNTED ABOVE THE CAB AND PROVIDE ADEQUATE SPACE FOR A PLUG IN TYPE TRANSFORMER. INTERIOR PTZ CAMERA POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE CIRCUIT CONNECTION SHALL BE PROVIDED WITHIN A 4" X 4" BOX MOUNTED ABOVE ACCESSIBLE CEILING ON INTERIOR OF BUILDING WITH WIRE ENDS TERMINATED INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL CAMERAS BUT SHALL NOT EXCEED 2 CONNECTIONS TOTAL. EACH CAMERA POWER SUPPLY ACTUAL LOAD SHALL NOT EXCEED 3A AT 120VAC. ACCESS CONTROL READER ACCESS CONTROL PANEL ACCESS CONTROL SERVER ANNUNCIATOR ALARM PANEL DOOR INTERLOCK DOOR INTERFACE UNIT DOOR POSITION SWITCH DIGITAL VIDEO RECORDER ELECTRIC LOCK HEAD END MONITORING LOCATION INTERCOM INFRARED BEAM ALARM KEYPAD FIRE RELAY (FOR LOCK RELEASE) LOCAL ALARM MAGNETIC CONTACT MOTION DETECTOR MAGNETIC HOLD OPEN VIDEO SURVEILLANCE NETWORK VIDEO RECORDER PUSH BUTTON REQUEST TO EXIT RELAY IN/OUT SECURITY BADGE PRINTER SECURITY RISER LOCATION SIREN/SOUNDER STROBE VIDEO INTERCOM VIDEO ENCODER VIBRATION SENSOR WORKSTATION LOCK POWER SUPPLY CAMERA POWER SUPPLY DEVICE POWER SUPPLY CCTV CAMERA - FIXED CCTV CAMERA - PTZ CCTV CAMERA - CEILING MOUNT CCTV CAMERA - WALL MOUNT CCTV CAMERA - CORNER MOUNT CCTV CAMERA - CORNER MOUNT PROVIDE 4" X 4" X 2-1/4" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED. PROVIDE 6" X 6" X 4" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED. PROVIDE 10" X 10" X 4" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED. PROVIDE 12" X 12" X 6" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED. PROVIDE 16" X 16" X 8" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED. PROVIDE 20" X 20" X 8" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED. 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 XX-XXX DEVICE TYPE AC-X DETAIL NUMBER LEVEL DEVICE NUMBER DRAWING LIST: ABBREVIATIONS: SECURITY ELECTRICAL NOTES: SYMBOLS: GENERAL NOTES: SECURITY CONDUIT AND WIRING NOTES: EQUIPMENT SYMBOL & TAG DEFINITIONS: SECURITY DEVICE NOTES: PTZ - PAN/TILT/ZOOM RM - ROOM STP - SHIELDED TWISTED PAIR XFRM - TRANSFORMER TEL - TELECOMMUNICATIONS TLR - TIME LAPSE RECORDER TS - TAMPER SWITCH TTB - TELECOM TERMINAL BOARD TTC - TELECOM TERMINAL CABINET TV - TELEVISION TYP - TYPICAL UON - UNLESS OTHERWISE NOTED UPS - UNINTERRUPTIBLE POWER SUPPLY UTP - UNSHIELDED TWISTED PAIR V - VOLTS VA - VOLT-AMPERES VM - VOLTMETER VP - VAPOR PROOF W - WATTS WP - WATERPROOF WT - WATERTIGHT MOSELEYARCHITECTS.COM PROJECT NO: DATE: 3200 NORFOLK STREET, RICHMOND, VA 23230 PHONE (804) 794-7555 FAX (804) 355-5690 A B C D E 1 2 4 5 3 6 7 8 9 10 F G H I J 3/31/2020 4:46:24 PM SECURITY LEGEND CITY OF VIRGINIA BEACH BUILDING 11 RENOVATION Project Address TY0.0.0 PWCN-18-0156 CIP-3-174 548507 MARCH 31, 2020 NUMBER NAME TY0.0.0 SECURITY LEGEND TY1.1.0 SECURITY OVERALL PLAN LOWER TY1.2.0 SECURITY OVERALL PLAN FIRST FLOOR TY1.3.0 SECURITY OVERALL PLAN SECOND FLOOR TY5.0.1 SECURITY DETAILS REVISIONS DATE DESCRIPTION

Upload: others

Post on 16-Oct-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BUILDING 11 RENOVATION

AC-

AC-

DI

DIU

DPS

IC-

LA

MC-

MH

RX

VI-

ACP

ACS

DVR

HE

K

MON

NVR

RIO

SBP

SR

VE

WS

XLP

XCP

XDP

AN

AP

EL

IR

KP

MD-

PB-

SI

ST

VBS

X

C-X

CAM-XX-XXX

X

X

X

X

X

X

C-X

C-X

J

J1

J2

J3

J4

J5

A - AMPERES AC - ABOVE COUNTER AFF - ABOVE FINISHED FLOOR AWG - AMERICAN WIRE GAUGE C - CONDUIT CAT - CATALOG CB - CIRCUIT BREAKER CCTV - CLOSED CIRCUIT TELEVISION CKT - CIRCUIT CL - CENTER LINE CLG - CEILING COND - CONDUCTOR CU - COPPER DVR - DIGITAL VIDEO RECORDER DWG - DRAWING EC - EMPTY CONDUIT EM - EMERGENCY EX - EXISTING FA - FIRE ALARM FACP - FIRE ALARM CONTROL PANEL G - GROUND HC - HUNG CEILING HZ - HERTZ IDF - INTERMEDIATE DISTRIBUTION FRAME JB - JUNCTION BOX LV - LOW VOLTAGE MAX - MAXIMUM MDF - MAIN DISTRIBUTION FRAME MER - MECHANICAL EQUIPMENT ROOM MIN - MINIMUM MTD - MOUNTED MTG - MOUNTING MTS - MANUAL TRANSFER SWITCH N - NEUTRAL NC - NORMALLY CLOSED NIC - NOT IN CONTRACT NO - NORMALLY OPEN No. - NUMBER NTS - NOT TO SCALE PA - PUBLIC ADDRESS PNL - PANEL POE - POWER OVER ETHERNET PTZ - PAN/TILT/ZOOM RM - ROOM MTG - MOUNTING MTS - MANUAL TRANSFER SWITCH N - NEUTRAL NC - NORMALLY CLOSED NIC - NOT IN CONTRACT NO - NORMALLY OPEN No. - NUMBER NTS - NOT TO SCALE PA - PUBLIC ADDRESS PNL - PANEL POE - POWER OVER ETHERNET

1. DRAWINGS ARE NOT TO BE USED FOR ARCHITECTURAL OR ENGINEERING PURPOSES. THE SECURITY DRAWINGS SHOULD ONLY BE USED FOR SECURITY SYSTEMS INSTALLATION AND COORDINATION.

2. ALL MOUNTING SPECIFICS SHALL BE AS INDICATED IN THE LEGEND UNLESS OTHERWISE NOTED IN THE SECURITY DRAWINGS. MOUNTING CONDITIONS IDENTIFIED ON THE SECURITY DRAWINGS SHALL TAKE PRECEDENCE OVER THE LEGEND DESACIPTIONS.

3. VERIFY AND COORDINATE THE EXACT MOUNTING LOCATION OF ALL DEVICES PRIOR TO INSTALLATION.

4. THE MOUNTING HEIGHTS ARE TO THE CENTERLINE OF THE DEVICE UNLESS OTHERWISE NOTED.

5. THE SECURITY CONTRACTOR SHALL RESTORE CEILINGS AND WALLS AND ANY OTHER SURFACES AFFECTED BY HIS WORK WITH LIKE MATERIALS TO MATCH EXISTING CONSTRUCTION UPON COMPLETION OF HIS WORK.

6. FIRE STOPPING OF ALL PENETRATIONS SHALL BE PROVIDED BY THE SECURITY CONTRACTOR AS REQUIRED BY CODE.

7. ALL DEVICES, WIRING, TERMINATIONS, AND OTHER REQUIRED ROUGH-IN NOT DESIGNATED "BY OTHERS" ARE TO BE PROVIDED BY THE SECURITY CONTRACTOR.

8. COORDINATE ALL EXTERIOR CAMERA LOCATIONS WITH THE LANDSCAPE TO ENSURE THAT CAMERA VIEW ARE NOT OBSTRUCTED.

1. ALL CONDUIT AND BACKBOXES SHALL CONFORM TO BUILDING STANDARD ELECTRICAL SPECIFICATIONS. ALL CABLES SHALL BE PLENUM RATED WHERE REQUIRED.

2. ALL CONDUIT SHALL BE 3/4" UNLESS OTHERWISE NOTED.

3. ALL CONDUIT USED IN POTENTIALLY DAMP OR WET LOCATIONS, EXPOSED OUTDOORS, OR IN HAZARDOUS AREAS SHALL BE INTERMEDIATE STEEL CONDUIT (IMC). ALL EXTERIOR CONDUIT IN SLAB SHALL BE PVC. ALL CONDUIT OTHER THAN SPECIFIED TO BE IMC OR PVC SHALL BE ELECTRICAL METALLIC TUBING (EMT).

4. ALL CONDUIT SHALL BE ROUTED ABOVE CEILINGS, BELOW FLOORS, OR WITHIN WALLS. NO CONDUIT SHALL BE EXPOSED UNLESS APPROVED BY THE ARCHITECT.

5. PROVIDE PULL STRINGS IN ALL CONDUIT AND PULLBOXES AS REQUIRED. ALL CONDUITS SHALL HAVE PLASTIC BUSHINGS INSTALLED AT OPEN ENDS PRIOR TO PULLING WIRE.

6. ALL BACKBOXES SHALL BE FLUSH MOUNTED UNLESS OTHERWISE NOTED.

7. ALL BACKBOXES MOUNTED WITHIN FIRE RATED PARTITIONS SHALL MEET THE FIRE RATING OF THE PARTITION AS REQUIRED BY CODE.

8. COORDINATE THE EXACT LOCATION OF ALL PULL AND BACKBOXES WITH ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS.

9. ALL JUNCTION AND PULLBOXES SHALL BE PROVIDED WITH ACCOMPANYING BLANK COVER PLATE.

10. JUNCTION BOXES LOCATED ABOVE DOORS WITH NO ACCESSIBLE CEILING SHALL BE SECURED WITH TAMPER PROOF SCREWS.

11. PROVIDE WATERTIGHT SEALING ASSEMBLIES WITH PRESSURE BUSHING AS REQUIRED FOR EXTERIOR PENETRATIONS.

12. JUNCTION AND PULLBOXES IN EXTERIOR LOCATIONS SHALL BE WATERPROOF.

13. ALL CABLE RUNS IN CEILING AREAS WHERE CONDUIT OR CABLE TRAY IS NOT SPECIFIED SHALL BE SUPPORTED WITH SIMILAR SUPPORT OR WITH THE USE OF J-HOOKS AT 5' INTERVALS ABOVE CEILING TILES.

14. COORDINATE WITH DESIGN BUILD CONTRACTOR FOR SECURITY DEVICE AND CONTROL PANEL POWER REQUIREMENTS.

15. WIRE SHEATH SHALL BE MAINTAINED TO FINAL TERMINATION. ALL TERMINATIONS SHALL MAINTAIN TWIST OF INDIVIDUAL PAIRS TO WITHIN 0.5" OR LESS OF FINAL TERMINATION. ALL WIRES SHALL BE LABELED WITHIN 6.5" OF FINAL TERMINATION. ALL LABELS SHALL BE

MACHINE PRINTED OR STENCILED. NO HAND LETTERED LABELS SHALL BE USED.

16. ANY CONDUIT ROUTING SHOWN IS SCHEMATIC AND IS NOT INTENDED TO REPRESENT INSTALLED PATHS OR DISTANCES. ACTUAL ROUTING AND BOX LOCATIONS SHALL BE FIELD VERIFIED AND COORDINATED WITH OTHER DISCIPLINES BY THE INSTALLING CONTRACTOR.

1.SECURITY DEVICES AND WIRING SHALL BE PROVIDED BY OTHERS AND ARE SHOWN FOR COORDINATION ONLY. DESIGN BUILD TEAM SHALL CONTINUE TO SHOW FOR COORDINATION. CONDUIT, BOXES, PULL STRINGS, AND OTHER REQUIRED ROUGH-IN SHALL BE PROVIDED BY THE DESIGN BUILD CONTRACTOR.

2.SECURITY DEVICES AND WIRING PROVIDED BY OTHER ARE SHOWN FOR COORDINATION ONLY. DESIGN BUILD TEAM SHALL CONTINUE TO SHOW FOR COORDINATION. NOTES BELOW INDICATE WORK BY THE DESIGN BUILD CONTRACTOR.

3.PROVIDE 4" X 4" X 2-1/4" DEEP BOX WITH SINGLE GANG DEVICE RING JB FLUSH MOUNTED 48" A.F.F WITH 3 /4" CONDUIT STUBUP TO J1 BY DESIGN BUILD CONTRACTOR.

4.STUB 3/4" CONDUIT OR GREENFIELD DOWN DOOR FRAME ON THE HINGE SIDE OF THE DOOR BACK BOX EL TO JUNCTION BOX J1 LOCATED ABOVE ACCESSIBLE CEILING, BY DESIGN BUILD CONTRACTOR.

5.STUB 3/4" CONDUIT OR GREENFIELD DOWN DOOR FRAME ON THE STRIKE SIDE OF THE DOOR ES TO JUNCTION BOX J1 LOCATED ABOVE ACCESSIBLE CEILING, BY DESIGN BUILD CONTRACTOR.

DEVICE

DETAIL NUMBER

DETAIL NUMBER

DEVICE TYPECAM = CCTV CAMERA

DEVICE TYPE

LEVEL

DEVICE

RISER POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR TO PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A EMERGENCY CIRCUIT DEDICATED TO SECURITY IN EACH RISER LOCATION WITHIN A 4" X 4" BOX SURFACE MOUNTED 18" A.F.F. WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS

RISER POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR TO PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY IN EACH RISER LOCATION WITHIN A 4" X 4" BOX SURFACE MOUNTED 18" A.F.F. WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS.

SECURITY CONTROL/EQUIPMENT ROOM POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR TO PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A UNINTERRUPTIBLE POWER CIRCUIT DEDICATED TO SECURITY WITHIN A 4" X 4" BOX SURFACE MOUNTED BEHIND THE CONSOLE/RACK AT 18" AFF WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS.

MAGNOTOMETER/X-RAY SCANNER POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE AN UN-SWITCHED DUPLEX OUTLET CONNECTED TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE OUTLET SHALL BE FLUSH MOUNTED IN THE FLOOR.

