BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO. 42, 47, 54 & 59, KONDAPUR, SERILINGAMAPALLY, RANGA REDDY DISTRICT 1. CONCEPTUAL PLAN 2. EMP RESIDENTIAL CONSTRUCTION PROJECT Submitted By M/s Krishnaiah Properties Pvt. Ltd., 8-2-502/1/A, JIVI Towers, Road No. 7, Banjara Hills, Hyderabad Studies & Documented By M/s Team Labs and Consultants B-115 - 117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad- 500 038 Phone: 91-040-23748555/616 Fax : 91-040-23748666 e-mail: [email protected] SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY , TELANGANA GOVERNMENT OF INDIA

Upload: lydung

Post on 29-Jul-2018

248 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

BOLLINENI BIONM/s. Krishnaiah Properties Pvt. Ltd.,

SURVEY NO. 42, 47, 54 & 59, KONDAPUR,SERILINGAMAPALLY, RANGA REDDY DISTRICT

1. CONCEPTUAL PLAN2. EMP

RESIDENTIAL CONSTRUCTION PROJECT

Submitted ByM/s Krishnaiah Properties Pvt. Ltd.,8-2-502/1/A, JIVI Towers, Road No. 7,Banjara Hills, Hyderabad

Studies & Documented ByM/s Team Labs and ConsultantsB-115 - 117 & 509,Annapurna Block, Aditya Enclave,Ameerpet, Hyderabad- 500 038Phone: 91-040-23748555/616Fax : 91-040-23748666e-mail: [email protected]

SUBMITTED TOSTATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY,

TELANGANAGOVERNMENT OF INDIA

Page 2: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 1

2.0 PROJECT DESCRIPTION/CONCEPTUAL PLANThis chapter details the need for the project, description of the proposed project andalternatives, and identifies the valued ecosystem components. The project is envisagedto provide high-density housing to meet the growing demands for housing in thegrowing urban area of Hyderabad falling under Serilingampally Municipality. M/sKrishnaiah Properties Pvt. Ltd., proposes to build 1013 apartments to cater to theneeds with all amenities as a gated community.

2.1 THE PROJECT LOCATION:The project will be spread over an area of 3.48 hectares of land for ResidentialApartments with necessary amenities in Survey Nos. 42, 47, 54 & 59 situated atKondapur, Serilingampally Mandal, Ranga Reddy District. The site is surrounded byOpen lands in nort and west directions, Residential Buildings and Commercial buildingsin east direction. An existing 30 m wide road in south direction connecting GachibowliMiyapur Road. The nearest railway station is the Hitech City railway station at adistance of 2.7 km.

2.2 PROJECT DESCRIPTION2.2.1 DESIGN STAGEThe project is envisaged as a gated community of residential apartments with variousamenities. The land area available for the project is 3.48 Hectares and will be allocatedfor various types of apartments and amenities based on the development rules ofGHMC. The built up areas and the number of units proposed is presented in table 2.1.

Table 2.1 Built Up Area Statement

Land Use No ofFloors

Total No ofUnits

Total SiteArea in m2

Total Built uparea (m2)

Block A (Tower 1 & 2) 3B+G+24 565 3366.5 84479.0Block B (Tower 3) 3B+G+24 50 983.63 24683.8Block C (Tower 4 & 5) 3B+G+24 398 2698.12 68381.7Amenities 3B+G+5 725.0 4439.1Green Area 3723.0Road Area 12181.1Open Area 10788.2Surface Parking 337.5ParkingBasement - 1 24780.0Basement - 2 24716.1Basement - 3 24396.6Total 1013 34803.0 255876.3

It is proposed to provide 1013 units in 3 Apartment blocks. The land allocation will beoptimized to ensure compliance with the regulations of GHMC. The water requirementof the project during operation will be drawn from HMWSSB. Sewage treatment plant

Page 3: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 2

will be provided to treat the sewage. Water conservation measures will beincorporated in the plumbing designs. Water recycling/reuse will be adopted by way ofusing treated sewage for green belt development. The rainwater will be let-out intoharvesting tank and excess discharged into storm water drains. The required power willbe drawn from the TRANSCO. Solar Energy will be used for fencing, and partially for hotwater in the apartments. The designs of the apartments will also incorporate IndianArchitectural principles of “Vastu” as the market demands the same. Constructionmaterial will be drawn from local sources. The layout of the project site is presentedin fig. 2.1 and typical floor plans are presented in figure 2.2. The parking provisionfollows the guidelines prescribed by GHMC and Building policy. The number of parkingspaces provided is presented in table 2.3

CIRCULATION PLANGround Floor Driveway : 9.0 m

No. of Basements: 3 nos. Basement Driveway: 5.5 m No. of Ramps : 4 – 1 way Width of Ramp : 4.0 m Slope of Ramp : 1 in 10 No. of Lifts : 8 Capacity of each Lift: 10-20 pax. Connecting Road : 24 m ROW

Modified Los & Performance

RoadExistingvolume,PCU/hr

Existingvolume/Capacity

Additionalvolume

ModifiedVolume

ModifiedVolume/Capacity

ModifiedLos &

performance

Gachibowli– Miyapurroad

2182 0.606 119 2301 0.639 “C” Good

Botanicalgarden road 1291 0.538 119 1410 0.588 “C” Good

ParkingIt is proposed to provide 3 Basement floors for parking. The parking provision exceedsthe guidelines prescribed by FAR and Building policy. Parking floor plans is presented infig 2.3. The no. of parking spaces are presented in table 2.2.

Table 2.2 Parking Space Provision of the ProjectFloor 4 - Wheeler 2 - Wheeler

Basement - 1 578 171Basement - 2 575 168Basement - 3 589 150Surface Parking 27Total 1769 489

Page 4: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 3

Fig 2.1 Layout of the project site

SITE PLAN

A

BELE

Page 5: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 4

Fig 2.2 Typical floor plan

CELE

BELE

TYPICAL FLOOR PLAN

Page 6: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 5

Fig 2.3 Parking floor plan

BASEMENT-3BASEMENT AREA :- 24397.0 SQMSERVICE AREA :- 1851.0 SQMPARKING AREA :- 24780.0 - 1851.0 = 22546.0 SQMNO. OF CAR PARK :- 589

A

Page 7: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 6

2.2.1.1 Storm water drains:Conservation of water resource is most important aspect of the project duringconstruction and occupation phases. Storm water drainage planning, domestic waterplanning and sewerage transfer and sewage treatment planning are most essential.

Storm water drains are provided along the road to collect the road runoff and runoffcoming from the open / landscape areas. These storm water drains shall be brickmasonry drains with plastering on both inside and outside and provided with grating onthe top for collecting the runoff. Roof down take pipes shall use PVC pipes as perrelevant IS code of 4/6 kg/cm2.

Calculation for Storm Water DrainQuantity of storm water(a) Without projectArea of Catchment, ‘A’ : 3.4803 HaRun off Coefficient, ‘C’ : 0.6Maximum intensity of rainfall, ‘I’ : 40 mm/hrTherefore Q : 0.232 m3/sec

(b) With project :Area for catchment for roof and road : 1.995 HaArea of Catchment, ‘A’ : 1.995 HaRun off Coefficient, ‘C’ : 0.9Maximum intensity of rainfall, ‘I’ : 40 mm/hrTherefore Q = : 0.200 m3/sec

Area for catchment for open areas : 1.485 HaRun off Coefficient, ‘C’ : 0.6Maximum intensity of rainfall, ‘I’ : 40 mm/hrTherefore Q = : 0.099 m3/secTotal Discharge : 0.299 m3/secBut, Discharge, Q = A/VWhere,A= Area of the Drain,

V= Max. Permissible Velocity : 6m/sec for concrete

drain

Area of drain, ‘A’ = Q/V : 0.050 m2

Taking depth of drain as 0.6 m at the starting point : 0.6Width of drain = Area/depth = : 0.083 m 83 mm

Width of the drain is to taken 85 mm and depth varies according to the slope of ground.

Rain Water Harvesting Pit shown in fig 2.4

Page 8: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 7

Table 2.3 Strom Water Runoff

Land UseArea inHectar

es

Vol./hr (KL)after

development C=0.8

Vol./hr (KL)before

Development C=0.6

Differencein

DischargesRemarks

Roof Area 0.78 248.7 186.6 62.2Harvested in sumps

with a capacity of 4 X 30m3

Road Area 1.22 389.8 292.3 97.4 32 nos. of RWH pitsare provided of size1.5m X 1.5m X 2.0 mOpen Area 1.48 178.2* 356.4 -178.2

TOTAL 3.48 -18.6*C=0.3 after development

Fig 2.4 Rain Water Harvesting Pit

Page 9: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 8

2.2.1.2 Water Availability:Water is required for the construction as well as during occupation stage as the same isan important resource. The water requirement during construction is in the order of70 cum/day with a peak demand of 120 cum/day, and during occupation stage in theorder of 730.4 KLD. The water resource available with the Municipal authorities wasstudied to identify the source and feasibility. The water resource both domestic waterand sewage is dealt by the Hyderabad Metropolitan water supply and Sewerage Board(HMWSSB) in the GHMC area. The HMWSSB has been maintaining the water supplyresources for Hyderabad along with the treatment of wastewater. The resourcesavailable with the HMWSSB are presented in table 2.4.

Table 2.4 Details of present sources of water supply to Hyderabad

Source Name River Year ImpoundmentName

Distance fromcity km

InstalledCapacity MGD

Osmansagar Musi 1920 Osmansagar 15 27Himayatsagar ESI 1927 Himayatsagar 9.6 18

Manjira Phase I Manjira 1965 Manjira barrage 58 15Manjira Phase II Manjira 1981 Manjira barrage 59 30Manjira Phase III Manjira 1991 Singur Dam 80 37Manjira Phase IV Manjira 1993 Singur Dam 80 38Krishna Phase I Krishna 2005 Nagarjuna Sagar 116 90Krishna Phase II Krishna 2008 Nagarjuna Sagar 116 90Krishna Phase III Krishna 2015 Nagarjuna Sagar 116 90Godavari Phase I Godavari 2016 Yellampally 186 172

Source: Hyderabad Metropolitan Water Supply & Sewerage Board,www.hyderabadwater.gov.in

It may be noted that the following water supply projects i.e., Krishna Phase III (Part II)with 45 MGD capacity and Godavari phase – I with 172 MGD capacity is anticipated tobe operational during 2015 and 2016 respectively. It may also be noted that thedependability of Osman sagar and Himiyath sagar is reduced to approximately 60%. 45MGD supply is available.

Domestic Water: It is proposed to draw domestic water from the HyderabadMetropolitan Water Supply and Sewerage Board (HMWSSB), which have beenencouraging the bulk consumers. The water shortage if any during summer season willbe drawn from ground water sources /bulk suppliers/municipal tankers. The waterrequirement of the project during occupation stage is in the order of 730.4 KLD. Thewater requirement during construction will be from ground water sources and therequirement is in the order of 120 m3/day. The water requirement for the projectduring the occupation stage is presented in table 2.5. The water saving is presented intable 2.7.

Page 10: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 9

Table 2.5 Water Requirement of the Project

Land Use No. ofUnits

No. ofPersons/

unit

Waterrequirement per

person in l *

Total WaterRequirement

in KLDBlock A to C 1013 5 135 683.8Amenities 1 250 45 11.3Swimming pool 1 5.0Visitors 2 15 30.4TOTAL 730.4*Water requirement as per NBC

Table 2.6 Water Saving Measures

Land UseNo.of

Units

No. ofPersons/

unit

WaterRequirement/

KLD

Treatedwater

reuse/dayKlpcd

EffectiveWater

Requirementin KLD

Block A to C 1013 5 683.8 202.6 481.2Amenities 1 250 11.3 5.0 6.3Swimming pool 5.0 5.0Visitors 2 30.4 15.2 15.2TOTAL 730.4 222.8 507.6

The effective water consumption is reduced by 222.8 KLD and the requirement will bein the order of 507.6 KLD. The water balance of the project during occupation stage istabulated in table 2.7

Table 2.7 Water BalanceInput KLD Output KLDDomestic water fromHMWSSB 507.6

Excess treated water will besent to sewer lines 351.5

Recycled water 222.8 Recycled water 222.8Water requirement for greenbelt during non monsoon 10.0Losses approx 20% 146.1

Total 730.4 Total 730.4

The water used in the order of 730.4 KLD would generate 584.3 KLD of wastewater,which has to be treated for reuse and excess will be let in to municipal sewer lines.

Sewage treatment plant based on Fluidized Aerobic Bio Reactor (FAB) technologyThe raw sewage will be collected in a collection sump and pumped to mechanical barscreen chamber for removal of large floating matter followed by grit removal in GritChamber. The raw sewage will then be collected in an equalization tank forhomogenization of hydraulic load. The tank contents will be kept in suspension by

Page 11: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 10

means of course bubble serration through pipe grid. The equalization tank, with airflow indicator for continuous monitoring of air supply to the tank in order to avoidseptic conditions, will be covered from top (RCC or FRP) to avoid nuisance. Theequalized effluent will then be pumped to two Fluidized Aerobic Bio Reactors (FAB) inseries where BOD/COD reduction can be achieved by virtue of aerobic microbialactivities. The oxygen required will be supplied through coarse air bubble diffusers.The bio-solids formed in the biological process will be separated in the down streamTube Settler. The clear supernatant will gravitate to the chlorine contact tank wheresodium hypochlorite will be dosed for disinfection of treated water prior to disposal.

Fluidized Aerobic Bio Reactor (FAB)Conventional effluent treatment plants are large sized, power intensive and require alot of monitoring. Scarcity of open space and rising land a power costs have forced theindustries to look our for space saving, compact and efficient treatment options. Thishas led to the development attached growth processes where the bio mass is retainedwithin the aeration tank obviating the need for recycle. These plants are not onlycompact but also user friendly. The endeavor to have a continuously operating, no-clogging biofilm reactor with no need for back washing, low head-loss and high specificbiofilm surface area culminated in the most advanced technology of aerobic biologicalfluidized bed treatment where the biofilm (biomass) grows on small carrier elementsthat move along with the water in the reactor. The movement is normally caused byaeration in the aerobic version of the reactor. The reactor combines all the advantagesand best features of Trickling filters, Rotating biological contractors, activated sludgeprocess and submerged fixed film reactors while eliminating the drawbacks of thesesystems. The plants are more compact and more energy efficient.

The Fluidized Aerobic Bio Reactor (FAB) consists of a tank in any shape filled up withsmall carrier elements. The elements are made up of special grade PVC orpolypropylene of controlled density (shown in plate). For media of specific gravity 0.92-0.96 the overall density could be expected to increase up to 9.5% when full of biomasssuch that they can fluidize using an aeration device. A biofilm develops on theelements, which move along the effluent in the reactor. The movement within thereactor is generated by providing aeration with the help of diffusers placed at thebottom of the reactor. Then thin biofilm on the elements enables the bacteria to actupon the biodegradable matter in the effluent and reduce the BOD/COD content in thepresence of oxygen available from the air that is used for fluidization.

