Page 1: Brochure Menard GB 2010

The Soil Improvement Specialist

Design, Construct… PerformHead Office

2 rue Gutenberg - BP 2891620 Nozay - France

Tél. : 01 69 01 37 38 - Fax : 01 69 01 75 05www.menard-web.com

CHEMISE GB INGENIEUR DU SOL_Mise en page 1 07/09/10 07:37 Page1SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD COUV INGENIEUR DU SOL GB $DOCPAGE 07/09/2010

Page 2: Brochure Menard GB 2010

The company

Overview page 2 History page 3

Menard around the world page 4 et 5

Techniques page 6 et 7

The Solutions

Infrastructure (Roads, Railways) page 8

Heavy Industry (Water, Power, Oil & Gas) page 9

Platforms and Logistics (Ports, Airports) page 10 et 11 Commercial and Industrial Buildings page 12

Content

King Adbullah University of sciences and Technology (KAUST) – Saudi Arabia

SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD INTERIEUR INGENIEUR DU SOL GB $DOCPAGE 16/09/2010

Page 3: Brochure Menard GB 2010

As a specialist geotechnical contractor, Menard delivers complete design-build foundation systems using ground improvement techniques. Our solutions are creative and cost-saving alternatives to the deep foundations traditionally used to support buildings and structures.

A Comprehensive Service

As a result of the geotechnical know-how accumulated through the completion of thousands of projects, MENARD consistently provides the essentials for success: a good price, a reliable schedule, well managed construction techniques and a commitment to excellence in safety and environmental protection.

A Complete Solution

Often involved from the project conception onwards, Menard works closely with clients in analyzing their objectives. Based on the geotechnical investigation report and the description of the structures to be built, MENARD will recommend the most appropriate soil improvement technique, depending on the analysis of the soil, the structure and the environmental constraints. MENARD engineers will then produce a detailed design, and the subsequent construction will be carried out by dedicated teams based in more than 50 locations worldwide. Finally, our quality control procedures will allow us to com-plement our design and construct package with a long-term guarantee.

State of the Art Technology

Over the last 50 years, MENARD has improved and developed a complete range of innovative and sustai-nable soil improvement techniques. A fundamental objective of the company has always been to remain at the forefront of technological advances in this fi eld and to offer more effi cient, reliable and economi-cal solutions. Our leading expertise is built on our fi eld experience, our numerical modelling capabilities and the development and optimization of specialised construction equipment.

The history of Menard has been punctuated with a series of world fi rsts, each demonstrating the company’s inherent capacity to innovate. Today, Menard is a major player in the construction sector.

1955 Invention of the MENARD Pressuremeter.1968 Invention of Dynamic Compaction (DC) for sandy soils.1975 Development of Dynamic Replacement (DR) for clayey soils.1977 First major contract outside France: Changi Airport, Singapore.1988 Development of Menard Vacuum with a fi rst application in France.1994 Development of Controlled Modulus Columns (CMC).2002 Develoment of Dry Bottom Feed method for offshore stone columns.

1977 Changi Airport, Singapore – First 40 m deep Vertical Drain1978 Nice Airport, France – Deepest (27 m) Dynamic Compaction application (4,000 tm energy)1989 European Space Centre, French Guyana – Full scale 300 t load test on Dynamic Repla cement pillars 1998 Jangyoo Sewage Treatment Plant, South Korea – Largest induced settlement on a soil improvement jobsite (5.5 m).2001 Airbus Industries in Hamburg, Germany – 1,600,000 m2 of reclaimed platform, im proved using Vertical Drains and Menard Vacuum.2001 National Wholesale Market Corbas (Lyon) - The largest Dynamic Compaction project undertaken in France, 470,000 m2.2006 Mayfi eld steelworks site remediation, Australia – Deepest barrier wall using the continuous open trench method (1.5 km long, 28 to 49 m deep).2007/2008 King Abdullah University of Science and Technology, Saudi Arabia – 2.7 million m2 completed in 8 months using 13 rigs for Dynamic Compaction/Replacement.2008/2009 Al Falah Community, Abu Dhabi – 4.85 million m2 completed in 7 months using 11 Dynamic Compaction rigs

