Page 1: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

BPK5A

COST ACCOUNTING

UNIT I - V

BPK5A-COST ACCOUNTING1

Page 2: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING

•Nature and scope of Cost Accounting

• Cost analysis

• Concepts and Classifications

• Installation of Costing Systems

• Cost Centres and Profit Centres

UNIT -1

1

Page 3: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

MEANING OF COST ACCOUNTING

It is a process of recording, classifying, analyzing, summarizing,

allocating and evaluating various alternative courses of action for the

control of costs

DEFINITION OF COST ACCOUNTING

The Institute of Cost and Management Accountant, England (ICMA)

has defined ―Cost Accounting as – ―the process of accounting for the

costs from the point at which expenditure incurred, to the establishment

of its ultimate relationship with cost centres and cost units‖

For Simple notes click

http://www.newagepublishers.com/samplechapter/002037.pdf

FUNDAMENTAL S OF COST ACCOUNTING

BPK5A-COST ACCOUNTING 21

Page 4: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

NATURE OF COST ACCOUNTING

Cost Accounting is a branch of knowledge

Cost Accounting is an Art

Cost Accounting is a Science also

Cost Accounting is a profession

BPK5A-COST ACCOUNTING 31

Page 5: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

SCOPE OF COST ACCOUNTING

1. Costing

2. Budgeting

3. Cost Audit

4. Cost Control Techniques

BPK5A-COST ACCOUNTING 41

Page 6: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

CONCEPTS

Cost unit - A cost unit is a unit of product or unit of service

Cost driver - A cost driver is any factor that influences costs.

A change in the cost driver will lead to a change in the total

cost

Cost Control - Cost control is related to achieving the cost

target as its objectives

Cost Reduction - Cost reduction is directed to explore the

possibility of improving the targets themselves

Cost Methods - Job costing, Contract costing, Batch costing,

Process costing, Operation costing, Output costing, Services

costing.

Costing Techniques - Absorption costing, Marginal costing

and Standard costing

BPK5A-COST ACCOUNTING 51

Page 7: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

CLASSIFICATION OF COST

BPK5A-COST ACCOUNTING 61

Page 8: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

OBJECTIVES OF COST ACCOUNTING

Determining selling price of a product

Controlling cost

Providing information for decision making

Ascertaining costing profit

Facilitating for financial and other statements

To provide basis for operating policy

BPK5A-COST ACCOUNTING 71

Page 9: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

ADVANTAGES OF COST ACCOUNTING

BPK5A-COST ACCOUNTING 81

Page 10: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

LIMITATIONS OF COST ACCOUNTING

It is expensive system of Accounting

It is unnecessary method

It is system of estimations and probabilities

Lack of trained professionals

Non cooperation from middle and bottom level managers

It is more complex

Not suitable for small scale units

BPK5A-COST ACCOUNTING 91

Page 11: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

INSTALLATION OF COSTING SYSTEM

Meaning - The common cost accounting system is not suitable for all

business units. It depends upon the nature of business and the type of product

manufactured.

For the successful functioning of the costing system, the following conditions

are essential:

Efficient system of material control.

A sound and well-designed method of wage payment

Sound basis for collection of all indirect expenses

The integration of cost and financial accounts

The use of printed forms so as to facilitate quick compilation of cost reports.

The duties and responsibilities of cost accountant must be made clear.

1BPK5A-COST ACCOUNTING 10

Page 12: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Factors to be Considered before Installing a Cost Accounting System

History of business unit:

Nature of the industry

Product range

Technical considerations

Organizational factors

Selling and distribution method

Accounting aspects

Area of control to be exercised

Reporting

Uniformity

Use of electronic data processing

Practical consideration

BPK5A-COST ACCOUNTING 111

Page 13: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

DIFFERENCE BETWEEN COST ACCOUNTING & FINANCIAL ACCOUNTING

Cost Accounting Point of

Difference

Financial Accounting

Internal Reporting Purpose External Reporting mainly to tax

authorities & Government

Optional Obligation Compulsory

Objective Manner Recording Subjective Manner

Marginal Costing

Budgetary Control

Standard Costing

Control No control techniques

The cost data helps in

evaluationEvaluation of

efficiency

Not sufficient for evaluation

Stock is always valued of

cost price

Valuation of

stock

Stock is valued at cost or market

price

BPK5A-COST ACCOUNTING 121

Page 14: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

•Cost sheet

•Tenders and Quotations

• Reconciliation of Cost and Financial Accounts.