Table 2.8 Characteristics of Waste waterParameter Quantity in mg/l

PH 6 – 7Total Suspended Solids 400 – 600BOD 200 – 300COD 450 – 500

Page 12: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 11

Design of the unitBasic data

Flow : 584.3 KLDCapacity : 700 m3

Peak factor : 3.5Peak flow Q peak : 2100 m3/dayInfluent BOD : 200 mg/litInfluent Suspended Solids : 200 mg/litInfluent COD : 350 mg/litEffluent BOD : 30 mg/litEffluent COD : 200 mg/litEffluent Suspended Solids : 100 mg/lit

1. Bar Screen ChamberAverage flow : 0.0072 m3/secPeak factor : 3.5Peak flow : 0.0252 m3/secVelocity at peak flow : 0.75 m/SecEffective area of screen RequiredAt average flow : 0.028 m2

At Peak flow : 0.036 m2

Provide Effective area of screen : 0.036 m2

Considering the bar of dia. 10 mm(w) and clear spacing of 20 mm (b)Overall area required : 0.05 m2

Considering screen depth as : 0.1 m Consider 0.5 mNumber of clear spacing : 1.65Number of bars : 2 Consider 4 Nos.Hence Provide 5 barsProvide a screen of 0.5 m X 0.5 m at an inclination of sin 600. In a screen channel ofone meter (1 m) length.

2. Grit Chamber :The flow from the bar screen chamber is let into the Grit Chamber of minimum 2 hourscapacity. This tank is provided to even out the flow variation, and to provide acontinuous feed into the secondary biological treatment units.Peak flow Q : 0.028 m3/secProviding a flow through velocity of 0.30 m/secCross sectional area of Channel (0.028/0.3) : 0.093 m2

Surface area of channel (0.028/0.013) : 2.15 m2

Assuming depth d : 0.2 mWidth of channel (0.093/0.2) : 0.465 m (say 0.2m)Length of channel (2.15/0.465) : 4. 5 m (say 4.5 m)

Provide two channels each of 0.2 m wide and 4.5 m long with depth of waste water 0.2m.

Page 13: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 12

3. Equalization tank:The flow from the bar screen chamber is let into the equalization tank of minimum2hours capacity. This tank is provided to even out the flow variation, and to provide acontinuous feed into the secondary biological treatment units.Average flow : 30 m3/hrPeak factor : 3.5Peak flow : 105 m3/hrHydraulic retention tank = 2 hrs at Peak flowHence required volume of the tank : 210 m3

Provide tank of : 210 m3 CapacityAssuming depth : 3 mArea : 70 m2

Assuming length to width ratio (1:1) ; l=blength of the tank : 8.3 mwidth of the tank : 8.3 mAir required for agitation : 0.01 m3/ m2 minTotal air required : 105 m3/hrAir blower required : 120 m3/hr @ 3.8 mwcEffluent transfer pump : 30 m3/hr @ 8 mwc

4. Fluidized Aerobic Bio Reactor (FAB):The polypropylene media have been provided with a specific surface area of 350 – 520m2 /m3. This allows micro-organisms to get attached and biomass concentration canbe increased to four folds as compared to Activated Sludge Process. This enables toconsider higher Organic loading rates.

The micro-organisms attached to media are kept in a fluid state thereby maintainingthe CSTR (continuous Stirrer tank reactor) regime as well as two tanks are provided inseries making the plug – flow system. This will enhance the efficiencies and have themerits of both CSTR and plug-flow regimes.Organic loading rate : 3.2 kg BOD/ m3 dOrganic load : 156 kg/dayVolume of the tank : 40 m3

Assume the depth : 5 mNo. of tanks in series : 2Size of the tank : 3.1 m dia. x 5.0 SWDSpecific gravity of media : 0.92 to 0.96Specific surface area of media : 350 – 520 m2 /m3

Media filling : 30 – 50 % of tank volumeOxygen required : 2 kg / kg BODOxygen in air : 23%Specific gravity of air @ 30 deg. : 1.65Aeration : Coarse bubbleOxygen transfer efficiency : 12%Air required : 331.7 m3/hrAir blower required : 350 m3/hr @ 6.5 m wc

Page 14: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 13

5.Tube settlerSurface loading rate : 48 m2 /m3 dSurface area required : 13.33 m2

Tank size : 3.0 m x 6.0 m x 2.7 m SWD With 55deg. hopper bottom

Tube Modules : 3.0m x 6.0 m x 0.6 m ht.Tube inclination : 60 deg.Settling area for 60 deg slope : 11 m2 /m3

Cross sectional area of tubes : 120 mm x 44 mm HexagonalHydraulic radius : 1/61 cm (1.5 cm)Shape factor : 0.6 – 0.7 for media settleable solids

6. Pre Filtration tankThe flow from the each individual settling tank i.e., the supernatant liquid is let into therespective Pre-Filtration Tank, which has a minimum 1.5 hours holding capacity. Thistank is provided to hold the treated effluent and give an even flow to the pressure sandfilter.Average flow : 30 m3/hrPeak factor : 2 m3/hrPeak flow : 60 m3/hrProvide min 1.5 hours holding capacity.Hence required volume of the tank : 90 m3

7. Pressure Sand Filter:Vertical down flow type with graded/sand bed under drain plate with polysterenestrains.Flow : 700.0 m3/dayRate of filtration assumed as : 15 m3/m2/hrRequirement of treated water for usage in 20 hrs : 40 m3/hrDia. of filter of 1 nos. : 1612 mmProvide pressure sand filter of 1700 mm dia. and 2000 mm HOS with sand as medialayer, under drain pipe, laterals face piping etc for each stream.

8. Activated Carbon Filter:Vertical down flow type with graded/sand bed under drain plate with polysterenestrains.Flow : 700.0 m3/dayRate of filtration assumed as : 15 m3/m2/hrRequirement of treated water for usage in 20 hrs : 40 m3/hrDia of filter of 1 nos. : 1612 mmProvide Activated Carbon filter of 1700 mm dia with granular Activated carbon asmedia and 2000 mm HOS with sand as media layer, under drain pipe, laterals facepiping etc for each stream.

9.Ultraviolet Disinfection:UV applied to low turbidity water is a highly effective means of disinfection. UV is notharmful to aquatic organisms in the receiving water. UV light kills viruses, Vegetative-

Page 15: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 14

and spore-forming bacteria, algae and yeasts. No chemicals are added to thewastewater to change the pH, conductivity, odor or taste to create possible toxiccompounds. UV treatment has a few moving parts to adjust or wear out.

10.Final Treated Water Holding TankIt is always preferred to provide one final holding tank of minimum one day holdingcapacity, so that the treated effluents can be stored and used back for gardening orother tertiary purposes.Capacity: 700 m3

11. Sludge Filter Press:The biomass in the aeration tank stabilizes BOD in wastewater by consuming theorganic matter in the wastewater. The metabolic activity results in growth of thebiomass population in the Fluidized Aerobic Bio Reactor (FAB). Sludge holding tank hasbeen provided with filter press for dewatering sludge. The filtrate drains off throughthe media, which is again let into equalization tank.The dewatered sludge is collected in trays, which can be used as manure in the garden.No. of plates : 24Size of plates : 600 mm X 600 mmPlate moc (material of construction) : PP (poly propline)Type of operation : HydraulicPower pack capacity : 2 HP

The biomass in the aeration tank stabilizes BOD in wastewater by consuming theorganic matter in the wastewater. The metabolic activity results in growth of thebiomass population in the Fluidized Aerobic Bio Reactor (FAB). Sludge holding tank hasbeen provided with filter press for dewatering sludge. The filtrate drains off throughthe media, which is again let into equalization tank. The dewatered sludge is collectedin trays, which can be used as manure in the garden.

Characteristics of Treated Waste waterParameter Quantity in mg/l

pH 7.3Total Suspended Solids 20BOD 10COD 50

Disposal of Treated Wastewater: It is proposed to reuse the treated wastewater forgreen belt development and for toilet flushing. Excess treated water shall be let outinto the municipal sewer line.

Page 16: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 15

Fig 2.5 Sewage Treatment Plant

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 15

Fig 2.5 Sewage Treatment Plant

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 15

Fig 2.5 Sewage Treatment Plant

Page 17: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 16

2.2.1.3 Solid WasteMunicipal Solid Waste CompositionIn India the biodegradable portion dominates the bulk of Municipal Solid Waste.Generally the biodegradable portion is mainly due to food and yard waste.

Table 2.9 Composition of Municipal Solid WasteType Composition (%) Solid waste in kg

Paper 8 257Plastics 9 289Metals 1 32Glass 1 32others 4 129Biodegradable 48 1543Inerts 25 804Rags 4 129Total 100 3215

Source: (National Solid Waste Association of India)

Design StageThe total number of people anticipated to stay in the housing project is in the range of7000-8000. The anticipated solid waste/garbage is in the range of 500 g/head, and thetotal garbage will be in the order of 3215 kg/day. The present practice is to collect thegarbage from each flat using the services of NGO’s and send it to the segregation pointby cycle-rickshaws. The area of Kondapur has no solid waste disposal plan, howeverresidents of the surrounding layouts are sending their solid waste through theSerlingampalli municipality appointed NGO for collection. Table 2.10 presents theanticipated garbage quantity after occupation. The responsibility of garbage collectionand disposal lies with Serlingmapalli municipality, however the project authoritiespropose to educate the residents to segregate the waste at source before disposal.

Table: 2.10. Solid Waste Generation

Land Use No. ofUnits

No. of Persons/unit

Total No.of Persons

Total Solid waste inKgs @ 0.5 kg/head

Block A to C 1013 5 5065 2533Amenities 1 250 250 75Visitors 2 2026 608

TOTAL 3215

2.2.2 CONSTRUCTION STAGE

The sequence of construction operations and the approximate time requirement ispresented in the following table 2.11. The construction sequence is for more number offloors and standard housing flats. The time schedule of the entire project isapproximately 60 months.

Page 18: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 17

Table: 2.11 Construction SequenceS.NO Description of work

1 Clearing and Grubbing2 Leveling by way of cut and fill3 Construction of Retaining wall4 Earth Work Excavation for Foundations.5 P.C.C. Bed for Foundations.6 R.C.C. for Foundations & Columns up to Plinth Beam Level7 R.C.C. Plinth Beams, Staircase First Flight & Sump8 R.C.C. Columns up to First Slab9 1st Slab Shuttering, Fabrication of Reinforcement & Concreting

10 Columns up to 2nd slab11 2nd Slab Shuttering, Fabrication of Reinforcement & Concreting12 1st Slab De-shuttering & Cleaning13 Columns up to Typical Slabs14 Earth filling for Flooring Bed & P.C.C. Bed15 Typical Slabs Shuttering, Fabrication of Reinforcement & Concreting16 2nd Slab De-shuttering & Cleaning17 Typical Slabs De-shuttering & Cleaning seimentinusly18 Water proofing for Sunken Slabs19 Brick work up to lintel height20 Electrical Concealed works

Electrical conduit junction boxes & board fixing.21 Plumbing Concealed works22 R.C.C. Lintels &Chajjas Shuttering, Reinforcing & Concreting23 Brick Work up to roof beam height24 Chajjas De-shuttering25 First Coat Ceiling Plastering26 Columns up to Staircase Head Rooms, lift machine rooms &Over head tanks27 Slab shuttering, Reinforcing & Concreting for above items28 De-shuttering for above items29 Electrical Concealed works

Electrical conduit junction boxes & board fixing for above items30 Plumbing Concealed works for above items31 First Coat Internal Plastering32 Door & Window Frame Fixing33 Masonry work in Elevation34 First Coat External Plastering35 Masonry work for Cupboards & internal finishes36 Internal & External Railings Fixing37 Second Coat Ceiling Plastering38 Second Coat Internal plastering39 Internal flooring, Skirting &Dadoing works40 Internal & External Electrification41 Internal & External Plumbing, Sanitary works

Page 19: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 18

S.NO Description of work42 Internal & External Flooring Finishes (incl. kitchen platforms)43 Doors & Window Shutter Fixing44 Parapet wall in terrace & Other miscellaneous works45 Terrace Water proofing works46 Finishes to Staircase Head Rooms, lift machine rooms &Over head tanks47 Second Coat External Paintings48 External Development, (Parking area flooring, Compound wall finishing)49 Internal & External Railing Paintings & Compound wall painting50 Amenities Fixing (Transformer & etc.,)

The clearing and grubbing activity involves clearing of shrubs mainly as the land area isdevoid of any trees due to biogenic pressures. The cut and fill operation for the entirearea is presented in table 2.12.

Table 2.12 Earth Work Quantities

S.No. Area Qty. of fill (m3) Qty. of cut (m3) Surplus fill(m3) Surplus cut (m3)

1 Site area 33411 41764 -------- 8353

The construction of this magnitude would require huge quantities of constructionmaterials. The material requirement for the project is presented in table 2.13.Thusaggregate requirement will be met from within the plant site. The lead distance forvarious construction materials is presented in table 2.14.

Table: 2.13 Material Consumption

UnitsBUA perunit in(m2)

Total ReadyMix

Concrete(m3)

TotalCement(bags)

TotalSand(m3)

TotalAggregate(m3)

TotalWater(m3)

TotalBricks(Nos) x1000

TotalReinforcement

Steel(MT)

Total BUA 255876 104909 237965 99792 11003 61922 29682 5885Total 255876 104909 237965 99792 11003 61922 29682 5885

Page 20: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 19

Table: 2.14 Lead Distance for Construction Materials

S.No Material Source Lead Distance(Km)

1 Sand ROBOSAND and or Krishna orGodavari river bed areaspermitted by Govt.

100-150

2 Aggregate Crushers near to the site 10-303 Cement Company Dealers 100-1504 Reinforcement Steel TATA / SAIL godowns 10-505 Bricks Local brick kiln 10-306 Plumbing Material Local Suppliers 2-77 Electrical Material Local Suppliers 2-78 Sanitary Material Local suppliers 2-78 Paints Local Suppliers 10-259 Ready Mix Concrete Local Batching Plants 10-50

2.2.2.1 Water RequirementThe water required for this project is in the order of 62,000 m3 for the entire projectimplementation period. The peak demand for water may be 240 m3/day, howevertypical daily consumption will be in the order of 120 m3/day. The required water will bedrawn from ground water sources/bulk suppliers/municipal tankers. The water supplyand plumbing will be optimized and low water consuming faucets and flush tanks willbe used to conserve water.

2.2.2.2 Construction DebrisThe construction debris consists of various types of materials. The construction debriswill be in both hazardous and non-hazardous categories. The hazardous debris consistsempty containers of adhesives, thinners, paints, and petroleum products. These emptycontainers will be sold to authorize recycling agencies. The non hazardous wastescontain recyclable debris like iron and other metal, glass, plastics, cartons of paper,wood etc. These wastes will be sent for reuse/recycle. The waste percentage will bein the order of 2%. Construction debris containing bricks, demolished RCC will be usedfor land filling in the place of subgrade.

2.2.2.3 PaintsAll the paints used in the premises will be ensured to have an albedo of at least 0.4 toincrease the reflectivity and reduce the heat dissipation and heat island effects.

2.2.2.4 Work Force:The labor/work force requirement is approximately 50,000 man days of various skilledand unskilled employees. Sufficient labor force and skilled employees are available asHyderabad is a favorite destination of skilled employees and migrating people from therural areas. The peak labor force requirement will be in the order of 1000 people andsome of the labor force will be provided with temporary accommodation within thesite. The labor force will be provided with a temporary toilet facilities connected to aseptic tank followed by soak pit. The labor accommodation will provide accommodation

Page 21: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 20

to about 20families. The water requirement for the labor force will be approximately10,000 lt/day.

2.2.2.5 Material preparation and transportMost of the construction material including aggregate will be drawn from outside. Thematerial will be transported by trucks and the approximate number of truck tripsare1000. The material transport within the site will be facilitated by required numberof tippers. All grades of concrete will be procured from RMC suppliers. No stone crushershall be installed at site. Aggregate for Road, pavements and floorings shall be procuredthrough the metal suppliers in the required quantities.

