board of p c f 28, 2018 s a i 1 portside ventura …draft rev. description public works department...

46
BOARD OF PORT COMMISSIONERS FEBRUARY 28, 2018 STANDARD AGENDA ITEM 1 PORTSIDE VENTURA HARBOR PROJECT UPDATE

Upload: others

Post on 19-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

BOARD OF PORT COMMISSIONERS FEBRUARY 28, 2018

STANDARD AGENDA ITEM 1 PORTSIDE VENTURA HARBOR

PROJECT UPDATE

Page 2: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

VENTURA PORT DISTRICT STANDARD AGENDA ITEM 1 BOARD COMMUNICATION Meeting Date: February 28, 2018 TO: Board of Port Commissioners FROM: Oscar Peña, General Manager SUBJECT: Update on the Portside Ventura Harbor Project

RECOMMENDATION: That the Board of Port Commissioners receive an update from Michael Sondermann and the City of Ventura on the progress of the Portside Ventura Harbor Project. SUMMARY: Michael Sondermann, President of Sondermann Ring Partners – Ventura Harbor, LLC will provide an update on the construction of Phase I. Brad Starr, Engineering Services Manager with the City of Ventura Public Works will provide information on the street modifications to Anchors Way Drive, Beachmont and related streets. BACKGROUND: In December 2017, Portside Partners Ventura Harbor, LLC began construction of a 27 acre prime Oceanside town center. There will be 270 units available for rent:

• 38 - studios • 104 - 1 bedroom with 1 – 1 ½ bath • 98 - 2 bedroom with 2 ½ bath • 30 - 3 bedroom with 3 bath

Additionally, 30 unique live/work spaces will be available in 1 or 2 bedroom floor plans that range from 1,600 – 2,700 square feet. 17 spaces with work spaces and store fronts will be located in the Portside Plaza for home based businesses. The Portside Plaza will also offer 20,000 square feet of retail/restaurant opportunities. The first phase is scheduled to open in August 2018. As part of the project on Parcels 15, 16, and 18, the developer was required to make modifications/improvements to Anchors Way Drive and some streets in the Ventura Keys to reduce overall traffic. All the street modifications required will be paid by Portside Partners Ventura Harbor, LLC. Additionally, the improvements must be completed prior to obtaining a certificate of occupancy for the first phase of development. The District’s dry storage yard will be reduced in size to allow for the reconfiguration of Anchors Way Drive. District staff is working with Portside to implement the changes to the dry storage yard. FISCAL IMPACT: As a result of the reconfiguration, there will be a reduction of 12%-15% of the total dry storage yard. In Fiscal Year 2016-2017, the revenue generated in the dry storage yard was approximately $110,000. A preliminary estimate in the reduction of revenue is 15% of the total revenue. ATTACHMENT: Attachment 1 – DRAFT Anchors Way Drive Improvement Plans

Page 3: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

DRAFTDESCRIPTIONREV.

PUBLIC WORKS DEPARTMENT LAND DEVELOPMENT DIVISION

DRN. BY:

CITY TRANSPORTATION MANAGER

DES. BY: CK'D BY:

R.C.E. NUMBER DATE

SID# SHEET FILE NO.OF

CK'D APP DATE

CITY ENGINEER R.C.E. NUMBER DATE

JN: 2013018

1972 2015-D-025

GRIM-8-15-29793ENCR-4-15-34225

DATE: 02-02-18

ATTACHMENT 1

AutoCAD SHX Text
CITY OF SAN BUENAVENTURA
AutoCAD SHX Text
VENTURA HARBOR
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
No. 41729
AutoCAD SHX Text
Exp. 3-31-18
AutoCAD SHX Text
RAMY F. AWAD - RCE. No. 41729 DATE
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
LAND PLANNING
AutoCAD SHX Text
(626) 446-6566
AutoCAD SHX Text
(626) 446-4449
AutoCAD SHX Text
FAX:
AutoCAD SHX Text
TEL:
AutoCAD SHX Text
20 E. FOOTHILL BLVD., STE 230 ARCADIA, CA 91006-2375
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
1
AutoCAD SHX Text
6
AutoCAD SHX Text
ANCHORS WAY MEDIAN & TURN-BAY
AutoCAD SHX Text
PLANS FOR THE IMPROVEMENTS OF
AutoCAD SHX Text
BEACHMONT ST. AT SEAFARER ST., SEAVIEW AVE.
AutoCAD SHX Text
SHEET NO.
AutoCAD SHX Text
1 TITLE SHEET
AutoCAD SHX Text
2
AutoCAD SHX Text
ANCHORS WAY MEDIAN IMPROVEMENTS
AutoCAD SHX Text
: 1. ALL WORK AS SHOWN HEREON SHALL BE CONSTRUCTED IN ACCORDANCE WITH "STANDARDS SPECIFICATIONS ALL WORK AS SHOWN HEREON SHALL BE CONSTRUCTED IN ACCORDANCE WITH "STANDARDS SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION" CURRENT EDITION, THE CITY OF SAN BUENAVENTURA STANDARD CONSTRUCTION DETAILS AND STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS. 2. STANDARD DETAILS REQUIRED FOR THIS PROJECT: STANDARD DETAILS REQUIRED FOR THIS PROJECT: STD. A20B-----------PAVEMENT MARKERS AND TRAFFIC LINES TYPICAL DETAILS STD. DETAIL 107-------6" P.C.C CURB AND GUTTER, SUPERPOSED CURB. STD. DETAIL 104-------RESIDENTIAL, COMMERCIAL, INDUSTRIAL DRIVEWAY 3. FEATHER OVER EXISTING PAVEMENT WITH OVERLAY AS NECESSARY TO MAKE A SMOOTH JOIN TO OR BEYOND CENTERLINE. (ALL STREET WIDENING STREET SECTIONS. 4. ALL TRAFFIC CONTROL SIGN DESIGNATIONS ARE STATE STANDARD DESIGNATIONS. 5. CONTRACTOR SHALL ADJUST TO FINISHED GRADE ALL VALVE BOXES, MANHOLES FRAME AND COVERS, ETC. WITHIN STREET RIGHT OF WAY. 6. INSTALL THERMOPLASTIC STRIPING DETAIL AS INDICATED ON PLAN. 7. THE CONTRACTOR SHALL NOTIFY THE FOLLOWING 72 HOURS IN ADVANCE OF CONSTRUCTION: UNDERGROUND SERVICE ALERT---------------(800) 422-4133 CITY OF SAN BUENAVENTURA ENGINEERING DIV.-----(805) 654-7889 8. THE CONTRACTOR SHALL HAVE COPIES OF APPROVED PLANS, SPECIFICATIONS, CONSTRUCTION SCHEDULE AND SHOP DRAWINGS ON THE JOB SITE AT ALL TIMES DURING CONSTRUCTION. 9. THE CONTRACTOR SHALL LOCATE, PROTECT AND SAVE ANY AND ALL SURVEY MONUMENTS THAT WILL BE OR MAY BE DAMAGED OR DESTROYED BY THIS OPERATIONS AND ONCE FOUND HE SHALL THEN IMMEDIATELY NOTIFY BOTH THE SUPERVISING CIVIL ENGINEER AND THE DISTRICT INSPECTOR. THE CIVIL ENGINEER SHALL RESET ALL SAID MONUMENTS PER THE REQUIREMENTS OF THE L.S. ACT. 10. THE CONTRACTOR SHALL PROVIDE A SMOOTH RIDING TRANSITION AT THE END OF THE ASPHALT OVERLAY, OR AT ANY AREA REQUIRING TRANSITION FROM THE NEW ASPHALT OVERLAY SURFACE TO AN EXISTING SURFACE. LONGITUDINAL TRANSITION LENGTHS SHALL BE TWENTY FEET UNLESS OTHERWISE NOTED ON THE PLANS OR IN THE SPECIFICATIONS. 11. ALL CONFLICTING STRIPING WITHIN THE PROJECT LIMITS SHALL BE REMOVED BY WET SANDBLASTING. 12. ALL PAVEMENT MARKINGS ON NEW ASPHALT SHALL OR PORTLAND CEMENT CONCRETE SHALL BE REFLECTIVE THERMOPLASTIC PAINT. 13. LONGITUDINAL JOINTS BETWEEN PARALLEL PAVEMENT RUNS SHALL OCCUR WITHIN ONE FOOT OF LANE LINES OR CENTER OF THE LANES.
AutoCAD SHX Text
5 RAISED INTERSECTION DETAILS
AutoCAD SHX Text
3 ANCHORS WAY TURNBAY AND CUL-DE-SAC DETAIL.
AutoCAD SHX Text
TG VENTURA PG 491, G,F-6
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
HARBOR BLVD
AutoCAD SHX Text
PACIFIC OCEAN
AutoCAD SHX Text
MARINA BAY
AutoCAD SHX Text
ARUNDELL BARRANCA
AutoCAD SHX Text
ARUNDELL BARRANCA
AutoCAD SHX Text
SPINNAKER DR.
AutoCAD SHX Text
NAVIGATOR
AutoCAD SHX Text
DR.
AutoCAD SHX Text
SEAFARER ST.
AutoCAD SHX Text
ST.
AutoCAD SHX Text
SCHOONER
AutoCAD SHX Text
DR.
AutoCAD SHX Text
ANCHOR
AutoCAD SHX Text
WAY
AutoCAD SHX Text
OPEN FIELD
AutoCAD SHX Text
OPEN FIELD
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text
101
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
126
AutoCAD SHX Text
34
AutoCAD SHX Text
232
AutoCAD SHX Text
118
AutoCAD SHX Text
118
AutoCAD SHX Text
101
AutoCAD SHX Text
W GONZALES RD
AutoCAD SHX Text
E HARBOR BLVD
AutoCAD SHX Text
S HARBOR BLVD
AutoCAD SHX Text
SAN BUENAVENTURA
AutoCAD SHX Text
STATE BEACH
AutoCAD SHX Text
OLIVIAS PARK DR
AutoCAD SHX Text
E MAIN ST
AutoCAD SHX Text
PACIFIC OCEAN
AutoCAD SHX Text
DORIS AVE
AutoCAD SHX Text
5TH ST
AutoCAD SHX Text
WOOLEY RD
AutoCAD SHX Text
HARBOR BLVD
AutoCAD SHX Text
VICTORIA AVE
AutoCAD SHX Text
VENTURA RD
AutoCAD SHX Text
PLEASANT VALLEY
AutoCAD SHX Text
ROSE AVE
AutoCAD SHX Text
FOOTHILL RD
AutoCAD SHX Text
TELEGRAPH RD
AutoCAD SHX Text
TELEPHONE RD
AutoCAD SHX Text
MOUNTAINS
AutoCAD SHX Text
TG VENTURA PG 491, G,F-6
AutoCAD SHX Text
VENTURA HARBOR CONTROL IS BASED ON THE FOLLOWING: HORIZONTAL: THE BEARINGS SHOWN HEREON ARE BASED ON THE BEARING N 11°29’20”W OF THE 20”W OF THE W OF THE CENTERLINE OF ANCHORS WAY AS SHOWN ON PARCEL MAP FOR THE VENTURA PORT DISTRICT, 25PM52. THE COORDINATE SYSTEM IS ARBITRARY, NOT BASED ON ANY STATE PLANE OR NATIONAL GRID SYSTEM. VERTICAL: COUNTY OF VENTURA BENCHMARK 3-26 RESET A BRASS CAP, SET FLUSH IN CONCRETE AT THE ARUNDELL BARRANCA BRIDGE ON HARBOR BLVD, AT THE S.E. CORNER OF THE BRIDGE, 1.5' S'LY FROM THE S. END OF THE CONC WALK, AND 20' E'LY FROM THE CENTERLINE OF HARBOR BLVD. Elev.= 27.477 FEET Datum= Adjustment 1985 (NGVD 29)
AutoCAD SHX Text
VENTURA PORT DISTRICT
AutoCAD SHX Text
CITY OF SAN BUENAVENTURA, CALIFORNIA
AutoCAD SHX Text
PLANS BASED ON APPROVED PLANS 13A & 13B BY PSOMAS. PLANS DATED: JUNE 19, 2013 AND STREET PLANS FOR PROJECT NO. 66909 ( SHEETS 8, 9 OF 23)
AutoCAD SHX Text
N
AutoCAD SHX Text
N
AutoCAD SHX Text
& SEASHELL AVE.
AutoCAD SHX Text
4 INDEX MAP OFFSITE TRAFFIC IMPROVEMENTS
AutoCAD SHX Text
X
AutoCAD SHX Text
2. INSTALL PAVERS ON SAND BASE (AKERSTONE OLD TOWN BLEND)
AutoCAD SHX Text
3. INSTALL "STOP" R1-1 SIGN.
AutoCAD SHX Text
4. REMOVE CONFLICTING STRIPING AND SIGNS.
AutoCAD SHX Text
5. PROTECT IN PLACE.
AutoCAD SHX Text
6. REMOVE EXISTING MEDIAN CURB, STAMPED CONCRETE
AutoCAD SHX Text
10. RELOCATE EXISTING FIRE HYDRANT, SEE DETAIL ON SHT 4.
AutoCAD SHX Text
11. INSTALL 4" YELLOW STRIPE LINE PER DETAIL 24 AS SHOWN
AutoCAD SHX Text
13. CONSTRUCT SPEED CUSHIONS PER MUTCD MANUAL.
AutoCAD SHX Text
14. EXISTING CURB AND GUTTER TO REMAIN.
AutoCAD SHX Text
18. PLACE 8" SOLID WHITE LIMIT LINE STRIPE DETAIL 38A
AutoCAD SHX Text
20. EXISTING STREET LIGHT TO BE RELOCATED.
AutoCAD SHX Text
21. REMOVE EXISTING SPEED CUSHIONS.
AutoCAD SHX Text
1. CONSTRUCT MEDIAN PER DETAIL SECTION HEREON. ALL MEDIAN NOSES SHALL BE PAINTED YELLOW.
AutoCAD SHX Text
7. CONSTRUCT 6" P.C.C. SUPERPOSED CURB ONLY PER CITY OF SAN BUENAVENTURA STD. DETAIL 107.
AutoCAD SHX Text
9. CONSTRUCT 6" C.F. CURB AND GUTTER TYPE "A" PER CITY OF SAN BUENAVENTURA STD. DETAIL 107
AutoCAD SHX Text
15. REMOVE PORTION OF EXISTING CURB, GUTTER AND SIDEWALK AS INDICATED ON PLAN.
AutoCAD SHX Text
16. CONSTRUCT 4" THICK P.C.C WALK PER CITY OF SAN BUENAVENTURA STD. DETAIL 102.
AutoCAD SHX Text
17. INSTALL SOLID YELLOW STRIPE WITH MARKERS PER DETAIL 25A OF CALTRANS STD. PLAN A20B.
AutoCAD SHX Text
19. CONSTRUCT MOD. DRIVEWAY PER CITY OF SAN BUENAVENTURA STD. DETAIL 104, W=8', X=6'.
AutoCAD SHX Text
22. CONSTRUCT 6" MOUNTABLE CURB PER DETAIL HEREON.
AutoCAD SHX Text
8. CONSTRUCT 6" P.C.C. CURB ONLY PER CITY OF SAN BUENAVENTURA STD. DETAIL 107.
AutoCAD SHX Text
24. INSTALL "NO PEDESTRIANS" BARRICADE SIGN R5-10c
AutoCAD SHX Text
25. CONSTRUCT ACCESS RAMP PER CITY OF SAN BUENAVENTURA DETAIL STD. 118.
AutoCAD SHX Text
26. EXISTING SCE VAULT TO REMAIN AND PROTECT IN PLACE. ADJUST COVER TO GRADE AND AWAY FROM CURB.
AutoCAD SHX Text
23. INSTALL REMOVABLE OR RETRACTABLE BOLLARDS
AutoCAD SHX Text
PER CALTRANS STD. PLAN A20B.
AutoCAD SHX Text
PER CALTRANS STD. PLAN A20D.
AutoCAD SHX Text
12. CONSTRUCT 4" THICK A.C. PAVEMENT ON 6" BASE. FINAL THICKNESS TO BE DETERMINED BY GEOTECHNICAL ENGINEER.
AutoCAD SHX Text
27. INSTALL 4" YELLOW STRIPE LINE PER DETAIL 25A AS SHOWN. PER CALTRANS STD. PLAN A20B.
AutoCAD SHX Text
29. EXISTING CROSS GUTTER TO REMAIN.
AutoCAD SHX Text
30. INSTALL 6 FT CHAIN LINK FENCE.
AutoCAD SHX Text
31. REMOVE EXISTING CHAIN LINK FENCE.
AutoCAD SHX Text
BY TRAFFICGUARD OR SIMILAR, SEE DETAIL ON SHEET 2.
AutoCAD SHX Text
AND EXISTING LANDSCAPE LIGHT.
AutoCAD SHX Text
32. EXTEND EXISTING DRIVEWAY TO PROPOSED CURB
AutoCAD SHX Text
33. EXISTING STREET LIGHT TO REMAIN
AutoCAD SHX Text
34. SAWCUT AND JOIN
AutoCAD SHX Text
35. CONSTRUCT 6" THICK P.C.C. PAVEMENT ON 4" BASE FINAL THICKNESS TO BE DETERMINED BY GEOTECHNICAL ENGINEER.
AutoCAD SHX Text
28. INSTALL 4" SOLID WHITE LIMIT LINE STRIPE PER DETAIL 38A AS SHOWN. PER CALTRANS STD. PLAN A20B.
AutoCAD SHX Text
6 ANCHORS WAY STRIPING PLAN
Page 4: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