EXTERIOR CAMERA POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE CIRCUIT CONNECTION SHALL BE PROVIDED WITHIN A 4" X 4" BOX MOUNTED ABOVE ACCESSIBLE CEILING ON INTERIOR OF BUILDING WITH WIRE ENDS TERMINATED INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL CAMERAS BUT SHALL NOT EXCEED 2 CONNECTIONS TOTAL. EACH CAMERA'S ACTUAL LOAD SHALL BE 5A AT 120VAC. FOR EXTERIOR LOCATION PROVIDE POWER IN 4"X4"OUTDOOR RATED BOX

POLE MOUNTED CAMERA POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY PROVIDED WITHIN A NEMA 4X ENCLOSURE MOUNTED AT THE BASE OF THE POLE WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL CAMERAS BUT SHALL NOT EXCEED 15 CONNECTIONS TOTAL. EACH CAMERA'S ACTUAL LOAD SHALL BE 1A AT 120VAC.

ELECTRIC EXIT DEVICE POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A EMERGENCY CIRCUIT DEDICATED TO SECURITY AT DOORS UTILIZING ELECTRIC EXIT DEVICES PROVIDED WITHIN A 4" X 4" BOX MOUNTED ABOVE ACCESSIBLE CEILING ADJACENT TO THE DOOR OR AS SHOWN ON DRAWINGS WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL ELECTRIC EXIT DEVICES BUT SHALL NOT EXCEED 10 CONNECTIONS TOTAL. EACH DEVICE'S ACTUAL LOAD SHALL BE 1.5A AT 120VAC.

X-RAY/METAL DETECTOR POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE AN UN-SWITCHED DUPLEX OUTLET TO A 120VAC 20A EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE OUTLET SHALL BE FLUSH MOUNTED IN FLOOR.

ELEVATOR SECURITY EQUIPMENT POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTIONS TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY IN THE ELEVATOR MACHINE ROOM(S) AS INDICATED ON THE DRAWINGS. TYPICAL LOAD FOR EACH CIRCUIT SHALL BE 10A. PROVIDE CONNECTION IN A SURFACE MOUNTED BOX MOUNTED AT 8' A.F.F. WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS

UPS POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 240VAC 65A EMERGENCY CIRCUIT DEDICATED TO SECURITY AS INDICATED ON THE DRAWINGS. THE CONNECTION SHALL BE PROVIDED WITHIN A 4" X 4" BOX SURFACE MOUNTED IN THE BACK OF THE SECURITY EQUIPMENT RACK, 18" A.F.F. AND SHALL HAVE WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS.

VEHICLE GATE POWER (EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A DEDICATED 120V AC HARD WIRED 20AMP CIRCUIT WITHIN THE GATE HOUSING. THE JUNCTION BOX SHALL BE OUTDOOR RATED. THE DESIGN BUILD CONTRACTOR SHALL PROVIDE SURGE PROTECTION FOR THE CIRCUIT EACH GATE SHOULD HAVE A DEDICATED CIRCUIT MULTIPLE GATES SHOULD NEVER SHARE CIRCUIT.

SITE POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE AN UN-SWITCHED DUPLEX OUTLET TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE OUTLET SHALL BE WALL MOUNTED 12" AAF.

ELECTRIC EXIT DEVICE POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A UN-SWITCHED CIRCUIT DEDICATED TO SECURITY AT DOORS UTILIZING ELECTRIC EXIT DEVICES PROVIDED WITHIN A 4" X 4" BOX MOUNTED ABOVE ACCESSIBLE CEILING ADJACENT TO THE DOOR OR AS SHOWN ON DRAWINGS WITH WIRE ENDS TERMINATED AND INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL ELECTRIC EXIT DEVICES BUT SHALL NOT EXCEED 10 CONNECTIONS TOTAL. EACH DEVICE'S ACTUAL LOAD SHALL BE 1.5A AT 120VAC.

SECURITY EMERGENCY CALL STATION POWER (EMERGENCY CIRCUIT) HARD WIRE TO 120VAC 20A CIRCUIT EMERGENCY CIRCUIT DEDICATED FOR EMERGENCY CALL STATIONS. MOUNTING HT OF CALL BOX TO BE 36" AFF TO BOTTOM OF UNIT. POWER TO BE BROUGHT DOWN IN COLUMN TO 4" X 4" BOX TO ALIGN WITH 3/4" KO ON BACK OF UNIT. 5 UNITS CAN BE POWERED FROM SAME CIRCUIT.

ELEVATOR CAMERA POWER (NON-EMERGENCY CIRCUIT) ELEVATOR CONTRACTOR SHALL PROVIDE AN UN-SWITCHED DUPLEX OUTLET TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED FOR THE SECURITY CAMERA. THE OUTLET SHALL BE MOUNTED ABOVE THE CAB AND PROVIDE ADEQUATE SPACE FOR A PLUG IN TYPE TRANSFORMER.

INTERIOR PTZ CAMERA POWER (NON-EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTOR SHALL PROVIDE A HARD WIRED CONNECTION TO A 120VAC 20A NON-EMERGENCY CIRCUIT DEDICATED TO SECURITY. THE CIRCUIT CONNECTION SHALL BE PROVIDED WITHIN A 4" X 4" BOX MOUNTED ABOVE ACCESSIBLE CEILING ON INTERIOR OF BUILDING WITH WIRE ENDS TERMINATED INSULATED WITH WIRE NUTS. MULTIPLE CONNECTIONS CAN BE BRANCHED OFF THIS CIRCUIT FOR ADDITIONAL CAMERAS BUT SHALL NOT EXCEED 2 CONNECTIONS TOTAL. EACH CAMERA POWER SUPPLY ACTUAL LOAD SHALL NOT EXCEED 3A AT 120VAC.

ACCESS CONTROL READER

ACCESS CONTROL PANEL

ACCESS CONTROL SERVER

ANNUNCIATOR

ALARM PANEL

DOOR INTERLOCK

DOOR INTERFACE UNIT

DOOR POSITION SWITCH

DIGITAL VIDEO RECORDER

ELECTRIC LOCK

HEAD END MONITORING LOCATION

INTERCOM

INFRARED BEAM

ALARM KEYPAD

FIRE RELAY (FOR LOCK RELEASE)

LOCAL ALARM

MAGNETIC CONTACT

MOTION DETECTOR

MAGNETIC HOLD OPEN

VIDEO SURVEILLANCE

NETWORK VIDEO RECORDER

PUSH BUTTON

REQUEST TO EXIT

RELAY IN/OUT

SECURITY BADGE PRINTER

SECURITY RISER LOCATION

SIREN/SOUNDER

STROBE

VIDEO INTERCOM

VIDEO ENCODER

VIBRATION SENSOR

WORKSTATION

LOCK POWER SUPPLY

CAMERA POWER SUPPLY

DEVICE POWER SUPPLY

CCTV CAMERA - FIXED

CCTV CAMERA - PTZ

CCTV CAMERA - CEILING MOUNT

CCTV CAMERA - WALL MOUNT

CCTV CAMERA - CORNER MOUNT

CCTV CAMERA - CORNER MOUNT

PROVIDE 4" X 4" X 2-1/4" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED.

PROVIDE 6" X 6" X 4" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED.

PROVIDE 10" X 10" X 4" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED.

PROVIDE 12" X 12" X 6" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED.

PROVIDE 16" X 16" X 8" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED.

PROVIDE 20" X 20" X 8" DEEP BOX SURFACE MOUNTED ABOVE ACCESSIBLE CEILING UNLESS OTHERWISE NOTED.

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

XX-XXX

DEVICE TYPE

AC-X

DETAIL NUMBER

LEVEL DEVICE NUMBER

DRAWING LIST: ABBREVIATIONS: SECURITY ELECTRICAL NOTES: SYMBOLS: GENERAL NOTES:

SECURITY CONDUIT AND WIRING NOTES:

EQUIPMENT SYMBOL & TAG DEFINITIONS:

SECURITY DEVICE NOTES:

PTZ - PAN/TILT/ZOOM RM - ROOM STP - SHIELDED TWISTED PAIR XFRM - TRANSFORMER TEL - TELECOMMUNICATIONS TLR - TIME LAPSE RECORDER TS - TAMPER SWITCH TTB - TELECOM TERMINAL BOARDTTC - TELECOM TERMINAL CABINET TV - TELEVISION TYP - TYPICAL UON - UNLESS OTHERWISE NOTED UPS - UNINTERRUPTIBLE POWER SUPPLY UTP - UNSHIELDED TWISTED PAIR V - VOLTS VA - VOLT-AMPERES VM - VOLTMETER VP - VAPOR PROOF W - WATTS WP - WATERPROOF WT - WATERTIGHT

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:46:2

4 P

M

SECURITY LEGEND

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TY0.0.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

NUMBER NAME

TY0.0.0 SECURITY LEGEND

TY1.1.0 SECURITY OVERALL PLAN LOWER

TY1.2.0 SECURITY OVERALL PLAN FIRSTFLOOR

TY1.3.0 SECURITY OVERALL PLAN SECONDFLOOR

TY5.0.1 SECURITY DETAILS

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 2: BUILDING 11 RENOVATION

REF.

FEC

CR

C - 2

CR

CR

CR

CR

CR

C -

2

C - 2

CR

CR

CR

C -

2

360 C - 4

360 C - 4

360 C - 4

CR

CR CR

CR

360 C - 4

CR

CR

CR

DPS_EL_RX

DPS_EL_RXDPS_EL_RXDPS_EL_RX

DPS_EL_RX

DPS_EL_RX

DC

2 DPS_EL_RX

2 DPS_EL_RX

2 DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

Room

051

PRINT SHOP

007

Room

50

Room

51

STAFF TOILET

020

CIRCULATION

002

STAIR

006OPEN OFFICE

003

OPEN OFFICE

024

OPEN OFFICE

030

CONFERENCE ROOM

047

MECHANICAL ROOM

044

STAIR

001

PHONE BOOTH

038

BOOT WASH

043

CONFERENCE ROOM

048

WORKROOM

023

IT SERVER

045

1:1 CONFERENCE

029

STAFF TOILET

021

ELECTRICAL

046

HOUSEKEEPING

041

LACTATION

042

ASSET RECOVERY

005

PLUMBING ACCESS

252

ELEVATOR

049

ELEV EQUIP

022

TIER 1 CALL CENTER

011

NOC

015

ITAC

016

INFO SEC

017

CA SUPERVISOR

013

CONVERGENT ARCHITECTURE LAB

014

SYSTEMS ENGINEER I

004

PRINT ROOM - STAFF

008

ASSET RECOVERY - STAFF

009

SOLUTIONS ENGINEERSUPERVISOR

010

OPS MANAGER

012

INFO SEC MGR

018

DIVISION MANAGER

025

INSPECTION COORDINATOR II

026

CONSTRUCTION BUREAU MANAGER

027

STORAGE

028

SURVEY TECHNICIAN

031

CITY SURVEYOR

033

STORAGE

035

CREW ROOM

036

STORAGE

037

BREAK ROOM

019

1:1 CONFERENCE

032

PHONE BOOTH

039PHONE BOOTH

040

W - 1

0101

04

2 DPS_EL_RX

2 DPS_EL_RX

DPS_EL_RX

NOTE: SECURITY DEVICES AND WIRING SHALL BE PROVIDED BY OTHERS AND ARE SHOWN FOR COORDINATION ONLY. DESIGN BUILD TEAM SHALL CONTINUE TO SHOW FOR COORDINATION. CONDUIT, BOXES, PULL STRINGS, AND OTHER REQUIRED ROUGH-IN SHALL BE PROVIDED BY THE DESIGN BUILD CONTRACTOR.

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:46:2

7 P

M

SECURITY OVERALL

PLAN LOWER

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TY1.1.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

SECURITY OVERALL PLAN LOWER

REVISIONS

DATE DESCRIPTION

SECURITY KEYNOTE LEGEND

NUMBER DESCRIPTION

01 RISER POWER (EMERGENCY CIRCUIT) DESIGN BUILDCONTRACTOR TO PROVIDE A HARD WIREDCONNECTION TO A 120VAC 20A EMERGENCY CIRCUITDEDICATED TO SECURITY IN EACH RISER LOCATIONWITHIN A 4" X 4" BOX SURFACE MOUNTED 18" A.F.F.WITH WIRE ENDS TERMINATED AND INSULATED WITHWIRE NUTS.

04 SECURITY CONTROL/EQUIPMENT ROOM POWER(EMERGENCY CIRCUIT) DESIGN BUILD CONTRACTORTO PROVIDE A HARD WIRED CONNECTION TO A 120VAC20A UNINTERRUPTIBLE POWER CIRCUIT DEDICATED TOSECURITY WITHIN A 4" X 4" BOX SURFACE MOUNTEDBEHIND THE CONSOLE/RACK AT 18" AFF WITH WIREENDS TERMINATED AND INSULATED WITH WIRE NUTS.

mgibson
Text Box
4/15/20 ADD-01
Page 3: BUILDING 11 RENOVATION

REF.REF.

DN

DN

C - 17

C -

17

C -

17 C - 17

C - 17

C -

17

C - 2

CR

CR

CR

CR

CR

360 C - 4

360 C - 4

CR CR

CR

CR

CR

CR

CR

2 DPS_EL

DPS_EL_RXDPS_EL_RX

DPS_EL_RX

DPS_EL_RX

DC

DPS_EL_RX

STAIR

132

STAIR

113

OPEN OFFICE

121

CADD ROOM

140

OPEN OFFICE

101

ENGINEER IV

118

ELEVATOR

161

WOMEN

129

OPEN OFFICE

157

ENGINEER V

105

CONFERENCE ROOM

137

STAFF TOILET

135

Room

000

CORRIDOR

160

CONFERENCE ROOM

114

OPEN OFFICE

106

SHARED WORK AREA

112

STAIR

149

OPEN OFFICE

143

BREAKROOM

138CONFERENCE ROOM

139

OPEN OFFICE

153

STAFF TOILET

133

MEN

130

LACTATION

127

HOUSEKEEPING

128

PLUMBING ACCESS

259

PLUMBING ACCESS

134

PHONE BOOTH

136

SYSTEMS ANALYST III

144

SYSTEMS ANALYST III

145

GIS COORDINATOR

146

CADD SUPERVISOR

142

ENGINEERING TECHNICIAN III

141

1:1 CONFERENCE

147

STORAGE

131

QA/QC MANAGER

107

1:1 CONFERENCE

111

ENGINEER V

152

STORAGE

151

ENGINEER IV

155

ENGINEER IV

156

ENGINEER V

154

PROJECT MANAGER SUPERVISOR

124

PROJECT MANAGER SUPERVISOR

125

TECHNICAL SERVICES MANAGER

126

STORMWATER ENGINEERINGCENTER ADMINISTRATOR

120

ENGINEER V

119

ENGINEER IV

117

ENGINEER IV

116

OPEN OFFICE

110

1:1 CONFERENCE

122

ENGINEER IV

108

HUDDLE AREA

115

OPEN OFFICE

104

ADMINISTRATIVE SPECIALIST I

103

STORAGE

102

LOBBY

100 ENGINEER IV

158

ENGINEER IV

159

ELECTRICAL

109

IT ROOM

123

HUDDLE AREA

148ELECTRICAL

150

DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

NOTE: SECURITY DEVICES AND WIRING SHALL BE PROVIDED BY OTHERS AND ARE SHOWN FOR COORDINATION ONLY. DESIGN BUILD TEAM SHALL CONTINUE TO SHOW FOR COORDINATION. CONDUIT, BOXES, PULL STRINGS, AND OTHER REQUIRED ROUGH-IN SHALL BE PROVIDED BY THE DESIGN BUILD CONTRACTOR.

