  • 7/28/2019 Boiler Retrofit.pdf

    1/44

    COAL WATER MIXTURE

  • 7/28/2019 Boiler Retrofit.pdf

    2/44

    BOILER RETROFIT TECHNOLOGY

    FORCOAL WATER MIXTURE

  • 7/28/2019 Boiler Retrofit.pdf

    3/44

    CONTENTEMISSION STANDARDFUEL : COAL WATER MIXTURETYPE OF BOILERRETROFIT OF BOILER

    AIR EMISSION CONTROL SYSTEMCONCLUSION

  • 7/28/2019 Boiler Retrofit.pdf

    4/44

    EMISSION STANDARD

  • 7/28/2019 Boiler Retrofit.pdf

    5/44

  • 7/28/2019 Boiler Retrofit.pdf

    6/44

    The Air Emission Standard from Distribution Facilities

    CoalHeavy FuelOil (HFO)

    Natural Gas Biomass Other

    1 Total Suspended Particulate mg/N.m 320 240 - 320 320

    2 Sulfur Dioxide (SO2) ppm 700 950 - 60 60

    3 Oxides of Nitrogen: NOX (as No2) ppm 400 200 - 200 200

    4 Carbon Monoxide (CO) ppm 690 690 - 690 690

    Type of Fuel

    UnitPollutantsNo.

    Remark: 1. Reference Condition at 1 Atm or 760 mm.Hg at 25C (Dry Basis) with Excess Air at 50% or Excess Oxygen 7%2. Reference under notification of the Minister of Industry

    3. Reference the air emission standards from distribut ion facilities on February 4, B.E. 2548 (2005)

  • 7/28/2019 Boiler Retrofit.pdf

    7/44

    The Air Emission Standard from Electricity Generation Transmission

    New Power Plant After January 31, B.E. 2539 (1996)

    Coal Oil Natural Gas Biomass

    1 Sulfur Dioxide (SO2) ppm

    Power Plant Size < 300 MWe 640 640 20 60

    300-500 MWe 450 450 20 60

    > 500 MWe 320 320 20 60

    2 Oxides of Nitrogen: NOX (as No2) ppm 350 180 120 200

    3 Particulates mg/N.m 120 120 60 120

    No. Pollutants UnitType of Fuel

    Remark: 1. Reference Condition at 1 Atm or 760 mm.Hg at 25C (Dry Basis) with Excess Air at 50% or Excess Oxygen 7%

    2. Reference under notification of the Minister of Industry

    3. Reference the air emission standards from electricity generation transmission or distribution facilities on

    September 28, B.E 2547 (2004)

  • 7/28/2019 Boiler Retrofit.pdf

    8/44

    Source : Department of Industrial Work, MOI

    INDUSTRIAL EFFLUENT STANDARD

    Parameters Units Standard Values

    pH - 5.5-9.0

    Conductivity m/cm < 2,000

    Total Dissolved Solid (TDS) mg/l < 1,300

    Biochemical Oxygen Demand (BOD5) mg/l < 20

    Chemical Oxygen Demand (COD) mg/l < 120

    Suspended Solids (SS) mg/l < 50

    Total Kjedahl Nitrogen (TKN) mg/l < 100

  • 7/28/2019 Boiler Retrofit.pdf

    9/44

    Source : Ministry of Interior

    NOISE STANDARD IN WORK PLACE

    Noise Level: dBA Exposure Time: hours per day Remar k

    104 Not allow

    91 Less than 790 7-8

    80 More than 8 Earplugs are need

    incase of necessary

    Distance 1.5m from

    center of Machine

  • 7/28/2019 Boiler Retrofit.pdf

    10/44

    FUEL : COAL WATER MIXTURE

  • 7/28/2019 Boiler Retrofit.pdf

    11/44

    COAL WATER MIXTURE (CWM)

    ULTRA CLEAN MICRONIZEDCOAL SLURRY

    CWM FOR INDUSTRY

  • 7/28/2019 Boiler Retrofit.pdf

    12/44

    CWM TECHNOLOGY

    Technical ReliabilityCWM, a new and clean fuel, good fluidity and stability. It can be used an alternative fuel in

    steam boilers for industrial boilers, such as traveling grate boiler to increase combustion efficiency.