UNIT -II

1BPK5A-COST ACCOUNTING

Page 15: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

COST SHEET FORMAT

1. Cost Sheet Without Stock Adjustment

2. Cost Sheet With Stock Adjustment

To workout simple problems click

Cost Accounting Problems

BPK5A-COST ACCOUNTING 141

Page 16: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Particulars Per Unit Total Cost

Raw materials Consumed xxx

direct Labour xxx

Direct Expenses xxx

Prime Cost xxx

Add: Factory overheads

All expenes incurred in manufacturing xxx xxx

works cost xxx

Add: Office Overheads

All expenses incurred in administration xxx xxx

Cost of Production xxx

Add: Selling & Distribution overheads

All expenses incurred in selling distribution xxx xxx

Cost of Sales xxx

Profit xxx

Sales xxx

1BPK5A-COST ACCOUNTING 15

Page 17: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

According to CIMA London

Cost Sheet is ‗A statement which provides for the assembly of the

detailed cost of a centre or a cost unit‘. It is also a periodical

statement.

‗The expenditure which has been incurred upon product for a period

is extracted from the financial books and the store records and set

out in a memorandum statement.

If this statement is confined to the disclosure of the costs of units

produced dividing the period, it is termed as Cost- Sheet, but where

the statement records both total cost, profit and sales, it is usually

known as Statement of Cost or Production Account‘.

BPK5A-COST ACCOUNTING 161

Page 18: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

ELEMENTS OF COST

(1) Direct Materials

(2) Direct Labour

(3) Other Direct or Chargeable Expenses

(4) Prime Cost

(5) Works Expenses or Overheads

(6) Scrap or Wastage

(7) Work in Progress

(8) Office and Administrative Expenses

(9) Cost of Production or Office Cost

(10) Cost of Goods Sold

(11) Selling and Distribution Expenses

(12) Profit

BPK5A-COST ACCOUNTING 171

Page 19: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Concept And Meaning Of Cost Reconciliation Statement

A manufacturing concern may adopt either Integrated Accounting

System or Non- Integral Accounting System. Under Integrated

Accounting System, only one set of books is maintained to record

both costing and financial transaction, therefore, under this

system, both financial accounts and cost accounts give similar

results.

But in Non- Integral Accounting System, separate books are

maintained for costing and financial transactions, which may

exhibit different results i.e. profits or losses. In other words, when

cost accounts and financial accounts are maintained

independently by a concern, the profit or loss shown by the cost

accounts may not agree with the profit or loss shown by the

financial accounts. In this situation.

It is needed to reconcile the profits or losses shown differently by

cost accounts and financial account by preparing a statement

called ' Cost Reconciliation Statement‘

BPK5A-COST ACCOUNTING 181

Page 20: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

NEED FOR RECONCILIATION

1. Reconciliation helps to check the arithmetical accuracy of both sets of

accounts.

2. Management is enable to know the reasons for the difference in

results of both cost and financial accounts.

3. Reconciliation explains reasons for difference which facilitate internal

control.

4. Reconciliation ensures the reliability of cost data.

5. Reconciliation promotes co-ordination between cost and financial

departments.

6. Reconciliation helps in formulation of policies regarding absorption of

overheads and depreciation and stock valuation method.

7. Reconciliation ensures managerial decision-making.

1BPK5A-COST ACCOUNTING 19

Page 21: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Problems need to be worked out under

1. Simple cost sheet

2. Cost Sheet with Stock Adjustment

3. Cost sheet with Tender or Quotation

4. Cost Sheet with Estimated cost for future period

5. Cost Sheet with Hidden Information

6. Reconciliation Statement

To check more problems click the following

Problems on Cost Sheet

BPK5A-COST ACCOUNTING 201

Page 22: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 211

Page 23: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

•Material purchase control

•Levels, aspects, need and essentials of material control.

Stores control

•Stores Department

•EOQ

• Stores Records

• ABC analysis

• VED analysis

• Material costing

•Issue of materials

•FIFO, LIFO, HIFO, SAM, WAM

•Market price, Base Stock method and Standard price

method.

UNIT –III

BPK5A-COST ACCOUNTING1

Page 24: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Introduction to Materials

Material costs are the costs of acquiring of material resources necessary for

business.

Raw materials and semi-finished products costs. The cost of

acquiring the necessary raw materials and semi-finished products belongs

to this group. This group of material costs is often the largest.