2.2.2.6 Batching PlantThe required concrete will be prepared in a batching plant to be located temporarily inthe site so as to maintain the quality and reduce the lead distance. The capacity of thebatching plant will be 30 m3 to 50 m3/hr. The raw mix design (Cement: sand: coarseaggregates: water: admixture) is stored in electronic panel board and the quantities areweighed automatically as per the design mix. Aggregates in the sizes of 10 mm, 20 mmis stacked in separate bins and these materials are loaded into the hopper by scrapperand load cells. Cement is provided to the mix through silos (40 MT to 20 MT capacity)with the help of screw conveyor. Measured quantity of water and admixture is fed intohopper though load cells. In the hopper coarse aggregates, fine aggregates, cement,water and admixture gets mixed in required quantities by rotary motion of the mixerand after proper mixing it is unloaded into transit mixers at the rate of 0.5 m3/minute.The water consumption for this process is approximately 160 lts/m3 of concrete. Theentire operation is closed and there is no scope of fugitive dust as the operation is wetin nature.

2.2.2.7 Stone CrusherThe required aggregate will be drawn from with in the site from a temporary stonecrusher. The capacity of the stone crusher is 150 tons/hour. The stone crusher will usethe rocky boulders removed during the cut operations and used for the production ofaggregates of various sizes. The main raw material is boulders obtained from within thesite during clearing operations of the land and conveyed by tippers & dumpers to theplant site. All the crushing units are mobile and electrically operated. The boulder ischarged into the hopper with help of dumper. The boulders are crushed and screenedto required size with help of screens and carried by belt conveyors to the storage yard.The dust and the aggregate of less than 12.5 mm size will be used for road constructionand as sub base for flooring purpose instead of sand. All the silos and the conveyor beltswill be covered and the transfer points will be provided with water sprinkling. Thewater requirement for this plant is approximately 5 cum/day.

2.2.3 OCCUPATION PHASEA number of facilities will be provided by project authorities for the occupants and thefacilities are shown in table 2.17.

Page 22: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 21

Table 2.15 Amenities ProposedAmenity Nos. or description

Garbage segregation point 4STP 1Open/ Green Area 3723.0 m2

DG Sets 6 X 500 kVA + 2 X 2000 kVA

The owners/purchasers will form cooperative to run the amenities like sewagetreatment plant, DG sets. The major requirement of resource is for electricity andwater. The electricity will be drawn from TRANSCO. The power requirement duringoperation phase is presented in table 2.16 and energy savings is presented in table2.17.

Table 2.16 Electricity Consumption Statement

S.No DescriptionNo. ofUnits

Load inKW

TotalConnectedLoad (KW)

TotalConnected

Load(kVA)

TotalMax

Demand(KVA)

1 Block A to C 1013 6 6078.0 7597.5 7597.52 Street Lights 60 0.04 2.4 3.0 2.43 Amenities 284.6 355.7 284.64 STP 1 120 120.0 150.0 150.05 Lifts 10 15 150.0 187.5 187.5

TOTAL 6635.0 8293.7 8222.0Maximum demand in kw at 0.6 diversity factor 3981.0Consumption of power for 8 hours per day 31847.8Maximum demand in kw at 0.2 diversity factor 1327.0Consumption of power for 16 hours per day 21231.9Total consumption of power per day 53079.6 KWTotal consumption of power per year 193.7 Lakh Units

Table 2.17 Energy Saving by using Solar Water Heater

S.No Description No. ofUnits

Powerallocated inwatts / unit

Total powerrequired in

(KW)1 Block A to C 350 2500 875

TOTAL 875Maximum demand in kw at 1 diversity factor 875Consumption of power for 2 hours per day 1750Maximum demand in kw at 0.4 diversity factor 350Consumption of power for 2 hours per day 700Total consumption of power per day 2450.0 KWTotal consumption of power per year 8.94 Lakh Units

Page 23: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 22

Table 2.18 Energy Saving by using Solar Street Lights

S.No Description No. ofUnits

Powerallocated inwatts / unit

Total powerrequired in

(KW)1 Street lights 20 40 0.8

TOTAL 0.8Maximum demand in kw at 0.6 diversity factor 0.5Consumption of power for 8 hours per day 4Maximum demand in kw at full load 1Consumption of power for 4 hours per day 3Total consumption of power per day 7.0 KWTotal consumption of power per year 0.03 Lakh Unitssaving with Solar Heater and Street Lighting 8.97 Lakh Units

Table 2.19 Electrical Power savings using CFL for lighting

S.No Description Area inm2

Powerallocated inwatts / unit

Total powerrequired in

(KW)1 Residential 113602 10 1136

2Common &Utilities

73893 1.5 111

TOTAL 1247Maximum demand in kw at 0.9 diversity factor 1122Consumption of power for 12 hours per day 13466Total consumption of power per day 13466.1 KWTotal consumption of power per year 49.15 Lakh UnitsSavings in power using CFL 14.75 Lakh Units

Table 2.20 Energy Savings

S.No Description With CFLWith Solar Heater

and StreetLighting

TotalConsumption

lakh units

TotalSaving

1 Savings in lakhkwh units

14.75 8.97193.74

23.71

2 Savings inpercentage (%)

7.61 4.63 12.2

2.2.3.1 Domestic WaterThe domestic water will be drawn from HMWSSB to augment the supplies. Thewastewater will be treated and reused for gardening. The line providing grey water willbe colored blue and ensured that the tank is at least 1 foot below the level of othertanks and a distance of minimum 2 feet from the other water pipelines.

Page 24: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environmental Impact Assessment

Team Labs and Consultants2 - 23

2.2.3.2 Solid WasteThe solid wastes anticipated during occupation stage include garbage, sludge from STP,hazardous waste of used oils, and batteries from generators. The quantity of wastes ispresented in table 2.21.

Table: 2.21 Solid Waste Generated during Occupation PhaseS.No Type of Waste Quantity Collection/storage Disposal

1 Garbage 3215kg/day

Stored at each housein green and blue binsfor recyclable and non-recyclable wastesrespectively. Collectedand transported to thesegregation bin byNGO’s.

Municipal solidwaste disposal

2SewageTreatment PlantSludge

30 kg/dayStored in HDPE bags. Used as manure

and or given tofarmers.

3 Used Batteries 12 nos. year

Sent toAuthorizedrecyclers orreturned toseller

4 Used Lubricant 220 l/yearStored in HDPECarbouy

Sold toauthorizedrecyclers

5 Transformer Oil 180 l/yearStored in HDPE Drum Sold to TRANSCO

authorizedcontractors

Page 25: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 1

8.0 ENVIRONMENT MANAGEMENT PLANThe project is envisaged to provide high-density housing to meet the growing demandsfor housing in the growing urban area of Hyderabad falling under Kondapur Village,Serilingampally Mandal. The area around the village has a number of educationalinstitutions and residential development. The Area is connected to Commercial IT parksof Hi-Tech city, IT-knowledge parks, Central University of Hyderabad. The project isenvisaged as a gated community with environment friendly features to cater to thegrowing market demand for quality housing. The demand for quality housing from thisarea will be partially met from this project, apart from the demand due to industrialnature of the surrounding areas. The village has a number of layouts and rapidlyturning into a residential zone for various types of socio economic sectors.

8.1 PROJECT DETAILS

The project will be spread over an area of 3.48 hectares of land for ResidentialApartments with necessary amenities in Survey Nos. 42, 47, 54 & 59 situated atKondapur, Serilingampally Mandal, Ranga Reddy District. The site is surrounded byOpen lands in nort and west directions, Residential Buildings and Commercial buildingsin east direction. An existing 30 m wide road in south direction connecting GachibowliMiyapur Road. The nearest railway station is the Hitech City railway station at adistance of 2.7 km.

It is proposed to provide 1031 units in 3 Apartment blocks. The land allocation will beoptimized to ensure compliance with the regulations of GHMC. The water requirementof the project during operation will be drawn from HMWSSB. Sewage treatment plantwill be provided to treat the sewage. Water conservation measures will beincorporated in the plumbing designs. Water recycling/reuse will be adopted by way ofusing treated sewage for green belt development. The rainwater will be let-out intoharvesting tank and excess discharged into storm water drains. The required power willbe drawn from the TRANSCO. Solar Energy will be used for fencing, and partially for hotwater in the apartments. The designs of the apartments will also incorporate IndianArchitectural principles of “Vastu” as the market demands the same. Constructionmaterial will be drawn from local sources.

8.2 Major findings of the EIA

An EIA was conducted and the major findings of the EIA study are presented below;

8.3 Environmental Impacts

Impact on Physical ResourcesConstruction of proposed project requires huge quantities of natural resources likesand, sub grade and aggregate, and materials produced from natural resources likebricks, cement and steel. The material shall be drawn from local sources, and the leaddistances range from 2 – 200 km. The impacts on physical resources of sand will beirreversible. While bricks will be brought from kilns which use Coal ash. The materialrequirement of steel, cement etc. will be purchased from manufacturers with in state.

Page 26: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 2

Hence, no major impacts on physical resources as regards the availability andprocurement of construction material are anticipated due to the project.

Impacts on Air QualityImpacts on air quality during construction stage are likely to be due to operation ofconstruction yards, material transport on trucks and fugitive emissions from theconstruction sites. The model results for occupation stage show slight increase in the airquality and in worst concentrations are falling within the site, and the results are with inthe prescribed limits.

Impacts on Noise QualityImpacts on noise quality during construction stage will be significant. Hence theconstruction near the habitation is proposed only during daytime. The impacts duringoccupation stage will be on the plots adjacent to the road. Construction workers will beprovided with protection equipment to guard against the noise impacts. Noisemitigating measures will be suggested for construction equipment and DG sets.

Impact on FloraThe project site and its surroundings do not form a habitat to any endangered flora.There are very few trees within the project site due to anthropogenic pressures. Theproject will enhance the aesthetics of the site due to the provision of avenue plantationand central greening. This would ensure minimum impact on flora.

Impact on FaunaAs there are no endangered species of wild life in and around the project site, it is likelyto have minimal impact. The avifauna will find abode on the trees proposed to beplanted. This would enhance the aesthetics of the area. Pet animal faeces may leadto pollution of water shed if allowed to join storm water drains.

Impact on Land useThere is no land acquisition for this project. The land use of the site fallow land andclassified as residential by GHMC. However the topography of the land being rockyplains involves cut and fill operations where there is an excess of cut . Erosion andsedimentation are impacts anticipated during construction. Mitigation measures shallbe adopted to avoid the same. The area development would increase the housingactivity in the surroundings, which is a positive impact, as barren lands will be used forproductive usage, and the negative impacts will be pressure on the infrastructurefacilities.

Impact on Surface Water ResourcesThe degradation of water quality can occur during construction phase from increasedsediment load into watercourses near the construction site. Suitable mitigationmeasures proposed, as part of the EMP will ensure that the residual impacts areminimal. Storm water runoff would increase due to the increase in impervious surface,and rainwater-harvesting structures will be provided as mitigation measure. The designof the storm water drain will consider the additional runoff. The urban storm waterjoining the storm water drain may carry pollutants from imperious surface.

Page 27: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 3

Impact on Ground Water ResourcesGround water shall be drawn during construction, and will be used to augment themunicipal supply during non-monsoon season if necessary. Exploitation of groundwater will have an impact and the same shall be restricted to ensure resourceconservation. This impact will be marginal, as the ground water will not be drawncontinuously.

Impact on Human Use ValuesThe dominant land use in the area is residential, and expected commercial space willincrease the pressure on the residential localities. There is no additional requirementand or acquisition of land. The project authorities will provide road safety measures toreduce risk of accidents in the internal roads. The impact on Human use values ismarginal.

8.4 ENVIRONMENTAL MANAGEMENT MEASURES PROPOSED

A description of the various management measures during the various stages of theproject is provided in the following sections.

8.4.1 Pre-construction stage

During the design and preconstruction stage the management proposes to comply withthe regulations of town planning, explore the availability of sufficient resources, provideplantation and sink bore wells after obtaining the necessary permissions, obtain allnecessary permissions from various statutory authorities after obtaining the relevantpermissions.

8.4.2 Construction stage

This will be the most crucial and active stage for the Environmental Management Plan.In addition to the monitoring of the construction activity itself to the pollution levelswithin permissible limits, mitigation and enhancement measures for water resourceswill go on simultaneously as the construction progresses. To facilitate implementationof the enhancement and mitigation measures suggested, working drawings of the samewould be prepared after completion of detailed project report. In addition, the needfor a balanced evaluation and planning for risks associated with construction activitiesrelated to housing project will be part of the supervising Contractors responsibility.

The resource conservation by way of identification of materials and construction debrisrecycle/disposal will be formulated by the supervising consultants. The responsibility ofenvironment management plan lies with the project authorities who would implementthe plan in consultation with other consultants, by including appropriate provisions inthe contract/sub contract documents and providing the necessary facilities.

8.4.3 Operation stageThe environment management plan will be implemented by ownersassociations/societies, where project authorities are co opted as members, and whilethe management plan related to the utilities like roads, street lighting and common

Page 28: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 4

open spaces lies with the Municipality. The management in operation stage willessentially entail maintenance of sewage treatment plant, maintenance of utilities, andmonitoring activity in the project site. Monitoring for pollutants specified in theMonitoring Plan will serve the two purposes. In addition to checking the efficiency ofthe protection/mitigation/enhancement measures implemented, this will help verify orrefute the predictions made as a part of the impact assessment. Thus, it will complete avery important feedback loop for the housing project.

The measures adopted and/or to be adopted during different stages of the project havebeen detailed in table 8.1.

Table 8.1 Environmental Management Plan and Action PlanEnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

PRE-CONSTRUCTION PHASEThe layout design shallbe on the basis of townplanning rules of GHMC.

Following the FSIprescribed and orreducing the FSI.

Provision of additionalparking

Enhancement of openspace area into a park.

Provision of avenueplantation.

Provision of stormwater drains, forinfiltration, filtration,flow dissipation andsediment control.

Provision for disposal ofstorm water and treatedwastewater.

Consultants for various activities areidentified and mandate given toidentify environmentally soundpractices and resource conservationmeasures.

CONSTRUCTION PHASEDust generation due toconstruction activities.

Roads in theconstruction area willbe sprinkled with waterto reduce the raising ofdust.

Plantation taken up atinitial stage.

Plantation to be ensured Horticulturists to identify the species.Supervising consultants/contractor toensure the water sprinkling

Exhaust gases fromheavy machinery andtransportation ofmaterials

Vehicle and equipmentmaintenance.

PUC for all transportvehicles.

Avoidance of idling of

Contractors to be educated andsupervising consultant to ensure thesame.

Page 29: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 5

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

equipment.

Sedimentation of stormwater during rainyseason

Avoiding stockpiles ofmaterials near naturaldrains.

Provision of filter fenceProvision of stormwater drains whereverpossible before thebeginning ofconstruction.

Architects, in consultation withSupervision consultants shouldidentify the measures needed.

Sewage transfer Lead bearing piping tobe avoided

Project authorities, and plumbingconsultant in coordination with theSupervision consultant shouldimplement the same.

Sewage Treatment Sewage to be treated inthe STP andreused/disposed.

STP shall be provided by the projectauthorities and ensured that thedesign of STP is optimised to meetthe prescribed standards with energyefficiency.

Alteration of Drainage Storm water drains tofollow the naturalcourse as far aspossible.

Storm water drains tohave a minimum watervelocity of 1 m/s and amaximum 3 m/s.

Minimum width of 0.6meters and depth basedon the gradient.