  • 7/28/2019 Boiler Retrofit.pdf

    13/44

    CWM TECHNOLOGY

    Specification of Coal

    Total Moisture 10 %

    Inherent Moisture 2~3

    Ash 5

    Volatile Matter 39.9

    Fixed Carbon 44.1

    Gross Calorific Value 6,400 kcal/kg

    Total Sulfur 0.7

    Hardgrove Grindability Index 46

    Ash Fusion Temperature

    Deformation 1,235 C

    Hemispherical 1,305 C

    Flow 1,360 C

  • 7/28/2019 Boiler Retrofit.pdf

    14/44

    CWM CharacteristicsConcentration 65 1 %

    Particle Size Distribution 45~50 m

    Average Particle Diameter 250~300 m

    < 75 m > 75 %

    < 150 m > 93 %

    iscosity 1,000 100 mPa.s

    Ash 4 %

    Low Calorific Value ~ 4,600 kcal/kg

  • 7/28/2019 Boiler Retrofit.pdf

    15/44

    TYPE OF BOILER-

    FIRE TUBE BOILER- WATER TUBE BOILER

  • 7/28/2019 Boiler Retrofit.pdf

    16/44

    Source : SKG-CONDORKESSEL

  • 7/28/2019 Boiler Retrofit.pdf

    17/44

    Economic Boiler(two-pass, dry back)Source : Spirax Sarco

  • 7/28/2019 Boiler Retrofit.pdf

    18/44

    Source : Spirax Sarco

    Fire Tube Boiler(three-pass, wet back)

  • 7/28/2019 Boiler Retrofit.pdf

    19/44

    Source : Spirax Sarco

    Thimble or Reverse Flame Boiler

  • 7/28/2019 Boiler Retrofit.pdf

    20/44

    Source : Spirax Sarco

    Water Tube Boiler

  • 7/28/2019 Boiler Retrofit.pdf

    21/44

    Water Tube Boiler

  • 7/28/2019 Boiler Retrofit.pdf

    22/44

    RETROFIT OF BOILER-

    PARTIAL RETROFIT- FULL RETROFIT

  • 7/28/2019 Boiler Retrofit.pdf

    23/44

    Source : DHMM Co.,Ltd.

    CWM Boiler and Accessories

  • 7/28/2019 Boiler Retrofit.pdf

    24/44

    Source : Idemitsu Kosan Co., Ltd.

    CWM Burner: 11.5 tph

  • 7/28/2019 Boiler Retrofit.pdf

    25/44

    1 Heat Evaporates Water

    2 Volatile Matter liberates

    3 Ignites4 Burns: Fixed Carbon blazes and Coke burns out

    Four Stages for Combustion Process

  • 7/28/2019 Boiler Retrofit.pdf

    26/44

    Proposed Retrofit

    General layout still intact: Heating Surface Area almost same, varies a little

    Arrangement of Burners: at the original Oil Burners, Capacity of Burners, Heating

    Surface Area and Force Draught

    Blast Distribution: complete Combustion, primary & secondary Force Draught Fan

    Steam Generation: effective Utilizing and Operation

    After Retrofit: Tear and Wear at Heating Surface Area must be carefully thought

    over, especially at the Corners, Headers in hot Gas and also wear plate must be

    improved

    PARTIAL RETROFIT

  • 7/28/2019 Boiler Retrofit.pdf

    27/44

    1 CWM Preparation: Storage Tank & CWM supply System2 CWM Burners & Accessories

    3 Hearth Cool Ash Bucket, deslaging& dedusting Equipment

    4 Precipitator: ESP, Bag Filter, etc.

    5 Induced Draught Fan ( IDF )

    6 Electricity & Control System

    7 Structure & auxiliary Facilities

  • 7/28/2019 Boiler Retrofit.pdf

    28/44

  • 7/28/2019 Boiler Retrofit.pdf

    29/44

    No. Parameter Remar k

    1 Main Equipment Load Screw Pump, Unload Screw Pumps, Pull-out Screw Pump,

    Supply Screw Pumps, Magnetic Flowmeter, CWM Burners,

    Mechanical Soot Blower, Air Compressor, Dedusting &

    Deslaging System, Precipitator, IDF

    2 Local Fabrication & Erection Work Unload Slot Tank, Storage Tank, Stirring Buckets, Slurry Filters,

    Steel Frame, Platform, Staircase, Exterior Cover Sheet

    3 Material & Labour Cost to ModifyCombustion Chamber of Boiler

    4 Electricity & Control System

    5 Civil & Construction Work by other

  • 7/28/2019 Boiler Retrofit.pdf

    30/44

    Proposed Retrofit

    CWM Preparation: Storage Tank & CWM supply System

    Arrangement of CWM Burners & Accessories

    Combustion Chamber Modification: Furnace Volume ( Height or Width ),Convection Surface Area, Analyze Structure of original of Boiler

    Hearth Cool Ash Bucket, deslaging & dedusting Equipment

    Precipitator: ESP, Bag Filter, etc.