Fuel and energy costs. Acquisition costs of gasoline, machine oil, gas,

solid fuel, electricity, heat belong to this group.

Packaging costs. Acquisition costs of various containers (boxes, bales,

boxes) belong to these costs.

Spare parts costs. Expenses of spare parts used to repair equipment,

machinery or vehicles.

Building materials costs. The cost of building materials arise when the

company is building new facilities or making renovation of existing facilities.

Other material cost. All material costs which are not included in the

above groups related to other expenses. It may be, for example, waste

production or other costs.

BPK5A-COST ACCOUNTING 231

Page 26: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

ECONOMIC ORDERING QUANTITY (EOQ)

The Economic Order Quantity (EOQ) is the number of units that a

company should add to inventory with each order to minimize the total

costs of inventory—such as holding costs, order costs, and shortage

costs.

FORMULA FOR EOQ

BPK5A-COST ACCOUNTING 251

Page 27: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

ECONOMIC ORDERING QUANTITY (EOQ)

1BPK5A-COST ACCOUNTING 26

Page 28: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

CONCEPT AND MEANING OF STOCK LEVEL

Stock level refers to the different levels of stock which are required

for an efficient and effective control of materials and to avoid over

and under-stocking of materials. The purpose of materials control is

to maintain the sock of raw materials as low as possible and at the

same time they may be available as and when required. To avoid

over and under-stocking, the storekeeper must fix the inventory

level, which is also known as a demand and supply method of

stock control. In a scientific system of inventory control the

following levels of materials are fixed.

1. Re-order Level

2. Minimum Level Or Safety Level

3. Maximum Level

4. Average stock Level

5.. Danger Level

BPK5A-COST ACCOUNTING 271

Page 29: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

PURPOSE

OF

STOCK

LEVELS

BPK5A-COST ACCOUNTING 281

Page 30: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Maximum Level of Stock = (Reorder Level + Reorder Quantity) –

(Minimum rate of consumption x Minimum

reorder period)

Minimum level of stock = Reorder level – (Average rate of consumption x

Average reorder period)

Reorder level or Ordering level = Maximum rate of consumption ×

Maximum reorder period

Average Stock level = (Maximum stock level + Minimum stock level) /2

or

Minimum Stock level + 14 Reorder Quantity

Danger level = Minimum rate of consumption × Emergency delivery time

BPK5A-COST ACCOUNTING 291

Page 31: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 301

Page 33: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

METHOS OF PRICING OF MATERIAL

ISSUES

FIFO - FIRST IN FIRST OUT

LIFO - LAST IN FIRST OUT

HIFO - HIGHEST IN FIRST OUT

SAM -SIMPLE AVERAGE METHOD

WAM - WEIGHTED AVERAGE METHOD

BASE STOCK

SPECIFIC PRICE METHOD

BPK5A-COST ACCOUNTING 321

Page 34: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

LIFO & FIFO

BPK5A-COST ACCOUNTING 331

Page 35: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 341

Page 36: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

LIFO METHOD

BPK5A-COST ACCOUNTING 351

Page 37: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

36BPK5A-COST ACCOUNTING1

Page 38: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

SPECIFIC PRICE METHOD

BPK5A-COST ACCOUNTING 371

Page 39: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 381

Page 40: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 391

Page 41: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 401

Page 42: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

WORKOUT PROBLEMS WITH THE HELP OF FOLLOWING LINK

https://youtu.be/3X2PyCLpfFw

https://youtu.be/0YLHjA_OePA

https://youtu.be/slFqL86q3EA

BPK5A-COST ACCOUNTING 411

Page 43: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

• Labour cost

• Computation and control

• Time keeping, Methods of wage payment

• Time rate and Piece rate system

• Payroll procedures

• Idle time and overtime wage calculation

• Labour Turnover

• Overheads

• Factory, Administration, Selling & Distribution

• Classification

• Allocation

• Apportionment and Absorption of Factory Overheads.

UNIT -IV

BPK5A-COST ACCOUNTING1

Page 44: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Labour cost - Meaning

It is classified as direct and indirect. They form the labour cost which in turn

forms a significant percentage of the total cost of production in a

manufacturing or service organization. Minimizing costs does not mean

reducing cost but means getting optimal and efficient productivity from the

employees.

Purposes of Labour Cost

• To calculate the correct gross and net wages for each employee.

• For financial accounting purposes.