DRAFTDESCRIPTIONREV.

PUBLIC WORKS DEPARTMENT LAND DEVELOPMENT DIVISION

DRN. BY: DES. BY: CK'D BY:

R.C.E. NUMBER DATE

SID# SHEET FILE NO.OF

CK'D APP DATE

CITY ENGINEER R.C.E. NUMBER DATE

JN: 2013018

1972 2015-D-025

CITY TRANSPORTATION MANAGER

www.trafficguard.net

NOTES:1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS.2. ALL DIMENSIONS ARE CONSIDERED TRUE AND REFLECT MANUFACTURER'S SPECIFICATIONS.

MODEL TL1002 - TRAFFICGUARD® ROUND POST TOP LOCK (36" POST HEIGHT), ASSEMBLY DETAIL

TOP LOCK10011002

TOP LOCK100310041006

SECURE LOCKINGMECHANISM WITHLOCK(NOT PROVIDED)

SECURE BOLLARDINTO SLEEVE

5 INCHGROUNDSLEEVE

12 INCHGROUNDSLEEVE

GROUND SLEEVEASSEMBLY

COVER - SECURELYFASTEN BY ROTATING1/8 TURN ONCEINSTALLED IN SLEEVE

GROUND SLEEVE

USE UNLOCKINGTOOL TO INSTALLAND REMOVE COVER

DATE: 02-02-18

ATTACHMENT 1

AutoCAD SHX Text
MH
AutoCAD SHX Text
S
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ANCHORS WAY
AutoCAD SHX Text
RR TIES
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
11.39
AutoCAD SHX Text
58
AutoCAD SHX Text
HV
AutoCAD SHX Text
10
AutoCAD SHX Text
12.5
AutoCAD SHX Text
12.5
AutoCAD SHX Text
MH
AutoCAD SHX Text
12.5
AutoCAD SHX Text
23
AutoCAD SHX Text
23
AutoCAD SHX Text
MH
AutoCAD SHX Text
S
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ANCHORS WAY
AutoCAD SHX Text
RR TIES
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
11.39
AutoCAD SHX Text
58
AutoCAD SHX Text
HV
AutoCAD SHX Text
10
AutoCAD SHX Text
12.5
AutoCAD SHX Text
12.5
AutoCAD SHX Text
MH
AutoCAD SHX Text
12.5
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
16
AutoCAD SHX Text
17
AutoCAD SHX Text
18
AutoCAD SHX Text
19
AutoCAD SHX Text
20
AutoCAD SHX Text
21
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
CITY OF SAN BUENAVENTURA
AutoCAD SHX Text
VENTURA HARBOR
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
No. 41729
AutoCAD SHX Text
Exp. 3-31-18
AutoCAD SHX Text
RAMY F. AWAD - RCE. No. 41729 DATE
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
LAND PLANNING
AutoCAD SHX Text
(626) 446-6566
AutoCAD SHX Text
(626) 446-4449
AutoCAD SHX Text
FAX:
AutoCAD SHX Text
TEL:
AutoCAD SHX Text
20 E. FOOTHILL BLVD., STE 230 ARCADIA, CA 91006-2375
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
40'
AutoCAD SHX Text
80'
AutoCAD SHX Text
SCALE 1"=40'
AutoCAD SHX Text
STA: 14+27.09
AutoCAD SHX Text
CB E.C.
AutoCAD SHX Text
STA: 15+21.95 B.C.
AutoCAD SHX Text
OFFSET: 5.50 R
AutoCAD SHX Text
STA: 16+11.18
AutoCAD SHX Text
E.C.
AutoCAD SHX Text
STA: 16+53.71
AutoCAD SHX Text
BEGIN TAPER
AutoCAD SHX Text
STA: 16+61.18
AutoCAD SHX Text
B.C.
AutoCAD SHX Text
STA: 16+89.87
AutoCAD SHX Text
RAD. PT.
AutoCAD SHX Text
STA: 20+31.50
AutoCAD SHX Text
B.C.
AutoCAD SHX Text
STA: 17+50.42
AutoCAD SHX Text
E.C.
AutoCAD SHX Text
6" SUPERPOSED. P.C.C. CURB PER CITY
AutoCAD SHX Text
OF SANBUENAVENTURA STD. DETAIL 107
AutoCAD SHX Text
INSTALL PAVERS ON SAND BASE
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
* NOTE: PLACE BASE MATERIAL UNDER MEDIAN FINISH
AutoCAD SHX Text
CONSTRUCTION NOTES (THIS SHEET): 1. CONSTRUCT MEDIAN PER DETAIL SECTION HEREON. CONSTRUCT MEDIAN PER DETAIL SECTION HEREON. ALL MEDIAN NOSES SHALL BE PAINTED YELLOW. 2. INSTALL PAVERS ON SAND BASE (AKERSTONE OLD TOWN INSTALL PAVERS ON SAND BASE (AKERSTONE OLD TOWN BLEND) 3. INSTALL SIGNS OR MARKERS AS INDICATED ON PLAN. INSTALL SIGNS OR MARKERS AS INDICATED ON PLAN. 4. REMOVE CONFLICTING STRIPING AND SIGNS. REMOVE CONFLICTING STRIPING AND SIGNS. 5. NOT USED. NOT USED. 6. REMOVE EXISTING MEDIAN CURB AND STAMPED REMOVE EXISTING MEDIAN CURB AND STAMPED CONCRETE. 7. CONSTRUCT 6" SUPERPOSED P.C.C. CURB PER CITY OF CONSTRUCT 6" SUPERPOSED P.C.C. CURB PER CITY OF SAN BUENA VENTURA STD. DETAIL 107. 8. INSTALL CALTRANS THERMOPLASTIC STRIPING DETAIL AS INSTALL CALTRANS THERMOPLASTIC STRIPING DETAIL AS INDICATED ON PLAN.
AutoCAD SHX Text
X
AutoCAD SHX Text
SLOPE 1/4" PER FT.
AutoCAD SHX Text
(AKERSTONE OLD TOWN BLEND)
AutoCAD SHX Text
1
AutoCAD SHX Text
SAWCUT & JOIN
AutoCAD SHX Text
TYPE K MARKER
AutoCAD SHX Text
3
AutoCAD SHX Text
REPLACE CROSSWALK
AutoCAD SHX Text
STRIPING DET A24E
AutoCAD SHX Text
8
AutoCAD SHX Text
EXIST. A.C. PAVEMENT
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
6" SUPERPOSED. P.C.C. CURB
AutoCAD SHX Text
EXIST. A.C. PAVEMENT
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
ANCHORS WAY MEDIAN
AutoCAD SHX Text
IMPROVEMENTS
AutoCAD SHX Text
2
AutoCAD SHX Text
6
AutoCAD SHX Text
2%%%
AutoCAD SHX Text
2%%%
AutoCAD SHX Text
VENTURA HARBOR MARINA & YACHT
AutoCAD SHX Text
VENTURA MARINA MHP
AutoCAD SHX Text
2
AutoCAD SHX Text
1
AutoCAD SHX Text
2
AutoCAD SHX Text
EXISTING CURB
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
EXISTING STRIPING
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
NEW CURB ISLAND
AutoCAD SHX Text
EXISTING CURB
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
EXISTING STRIPING
AutoCAD SHX Text
(TYP.)
AutoCAD SHX Text
EX. CURB ISLAND
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
PARKING LOT
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
EXIST. BOAT
AutoCAD SHX Text
LAUNCHING RAMP
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
2
AutoCAD SHX Text
PAVERS ON SAND BASE
AutoCAD SHX Text
(AKERSTONE OLD TOWN BLEND)
AutoCAD SHX Text
A.C. PAVEMENT
AutoCAD SHX Text
SLOPE 1/4" PER FT.
AutoCAD SHX Text
STA: 12+44.93
AutoCAD SHX Text
E.C.
AutoCAD SHX Text
17+00.00 END IMPROVEMENTS
AutoCAD SHX Text
EX. CURB ISLAND
AutoCAD SHX Text
BEGIN IMPROVEMENTS
Page 5: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

DRAFTDESCRIPTIONREV.