Overview History

The company The company

Innovations

World fi rsts and major projects

Nice Airport - France Offshore Compaction - Kuweit

SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD INTERIEUR INGENIEUR DU SOL GB $DOCPAGE 16/09/2010

Page 4: Brochure Menard GB 2010

(Bottom Feed)

C

Dynamic Compaction

Stone Columns

Vertica Drainsl

Controled Modulusolumns

Temporary offi ces

Permanent offi ces

MENARD around the world

You will fi nd the addresses of the different branches of MENARD

worldwide, as well as summaries of completed projects, on our internet site: www.menard-web.com

The company

The services MENARD offers are accessible everywhere via our subsidiary companies and agencies. This network of establishments in more than 50 countries allows our engineers to be available to achieve our clients’ most ambitious projects all around the world.The Scientifi c Committee and the Technical Department of MENARD ensure that inno-vations and know-how are circulated effectively throughout the group. Consequently, every client benefi ts from solutions which have been tried and tested on numerous projects.

SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD INTERIEUR INGENIEUR DU SOL GB $DOCPAGE 16/09/2010

Page 5: Brochure Menard GB 2010

Techniques Techniques

Dynamic Compaction (DC)

Vertical Drains (VD)

Menard Vacuum (MV)

Vibro Compaction (VC)

The techniques implemented by Menard can meet the most demanding specifi cations. They fall into two categories.

Improvement without addition of material

For granular soils (sand, gravel), densifi cation is achieved by pounding (Dy-namic Compaction) or vibratory (Vibro Compaction) methods. For cohesive soils (clay, silt), the soil characteristics are improved by preloading the site with a temporary embankment; this process can be signifi cantly accelerated by installing a drainage system (Vertical Drains). The atmospheric pressure (Menard Vacuum) can also be applied instead of the load of the embank-ment to provide an accelerated isotropic consolidation.

Improvement with addition of material

These techniques consist in installing fl exible, rigid or semi-rigid vertical inclu-sions in the compressible soil layers. These inclusions are laid out following a regular grid pattern. They are either made of non-cohesive granular material (stone columns and dynamic replacement pillars) or involve the use of a bin-der (controlled modulus columns, compaction grouting, soil mixing, jet grou-ting). The resulting consolidated soil layer behaves like a composite material with improved characteristics.

Dynamic Compaction Rig mounted with the MARS system developed by Menard

CMC rig designed by Menard

The diagrams below and on the next page illustrate the optimal range of each technique, depending on the type of structure, the depth of soil to be improved and the type of soil.

The Company The Company

Hight Energy Dynamic Compaction (DCHE)

Bi-Modulus Columns (BMC)

Controled Modulus Columns (CMC)

Jet Grouting (JG)

Compaction Grounting (CG)

Soil Mixing (SM)

Stone Columns (SC)

Dynamic Replacement (DR)

Peat Clay Silts Marls and BlokcsSand and GravelSand

DV

MV

DC

HEDC

below 1 m - soil substitution

Improvement without addition of material

MV

VC

1 m

5 m

10 m

15 m

20 m

25 m

30 m

Peat Clay Silts Chalk Sand and GravelsSand

DRCMC sc CG

Improvement with additional of material

SM

below 1 m - soil substitution

JG

SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD INTERIEUR INGENIEUR DU SOL GB $DOCPAGE 16/09/2010

Page 6: Brochure Menard GB 2010

The Solutions The Solutions

InfrastructureRoads and Railways

Heavy industryWater, Power, Oil&Gas

Objectives :

- reduce long term differential settlements;

- guarantee the stability of high embankments with regards to circular slope failure

For transportation engineers, it is not always possible to avoid building on highly compres-sible soils. The crossing of wetlands and rivers in particular will require an important consoli-dation of the in-situ soil in order to avoid ma-jor slope failures within the future road and rail embankments.The pre-consolidation of the most compres-sible areas is crucial to prevent long term creep settlement while ensuring the infrastructure can be operated safely. The consolidated soil foundation will increase the service life of the road pavement, thus reducing life-cycle costs for the roads and railways.Approach embankments leading to bridges can produce signifi cant loads in subsurface soils, up to 20 t/m2. These specifi c critical zones will require intensive ground improve-ment to ensure proper performance.

