bsr 1-1

6
SREENIVASA RAO BONGU 5-23/3, Santosh Nagar, Kothapalem, Gopalapatnam, Visakhapatnam-530027. AP. India +91 9440436832 [email protected] Accomplished, proactive engineer with more than 20 years of experience in electrical design, testing, analysis, and project coordination. Expert in maintenance, installation of DG’s, electrical panel board installation and electrical cabling. Recognized for strong adherence to work well as a team member and a leader. Core competencies and professional strengths include: Electrical Design Report Preparation Cross-functional Collaborations Electrical Testing Budget Development Project Scheduling Cost Controls and Purchasing Proficient in CATIA, AUTO-CAD, MS Project, MS Office & Internet navigation. Oral and written communication skills. Effective time management skills. ISO – 9001 for Quality management OSHAS – 18001 Occupational health and safety management system ISO – 14001: EMS, Environmental management system ISO – 27001: IMS, Information security management Since Oct 2014 Asst. Manager Installation and planning department LARSEN & TOUBRO HEAVY ENGINEERING Visakhapatnam, Andhra Pradesh 530017, India Since 2005 at Larsen & Toubro Heavy Engineering, involved in multiple projects and served as a team member, project lead in various departments. Currently working as an Asst.Manager in Electrical Electrical Engineer Standards/Certifications Professional Experience

Upload: sreenivasa-rao

Post on 13-Apr-2017

82 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: BSR 1-1

SREENIVASA RAO BONGU

5-23/3, Santosh Nagar, Kothapalem, Gopalapatnam,Visakhapatnam-530027. AP. India

+91 [email protected]

Accomplished, proactive engineer with more than 20 years of experience in electrical design, testing, analysis, and project coordination. Expert in maintenance, installation of DG’s, electrical panel board installation and electrical cabling. Recognized for strong adherence to work well as a team member and a leader. Core competencies and professional strengths include:

Electrical Design Report Preparation Cross-functional Collaborations Electrical Testing Budget Development

Project Scheduling Cost Controls and Purchasing Proficient in CATIA, AUTO-CAD, MS Project,

MS Office & Internet navigation. Oral and written communication skills. Effective time management skills.

ISO – 9001 for Quality management OSHAS – 18001 Occupational health and safety management system ISO – 14001: EMS, Environmental management system ISO – 27001: IMS, Information security management

Since Oct 2014

Asst. Manager Installation and planning departmentLARSEN & TOUBRO HEAVY ENGINEERINGVisakhapatnam, Andhra Pradesh 530017, India

Since 2005 at Larsen & Toubro Heavy Engineering, involved in multiple projects and served as a team member, project lead in various departments. Currently working as an Asst.Manager in Electrical Installation and planning department for construction of submerged vessels

Roles: Planning of yearly schedule and preparation of monthly schedules. Arrangement of three months plan material for production inputs. Resolving the day to day issues which are raised by production in charges. Take up the issues to customer and liase with designer for early resolving issues.

Responsibilities: Monitoring and controlling the production status daily. Monitoring the critical path activities for completion on time and follow up for

sequential activities.

Electrical Engineer

Standards/Certifications

Professional Experience

Page 2: BSR 1-1

Assessment of interferences in 3D environment while progressing the actual work. Completion of local run and Main run cabling in time.

2011 to Oct 2014

Maintenance Engineer Plant Maintenance, Department of Manufacturing facilityLARSEN & TOUBRO HEAVY ENGINEERINGVisakhapatnam, Andhra Pradesh 530017, India

Roles: Preparation of capital Budget and procurement of capital assets Oversee Preventive & Break down maintenance of machinery Regular communication with internal customers to meet production oriented

requirements Procurement of capital assets through ERP

Preparation of capital budget plan with necessary back-up and approval of same from top management.

Preparation of operating procedures, Preventive maintenance calendar and check lists, Data monitoring for monthly maintenance statistics

Responsibilities: as Plant maintenance Head, responsible for planning preventive maintenance

schedules of various Machinery/Equipment includes Welding Robots, Inverter based welding machines, CNC profile cutting machines, Hydraulic presses, rolling machines, CNC Lathe & milling machines, Boring machines, Band saw cutting machine, Radial drilling machines, EOT Cranes, Compressors, Grinding machines, Shearing machine, punching machines etc. to increase machine up time / equipment reliability; thereby accomplishing planned production targets within budget.