PUBLIC WORKS DEPARTMENT LAND DEVELOPMENT DIVISION

DRN. BY: DES. BY: CK'D BY:

R.C.E. NUMBER DATE

SID# SHEET FILE NO.OF

CK'D APP DATE

CITY ENGINEER R.C.E. NUMBER DATE

JN: 2013018

1972 2015-D-025

CITY TRANSPORTATION MANAGER

DATE: 02-02-18

ATTACHMENT 1

AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
WATER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
STOP
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
DECK
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
23
AutoCAD SHX Text
24
AutoCAD SHX Text
26
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
5'
AutoCAD SHX Text
11'
AutoCAD SHX Text
5'
AutoCAD SHX Text
12'
AutoCAD SHX Text
12'
AutoCAD SHX Text
12'
AutoCAD SHX Text
12'
AutoCAD SHX Text
23
AutoCAD SHX Text
11'
AutoCAD SHX Text
11'
AutoCAD SHX Text
25
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
WATER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
STOP
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
ASPH
AutoCAD SHX Text
DECK
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
22
AutoCAD SHX Text
23
AutoCAD SHX Text
27
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
CITY OF SAN BUENAVENTURA
AutoCAD SHX Text
VENTURA HARBOR
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
No. 41729
AutoCAD SHX Text
Exp. 3-31-18
AutoCAD SHX Text
RAMY F. AWAD-RCE. No. 41729 DATE
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
LAND PLANNING
AutoCAD SHX Text
(626) 446-6566
AutoCAD SHX Text
(626) 446-4449
AutoCAD SHX Text
FAX:
AutoCAD SHX Text
TEL:
AutoCAD SHX Text
20 E. FOOTHILL BLVD., STE 230 ARCADIA, CA 91006-2375
AutoCAD SHX Text
TURN BAY AND CUL-DE-SAC DETAIL
AutoCAD SHX Text
3
AutoCAD SHX Text
SCALE: 1"=30'
AutoCAD SHX Text
OFFSET: 76.66 R
AutoCAD SHX Text
B.C.R. CB.
AutoCAD SHX Text
E.C. CB.
AutoCAD SHX Text
B.C. CB.
AutoCAD SHX Text
CB. B.C.
AutoCAD SHX Text
E.C. CB.
AutoCAD SHX Text
RAD. PT.
AutoCAD SHX Text
E.C.
AutoCAD SHX Text
STA: 28+60.86
AutoCAD SHX Text
STA: 26+63.64
AutoCAD SHX Text
B.C.
AutoCAD SHX Text
E.C. CB.
AutoCAD SHX Text
E.C. CB.
AutoCAD SHX Text
P.R.C. CB.
AutoCAD SHX Text
P.R.C. CB.
AutoCAD SHX Text
CB.-JOIN
AutoCAD SHX Text
4
AutoCAD SHX Text
27
AutoCAD SHX Text
9
AutoCAD SHX Text
9
AutoCAD SHX Text
4
AutoCAD SHX Text
1
AutoCAD SHX Text
6
AutoCAD SHX Text
11
AutoCAD SHX Text
4
AutoCAD SHX Text
12
AutoCAD SHX Text
13
AutoCAD SHX Text
14
AutoCAD SHX Text
15
AutoCAD SHX Text
RAD. PT.
AutoCAD SHX Text
JOIN
AutoCAD SHX Text
15
AutoCAD SHX Text
STA: 24+26.27
AutoCAD SHX Text
STA: 24+22.79
AutoCAD SHX Text
OFFSET: 73.34 R
AutoCAD SHX Text
EXIST. R/W
AutoCAD SHX Text
EXIST. R/W
AutoCAD SHX Text
CB. E.C.
AutoCAD SHX Text
STA: 24+42.98
AutoCAD SHX Text
OFFSET: 57.75 R
AutoCAD SHX Text
STA: 24+58.47
AutoCAD SHX Text
OFFSET: 40.75 R
AutoCAD SHX Text
STA: 24+52.31
AutoCAD SHX Text
C1
AutoCAD SHX Text
C2
AutoCAD SHX Text
C3
AutoCAD SHX Text
C4
AutoCAD SHX Text
C5
AutoCAD SHX Text
C6
AutoCAD SHX Text
C7
AutoCAD SHX Text
C8
AutoCAD SHX Text
C9
AutoCAD SHX Text
C10
AutoCAD SHX Text
C11
AutoCAD SHX Text
C12
AutoCAD SHX Text
C13
AutoCAD SHX Text
C14
AutoCAD SHX Text
C15
AutoCAD SHX Text
C16
AutoCAD SHX Text
C17
AutoCAD SHX Text
C19
AutoCAD SHX Text
C20
AutoCAD SHX Text
C21
AutoCAD SHX Text
C22
AutoCAD SHX Text
C23
AutoCAD SHX Text
C24
AutoCAD SHX Text
C25
AutoCAD SHX Text
C26
AutoCAD SHX Text
C27
AutoCAD SHX Text
C28
AutoCAD SHX Text
L1
AutoCAD SHX Text
L2
AutoCAD SHX Text
L3
AutoCAD SHX Text
L4
AutoCAD SHX Text
L5
AutoCAD SHX Text
L6
AutoCAD SHX Text
L7
AutoCAD SHX Text
L8
AutoCAD SHX Text
L9
AutoCAD SHX Text
L10
AutoCAD SHX Text
OFFSET: 11.72 R
AutoCAD SHX Text
L11
AutoCAD SHX Text
STA: 24+68.99
AutoCAD SHX Text
L12
AutoCAD SHX Text
OFFSET: 20.30 R
AutoCAD SHX Text
17
AutoCAD SHX Text
17
AutoCAD SHX Text
12
AutoCAD SHX Text
6
AutoCAD SHX Text
5
AutoCAD SHX Text
20
AutoCAD SHX Text
(1.7%%%)
AutoCAD SHX Text
20
AutoCAD SHX Text
16
AutoCAD SHX Text
1
AutoCAD SHX Text
19
AutoCAD SHX Text
2
AutoCAD SHX Text
6
AutoCAD SHX Text
21
AutoCAD SHX Text
TANGENT
AutoCAD SHX Text
LENGTH
AutoCAD SHX Text
RADIUS
AutoCAD SHX Text
DELTA
AutoCAD SHX Text
CURVE
AutoCAD SHX Text
CURB CURVE DATA:
AutoCAD SHX Text
C1
AutoCAD SHX Text
29%%d13'08"
AutoCAD SHX Text
30.00'
AutoCAD SHX Text
15.30'
AutoCAD SHX Text
7.82'
AutoCAD SHX Text
C2
AutoCAD SHX Text
60%%d33'59"
AutoCAD SHX Text
30.00'
AutoCAD SHX Text
31.71'
AutoCAD SHX Text
17.52'
AutoCAD SHX Text
C3
AutoCAD SHX Text
48%%d26'38"
AutoCAD SHX Text
8.00'
AutoCAD SHX Text
6.76'
AutoCAD SHX Text
3.60'
AutoCAD SHX Text
C4
AutoCAD SHX Text
32%%d25'10"
AutoCAD SHX Text
30.00'
AutoCAD SHX Text
16.97'
AutoCAD SHX Text
8.72'
AutoCAD SHX Text
C5
AutoCAD SHX Text
30%%d51'40"
AutoCAD SHX Text
30.00'
AutoCAD SHX Text
16.16'
AutoCAD SHX Text
8.28'
AutoCAD SHX Text
C6
AutoCAD SHX Text
27%%d37'34"
AutoCAD SHX Text
30.00'
AutoCAD SHX Text
14.47'
AutoCAD SHX Text
7.38'
AutoCAD SHX Text
C7
AutoCAD SHX Text
87%%d01'09"
AutoCAD SHX Text
2.00'
AutoCAD SHX Text
3.04'
AutoCAD SHX Text
1.90'
AutoCAD SHX Text
C8
AutoCAD SHX Text
165%%d54'11"
AutoCAD SHX Text
1.00'
AutoCAD SHX Text
2.90'
AutoCAD SHX Text
8.09'
AutoCAD SHX Text
C9
AutoCAD SHX Text
19%%d23'34"
AutoCAD SHX Text
72.87'
AutoCAD SHX Text
24.66'
AutoCAD SHX Text
12.45'
AutoCAD SHX Text
C10
AutoCAD SHX Text
154%%d35'28"
AutoCAD SHX Text
2.50'
AutoCAD SHX Text
6.75'
AutoCAD SHX Text
11.09'
AutoCAD SHX Text
C11
AutoCAD SHX Text
79%%d21'40"
AutoCAD SHX Text
40.00'
AutoCAD SHX Text
55.40'
AutoCAD SHX Text
33.19'
AutoCAD SHX Text
C12
AutoCAD SHX Text
140%%d47'51"
AutoCAD SHX Text
4.00'
AutoCAD SHX Text
9.83'
AutoCAD SHX Text
11.23'
AutoCAD SHX Text
C13
AutoCAD SHX Text
99%%d13'07"
AutoCAD SHX Text
3.00'
AutoCAD SHX Text
5.20'
AutoCAD SHX Text
3.53'
AutoCAD SHX Text
C14
AutoCAD SHX Text
27%%d32'46"
AutoCAD SHX Text
122.00'
AutoCAD SHX Text
58.65'
AutoCAD SHX Text
29.91'
AutoCAD SHX Text
C15
AutoCAD SHX Text
180%%d00'00"
AutoCAD SHX Text
1.50'
AutoCAD SHX Text
4.71'
AutoCAD SHX Text
----
AutoCAD SHX Text
C16
AutoCAD SHX Text
24%%d09'34"
AutoCAD SHX Text
63.00'
AutoCAD SHX Text
26.56'
AutoCAD SHX Text
13.48'
AutoCAD SHX Text
C17
AutoCAD SHX Text
69%%d02'41"
AutoCAD SHX Text
65.00'
AutoCAD SHX Text
78.33'
AutoCAD SHX Text
44.71'
AutoCAD SHX Text
C18
AutoCAD SHX Text
88%%d18'20"
AutoCAD SHX Text
65.00'
AutoCAD SHX Text
100.18'
AutoCAD SHX Text
63.11'
AutoCAD SHX Text
C19
AutoCAD SHX Text
67%%d05'44"
AutoCAD SHX Text
125.00'
AutoCAD SHX Text
146.38'
AutoCAD SHX Text
82.89'
AutoCAD SHX Text
C20
AutoCAD SHX Text
179%%d09'02"
AutoCAD SHX Text
1.50'
AutoCAD SHX Text
4.69'
AutoCAD SHX Text
202.33'
AutoCAD SHX Text
C21
AutoCAD SHX Text
19%%d26'53"
AutoCAD SHX Text
81.00'
AutoCAD SHX Text
27.49'
AutoCAD SHX Text
13.88'
AutoCAD SHX Text
C22
AutoCAD SHX Text
33%%d51'00"
AutoCAD SHX Text
103.00'
AutoCAD SHX Text
60.85'
AutoCAD SHX Text
31.34'
AutoCAD SHX Text
C23
AutoCAD SHX Text
144%%d44'50"
AutoCAD SHX Text
5.00'
AutoCAD SHX Text
12.63'
AutoCAD SHX Text
15.74'
AutoCAD SHX Text
C24
AutoCAD SHX Text
15%%d59'42"
AutoCAD SHX Text
46.00'
AutoCAD SHX Text
12.84'
AutoCAD SHX Text
6.46'
AutoCAD SHX Text
C25
AutoCAD SHX Text
105%%d23'42"
AutoCAD SHX Text
5.00'
AutoCAD SHX Text
9.20'
AutoCAD SHX Text
6.56'
AutoCAD SHX Text
LINE DATA:
AutoCAD SHX Text
LINE
AutoCAD SHX Text
BEARING
AutoCAD SHX Text
DISTANCE
AutoCAD SHX Text
L1
AutoCAD SHX Text
N 85%%d08'14" W
AutoCAD SHX Text
8.34'
AutoCAD SHX Text
L2
AutoCAD SHX Text
N 82%%d23'47" W
AutoCAD SHX Text
6.02'
AutoCAD SHX Text
L3
AutoCAD SHX Text
N 00%%d05'52" W
AutoCAD SHX Text
67.08'
AutoCAD SHX Text
L4
AutoCAD SHX Text
N 01%%d49'29" W
AutoCAD SHX Text
31.08'
AutoCAD SHX Text
L5
AutoCAD SHX Text
N 01%%d49'29" W
AutoCAD SHX Text
41.56'
AutoCAD SHX Text
L6
AutoCAD SHX Text
N 06%%d05'40" W
AutoCAD SHX Text
37.63'
AutoCAD SHX Text
L7
AutoCAD SHX Text
N 02%%d57'51" W
AutoCAD SHX Text
30.08'
AutoCAD SHX Text
L8
AutoCAD SHX Text
N 02%%d06'52" W
AutoCAD SHX Text
137.56'
AutoCAD SHX Text
L9
AutoCAD SHX Text
N 72%%d29'25" E
AutoCAD SHX Text
30.80'
AutoCAD SHX Text
C27
AutoCAD SHX Text
34%%d08'07"
AutoCAD SHX Text
140.00'
AutoCAD SHX Text
83.41'
AutoCAD SHX Text
42.98'
AutoCAD SHX Text
L10
AutoCAD SHX Text
N 24%%d50'06" E
AutoCAD SHX Text
22.45'
AutoCAD SHX Text
C26
AutoCAD SHX Text
50%%d22'05"
AutoCAD SHX Text
38.00'
AutoCAD SHX Text
33.41'
AutoCAD SHX Text
17.87'
AutoCAD SHX Text
L11
AutoCAD SHX Text
N 39%%d57'48" E
AutoCAD SHX Text
57.73'
AutoCAD SHX Text
L12
AutoCAD SHX Text
N 47%%d02'23" W
AutoCAD SHX Text
63.48'
AutoCAD SHX Text
2
AutoCAD SHX Text
10
AutoCAD SHX Text
STA: 23+68.46
AutoCAD SHX Text
OFFSET: 6.65 R
AutoCAD SHX Text
STA: 23+68.41
AutoCAD SHX Text
OFFSET: 7.18 L
AutoCAD SHX Text