Our clients: Camrail. P.L.U.S Malaysia, Eurotunnel, Korea RailRoad Authority, Deutsche Bahn, SNAM, US Depart-ment of Transportation, SNCF, Federal Highway Authorities, ASF, EGIS, INGEROP

The term Heavy Industry covers specifi c facilities such as sewage treatment plants, power plants, refi neries, petrochemical plants, storage areas, etc. These structures are often very heavy and prone to risk. Their foundations in compressible soils is a major challenge to guarantee the safe and secure performance of the plants over time. The most cost-effective foundations system of-ten requires using multiple soil improvement treatment techniques to match the variety of soil properties and load conditions.These foundation systems will:support uniform heavy loads (water, oil and gas storage tanks);support isolated loads (pipe-racks, industrial buildings, machinery);reduce total and differential settlements to wi-thin acceptable limits.

Our clients:Agip, China Petroleum Corp., JGC, Phillips Petroleum, ABB, Chevron, Mitsubishi Heavy Industries, Saudi Royal Commission, Amoco, Elf/Antar, Mobil/NNP, Technip, Bayer AG, Formosa Plastics, Parsons, Total, Bechtel, Foster Wheeler, Péchiney, Caltex-Exxon/Mobil, Petronas, Areva, Saint Gobain, Arce-lor...

Objectifs du traitement :

- Provide a bearing capacity of up to 25 t/m²- Allow isolated loads of up to 300 t- Reduce differential settlements to around 1/1000

Menard Vacuum consolida-tion of the approach embank-ments for the Boutonne river crossing on A837 in Saintes-Rochefort area, France.

Menard Vacuum Consolida-tion of the Eurotunnel railway station at Coquelles, France. View of the station under operation after construction.

Installation of 25 m deep Ver-tical Drains in clay under the Rabat-Tanger motorway (Mo-rocco) to consolidate the road embankments by preloading.

Soil improvement using CMC under the approach embank-ment of a bridge. View of site after completion of the em-bankment.

Consolidation by Dynamic Compaction and Preloa-ding for the Tsing-Yi oil ter-minal, Hong Kong.

Menard Vacuum Conso-lidation of 40 m of very soft marine mud for Pusan Sewage Treatment Plant, South Korea. View of the membrane during pumping operations.

LNG tank on Bonny Island, Nigeria. Turnkey foundation system including preloa-ding under roads, Dynamic Replacement under indus-trial facilities and Jet Grou-ting under heavy tanks.

Pusan Sewage Treatment Plant after completion, South Korea.

Menard VacuumTM

+

Substratum φ 60 - 100 cm

Dynamic

Preloading & Drains

Replacement Pillars

Imprevious Layer

Compressible Soils

Up to 50 m

Stone Colum sn

Access Embankments

Substratum

Voiries

Hangars

φ 80 - 1,20 M.

Controlled ModulusColumns

JetGrouting

Verticcal Drains Dynamic Replacement

Warehouses

RoadsTanks

Factory

SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD INTERIEUR INGENIEUR DU SOL GB $DOCPAGE 16/09/2010

Page 7: Brochure Menard GB 2010

The solutions The solutions

Platform and Logistics – Ports and Airports

Objectives :

-ensure the self-bearing capacity and stability of the fi ll and existing soils;

-reduce long term residual settlements.

Cohesive soils Granular soils

Objectives :

- ensure the self-bearing capacity and stability of the fi ll; - increase the bearing capacity;

Available lands around marine routes (sea, ri-vers) on which ports and airports are construc-ted often consist of highly compressible and saturated soils. Our techniques provide econo-mical solutions to consolidate these soils within a reduced timeframe, in order to guarantee mi-nimal residual settlements when the platforms are operational.

Our clients:Port of Dunkerque, Port of Guadeloupe, Port of Havre, Port of Nantes Saint-Nazaire, Port of Paris, Port of Hambourg, Port of Lubeck, Port of Wismar, Port of Kaohsiung, Port of Pusan, Port of Taichung, Port of Uddevalla, Port of Mar-seille, Port of Rouen...