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:46:2

9 P

M

SECURITY OVERALL

PLAN FIRST FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TY1.2.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

SECURITY OVERALL PLAN FIRST FLOOR

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 4: BUILDING 11 RENOVATION

CR

CR

C - 1

C -

1C

-1

360 C - 4

CR

CR

CR

CR

OPEN OFFICE

205

OPEN OFFICE

220

OPEN OFFICE

213

OPEN OFFICE

209

SHARED WORK AREA

234

CORRIDOR

201

STAIR

254

ELEVATOR

235

STAIR

211

MEN

202

MECH

219

?

?

CONFERENCE ROOM

208

CITY ENGINEER

223

CONFERENCE ROOM

231

CONFERENCE ROOM

221

CONFERENCE ROOM

225

WOMEN

203

ACCESS

204

LACTATION ROOM

206

DPS_EL_RX

DPS_EL_RX

ENGINEER V

207

CONTRACT SUPERVISOR

210

ENGINEER IV

214

ENGINEER V

215

ADMIN ASST

217

FILES

216

1:1 CONFERENCE

222

ADMINISTRATIVE SERVICESMANAGER III

224

OPERATIONS SUPPORTADMINISTRATOR

226

DIRECTOR

227

EXECUTIVE ASSISTANT

228

MEDIA & COMMUNICATIONS

229

IT POSITION

230

FILE ROOM

212

ELECTRICAL

218

IT ROOM

232

STORAGE

233

DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

DPS_EL_RX

NOTE: SECURITY DEVICES AND WIRING SHALL BE PROVIDED BY OTHERS AND ARE SHOWN FOR COORDINATION ONLY. DESIGN BUILD TEAM SHALL CONTINUE TO SHOW FOR COORDINATION. CONDUIT, BOXES, PULL STRINGS, AND OTHER REQUIRED ROUGH-IN SHALL BE PROVIDED BY THE DESIGN BUILD CONTRACTOR.

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:46:3

0 P

M

SECURITY OVERALL

PLAN SECOND FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TY1.3.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

SECURITY OVERALL PLAN SECOND FLOOR

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 5: BUILDING 11 RENOVATION

C-1 VIDEO SURVEILLANCE - FIXED IP DOME - CEILING OR WALL MOUNTED - FLUSH MOUNTED - INTERIOR

1

6 37

2

4

5

5

7

3

4

2

1

6

C-17 VIDEO SURVEILLANCE - FIXED IP DOME - WALLPENDANT MOUNTED - EXTERIOR

7

3

6

3

10

9

8

C-2

8'-0" MIN.15'-0" MAX.

FINISHED GRADE

FINISHED CEILING

8'-0" MIN.15'-0" MAX.

FINISHED GRADE

FINISHED CEILING

FIELD CONDITION "A" FIELD CONDITION "B"

VIDEO SURVEILLANCE - FIXED IP DOME - WALL SURFACE MOUNTED - EXTERIOR

5

1

11

12

7

6

5

1

11

12

7

6

C-3VIDEO SURVEILLANCE - 360 DEGREE HEMISPHERIC DOME - CEILING FLUSH MOUNTED - INTERIOR

1

6 37

2

4

5

C-4VIDEO SURVEILLANCE - MULTI-SENSOR DOME - CEILING FLUSH MOUNTED - INTERIOR

1

6 37

2

4

5

CAMERA DETAIL NOTES

1 CAMERA BACK BOX

2 TOGGLE BOLTS (AS REQUIRED)

3 IP DATA JACK PROVIDED. 6"x6"x4" JUNCTION BOX.

4 CEILING SOFFIT

5 CAMERA

6 IP JUMPER CABLE.

7 3/4" CONDUIT TO NEAREST ACCESSIBLE CEILING OR CABLE TRAY.

8 PENETRATION IN WALL FILLED WITH APPROVED SEALANT

CCTV fIXED CAMERA IN ENVIRONMENTAL HOUSING MOUNTED

EXTERIOR WALL

9

10

NOTE: SECURITY DEVICES AND WIRING SHALL BE PROVIDED BY OTHERS AND ARE SHOWN FOR COORDINATION ONLY. DESIGN BUILD TEAM SHALL CONTINUE TO SHOW FOR COORDINATION. CONDUIT, BOXES, PULL STRINGS, AND OTHER REQUIRED ROUGH-IN SHALL BE PROVIDED BY THE DESIGN BUILD CONTRACTOR.

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:46:3

1 P

M

SECURITY DETAILS

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TY5.0.1

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 6: BUILDING 11 RENOVATION

REF.

FEC

D D

D

D

D

DD

D

3D

DD

D D

OD

OD

3D

3D

3D

OS

OD

OD

D

D

OD

3D

OD

3D

4D

DD

D

OD

DOD

D

3D

3D

OSOS OS

OD

OD

3

3

A

A

B

B

D

D

E

E

F

F

G

G

H

H

J

J

K

K

M

M

Q

Q

R

R

S

S

V

V

C

C

L

L

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10

10

11 11

12 12

13 13

14 14

15 15

17 17

16 16

18 18

19 19

T

T

U

U

5.1 5.1

PRINT SHOP

007

STAFF TOILET

020

CIRCULATION

002

STAIR

006OPEN OFFICE

003

OPEN OFFICE

024

OPEN OFFICE

030CONFERENCE

ROOM

047

MECHANICAL

ROOM

044

STAIR

001

BOOT WASH

043

CONFERENCE

ROOM

048

WORKROOM

023

1:1

CONFERENCE

029

STAFF TOILET

021

ELECTRICAL

046

HOUSEKEEPING

041

LACTATION

042

ASSET

RECOVERY

005

ELEVATOR

049

ELEV EQUIP

022

TIER 1 CALL

CENTER

011

NOC

015

ITAC

016

INFO SEC

017

CA

SUPERVISOR

013

CONVERGENT

ARCHITECTURE

LAB

014

CTO

SUPERVISOR

004

PRINT ROOM -

STAFF

008

ASSET

RECOVERY -

STAFF

009

SOLUTIONS

ENGINEER

SUPERVISOR

010

OPS MANAGER

012

INFO SEC MGR

018

DIVISION

MANAGER

025

INSPECTION

COORDINATOR

II

026

CONSTRUCTION

BUREAU

MANAGER

027

STORAGE

028

SURVEY

TECHNICIAN

031

STORAGE

035

CREW ROOM

036

STORAGE

037

A

A A

A A

A

AA

D1

D1D1

D1

B

A

A

A

E1 E1 E1

E1E1

E1

AA

AA

AAA

A A

A A A A

AAA

A A A

A A A A A

A

A

A

A

A

A

A A A A

AAAA

A

A

A

A

A

A

A

A

A

A

A

A A

A

A

A

A A

A

A

A

A A

A

A

A

A A

A

A

A

A A

A

A

A

A A

A

A

A

A

A

A

AAAA

A

AA

AA

A A

A A

A B

A A

B

B

BB

B

B

B

A

A A

A A

A

B B B

A

A A

A A

A

A

A

A

A

A

A

A A A

AAA

A A A A A

AAAAA

A A A A A

AAAAA

A A A A A

AAAAA

A A A

A A A

AAA

E1 E1

E1

E1

E1 E1

E1

E1

E1 E1

E1E1

A

A A

A A

A

A A

A A

A

A

A

A

A A

A

A

A

A A

A

A

A

A A

A

A

A

A A

A

A

A

A A

A

A

A

A

E2

E2

E1

E1 E1 E1

E1

E1

E2 E2

E2E2

S1

S1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

E1

+9'-0"AFF

+9'-0"AFF

+9'-0"AFF +9'-0"AFF

+9'-0"AFF+9'-0"AFF

MOUNT LIGHT

FIXTURES IN

ELEVATOR PIT.

X1

X1X2

X2

X2

X1

MOSELEYARCHITECTS.COM

PROJECT NO:

DATE:

3200 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

3230

PH

ON

E (

804)

794-7

555 F

AX

(804)

355-5

690

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

4/1

3/2

02

0 5

:51

:42

PM

BASEMENT

LIGHTING PLAN

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

-P

UB

LIC

WO

RK

S

VIR

GIN

IA B

EA

CH

, V

IRG

INIA

234

56

E2.1.1

PW

CN

-20

-00

84

CIP

-3-1

74

PROGRESS

PRINT NOT FOR

CONSTRUCTION

584507

MARCH 31, 2020

1/8" = 1'-0"

BASEMENT LIGHTING PLAN

REVISIONS

DATE DESCRIPTION

04-13-20 *AD 01

FOOTCANDLES

THE CONTRACTOR SHALL BE RESPONSIBLE FOR

FOOTCANDLE CALCULATIONS AND SELECTING THE

CORRECT LUMEN PACKAGE FOR THE LIGHT FIXTURES TO

MEET THE DESIRED LIGHTING LEVELS.

*AD 01

Page 7: BUILDING 11 RENOVATION

DRAWING LIST SYMBOLS: SYMBOLS:

ABBREVIATIONS:

AFF - ABOVE FINISHED FLOORAV - AUDIOVISUALC - CONDUITCAT-3 - TIA/EIA CATEGORY 3 RATEDCAT-5E - TIA/EIA CATEGORY 5e RATEDCAT-6 - TIA/EIA CATEGORY 6 RATEDCLG - CEILINGCOAX - COAXIAL CABLECP - CONSOLIDATION POINTF.O. - FIBER OPTICGND - GROUNDIC - INTERMEDIATE CROSS-CONNECTI.D. - INSIDE DIAMETERIDF - INTERMEDIATE DISTRIBUTION FRAMEJB - JUNCTION BOXLAN - LOCAL AREA NETWORKMC - MAIN CROSS-CONNECTMDF - MAIN DISTRIBUTION FRAMEMH - MANHOLEMM - MULTIMODEMTER - MAIN TELECOMMUNICATIONS EQUIPMENT ROOMNIC - NOT IN CONTRACTNTS - NOT TO SCALEO.D. - OUTSIDE DIAMETEROFE - OWNER FURNISHED EQUIPMENTOSP - OUTSIDE PLANTP.P. - PATCH PANELPR - PAIRPB - PULLBOXPBX - PRIVATE BRANCH EXCHANGERW - RACEWAYSM - SINGLE MODEST - STRANDSTP - SHIELDED TWISTED PAIRTEMP - TEMPORARYTGB - TELECOMMUNICATIONS GROUND BARTR - TELECOMMUNICATIONS ROOMTSER - TELECOMMUNICATIONS SERVICE ENTRANCE ROOMTYP - TYPICALU.O.N. - UNLESS OTHERWISE NOTEDUPS - UNINTERRUPTIBLE POWER SUPPLYUTP - UNSHIELDED TWISTED PAIRVOIP - VOICE OVER INTERNET PROTOCOLWAN - WIDE AREA NETWORKWAO - WORK AREA OUTLETWAP - WIRELESS ACCESS POINTW.M.O. - WIRE MANAGEMENTWP - WEATHERPROOFWS - WORKSTATIONWW - WIREWAY

PATH FOR ROUTING OF TELECOMMUNICATIONS CABLING IN THE CEILING

PATH FOR ROUTING OF TELECOMMUNICATIONS CABLING IN THE CEILING OF THE FLOOR BELOW

CONDUITS/CONDUIT SLEEVES - UP/DOWN

DRAWING NUMBER/DETAIL CALLOUT

GENERAL NOTES:

1. REFER TO DIVISION-26 SPECIFICATION FOR INSTALLATION (BY OTHERS) OF FLOOR BOXES, WALL BOXES, PULL BOXES, CONDUITS, RACEWAYS, MANHOLES, ETC.

2. REFER TO DIVISION-27 SPECIFICATIONS FOR INSTALLATION UNDER THIS SECTION OF TELECOM INFRASTRUCTURE ELEMENTS INCLUDING RACK, CABINETS, CABLE TRAY, BACKBOARDS, GROUNDING, BONDING AND STRUCTURE CABLING SYSTEMS (SCS).

3. INSTALL FIRESTOP TO ALL SLAB AND WALL PENETRATIONS PROVIDED FOR THE INSTALLATION OF TELECOMMUNICATIONS CABLE AS REQUIRED TO MAINTAIN FIRE RATING OF SLAB OR WALL. REVIEW ARCHITECT'S PLANS FOR PARTITION TYPES.

4. PROVIDE SMOKE/FIRE/ACOUSTIC PROOF POKE THROUGH DEVICE (EZ-PATH) AT ALL CABLE PENETRATIONS, THROUGH RATED FLOORS AND WALLS.

CABLING NOTES:

1. PROVIDE IDENTIFICATION LABELS FOR ALL TELECOMMUNICATIONS CABLES AT BOTH ENDS.

2. PROVIDE DESIGNATION LABELS FOR ALL TERMINATION BLOCKS, PATCH PANELS, AND WORKSTATION OUTLET FACEPLATES.

3. COORDINATE WALL BOX LOCATIONS AND DIMENSIONS WITH ARCHITECTURAL AND ELECTRICAL PLANS.

4. COORDINATE WITH ELECTRICAL DRAWINGS FOR LOCATION OF ALL TELECOMMUNICATIONS OUTLETS (WAO's). WAO'S MAY BE STUBBED INTO NEAREST ACCESSIBLE CEILING SPACE WITH J-HOOKS PROVIDED BETWEEN WAO CONDUIT STUB AND ABOVE CEILING CABLE TRAY.

5. INSTALL CONDUIT AND LADDER CABLE TRAY FOR TELECOMMUNICATIONS CABLING TO MAINTAIN A MINIMUM OF 5" SEPARATION FROM FLUORESCENT LIGHTING.

6. PROVIDE CABLE J-HOOKS NO GREATER THAN 5' APART TO SUPPORT CABLES WHERE NO CABLE TRAYS AND CONDUITS ARE PROVIDED.

7. INSTALL EACH CABLE SET INDICATED BY THE SYMBOLS LIST FROM THE OUTLET LOCATION BACK TO THE RESPECTIVE SERVING TELECOM ROOM.

8. IF CONFLICTS ARE FOUND BETWEEN THE TELECOMMUNICATIONS DRAWINGS AND ANY OTHER DRAWINGS ASSOCIATED WITH THE PROJECT, NOTIFY THE ARCHITECT AT ONCE AND HAVE LOCATION VERIFIED BEFORE OUTLETS ARE INSTALLED. ANY REASONABLE CHANGE IN LOCATION OF OUTLETS PRIOR TO ROUGHING SHALL NOT INVOLVE ADDITIONAL EXPENSE TO THE OWNER. THE TERM "REASONABLE" SHALL BE INTERPRETED AS MOVING OUTLET LOCATIONS A MAXIMUM OF 10' IN ANY DIRECTION FROM THE LOCATION INDICATED ON THE DRAWINGS.