STA: 23+99.04
AutoCAD SHX Text
OFFSET: 18.09 R
AutoCAD SHX Text
STA: 25+16.82
AutoCAD SHX Text
OFFSET: 75.86 R
AutoCAD SHX Text
STA: 24+99.35
AutoCAD SHX Text
OFFSET: 7.46 L
AutoCAD SHX Text
STA: 25+12.76
AutoCAD SHX Text
OFFSET: 44.00 R
AutoCAD SHX Text
STA: 25+61.09
AutoCAD SHX Text
OFFSET: 8.24 R
AutoCAD SHX Text
STA: 25+61.97
AutoCAD SHX Text
OFFSET: 31.25 R
AutoCAD SHX Text
STA: 25+79.91
AutoCAD SHX Text
OFFSET: 1.38 R
AutoCAD SHX Text
STA: 26+06.83
AutoCAD SHX Text
OFFSET: 3.51 L
AutoCAD SHX Text
STA: 26+36.91
AutoCAD SHX Text
OFFSET: 6.82 L
AutoCAD SHX Text
STA: 26+34.41
AutoCAD SHX Text
OFFSET: 18.24 R
AutoCAD SHX Text
STA: 26+60.77
AutoCAD SHX Text
OFFSET: 23.90 R
AutoCAD SHX Text
STA: 26+60.91
AutoCAD SHX Text
OFFSET: 6.5 R
AutoCAD SHX Text
STA: 27+02.66
AutoCAD SHX Text
OFFSET: 4.77 R
AutoCAD SHX Text
STA: 27+59.69
AutoCAD SHX Text
OFFSET: 7.16 R
AutoCAD SHX Text
STA: 27+57
AutoCAD SHX Text
OFFSET: 15.16 L
AutoCAD SHX Text
STA: 27+91.83
AutoCAD SHX Text
OFFSET: 2.86 L
AutoCAD SHX Text
STA: 28+21.09
AutoCAD SHX Text
OFFSET: 19.58 R
AutoCAD SHX Text
STA: 28+20.14
AutoCAD SHX Text
OFFSET: 20.15 L
AutoCAD SHX Text
CB. B.C.
AutoCAD SHX Text
E.C. CB.
AutoCAD SHX Text
L13
AutoCAD SHX Text
B.C. CB.
AutoCAD SHX Text
STA: 26+88.44
AutoCAD SHX Text
OFFSET: 24.39 L
AutoCAD SHX Text
STA: 27+25.09
AutoCAD SHX Text
OFFSET: 28.17 L
AutoCAD SHX Text
E.C. CB.-JOIN
AutoCAD SHX Text
15
AutoCAD SHX Text
BEG. EXIST. WALK
AutoCAD SHX Text
18
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
35
AutoCAD SHX Text
15
AutoCAD SHX Text
CONSTRUCT 6" P.C.C. CURB ONLY PER CITY
AutoCAD SHX Text
OF SANBUENAVENTURA STD. DETAIL 107
AutoCAD SHX Text
C
AutoCAD SHX Text
L
AutoCAD SHX Text
* NOTE: PLACE BASE MATERIAL UNDER MEDIAN FINISH
AutoCAD SHX Text
EXIST. A.C. PAVEMENT
AutoCAD SHX Text
TO REMAIN
AutoCAD SHX Text
2%%%
AutoCAD SHX Text
2%%%
AutoCAD SHX Text
22
AutoCAD SHX Text
22
AutoCAD SHX Text
STA: 22+93.80
AutoCAD SHX Text
OFFSET: 23.66 R
AutoCAD SHX Text
CB. B.C.-JOIN
AutoCAD SHX Text
E.C. CB.
AutoCAD SHX Text
L13
AutoCAD SHX Text
N 41%%d15'57" E
AutoCAD SHX Text
5.20'
AutoCAD SHX Text
N.T.S.
AutoCAD SHX Text
12"
AutoCAD SHX Text
1/2"R
AutoCAD SHX Text
1/2"R
AutoCAD SHX Text
8:12
AutoCAD SHX Text
CURB LINE
AutoCAD SHX Text
6"
AutoCAD SHX Text
12
AutoCAD SHX Text
STA: 27+75.63
AutoCAD SHX Text
E.C. CB.
AutoCAD SHX Text
7
AutoCAD SHX Text
8
AutoCAD SHX Text
14
AutoCAD SHX Text
9
AutoCAD SHX Text
P.R.C. CB.
AutoCAD SHX Text
C/L ACCESS RAMP
AutoCAD SHX Text
STA: 22+91.26
AutoCAD SHX Text
OFFSET: 0.00 R
AutoCAD SHX Text
JOIN
AutoCAD SHX Text
JOIN
AutoCAD SHX Text
6
AutoCAD SHX Text
REMOVE 12" OF EX. A.C. PVMT. AND
AutoCAD SHX Text
REPLACE IT WITH SAME.
AutoCAD SHX Text
SAWCUT AND JOIN (TYP)
AutoCAD SHX Text
EXIST. R/W
AutoCAD SHX Text
0.66%%%
AutoCAD SHX Text
0.66%%%
AutoCAD SHX Text
0.66%%%
AutoCAD SHX Text
14.30 TC
AutoCAD SHX Text
14.30 TC
AutoCAD SHX Text
(13.40) TC-JOIN
AutoCAD SHX Text
12.50 TC
AutoCAD SHX Text
(12.40) TC-JOIN
AutoCAD SHX Text
15.0 TC
AutoCAD SHX Text
15.50 TC
AutoCAD SHX Text
(14.80) TC-JOIN
AutoCAD SHX Text
14.50 TC
AutoCAD SHX Text
(15.09) TC-JOIN
AutoCAD SHX Text
15.5 TC
AutoCAD SHX Text
14.62 TC
AutoCAD SHX Text
13.70 TC-MOC
AutoCAD SHX Text
14.11 TC
AutoCAD SHX Text
13.69 TC
AutoCAD SHX Text
14.00 TC
AutoCAD SHX Text
13.90 TC
AutoCAD SHX Text
13.03 TC
AutoCAD SHX Text
13.00 TC
AutoCAD SHX Text
13.59 TC
AutoCAD SHX Text
13.32 TC
AutoCAD SHX Text
(13.20) TC-JOIN
AutoCAD SHX Text
(13.20) TC-JOIN
AutoCAD SHX Text
15.40 TC
AutoCAD SHX Text
(12.04) TC-JOIN
AutoCAD SHX Text
14.00 TC
AutoCAD SHX Text
13.68 TC-JOIN
AutoCAD SHX Text
JOIN
AutoCAD SHX Text
C28
AutoCAD SHX Text
195%%d07'42"
AutoCAD SHX Text
23.00'
AutoCAD SHX Text
78.33'
AutoCAD SHX Text
-173.20'
AutoCAD SHX Text
RAD. PT.
AutoCAD SHX Text
23
AutoCAD SHX Text
PROP. OM2-H1, TYPE K-1 SIGN
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
24
AutoCAD SHX Text
25
AutoCAD SHX Text
26
AutoCAD SHX Text
14.00 TC
AutoCAD SHX Text
14.00 TC
AutoCAD SHX Text
15.70 TC/HP
AutoCAD SHX Text
JOIN
AutoCAD SHX Text
PROP. STRIPING
AutoCAD SHX Text
PROP. 5' MEDIAN OPENINIG
AutoCAD SHX Text
INSTALL R1-5 SIGN
AutoCAD SHX Text
INSTALL R1-5 SIGN
AutoCAD SHX Text
15
AutoCAD SHX Text
PROPOSED MONUMENT SIGN FOR RESORT
AutoCAD SHX Text
25
AutoCAD SHX Text
12
AutoCAD SHX Text
INSTALL PAVERS ON SAND BASE
AutoCAD SHX Text
SLOPE 1/4" PER FT.
AutoCAD SHX Text
(AKERSTONE OLD TOWN BLEND)
AutoCAD SHX Text
28
AutoCAD SHX Text
X
AutoCAD SHX Text
2. INSTALL PAVERS ON SAND BASE (AKERSTONE OLD TOWN BLEND)
AutoCAD SHX Text
3. INSTALL "STOP" R1-1 SIGN.
AutoCAD SHX Text
4. REMOVE CONFLICTING STRIPING AND SIGNS.
AutoCAD SHX Text
5. PROTECT IN PLACE.
AutoCAD SHX Text
6. REMOVE EXISTING MEDIAN CURB, STAMPED CONCRETE
AutoCAD SHX Text
10. RELOCATE EXISTING FIRE HYDRANT, SEE DETAIL ON SHT 4.
AutoCAD SHX Text
11. INSTALL 4" YELLOW STRIPE LINE PER DETAIL 24 AS SHOWN
AutoCAD SHX Text
13. CONSTRUCT SPEED CUSHIONS PER MUTCD MANUAL.
AutoCAD SHX Text
14. EXISTING CURB AND GUTTER TO REMAIN.
AutoCAD SHX Text
18. PLACE 8" SOLID WHITE LIMIT LINE STRIPE DETAIL 38A
AutoCAD SHX Text
20. EXISTING STREET LIGHT TO BE RELOCATED.
AutoCAD SHX Text
21. REMOVE EXISTING SPEED CUSHIONS.
AutoCAD SHX Text
1. CONSTRUCT MEDIAN PER DETAIL SECTION HEREON. ALL MEDIAN NOSES SHALL BE PAINTED YELLOW.
AutoCAD SHX Text
7. CONSTRUCT 6" P.C.C. SUPERPOSED CURB ONLY PER CITY OF SAN BUENAVENTURA STD. DETAIL 107.
AutoCAD SHX Text
9. CONSTRUCT 6" C.F. CURB AND GUTTER TYPE "A" PER CITY OF SAN BUENAVENTURA STD. DETAIL 107
AutoCAD SHX Text
15. REMOVE PORTION OF EXISTING CURB, GUTTER AND SIDEWALK AS INDICATED ON PLAN.
AutoCAD SHX Text
16. CONSTRUCT 4" THICK P.C.C WALK PER CITY OF SAN BUENAVENTURA STD. DETAIL 102.
AutoCAD SHX Text
17. INSTALL SOLID YELLOW STRIPE WITH MARKERS PER DETAIL 25A OF CALTRANS STD. PLAN A20B.
AutoCAD SHX Text
19. CONSTRUCT MOD. DRIVEWAY PER CITY OF SAN BUENAVENTURA STD. DETAIL 104, W=8', X=6'.
AutoCAD SHX Text
22. CONSTRUCT 6" MOUNTABLE CURB PER DETAIL HEREON.
AutoCAD SHX Text
8. CONSTRUCT 6" P.C.C. CURB ONLY PER CITY OF SAN BUENAVENTURA STD. DETAIL 107.
AutoCAD SHX Text
24. INSTALL "NO PEDESTRIANS" BARRICADE SIGN R5-10c
AutoCAD SHX Text
25. CONSTRUCT ACCESS RAMP PER CITY OF SAN BUENAVENTURA DETAIL STD. 118.
AutoCAD SHX Text
26. EXISTING SCE VAULT TO REMAIN AND PROTECT IN PLACE. ADJUST COVER TO GRADE AND AWAY FROM CURB.
AutoCAD SHX Text
23. INSTALL REMOVABLE OR RETRACTABLE BOLLARDS
AutoCAD SHX Text
PER CALTRANS STD. PLAN A20B.
AutoCAD SHX Text
PER CALTRANS STD. PLAN A20D.
AutoCAD SHX Text
ANCHORS WAY
AutoCAD SHX Text
25
AutoCAD SHX Text
6"
AutoCAD SHX Text
BEG. CB & GUTTER
AutoCAD SHX Text
9
AutoCAD SHX Text
END CB & GUTTER
AutoCAD SHX Text
END CB & GUTTER
AutoCAD SHX Text
BEG. CB & GUTTER
AutoCAD SHX Text
9
AutoCAD SHX Text
12. CONSTRUCT 4" THICK A.C. PAVEMENT ON 6" BASE. FINAL THICKNESS TO BE DETERMINED BY GEOTECHNICAL ENGINEER.
AutoCAD SHX Text
27. INSTALL 4" YELLOW STRIPE LINE PER DETAIL 25A AS SHOWN. PER CALTRANS STD. PLAN A20B.
AutoCAD SHX Text
29. EXISTING CROSS GUTTER TO REMAIN.
AutoCAD SHX Text
29
AutoCAD SHX Text
BEG. IMPROVEMENTS
AutoCAD SHX Text
END IMPROVEMENTS
AutoCAD SHX Text
5
AutoCAD SHX Text
5
AutoCAD SHX Text
30. INSTALL 6 FT CHAIN LINK FENCE. SEE SECTION B HEREON
AutoCAD SHX Text
30
AutoCAD SHX Text
30
AutoCAD SHX Text
31. REMOVE EXISTING CHAIN LINK FENCE.
AutoCAD SHX Text
31
AutoCAD SHX Text
BY TRAFFICGUARD OR SIMILAR, SEE DETAIL ON SHEET 2.
AutoCAD SHX Text
AND EXISTING LANDSCAPE LIGHT.
AutoCAD SHX Text
32. EXTEND EXISTING DRIVEWAY TO PROPOSED CURB
AutoCAD SHX Text
32
AutoCAD SHX Text
33. EXISTING STREET LIGHT TO REMAIN
AutoCAD SHX Text
33
AutoCAD SHX Text
36
AutoCAD SHX Text
SAWCUT AND JOIN (TYP)
AutoCAD SHX Text
34. SAWCUT AND JOIN
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
34
AutoCAD SHX Text
35. CONSTRUCT 6" THICK P.C.C. PAVEMENT ON 4" BASE FINAL THICKNESS TO BE DETERMINED BY GEOTECHNICAL ENGINEER.
AutoCAD SHX Text
35
AutoCAD SHX Text
28. INSTALL 4" SOLID WHITE LIMIT LINE STRIPE PER DETAIL 38A AS SHOWN. PER CALTRANS STD. PLAN A20B.
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
AutoCAD SHX Text
B
AutoCAD SHX Text
PROP. CLF
AutoCAD SHX Text
STA: 24+12.19 E.C.
AutoCAD SHX Text
C18
AutoCAD SHX Text
PROP. R/W
AutoCAD SHX Text
PROP. STREET IMPROVEMENTS
AutoCAD SHX Text
PROP. R/W
AutoCAD SHX Text
(14.8) TC-JOIN
AutoCAD SHX Text
HP
AutoCAD SHX Text
HP
AutoCAD SHX Text
36. CONSTRUCT 20' WIDE DRIVEWAY PER CITY OF SAN BUENAVENTURA STD. DETAIL 104.
AutoCAD SHX Text
STA: 24+70.21
AutoCAD SHX Text
C/L 20' WIDE DRIVEWAY OPENING
AutoCAD SHX Text
33
Page 6: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