• For management accounting purposes (i.e. stock valuation)

• Decision making and control purposes

Elements of Labour Cost.

• Basic Wages.

• Overtime premium

• Bonus payment

• Idle time

• Labour turnover

BPK5A-COST ACCOUNTING 431

Page 45: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

CLASSIFICATION OF

LABOUR COST

BPK5A-COST ACCOUNTING 441

Page 46: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 451

Page 47: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

REMUNERATION METHODS

Time Rate System

Wages = No. of hours worked x Rate per hour

Piece Rate System

Wages = Rate per unit x No. of units produced.

Incentive Plans

Straight Piece Rate Method Flat Time Rate Method

Guaranteed Day Work Taylor Differential Piece Rate

Rowan Premium Bonus Plan Halsey Premium Bonus Plan

Group Incentive Schemes Merrick Multiple Piece Rate

Gantt Task Bonus System Bedaux Point System

Emerson Plan Barth Premium System

BPK5A-COST ACCOUNTING 461

Page 48: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 471

Page 49: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

LABOUR TURNOVER

MEANING - A measure of the proportion of people leaving relative to the

average number of people employed over a period of time. This rate

should be kept as low as possible. Management might wish to monitor

labour turnover so that control.

Causes of Labour Turnover

Avoidable Unavoidable

i) Poor remuneration. i) Illness, death.

ii) Lack of training opportunities ii) Retirement

iii) Lack of promotion prospects. iii) Relocation, redeployment

iv) Poor working conditions. iv) Family matters.

v) Bullying in work place (Harassment).

BPK5A-COST ACCOUNTING 481

Page 50: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Methods of Calculating Labour Turnover

1. Calculating Labour Turnover by Separation Method

= No. of workers left or separated during a period /

Average number of workers on role during that period x 100

Average No. of. Workers = (No. of workers at the beginning of the

period + No. of workers at the end of the period) / 2

2. Calculating Labour Turnover by Replacement Method

= No. of workers replaced during a period / Average number of

workers on role during that period x 100

3. Calculating Labour Turnover by Flux Method

= (No. of workers separated in a period + No. of workers replaced in

the same period) / Average number of workers on role during that

period x100

BPK5A-COST ACCOUNTING 491

Page 52: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Meaning

Overhead costs, often referred to as

overhead or operating expenses, refer

to those expenses associated with

running a business that can‘t be linked

to creating or producing a product or

service.

Types

Overhead costs can be broken down

into three types:

Fixed

Variable

Semi-variable

OVERHEADS

BPK5A-COST ACCOUNTING 521

Page 53: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

OVERHEAD ANALYSIS CAN BE DIVIDED INTO SIX STAGES

1.Overhead Collection - Overhead is said to be collected when it is

incurred

2. Overhead Classification - This is the logical grouping of overhead into

the major activities undertaken by a business such as production, selling,

distribution and administration.

3. Overhead Codification - This refers to the use codes for the

identification of overhead costs of different kinds

4. Overhead Allocation - This is charging of whole item of overhead to a

single cost centre

5. Overhead Apportionment - This is the charging of proportions of

overhead to different cost centres using fair and equitable bases.

6. Overhead Absorption - This is the charging of overhead to cost units

using carefully calculated predetermined overhead rates

BPK5A-COST ACCOUNTING 531

Page 54: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Over Absorption and Under Absorption of Overhead

Over absorption occurs when the overhead absorbed is greater than the

actual overhead incurred. Over absorbed overheads represent gains and

are therefore credited to the profit and loss account.

Under absorption occurs when actual overhead cost incurred is greater

than the overhead absorbed. Under-absorbed overhead represents a

loss and is therefore debited to the profit and loss account.

BPK5A-COST ACCOUNTING 541

Page 55: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Overhead Absorption

This is the final stage of the overhead analysis process where the

overhead of the production departments are charged to the final product.

The following is the general formula for calculating overhead absorption

rate. Activity level maybe measured using any of the following

Cost basis

Production hours

Output

Overhead absorption rates are based on budgeted overhead rather than

actual overhead

BPK5A-COST ACCOUNTING 551

Page 56: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

PRIMARY DISTRIBUTION OF OVERHEAD

Primary Distribution is the allocation or appointment of different items of

overhead to both production and service departments on suitable basis.

There is no partiality between production and service department in

making primary distribution.

IMPORTANT POINTS SHOULD BE KEPT IN MIND

The basis for allocation and apportionment should be

equitable and practicable.