9. CABLE ADMINISTRATION:

A. PROPERLY TAG ALL CABLES, RECEPTACLES, CONNECTION BLOCKS AND PATCH PANELS.

B. REPORT ANY CABLE THAT EXCEEDS 75m TO THE DESIGN TEAM, THE CABLE SHALL BE CLEARLY MARKED WITH RED TAPE AT BOTH ENDS OF EACH CABLE INDICATING THE EXACT CABLE LENGTH AND NOTED IN THE REQUIRED AS-BUILT LABEL REPORT.

C. PRIOR TO SYSTEM ACCEPTANCE, THE CONTRACTOR SHALL SUBMIT AN AS-BUILT LABEL REPORT PROVIDING THE ROOM NUMBERS AND CABLE LENGTHS FOR EACH OF THE INSTALLED CABLES.

10. LABEL REQUIREMENTS:

A. PROVIDE WHITE LABEL WITH TYPEWRITTEN LEGIBLE CHARACTERS. PRINTED WITH NON-SMEAR TYPE INK. HANDWRITTEN LABELS ARE NOT PERMITTED.

B. PROVIDE LABELS WITH A SELF ADHESIVE BACKING.

C. PROVIDE LABELS FOR CABLES WITH PROTECTIVE WRAP-AROUND PLASTIC TRANSPARENT COVER WHICH WILL SERVE TO PROTECT THE INK FROM SMEARING AND SECURE THE LABEL TO THE CABLE.

D. PROVIDE LABELS FOR CABLES WIDE ENOUGH FOR 23 CHARACTERS IN A SINGLE ROW.

E. RISER AND TIE CABLES JACKETS SHALL BE LABELED WITHIN EACH TECHNOLOGY ROOM AND AT 15m INTERVALS OUTSIDE TECHNOLOGY ROOMS ABOVE CEILINGS.

PATHWAY NOTES:

1. COORDINATE INSTALLATION OF CONDUITS, J-HOOKS AND CABLE TRAYS WITH OTHER COMPONENTS INSTALLED WITHIN CEILING. PREPARE SHOP DRAWINGS TO DEMONSTRATE AND ENSURE PROPER INSTALLATION OF ALL COMPONENTS.

2. MAINTAIN MINIMUM BEND RADIUS OF 10X O.D. FOR CONDUITS GREATER THAN 2" DIAMETER. MAINTAIN MINIMUM BEND RADIUS OF 6X O.D. FOR CONDUITS EQUAL TO OR LESS THAN 2" DIAMETER.

3. PROVIDE PULL BOXES (SIZE AS NOTED) AFTER EVERY 150 FEET OF RUN OR AFTER EVERY 180-DEGREES OF BEND.

4. DO NOT INSTALL PULL BOXES IN LIEU OF A BEND.

5. REAM AND BUSH THE ENDS OF ALL CONDUITS.

6. PROVIDE AND LEAVE IN PLACE A PULL 200 LB TEST LINE IN EACH CONDUIT.

7. STUB UP CONDUIT SLEEVES THROUGH SLABS 3" ABOVE FINISHED FLOORS.

8. PROVIDE HANGERS, ANCHORS, MOUNTING HARDWARE, GROUND LUGS AND STRAPS AS REQUIRED TO ENSURE PROPER INSTALLATION OF PATHWAY COMPONENTS. INSTALL ALL COMPONENTS AS PER MANUFACTURERS RECOMMENDATIONS AND PER ALL APPLICABLE CODES.

9. GROUND ALL CONDUITS AND CABLE TRAY AS PER MANUFACTURERS' RECOMMENDATIONS, INDUSTRY STANDARDS AND PER ALL APPLICABLE CODES.

10. PROVIDE AT ALL CABLE TRAY AND CABLE TRAY LOCATIONS: RUNWAY DROPOFFS, SPLICE HARDWARE, GROUND STRAPS, THERMAL EXPANSION PLATES, TERMINATION KITS, END SUPPORT KITS AND CEILING SUPPORT HARDWARE.

11. REFER TO DISTRIBUTION PLANS FOR REQUIREMENTS FOR JUNCTION BOX AND CONDUITS TO SUPPORT WORK AREA OUTLETS.

T-XXX

1

12.WHERE CABLE IS RUN ABOVE NON-ACCESSIBLE (I.E. GYPSUM BOARD) CEILING CONSTRUCTION, CONDUIT, PULLBOXES AND ACCESS PANELS SHALL BE INSTALLED TO PROPERLY ROUTE CABLE.

13.PROVIDE J-HOOKS AND CABLE STRAPS TO SUPPORT CABLE ABOVE ACCESSIBLE CEILING CONSTRUCTION, EXCEPT IN AREAS WHERE CABLE TRAY OR CONDUIT IS INDICATED.

PATHWAY NOTES:WALL MOUNTED SINGLE PORT WAO (1) CATEGORY 6 CABLE TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 4" BOX W/1-GANG OPENING AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR."CP"= WALL MOUNTED AV CONTROL PANEL"E"= WALL MOUNTED WAO FOR ELEVATOR CONTROLLER

WALL MOUNTED DUAL PORT WAO (2) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 4" BOX W/1-GANG OPENING AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

"E"= WALL MOUNTED WAO FOR ELEVATOR CONTROLLER"AP"= SECURITY ALARM PANEL

WALL MOUNTED 3-PORT WAO (3) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 4" BOX W/1-GANG OPENING AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

WALL MOUNTED 4-PORT WAO (UON) - (4) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 4" BOX W/1-GANG OPENING AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR. A NUMBER "6" ADJUST TO THIS SYMBOL INDICATES 6 CATEGORY 6 CABLES TO BE PROVIDED IN LIEU OF 4.

"ACP"= SECURITY ACCESS CONTROL PANEL

WALL MOUNTED CAMERA 1-PORT WAO (1) CATEGORY 6A CABLE TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 3/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR

CAM

WALL MOUNTED CATV WAO (2) CATEGORY 6A SHIELDED CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR. BACK BOX IS COMBINED WITH AV AND POWER (REFER TO AV AND ELEC. DWGS.)

TV

WALL MOUNTED WAP 2-PORT WAO (2) CATEGORY 6A CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

WAP

WALL MOUNTED TELEPHONE (48" AFF) PROVIDE (1) CATEGORY 6 CABLE TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4" CONDUIT FROM THE OUTLET TO THE NEAREST CABLE TRAY OR TR.

W

FLOOR MOUNTED SINGLE 1-PORT WAO (1) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE SINGLE-GANG FLOOR BOX AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

FLOOR MOUNTED 2-PORT WAO (2) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE SINGLE-GANG FLOOR BOX AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

FLOOR BOX MOUNTED 3-PORT WAO (3) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE SINGLE-GANG FLOOR BOX AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

FLOOR BOX MOUNTED 4-PORT WAO (UON) - (4) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE SINGLE-GANG FLOOR BOX AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

FLOOR POKE-THRU MOUNTED 1-PORT WAO (1) CATEGORY 6 CABLE TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE POKE-THRU DEVICE AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

FLOOR POKE-THRU MOUNTED 2-PORT WAO (2) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE POKE-THRU DEVICE AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR

FLOOR POKE-THRU MOUNTED 3-PORT WAO (3) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE POKE-THRU DEVICE AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

FLOOR POKE-THRU MOUNTED 4-PORT WAO (UON) - (4) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE POKE-THRU DEVICE AND 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR.

FURNITURE MOUNTED SINGLE PORT WAO (1) CATEGORY 6 CABLE TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4" FLEXIBLE WHIP FROM THE WAO LOCATION TO THE FURNITURE IN-FEED.

FURNITURE MOUNTED DUAL PORT WAO (2) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4" FLEXIBLE WHIP FROM THE WAO LOCATION TO THE FURNITURE IN-FEED.

FURNITURE MOUNTED 3-PORT WAO (3) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4"" FLEXIBLE WHIP FROM THE WAO LOCATION TO THE FURNITURE IN-FEED.

FURNITURE MOUNTED 4-PORT WAO (4) CATEGORY 6 CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4"" FLEXIBLE WHIP FROM THE WAO LOCATION TO THE FURNITURE IN-FEED.

WALL MOUNTED FURNITURE IN-FEED PROVIDE DOUBLE-GANG BACK BOX AND 2" CONDUIT FROM THE OUTLET TO THE NEAREST CABLE TRAY OR TR.

FLOOR MOUNTED FURNITURE IN-FEED PROVIDE DOUBLE-GANG FLOOR BOX AND 2" CONDUIT FROM THE OUTLET TO THE NEAREST CABLE TRAY OR TR.

FLOOR MOUNTED FURNITURE IN-FEED PROVIDE DOUBLE-GANG FLOOR BOX AND 2" CONDUIT FROM THE OUTLET TO THE NEAREST CABLE TRAY OR TR.

CEILING MOUNTED SINGLE PORT OUTLET (1) CATEGORY 6A CABLE TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE SINGLE-GANG BACK BOX AND 3/4" CONDUIT FROM THE OUTLET TO THE NEAREST CABLE TRAY OR TR. PROVIDE 20 FEET OF CABLE SERVICE LOOP OF EACH CEILING OUTLET LOCATION.

"CAM"= CEILING MOUNTED SECURITY CAMERA WAO (PROVIDE 3/4" CONDUIT IN LIEU OF 1/4" CONDUIT FOR CAMERAS)

CEILING MOUNTED DUAL PORT OUTLET (2) CATEGORY 6A CABLES TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE SINGLE-GANG BACK BOX AND 1-1/4"" CONDUIT FROM THE OUTLET TO THE NEAREST CABLE TRAY OR TR. PROVIDE 20 FEET OF CABLE SERVICE LOOP OF EACH CEILING OUTLET LOCATION.

"TV"= CEILING MOUNTED CATV WAO - INCLUDE ONE COAXIAL CABLE (PROVIDE SERIES 6 COAX UP TO 149 FEET AND SERIES 11 COAX FROM 150 FEET TO 295 FEET IN LENGTH)."WAP"= CEILING MOUNTED WAP WAO"VP"= CEILING MOUNTED VIDEO PROJECTOR WAO

WIRE BASKET TYPE CABLE TRAY SIZE AS INDICATED

LADDER TYPE CABLE TRAY SIZE AS INDICATED.

WALL MOUNTED ONE COAXIAL CABLE (PROVIDE SERIES 6 COAX UP TO 149 FEET AND SERIES 11 COAX FROM 150 FEET TO 295 FEET IN LENGTH). TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR. BACK BOX IS COMBINED WITH AV AND POWER (REFER TO AV AND ELEC. DWGS.)

CX

CABLE PATHWAY THROUGH MULLION - (1) CATEGORY 6A CABLE TO THE DESIGNATED TECHNOLOGY ROOM.

M

WALL MOUNTED EMERGENCY CALL STATION 1-PORT WAO (1) CATEGORY 6A CABLE TO THE DESIGNATED TECHNOLOGY ROOM PROVIDE 1-1/4" CONDUIT FROM THE WAO TO THE NEAREST CABLE TRAY OR TR

ECB

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:1

9 P

M

TELECOM LEGEND

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT0.0.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

NUMBER NAME

TT0.0.0 TELECOM LEGEND

TT1.1.0 TELECOM OVERALL PLAN LOWER

TT1.2.0 TELECOM OVERALL PLAN FIRST FLOOR

TT1.3.0 TELECOM OVERALL PLAN SECOND FLOOR

TT2.1.0 TELECOM OVERALL RCP LOWER

TT2.2.0 TELECOM OVERALL RCP FIRST FLOOR

TT2.3.0 TELECOM OVERALL RCP SECOND FLOOR

TT3.0.1 TELECOM ENLARGED PLAN

TT5.0.1 TELECOM DETAILS

TT5.0.2 TELECOM DETAILS

TT5.0.3 TELECOM DETAILS

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 8: BUILDING 11 RENOVATION

REF.

FEC

CA

M

CAM

FP

A

A

B

B

D

D

E

E

F

F

G

G

H

H

J

J

K

K

M

M

Q

Q

R

R

S

S

V

V

C

C

L

L

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

17 17

16 16

18 18

19 19

T

T

U

U

5.1 5.1

TT3.0.1

2

CITY SURVEYOR

033

1:1 CONFERENCE

032

SURVEY TECHNICIAN

031

1:1 CONFERENCE

029

STORAGE

028

OPEN OFFICE

030

STORAGE

035

STORAGE

037

CREW ROOM

036

HOUSEKEEPING

041 LACTATION

042

BOOT WASH

043

PHONE BOOTH

040PHONE BOOTH

039

PHONE BOOTH

038

MECHANICAL ROOM

044

IT SERVER

045

ELECTRICAL

046

CONFERENCE ROOM

047

CONFERENCE ROOM

048

STAFF TOILET

021

STAFF TOILET

020

ELEV EQUIP

022

BREAK ROOM

019

STAIR

001

SYSTEMS ENGINEER I

004

Room

051

Room

50

Room

51

OPEN OFFICE

003

WORKROOM

023

OPEN OFFICE

024

CONSTRUCTION BUREAU MANAGER

027

INSPECTION COORDINATOR II

026

DIVISION MANAGER

025

INFO SEC

017

INFO SEC MGR

018

ITAC

016NOC

015

CONVERGENT ARCHITECTURE LAB

014

CA SUPERVISOR

013

TIER 1 CALL CENTER

011

OPS MANAGER

012

SOLUTIONS ENGINEERSUPERVISOR

010ASSET RECOVERY - STAFF

009

PRINT ROOM - STAFF

008

PRINT SHOP

007

ASSET RECOVERY

005

STAIR

006

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:2

1 P

M

TELECOM OVERALL

PLAN LOWER

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT1.1.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

TELECOM OVERALL PLAN LOWER

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 9: BUILDING 11 RENOVATION

REF.REF.