    Induced Draught Fan ( IDF ) Electricity & Control System

    Structure & auxiliary Facilities

    FULL RETROFIT

  • 7/28/2019 Boiler Retrofit.pdf

    31/44

  • 7/28/2019 Boiler Retrofit.pdf

    32/44

    NEW CWM BOILER

    No. Parameter Remar k

    1 CWM Unloading, Storage & Supply System Unload Slot Tank, Storage Tank, Load Screw Pump, Unload Screw Pumps, Pull-out Screw

    Pump, Stirring Buckets, Supply Screw Pumps, Slurry Filters, Magnetic Flowmeter, etc.

    2 CWM Boiler & Combustion System Steam Header, Water Cool Plate, Economizer, Steel Frame, Platform, Staircase, Exterior

    Cover Sheet, Air Preheater, Superheater, Proper Pipeline, CWM Burners, Secondary Blast

    Gate & Metal Elements of Chamber Wall, Primary Valve Instrument, etc.

    3 Blower & Induced Draught Fan System FDF & IDF

    4 Dedusting & Deslaging System, Precipitator Ash Removal System ( Bottom & Fly Ash)

    5 Flue Gas, Ducting System & Insulation

    6 Monitoring & Control System

    7 Stack

    8 Water Treatment Plant Softener, RO, Demineralization, etc.

    9 Deaerator & Feed Water Tank, Feed Water Pumps &

    Control Valves

    10 Electricity System

    11 Civil Work by other

  • 7/28/2019 Boiler Retrofit.pdf

    33/44

    AIR EMISSION CONTROL SYSTEM

  • 7/28/2019 Boiler Retrofit.pdf

    34/44

    Source : Flakt

    ELECTROSTATIC PRECIPITATOR

    Electrode System-Principle sketch

  • 7/28/2019 Boiler Retrofit.pdf

    35/44

    The electric field in the dust layer

  • 7/28/2019 Boiler Retrofit.pdf

    36/44

    Back-corona in the dust layer

  • 7/28/2019 Boiler Retrofit.pdf

    37/44

    Collecting electrode-principle sketch

  • 7/28/2019 Boiler Retrofit.pdf

    38/44

    Rapping acceleration distribution on the collecting electrodes

  • 7/28/2019 Boiler Retrofit.pdf

    39/44

    Bag Filter

    Source : EEC

  • 7/28/2019 Boiler Retrofit.pdf

    40/44

    Source : EEC

    HIGH EFFICIENCY BACKWASH PULSE-JET DUST COLLECTOR

  • 7/28/2019 Boiler Retrofit.pdf

    41/44

    CONCLUSION

  • 7/28/2019 Boiler Retrofit.pdf

    42/44

    Boiler Retrofit concerned with the regulation as follow:

    Environmental Regulation:SO2,NO2,CO,Particulate,etc.

    The air emission standard from distribution facilities utilizing coal shall beconsidered this notification.

    Ambient Air Standard (1995)

    Pollution Control Department (PCD)

    Ministry of Natural Resources and Environment

  • 7/28/2019 Boiler Retrofit.pdf

    43/44

    The air emission standard from distribution facilities on February 4, B.E. 2548

    (2005 )

    The air emission standard from electricity generation transmission or

    distribution facilities on September 28, B.E. 2547 ( 2004 )

    Department of Industrial Work

    Ministry of IndustrySafety

    Repair and Modification

    Hydrostatic Test

    Safety Technology Bureau

    Ministry of Industry

  • 7/28/2019 Boiler Retrofit.pdf

    44/44

    COST COMPARISON OF RETROFIT AND NEW BOILER

    Parameter Retrofi t of Boiler Cost of Retrofit Cost Remar k

    A Partial Retrofit Low Steam Generate drop 20% approximately

    B Full Retrofit > 3 time of A Equivalent with existing HFO Boiler

    C New Boiler 2 - 2.6 time ofA