Provision of rainwaterharvesting structures.

Architects in consultation withsanitary engineering consultants.

Supervision consultant to ensure thesame.

Ground water drawl Water conservationmeasures duringconstruction.

Sub contractors to be educated onwater conservation measures.

Loss of productive soil The site area is rocky.Topsoil to be stock piledseparately with 1:2slope and reused forgreening purpose.

Supervision consultant to ensure thesame in consultation withhorticulturist and architect.

Soil Erosion Cut and fill operation to Supervision consultant to ensure the

Page 30: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 6

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

be done during non-monsoon season.

Silt fence to ensure siltdoes not enter stormwater drains.

Side slopes will be keptflatter whereverpossible, and in case ofsteeper slopes it ismulched.

same in consultation with projectauthorities.

Compaction of Soil Movement ofconstruction vehiclespreferably in theproposed road areas.

Heavy vehiclemovement restricted incentral green area.

Ploughing the area afterconstruction.

Architects to identify the road areas.

Contamination of Soil Vehicle washing andmachinery washing tobe avoided in site.

Parking of vehicles andmaintenance of vehiclesto be avoided in site.

Disposal of solid wastesby construction campsto be made in garbagebins only.

Accidental Leakage andspillage of fuels andother constructionmaterials to becontrolled by providingroad signs and coveredtrucks.

Subcontractors and Projectauthorities should ensure.

Designate the parking areasProvision of Garbage bin by projectauthorities and arrangements to befor disposal of the same.

Page 31: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 7

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

Natural Resourceconsumption

Identify sandavailability fromgovernment authorisedlocations.

Identify and use bricksfrom coal ash users.

Aggregate to be madefrom the excessmaterials of cutoperations.

Identify and userecycled steel whereverpossible.

Proper availability ofdrinking water andsanitation facilities.

The design team in consultation withproject authorities and supervisionconsultants must identify thesuppliers.

Damage to servicesrunning parallel oracross the site duringconstruction leading tointerruption in supply

Relocation of any po-tentially affected ser-vices prior to com-mencement of anyconstruction works

Contractors to be re-sponsible for identifyingand safeguardingservices adjacent toworks and for com-pensating statutoryundertakers for anyaccidental damage tosuch services.

Potentially affected servicesidentified in design stage.

Service undertakers to be notified forrelocation and necessaryprogramming to avoid constructiondelays (incl. payments).

Relocation works to be completed bystatutory undertakers beforeconstruction works proceed inaccordance with an agreedprogramme.

Inclusion of appropriate clauses inconstruction contracts; monitoring ofcompliance during construction andproper administration of contracts.

Fire Prevention Adopt safe work prac-tice and have adequatefire fighting facilities.

Provision of adequate fire fightingequipment

Noise Pollution fromheavy machinery, andtransportation.

Noise causing activitiesnear residential areas tobe conducted duringdaytime.

Maintenance ofequipment and vehiclesto mitigate noisegeneration.

Inclusion of appropriate clauses inconstruction contracts; monitoring ofcompliance during construction andproper administration of contracts.

Pressures on Identification of Transporting the materials during

Page 32: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 8

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

Infrastructure alternative routes fortransport of materialsfrom outside the sitepreferably using innerring road.

Transport of materialsduring non-peak hours.

Installing ElectricalTransformer ifnecessary based onTRANSCO advise toavoid powerfluctuations in the siteand also theneighbouring residentialareas.

nighttime.Consultation with TRANSCO byproject authorities.

Construction debris Construction debris tobe used for aggregateand or sub gradepurpose in the case ofRCC.

Recyclable metals to becollected and sold torecyclers.

Avoidance of excessinventory of materials.

Packing materials to besent for reuse/recycling.

Hazardous wastecontainers to bereturned toseller/authorisedrecyclers.

Provision of waste disposal site forwaste from construction and storageyard.

Supervision consultant in consultationwith the sub contractors.

Inclusion of appropriate clauses inconstruction contracts; monitoring ofcompliance during construction andproper administration of contracts.

Plantation andEnvironmentalgreening.

Soil reclamationUse of top soilInitiation of plantation

Horticulture consultant shall preparethe plan for soil reclamation and useof topsoils in consultation witharchitects and supervisionconsultants.

Social Impacts Additional employmentto locals.

Qualified locals to be chosen foremployment.

Occupational Safety andHealth

Construction workersare provided with per-sonal protective

Ensure adequacy and availability ofPersonal protective equipments.

Project authorities to ensure

Page 33: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 9

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

equipment (PPE) such asearplugs, helmets,safety shoes, gloves,etc.

Follow the relevantstatutory guidelines

Comply with Buildingconstruction acts.

The premises shall befenced and notrespassing be allowed.

compliance with statutoryrequirements.

Project authorities to fence theboundaries to avoid unauthorisedtrespassing.

OCCUPATION STAGEUrban Heat Island Effect Cool roof

Green roof Vegetation Cool Pavements

Cool roof with light shades having lowalbedo values to be provided.

Vegetation to be provided byhorticulturist for the avenues, andcentral green

Pavements will be made imperviousfor footpaths and jogging paths byprovision of pavers.

Pervious roads using pavers oncompacted soils.

Dust Generation fromtraffic.

Avenue plantation. Maintenance of roadsby way of sweeping.

Horticulturist should ensure avenueplantation

The managing committees shouldensure maintenance of avenueplantation.

Local Panchayath authorities shouldensure the road maintenance.

Generation of Exhaustgases from transportand utilities.

Avenue plantation. Rule to allow onlyvehicles with PUC.

Proper maintenance ofvehicles.

Stack heights of the DGsets must be providedas per CPCB guidelinesand the emission levelsshould meet the CPCBstandards.

To be maintained by the cooperativesociety

To be implemented by thecooperative society.

To be maintained by individualowners.

Project authorities must ensure thatthe DG sets are provided withacoustic enclosures and proper stackheights.

Sewage Management All Sewage will becollected by underground

A Cooperative society (society) of ownerswill maintain the STP, and sewerage.

Page 34: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 10

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

drainage system. The sewage will betreated in sewagetreatment plant

The treated sewage isreused for on landirrigation for thedevelopment of greenbelt.

Treated water line will beprovided in apartmentsfor reuse for flushing.

Excess sewage will be letout into drains

Local body authorities will be appraisedduring rainy season when excessquantities are released into the drain.

Treated water lines will be colored blueand a distance of 2 feet will bemaintained from the other lines by theproject authorities.

Records of influent and treated effluentquality and quantity should bemaintained by the society, and thetreatment must be ensured to meet thestandards prescribed by GSR 422 E.

Storm waterManagement

Storm water will bedisposed into stormwater drain provided bylocal authorities.

Storm water drains willbe maintainedperiodically beforemonsoon.

Accidental dischargesspillages will not beallowed to join stormwater drains.

Roads, pavements andother surfaces areswept regularly.

Rainwater harvestingstructures will beconnected to allresidential areas andmaintained periodicallyto remove sediment.

Washings of the frontportions and porticosshould be avoided as itmay join the drain andsweeping should bepreferred.

Storm water drain system anddisposal point to be provided by theproject authorities.

Rain water-harvesting structures tobe provided by project authorities.

Maintenance of storm water drainsby Local body authorities and thesociety of residents shall oversee thesame.

Sweeping by municipal authorities tobe supervised by the society.

Pet owners/all residents informedabout pet refuse disposal. Society toensure the same.

Ground water usage Ground water sourcesto be used during nonavailability of sufficient

Ground water to be used sparinglyand water conservation measures tobe adopted, society shall educate and

Page 35: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 11

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

supplies from HMWSSB.Occupants not allowedto sink bore wells.

implement among residents. Society holds the responsibility ofbore wells in the campus.

Water ConservationMeasures

Water conservationmeasures to be adoptedto reduce resourceconsumption.

Society to educate the residents andprovide a book let of measures toreduce water consumption.

Loss of productive soil Plot owners to beeducated aboutimportance greening toavoid loss of productivesoil.

Society to educate the residents.

Solid Wastes Solid waste/garbage tobe collected in greenand blue dustbins. Thegreen bin to be filledwith Biodegradablekitchen waste, while theblue dustbin to be filledwith recyclable wastelike glass, plastic, papersetc.

The biodegradablewastes to be removedeveryday while therecyclable wastes to beremoved once a weekfrom each residence.

The dustbins along thestreets to be emptiedonce a day by thesociety and or itsrepresentative NGO.

Solid waste/garbage tobe picked by society orits representative NGO.

Transporting thegarbage to segregationpoint by NGO.

Local body authoritiesshall transport thewastes to dump yard atJawaharnagar or other

The project authorities to makearrangements with the Localauthority.

The society shall educate thesegregation of wastes

The society shall ensure the transferof wastes to the segregation point.

Society shall interact with the localbody and implement themanagement plan updated if any.

The project authorities must identifythe users for STP sludge andauthorised recyclers for hazardouswastes and inform the society forimplementation.

Page 36: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 12

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

designated location.The sludge from the STPmay be used as manurefor greening program isdisposed to farmers.

The used oils and usedbatteries, and usedtransformer oils shouldbe sent to authorisedrecyclers.

Consumption of naturalresource

The major naturalresource consumedduring occupation stageis ground water duringin sufficient availabilityof water from HMWSSB.

Consumption of natural resourcesshall be optimised by education andconservation measures by theSociety.

Noise Levels Noise levels due totraffic, and otherlivelihood activity willincrease in the area andthe mitigation measuresof construction andGreening will reduce thesame.

Noise levels from DGsets to be mitigated bythe provision of acousticenclosures.

Noise levels duringfestivals and othercommunity functions.

The project authorities shall ensurethat the material of construction shalluse best sound transmission classmaterials to ensure that the soundlevels with in the residence are withinthe prescribed limits for residentialareas.

Avenue plantation should becompleted before the occupationstage to ensure that the noise levelsare mitigated.

The project authorities must ensurethe provision of acoustic enclosuresto the DG sets.The society must ensure that thenoise from public address systems ifany during festivals should follow theguidelines of police and local body.Society must educate the residentsabout the noise level mitigationmeasures suggested by variousagencies during festivals.

Page 37: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 13

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

Traffic Volumes andparking facilities

Traffic volumes willincrease over a period oftime and put pressure onthe infrastructure.

Subsequent increase inair pollution loads on theproject site and itssurroundings.

Provision of car parkingfacilities in the residentialareas over and above theprescribed number.

Provision of Parking atcommon amenities likeclub house, commercialareas.

Traffic and road safetysignals to be provided.

The colony roads shall not be made athoroughfare and the projectauthorities shall ensure the same bydeclaring the project a gatedcommunity.

The project authorities must ensurepublic transport bus stations in theimmediate vicinity of the site and themaximum distance from the residenceand the bus stand should be less than 1km.

The society should educate andencourage public transport by road,MMTS by rail and car pool systems byproviding incentives like awards etc.

Parking facility should not be convertedinto living space/commercial space bythe residents and the society mustensure the same during the occupationstage.

The project authorities must providethe traffic and road safety signals in theproject. Two way mirrors must beprovided at blind corners.

Flora The impacts on flora aredue to air pollution fromexhaust of vehicles tobe mitigated by thechoice of species.

The flora of the siteshall increase with thegreening program in thecentral greenarea/totlots and otheropen spaces.

The flora of the siteshall increase with thegreening plans for thehouses.

The impacts on thesurrounding area faunawill be minimal and yetthe residents toparticipate actively in

The Project authorities to ensuregreening the central open space andavenue plantation.

Horticulturists to assist the residentsin identifying the plant species withan objective of reducing the energycosts and mitigating the urban heatisland effect.

The society should participate inurban greening programs of GHMCand Municipality actively.

Page 38: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 14

EnvironmentalIssues/Impacts

Enhancement/Mitigation Measures Management Action

community greening ofthe surroundings.

Fauna/pets Pet refuse should beremoved and dumped inthe dustbins only andshould not be allowedinto storm water drains.

The society must educate theresidents and ensure the same.

Energy Conservation The white goods usedby the residents shouldhave optimum energyconsumption.

Usage of Compactfluorescent lamps incommon areas, parkareas and in theresidences.

The project authorities shall installCFLs in all common areas and greenareas.

The society shall collect anddisseminate information regardingthe household white goods and theirenergy efficiency.

Fire Safety Apartments shall beprovided with fire safetymeasures as per the firesafety regulations.

The project authorities must providethe measures and obtain the NOCfrom the Director general of firesafety.

8.5 IMPLEMENTATION ARRANGEMENTSThe responsibility of implementing the mitigation measures lies with M/s KrishnaiahProperties Pvt. Ltd., during design and construction stages while the responsibility lieswith the cooperative owner’s society and the Serilingampally village authorities duringoccupation stage. All construction activities taken up by the project authorities will besupervised by the Supervision Consultant (SC). Implementation schedule will be workedfor phase wise implementation of the mitigation measures after completion of detaileddesigns. In the pre-construction phase of the project the supervision consultants shallreview the EMP to identify environmental and social issues and arrive at a suitablestrategy for implementation. The activities to be carried out and the target dates will beworked out after completion of detailed designs.

8.6 INSTITUTIONAL STRENGTHENINGThe management of M/s Krishnaiah Properties Pvt. Ltd., will evaluate the organizationalstructure with respect to inadequacies in implementing the environment managementplans. The housing project is typical as the responsibility of management lies with theowners/residents during occupation stage. The owners form a cooperativesociety/association to manage the utilities and common areas in a normal case. Thecommon areas, electrical supply, street lighting, open space of central green will betaken over and managed by the local body and TRANSCO. The role of residents islimited to being stakeholders with little say in the day-to-day matters; this issue mustbe addressed by the town planning agencies and the government.

Page 39: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 15

The Environment Management Plan envisages on-site monitoring of constructionactivities for environmental pollution and will involve collection of samples and theirsubsequent analysis. For this purpose two chemists would be required especially whenthe implementation of the two phases goes on simultaneously. Induction of two moreassistant engineers, one each for the biophysical and social environment will also benecessary.

8.6 TRAINING

The existing supervising staff and the additional staff have to be trained to effectivelycarry out.

Co-ordinate, with supervision consultants and contractors on compliancemonitoring of mitigation measures during construction phase.

Monitoring of environmental components in the operation stage; Co-ordinate with concerned departments on environmental issues; Environmental impact studies for future housing projects; Liase with State and Government of India on fiscal policies to reduce

environmental pollution from housing activity.

8.7 ENVIRONMENTAL MONITORING

8.7.1 Introduction

The environmental monitoring programme provides such information on whichmanagement decision may be taken during construction and occupation phases. Itprovides basis for evaluating the efficiency of mitigation and enhancement measuresand suggest further actions that need to be taken to achieve the desired effect.The monitoring includes:

(i) Visual observations;(ii) Selection of environmental parameters at specific locations;(iii) Sampling and regular testing of these parameters.

8.7.2 Objectives

The objectives of the environmental monitoring programme are: Evaluation of the efficiency of mitigation and enhancement measures; Updating of the actions and impacts of baseline data; Adoption of additional mitigation measures if the present measures are

insufficient; Generating the data, which may be incorporated in environmental

management plan in future projects.

8.7.3 Methodology

Monitoring methodology covers the following key aspects: Components to be monitored; Parameters for monitoring of the above components; Monitoring frequency;

Page 40: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 16

Monitoring standards; Responsibilities for monitoring; Direct responsibility, Overall responsibility; Monitoring costs.

Environmental monitoring of the parameters involved and the threshold limits specifiedare discussed below.