DN

DN

W

A

A

B

B

D

D

E

E

F

F

G

G

H

H

J

J

K

K

M

M

Q

Q

R

R

S

S

V

V

C

C

L

L

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

17 17

16 16

18 18

19 19

T

T

U

U

5.1 5.1

STAIR

132

STAIR

113

OPEN OFFICE

121

CADD ROOM

140

OPEN OFFICE

101

ENGINEER IV

118

ELEVATOR

161

WOMEN

129

OPEN OFFICE

157

ENGINEER V

105

CONFERENCE ROOM

137

STAFF TOILET

135

Room

000

CORRIDOR

160

CONFERENCE ROOM

114

OPEN OFFICE

106

SHARED WORK AREA

112

STAIR

149

OPEN OFFICE

143

BREAKROOM

138CONFERENCE ROOM

139

OPEN OFFICE

153

STAFF TOILET

133

MEN

130

LACTATION

127HOUSEKEEPING

128

PLUMBING ACCESS

259

PLUMBING ACCESS

134

PHONE BOOTH

136

SYSTEMS ANALYST III

144

SYSTEMS ANALYST III

145

GIS COORDINATOR

146

CADD SUPERVISOR

142

ENGINEERING TECHNICIAN III

141

1:1 CONFERENCE

147

STORAGE

131

QA/QC MANAGER

107

1:1 CONFERENCE

111

ENGINEER V

152

STORAGE

151

ENGINEER IV

155

ENGINEER IV

156

ENGINEER V

154

PROJECT MANAGER SUPERVISOR

124

PROJECT MANAGER SUPERVISOR

125

TECHNICAL SERVICES MANAGER

126

STORMWATER ENGINEERINGCENTER ADMINISTRATOR

120

ENGINEER V

119

ENGINEER IV

117

ENGINEER IV

116

OPEN OFFICE

110

1:1 CONFERENCE

122

ENGINEER IV

108

HUDDLE AREA

115

OPEN OFFICE

104

ADMINISTRATIVE SPECIALIST I

103

STORAGE

102

LOBBY

100 ENGINEER IV

158

ENGINEER IV

159

ELECTRICAL

109

IT ROOM

123

HUDDLE AREA

148ELECTRICAL

150

TT3.0.1

3

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:2

3 P

M

TELECOM OVERALL

PLAN FIRST FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT1.2.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

TELECOM OVERALL PLAN FIRST FLOOR

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 10: BUILDING 11 RENOVATION

A

A

B

B

D

D

E

E

F

F

G

G

H

H

J

J

K

K

M

M

Q

Q

R

R

S

S

V

V

C

C

L

L

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

17 17

16 16

18 18

19 19

T

T

U

U

5.1 5.1

OPEN OFFICE

205

OPEN OFFICE

220

OPEN OFFICE

213

OPEN OFFICE

209

SHARED WORK AREA

234

CORRIDOR

201

STAIR

254

ELEVATOR

235

STAIR

211

MEN

202

MECH

219

CONFERENCE ROOM

208

CITY ENGINEER

223

CONFERENCE ROOM

231

CONFERENCE ROOM

221

CONFERENCE ROOM

225

WOMEN

203

ACCESS

204

LACTATION ROOM

206

ENGINEER V

207

CONTRACT SUPERVISOR

210

ENGINEER IV

214

ENGINEER V

215

ADMIN ASST

217

FILES

216

1:1 CONFERENCE

222

ADMINISTRATIVE SERVICESMANAGER III

224

OPERATIONS SUPPORTADMINISTRATOR

226

DIRECTOR

227

EXECUTIVE ASSISTANT

228

MEDIA & COMMUNICATIONS

229

IT POSITION

230

FILE ROOM

212

ELECTRICAL

218

IT ROOM

232

STORAGE

233

TT3.0.1

5

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:2

4 P

M

TELECOM OVERALL

PLAN SECOND FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT1.3.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

TELECOM OVERALL PLAN SECOND FLOOR

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 11: BUILDING 11 RENOVATION

CAM

CAM

CAM

WAP WAP

WAP

WAP

WAP

WAP

WAP

CAM

A

A

B

B

D

D

E

E

F

F

G

G

H

H

J

J

K

K

M

M

Q

Q

R

R

S

S

V

V

C

C

L

L

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

17 17

16 16

18 18

19 19

T

T

U

U

5.1 5.1

3

3

TT3.0.1

1

IT SERVER

045

ELECTRICAL

046

MECHANICAL ROOM

044

HOUSEKEEPING

041

BOOT WASH

043

CREW ROOM

036

STORAGE

035

STORAGE

037

OPEN OFFICE

030

CITY SURVEYOR

033

1:1 CONFERENCE

032

SURVEY TECHNICIAN

031

1:1 CONFERENCE

029

STORAGE

028

CONSTRUCTION BUREAU MANAGER

027 INSPECTION COORDINATOR II

026 DIVISION MANAGER

025

OPEN OFFICE

024

WORKROOM

023

STAFF TOILET

021

STAFF TOILET

020

ELEV EQUIP

022

ELEVATOR

049

BREAK ROOM

019

CONFERENCE ROOM

047

CONFERENCE ROOM

048

Room

051

Room

50

STAIR

001

SYSTEMS ENGINEER I

004

OPEN OFFICE

003

CA SUPERVISOR

013

CONVERGENT ARCHITECTURE LAB

014

NOC

015

OPS MANAGER

012

ITAC

016

INFO SEC

017

INFO SEC MGR

018

OPEN OFFICE

003

SOLUTIONS ENGINEERSUPERVISOR

010

ASSET RECOVERY - STAFF

009 PRINT ROOM - STAFF

008

TIER 1 CALL CENTER

011

PRINT SHOP

007

STAIR

006

ASSET RECOVERY

005

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:2

7 P

M

TELECOM OVERALL

RCP LOWER

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT2.1.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

TELECOM OVERALL RCP LOWER

TELECOM KEYNOTE LEGEND

NUMBER DESCRIPTION

3 12" X 4" BASKET TYPE CABLE TRAY ABOVE ACCESSIBLECEILING

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 12: BUILDING 11 RENOVATION

CAM

CAM

CA

M

CAM

CA

M

CA

M

CAM

CAM

CA

M

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP

WAP WAP

WAP WAP

WAP

WAP

A

A

B

B

D

D

E

E

F

F

G

G

H

H

J

J

K

K

M

M

Q

Q

R

R

S

S

V

V

C

C

L

L

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

17 17

16 16

18 18

19 19

T

T

U

U

5.1 5.1

STAIR

132

STAIR

113

ELEVATOR

161

WOMEN

129

CONFERENCE ROOM

137

STAFF TOILET

135

Room

000

CORRIDOR

160

CONFERENCE ROOM

114

STAIR

149

CONFERENCE ROOM

139

STAFF TOILET

133

MEN

130

LACTATION

127

HOUSEKEEPING

128

PLUMBING ACCESS

259

PLUMBING ACCESS

134

PHONE BOOTH

136

3

3

IT ROOM

123

STORMWATER ENGINEERINGCENTER ADMINISTRATOR

120

ENGINEER V

119

ENGINEER IV

118

ENGINEER IV

117

ENGINEER IV

116

HUDDLE AREA

115

TECHNICAL SERVICES MANAGER

126

PROJECT MANAGER SUPERVISOR

125

PROJECT MANAGER SUPERVISOR

124

STORAGE

131

OPEN OFFICE

121

1:1 CONFERENCE

122

CADD ROOM

140

BREAKROOM

138

ENGINEER V

154

ENGINEER IV

156

ENGINEER IV

155

LOBBY

100

OPEN OFFICE

110

HUDDLE AREA

115

ENGINEER IV

116

TT3.0.1

4

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:2

9 P

M

TELECOM OVERALL

RCP FIRST FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT2.2.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

TELECOM OVERALL RCP FIRST FLOOR

TELECOM KEYNOTE LEGEND

NUMBER DESCRIPTION

3 12" X 4" BASKET TYPE CABLE TRAY ABOVE ACCESSIBLECEILING

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 13: BUILDING 11 RENOVATION

CAM

CAM

CAM

CAM

WAP WAP

WAP

WAP

WAP

WAP

WAP

A

A

B

B

D

D

E

E

F

F

G

G

H

H

J

J

K

K

M

M

Q

Q

R

R

S

S

V

V

C

C

L

L

N

N

O

O

P

P

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

17 17

16 16

18 18

19 19

T

T

U

U

5.1 5.1

OPEN OFFICE

205

OPEN OFFICE

209

SHARED WORK AREA

234

STAIR

254

ELEVATOR

235

STAIR

211

MEN

202

MECH

219

?

?

CONFERENCE ROOM

208

CONFERENCE ROOM

231

CONFERENCE ROOM

221

WOMEN

203

ACCESS

204

LACTATION ROOM

206

3

3

IT ROOM

232

TT3.0.1

6

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:3

1 P

M

TELECOM OVERALL

RCP SECOND FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT2.3.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

TELECOM OVERALL RCP SECOND FLOOR

TELECOM KEYNOTE LEGEND

NUMBER DESCRIPTION

3 12" X 4" BASKET TYPE CABLE TRAY ABOVE ACCESSIBLECEILING

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 14: BUILDING 11 RENOVATION

TGB

TGB

TG

BT

GB

TGB

TGB

IT SERVER

045

10

10

11

7

7

1

2

2

2

2

7' - 3 7/32" 1' - 3" 5' - 2 21/32"

18

' -

0"

IT SERVER

045

3

13

13

IT ROOM

123

10711710

4' -

5"

1' -

3"

4' -

4"

12' - 10 5/8"

1

2

2

2

2

IT ROOM

123

13

13

3

IT ROOM

232

2

1

10

7

11

7

10

2

2

2

4' - 5 27/32" 1' - 3" 4' - 3 5/32"

12

' -

7 1

/8"

IT ROOM

232

3

13

13

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:3

3 P

M

TELECOM ENLARGED

PLAN

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT3.0.1

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

REVISIONS

DATE DESCRIPTION

1/2" = 1'-0"2

IT SERVER 045 ENLARGED PLAN

1/2" = 1'-0"1

IT SERVER 045 ENLARGED RCP

TELECOM KEYNOTE LEGEND

NUMBER DESCRIPTION

1 TGB MOUNTED ABOVE LADDER TRAY

2 8' PLYWOOD BACKBOARD PAINTED WHITE

3 12" X 4" BASKET TYPE CABLE TRAY ABOVE ACCESSIBLECEILING

7 26"W X 36"D X 84"H CABINET - TYPICAL

10 6" WIDE VERTICAL CABLE MANAGER

11 12" WIDE VERTICAL CABLE MANAGER

13 12" LADDER TYPE CABLE TRAY

1/2" = 1'-0"3

IT ROOM 123 ENLARGED PLAN

1/2" = 1'-0"4

IT ROOM 123 ENLARGED RCP

1/2" = 1'-0"5

IT ROOM 232 ENLARGED PLAN

1/2" = 1'-0"6

TELECOM OVERALL RCP UPPER - Callout 1

mgibson
Text Box
4/15/20 ADD-01
Page 15: BUILDING 11 RENOVATION

SPLICE HARDWARE ASSEMBLY:GROUND BOLT ASSEMBLY

#6 AWG GROUND WIRE

SHALLOW SUPPORT CHANNEL MOUNTED TO WALL

BASKET TRAY

BASKET TRAY HOLD DOWN PLATE

NOTES:

1. MAXIMUM DISTANCE BETWEEN SUPPORTS SHALL BE NO GREATER THAN 5'.

BEND RADUIS CONTROL BRACKET SHIELD

BASKET TRAY

NOTES:

1. PROVIDE BEND RADIUS CONTROL AT ALL RUNWAY DIRECTION CHANGES AND INTERSECTIONS.

EC TO OUTLET BACKBOX

BASKET TRAY

ALL THREAD

BASKET TRAY SIZED PER PLAN

SHALLOW SUPPORT CHANNEL SECTION

ASSEMBLY HARDWARE

NOTES:

1. MAXIMUM DISTANCE BETWEEN SUPPORTS SHALL BE NO GREATER THAN 5'.

BEND RADIUS WATERFALL BRACKET

BASKET TRAY

NOTES:

1. PROVIDE BEND RADIUS CONTROL AT ALL RUNWAY DIRECTION CHANGES AND INTERSECTIONS.

BASKET TRAY CABLE DROP OUT ASSEMBLY

BASKET TRAY

NOTES:

1. PROVIDE RADIUS DROP CONTROL COMPONENTS AT ALL CABLE ELEVATION CHANGES.

BEND RADIUS WATERFALL BRACKET

BASKET TRAY

NOTES:

1. PROVIDE RADIUS DROP CONTROL COMPONENTS AT ALL CABLE ELEVATION CHANGES.

NOTES:

1. MAXIMUM DISTANCE BETWEEN SUPPORTS SHALL BE NO GREATER THAN 5'.

CABLE BASKET TRAY

CABLE BASKET TRAY TRAPEZE SUPPORT

THREADED ROD

CABLE DROPOUT

WATERFALL FOR CABLE EXIT

FLEXIBLE WIRE BASKET-TYPE CABLETRAY

NOTES:1. PROVIDE RADIUS DROP CONTROL COMPONENTS AT ALL CABLE ELEVATION CHANGES.

BASKET-TYPE CABLE TRAY

SECURITY CABLEUTP CABLE

CABLE DIVIDERS

OPTICAL FIBER CABLE

GENERAL NOTES:

1. WHENEVER POSSIBLE SEPERATE VARIOUS CABLE TYPES WITH PARTITIONS IN CABLE TRAY

CABLE DIVIDERS

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:3

6 P

M

TELECOM DETAILS

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT5.0.1

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/16" = 1'-0"1

Basket Cable Tray Attachment & Grounding Detail11/16" = 1'-0"

2Basket PDS Enclosure Cable Attachment1

1/16" = 1'-0"3

Basket Tray Bend Radius11/16" = 1'-0"

4Basket Tray Station Conduit Assembly1

1/16" = 1'-0"5

Basket Tray Trapeze Assembly11/16" = 1'-0"

6Basket Tray Waterfall (end)1

1/16" = 1'-0"7

Basket Tray Waterfall (inside)11/16" = 1'-0"

8Basket Tray Waterfall (Side)1

1/16" = 1'-0"9

Cable Basket Tray Mounting Detail11/16" = 1'-0"

10Cable Exiting From Basket-Type Tray1

1/8" = 1'-0"11

Cable Seperation on Basket Tray1 REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 16: BUILDING 11 RENOVATION

COMMUNICATIONS CONDUIT (typ)

HOLE GROUNDING LUG

STRANDED GROUND CABLE

GROUNDING BUSHING

NOTE:

1. CONTRACTOR SHALL BOND EVERY CONDUIT CARRYING COMMUNICATIONS CABLES

GROUND CABLE

H TAP

EQUIPMENT CABINET

VERTICAL POWER STRIP; TWO (2) PER CABINET

STAND-OFF BRACKET

CHANNEL ROD STIFFENER WITH ASSEMBLY COMPONENTS

"UNISTRUT" CHANNEL

ALL THREAD ROD

NOTES:

1. ROD STIFFENER ASSEMBLY REQUIRED ON HANGER RODS THAT HAVE SEISMIC BRACING ATTACHED TO THE HANGER OR TRAPEZE ASSEMBLY, UNLESS OTHERWISE NOTED BY CODE.

13

" M

AX

. (U

ON

)1

3"

MA

X. (U

ON

)1

3"

MA

X. (U

ON

)

6"

MA

x.

NOTE:

1. UTILIZE ROD STIFFENER ASSEMBLY AS REQUIRED ON HANGER RODS THAT HAVE SEISMIC BRACKING ATTACHED TO THE HANGER OR TRAPEZE ASSEMBLY, UNLESS OTHERWISE NOTED BY CODE

2. MAXIMUM DISTANCE BETWEEN SUPPORTS SHALL BE NO GREATER THAN 5'.

CABLE RUNWAY SECTION

CABLE RUNWAY - ROD MOUNTING HARDWARE

THREADED ROD - SIZED PER STRUCTURAL ENGINEER REQUIREMENTS

THREADED ROD ATTACHMENT HARDWARE

CIRCUITS TO BE INSTALLED ON THE OVERHEAD CABLE RUNWAY IN J-BOX MOUNTED ON THE WALL AT THE END OF THE RACKS AT 8' AFF. CAP WIRES IN J-BOX BY ELECTRICAL CONTRACTOR.