DRAFTCONC. WALK

WVWV

WVWV

CONC. WALK

CONC. WALK

CONC. WALKCONC. WALKDWY.

DWY.

DWY.DWY. DWY.

DWY.DWY.DWY.DWY.DWY.DWY.DWY.

DWY.DWY.

DWY.DWY.

DWY. DWY.

DWY. DWY. DWY.

DWY.DWY.

DWY.

DWY.

DWY.

DWY.

CO

NC

. W

ALK

CO

NC

. W

ALK

CO

NC

. W

ALK

CO

NC

. W

ALK

DWY.

DWY.

WVWV

CO

NC

. W

ALK

CO

NC

. W

ALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC

. WAL

K

CONC

. WAL

K

CONC

. WAL

K

CONC

. WAL

K

SEWER VAULT

CONC. WALK

CONC. WALK

WVWV

WVWV

CONC. WALK

CONC. WALK

CONC. WALKCONC. WALKDWY.

DWY.

DWY.DWY. DWY.

DWY.DWY.DWY.DWY.DWY.DWY.DWY.

DWY.DWY.

DWY.DWY.

DWY. DWY.

DWY. DWY. DWY.

DWY.DWY.

DWY.

DWY.

DWY.

DWY.

CO

NC

. W

ALK

CO

NC

. W

ALK

CO

NC

. W

ALK

CO

NC

. W

ALK

DWY.

DWY.

WVWV

CO

NC

. W

ALK

CO

NC

. W

ALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

CONC

. WAL

K

CONC

. WAL

K

CONC

. WAL

K

CONC

. WAL

K

SEWER VAULT

CONC. WALK

40'

DESCRIPTIONREV.

PUBLIC WORKS DEPARTMENT LAND DEVELOPMENT DIVISION

DRN. BY: DES. BY: CK'D BY:

R.C.E. NUMBER DATE

SID# SHEET FILE NO.OF

CK'D APP DATE

CITY ENGINEER R.C.E. NUMBER DATE

JN: 2013018

1972 2015-D-025

DATE: 02-02-18

CITY TRANSPORTATION MANAGER

SPEEDBUMPSAHEAD

20 MPH

NOT ATHROUGHSTREET

NO ACCESSTO

VENTURAHARBOR

USEHARBOR BLVD

ACCESSTO

VENTURAHARBOR

NO ACCESSTO

HARBOR BLVD

ACCESS

TOHARBOR

BLVD

ATTACHMENT 1

AutoCAD SHX Text
WATER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
8.71
AutoCAD SHX Text
54
AutoCAD SHX Text
HV
AutoCAD SHX Text
15
AutoCAD SHX Text
12.5
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
15
AutoCAD SHX Text
15
AutoCAD SHX Text
2.5
AutoCAD SHX Text
5
AutoCAD SHX Text
7.5
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
5
AutoCAD SHX Text
2.5
AutoCAD SHX Text
12.5
AutoCAD SHX Text
15
AutoCAD SHX Text
15
AutoCAD SHX Text
DECK
AutoCAD SHX Text
27
AutoCAD SHX Text
28
AutoCAD SHX Text
5'
AutoCAD SHX Text
11'
AutoCAD SHX Text
12'
AutoCAD SHX Text
12'
AutoCAD SHX Text
WATER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
8.71
AutoCAD SHX Text
54
AutoCAD SHX Text
HV
AutoCAD SHX Text
15
AutoCAD SHX Text
12.5
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
15
AutoCAD SHX Text
15
AutoCAD SHX Text
2.5
AutoCAD SHX Text
5
AutoCAD SHX Text
7.5
AutoCAD SHX Text
10
AutoCAD SHX Text
10
AutoCAD SHX Text
5
AutoCAD SHX Text
2.5
AutoCAD SHX Text
12.5
AutoCAD SHX Text
15
AutoCAD SHX Text
15
AutoCAD SHX Text
DECK
AutoCAD SHX Text
SEAFARER STREET
AutoCAD SHX Text
BEACHMONT
AutoCAD SHX Text
SEAVIEW
AutoCAD SHX Text
STREET
AutoCAD SHX Text
SEASHELL AVENUE
AutoCAD SHX Text
OUTRIGGER
AutoCAD SHX Text
AVE
AutoCAD SHX Text
OYSTER DRIVE
AutoCAD SHX Text
DOLPHIN CT.
AutoCAD SHX Text
SEAL CT.
AutoCAD SHX Text
BONITA CT.
AutoCAD SHX Text
HARBOR BLVD
AutoCAD SHX Text
27
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
STOP
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
BUMP
AutoCAD SHX Text
H
AutoCAD SHX Text
Y
AutoCAD SHX Text
D
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
STOP
AutoCAD SHX Text
NEW SPEED CUSHION (TYP.) PER CA. MUTCD OPTION A
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
100'
AutoCAD SHX Text
200'
AutoCAD SHX Text
SCALE 1"=100'
AutoCAD SHX Text
SEE SHEET 3
AutoCAD SHX Text
INDEX MAP
AutoCAD SHX Text
TRAFFIC CALMING IMPROVEMENTS
AutoCAD SHX Text
4
AutoCAD SHX Text
6
AutoCAD SHX Text
EXISTING SPEED CUSHIONS TO BE UPGRADED
AutoCAD SHX Text
NEW SPEED CUSHION (TYP.) PER CA. MUTCD OPTION A
AutoCAD SHX Text
NEW SPEED CUSHION (TYP.) PER CA. MUTCD OPTION A
AutoCAD SHX Text
NEW SPEED CUSHION (TYP.) PER CA. MUTCD OPTION A
AutoCAD SHX Text
CITY OF SAN BUENAVENTURA
AutoCAD SHX Text
VENTURA HARBOR
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
No. 41729
AutoCAD SHX Text
Exp. 3-31-18
AutoCAD SHX Text
RAMY F. AWAD-RCE. No. 41729 DATE
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
LAND PLANNING
AutoCAD SHX Text
(626) 446-6566
AutoCAD SHX Text
(626) 446-4449
AutoCAD SHX Text
FAX:
AutoCAD SHX Text
TEL:
AutoCAD SHX Text
20 E. FOOTHILL BLVD., STE 230 ARCADIA, CA 91006-2375
AutoCAD SHX Text
NEW SPEED CUSHION (TYP.) PER CA. MUTCD OPTION A
AutoCAD SHX Text
NEW SIGNAGE TO BE APPROVED BY THE CITY TRANSPORTATION MANAGER PRIOR TO FABRICATION AND INSTALLATION.
AutoCAD SHX Text
X
AutoCAD SHX Text
2. EXISTING WATER VALVE TO BE ADJUSTED TO GRADE.
AutoCAD SHX Text
1. EXISTING WATER VALVE TO PROTECT IN PLACE.
AutoCAD SHX Text
3. RELOCATE EXISTING FIRE HYDRANT AS SHOWN PER CITY OF SAN BUENAVENTURA STD. DETAIL 020.
AutoCAD SHX Text
EXISTING 8' WATER MAIN
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
40'
AutoCAD SHX Text
80'
AutoCAD SHX Text
SCALE 1"=20'
AutoCAD SHX Text
EXISTING 12' WATER MAIN
AutoCAD SHX Text
DETAIL "B"
AutoCAD SHX Text
DETAIL "A"
AutoCAD SHX Text
DETAIL "A"
AutoCAD SHX Text
DETAIL "E"
AutoCAD SHX Text
DETAIL "A" & "D"
AutoCAD SHX Text
DETAIL "C"
AutoCAD SHX Text
DETAIL "A"
AutoCAD SHX Text
DETAIL "A"
AutoCAD SHX Text
DETAIL "A"
AutoCAD SHX Text
DETAIL "A" & "B"
AutoCAD SHX Text
4.INSTALL STOP SIGN AHEAD SIGN AND POSTINSTALL STOP SIGN AHEAD SIGN AND POST
AutoCAD SHX Text
SEE DETAIL HEREON.
Page 7: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

DRAFT

CONC. WALK

CONC. WALK

CONC. WALK DWY. DWY.

DWY.DWY.DWY.DWY.DWY.

CO

NC

. W

ALK

CO

NC

. W

ALK

CONC. WALK

CONC. WALK

CONC. WALK DWY. DWY.

DWY.DWY.DWY.DWY.DWY.

CO

NC

. W

ALK

CO

NC

. W

ALK

DWY. DWY.

DWY.DWY.

DWY.

WVWV

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

DWY. DWY.

DWY.DWY.

DWY.