8.7.4 Ambient Air Quality (AAQ) MonitoringAmbient air quality parameters recommended for road transportation developmentsare Respirable Particulate Matter (RPM), Suspended Particulate Matter (SPM), Oxidesof Nitrogen (NOX),Sulphur Dioxide (SO2)and Lead (Pb). These are to be monitored atdesignated locations starting from the commencement of construction activity. Datashould be generated over three days at all identified locations in accordance to theNational Ambient Air Quality Standards (Table 8.2) location, duration and the pollutionparameters to be monitored and the responsible institutional arrangements aredetailed out in the Environmental Monitoring Plan.

Table 8.2National Ambient Air Quality StandardsS. No Pollutant Time

WeightedAverage

Concentration in Ambient Air

Industrial,Residential, Rural andOther Area

EcologicalSensitive Area(Notified byCentralGovernment)

Methods ofMeasurement

(1) (2) (3) (4) (5) (6)1 Sulphur Dioxide

(SO2), µg/m3Annual*

24 Hours**

50

80

20

80

Improved westand GaekeUltravioletfluorescence

2 NitrogenDioxide(NO2), µg/m3

Annual*

24 Hours**

40

80

30

80

Modified Jacob& Hochheiser(Nn-Arsenite)Chemiluminescence

3 ParticulateMatter (Size Lessthan 10µm) orPM10 µg/m3

Annual*

24 Hours**

60

100

60

100

GravimeticTOEMBetaAttenuation

4 ParticulateMatter (Size Lessthan 2.5µm) orPM2.5 µg/m3

Annual*

24 Hours**

40

60

40

60

GravimeticTOEMBetaAttenuation

5 Ozone (O3)µg/m3

8 hours**

1 hour**

100

180

100

180

UV PhotometricChemilminescenceChemicalMethod

Page 41: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 17

S. No Pollutant TimeWeightedAverage

Concentration in Ambient Air

Industrial,Residential, Rural andOther Area

EcologicalSensitive Area(Notified byCentralGovernment)

Methods ofMeasurement

6 Lead (Pb) µg/m3 Annual*

24 hours**

0.50

1.0

0.50

1.0

AAS /ICPmethod aftersampling onEPM 2000 orequivalent filterpaperED-XRF usingTeflon filter

7 CarbonMonoxide (CO)mg/m3

8 hours**

1 hour**

02

04

02

04

Non DispersiveInfra Red (NDIR)Spectroscopy

8 Ammonia (NH3)µg/m3

Annual*24 hours**

100400

100400

ChemilminescenceIndophenol bluemethod

9 Benzene (C6H6)µg/m3 Annual* 05 05

GasChromotography basedcontinuousanalyzerAbsorption andDesorptionfollowed by GCanalysis

10 Benzo(o)Pyrene(BaP) –Particulate Phaseonly, ng/m3

Annual* 01 01 Solventextractionfollowed byHPLC/GCanalysis

11 Arsenic (As),ng/m3

Annual* 06 06 AAS/ICPmethod aftersampling onEPM 2000 orequivalent filterpaper

12 Nickel (Ni),ng/m3

Annual* 20 20 AAS/ICPmethod aftersampling onEPM 2000 orequivalent filterpaper

Source:Anon 1996-97, National Ambient Air Quality Monitoring Series NAQMS/a/1996-97, Central Pollution Control Board, Delhi.

*Average Arithmetic mean of minimum 104 measurements in a year taken for a week24 hourly at uniform interval.

**24 hourly/8 hourly values should meet 98 percent of the time in a year

Page 42: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 18

8.7.5 Water Quality MonitoringThe physical and chemical parameters recommended for analysis of water qualityrelevant to road development projects are pH, total solids, total dissolved solids, totalsuspended solids, oil and grease, COD, chloride, lead, zinc and cadmium. The location,duration and the pollution parameters to be monitored and the responsibleinstitutional arrangements are detailed in the Environmental Monitoring Plan. Themonitoring of the water quality is to be carried out at all identified locations inaccordance to the Indian Standard Drinking Water Specification – IS 10500: 1991(stated in table 8.3)

Table 8.3 Indian Standard Drinking Water Specifications – IS: 10500:1991

SlNo

Substance orCharacteristics

Requirement

(Desirable Limit)

UndesirableEffect Outsidethe Desirable

Limit Perm

issib

leLi

mit

in th

eAb

senc

e of

Alte

rnat

eSo

urce Methods of

Test (Ref.To IS)

Remarks

ESSENTIAL CHARACTERISTICS

1 Colour, Hazenunits, Max.

5 Above 5,consumeracceptancedecreases

25 3025 (Part 4)1983

Extended to 25only if toxicsubstances are notsuspected, inabsence ofalternate sources

2 Odour Unobjectionable

- - 3025 (Parts5):1984

a) Test cold andwhen heatedb) Test at severaldilutions

3 Taste Agreeable

- - 3025 (Part 7and 8)1984

Test to beconducted onlyafter safety hasbeen established

4 Turbidity NTU,Max.

5 Above 5,consumeracceptancedecreases

10 3025 (Part 10)1984

-

5 pH Value 6.5 to8.5

Beyond thisrange, the waterwill affect themucousmembraneand/or watersupply system

Norelaxation

3025 (Part 11)1984

-

Page 43: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 19

SlNo

Substance orCharacteristics

Requirement

(Desirable Limit)

UndesirableEffect Outsidethe Desirable

Limit Perm

issib

leLi

mit

in th

eAb

senc

e of

Alte

rnat

eSo

urce Methods of

Test (Ref.To IS)

Remarks

6 Totalhardness (asCaCO3) mg/l,Max

300 Encrustation inwater supplystructure andadverse effectson domestic use

600 3025 (Part 21)1983

-

7 Iron (as Fe)mg/l, Max

0.3 Beyond this limittaste/appearance are affected,has adverseeffect ondomestic usesand watersupply struc-tures, andpromotes ironbacteria

1 32 of 3025 :1964

-

8 Chlorides (asCI) mg/l, Max

250 Beyond thislimit, taste,corrosion andpalatability areaffected

1000 3025 (Part32)1988

-

9 Residual, freechlorine, mg/l,Min

0.2 - - 3025 (Part 26)1986

To be applicableonly when water ischlorinated. Testedat consumer end.When protectionagainst viralinfection isrequired, it shouldbe Min 0.5 mg/l

DESIRABLE CHARACTERISTICS1 Dissolved

solids mg/l,Max

500 Beyond thispalatabilitydecreases andmay causegastro intestinalirritation

2000 3025 (Part 16)1984

-

2 Calcium (asCa) mg/l, Max

75 Encrustation inwater supplystructure andadverse effects

200 3025 (Part 40)1991

-

Page 44: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 20

SlNo

Substance orCharacteristics

Requirement

(Desirable Limit)

UndesirableEffect Outsidethe Desirable

Limit Perm

issib

leLi

mit

in th

eAb

senc

e of

Alte

rnat

eSo

urce Methods of

Test (Ref.To IS)

Remarks

on domestic use3 Magnesium

(as Mg), mg/l,Max

30 Encrustation towater supplystructure andadverse effectson domestic use

100 16, 33, 34 ofIS 3025: 1964

-

4 Copper (asCu) mg/l, Max

0.05 Astringent taste,discolorationand corrosion ofpipes, fitting andutensils will becaused beyondthis

1.5 36 of 3025:1964

-

5 Manganese(as Mn) mg/l,Max

0.1 Beyond this limittaste/appearance are affected,has adverseeffects ondomestic usesand watersupplystructures

0.3 35 of 3025:1964

-

6 Sulphate (as200 SO4) mg/l,Max

200 Beyond thiscauses gastrointestinal irrita-tion whenmagnesium orsodium arepresent

400 3025 (Part 24)1986

May be extendedup to 400 provided(as Mg) does notexceed 30

7 Nitrate (asNO2) mg/l,Max

45 Beyond this,may causemethaemoglobinemia

100 3025 (Part 34)1988

-

8 Fluoride (as F)mg/l, Max

1 Fluoride may bekept as low aspossible. Highfluoride maycause fluorosis

1.5 23 of 3025:1964

-

9 Phenoliccompounds(As C6H5OH)

0.001 Beyond this, itmay causeobjectionable

0.002 54 of 3025:1964

-

Page 45: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 21

SlNo

Substance orCharacteristics

Requirement

(Desirable Limit)

UndesirableEffect Outsidethe Desirable

Limit Perm

issib

leLi

mit

in th

eAb

senc

e of

Alte

rnat

eSo

urce Methods of

Test (Ref.To IS)

Remarks

mg/l, Max taste and odour10 Mercury (as

Hg) mg/l, Max0.001 Beyond this, the

water becomestoxic

Norelaxation

(see Note)Mercury ionanalyser

To be tested whenpollution issuspected

11 Cadmium (asCd), mg/l,Max

0.01 Beyond this, thewater becomestoxic

Norelaxation

(See note) To be tested whenpollution issuspected

12 Selenium (asSe), mg/l, Max

0.01 Beyond this, thewater becomestoxic

Norelaxation

28 of 3025:1964

To be tested whenpollution issuspected

13 Arsenic (AsAs) mg/l, max

0.05 Beyond this, thewater becomestoxic

Norelaxation

3025 (Part 37)1988

To be tested whenpollution issuspected

14 Cyanide (AsCN), mg/l,Max

0.05 Beyond thislimit, the waterbecomes toxic

Norelaxation

3025 (Part 27)1986

To be tested whenpollution issuspected

15 Lead (as Pb),mg/l, Max

0.05 Beyond thislimit, the waterbecomes toxic

Norelaxation

(see note) To be tested whenpollution issuspected

16 Zinc (As Zn).Mg/l, Max

5 Beyond this limitit can causeastringent tasteand anopalescence inwater

15 39 of 3025:1964)

To be tested whenpollution issuspected

17 Anionicdetergents (AsMBAS) mg/l,Max

0.2 Beyond this limitit can cause alight froth inwater

1 Methylene-blueextractionmethod

To be tested whenpollution issuspected

18 Chromium (AsCr6+) mg/l,Max

0.05 May becarcinogenicabove this limit

Norelaxation

38 of 3025:1964

To be tested whenpollution issuspected

19 Poly nucleararomatichydrocarbons(as PAH) g/1,Max

- May becarcinogenicabove this limit

- - -

20 Mineral oilmg/l, Max

0.01 Beyond this limitundesirabletaste and

0.03 GasChromatographic method

-

Page 46: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 22

SlNo

Substance orCharacteristics

Requirement

(Desirable Limit)

UndesirableEffect Outsidethe Desirable

Limit Perm

issib

leLi

mit

in th

eAb

senc

e of

Alte

rnat

eSo

urce Methods of

Test (Ref.To IS)

Remarks

odourafterchlorination takeplace

21 Pesticidesmg/l, Max

Absent Toxic 0.001 - -

22 Radioactive materials: 58 of3025:01964

-

23 a) Alphaemitters Bq/l,Max

- - 0.1 - -

24 Betaemiterspci/1,Max

- - 1 - -

25 Aluminium (asAl), mg/l, Max

200 Beyond this limittaste becomesunpleasant

600 13 of3025:1964

-

26 Aluminium (asAl), mg/l, Max

0.03 Cumulativeeffect isreported tocause dementia

0.2 31 of 3025:1964

-

27 Boron, mg/l,Max

1 - 5 29 of 3025:1964

-

Source: Indian Standard Drinking Water Specification-IS10500:1991

8.7.6 Noise Level MonitoringThe measurements for monitoring noise levels would be carried out at all designatedlocations in accordance to the Ambient Noise Standards formulated by Central PollutionControl Board (CPCB) in 1989 (refer) Sound pressure levels would be monitored ontwenty-four hour basis. Noise should be recorded at a “A” weighted frequency using a“slow time response mode” of the measuring instrument. The location, duration andthe noise pollution parameters to be monitored and the responsible institutionalarrangements are detailed in the Environmental Monitoring Plan (table 8.5)

Page 47: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 23

Table 8.4Noise level standards (CPCB)

Type Noise level for DayTime Leq dB(A)

Noise level forNight Time dB(A)

Industrial area 75 70Commercial area 65 55Residential area 55 45Silence zone 50 40Day time - 6.00 am - 9.00 pm (15 hours)Night time - 9.00 pm - 6.00 am (9 hours)

The monitoring plan along with the environmental parameters and the time frame ispresented in the table 8.5 environmental monitoring plan

Table 8.5 Environmental Monitoring Plan

Envi

ronm

ent

com

pone

nt

Proj

ect S

tage MONITORING Institutional

Responsibilities

Parameters

SpecialGuidanc

e

Standards Location Frequen

cyDuratio

nImplementation

Supervision

Air

Cons

truc

tion

stag

e

PM10,PM2.5,SO2,NOX, CO,HC

Highvolumesamplerto belocated50 mfrom theplant inthedown-winddirec-tion. Usemethodspecifiedby CPCBforanalysis

Air(Preven-tion andControlof Pollu-tion)Rules,CPCB,1994

Locationofconstruction area

Onceeveryseasonfor 2years

Continuous 24hours/or for 1fullworking day

Contractorthroughts -provedmoni-toringagency

EnvironmentalEngineer, GHMC

Page 48: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 24

Envi

ronm

ent

com

pone

nt

Proj

ect S

tage MONITORING Institutional

Responsibilities

Parameters

SpecialGuidanc

e

Standards Location Frequen

cyDuratio

nImplementation

Supervision

Cons

truc

tion

stag

ePM10,PM2.5

HighVolumeSamplerto belocated40 mfrom theROW inthedown-winddirec-tion. Usemethodspecifiedby CPCBforanalysis

Air(Preven-tion andControlof Pollu-tion)Rules,CPCB,1994

Locationofconstruction area

Onceeverymonthfor 2years

Continuous 24hours/or for 1fullworking day

Contractorthroughts -provedmoni-toringagency

EnvironmentalEngineer, M/sKrishnaiahProperties Pvt.Ltd.,

Occ

upat

ion

stag

e

PM10,PM2.5SO2, NOx,CO, Pb,HC

HighVolumeSamplerto belocatedat 15 mfrom theedge ofpave-ment

Air(Preven-tion andControlof Pollu-tion)Rules,CPCB,1994

1.Kondapur

2.Nallagundla

3.Lingampalli

4.Timmidikunta

Thrice inoccupationstage.December 2017,January2018andJanuary2019

Continuous24 hours

Society Society

Page 49: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 25

Envi

ronm

ent

com

pone

nt

Proj

ect S

tage MONITORING Institutional

Responsibilities

Parameters

SpecialGuidanc

e

Standards Location Frequen

cyDuratio

nImplementation

SupervisionW

ater

Qua

lity

Cons

truc

tion

stag

epH, BOD,COD,TDS, TSS,DO, Oil &Greaseand Pb

Grabsamplecollectedfromsourceandanalyseas perStandardMethodsforExamination ofWaterandWastewater

Waterqualitystandards byCPCB

1.Timmidikunta lake

End ofsummerbeforetheonset ofmon-sooneveryyear for2 years

- Contractorthroughts -provedmoni-toringagency

EnvironmentalEngineer, M/sKrishnaiahProperties Pvt.Ltd.,

Wat

er Q

ualit

y

Occ

upat

ion

stag

e

pH,BOD,COD,TDS,TSS, DO,Pb, OilandGrease.