20AMP 110V, W/ TWIST LOCK RECEPTACLE BY ELECTRICAL CONTRACTOR.

LADDER TYPE CABLE TRAY BY LOW VOLTAGE CONTRACTOR.

COMPONENT RACK BY LOW VOLTAGE CONTRACTOR.

20AMP 110V, W/ TWIST LOCK RECEPTACLE BY ELECTRICAL CONTRACTOR.

CIRCUITS TO BE INSTALLED ON THE OVERHEAD CABLE TRAY IN J-BOX MOUNTED ON THE WALL AT THE END OF THE RACKS AT 8' AFF. CAP WIRES IN J-BOX.

20AMP 110V, W/ TWIST-LOCK RECEPTACLE

LADDER TYPE CABLE TRAY

CONTRACTOR TO REMOVE BLADE PLUG AND SUBSTITUTE TWIST-LOCK PLUG (TYPICAL)

STANDOFF BRACKET

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:3

9 P

M

TELECOM DETAILS

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT5.0.2

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

Bonding Detail11/8" = 1'-0"

2Bonding Ground Cables w/ H-Tap1

1/16" = 1'-0"3

Cabinet-Vertical Power strip Assembly1

1/8" = 1'-0"4

Cable Runway Vertical Rod Stiffener Support Assembly11/8" = 1'-0"

5Cable Runway/Tray Threaded Rod Support1

1/8" = 1'-0"6

Cabletray/Plugmold mounting with TR1

1/8" = 1'-0"7

Equipment Rack Detail

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 17: BUILDING 11 RENOVATION

2" HIGH RED STENCILED LETTERING

CLEAR 3/8" THICK FLEXIGLASS COVER

5/8"-11 X 1-1/2" CONT. THREADED ROD (typ)

2-3/4" INSULATOR

5/8" DIAMETER (typ)

9/16" (40) PLACES

5/8"-11 X 1" H.H.C.S.

7/16" DIAMETER (20) PLACES

LOCK WASHER

TBB

2-3/4" INSULATOR

5/8" DIAMETER (typ)

5/8"-11 X 1" H.H.C.S.

2-3/4" INSULATOR

3/8 " ALL THREAD ROD (NEWTON 3022-11) HANGERS 4'-0" O.C. UP TO STRUCTURAL STEEL (SEE STRUCTURAL DRAWINGS) IN EQUIPMENT ROOM. INSTALL ON BOTH SIDES OF CABLE LADDER.

AUX. CABLE BRACKET WALL ANGLE

J-BOLT KIT

CABLE RING

JUNCTION KIT

#2/0 INSULATED COPPER EQUIPMENT GROUND ON RACK

CABLE BRACKET

RUNWAY SPLICE

#2/0 INSULATED COPPER EQUIPMENT GROUND ROUTED BENEATH RACK

ROUTE TO TBB

CABLE LADDER DETAIL NOTES:

1. ALL CABLE LADDER SECTIONS ARE TO BE BOUNDED TOGETHER, SEE DETAIL.

2. ALL UNISTRUT SUPPORTING CABLE TAPS ARE TO BE BONDED AT EACH INTERSECTION OR SECTION.

3. SEE ARCHITECTURAL PLANS FOR MOUNTING HEIGHT.

CABLE LADDER INTERIOR GROUNDING NOTES:

1. INTERIOR GROUNDING SHALL BE PROVIDED ON THE CABLE LADDER AS SHOWN ON DRAWINGS.

2. ALL INTERIOR GROUNDING AND CROSS RUNS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR. SEE GROUNDING DETAIL DRAWING FOR GROUNDING DETAILS PERTAINING TO THESE NOTES.

3. CROSS RUNS SHALL BE CONNECTED TO THE INTERNAL RING.

4. CROSS RUNS SHALL BE BONDED TOGETHER USING A MEDIUM CROSS RUN CLAMP FOR NO. 2/0 WIRE. THOMPSON LIGHTING PROTECTION NO. 125 OR AS APPROVED EQUIVALENT.

5. CROSS RUNS SHALL BE ATTACHED UNDERNEATH THE CABLE LADDER USING APPROVED DEVICES.

6. CABLE LADDER HEIGHTS TO BE SHOWN ON ARCHITECTS DRAWINGS. CONTRACTOR SHALL CONFIRM THE REQUIRED HEIGHTS AFF. AS SHOWN ON THE CABLE LADDER PLANS BEFORE INSTALLING THE CABLE LADDER AND INSTALLING GROUND SYSTEM CROSS RUNS.

7. CABLE LADDER AND UNISTRUT SECTIONS SHALL BE BONDED TOGETHER USING BRAIDED TINNED COPPER STRAPS.

RUNWAY BRACKET

TO BUILDING MAIN GROUND

TO TENENT MAIN ELECTRICAL PANEL

TO LOCAL ELECTRICAL PANEL

2 HOLE GROUND LUG (typ.)

TELECOMMUNICATIONS GROUND BAR (TMGB) COMPLAINT WITH J-STD-607-A

6"

TYP. 16" WALL STUD SPACING

J-BOX BRIDGE SUPPORT

DUAL GANG QUAD FOR POWER

(1)

X 1

-1/4

" S

TU

B-U

P

WA

LL S

TU

D

WA

LL S

TU

D

W/ SINGLE GANG MUD-RING FOR

TYPICAL SEPARATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:07:4

0 P

M

TELECOM DETAILS

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TT5.0.3

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/4" = 1'-0"1

Grounding Busbar11/4" = 1'-0"

2Ladder Rack Assembly (typ)1

1/8" = 1'-0"4

Telecommunications Main Ground Bar Detail (TMGB)1

3/8" = 1'-0"3

WOA Wall Box Detail

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 18: BUILDING 11 RENOVATION

DRAWING LIST:

AFC AT FINISHED CEILING

AFF ABOVE FINISHED FLOOR

AFP ABOVE FINISHED PLATFORM OR RAISED FLOOR

AS ABOVE SLAB

ATS ABOVE TABLE SURFACE

AV AUDIOVISUAL

CLG CEILING

EMT

FP FLAT PANEL

GND GROUND

ID INSIDE DIAMETER

IDF INTERMEDIATE DISTRIBUTION FRAME

LAN LOCAL AREA NETWORK

MAX MAXIMUM

MDF MAIN DISTRIBUTION FRAME

MIN MINIMUM

MM MULTIMODE

MTD MOUNTED

MTER MAIN TELECOMMUNICATIONS EQUIPMENT ROOM

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OD OUTSIDE DIAMETER

OFE OWNER FURNISHED EQUIPMENT

OSP OUTSIDE PLANT

PB PULLBOX

SM SINGLE MODE

ST STRAND

STP SHIELDED TWISTED PAIR

TBD TO BE DETERMINED

TEMP TEMPORARY

TGB TELECOMMUNICATIONS GROUND BAR

TR TELECOMMUNICATIONS ROOM

TSER TELECOMMUNICATIONS SERVICE ENTRANCE ROOM

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

VIF VERIFY IN FIELD

VOIP VOICE OVER INTERNET PROTOCOL

WAN WIDE AREA NETWORK

WAP WIRELESS ACCESS POINT

WP WATERPROOF

WW WIREWAY

1.

2.

3.

4.

4.1.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

MINIMUM ACCEPTABLE DISTANCE BETWEEN PARALLEL AV AND POWER CONDUITS

AV CONDUITPOWER

CONDUIT

COMBINED AMPACITY OF ALL PHASE CONDUCTORS IN POWER CONDUIT

UNDER 60A 60A 120A 240A 400A

EMT EMT 2 FT. 3 FT. 4 FT. NA NA

EMT RIGID STEEL 4 IN. 8 IN. 1 FT. 2 FT. 4 FT.

RIGID STEEL RIGID STEEL1 IN. 2 IN. 4 IN. 8 IN. 16 IN.

DEFINITION OF TERMS

LEGEND FOR SCOPE OF WORK BETWEEN TRADES:

GC = GENERAL CONTRACTOR

EC = ELECTRICAL CONTRACTOR

AV = AUDIOVISUAL CONTRACTOR

O = OWNER

ST = STRUCTURED CABLING, OR TELECOMMUNICATIONS CONTRACTOR

NO LARGE POWER TRANSFORMERS OR MOTORS SHOULD BE LOCATED WITHIN 50 FEET OF AV EQUIPMENT SPACES.

ALL AV CABLING THAT IS RUN OPEN-WIRE SHALL BE SUPPORTED FROM J-HOOKS NO GREATER THAN 3 FEET APART. NO CABLE IS TO BE UNSUPPORTED OR LAID OVER CEILING TILES, BLACK IRON, OR OTHER CEILING MEMBERS.

THE METHOD OF INSTALLATION OF BOXES IN WALLS, AND THE METHOD OF PASSAGE OF CONDUITS AND WIREWAYS THROUGH ACOUSTICALLY SENSITIVE WALLS SHALL BE COORDINATED WITH THE ACOUSTICAL CONSULTANT.

INSTALL FIRESTOP TO ALL SLAB AND WALL PENETRATIONS PROVIDED FOR THE INSTALLATION OF CABLE AND CONDUIT AS REQUIRED TO MAINTAIN FIRE RATING OF SLAB OR WALL. REVIEW ARCHITECT'S PLANS FOR PARTITION TYPES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE FIRE RATING OF ALL WALLS AND FLOORS HAVING CABLING PENETRATIONS, COORDINATE SEALANT INSTALLATION WITH WORK OF OTHER TRADES. REFER TO ELECTRICAL SPECIFICATIONS FOR MATERIAL AND INSTALLATION PARAMETERS.

ALL POWER, WIREWAYS, AND JUNCTION BOXES ARE TO BE REVIEWED BY ELECTRICAL ENGINEER FOR CODE AND SAFETY COMPLIANCE.

ALL OVERHEAD RIGGING REQUIREMENTS ARE TO BE REVIEWED AND STAMPED FOR APPROVAL BY LICENSED STRUCTURAL ENGINEER FOR CODE AND SAFETY COMPLIANCE.

POWER BREAKER AND DISTRIBUTION PANELS ARE SIZED AND SPECIFIED BY THE ELECTRICAL ENGINEER.

ALL CABLE TRAY THAT IS SURFACE-MOUNTED ON SLAB BELOW RAISED FLOOR OR ABOVE EQUIPMENT RACKS SHALL BE SECURELY FASTENED AND LEFT OPEN FOR CABLE ACCESS.

POWER FOR AV AND RELATED SYSTEMS SHALL USE AN EIA/TIA 607 COMPLIANT GROUNDING SYSTEM, DESIGNED BY THE ELECTRICAL ENGINEER. REFER TO AV DETAIL SHEETS FOR ADDITIONAL GROUNDING REQUIREMENTS IF APPLICABLE.

ALL AV-RELATED EMPTY CONDUIT SHALL BE REAMED, CLEANED, CAPPED (WHERE APPROPRIATE), TAGGED, AND FURNISHED WITH PULL WIRES.

WHERE EXACT DIMENSIONS ARE NOT INDICATED, THE SCALE OF THIS DRAWING IS SUFFICIENTLY ACCURATE FOR DETERMINING THE LOCATION OF EQUIPMENT, JUNCTION BOXES, OUTLET BOXES, WIREWAYS, PANELS, ETC. WHERE EXACT DIMENSIONS ARE INDICATED, THE REFERENCE SURFACE SHALL BE THE FINAL FINISHED SURFACE INCLUDING ANY ACOUSTICAL TREATMENT. ROOM DIMENSIONS ON THE DRAWINGS HAVE BEEN TAKEN FROM PRELIMINARY ARCHITECTURAL DRAWINGS. ALL DIMENSIONS MUST BE VERIFIED AND ANY DEVIATIONS CAUSING CHANGES MUST BE COORDINATED WITH SHEN MILSOM & WILKE, LLC.

NOTIFY OWNER'S REPRESENTATIVES OF ANY DISCREPANCIES BETWEEN THE EXISTING CONDITIONS AND THE AV DRAWINGS. OBTAIN CLARIFICATION BEFORE PROCEEDING WITH WORK.

ALL AV DEVICES SHALL BE SECURELY MOUNTED PLUMB AND STRAIGHT TO WALLS, FLOORS, OR RACKS PER THE MANUFACTURER'S RECOMMENDED MOUNTING PRACTICE.

THERE SHALL BE A MINIMUM OF ONE PULL BOX FOR EVERY 100' OF STRAIGHT EMPTY AV-RELATED CONDUIT AND ONE PULL BOX WHERE THERE ARE MORE THAN TWO 90° BENDS OR LESSER BENDS TOTALING 180° IN A CONDUIT RUN.

MAINTAIN MINIMUM BEND RADIUS OF 10X OD FOR ALL AV-RELATED CONDUITS.

LIGHTING DESIGNER TO PROVIDE LIGHTING ON A SEPARATE DIMMING ZONE AT THE SCREEN/DISPLAY DEVICE TO ENSURE GOOD CONTRAST AND IMAGE SHARPNESS.

AV CONTRACTOR SHALL RESTORE CEILINGS, WALLS AND ANY OTHER SURFACES AFFECTED BY THEIR WORK PRIOR TO COMPLETION OF WORK WITH LIKE MATERIALS TO MATCH EXISTING CONSTRUCTION.

REFER TO AV ELECTRICAL PLANS AND/OR RISER DIAGRAMS FOR EMPTY CONDUIT SIZING.

ALL POWER CIRCUITS INDICATED IN THIS DRAWING SET TO BE PROVIDED BY DEDICATED BREAKER PANEL(S). NO NON-AV CIRCUITS TO BE FED FROM DEDICATED AV BREAKER PANEL(S).

POWER FOR ALL AV SERVICES IN EACH DESIGNATED SPACE SHALL BE ON THE SAME ELECTRICAL PHASE, AND THIS PHASE SHALL NOT INCLUDE MOTORS, APPLIANCES, OR ANY OTHER SOURCE THAT CAN CAUSE SIGNAL INTERFERENCE.

GROUNDING: GROUND COMMUNICATIONS SYSTEMS AND EQUIPMENT IN ACCORDANCE WITH ANSI/TIA/EIA-807 GROUNDING STANDARDS AND APPLICABLE NEC REQUIREMENTS EXCEPT WHERE DRAWINGS OR SPECIFICATIONS EXCEED NEC REQUIREMENTS. ALL RACKS, METALLIC BACKBOARDS, CABLE SHEATHS, CABLE TRAYS, ETC. ENTERING OR RESIDING IN TECHNICAL EQUIPMENT SPACES SHALL BE GROUNDED TO THEIR RESPECTIVE GROUND SYSTEM USING A MINIMUM OF #6 AWG STRANDED COPPER BONDING CONDUCTOR AND COMPRESSOR CONNECTORS. ALL WIRES USED FOR TECHNICAL POWER SYSTEMS GROUNDING PURPOSES SHALL BE IDENTIFIED WITH GREEN INSULATION OR IDENTIFIED AT EACH TERMINATION POINT WITH A WRAP OF GREEN TAPE. ALL CABLES AND BUS BARS SHALL BE IDENTIFIED AND LABELED "TECHNICAL POWER SYSTEM GROUND".