WVWV

CONC. WALK

CONC. WALK

CONC. WALK

CONC. WALK

WVWV

WVWV

CONC. WALKDWY.DWY. DWY.

DWY.DWY.DWY.

SEWER VAULT

CONC. WALK

WVWV

WVWV

CONC. WALKDWY.DWY. DWY.

DWY.DWY.DWY.

SEWER VAULT

CONC. WALK

DESCRIPTIONREV.

PUBLIC WORKS DEPARTMENT LAND DEVELOPMENT DIVISION

DRN. BY: DES. BY: CK'D BY:

R.C.E. NUMBER DATE

SID# SHEET FILE NO.OF

CK'D APP DATE

CITY ENGINEER R.C.E. NUMBER DATE

JN: 2013018

1972 2015-D-025

CITY TRANSPORTATION MANAGER

DATE: 02-02-18

ATTACHMENT 1

AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
AHEAD
AutoCAD SHX Text
STOP
AutoCAD SHX Text
STOP
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
STOP
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
CITY OF SAN BUENAVENTURA
AutoCAD SHX Text
VENTURA HARBOR
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
No. 41729
AutoCAD SHX Text
Exp. 3-31-18
AutoCAD SHX Text
RAMY F. AWAD-RCE. No. 41729 DATE
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
LAND PLANNING
AutoCAD SHX Text
(626) 446-6566
AutoCAD SHX Text
(626) 446-4449
AutoCAD SHX Text
FAX:
AutoCAD SHX Text
TEL:
AutoCAD SHX Text
20 E. FOOTHILL BLVD., STE 230 ARCADIA, CA 91006-2375
AutoCAD SHX Text
10+54.90
AutoCAD SHX Text
13+15.14
AutoCAD SHX Text
INTERSECTION DETAILS
AutoCAD SHX Text
STREET CL
AutoCAD SHX Text
STREET CL
AutoCAD SHX Text
5
AutoCAD SHX Text
6
AutoCAD SHX Text
SCALE: 1"=30'
AutoCAD SHX Text
2
AutoCAD SHX Text
2+32.50
AutoCAD SHX Text
STREET CL
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
NOTES: 1. RE-STRIP EXISTING CROSS WALKS PER CITY STANDARDS 2. REMOVE CONFLICTING STRIPING AND SIGNS. 3. RAISED SPEED CUSHIONS MAY CAUSE WATER PONDING/FLOODING UPSTREAM OF INTERSECTIONS AND DRIVEWAY DURING RAIN EVENTS.
AutoCAD SHX Text
EX. STOP SIGN
AutoCAD SHX Text
EX. CROSS WALK
AutoCAD SHX Text
EX. CROSS WALK
AutoCAD SHX Text
EX. STOP SIGN
AutoCAD SHX Text
EX. CATCH BASIN
AutoCAD SHX Text
CONSTRUCTION NOTES: 1. R-1 "STOP" SIGN WHERE INDICATED ON PLAN. R-1 "STOP" SIGN WHERE INDICATED ON PLAN. 2. STRIPE CROSS WALK PER DETAIL HEREON. STRIPE CROSS WALK PER DETAIL HEREON. 3. CONSTRUCT ACCESS RAMP PER CITY OF SAN BUENAVENTURA CONSTRUCT ACCESS RAMP PER CITY OF SAN BUENAVENTURA DETAIL STD. 118.
AutoCAD SHX Text
X
AutoCAD SHX Text
TYP
AutoCAD SHX Text
EX. CROSS WALK
AutoCAD SHX Text
EX. CROSS WALK
AutoCAD SHX Text
EX. STOP SIGN
AutoCAD SHX Text
EX. CROSS WALK
AutoCAD SHX Text
2
AutoCAD SHX Text
TYP
AutoCAD SHX Text
RELOCATE EX. STOP SIGN
AutoCAD SHX Text
NTS
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
10'X2' THERMOPLASTIC WHITE MARKINGS
AutoCAD SHX Text
EX. STOP SIGN
AutoCAD SHX Text
2
AutoCAD SHX Text
TYP
AutoCAD SHX Text
3
AutoCAD SHX Text
3
AutoCAD SHX Text
RELOCATE EX. CROSSWALK SIGN
AutoCAD SHX Text
2
Page 8: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

DRAFTDESCRIPTIONREV.

PUBLIC WORKS DEPARTMENT LAND DEVELOPMENT DIVISION

DRN. BY: DES. BY: CK'D BY:

R.C.E. NUMBER DATE

SID# SHEET FILE NO.OF

CK'D APP DATE

CITY ENGINEER R.C.E. NUMBER DATE

JN: 2013018

1972 2015-D-025

CITY TRANSPORTATION MANAGER

DATE: 02-02-18

VENTURA HARBORPATROL RESORT

BEACHMONTSTREET

(NORETURN)

HARBOR BLVD

VENTURA HARBORPATROL RESORT

BEACHMONTSTREET

(NORETURN)

EXIT TO

ATTACHMENT 1

AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
WATER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
DECK
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
5'
AutoCAD SHX Text
11'
AutoCAD SHX Text
5'
AutoCAD SHX Text
12'
AutoCAD SHX Text
12'
AutoCAD SHX Text
12'
AutoCAD SHX Text
12'
AutoCAD SHX Text
11'
AutoCAD SHX Text
11'
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
WATER
AutoCAD SHX Text
WATER
AutoCAD SHX Text
PIPE
AutoCAD SHX Text
DECK
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
0
AutoCAD SHX Text
0
AutoCAD SHX Text
30'
AutoCAD SHX Text
60'
AutoCAD SHX Text
STRIPING DETAILS
AutoCAD SHX Text
6
AutoCAD SHX Text
SCALE: 1"=30'
AutoCAD SHX Text
6
AutoCAD SHX Text
CITY OF SAN BUENAVENTURA
AutoCAD SHX Text
VENTURA HARBOR
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
S
AutoCAD SHX Text
T
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
E
AutoCAD SHX Text
D
AutoCAD SHX Text
P
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
E
AutoCAD SHX Text
S
AutoCAD SHX Text
S
AutoCAD SHX Text
I
AutoCAD SHX Text
O
AutoCAD SHX Text
N
AutoCAD SHX Text
A
AutoCAD SHX Text
L
AutoCAD SHX Text
E
AutoCAD SHX Text
N
AutoCAD SHX Text
G
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
E
AutoCAD SHX Text
E
AutoCAD SHX Text
R
AutoCAD SHX Text
A
AutoCAD SHX Text
I
AutoCAD SHX Text
N
AutoCAD SHX Text
R
AutoCAD SHX Text
O
AutoCAD SHX Text
F
AutoCAD SHX Text
I
AutoCAD SHX Text
L
AutoCAD SHX Text
A
AutoCAD SHX Text
C
AutoCAD SHX Text
F
AutoCAD SHX Text
O
AutoCAD SHX Text
E
AutoCAD SHX Text
T
AutoCAD SHX Text
A
AutoCAD SHX Text
T
AutoCAD SHX Text
S
AutoCAD SHX Text
L
AutoCAD SHX Text
I
AutoCAD SHX Text
V
AutoCAD SHX Text
I
AutoCAD SHX Text
C
AutoCAD SHX Text
No. 41729
AutoCAD SHX Text
Exp. 3-31-18
AutoCAD SHX Text
RAMY F. AWAD-RCE. No. 41729 DATE
AutoCAD SHX Text
SURVEYING
AutoCAD SHX Text
CIVIL ENGINEERING
AutoCAD SHX Text
LAND PLANNING
AutoCAD SHX Text
(626) 446-6566
AutoCAD SHX Text
(626) 446-4449
AutoCAD SHX Text
FAX:
AutoCAD SHX Text
TEL:
AutoCAD SHX Text
20 E. FOOTHILL BLVD., STE 230 ARCADIA, CA 91006-2375
AutoCAD SHX Text
ANCHORS WAY
Page 9: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

BOARD OF PORT COMMISSIONERS

FEBRUARY 28, 2018

STANDARD AGENDA ITEM 2 APPROVAL OF 2018

AQUACULTURE SEA GRANT

Page 10: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

VENTURA PORT DISTRICT STANDARD AGENDA ITEM 2 BOARD COMMUNICATION Meeting Date: February 28, 2018 TO: Board of Port Commissioners FROM: Brian Pendleton, Deputy General Manager SUBJECT: Approval of 2018 Aquaculture Sea Grant

RECOMMENDATION: That the Board of Port Commissioners authorize the General Manager to submit the application for NOAA Sea Grant 2018 for two-year funding of approximately $300,000 with a District and VSE partners match of approximately $277,210 of in-kind contribution. SUMMARY: NOAA National Sea Grant College Program (NOAA Sea Grant) expects to have available a total of $7,000,000 to $11,500,000 across fiscal years 2018, 2019 and 2020 as part of the Sea Grant National Aquaculture Initiative (NAI). As part of the NAI, this competition is designed to foster the expansion of a sustainable U.S. ocean, coastal and Great Lakes aquaculture sector by addressing one or more of the following priorities identified below. This application for grant funds will be for a two year period beginning September 1, 2018 to August 31, 2020 and is competitive in nature. This dovetails with the District’s efforts as it relates to the sub-award from a NOAA 2015 Sea Grant Aquaculture Extension and Technology Transfer Grant that provides for strategic permitting and planning initiative to facilitate and substantially increase shellfish farming in the Santa Barbara Channel. The current grant concludes August 31, 2018. BACKGROUND: NAI Priorities include:

• (a) supporting the development of emerging systems or technologies that will advance aquaculture in the U.S., including projects that will help stimulate aquaculture production by nascent industries;

• (b) developing and implementing actionable methods of communicating accurate, science based messages and information about the benefits and risks of U.S. marine aquaculture to the public; and

• (c) increasing the resiliency of aquaculture systems to natural hazards and changing conditions.

In 2015, VPD received a Sea Grant Aquaculture Extension sub-award of $265,000 that provided financial support for: Task 1, preparation of a strategic plan for permitting the project; Task 2, preparation of all required permit and entitlement applications and environmental impact documentation for open federal waters proximate to Ventura Harbor; and Task 3, an educational outreach component, including eight public workshops. Task 1 and 3 are complete. Task 2 will be completed by August 2018 consistent with Sea Grant requirements. Moving the project forward to harvested product, the project objectives and methods (Tasks 4-8) as defined further below. The objectives of this project proposal are to:

• Develop a technically sound and defensible strategy to successfully obtain all required government entitlements necessary to establish twenty 100-acre aquaculture permits sites in federal waters of the Santa Barbara Channel, proximate to Ventura Harbor;

Page 11: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

• Implement this strategy and obtain the necessary permits and entitlements, and complete associated environmental review documents;

• Develop an effective monitoring and reporting program to monitor environmental impacts and evaluate project progress;

• Collaborate with NOAA and the Food and Drug Administration (FDA) to ensure future landed product has a pathway for compliance with the National Shellfish Sanitation Program (NSSP) and Seafood Sanitation Inspection Program (SSIP) guidelines for shellfish grown in federal waters;

• Offer economies of scale to individual grower/producers to facilitate the participation of entities who might otherwise be precluded because of the significant regulatory process and costs associated with obtaining the required government approvals; and,

• Prepare grower/producers for successful farming of the growing areas through business planning, training, and technology transfer.

The specific grant activities planned to achieve these objectives within two years and begin farming Mediterranean mussels through individual grower/producer’s permits are outlined in the attached final draft project description and budget justification. FISCAL IMPACT: The grant includes a cost-share in the amount of $277,210 over a two-year period. The cost-share is achieved through in-kind contributions of the Port District as well as VSE partners. The VSE project budget was included in the FY 2017-18 mid-year budget presented on February 14, 2018. ATTACHMENT: Attachment 1 - Project Description Attachment 2 - Budget Justification Attachment 3 - Collaborators List

Page 12: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Title: Ventura Shellfish Enterprise: Implementing an Integrative Model for New Shellfish Aquaculture Permitting and Production in California Grant: 2018 NOAA Sea Grant Proposal Increasing the supply of safe, sustainably produced domestic seafood is a priority for NOAA and the Department of Commerce. The Ventura Shellfish Enterprise (VSE) is a multi-stakeholder initiative that seeks to permit and manage a commercial bivalve shellfish aquaculture operation consistent with this objective. Globally, bivalve shellfish culture has been very successful in producing high value seafood with limited environmental impacts. However, the current complexities and costs associated with the aquaculture permitting process represent a significant barrier to expansion of the industry in the US, and in California particularly. VSE seeks to address several regulatory and planning challenges that effectively limit the development of domestic marine shellfish culture. In 2015, VPD received a Sea Grant Aquaculture Extension sub-award of $265,000 that provided financial support for: Task 1, preparation of a strategic plan for permitting the project; Task 2, preparation of all required permit and entitlement applications and environmental impact documentation for open federal waters proximate to Ventura Harbor; and Task 3, an educational outreach component, including eight public workshops. Task 1 and 3 are complete. Task 2 will be completed by August 2018 consistent with Sea Grant requirements. Moving the project forward to harvested product, the project objectives and methods (Tasks 4-8) as defined further below. Project Objectives The objectives of this project proposal are to:

• Develop a technically sound and defensible strategy to successfully obtain all required government entitlements necessary to establish twenty 100-acre aquaculture permits sites in federal waters of the Santa Barbara Channel, proximate to Ventura Harbor;

• Implement this strategy and obtain the necessary permits and entitlements, and complete associated environmental review documents;

• Develop an effective monitoring and reporting program to monitor environmental impacts and evaluate project progress;

• Collaborate with NOAA and the Food and Drug Administration (FDA) to ensure future landed product has a pathway for compliance with the National Shellfish Sanitation Program (NSSP) and Seafood Sanitation Inspection Program (SSIP) guidelines for shellfish grown in federal waters;

• Offer economies of scale to individual grower/producers to facilitate the participation of entities who might otherwise be precluded because of the significant regulatory process and costs associated with obtaining the required government approvals; and,

• Prepare grower/producers for successful farming of the growing areas through business planning, training, and technology transfer.