Grabsamplecollectedfromsourceandanalyseas perStandardMethodsforExamination ofWaterandWastewater

Waterqualitystandards byCPCB

1.Kondapur

2.Nallagundla

3.Lingampalli

4.Timmidikunta

5.STPInfluent6.STPtreatedEffluent

End ofsummerbeforetheonset ofmon-soon in20172018and2019

Daily

Daily

- M/sKrishnaiahProperties Pvt.Ltd.,

M/sKrishnaiahProperties Pvt.Ltd.,

Society

Society

Page 50: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 26

Envi

ronm

ent

com

pone

nt

Proj

ect S

tage MONITORING Institutional

Responsibilities

Parameters

SpecialGuidanc

e

Standards Location Frequen

cyDuratio

nImplementation

Supervision

Noi

se le

vels

Cons

truc

tion

stag

eNoiselevels ondB (A)scale

Freefield at 1m fromtheequipment whosenoiselevelsarebeingdeter-mined.

Noisestan-dards byCPCB

Atequipmentyards

Onceeverymonth(max)for twoyears, asrequiredby theengineer

Readings to betakenat 15seconds inter-val for15minutes everyhourandthenaveraged

Contractorthroughts -provedmoni-toringagency

EnvironmentalEngineer, M/sKrishnaiahProperties Pvt.Ltd.,

Noiselevels ondB (A)scale

Equivalent noiselevelsusing aninte-gratednoiselevelmeterkept at adistanceof 15from theinternalroads

Noisestan-dards byCPCB

Asdirectedby theEngineer(Atmaximum5locations)

Thrice ayear for2 yearsduringtheconstructionperiod.

Readings to betakenat 15seconds inter-val for15minutes everyhourandthenaveraged.

Contractorthroughts -provedmoni-toringagency

EnvironmentalEngineer, M/sKrishnaiahProperties Pvt.Ltd.,

Page 51: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 27

Envi

ronm

ent

com

pone

nt

Proj

ect S

tage MONITORING Institutional

Responsibilities

Parameters

SpecialGuidanc

e

Standards Location Frequen

cyDuratio

nImplementation

SupervisionO

ccup

atio

n st

age

Noiselevels ondB (A)scale

Equivalent noiselevelsusing aninte-gratednoiselevelmeterkept at adistanceof 15fromedge ofpavement

Noisestan-dards byCPCB

1. At allboundaries of thesite.

Thrice inop-erationperiod,inDecember 2017,January2018andJanuary2019

Readings to betakenat 15seconds inter-val for15minutes everyhourandthenaveraged.

Societythroughanapprovedmonitoringagency

Society

Soil

Cons

truc

tion

stag

e

Monitoring of Pb,Cr, Cd

Sampleof soilcollectedtoacidifiedandanalysedusingabsorptionspectropho-tometry

Threshold foreachcontami-nant setby IRISdatabaseof USEPAuntilnationalstan-dardsarepromulgated.

Atproductiveagricultural lands inthe projectimpactarea to beidentifiedby theenvironmentalengineer

Once ayear for2 years

- Contractorthroughanapprovedmonitoringagency

EnvironmentalEngineer, M/sKrishnaiahProperties Pvt.Ltd.,

Page 52: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 28

Envi

ronm

ent

com

pone

nt

Proj

ect S

tage MONITORING Institutional

Responsibilities

Parameters

SpecialGuidanc

e

Standards Location Frequen

cyDuratio

nImplementation

Supervision

Occ

upat

ion

stag

eMonitoring ofheavymetals,oil andgrease

Sampleof soilcollectedtoacidifiedandanalysedusingabsorptionspectropho-tometry

Threshold foreachcontami-nant setby IRISdatabaseof USEPAuntilnationalstan-dardsarepromulgated.

Ataccident/spilllocationsinvolvingbulktransportcarryinghazardousmaterials(5locationsmaximum)

As pertheoccurrence ofsuchincidents

Thricein op-erationstageformonitoringturbidity

Society Society

Soil

Eros

ion

Cons

truc

tion

stag

e

Turbidityin Stormwater

Silt loadin ponds

Visualobser-vationsduringsite visits

Asspecifiedby theWaterqualitystandards

At thedrains

Pre-monsoon andpost-mon-soonseasonsfor 2years

Engineer M/sKrishnaiahProperties Pvt.Ltd.,

Occ

upat

ion

stag

e

Turbidityin Stormwater

Silt loadin ponds

Visualobser-vationsduringsite visits

Asspecifiedby theWaterqualitystandards

Thrice inpre-monsoon andpost-monsoonseasonsin 2017,2018and2019.

Society Society

Page 53: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 29

Envi

ronm

ent

com

pone

nt

Proj

ect S

tage MONITORING Institutional

Responsibilities

Parameters

SpecialGuidanc

e

Standards Location Frequen

cyDuratio

nImplementation

Supervision

Cons

truc

tion

Site

s and

Con

stru

ctio

nCa

mps

Cons

truc

tion

Stag

eMonitoring of:1.

StorageArea

2.DrainageArrangements

3.Sanitation inConstructionCamps

Visualobser-vationswillsuffice.Theseare to becheckedasspecifiedin theEMP.

To thesatisfac-tion ofthe M/sKrishnaiahProperties Pvt.Ltd.,and thestan-dardsgiven inthereporting form.

At Storagearea andcon-structioncamps

Quarterly in theconstructionstage.

SupervisionEngineer/consultant

M/sKrishnaiahProperties Pvt.Ltd.,

8.8 Reporting systemReporting system provides the necessary feedback for project management to ensurequality of the works and that the program is on schedule. The rationale for a reportingsystem is based on accountability to ensure that the measures proposed as part of theEnvironment Management Plan get implemented in the project.

The reporting system will operate linearly with the contractor who is at the lowest rungof the implementation system reporting to the Supervision Consultant, who in turnshall report to the M/s Krishnaiah Properties Pvt. Ltd.,

All reporting by the contractor and Supervision Consultant shall be on a quarterly basis.M/s Krishnaiah Properties Pvt. Ltd., shall be responsible for preparing targets for eachof the identified EMAP activities. All subsequent reporting by the contractor shall bemonitored as per these targets set by the M/s Krishnaiah Properties Pvt. Ltd., beforethe contractors move on to the site. The reporting by the Contractor will be a monthlyreport like report of progress on construction and will form the basis for monitoring bythe M/s Krishnaiah Properties Pvt. Ltd., either by its own Environmental Cell or theEnvironmental Specialist hired by the Supervision Consultant.

Monitoring of facilities at construction camps Monitoring of air, noise, soil and water parameters including silt load Monitoring of survival rate of plantation. Monitoring of cleaning of drains and water bodies.

Page 54: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 30

8.9Environmental management budgetThe environmental budget for the various environmental management measuresproposed in the EMP is detailed in table 8.6 There are several other environmentalissues that have been addressed as part of good engineering practices, the costs forwhich has been accounted for in the Engineering Costs. Moreover, since environmentalenhancements have not been finalized at this stage, the table projects the typical costsunit wise.

Table 8.6 Environmental Budgets for Proposed Project

S.NO. Description

Capital cost in Rs. Lakhs Recurring cost in Rs. Lakhs

ConstructionPhase

OccupationPhase

ConstructionPhase

OccupationPhase

1 Air PollutionControl 4.1 -- 1.0 1.0

2WaterPollutionControl

112.5 -- 31.0 35.0

3 Noise PollutionControl 1.8 -- 1.0 0.4

4EnvironmentalMonitoring &Management

0.2 14.0 0.3 5.6

5Green belt &Open areadevelopment

6.7 1.3 0.3 4.3

6 Solid Waste 7.5 0.8 1.4 6.3

7 Others 80.5 -- 1.5 4.0

Total 213.3 16.1 36.6 56.6

8.10 Horticultural and Landscaping Works

(a) ScopeThe Horticultural and Landscaping works may be entrusted to a contractor. It wouldgenerate local employment if the plantation, upkeep and maintenance of the green beltwere entrusted to local VSS bodies. Detailed drawings and designs of landscaping willbe drawn after completion of the detailed designing. The following precautions mustbe taken while undertaking horticulture and landscaping works. The project will havegreenery by way of avenue plantation and central green. The scheme of plantation andthe figures are presented in mitigation chapter. The upkeep and the management ofthe greening are presented as follows:

Page 55: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 31

b) Materials

Plant Materials

Plant Materials shall be well formed and shaped true to type, and free from disease,insects and defects such as knots, sun-scaled, windburn, injuries, abrasion ordisfigurement.All plant materials shall be healthy, sound, vigorous, free from plant diseases, insectspests, of their eggs, and shall have healthy, well-developed root systems. All plants shallbe hardy under climatic conditions similar to those in the locally of the project. Plantssupplied shall to confirm to the names listed on both the plan and the plant list. Noplant material will be accepted if branches are damaged or broken. All material must beprotected from the sun and weather until planted.

Any nursery stock shall have been inspected and approved by the EnvironmentalSpecialist or the Engineer.

All plants shall conform to the requirements specified in the plant list. Except thatplants larger then specified may be used if approved, but use of such plants shall notincrease the contract price. If the use of the larger plant is approved, the spread ofroots or ball of earth shall be increased in proportion to the size of plant.Deliver plants with legible identification labels.

Top Soil (Good Earth)

Topsoil or good earth shall be a friable loam, typical of cultivated topsoils of the localitycontaining at least 2% of decayed organic matter (humus). It shall be taken from a well-drained arable site. It shall be free of subsoil, stones, earth skids, sticks, roots or anyother objectionable extraneous matter or debris. It shall contain no toxic material. Notopsoil shall be delivered in a muddy condition. It shall have pH value ranging between6 and 8.5.

Fertiliser

Measurement of sludge shall be in stacks, with 8% reduction for payment. It shall befree from extraneous matter, harmful bacteria insects or chemicals. (Subjected tosafety norms).

Root System

The root system shall be conducive to successful transplantation. While necessary, theroot-ball shall be preserved by support with Hessian or other suitable material. On soilswhere retention of a good ball is not possible, the roots should be suitably protected insuch a way that the roots are not damaged.

(c) Supply and SubstitutionUpon submission of evidence that certain materials including plant materials are notavailable at time of contract, the contractor shall be permitted to substitute with anequitable adjustment of price. All substitutions shall be of the nearest equivalent

Page 56: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 32

species and variety to the original specified and shall be subjected to the approval ofthe Landscape Architect.

(d) PackagingPackaging shall be adequate for the protection of the plants and such as to avoidheating or drying out.

(e) MarkingEach specimen of tree and shrub, or each bundle, shall be legibly labelled with thefollowing particulars:

Its name. The name of the supplier, unless otherwise agreed. The date of dispatch from the nursery.

(f) Tree PlantingPlants and Shrubs

Trees should be supplied with adequate protection as approved. After delivery, ifplanting is not to be carried out immediately, balled plants should be placed back toback and the ball covered with sand to prevent drying out. Bare rooted plants can beheeled in by placing the roots in prepared trench and covering them with earth, whichshould be watered into, avoid air pockets round the roots. Trees and shrubs shall beplanted as shown in architectural drawings and with approval of site supervisionengineer.

Digging of Pits

Tree pits shall be dug a minimum of three weeks prior to backfilling. The pits shall be120 cm in diameter and 120 cm deep. While digging the pits, the topsoil up to a depthof 30 cm may be kept aside, if found good (depending upon site conditions), and mixedwith the rest of the soil.If the side of the below, it shall be replaced with the soil mixture as specified furtherherein. If the soil is normal it shall be mixed with manure; river sand shall be added tothe soil if it is heavy.

The bottom of the pit shall be forked to break up the subsoil.

Back Filling

The soil back filled watered through and gently pressed down, a day previous toplanting, to make sure that it may not further settle down after planting. The soil shallbe pressed down firmly by treading it down, leaving a shallow depression all round forwatering.

Planting

No tree pits shall be dug until final tree position has been pegged out for approval. Careshall be taken that the plant sapling when planted is not be buried deeper than in thenursery, or in the pot. Planting should not be carried out in waterlogged soil. Plant

Page 57: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 33

trees at the original soil depth; soil marks on the stem is an indication of this and shouldbe maintained on the finished level, allowing for setting of the soil after planting. Allplastic and other imperishable containers should be removed before planting. Anybroken or damage roots should be cut back to sound growth.

The bottom of the planting pit should be covered with 50mm to 75mm of soil. Bareroots should be spread evenly in the planting pit; and small mound in the centre of thepits on which the roots are placed will aid on even spread. Soil should be placed aroundthe roots, gently shaking the tree to allow the soil particles to shift into the root systemto ensure close contact with all roots and prevent air pockets. Back fill soil should befirmed as filling proceeds, layer by layer, care being taken to avoid damaging the roots,as follows:

The balance earth shall be filled in a mixture of 1:3 (1 part sludge to 3 part earth byvolume) with 50 gm potash, (Mop) 50gms of Super Phosphate and 1Kg. Neem oil cake.Aldrin or equivalent shall be applied every 15 days in a mixture of 5ml in 5 litres ofwater.

Staking

Newly planted trees must be held firmly although not rigidly by staking to prevent apocket forming around the stem and newly formed fibrous roots being broken bymechanical pulling as the tree rocks.

Methods:The main methods of staking shall be:

(a) A single vertical shake, 900mm longer than the clear stem of the tree,driven 600mm to 900mm into the soil.

(b) Two stakes as above driven firmly on either side of the tree with across bar to which the stem is attached. Suitable for bare- rooted orBall material.

(c) A single stake driven in at an angle at 45 degrees and leaning towardsthe prevailing wind, the stem just below the lowest branch beingattached to the stake. Suitable for small bare- rooted or Ball material

(d) For plant material 3m to 4.5m high with a single stem a three- wireadjustable guy system may be used in exposed situations.

The end of stake should be pointed and the lower 1m to 1.2m should be coated with anon-injurious wood preservative allowing at least 150mm above ground level.

Tying

Each tree should be firmly secured to the stake so as to prevent excessive movement.Abrasion must be avoided by using a buffer, rubber or Hessian, between the tree andstake. The tree should be secured at a point just below its lowest branch, and also justabove ground level; normally two ties should be used for tree. These should beadjusted or replaced to allow for growth.

Page 58: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 34

Watering

The Landscape Contractor should allow for the adequate watering in of all newlyplanted trees and shrubs immediately after planting and he shall during the followinggrowing season, keep the plant material well watered.Fertilising

Fertilising shall be carried out by application in rotation of the following fertilisers, every15 days from the beginning of the monsoon till the end of winter:

(1) Sludge or organic well-rotted dry farm yard manure: 0.05 cum ortussle.

(2) Urea 25 gm.(3) Ammonium sulphate 25 gm.(4) Potassium sulphate 25 gm.

All shrubs, which are supplied pot grown, shall be well soaked prior to planting.Watering in and subsequent frequent watering of summer planted container- grownplants is essential.

(g) Shrub Planting In Planter BedsAll areas to be planted with shrubs shall be excavated, trenched to a depth of 750 mm,refilling the excavated earth after breaking clods and mixing with sludge in ratio 8:1 (8parts of stacked volume of earth after reduction by 20%: 1 part of stacked volume ofsludge after reduction by 8%.)

Tall shrubs may need staking, which shall be provided if approved by the contractingconsulting engineer, depending upon the conditions of individual plant specimen.

For planting shrubs and ground cover shrubs in planters, good earth shall be mixed withsludge in the proportion as above and filled in planters.

Positions of planters shall be planted should be marked out in accordance with thearchitectural drawing. When shrubs are set out, precautions should be taken to preventroots drying. Planting holes 40 cm in diameter, and 40 cm deep should be excavated forlonger shrubs. Polythene and other non-perishable containers should be removed andany badly damaged roots carefully pruned. The shrubs should then be set in holes sothat the soil level, after settlement, will be original soil mark on the stem of the shrub.The holes should be back filled to half of its depth and firmed by treading. Theremainder of the soil can then be returned and again firmed by treading.

