  • X-band Accelerating structure Review 1 24-25 NOVEMBER 2014

    Bonding and brazing sequence (based on accelerating structures TD26 CC and TD24)

    Serge Lebet and Anastasiya Solodko

  • X-band Accelerating structure Review 2 24-25 NOVEMBER 2014

    Drawings TD26 CC TD24 KEK

  • X-band Accelerating structure Review 3 24-25 NOVEMBER 2014

    Environment

    • Assembly of the structures are done in air-conditioned room with air-filtering which corresponds to a «salle blanche».

    • The room is equipped with leak detector of H2 and of N2

  • X-band Accelerating structure Review 4 24-25 NOVEMBER 2014

    Thermal cycles

    Brazing of the couplers

    Machining of interfaces for RF flanges

    1st brazing of cooling circuits

    Brazing of RF flanges

    Preparation of discs for bonding

    Alignment measurements of disc stacks before bonding

    Difussion bonding

    Alignment measurements after bonding

    Brazing of tuning studs, vacuum tubes and vacuum flanges

    Brazing of cooling circuits

    Leak tightness test

    RF measurements and tuning

    Vacuum baking

    Structure Components Numbers of

    heating cycles

    TD24 Couplers 4

    Discs 3

    TD26 CC

    CC waveguides 5

    Input/output cells 5

    Discs 3

  • X-band Accelerating structure Review 5 24-25 NOVEMBER 2014

    Requirements

    Temperature ~ 1040 °C; Time ~ 1,5 h; Vacuum 10-6 mbar; H2 partial pressure 20 mbar; Applied pressure 0.1 MPa; 3 thermocouples; Witness discs for pollution analysis

    Bonding oven (outside)

    Bonding oven (inside) all molybdenum

    Temperature profile

    Bonding requirements

  • X-band Accelerating structure Review 6 24-25 NOVEMBER 2014

    Assembly process • Assembly in V-shape column • Straightness and tilt measurements before bonding • Weight application • Bonding • Straightness and tilt measurement after bonding

    Pro

    cess

    Eq

    uip

    me

    nt

    • V-shape column • Measurement column • Tooling for the weight application • Graphite/ceramic pads

    Straightness measurements before and after bonding

    Equipment

    Bonding procedure

  • X-band Accelerating structure Review 7 24-25 NOVEMBER 2014

    Brazing requirements:

    High temperature (depends on the brazing alloy); Time a few minutes; Vacuum 10-6 mbar; H2 partial pressure 20 mbar.

    Au/Cu 25%/75% 1040 °C

    Au/Cu 35%/65% 1020 °C

    Au/Cu 50%/50% 980 °C

    Brazing material (configuration):

    Paste; Wire; Shim; Plating.

    Brazing material (composition):

    Au/Cu; Ag/Cu/Pd.

    MO

    ST U

    SED

    Brazing requirements

  • X-band Accelerating structure Review 8 24-25 NOVEMBER 2014

    First step: outgassing of the bonding/brazing tooling at 1100 °C

    • Ceramic pad • Graphyte pad • Tooling bonding • Etc…

    Outgassing of the tooling

  • X-band Accelerating structure Review 9 24-25 NOVEMBER 2014

    Brazing of coupleurs (body & cover)

    3. Brazing of compact coupler waveguides TD26 CC

    2. Brazing of couplers TD24 1. 1st brazing of cooling circuits

    Au/Cu 25%/75% 1040 °C

  • X-band Accelerating structure Review 10 24-25 NOVEMBER 2014

    Machining of couplers

    Machining of compact coupler waveguides TD26 CC

    Machining of coupleurs TD24

    Machining of interfaces for the RF flange

  • X-band Accelerating structure Review 11 24-25 NOVEMBER 2014

    Bonding input / output cells TD26 CC

    Bonding of output/input cells TD26 CC

  • X-band Accelerating structure Review 12 24-25 NOVEMBER 2014

    Brazing of couplers & RF flanges Brazing of output/input cells,

    CC waveguides and RF flanges TD26 CC

    (assembly before brazing)

    Brazing of couplers, vacuum and RF flanges TD24

    (assembly before brazing)

    Au/Cu 25%/75% 1040 °C

  • X-band Accelerating structure Review 13 24-25 NOVEMBER 2014

    Alignment tools

    Column Mitutoyo 600mm (1.1 + 0.6L µm)

    Camera Vision

    Equipment for: - straightness measurement of disc stacks; - measurement of external diameter of discs; - angular positioning of discs using a reference line.

    Comparator (±0.5 µm) with gage blocks

  • X-band Accelerating structure Review 14 24-25 NOVEMBER 2014

    Straightness measurement before bonding

    Straightness measurement before bonding TD24

    Straightness measurement before bonding TD26 CC

  • X-band Accelerating structure Review 15 24-25 NOVEMBER 2014

    Pressure application

    TC1

    TC3

    TC2 30 kg

    28 kg

    Pressure application 0.1 MPa P= F/S

    Pressure application TD24 Pressure application TD26 CC

    3 Thermocouples

    Witness discs

  • X-band Accelerating structure Review 16 24-25 NOVEMBER 2014

    Straightness measurements after bonding

    16

    Measurement 1

    Measurement 2

    Measurement 3

    Measurement 4

    Measurement 6

    Measurement 5 22

    2 m

    m

    Engr

    aved

    are

    a Starting height 5 mm, length 222 mm, step 8.3 mm (1 point per disc)

    5 mm

  • X-band Accelerating structure Review 17 24-25 NOVEMBER 2014

    Straightness measurements

    Straightness measurements for the disc stacks of accelerating structures have been done before and after bonding:

    • Before bonding, measurements have been done for two generatrices because

    of the position of the structure in the v-shape column, the position of the tooling and the position of engraved numbers.

    • After bonding, measurements have been done for six generatrices.

  • X-band Accelerating structure Review 18 24-25 NOVEMBER 2014

    Brazing of tuning studs

    Fixed by ceramic studs

    Brazing of tuning studs TD26 CC Brazing of tuning studs TD24

    Au/Cu 35%/65% 1020 °C

  • X-band Accelerating structure Review 19 24-25 NOVEMBER 2014

    Brazing of cooling circuits

    Brazing of cooling circuits TD26 CC Brazing of cooling circuits TD24

    Au/Cu 50%/50% 980 °C

  • X-band Accelerating structure Review 20 24-25 NOVEMBER 2014

    Leak tightness test TD26 CC TD24

  • X-band Accelerating structure Review 21 24-25 NOVEMBER 2014

    RF measurements and tuning TD26 CC TD24

    …see B. Woolley presentation on 25.11.2014 Session “Established procedures and Quality assurance”

  • X-band Accelerating structure Review 22 24-25 NOVEMBER 2014

    Vacuum baking

    CERN oven now is equipped with an gas analyser

    Requirements

    Temperature 650 °C; Time 10 days; Total time ~ 15 days; Vacuum 10-9 mbar.

    …see M. Taborelli presentation on 25.11.2014 Session “Established procedures and Quality assurance”

    Packaging and shipping

  • X-band Accelerating structure Review 23 24-25 NOVEMBER 2014

    TD26 CLEX superstructure

    One TD26 CLEX structure is currently under test in CLEX. The second SAS is supposed to be installed in January 2015.

    A superstructure (two AS brazed together);

    4 waveguides with WFM; Compact couplers; Vacuum manifolds; SiC absorbers.