The specific grant activities planned to achieve these objectives within two years and begin farming Mediterranean mussels through individual grower/producer’s permits are outlined below: Project Methods Task 4: Permit Assignment Strategy This Project is scaled to bolster the working waterfront in Ventura Harbor, providing economic benefits to VPD, its tenants, and the community, thus ensuring the long-term economic viability

ATTACHMENT 1

Page 13: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

of the Harbor. The scale of the Project also allows the individual grower/producers to benefit from centralized environmental monitoring, product safety testing, and product marketing. The project will be the first of its kind in California to develop an offshore aquaculture permit with NOAA that authorizes assignment of sub-permits to individual shellfish grower/producers. A key part of the project will be drafting and negotiation of permit terms that contemplate this unique situation, with the goal of developing a template that can be used to support by similar aquaculture projects located in federal waters and hosted future by ports or governmental entities in the future. To complete the entitlement process and secure all necessary permits, we propose the following subtasks as part of this 2018 Sea Grant application. Subtask 4.1: Develop Permit Terms After submission of permit applications and draft master permit, Plauché & Carr LLP and VPD will work with the lead federal agency (e.g. USACE or NOAA) to craft permit terms for the master permit that are acceptable to the parties. As noted above, one goal will be to develop a permit template that can be replicated for other offshore aquaculture projects in federal waters where the permitee is a government agency. Plauche & Carr LLP will serve as VPD’s legal counsel, and the following staff will be involved in this task: Robert Smith Esq., Brian Pendleton, Richard Parsons and Everard Ashworth

Costs for Subtask 4.1: $25,000 (2018); $10,000 (2019)

SUBTASK 4.2: Drafting and Approval of Sub-Permits

The Project contemplates that while VPD will hold the master permit, it will separately execute sub-permits with individual shellfish growers/producers who will operate within the project area. The lead federal agency must approve the form of any such sub-permits entered into by VPD; however, NOAA currently does not have a template or precedent for approving sub-permit agreements. Plauché & Carr LLP and VPD will work with the lead federal agency to develop a common sub-permit agreement that can be used to sub-permit individual plots within the project area. Plauche & Carr LLP will serve as VPD’s legal counsel, and the following staff will be involved in this task: Robert Smith Esq., Brian Pendleton, Richard Parsons and Everard Ashworth

Costs for Subtask 4.2: $5,000 (2018); $10,000 (2019)

SUBTASK 4.3: Legal Analysis of Supplemental Environmental Review VPD legal counsel Plauché & Carr LLP will work with VPD, its environmental consultant DUDEK and the lead federal agency and to provide legal analysis of any supplementary environmental documentation (e.g. supplemnetal studies, reports, surveys, etc.) required during the permitting and entitlement process.

Costs for Subtask 4.3: $10,000 (2018); $0 (2019) ANNUAL COSTS FOR Task 4: 2018 - $40,000, 2019 - $20,000; COMBINED TOTAL Task 4 COSTS: $60,000

ATTACHMENT 1

Page 14: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Task 5: Environmental Review The overall VSE project objectives are for VPD to obtain permits and entitlements for twenty, 100-acre shellfish aquaculture sites in federal waters within the Santa Barbara Channel; assign sites to individual grower producers via sub-permits; establish best management practices for commercial grower/producers; coordinate comprehensive monitoring and reporting for all permits; and leverage existing underutilized onshore facilities at Ventura Harbor for processing and shipping the shellfish product. Submission of permit applications to the applicable state and federal regulatory agencies will be completed by August 2018 under VSE existing 2015 Sea Grant (Task 2). VPD will submit applications for the following permits and environmental clearances:

• U.S. Army Corps of Engineers Individual Permit (pursuant to Section 10 of the Rivers and Harbors Act);

• National Marine Fisheries Service and U.S. Fish and Wildlife Service Biological Opinions (pursuant to Section 7 of the Endangered Species Act and Magnuson-Stevens Fishery Conservation and Management Act);

• U.S. EPA 401 Water Quality Certification (pursuant to Section 401 of the Clean Water Act);

• U.S. Coast Guard Private Aid to Navigation Permit; and, • California Coastal Commission Consistency Certification (pursuant to the Coastal Zone

Management Act). To complete the entitlement process and secure all necessary permits, we propose the following subtasks as part of this 2018 Sea Grant application through VSE project collaborators as well as Dudek, the environmental consultant for the VSE project. Subtask 5.1: Environmental Reports and Studies Dudek will identify necessary supplemental studies, reports and documentation as required by federal and state regulators prior to permit issuance. This work is being performed in close coordination with Diane Windham, the VSE team’s NOAA Aquaculture Coordinator, and NOAA staff. This subtask will include preparation of sampling protocols and study plans and consultation with the agencies to obtain concurrence on the methods and scope of the studies. We anticipate the required studies will include a pre-project benthic survey of the proposed project site to confirm the substrate type and biota, as well as a water quality sampling plan to determine ambient conditions within the project area.

Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, John Davis, Andrea Dransfield, Amber Geraghty, Richard Parsons, Brooke Ashworth, Doug Bush, Everard Ashworth.

Costs for Subtask 5.1: $22,100 (2018); $0 (2019) Subtask 5.2: Meetings and Agency Coordination

Recent aquaculture projects in California struggled for several years to obtain permits once applications were filed. Consistent project coordination and guidance throughout the permitting process is extremely important to ensure that permits are issued in a timely manner with appropriate conditions and mitigation measures that balance any environmental concerns with

ATTACHMENT 1

Page 15: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

the operational needs of the project. In close coordination with Diane Windham, our regional NOAA aquaculture coordinator, Dudek will work with VPD, relevant stakeholder groups, and regulatory agency team members to conduct permit application follow-up in a thorough manner to smooth review and prevent disrupting of the anticipated project schedule. This requires thoughtful and diligent coordination with the agencies from application submittal through permit issuance to obtain permits within an appropriate timeframe. This coordination and continuous feedback from the agencies will be critical to successfully identify the necessary data requirements for timely permitting process completion.

This task will include handling administrative functions (e.g., notification of participants, scheduling, coordination of meeting location), technical functions, such as preparation of meeting materials (e.g., meeting agendas, presentations, hand-outs), and preparation of pre-meeting briefings and meeting minutes. It is critical that the meetings are efficient and productive and have measurable outcomes; Dudek will facilitate and guide discussions to stay on topic. Dudek will also provide technical and policy support for VPD as needed.

Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, David Wickens, John Davis, Amber Geraghty, Brian Pendleton, Richard Parsons, Everard Ashworth.

Cost for Subtask 5.2: $20,000 (2018); $10,800 (2019)

Subtask 5.3: Finalize List of BMPs

Dudek, with the assistance of VSE collaborators and in close coordination with Diane Windham, our NOAA regional aquaculture coordinator, will develop a list of resource protection measures, including best management practices (BMPs) that will avoid and minimize impacts on the aquatic environment. These BMPs will be an important component of regulatory agency approval of the project, and will include measures related to minimizing impacts on marine mammals and other aquatic wildlife, carrying capacity, seed supply, sediment quality, predator and wildlife interactions, and storage and disposal of aquaculture gear. The BMPs will be incorporated in project permit conditions and/or mitigation measures. The goal of the project is to develop a standardized, predictable list of BMPs that can be used in the future for other shellfish aquaculture projects, thereby facilitating sustainable growth of the aquaculture industry nationally in a manner that minimizes environmental impacts.

Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, David Wickens, John Davis, Andrea Dransfield, Amber Geraghty, Melis Okter, Brooke Ashworth, Doug Bush, Dr. Linda Santschi, Dr. Ralph Imondi.

Cost for Subtask 5.3: $18,450 (2018); $0 (2019)

Subtask 5.4: Coordinate and Draft Permit Language and Permit Special Conditions

ATTACHMENT 1

Page 16: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Often, regulatory agencies are short-staffed and have a backlog of permit applications to evaluate. This, coupled with a lack of experience processing open water aquaculture applications can lead to delays in permit processing and issuance. One way to increase the efficiency of permit review is through providing the agencies with draft permit language and a list of proposed permit special conditions during the permit application review process. In close coordination with Diane Windham, NOAA Regional Aquaculture Coordinator, and VSE team members, Dudek will draft appropriate permit language for submittal to the agencies such as a complete project description, identification of avoidance and minimization measures, and the project’s monitoring plan. Dudek will also provide a list of proposed special conditions to the agencies, using pre-established language and requirements as much as possible. We anticipate Subtask 5.4 will begin in September 2018 and have an anticipated completion date of August 2019.

Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, David Wickens, John Davis, Andrea Dransfield, Amber Geraghty, Melis Okter, Brian Pendleton, Richard Parsons, Doug Bush, Brooke Ashworth, Everard Ashworth.

Cost for Subtask 5.4: $24,400 (2018): $0 (2019)

Subtask 5.5: Draft or Review Monitoring Plans

Given the dearth of offshore shellfish aquaculture on the Pacific coast, there are certain issues where the resource agencies may request monitoring to confirm whether the project has an environmental impact. Dudek together with VSE team members, and in close coordination with Diane Windham, NOAA regional aquaculture coordinator, will assist with developing any required monitoring plan(s) to be carried out during project implementation. The monitoring program(s) and protocols will be vetted with input and coordination among VSE’S NOAA aquaculture coordinator and the appropriate regulatory agencies and will include data sampling requirements and reporting requirements such as timing of annual reports. It is currently anticipated that monitoring will include an evaluation of the project’s potential impacts on: (1) the seafloor and benthic environment beneath and in the vicinity of project facilities; (2) wildlife interactions with the project; and (3) impacts of marine debris such as lost and broken fishing gear. We anticipate Subtask 5.5 will begin in September 2018 and have an anticipated completion date of August 2019. Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, David Wickens, John Davis, Andrea Dransfield, Amber Geraghty, Melis Okter, Doug Bush, Brooke Ashworth, Everard Ashworth, Richard Parsons.