Substratumφ 200 - 250 cmφ 60 - 80 cm

Stones Columns+

Preload

Dynamic Replacement Controlled Modulus Columns

COHESIVE SOILSClays, silts, peat

Vibroflotation Dynamic Compaction

GRANULAR SOILSGravel, sand, fill

Our clients :Port of Beyrout, Port of Long Beach, Port of Singapour, Hong-Kong Airport, Macau Airport, Nice Airport, Osaka Airport, Singapore Airport...

Ports and airports usually cover large areas of land – several hectares – and they are conse-quently often reclaimed from the sea using granular dredged materials or imported fi ll ma-terials. The challenge is to provide an economi-cal means to improve the characteristics of the large quantities of fi ll involved in the construc-tion of the platform. The primary objectives of the ground improvement works is to ensure the short-term and long-term stability of the plat-form. When required, a more intensive impro-vement can also increase the bearing capacity suffi ciently to support future facilities and buil-dings. Eventually, in seismic areas, the risk of liquefaction can be mitigated.

Port of Wismar, Ger-many. Menard Vacuum consolidation of the container storage area (22,000 m2).

Port of Lübeck, Ger-many. Vacuum conso-lidation of dredged mud. View of the ba-sin being backfi lled.

Port of Lübeck. Gene-ral view of the contai-ner storage platform.

European Space Centre, French Guyana. Instal-lation of Dynamic Re-placement pillars un-der the railway linking the assembly area to the launching pad.

Pasir Pajang, Singa-pore. Improvement to a depth of 15 m using Vibro Compaction.

Macau International Airport. Dynamic Com-paction for anti-lique-faction and consolida-tion purposes.

Dynamic Compaction on the artifi cial is-land of Osaka Airport, Japan. A tripod de-veloping an energy of 1,400 t.m (drop height times pounder weight) was used.

- mitigate the risk of liquefaction (in seismic zones).

SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD INTERIEUR INGENIEUR DU SOL GB $DOCPAGE 16/09/2010

Page 8: Brochure Menard GB 2010

The solutions

Objectives:

-Allow uniform loads over large areas of 5 t/m²

-Allow isolated loads of up to 400 t

-Reduce differential settlements to less than 1/1,000

Commercial and Industrial Buildings

Stones Columns Dynamic Replacement

Controlled Modulus Columns

Substratum

CompressibleSoil

Our clients:Auchan, BEG, Black & Veatch, Casino, Calberson, Carrefour, Castorama, CIA, CVZ, Danzas, Décathlon, Eurodisney, IEE, Intermarché, Leclerc, Metro, Novatrans, Samsung, Stockal-liance, GSE, GA, ABCD, Prologis...

Ground improvement technologies are well adapted to loads induced by commercial structures, such as slab-on-grade and isola-ted footings.Depending on the in-situ soil properties, Me-nard engineers rely on three particular op-tions to deliver a cost-saving foundation sys-tem: Dynamic Replacement, Stone Columns and Controlled Modulus Columns.

Steel structure wa-rehouse with loads of 80 t on isolated footings and 3 t/m2 on slab.

Logistic warehouse founded on Dynamic Replacement pillars.

Pallet storage on slab. Maximum uni-form loading of 5 t/m2. Maximum allo-wable settlement: 0.8/1000.

Typical structure with posts and slab.

SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD INTERIEUR INGENIEUR DU SOL GB $DOCPAGE 16/09/2010

Page 9: Brochure Menard GB 2010

The Soil Improvement Specialist

Design, Construct… PerformHead Office

2 rue Gutenberg - BP 2891620 Nozay - France

Tél. : 01 69 01 37 38 - Fax : 01 69 01 75 05www.menard-web.com

CHEMISE GB INGENIEUR DU SOL_Mise en page 1 07/09/10 07:37 Page1SIO Ceci un PDF 72DPI pour Relecture et BAT 0091620 MENARD COUV INGENIEUR DU SOL GB $DOCPAGE 07/09/2010