Ensuring suitable deployment of manpower & timely availability of manpower and equipment/materials to ensure timely repairs

Liaison with consultants, Contractors, Sub-Contractors, supervisors, planners, welding Engineers and the general workforce involved in the project

Finalization of AMCs (annual maintenance contracts) and repair contracts Ensuring all Equipment / Machinery power supply given through ELCB’s and also

periodical inspection of healthiness of ELCB’s in site. Periodical inspection of Earth pits and measurement of Earth Resistance Conducting Safety pep talks and training sessions on various topics such as

Electrical safety and Machinery safety etc to the workmen Co coordinating with Safety department for Illumination, Vehicle inspection,

Generators and Electrical inspection Reports Inducting awareness session among the Engineers and workmen regarding

operation of the machines, preventive measures and energy saving techniques Setting of Department Performance parameters for the department and ensuring

continual improvement in achieving the DPP’s Conducting meetings with subordinates to review the progress, identify their

weaknesses & strengths and impart necessary training

Page 3: BSR 1-1

Identifying scope for implementation & monitoring of technological changes to enhance productivity.

Executing cost saving techniques / measures and modifications to achieve substantial reduction in O&M

Estimation of minimum spares required for minimizing the breakdown of machinery and cost control with lowest store inventory

Resource Planning- Identification of resources, Timely arrangement of resources and optimal utilization of all types of resources Conducting Energy auditing and implementing corrective actions

Development of multi skill workmen in Maintenance team LED Lighting: Design and development of low voltage (24V) LED lights for Vessel Ensuring safety compliance with in the team and attending to Safety walk down and

safety committee meetings Installation of DG sets (500 KVA) and maintenance.

2005 to July 2011

Design Engineer Planning & Outfitting department for construction of submerged vesselLARSEN & TOUBRO HEAVY ENGINEERINGVisakhapatnam, Andhra Pradesh 530017, India

Roles: Installation of local run cables and main run cables equipment compartment of ship1. Installation of Engineering & Electrical equipment Installation pipes System integration and handing over to Customer post launch of ship

Responsibilities: Preparation of monthly/weekly plans, study of schematic drawings, assessment for

interferences in 3D environment, finalization of layout plan, preparation of procedures, preparation of BoQ, installation and monitoring of progress. Interaction with customer (INDIAN Navy) for Free Issue equipment supply, query resolutions, progress updates and site reviews.

July 1998 to March 2005

Electrical Engineer BOTHRA SHIPPING SERVICES Visakhapatnam, Andhra Pradesh 530020, India

Roles: Worked at Bothra Shipping Services as Electrical Engineer, responsible for

completion of below mentioned works for construction of floating crane “RAVI B” (at Hindustan Shipyard Limited).

Installation of electrical equipment such as Distribution Boards, Operation of Two 500KVA DG’s with synchronous operation etc.

Laying of cables across the ship & Connectorization of cables Electrical Maintenance during crane operation

Maintenance of automatic bagging plant

Page 4: BSR 1-1

Responsibilities:As an Electrical Engineer at Bothra Shipping Services I was responsible for planning, execution of work through sub-contractors and co-ordination with OEM.

March 1995 to July 1998

Electrical Service Engineer REED MEDWAY PACKAGING COMPANY OF INDIA PVT LTD.Electrical Service Engineer for Maintenance, installation & commissioning of packaging machinery.

Responsibilities:

Installation and commissioning of Electronic bagging /packing machine for electronic auto weighing and packaging machine (Mfr.M/S Chronos richardson(SPEEDAC 7),

Installation & commissioning of conveyors to fertilizer, sugar, polymer plants

Academic : Diploma in Electronics & Communication Engineering State Board of Technical Education & Training, Andhra Pradesh, INDIA

Expertise : MS-Dos, MS-Office 97/2000, Windows 95/98

Date of Birth : 12-06-1971

Marital Status : Married

Passport Details : H2948429

Strengths : Communication Skills, Patience, Hard work & Positive Attitude.

Other Activities : Participating in Cultural events and corporate social initiatives.

DECLARATION:All the information furnished herein is true to the best of my knowledge and belief, I bear the complete responsibility for the correctness of the particulars mentioned above.

Date:

Place: Signature

Educational Qualifications

Personal Profile