(h) Grassing

Preparation

During period prior to planting the ground shall be maintained free from weeds.Grading and final weeding of the area shall be completed at least three weeks prior tothe actual sowing. Regular watering shall be continued until sowing by dividing the areainto portions of approximately 5m squares by constructing small bunds to retain water.

Page 59: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 35

These 'bunds' shall be levelled just prior to sowing of grass plants; it shall be ensuredthat the soil has completely settled.

Soil

The soil itself shall be ensured to the satisfaction of Landscape Architect to be a goodfibrous loam, rich in humus.

Sowing the grass roots

Grass roots (cynodon, dectylon or a local genus approved by the Landscape Architect)shall be obtained from a grass patch, seen and approved before hand.

The grass roots stock received at site shall be manually cleared of all weeds and watersprayed over the same after keeping the stock in place protected from sun and drywinds.

Grass stock received at site may be stored for a maximum of three days. In casegrassing for some areas is scheduled for a later date fresh stock of grass roots shall beordered and obtained.

Execution

Small roots shall be dibbled about 5 cm apart into the prepared grounds. Grass willonly be accepted as reaching practical completion when germination has provedsatisfactory and all weeds have been removed.

Maintenance

As soon as the grass is approximately a 3cm high it shall be rolled with a light woodenroller – in fine, dry weather – and when it has grown to 5 to 8 cm, above to groundweeds must be removed and regular cutting with the scythe and rolling must be begun.A top-dressing of an ounce of guano to the square yard or well decomposed wellbroken sludge manure shall be applied when the grass is sufficiently secure in theground to bear the mowing machine, the blades must be raised an inch above thenormal level for the first two or three cuttings. That is to say, the grass should be cut sothat it is from 4 to 5 cm in length, instead of the 3 cm necessary for mature grass.

In the absence of rain, in the monsoon, the lawn shall be watered every ten daysheavily, soaking the soil through to a depth of at least 20 cm.

Damage failure or dying back of grass due to neglect of watering especially for seedingout of normal season shall be the responsibility of the contractor. Any shrinkage belowthe specified levels during the contract or defect liability period shall be rectified at thecontractor's expense. The Contractor is to exercise care in the use of rotary cultivatorand mowing machines to reduce to a minimum the hazards of flying stones andbrickbats. All rotary mowing machines are to be fitted with safety guards.

Page 60: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 36

Rolling

A light roller shall be used periodically, taking care that the area is not too wet andsodden.

Edging

These shall be kept neat and must be cut regularly with the edging shears.

Fertilising

The area shall be fed once in a month with liquid manure prepared by dissolving 45gmsof ammonium sulphate in 5 litres of water.

Watering

Water shall be applied at least once in three days during dry weather. Wateringwhenever done should be thorough and should wet the soil at least up to a depth of20 cm.

Weeding

Prior to regular mowing the contractor shall carefully remove rank and unsightly weeds.

Cultivating

The Landscape Contractor shall maintain all planted areas within Landscape contractboundaries for one year until the area is handed over in whole or in phases.Maintenance shall include replacement of dead plants, watering, weeding, cultivating,control of insects, fungus and other diseases by means of spraying with an approvedinsecticide or fungicide, pruning, and other horticulture operations necessary for propergrowth of the plants and for keeping the landscape sub-contract area neat inappearance.

Pruning and Repairs

Upon completion of planting work of the landscape sub-contract all trees should bepruned and all injuries repaired where necessary. The amount of pruning shall belimited to the necessary to remove dead or injured twigs and branches and tocompensate for the loss of roots and the result of the transplanting operations. Pruningshall be done in such a manner as not to change the natural habit or special shape oftrees.

Tree Guards

Where the tree guards are necessary, care should be taken to ensure that they do notimpede natural movement or restrict growth. Circular iron tree guards shall be providedfor the trees at enhancement locations. The specifications for which one given below:

Circular Iron Tree Guard with Bars. The tree guard shall be 50 cm. in diameter.

Page 61: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 37

The tree guards shall be formed of (i) 3 Nos. 25x25x3mm angle iron verticals 2.00m longexcluding splayed outward at lower end up to an extent of 10 cms. (ii) 3 Nos. 25x25mmMS flat rings fixed as per design (iii) 15 Nos. 1.55 metres long 6mm dia bars. Each ringshall be in two parts in the ratio of 1:2 and their ends shall be turned in radially for alength of 4 cm at which they are bolted together with 8mm dia and 30mm long MSbolts and nuts.

The vertical angle irons shall be welded to rings along the circumference with electricplant 15 Nos. bars shall be welded to rings at equal spacing along the circumference ofring. The lower end of the angle iron verticals shall be splayed outwards up to an extentof 10cm. The lower end of the flat of lower ring shall be at a height of 45cm. and upperend of the flat of top ring shall be at the height of 2.00 metres. The middle ring shall bein the centre of top and lower ring. The bars shall be welded to rings as shown in thedrawing. The entire tree guard shall be given two coats of paint of approved brand andof required shade over a priming coat of ready mixed primer of approved brand.

(j) Nursery StackPlanting should be carried out as soon as possible after reaching the site. Whereplanting must be a necessity and/or be delayed, care should be taken to protect theplants from pilfering or damage from people animals. Plants with bare-roots should beheeled- in as soon as received or otherwise protected from drying out, and others setclosely together and protected from the wind. If planting is to be delayed for more thana week, packaged plants should be unpacked, the bundles opened up and each group ofplants heeled in separately and clearly labelled. If for any reason the surface of theroots becomes dry the roots should be thoroughly soaked before planting.

(k) Protective FencingAccording to local environment, shrubs shall be protected adequately from vandalismuntil established.

(l) CompletionOn completion, the ground shall be formed over and left tidy.

8.11 Water Conservation MeasuresWater conservation measures must be adopted during the occupation stage that

would conserve the natural resource and also reduce the pressure on other users.Typical lists of water conservation measures are presented as follows;

Water Saving MeasuresThere are a number of ways to save water, and they all start with you.

1) Check your sprinkler system frequently and adjust sprinklers so only your lawn iswatered and sidewalk, or street.

2) Avoid planting turf in areas that are hard to water such as steep inclines andisolated strips along sidewalks and driveways.

3) Install covers on pools and check for leaks around your pumps.

4) Use the garbage disposal less often.

Page 62: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 38

5) Plant during rainy season and or winter when the watering requirements are lower.

6) Check your water meter and bill to track your water usage.

7) Always water during the early morning hours, when temperatures are cooler, tominimize evaporation.

8) Wash your produce in the sink or a pan that is partially filled with water instead ofrunning water from the tap.

9) Use a layer of organic mulch around plants to reduce evaporation and savehundreds of liters of water a year.

10) Use a broom instead of a hose to clean your driveway and sidewalk and save up to300 liters of water every time.

11) Collect the water you use for rinsing produce and reuse it to water houseplants.

12) Water your lawn in several short sessions rather than one long one. This will allowthe water to be better absorbed.

13) We’re more likely to notice leaky faucets indoors, but don’t forget to check outdoorfaucets, pipes, and hoses for leaks.

14) Only water your lawn when needed. You can tell this by simply walking across yourlawn. If you leave footprints, it’s time to water.

15) When you shop for a new appliance, keep in mind that one offering severaldifferent cycles will be more water and energy-efficient.

16) Install low-volume toilets.

17) When you clean your fish tank, use the water you’ve drained on your plants. Thewater is rich in nitrogen and phosphorus, providing you with a free and effectivefertilizer.

18) Water small areas of grass by hand to avoid waste.

19) Put food coloring in your toilet tank. If it seeps into the toilet bowl, you have a leak.It's easy to fix, and you can save more than 2250 liters a month.

20) Use porous materials for walkways and patios to keep water in your yard andprevent wasteful runoff.

21) Instead of using a hose or a sink to get rid of paints, motor oil, and pesticides,dispose of them properly by recycling or sending them to a hazardous waste site.

22) Install a rain shut-off device on your automatic sprinklers to eliminate unnecessarywatering.

23) Choose water-efficient drip irrigation for your trees, shrubs, and flowers. Wateringroots is very effective, be careful not to over water.

24) Grab a wrench and fix that leaky faucet. It’s simple, inexpensive, and can save 525liters a week.

25) Cut back on the amount of grass in your yard by planting shrubs and ground coveror landscaping with rock.

26) Remember to check your sprinkler system valves periodically for leaks and keep theheads in good shape.

Page 63: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 39

27) Don’t water your lawn on windy days. After all, sidewalks and driveways don’t needwater.

28) Water deeply but less frequently to create healthier and stronger landscapes.

29) Make sure you know where your master water shut-off valve is located. This couldsave liters of water and damage to your home if a pipe were to burst.

30) When watering grass on steep slopes, use a soaker hose to prevent wasteful runoff.

31) To get the most from your watering time, group your plants according to their waterneeds.

32) Remember to weed your lawn and garden regularly. Weeds compete with otherplants for nutrients, light, and water.

33) While fertilizers promote plant growth, they also increase water consumption.Apply the minimum amount of fertilizer needed.

34) Avoid installing ornamental water features unless the water is being recycled.

35) Use a commercial car wash that recycles water.36) Don’t buy recreational water toys that require a constant flow of water.

37) Make sure your toilet flapper doesn’t stick open after flushing.

38) Make sure there are aerators on all of your faucets.

39) Next time you add or replace a flower or shrub, choose a low water use plant foryear-round landscape color and save up to 2063 liters each year.

40) Spot spray or remove weeds as they appear.

41) Use a screwdriver as a soil probe to test soil moisture. If it goes in easily, don’twater. Proper lawn watering can save thousands of liters of water annually.

42) Install a drip irrigation system around your trees and shrubs to water moreefficiently.

43) Mow your lawn as infrequently as possible. Mowing puts your lawn underadditional stress, causing it to require more water.

44) Don’t use the sprinklers just to cool off or for play. Running through water from ahose or sprinkler wastes liters of water.

45) Make sure your swimming pools, fountains, and ponds are equipped withrecirculating pumps.

46) Direct downspouts or gutters toward shrubs or trees.

47) Insulate hot water pipes so you don’t have to run as much water to get hot water tothe faucet.

48) Drop that tissue in the trash instead of flushing it and save liters every time.

49) If you have an evaporative air conditioner, direct the water drain to a flowerbed,tree, or your lawn.

50) Make suggestions to your employer to save water (and dollars) at work.

51) Use a hose nozzle and turn off the water while you wash your car and save morethan 375 liters.

Page 64: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 40

52) Install a toilet dam or bottle filled with water in your toilet tank to cut down on theamount of water used for each flush. Be sure these devices do not interfere withoperating parts.

53) Prune back heavy foliage. Reducing leaf area reduces water needs.

54) Pick-up the phone and report significant water losses from broken pipes, openhydrants and errant sprinklers to the society.

55) If your grass is brown, it’s not dead, it’s just dormant. Dormant grass only needs tobe watered every three weeks. When the rain begins, your grass will turn greenagain.

56) Listen for dripping faucets and toilets that flush themselves. Fixing a leak can save1875 liters each month.

57) More plants die from over-watering than from under-watering. Be sure only towater plants when necessary.

58) Adjust your watering schedule to the season. Water your summer lawn every thirdday and your winter lawn every fifth day.

59) Water only as rapidly as the soil can absorb the water.

60) Aerate your lawn. Punch holes in your lawn about six inches apart so water willreach the roots rather than run off the surface.

8.12Energy Efficiency Measures in a Typical Household

8.12.1 Hot Water

Repair leaky faucets. Reduce the temperature setting of your water heater to warm (500 C). Add an insulating blanket to your water heater. Install low-flow showerheads. Wash clothes in warm or cold water using the appropriate water level setting for

the load. Replace water heater, when needed, with an energy efficient model.

8.12.2 Major Appliances and Other Appliances

Maintain refrigerator at 2 to 50 C and freezer section at –15 0 C.

Maintain stand-alone freezer at 0 F.

Choose a refrigerator/freezer with automatic moisture control.

Use toaster ovens or microwave ovens for cooking small meals.

Adjust the flame on gas cooking appliances so it’s blue, not yellow.

Replace a gas-cooking appliance with a unit with an automatic, electric ignitionsystem.

Run the dishwasher only with a full load of dishes.

Air dry dishes in a dishwasher.

Page 65: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 41

Shut down home computers when not in use.

Select appliances (i.e., curling irons, coffee pots, irons) with time limited shut offswitches.

Replace aging major appliances, TVs and VCRs when needed, with energyefficient models. Replacing a 1970s refrigerator with an energy efficiencyrefrigerator. This can save over 2,000 kWh per year. This will also reduce carbondioxide emissions by over 2,000 pounds every year.

Increase Air Conditioner thermostat by 3 degrees F. This can save over 900 kWhper year, annually and over 900 pounds of carbon dioxide each year. Dependingon the size of your home, you can save 3% on your cooling costs for every degreeyou raise your thermostat in the summer. Raising the thermostat from 73 to 78 Fdegrees can reduce cooling costs by 15%.

Make sure your air conditioner is the proper size for the area you are cooling. Anair conditioner that is too large will use more electricity than needed; an airconditioner that is too small will have to work harder to cool a space. Therecommended Air conditioners based on the room size are as follows:

Area To Be Cooled (sq. ft.) Capacity (BTU/HR)100 to 150 5,000150 to 250 6,000250 to 300 7,000300 to 350 8,000350 to 400 9,000400 to 450 10,000450 to 550 12,000500 to 700 14,000700 to 1,000 18,000

Only run the washing machine, dryer, and dishwasher when you have full loads.Cool only the rooms you use and utilize fans when the temperature is moderate.

8.12.3 Lighting

Turn off lights when not in use.

Use task lighting whenever possible instead of brightly lighting an entire room.

Install compact fluorescent lamps in the fixtures which receive high use.

Replace the five most frequently used incandescent light bulbs with compactfluorescent bulbs. This will save over 500 kWh per year, and over 500 pounds ofCO2.

Page 66: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 42

Electricity Savings, and Carbon Dioxide Emissions Avoided For ImplementingEfficiency and Conservation Measures in One Household

Household Measure

Electricitysaved for one

household(kWh/yr)

CO2 avoided in for onehousehold (Kg/yr)

Replace a 1970s refrigerator w/a newENERGY EFFICIENT refrigerator

2,197 993.36

Increase AC thermostat by 3F degrees forcooling

937 423.6

Replace 5 incandescent light bulbs withcompact fluorescent

562 254

Electricity Savings: Incandescent vs. Compact Fluorescent Lights

The following table shows the result of replacing one incandescent bulb with a compactfluorescent bulb in one household.