Charges are to be made to different departments in relation to

benefits received.

The method and basis for allocation and apportionment should

not be time consuming and costly

BPK5A-COST ACCOUNTING 561

Page 57: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Bases of Apportionment Overhead Cost

1Cost or value of asset

Depreciation, insurance, repairs and

maintenance, etc.

2Floor space occupied

Building depreciation, insurance and

repairs, rent and rates, electricity,

cleaning cost,

3Number of employees

Canteen, personnel administration,

welfare, supervision, etc.

Production or working hours Working hours affect almost all types

5Number of light bulbs Electricity

6.Metre reading Electricity, heating, air conditioning

7.Machine capacity or HP Electrical power

8.Number of requisitions Stores costs

BPK5A-COST ACCOUNTING 571

Page 58: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

1BPK5A-COST ACCOUNTING 58

Page 59: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 591

Page 60: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 601

Page 61: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

SECONDARY APPORTIONMENT

It reapportions service department overhead to production

departments. The objective of this stage is to ensure that only

production departments bear all overhead costs, and which will

eventually be charged to products. This is because while there is a

direct link between the product produced and the production

departments, there is no such link between the products and service

departments. The absence of a direct link between service cost centres

and products will make it difficult to charge service cost centre

overheads to products.

SERVICE DEPARTMENTS

The departments such as canteen, administration, stores,

maintenance, etc that do not take direct part in the production process.

They provide support work for the production departments

BPK5A-COST ACCOUNTING 611

Page 62: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK5A-COST ACCOUNTING 621

Page 63: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Machine Hour Rate:

Machine hour rate is a rational method for absorption of factory

overhead. The factory overhead costs are allocated to a machine or a

group of machines doing the same type of job and the cost per hour of

the machine is ascertained dividing the total allocated overhead costs to

the machine by number of hours the machine worked during the same

period of time for which the costs have been considered.

BPK5A-COST ACCOUNTING 631

Page 64: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

Sub Code - Sub Name 641

Page 66: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK6A / Management Accounting

MARGINAL COSTING

Marginal Cost is the amount at any given volume of output by which

aggregate costs are changed if volume of output is increased or

decreased by one unit .It relates to change in output in particular

circumstances under consideration.

Marginal costing is the ascertainment of marginal cost and of the effect

on profit of changes in volume or type of output by differentiating fixed

cost &variable cost .In this technique of costing only variable cost are

charged to operation ,processes or products leaving all indirect cost to

be written off against profits in period in which they arise.

1

Page 67: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK6A / Management Accounting1

Page 68: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK6A / Management Accounting

Limitations

• Technical difficulties.

• Less effective.

• Balance sheet will not exhibit true

and fair view.

• Problem of apportionment of

variable cost still arises.

• Difficulty to apply in contract or

ship building industry.

• Does not provide any standard.

• Reduction in selling price and

thus losses.

1

Page 69: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

BPK6A / Management Accounting69

https://youtu.be/c6A59hYLTKs

1

Page 70: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

BPK6A / Management Accounting70

Sales = Variable Cost + Fixed Cost + Profit

S = VC + FC + P

Profit = Sales – Variable Cost – Fixed Cost

P = S-VC-FC

1

Page 71: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

Tm

BPK6A / Management Accounting

Marginal Cost Equation

Contribution = Sales – Variable Cost

(or)

Contribution = Fixed Cost + Profit

C = S – VC (or) C = FC + P

P/V Ratio = Contribution / Sales * 100

P/V Ratio = C/S*100

Break Even Point = Fixed Cost / PV Ratio

BEP (Rs.) = FC/PV Ratio

BEP (Units) = Fixed Cost / Contribution Per Unit

Required Sales = (Fixed Cost + Profit) / PV Ratio * 100

https://youtu.be/JmoTmFCylk4

1

Page 72: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

BPK6A / Management Accounting721

Page 73: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

Margin of Safety = Profit / PV Ratio

(or)

Margin of Safety = Actual Sales – Break Even Sales

MOS = P/PV Ratio (or) MOS = S-BES

BPK6A / Management Accounting731

Page 74: BPK5A COST ACCOUNTING UNIT I - V · Practical consideration BPK5A-COST ACCOUNTING 11 1. TM ... Scrap or Wastage (7) ... waste production or other costs. BPK5A-COST ACCOUNTING 23 1

TM

BPK6A / Management Accounting

https://youtu.be/Du07z79T-Js