Page 1: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 1

BTS Biogas Srl/GmbH Company Overview

Page 2: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 2

BTS Biogas, is active in the design, engineering and construction of turnkey or modular biogas power plants with a rated capacity of 50 kW to 1.5 MW+. With an experience of more than twenty years, BTS has built 170 plants with a total capacity of 134 MW. With its full-service contracts, the company offers a complete package for operators comprising maintenance, servicing and biological optimization. BTS’s activities cover the entire value chain, from biomass cultivation to the use of digestate. BTS Biogas engineers plants that make exclusive use of agricultural residues such as wheat, rice or corn straw, manure, landscaping material and organic wastes. The company has 120 employees (biologists, technicians, chemists and agronomists) committed to product development and enhancement at BTS Biogas. Their competence and over twenty years of experience in the energy sector make TS energy GROUP, to which BTS Biogas and GTS Syngas are affiliated, Italy’s biggest operator for one-stop shopping in the field of biogas.

Short description

Page 3: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 3

Development of Revenue Engineering + Monitoring of plants

31,497,272 €

46,426,368 €

74,804,969 €

0 €

10,000,000 €

20,000,000 €

30,000,000 €

40,000,000 €

50,000,000 €

60,000,000 €

70,000,000 €

80,000,000 €

2010 2011 2012 2013

60% growth in 2012, continues for 2013, especially in Asia. Since beginning of 2014 active in USA, 120 academic co-workers; engineers, chemists and technicians.

Page 4: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 4

The Group

BIOGAS SYNGAS AGRICULTURE

Page 5: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 5

1992 - 2002 2002 - 2007 2007 - 2011 2002 - 2007 1992 - 2002 2007 - 2011 2011

• UTS Umwelt Technik Süd GmbH • 1996 first biogas power plant in Italy

• UTS Italia Tecnologie Ambientali srl • 2006 first Info Biogas

• 2007 new owner • 2008 B.T.S. Italia • 2009 BTS Biogas GmbH

• 2011 GTS Syngas GmbH • 2012 International Centre Affi • 2013 BTS goes Japan

UTS Umwelt Technik Süd GmbH

UTS Italia Tecnologie Ambientali srl

BTS Biogas GmbH

TS energy Group goes abroad

Our company in a glance

Growth in 2012 – 60%

Page 6: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 6

Our company: subsidiaries

Logistics & International Training Centre Affi (VR) – Italy 800 m² offices 3500 m² warehouse 18500 m² surface

METANlab laboratory Porto Mantovano (MN) Italy

First company in Italy with an own

biogas laboratory - METANlab

Page 7: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 7

Products

• Turnkey biogas power plants (modules from 50 kW up to 1.5 MW+)

which can flexibly be combined and multiplied

• Possible use of various types of biomass

• Costumized solutions (for the farmers, industrial agronomists,

communities and investors in many countries)

• Software development for our customers

Page 8: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 8

Integrated technologies

Page 9: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 9

• By means of our own laboratory "METANlab" we’re able to optimize the seed, the harvest, the silage and the biochemical operation of the biogas power plants of our customers

• An occupancy rate of at least 8,000 full-load hours per year • Automation and software development

Control of complete value chain

Page 10: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 10

Plants

• Over 20 years of experience in agriculture – in the design, construction and operation of biogas power plants (modules from 50 KW up to 1.5 MW)

• A “Repowering” of biogas power plants with the BIOaccelerator technology (accelerated fermentation and increase of the methane yield thanks to the pre-treatment of the biomass)

• Full Service - maintenance, technical service and biological support

Page 11: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 11

BTS Bio Gas Plants are Superior to Other Bio Gas Plants

• 20 years of experience in building and operating a large numbers of plants

• Pre treatment of substrates (raw materials) with BTS “BIOaccelerator” allows to use various different substrates at high yield

• Continuous monitoring (online) of the digestion parameters in combination with the use of the Dina METAN software allows at any time to calculate the optimum available feed stock addition to the reaction in process

• This allows to guarantee performance of 8000 hours per year production at full capacity

Page 12: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 12

BTS Technology Highlights

Profitability of a bio gas plant depends on the productivity level of such a difficult bio gas process • BIOseparator • BIOaccelerator • METANmax • ɳ[ETA]max • NITROstripp & BIOdry

Page 13: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 13

Average: 8.667 h

kWh % of Pos. [kW] Jan-Dec 2012 Full production

Full running hours

Soresina 1 634 5.538.512 99,46 8.736 Zambelli 2 996 8.651.679 98,88 8.686

AGT 1 3 999 8.671.338 98,82 8.680 BMZ 4 995 8.634.566 98,75 8.678

Finato 5 700 6.064.662 98,65 8.664 Volpi 6 998 8.640.561 98,58 8.658

Gallmann 7 997 8.626.082 98,49 8.652 Grazioli 8 250 2.162.177 98,44 8.649

Martinoni 9 526 4.543.925 98,28 8.639 Ghione 10 990 8.539.829 98,20 8.626

Top Ten Best Performance Plant

Page 14: BTS Biogas Srl/GmbH - GACC · PDF file• 20 years of experience in building and operating a large numbers of plants • Pre treatment of substrates (raw materials) with BTS “BIOaccelerator”

© TSenergyGroup | 2014 14

Thank you for your patience

Thomas Trendelenburg