Bulb Type 60 wattincandescent

11 watt compactfluorescent

Savings Over OneYears By

Replacing BulbPurchase Price Rs. 25 Rs. 50Life of the Bulb 750 hours 10,000 hoursNumber of HoursBurned per Day

4 hours 4 hours

Number of BulbsNeeded About 2 over 1 years 1 over 6.8 years

Lumens 1,690 1,500Total Cost of Bulbs Rs. 50 Rs. 50Total energy used over 1years

87.6 kWh perhousehold

60 w (4 hrs/day)(365days/year)(1 years) = 87600watt-hours or87.6kWh

16.06 kWh perhousehold

11 w (4hrs/day)(365days/year)(1 years) = 16060watts-hours or16.06kWh

71.54 kWh perhousehold

Total CO2 emissionsover 1 yrs (avg emissionrate: 996.7 lbs/MWh or0.9967 lbs/kWh)

39.6 kg perhousehold

87.6kWh (.9967lbs/kWh) = 87.31 lbs

7.26 kg perhousehold

16.06 kWh(.9967 lbs/kWh)= 16lbs

32.34kg perhousehold

Total SO2 emissions 0.203 kg per 0. 037 kg 0.166 kg per

Page 67: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 43

over 1 yrs (avg emissionrate: 5.1 lbs/MWh or0.00511 lbs/kWh)

household

87.6 kWh (.00511lbs/kWh) = 0.447 lbs

household

16.06kWh(.00511 lbs/kWh)= 0.082 lbs

household

Total NOx emissionsover 1 years (avgemission rate: 1.9lbs/MWh or 0.0019lbs/kWh)

0.075kg perhousehold

87.6 kWh (.0019lbs/kWh) = 0.166 lbs

0.014 kg perhousehold

16.06 kWh(.0019 lbs/kWh)= 0.0305 lbs

0.061 kg perhousehold

It is proposed to provide CFL units in the common areas, bathrooms, and central greenarea to conserve electricity by the project authorities. The average usage of 4 CFLs ineach dwelling, and the total energy savings from the project and the overall reductionin pollutants is presented in the following table;

8.13 Fire Protection Plan/SystemDescription

The fire protection system consists of the following:a) Hydrant system for entire housings with each floor having a hydrant.b) High Velocity Water Spray System (HVWS) for Generator, Transformers, etc.c) Water sump (capacity of 30 KL) for the hydrants will be at the top of each building.d) Portable fire extinguishers in different areas of the housing.e) Microprocessor based intelligent addressable fire detection and alarm system will

be provided at all floors of the buildings and silt area.

Design, Construction & Operating ConditionsWater supply for the fire protection system will be provided from the clarified waterstorage tank. Adequate dead storage will be provided for fire protection system.Common pumps for hydrant and spray systems will be provided with provision forinterconnection between the two. Booster pumps of 900-litres/minute capacity will beprovided at top of the building for drawing water from the sump of 30 Kl capacityThe hydrant system will be provided for all the areas of the housing project. Hydrantsystem will consist of the underground ring headers, mains (piping) upto the individualhydrant outlets, risers and above ground branch headers (terminal mains) with isolatingvalves in case of landing valves/internal hydrants, stand posts, single headed or doubleheaded hydrant valves depending on the hazard covered, hoses, hose couplings, branchpipes and nozzle assemblies, etc. All accessories required for external and internalhydrants will be stored in hose boxes located alongside each hydrant. The system willbe adequately designed to maintain the required pressure in the hoses operated fromthe farthest hydrant ring main.Portable extinguishers of suitable capacity, rating and medium (water, sand, CO2, foam,etc.) in adequate numbers covering all the buildings in the power plant premises will beprovided.

Page 68: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 44

Suitable alarm system with audiovisual indicators for personnel safety shall be providedin the event of fire and extinguish discharge. Suitable extinguish gas detectors shall alsobe provided for detecting presence or discharge of extinguishant and provide warningto personnel. The system provided shall be of the highest order and testing on routinebasis shall be possible.

Codes & StandardsThe applicable codes & standards will be the latest version of the following:IS: 1978 – Line PipesIS: 1367,GL – 4B,4 – Technical supply conditions for threaded steel fastenersIS:1239 – Mild steel tubes, tubular and other wrought steel fittingsIS: 10221 – Code of practice for coating and wrapping of underground mild steelstructuresIS: 903 – Fire hose delivery couplings, branch pipe, nozzles and nozzle spannerIS: 4927 – Unlined flax canvas hose for fire fightingIS: 8423 – Controlled percolating hose for fire fightingIS: 5290 – Landing valvesIS: 2878 – Specification for fire extinguisher, carbon-do-oxide type (portable and trolleymounted)IS: 933 – Portable chemical foam fire extinguisherIS: 2171 – Portable fire extinguishers, dry powder(cartridge type)IS: 4308 – Specification for dry powder for fire fightingIS: 4861 – Dry powder for fire fighting in burning metalsIS: 2871 – Specification for branch pipe, universal for fire fighting purposesIS: 2189 – Selection, installation and maintenance of automatic fire detection and alarmsystemIS: 636 – Non- percolating flexible fire fighting delivery hoseIS: 3034 – Fire safety of industrial buildings: electrical generating and distributingstations.IS:9137 - Code for acceptance tests for centrifugal, mixed flow and axial pumps – Class CIS:10981 – Class of acceptance test for centrifugal flow and axial pumpsTariff Advisory Committee (TAC) of India/NFPA standardsOISD – 117 – Oil Installations

System DescriptionThe fire protection system contains; Firewater pumping system, Wet riser system andHose reel system, Yard hydrant system, Automatic sprinkler system, The Pressurisationsystem, Portable First Aid fire extinguishers, Fire safety plans, Analogue addressableAutomatic fire detection and alarm system.

Firewater pumping systemFirewater to the complete fire protection system shall be catered through an RCCUnderground (UG) storage tank of capacity 300 cum located at the ground floor of theoffice building. Water to this tank shall be fed by gravity tapped off from the bore wellwater supply line. The following are the motor driven and diesel driven firewater pumpsthat shall be located adjacent to the UG storage tank.

i) Fire Hydrant pump (Motor driven) -1 No. 2850 lpm @100m head.

Page 69: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 45

ii) Sprinkler pump (Motor Driven) – 1 No. 2850 lpm @ 100 m head

iii) Common standby pump (Engine driven) 1 No. 2850 lpm @ 100m head.

iv) Jockey pump (Motor driven) -1 No.180 lpm @ 100m head shall be provided formaintaining system pressure at all times and to compensate the minor losses.

v) Terrace level booster pump (motor driven) – 1No. 900 lpm @35m head.All the pumps will be of horizontal centrifugal end suction type. These pumps shalldraw water from the underground RCC static tank of capacity 300 cu.mtrs for hydrantand sprinkler system.

The level switches shall be provided in the Underground tank and terrace tank.Breaching inlet shall be provided at the inlet of the storage tank for quick filling by firebrigade.

Wet riser and Hose reel systemWet riser shall be provided at all floor landings of the staircase of the office building.Water supply to the wet risers shall be fed directly from the motor driven wet riserpump. This system shall consist of double hydrant outlet landing valve installed at aheight of 1000 mm above finished floor level and a separate tap off for hose reelassociated with hoses, branch pipe and nozzles for office building at each floor on eachriser. The system shall be designed hydraulically to meet the flow and pressurerequirements as per NBC. Hydrant accessories such as hose reel, branch pipe andnozzles etc. shall be provided in separate enclosures/cabinet with glass panels.

Four way breaching inlet with sluice check valve shall be installed and connected toeach wet risers. The breaching inlets shall be located at 1000 mm above the groundfloor level.

The pipe material for Wet risers shall be Galvanised Iron (GI) "C" class as perrequirements of the local fire officer from pump house to discharge to Wet riser andhose reel system topmost hydrant/ hose reel.In the event of fire, if the hydrant or hose reel are opened, the pressure in the wet risermain will drop due to the resulting flow, thereby the booster pump comes in tooperation at a preset low pressure. If the pressure drops further, at a preset lowpressure in the wet riser, the wet riser pump shall start automatically by getting animpulse from a pressure switch provided on the main.

In case the wet riser pump fails to start, the pressure in the main will drop further andat a pre-set low pressure, the common standby pump diesel shall come into operationby getting an impulse from a pressure switch provided. Stopping of the pump shall bemanual.

Automatic Sprinkler SystemsAutomatic sprinkler system shall be provided to cover all the floors of the officebuilding. Sprinklers shall be provided in two layers in all the floors of the office area,upright type sprinkler at RCC ceiling level and pendent type sprinkler with rosette plateat false ceiling level. Water supply to the sprinkler system shall be fed from the motor

Page 70: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 46

driven sprinkler pump. This system shall be designed hydraulically to meet the flow andpressure requirements as per codes and standards. This system shall comprise ofnetwork of piping, valves, sprinkler heads, flow switches etc. The sprinklers shall bedesigned to produce spherical type of discharge with a portion of water being thrownupwards to the ceiling. Sprinklers shall be of satin-chromed finish to architect'srequirement. Ceiling plates shall be of steel construction and shall be either chromed orpainted to architect's requirement. Sprinkler pipes shall be so installed that the systemcan be thoroughly drained.

Four Way breaching inlet with check valves shall be provided and connected to the eachsprinkler riser.

The mode of operation of the sprinkler system is as follows:In the event of fire in any section of the area to be protected by the sprinkler system,the sprinklers in that particular section shall open initiating the flow of water andannunciating the flow of water through flow switch provided at each sprinkler tap offriser. The motor driven sprinkler pump shall start automatically due to consequentialpressure drop in the sprinkler system piping. In case motor driven sprinkler pump failsto start, standby diesel engine driven pump shall come into operation by getting animpulse from a pressure switch provided at a preset low pressure. During sprinklersystem operation a local alarm shall be raised by activation of flow switch. Stopping ofthe pumps shall be manual.

Yard Hydrant SystemThe yard hydrant shall be located at various places around the building. The watersupply for yard hydrant shall be tapped off from wet riser system headers. Each singleheaded yard hydrant shall be provided with hoses, nozzles and accessories. All Hydrantaccessories shall be located in a Hose box adjacent to Hydrant valve. Brick masonryvalve chambers with cast iron covers shall be provided wherever required for isolatingthe system to enable maintenance if any without affecting the complete system.

The mode of operation of the hydrant system is as follows. In the event of fire, hydrantvalves are opened, at the preset low pressure the wet riser pumps shall start asfurnished in Wet riser system. In case of failure of wet riser pump stand by commonpump shall come into operation.

Pressurization SystemThe common pressurization system of wet riser system shall comprise of one (1) Jockeypump operating automatically. In the event of minor system leakages either in wet risersystem the Jockey pump will start automatically by getting an impulse from pressureswitch provided on the discharge header of the Jockey pump. The Jockey pump shallstop automatically once the mains pressure is restored to original set value. All pressureswitches shall have two (2) contacts -one for starting / stopping the Jockey pump andthe other for Jockey pump running annunciation in the panel. The control panel shallhave all necessary control and interlock for operation and control of the pumps. Jockeypump shall not be running when main pump/booster pump are under operation.

Page 71: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 47

Portable First Aid Fire ExtinguishersPortable extinguishers such as carbon-di-oxide extinguishers, dry chemical powders etc.shall be provided in all areas of the building. The type of portable fire extinguishers andtheir numbers shall be as per NBC. Service tags shall be provided and attached on allextinguishers installed.

4.5kg extinguisher to be provided for every 500sqft of work area, every electrical room,and in every AHU room. A 22.5kg DCP cylinder on trolley for every DG set and UPS.

All safety equipments like fire buckets with one spare filled cylinder shall be provided.

Fire Safety PlansFire escape route printed in signal red colour shall be fixed near fire exit staircases,which shall show directions to the inmates for escape in case of fire.

Fire order as per NBC shall be fixed near lift/lift lobby, which shall guide action to betaken in case of fire.

Analogue Addressable Automatic Fire Detection and Alarm systemAutomatic fire alarm and detection and alarm system shall be provided for the officecomplex.

The fire detection and alarm system proposed consists of: Multi sensor Smokedetectors which shall be provided in the electrical switchgear room, electricalriser/ducts, lift shaft, lift machine room, BAS, communication room, and in office areaof all the floors above and below the false ceiling. Heat detectors shall be provided inpantry, DG room and kitchen. Manual call points shall be provided at all the entrancesand exits. Hooters with strobe lights shall be provided at all the entrances and exits,staircases and also inside office areas.

Mimic panel shall be located in the smoke free lobby at each floor of office building toindicate the location of fire. A central fire alarm panel shall be located at the Firecommand centre. This panel shall have the indication to identify the location of fire inthe building.

Fire alarm panel shall be located at the reception area and the repeater panel shall belocated in the guardhouse.

The provisions shall conform to the requirements of the National Building Code (NBC)1983, AMD3 (SP-7 1983, part- IV).

Fire Suppression SystemFM200 Gas fire suppression system is recommended for the server rooms.

Inspection and TestingInspection & testing will be carried out as per the Approved Quality Assurance plan.Minimum requirement will be as indicated below.

Shop Tests on Hydrant Valves:a) Dimensionalb) Hydro test of body

Page 72: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 48

c) Flow test on 5% of valvesd) Seat leakage Teste) Operational check

Shop Tests on hose cabinets:

a) Hydro Test of hose pipe/coupling/nozzleb) Percolation testc) Burst test (Type test or Type test report)

Dimensional InspectionOn completion of erection, at Site, Pipes will be hydro tested at 1.5 times the pumpshut-off head, or twice the operating pressure, whichever is higher.

Page 73: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

Bollineni Bion Environment Management Plan

Team Labs and Consultants8 - 49

Annexure – ADetailed Cost Estimate

DescriptionCapital cost in (Rs. Lakhs) Recurring cost in (Rs.Lakhs)

ConstructionPhase

OccupationPhase

ConstructionPhase

OccupationPhase

Air PollutionControl

DG Stack 3.0 0.6Personal protective equipments 0.6 0.9 0.3Equipment maintenance 0.5 0.1 0.1Sprinkling of water 0.0 0.0

Total 4.1 1.0 1.0

Water PollutionControl

Sedimentation tank 0.3 0.1Rain water harvesting pits 3.0 0.5Rain water harvesting sump (KL) 4.0 1.0Sewage treatment plant (KLD) 75.0Temporary Toilets 0.9 0.2Dual Plumbing 29.3 29.3STP maintenance 35.0

Total 112.5 31.0 35.0Noise Pollution

ControlPersonal protective equipments 0.6 0.6 0.2Acoustic enclosures 1.2 0.4 0.2

Total 1.8 1.0 0.4

Environmentalmonitoring

Ambient air quality studies - Oncein six months - 2 locations 0.14 0.2

Water quality studies - Once ayear - 2 Locations 0.03 0.1

Noise studies - Once in six months- 2 Locations 0.04 0.1

STP Lab 14.0 5.6Total 0.2 14.0 0.3 5.6

Green belt &Open area

development

Green belt 6.7 1.3 0.3

Horticulturists & Gardeners 4.3

Total 6.7 1.3 0.3 4.3

Solid WasteConstruction waste storage 3.5 0.4 1.0Garbage Segregation point 4.0 0.4 0.4Garbage 6.3

Total 7.5 0.8 1.4 6.3

Others

Solar lighting 2.0 0.4 0.4Solar Heaters 42.0 0.8 0.8Barricade 10.4

Safety Signage 0.3 0.1 0.1LED Lighting 0.1 0.1 0.0Roof insulation 25.7 2.6Training & Mobilization 0.1 0.1

Total 80.5 0.0 1.5 4.0

Grand Total 213.3 16.1 36.6 56.6

Page 74: BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd.,environmentclearance.nic.in/writereaddata/FormB/EC/EIA_EMP/... · BOLLINENI BION M/s. Krishnaiah Properties Pvt. Ltd., SURVEY NO

BOLLINENI BIONM/s. Krishnaiah Properties Pvt. Ltd.,

SURVEY NO. 42, 47, 54 & 59, KONDAPUR,SERILINGAMAPALLY, RANGA REDDY DISTRICT

Studies and Documentation by:M/s Team Labs and ConsultantsB-115 to 117 & 509, Annapurna Block,Aditya Enclave, Ameerpet,Hyderabad- 500 038Phone: 91-040-23748555/616Fax : 91-040-23748666e-mail: [email protected]