CONDUIT STUBS: PROVIDE NYLON BUSHING ON ALL CONDUIT STUBS AND NON-TERMINATING CONDUIT ENDS TO PROTECT WIRE PULLS.

JUNCTION BOX COVERS: UNLESS OTHERWISE NOTED, ALL JUNCTION BOXES MUST BE PROVIDED WITH A COVER. WHERE RAISED DEVICE COVERS ARE SPECIFIED, MATCH COVER DEPTH TO WALL THICKNESS. WHERE JUNCTION BOXES ARE MOUNTED AT OR ABOVE FINISHED CEILING HEIGHT, INSTALL JUNCTION BOXES WITH OPEN SIDE FACING DOWN.

POWER RECEPTICALS: TECHNICAL POWER RECEPTICALS, INCLUDING THOSE WITHIN FLOOR BOXES, WALL BOXES, OR CEILING BOXES, SHALL BE PROVIDED BY THE BUIDING CONTRACTOR AND APPEAR ON THE ELECTRICAL DRAWINGS. TECHNICAL POWER RECEPTACLES IN RELATION TO TECHNOLOGY INFRASTRUCTURE IS CRITICAL. REFER TO THE ELECTRICAL DRAWINGS FOR COMPLETE POWER LAYOUTS AND CIRCUITING DETAILS

NETWORK OUTLETS FOR AUDIOVISUAL SYSTEMS: ALL NETWORK OUTLETS SHALL APPEAR ON THE NETWORK DRAWINGS. NETWORK SERVICES APPEARING ON THE AUDIOVISUAL DRAWINGS ARE REPRESENTATIVE OF NETWORK CONNECTIVITY REQUIREMENTS IN SUPPORT OF AUDIOVISUAL SYSTEMS, AS THE LOCATION OF NETWORK SERVICES IN RELATION TO TECHNOLOGY INFRASTRUCTURE IS CRITICAL. REFER TO THE STRUCTURED CABLING SYSTEM SPECIFICATIONS AND DRAWINGS FOR ADDITIONAL INFORMATION.

POWER AND DATA REQUIREMENTS SHOWN FOR REFERENCE ONLY AND ARE NOT FOR CONSTRUCTION. COORDINATE WITH ELECTRICAL ENGINEER, ARCHITECT AND TELECOM DESIGNER DRAWINGS FOR LOCATION OF ALL OUTLETS IN THIS DRAWING SET.

WHERE POWER CIRCUITS ARE SHOWN TERMINATING IN JUNCTION BOXES WITHOUT RECEPTACLES, THE WIRES SHALL BE TAPED AND THE BOXES COVERED. THESE CIRCUITS WILL BE CONNECTED BY OTHERS DURING INSTALLATION OF THE AV SYSTEMS EQUIPMENT.

EMPTY CONDUIT RUNS ON THESE DRAWINGS SHOW ONLY INTERCONNECTION BETWEEN TERMINATION POINTS. THE EXACT PATH OF CONDUIT IS TO BE DETERMINED BY THE COORDINATE PATHWAYS FOR ALL AV RELATED DEVICES WITH ARCHITECTURAL AND ELECTRICAL PLANS.

HIGH LEVEL/HIGH CURRENT FEEDS (SUCH AS FOR POWER DISTRIBUTION PANELS, LIGHTING, AND BRANCH CIRCUITS,) ARE NOT TO BE RUN PARALLEL WITH AUDIO/VIDEO CONDUITS OR CABLING. IF HIGH LEVEL/HIGH CURRENT FEEDS MUST RUN PARALLEL TO AUDIO/VIDEO CONDUITS OR CABLING, MINIMUM SEPARATION MUST BE MAINTAINED ACCORDING TO THE FOLLOWING TABLE. "NA" INDICATES THAT THE USE SHOULD BE AVOIDED. SPACINGS ASSUME THAT POWER CONDUCTORS WILL NOT BE TWISTED PAIRS. CLOSER SPACINGS CAN BE USED IF POWER CONDUCTORS ARE TWISTED PAIRS.

FURNISH - TO PURCHASE AND DELIVER TO THE PROJECT SITE COMPLETE WITH EVERY NECESSARY APPURTENANCE AND SUPPORT. PURCHASING SHALL INCLUDE PAYMENT OF ALL SALES TAXES AND OTHER SURCHARGES AS MAY BE REQUIRED TO ASSURE THAT PURCHASED ITEMS ARE FREE OF ALL LIENS. CLAIMS, OR ENCUMBRANCES.

INSTALL - TO UNLOAD AT THE DELIVERY POINT AT THE SITE AND PERFORM EVERY OPERATION NECESSARY TO ESTABLISH SECURE MOUNTING AND CORRECT OPERATION AT THE PROPER LOCATION IN THE PROJECT, ALL AS PART OF THE WORK.

PROVIDE - TO FURNISH AND INSTALL

ELECTRICAL FLOOR MOUNTED SYMBOLS: ELECTRICAL CEILING MOUNTED SYMBOLS: NOTES: ABBREVIATIONS:

ELECTRICAL WALL MOUNTED SYMBOLS: SCOPE OF WORK BETWEEN TRADES:

EC

ELECTRICAL METALLIC TUBING (WITH PULL STRING)

EMPTY CONDUIT

22.

JUNCTION BOX, 6" x 6" x 4" DEEP, UON, WITH COVER PLATE FOR AV RECEPTACLES. FLUSH MOUNTED IN FINISHED FLOOR OR SURFACE MOUNTED TO SLAB BELOW RAISED FLOOR.

FLOOR BOX WITH DIVIDED COMPARTMENTS FOR AV, DATA AND POWER. FLUSH MOUNTED IN FINISHED FLOOR WITH HINGED SCRUB WATER RATED COVER PLATE AND CARPET FLANGE, OoN (VERIFY FINISH PLATE COLOR WITH ARCHITECT). SEE DETAIL. FSR FLOOR BOX MODEL FL-500P (4" DEEP), UON. REFER TO POWER AND DATA SYMBOL FOR RELATED REQUIREMENTS.

(* = NUMBER OF POWER CIRCUITS)(# = NUMBER OF DATA DROPS)

JUNCTION BOX, 2.5" DEEP, FOR AV RECEPTACLES. SINGLE GANG, UON. MOUNT FLUSH WITH FINISHED WALL TREATMENT AT BUILDING STANDARD BASE OUTLET HEIGHT, UON.(* = NUMBER OF GANGS)

FLAT PANEL DISPLAY JUNCTION BOX WITH SEPARATE COMPARTMENTS FOR AV, DATA, AND POWER. SEE DETAIL. CHIEF BACK BOX MODEL PAC 526 SERIES (4.0" DEEP), UON. MOUNT FLUSH WITH FINISHED WALL TREATMENT. SEE ELEVATION. AT 60" AFF, UON. REFER TO POWER AND DATA DESCRIPTIONS FOR RELATED REQUIREMENTS.

(# = NUMBER OF DATA DROPS)(* = NUMBER OF POWER OUTLETS)

JUNCTION BOX, 2.5" DEEP, FOR AV RECEPTACLES SINGLE GANG, UON. FLUSH MOUNTED IN FINISHED CEILING.(# = NUMBER OF GANGS)

JUNCTION BOX, 2.5" DEEP, PROVIDE DOUBLE-GANG BOX, UON, FOR AVRECEPTACLES. SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING.(# = NUMBER OF GANGS)

SCREW COVER BOX FOR AV SIGNAL CABLE AND CONDUIT TERMINATION. SIZED BYELECTRICAL ENGINEER. SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING.

12" x 4", UON, CABLE TRAY. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.

LOW VOLTAGE CONTROLLER FOR PROJECTION SCREEN OR SHADE CONTROL.SUPPLIED WITH SCREEN. SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING. ACCESS PANEL TO CONTROLLER MUST BE PROVIDED FOR MAINTENANCE.

CONDUIT STUB-UP INTO FURNITURE.

POWER RECEPTACLE, DUPLEX, 120 VAC, 15 AMP CIRCUIT, UON. FLUSH MOUNTED IN FINISHED FLOOR OR SURFACE MOUNTED TO SLAB BELOW RAISED FLOOR. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.

POWER RECEPTACLE, QUAD, 120 VAC, SINGLE DEDICATED 20 AMP CIRCUIT.MOUNTED IN FINISHED FLOOR OR SURFACE MOUNTED TO SLAB BELOW RAISED FLOOR. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(* = NUMBER OF DEDICATED POWER CIRCUITS)

JUNCTION BOX FOR POWER, 120 VAC, SINGLE DEDICATED 20 AMP CIRCUIT BY THE ELECTRICAL ENGINEER. FLUSH MOUNTED IN FINISHED FLOOR OR SURFACE MOUNTED TO SLAB BELOW RAISED FLOOR. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(* = NUMBER OF DEDICATED POWER CIRCUITS)

STANDARD DATA OUTLET FLUSH MOUNTED IN FINISHED FLOOR, FLOOR BOX OR SURFACE MOUNTED IN FINISHED FLOOR, FLOOR BOX OR SURFACE MOUNTED TO SLAB BELOW RAISED FLOOR. REFER TO AV NOTES FOR ADDITIONAL INFORMATION. (# = NUMBER OF DATA DROPS)

SCREW COVER BOX FOR AV SIGNAL CABLE AND CONDUIT TERMINATION. SIZED BY ELECTRICAL ENGINEER. MOUNT FLUSH WITH FINISHED WALL TREATMENT ATSTANDARD BASE OUTLET HEIGHT, UON.

WALL BOX TYPE 1, 6" x 6" x 4" DEEP, FOR AV RECEPTACLES. MOUNT FLUSH WITH FINISHED WALL TREATMENT AT BUILDING STANDARD BASE OUTLET HEIGHT, UON.

WALL BOX TYPE 2, 12" x 12" x 4" DEEP, FOR AV RECEPTACLES. MOUNT FLUSH WITH FINISHED WALL TREATMENT AT BUILDING STANDARD BASE OUTLET HEIGHT, UON.

WALL SWITCH FOR RAISE/LOWER/STOP OF PROJECTION SCREEN AND/OR FOR VIDEO PROJECTOR LIFT. MOUNT AT STANDARD SWITCH HEIGHT, UON.

POWER RECEPTACLE, DUPLEX, 120 VAC, 15 AMP CIRCUIT. MOUNT AT BUILDING STANDARD BASE ELECTRICAL HEIGHT, UON. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.

POWER RECEPTACLE, QUAD, 120 VAC, SINGLE DEDICATED 20 AMP CIRCUIT. MOUNTAT BUILDING STANDARD BASE ELECTRICAL HEIGHT, UON. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(* = NUMBER OF DEDICATED POWER CIRCUITS)

POWER RECEPTACLE, 208 VAC, SINGLE DEDICATED 30 AMP CIRCUIT. MOUNT AT BUILDING STANDARD BASE ELECTRICAL HEIGHT, UON. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.

JUNCTION BOX FOR POWER, 120 VAC, 20 AMP, SIZED BY THE ELECTRICAL ENGINEER. MOUNT AT BUILDING STANDARD BASE ELECTRICAL HEIGHT, UON. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(* = NUMBER OF DEDICATED CIRCUITS)

STANDARD INFORMATION OUTLET. MOUNT AT BUILDING STANDARD BASE ELECTRICAL HEIGHT, UON. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DATA DROPS)

AUDIOVISUAL CONTROL PANEL OUTLET. REFER TO DETAIL. TRIPLE-GANG BOX WITH DOUBLE GANG REDUCTION RING AND SINGLE POE DATA DROP, UON. MOUNT AT 48" AFF, UON. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DATA DROPS)

AUDIOVISUAL ROOM SCHEDULRE OUTLET. REFER TO DETAIL. DOUBLE-GANG BOX WITH SINGLE GANG REDUCTION RING AND SINGLE POE DATA DROP, UON. MOUNT AT 48" AFF, UON. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DATA DROPS)

DATA OUTLET FOR AUDIO NETWORK. PROVIDE DROPS WITH NEUTRIK ETHERCON CHASSIS CONNECTORS. MOUNT AT BUILDING STANDARD BASE ELECTRICAL HEIGHT, UON. REFER TO AV NOTES FOR ADDITIONAL INFORMATION. REFER TO DETAIL.(# = NUMBER OF DATA DROPS)

RS232 INTERFACE FOR LIGHTING AND SHADES. MOUNT AT BUILDING STANDARD BASE OUTLET HEIGHT, UON. REFER TO ELECTRICAL DRAWINGS FOR LIGHTING AND SHADE CONTROL SPECIFICATIONS.

CATV OUTLET WITH A SINGLE RF DROP, UON. MOUNT AT BUILDING STANDARD BASEOUTLET HEIGHT, UON.(# = NUMBER OF CATV DROPS)

POWER RECEPTACLE, DUPLEX, 120 VAC, 15 AMP, UON. FLUSH MOUNTED IN FINISHED CEILING. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DEDICATED POWER CIRCUITS)

POWER RECEPTACLE, QUAD, 120 VAC, SINGLE DEDICATED 20 AMP CIRCUIT. FLUSH MOUNTED IN FINISHED CEILING. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DEDICATED POWER CIRCUITS)

POWER RECEPTACLE, 208 VAC, SINGLE DEDICATED 30 AMP CIRCUIT. FLUSH MOUNTED IN FINISHED CEILING. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.

POWER RECEPTACLE, DUPLEX, 120 VAC, 15 AMP, OON. SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DEDICATED POWER CIRCUITS)

POWER RECEPTACLE, QUAD, 120 VAC, SINGLE DEDICATED 20 AMP CIRCUIT. SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DEDICATED POWER CIRCUITS)

JUNCTION BOX FOR POWER, 120 VAC, SINGLE DEDICATED 20 AMP CIRCUIT, SIZED BY THE ELECTRICAL ENGINEER. SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DEDICATED POWER CIRCUITS)

DATA OUTLET FLUSH MOUNTED IN FINISHED CEILING. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DATA DROPS)

DATA OUTLET SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING. REFER TO AV NOTES FOR ADDITIONAL INFORMATION.(# = NUMBER OF DATA DROPS)

RS232 INTERFACE FOR LIGHTING AND SHADES. SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING.

CATV OUTLET WITH A SINGLE RF DROP, UON. SURFACE MOUNTED TO SLAB ABOVE FINISHED CEILING.(# = NUMBER OF CATV DROPS)

SPEAKER LOCATION, SPEALER TYPE [1], SINGLE ZONEM OON. SHOW DETAIL. SHOWN FOR COORDINATION PURPOSES ONLY.(* = SPEAKER ZONE)

CUSTOM SPEAKER BACK BOX. FLUSH MOUNTED IN FINISHED CEILING.

MANUFACTURER BACK BOX MODEL MODEL# (X.X" DEEP). SPEAKER DRIVER TO BE INSTALLED AT A LATER DATE BY AV CONTRACTOR.(* = SPEAKER ZONE)

23.

FB

# *

J

#

FP

*#

RL

SC

W1

W2

*

#

*

CP#

RS#

AN#

J

#

SC

LVC

*

*

#

#

P

#

#

#

LS

S1

S2

P

*

J*

P*

TV

#

J

#

LS

TV#

ST

NOTES:

24.

25.

26.

27.

28.

A AMPERES

AC ABOVE COUNTER

AWG AMERICAN WIRE GAGE

C CONDUIT

CAT-3 TIA/EIA CATEGORY 3 RATED

CAT-5E TIA/EIA CATEGORY 5 E RATED

CAT-6A TIA/EIA CATEGORY 6A RATED

CAT-6E TIA/EIA CATEGORY 6 E RATED

CB CEILING BOX

CCTV CLOSED CIRCUIT TELEVISION

CKT CIRCUIT

COAX COAXIAL CABLE

CL CENTER LINE

COND CONDUCTOR

EM EMERGENCY

CP CONSOLIDATION POINT

CU COPPER

DVR DIGITAL VIDEO RECORDER

DWG DRAWING

EC CONDUCTOR

EX EXISTING

F/UTP FOILED/UNSHIELDED TWISTED PAIR

VP VAPOR PROOF

W WATTS

WM WIRE MANAGEMENT

WS WORKSTATION

WT WATER TIGHT

XFRM TRANSFORMER

TV TELEVISION

VA VOLT/AMPERS

VM VOLTMETER

TS TAMPER SWITCH

SP SPEAKER

SB SPEAKER BACK BOX

PR PAIR

PNL PANEL

POE POWER OVER ETHERNET

PRJ PROJECTOR

PTZ PAN/TILT/ZOOM

RM ROOM

RW RACEWAY

SC SCREW COVER BOX

PBX PRIVATE BRANCH EXCHANGE

PP PATCH PANEL

PA PUBLIC ADDRESS

NO NORMALLY OPEN

NO. NUMBER

NID NETWORK INTERFACE DEVICE

N NEUTRAL

NC NORMALLY CLOSED

MH MANHOLE

MER MECHANICAL EQUIPMENT ROOM

MC MAIN CROSS CONNECT

MIC MICROPHONE

LV LOW VOLTAGE

HC HUNG CEILING

HZ HERTZ

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FB FLOOR BOX

FO FIBER OPTIC

SCOPE OF WORK FURNISH INSTALL

IN-WALL BLOCKING SUPPORT FOR AV MOUNTS GC GC

MOTORIZED PROJECTION SCREENS GC GC

PROJECTION GLASS GC GC

WALL AND CEILING SPEAKER CUTOUTS

FURNITURE CUTOUTS FOR AV EQUIPMENT (UNLESS PROVIDED BY FURNITURE PROVIDER)

MOTORIZED PROJECTION LIFTS AV GC

KINDORF AND/OR BLACK IRON AS REQUIRED FOR CEILING MOUNTED AV DEVICES

GC GC

CABLE CONTAINMENT INCLUDING: EC EC

- CONDUIT WITH MEASURED PULLSTRINGS EC EC

- CABLETRAY, LADDERTRAY, AND WIREWAYS EC EC

- FLOORBOXES EC EC

- JUNCTION BOXES, PULL BOXES, AND BACKBOXES EC EC

POWER OUTLETS EC EC

DEDICATED DISTRIBUTION PANELS, LOAD CENTERS, AND POWER ISOLATION TRANSFORMERS

EC EC

AV CABLING (LOW VOLTAGE) AV AV

AV TERMINATIONS AV AV

CUSTOM ENGRAVED AV COVER PLATES AV AV

J-HOOKS AND OTHER SUPPORTS REQUIRED FOR OPEN-RUN AV CABLING

AV AV

AV DEVICE WALL MOUNTS AV AV

AV DEVICES (AS DESCRIBED IN THE AV BID DOCS) AV AV

VOICE/DATA NETWORK CABLING (FIBER AND TWISTED PAIR)

ST ST

VOICE/DATA COVER PLATES ST ST

CATV CABLING ST ST

LIGHTING & SHADE CONTROL INTERFACE EC EC

REFER TO AV DETAIL SHEETS FOR ADDITIONAL SCOPE DELINEATION AND INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:08:1

2 P

M

AUDIOVISUAL LEGEND

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TA0.0.0

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

NUMBER NAME

TA0.0.0 AUDIOVISUAL LEGEND

TA1.1 AUDIOVISUAL OVERALL PLAN LOWER

TA1.2 AUDIOVISUAL OVERALL PLAN FIRST FLOOR

TA1.3 AUDIOVISUAL OVERALL PLAN SECOND FLOOR

TA2.1 AUDIOVISUAL OVERALL RCP LOWER

TA2.2 AUDIOVISUAL OVERALL RCP FIRST FLOOR

TA2.3 AUDIOVISUAL OVERALL RCP SECOND FLOOR

TA3.1 LOWER LEVEL ENLARGED PLANS

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 19: BUILDING 11 RENOVATION

REF.

FEC

TA3.1

1

Room

051

PRINT SHOP

007

Room

50

Room

51

STAFF TOILET

020

CIRCULATION

002

STAIR

006OPEN OFFICE

003

OPEN OFFICE

024

OPEN OFFICE

030

CONFERENCE ROOM

047

MECHANICAL ROOM

044

STAIR

001

PHONE BOOTH

038

BOOT WASH

043

CONFERENCE ROOM

048

WORKROOM

023

IT SERVER

045

1:1 CONFERENCE

029

STAFF TOILET

021

ELECTRICAL

046

HOUSEKEEPING

041

LACTATION

042

ASSET RECOVERY

005

PLUMBING ACCESS

252

ELEVATOR

049

ELEV EQUIP

022

TIER 1 CALL CENTER

011

NOC

015

ITAC

016

INFO SEC

017

CA SUPERVISOR

013

CONVERGENT ARCHITECTURE LAB

014

SYSTEMS ENGINEER I

004

PRINT ROOM - STAFF

008

ASSET RECOVERY - STAFF

009

SOLUTIONS ENGINEERSUPERVISOR

010

OPS MANAGER

012

INFO SEC MGR

018

DIVISION MANAGER

025

INSPECTION COORDINATOR II

026

CONSTRUCTION BUREAU MANAGER

027

STORAGE

028

SURVEY TECHNICIAN

031

CITY SURVEYOR

033

STORAGE

035

CREW ROOM

036

STORAGE

037

BREAK ROOM

019

1:1 CONFERENCE

032

PHONE BOOTH

039PHONE BOOTH

040TA3.1

5

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:08:1

3 P

M

AUDIOVISUAL OVERALL

PLAN LOWER

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TA1.1

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

AUDIOVISUAL OVERALL PLAN LOWER

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 20: BUILDING 11 RENOVATION

REF.REF.

DN

DN

STAIR

132

STAIR

113

OPEN OFFICE

121

CADD ROOM

140

OPEN OFFICE

101

ENGINEER IV

118

ELEVATOR

161

WOMEN

129

OPEN OFFICE

157

ENGINEER V

105

CONFERENCE ROOM

137

STAFF TOILET

135

Room

000

CORRIDOR

160

CONFERENCE ROOM

114

OPEN OFFICE

106

SHARED WORK AREA

112

STAIR

149

OPEN OFFICE

143

BREAKROOM

138CONFERENCE ROOM

139

OPEN OFFICE

153

STAFF TOILET

133

MEN

130

LACTATION

127HOUSEKEEPING

128

PLUMBING ACCESS

259

PLUMBING ACCESS

134

PHONE BOOTH

136

SYSTEMS ANALYST III

144

SYSTEMS ANALYST III

145

GIS COORDINATOR

146

CADD SUPERVISOR

142

ENGINEERING TECHNICIAN III

141

1:1 CONFERENCE

147

STORAGE

131

QA/QC MANAGER

107

1:1 CONFERENCE

111

ENGINEER V

152

STORAGE

151

ENGINEER IV

155

ENGINEER IV

156

ENGINEER V

154

PROJECT MANAGER SUPERVISOR

124

PROJECT MANAGER SUPERVISOR

125

TECHNICAL SERVICES MANAGER

126

STORMWATER ENGINEERINGCENTER ADMINISTRATOR

120

ENGINEER V

119

ENGINEER IV

117

ENGINEER IV

116

OPEN OFFICE

110

1:1 CONFERENCE

122

ENGINEER IV

108

HUDDLE AREA

115

OPEN OFFICE

104

ADMINISTRATIVE SPECIALIST I

103

STORAGE

102

LOBBY

100 ENGINEER IV

158

ENGINEER IV

159

ELECTRICAL

109

IT ROOM

123

HUDDLE AREA

148ELECTRICAL

150

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:08:1

5 P

M

AUDIOVISUAL OVERALL

PLAN FIRST FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TA1.2

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

AUDIOVISUAL OVERALL PLAN FIRST FLOOR

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 21: BUILDING 11 RENOVATION

OPEN OFFICE

205

OPEN OFFICE

220

OPEN OFFICE

213

OPEN OFFICE

209

SHARED WORK AREA

234

CORRIDOR

201

STAIR

254

ELEVATOR

235

STAIR

211

MEN

202

MECH

219

CONFERENCE ROOM

208

CITY ENGINEER

223

CONFERENCE ROOM

231

CONFERENCE ROOM

221

CONFERENCE ROOM

225

WOMEN

203

ACCESS

204

LACTATION ROOM

206

ENGINEER V

207

CONTRACT SUPERVISOR

210

ENGINEER IV

214

ENGINEER V

215

ADMIN ASST

217

FILES

216

1:1 CONFERENCE

222

ADMINISTRATIVE SERVICESMANAGER III

224

OPERATIONS SUPPORTADMINISTRATOR

226

DIRECTOR

227

EXECUTIVE ASSISTANT

228

MEDIA & COMMUNICATIONS

229

IT POSITION

230

FILE ROOM

212

ELECTRICAL

218

IT ROOM

232

STORAGE

233

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:08:1

7 P

M

AUDIOVISUAL OVERALL

PLAN SECOND FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TA1.3

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

AUDIOVISUAL OVERALL PLAN SECOND FLOORREVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 22: BUILDING 11 RENOVATION

Room

051

PRINT SHOP

007

Room

50

Room

51

?

?

?

?

CIRCULATION

002

?

?

STAIR

006OPEN OFFICE

003

CONFERENCE ROOM

047

MECHANICAL ROOM

044

STAIR

001

STAIR

006

PHONE BOOTH

038

BOOT WASH

043

?

?

CONFERENCE ROOM

048

IT SERVER

045

STAFF TOILET

021

ELECTRICAL

046

HOUSEKEEPING

041

LACTATION

042

ASSET RECOVERY

005

?

?

?

?

ELEVATOR

049

ELEV EQUIP

022

TIER 1 CALL CENTER

011

NOC

015

ITAC

016

INFO SEC

017

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:08:1

8 P

M

AUDIOVISUAL OVERALL

RCP LOWER

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TA2.1

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

AUDIOVISUAL OVERALL RCP LOWER

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 23: BUILDING 11 RENOVATION

STAIR

132

STAIR

113

ELEVATOR

161

WOMEN

129

CONFERENCE ROOM

137

STAFF TOILET

135

Room

000

CORRIDOR

160

CONFERENCE ROOM

114

STAIR

149

CONFERENCE ROOM

139

STAFF TOILET

133

MEN

130

LACTATION

127

HOUSEKEEPING

128

PLUMBING ACCESS

259

PLUMBING ACCESS

134

PHONE BOOTH

136

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:08:2

0 P

M

AUDIOVISUAL OVERALL

RCP FIRST FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TA2.2

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

AUDIOVISUAL OVERALL RCP FIRST FLOOR

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 24: BUILDING 11 RENOVATION

OPEN OFFICE

205

OPEN OFFICE

209

SHARED WORK AREA

234

STAIR

254

ELEVATOR

235

STAIR

211

MEN

202

MECH

219

?

?

CONFERENCE ROOM

208

CONFERENCE ROOM

231

CONFERENCE ROOM

221

WOMEN

203

ACCESS

204

LACTATION ROOM

206

NOTE: DEMOUNTABLE PARTITIONS AND DOORS SHOWN DASHED FOR INFORMATION AND COORDINATION PURPOSES ONLY, NIC. REFER TO THE FURNITURE DRAWINGS AND THE PROJECT MANUAL PREAMBLE-ALTERNATES AND UNIT PRICING FOR ADDITIONAL INFORMATION

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:08:2

1 P

M

AUDIOVISUAL OVERALL

RCP SECOND FLOOR

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TA2.3

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/8" = 1'-0"1

AUDIOVISUAL OVERALL RCP SECOND FLOOR

REVISIONS

DATE DESCRIPTION

mgibson
Text Box
4/15/20 ADD-01
Page 25: BUILDING 11 RENOVATION

NOC

015

TA3.1 2

TA3.1

3

TA3.1

4

102

110

131

OPS MANAGER

012

CONVERGENT ARCHITECTURE LAB

014

CA SUPERVISOR

013

TIER 1 CALL CENTER

011

112

111

142

111

3' -

6"

136

1' -

6"

102

131

5' -

6"

3' -

6"7

' - 1

0 1

7/3

2"

112

136

1' -

6"

IT SERVER

045 146

MO

SE

LE

YA

RC

HIT

EC

TS

.CO

M

PROJECT NO:DATE:

320

0 N

OR

FO

LK

ST

RE

ET

, R

ICH

MO

ND

, V

A 2

323

0

PH

ON

E (

80

4)

79

4-7

555

F

AX

(8

04

) 3

55

-569

0

A

B

C

D

E

1 2 4 53 6 7 8 9 10

F

G

H

I

J

3/3

1/2

02

0 4

:08:2

3 P

M

LOWER LEVEL

ENLARGED PLANS

CIT

Y O

F V

IRG

INIA

BE

AC

H

BU

ILD

ING

11

RE

NO

VA

TIO

N

Pro

ject

Ad

dre

ss

TA3.1

PW

CN

-18-

0156

CIP

-3-1

74

548507MARCH 31, 2020

1/4" = 1'-0"1

NOC 015, TIER 1 CALL CENTER 011, CONVERGENT ARCHITECTURE LAB 014 ENLARGED FACILITY PLAN

AUDIOVISUAL FACILITY KEYNOTE LEGEND

NUMBER DESCRIPTION

102 65" FLAT PANEL DISPLAY WITH DISPLAY BACK BOX

110 DUAL ARM FULL SWING DISPLAY MOUNT KIT

111 VIDEO WALL DISPLAY, 55", 2X2

112 VIDEO WALL DISPLAY, 55", 6X2

131 WALL MOUNTED PTZ CAMERA

136 AV WALL PLATE

142 AV FLOOR BOX

146 AV EQUIPMENT RACK - FLOOR STANDING, FULL SIZE

1/4" = 1'-0"2

NOC 015 ELEVATION1/4" = 1'-0"

3CONVERGENT ARCHITECTURE LAB 014 ELEVATION

1/4" = 1'-0"4

TEIR 1 CALL CENTER 011 ELEVATION

REVISIONS

DATE DESCRIPTION

1/4" = 1'-0"5

IT SERVER F045 FACILITY ENLARGED PLAN

mgibson
Text Box