Cost for Subtask 5.5: $23,660 (2018); $0 (2019)

TOTAL COST FOR Task 5: 2018 - $108,610, 2019 - $10,800; COMBINED TOTAL: $119,410

Task 6: Shellfish Sanitation

ATTACHMENT 1

Page 17: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Recognized by the U. S. Food and Drug Administration (FDA) and the Interstate Shellfish Sanitation Conference, the National Shellfish Sanitation Program (NSSP) is the federal/state cooperative program for the sanitary control of all bivalve shellfish that is cultivated, harvested, and processed for human consumption. The NSSP establishes standards and administrative practices necessary to regulate interstate shellfish commerce and to protect consumer public health. These standards are published in the NSSP Guide for the Control of Molluscan Shellfish1, which articulates both pre- and post-harvest elements of sanitation compliance. At present, the NSSP Guide does not explicitly cover requirements and standards for the sanitary control of shellfish harvested from federal waters, which has impeded the harvest of shellfish from federal waters. To address this deficiency, the NOAA Seafood Inspection Program (NOAA-SIP), in collaboration with the FDA, is now developing an NSSP sanitation compliance pathway for entities seeking to grow shellfish in federal waters (where there is no state jurisdiction by the California Department of Public Health (CDPH)). This pathway includes the articulation of auditing procedures, testing requirements/protocols, and procedures for product traceability. Given the proposed VSE project’s shift in emphasis to a federal siting alternative, VSE team members at Coastal Marine Biolabs (CMB) are now working with NOAA-SIP and FDA representatives to collaboratively develop and adapt these emerging sanitation protocols to meet the goals and needs of the VSE effort. Importantly, this collaborative effort to explicitly articulate standard sanitation protocols for molluscan shellfish cultivated in federal waters will not only advance the overarching goals of the VSE project, but also facilitate the efforts of other groups seeking to establish shellfish aquaculture operations in federal waters. Coastal Marine Biolabs will provide the lead, the following staff would be involved in this task: Dr. Linda Santschi, Dr. Ralph Imondi, Doug Bush, Everard Ashworth Subtask 6.1: Coordinating a Growing Area Sanitary Survey with NOAA-SIP Representatives Our initial discussions with NOAA-SIP representatives have focused primarily on the process underlying the development and implementation of a sanitary survey of proposed VSE mussel growing sites. The survey constitutes a required component of NSSP sanitation compliance and includes a written evaluation of all environmental factors (including actual and potential pollution sources) that may impact water quality within a proposed growing area. Pursuant to the newly proposed protocols for bivalve shellfish cultivated in federal waters, NOAA-SIP inspectors (in consultation with FDA) will oversee the sanitary survey and assure that the number and location of sampling stations is sufficient to effectively evaluate all potential pollution sources within the growing area. Meteorological, hydrodynamic, and geographic attributes of the growing area will influence the location and number of required sampling stations. It bears noting here that the new protocols under joint development by NOAA-SIP and FDA will allow water sampling and microbiological testing associated with the sanitary survey to be initiated and performed in parallel with the project’s permit application process. This provision will significantly accelerate the overall progression of the VSE effort. CMB scientists have already engaged in extensive dialog with NOAA-SIP personnel to discuss water quality testing and sampling plan requirements encompassed by the sanitary survey. Throughout the two-year project performance period, CMB is committed to working collaboratively with representatives of NOAA-SIP, FDA, and any other relevant federal entities, to develop and implement an NSSP-compliant sampling plan for the proposed VSE growing area. The NSSP typically requires that a minimum of 30 water samples be collected for bacteriological analysis from each sample station, and that the samples be collected year-round under various environmental conditions to evaluate adverse pollution conditions (including seasonal variations). Assuming the simplest case scenario where each of the twenty proposed 100-acre growing sites contains a single sampling station, a minimum of 600 samples will be required to complete the sanitary survey. We anticipate that a sampling plan will be developed

ATTACHMENT 1

Page 18: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

in 2018, and that a sanitary survey will be initiated and conducted during 2019. Given unavoidable uncertainties at the time of this submission, funds requested in the relevant section of the project budget represent a reasonable estimate of the overall sampling and testing costs associated with the survey. Personnel performing Subtask 6.1 will be VSE members Dr. Ralph Imondi and Dr. Linda Santschi of Coastal Marine Biolabs. Cost for Subtask 6.1: $0 (2018); $39,000 (2019) Subtask 6.2: Establishing the Administrative and Technical Framework for a Locally Based, FDA-Approved Safety Testing Laboratory The safety of molluscan shellfish grown and harvested for human consumption is determined through specific microbiological and toxicological tests of shellfish meat and growing waters. These tests are performed by laboratories that receive FDA approval to support the NSSP (after demonstrating conformance with uniform standards and administrative practices during periodic onsite evaluations). It is important to emphasize here that the only laboratory in the state of California that is currently FDA approved to conduct biotoxin testing of shellfish cultivated for human consumption is operated by CDPH (Richmond, CA), which restricts its biotoxin analyses to samples obtained exclusively from state waters. This subtask seeks to establish the administrative and technical groundwork for a locally based, FDA-approved laboratory that is capable of accommodating the full range of NSSP testing and reporting requirements for mussels cultivated in (and harvested from) federal waters by VSE grower/producers. Representing the first of its kind in the state of California, this proposed commercial laboratory is intended to: (1) eliminate the cost of shipping samples to out-of-state laboratories for biotoxin testing; (2) minimize resulting delays in moving shellfish product through the supply chain; (3) centralize and streamline the reporting of VSE testing results to the relevant federal and state regulatory agencies (i.e., FDA, NOAA-SIP, CDPH); (4) establish a nexus for coordinating sanitation-related communications among VPD representatives, VSE grower/producers, testing lab personnel, regulatory agencies, patrol authorities, and other entities; (5) develop training materials, courses, and programs for new and existing grower/producers (refer to Task 7 below); and (6) perform standardized growing water sample collections and other low-cost ancillary services on behalf of VSE grower/producers. Beyond the VSE project, a laboratory of this kind could also accommodate the testing needs of other emerging shellfish aquaculture operations based in federal waters off the California coast. For start-up testing laboratories, the key initial steps in the FDA approval pathway include the selection of NSSP-compliant analytical methods that will be performed by lab personnel, the creation of detailed standard operating procedures that cover the day-to-day implementation of these technical methods (along with the performance of various administrative/managerial functions), and the development of a comprehensive quality assurance plan containing pre-specified components (e.g. descriptions of laboratory structure/organization, staff qualifications and training programs, analytical methods, quality control measures, record keeping for equipment maintenance and calibration, corrective actions for deficiencies noted during FDA evaluations, etc.). The successful completion of these steps will unfold in 2018 and 2019 through an iterative development process involving the input and guidance of FDA and NOAA-SIP representatives. We anticipate that by the end of the two-year grant performance period, the VSE team will have established the administrative and technical foundation required for FDA-approval of a testing laboratory that is capable of managing the anticipated testing workload of VSE grower/producers (and potentially other aquaculture entities) operating in federal waters off the California coast. The identification of space appropriate for accommodating this workload constitutes a related goal for this subtask that will be initiated in 2019 in consultation with VPD staff.

ATTACHMENT 1

Page 19: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

REFERENCES CITED IN THIS SECTION 1 National Shellfish Sanitation Program (NSSP) Guide for the Control of Molluscan Shellfish, 2015 Revision. Personnel performing Subtask 6.2 will be VSE members Dr. Ralph Imondi and Dr. Linda Santschi of Coastal Marine Biolabs.

Cost for Subtask 6.2: $0 (2018); $0 (2019) (In-Kind Contributions only) TOTAL COST for Task 6: $39,000 (2019) Task 7: Grower/Producer Compliance Training Program and Information Dissemination To maintain a robust working waterfront and commercial fishing industry based in Ventura, one of the goals of the VSE project is to diversify and stabilize seafood product landed at the port. The VSE project is designed to minimize constraints and barriers for entrepreneurs and existing seafood producers seeking to enter the aquaculture industry or expand current mussel farming operations. By permitting twenty, 100-acre growing parcels the VPD is assuming much of the initial risk associated with the permitting process. VPD, as master permit holder, will require sub-permit holders to adhere to all permit obligations and ensure ongoing compliance with regulatory agency requirements. To prepare grower/producers for this innovative approach, VSE will engage potential grower/producers to disseminate essential information related to federal permit requirements prior to commencement of commercial aquaculture operations. VSE members will host and facilitate a series of educational workshops intended to summarize permit compliance requirements; including but not limited to topics such as best management practices, shellfish safety and sanitation protocols, ongoing monitoring and reporting processes, insurance/bond requirements, etc. In addition, the VSE will prepare a set of manuals to serve as reference materials and supplement in-person instructional events. This task will ensure new entrants, and industry veterans alike, have access to information necessary to establish and manage a successful mussel farming operation in compliance with all VSE permit conditions. Coastal Marine Biolabs will provide the lead, the following staff would be involved in this task: Dr. Linda Santschi, Dr. Ralph Imondi, Scott Lindell, Blake Stok, Brian Pendleton, Brooke Ashworth. Subtask 7.1: Grower/Producer Outreach and Inclusion To secure grower/producer tentative commitments, VPD will undertake three main work streams: (1) research and identify prospective local, regional, national, and international grower/producers that are suitable candidates for participation in the VSE project; (2) provide direct engagement with potential grower/producers; (3) develop a VPD approved grower/producer application process. Work will begin in September 2018 with an anticipation completion date of August 2019. Coastal Marine Biolabs will provide the lead, the following staff would be involved in this task: Dr. Linda Santschi, Dr. Ralph Imondi, Scott Lindell, Blake Stok, Brian Pendleton, Brooke Ashworth. Cost for Subtask 7.1: $21,250 (2018); $0 (2019) Subtask 7.2: Curriculum and Materials Design VSE will build curriculum and supplemental materials that align with established objectives and requirements for grower/producers participating in the VSE project. Our team for this task has potential to address the needs of the US ocean aquaculture sector writ large. Training

ATTACHMENT 1

Page 20: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

resources will be digitized and deployed through a learning management system (LMS) that enables course content to be easily accessed, independent of time and location. The virtual classroom is designed to provide instructors, facilitators, and participants with access to a cost-effective platform which lends the ability to centralize learning materials, streamline communication and feedback mechanisms, and provide opportunities for interactive blended learning instruction that includes both online and in-person elements. A central component of the VSE training program is a module developed by CMB (see Task 6 reference) dedicated to protocols that cover both pre- and post-harvest elements of the NSSP Model Ordinance for bivalve shellfish cultivated in federal waters. Such a training model could be replicated by other projects nationally. Designing comprehensive instructional manuals and participant centered training workshops requires a thorough permit review to identify requisite information for inclusion. During this phase of the development process VPD and its VSE partners will host one or more design charrettes with environmental consultants, existing shellfish aquaculture operators, and select representatives from the grower/producer community unfamiliar with production protocols to define the scope and sequence of training activities and materials. The goal of this effort is to establish a cooperative climate for collaboration while selecting methods, materials, and resources for instruction. Coastal Marine Biolabs will provide the lead, the following staff would be involved in this task: Dr. Linda Santschi, Dr. Ralph Imondi, Scott Lindell, Blake Stok, Brian Pendleton, Brooke Ashworth.

Cost for Subtask 7.2: $0 (2018); $24,000 (2019) Subtask 7.3: Training Video Production Narrated field demonstrations (five in total) of mussel aquaculture tasks and certification procedures will be produced as supporting instructional resources to accompany written manual resources and used, in preparation of, and during the in-person workshop series. These videos will be digitally produced and housed on the learning management system to provide flexible access to information for VSE participants. In addition to providing training participants with information in an efficient and visually stimulating manner, these videos have the potential to be adopted as resources for offshore aquaculture projects beyond the VSE project. Video subject matter and topic themes will be chosen with reference to both the current VSE project and future federal waters shellfish aquaculture projects. CAPS Media will produce these assets.

Cost for Subtask 7.3: $0 (2018); $3,000 (2019) Subtask 7.4: Training and Certification The logistics of the proposed training and certification pathway (e.g., the timing and form of recruitment, program duration, host institution, instructor selection, assessment/performance rubrics/instruments, etc.) will be determined in parallel with the design of major program components, as described above. Implementation of the program is dependent on the timing of issuance of required aquaculture permits. The training and certification described in this task will supplement and support VPD’s permitting and sub-permitting efforts to ensure that sub-permittees, where necessary, have significant prior experience with mussel aquaculture operations protocols and access to proper training, logistical support, and technology transfers to maximize their opportunities to develop a successful and compliant aquaculture operation.

ATTACHMENT 1

Page 21: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Coastal Marine Biolabs will provide the lead, the following staff would be involved in this task: Dr. Linda Santschi, Dr. Ralph Imondi, Scott Lindell, Blake Stok, Brian Pendleton, Brooke Ashworth. Synergistic Activities Separately, VSE team collaborators (Doug Bush, General Manager, The Cultured Abalone) is teaming with the University of Southern California on a 2018 Sea Grant proposal to optimize the development in a hatchery of Mediterranean mussels larvae for use in the Santa Barbara Channel. This parallel effort supports the implementation of Best Management Practices for VSE grower producers. The VSE ongoing efforts also lay the groundwork for science-based educational programming organized around the scientific and technical, and public health aspects of long-line mussel aquaculture.

Cost for Subtask 7.4: $0 (2018); $0 (2019) (In-Kind Contributions only) TOTAL ANNUAL COSTS for Task 7: 2018 - $21,250, 2019 - $28,500; COMBINED TOTAL COST for Task 7: $48,250 Task 8: Project Summary As a final task, the VSE will provide a concise report to document the practical and strategic decisions that were made to keep the project on a critical path for timely completion of all project tasks (Tasks 1-8) applications. This concise summary will be drafted with input from VSE members, the projects principal investigators, NOAA and California shellfish coordinators, NOAA technical staff, and university/research affiliates. It will focus on key project design elements (including species selection, technical design, project scope and location), recommendations for efficient project management (i.e., role of the Ventura Port District, and VSE participating members) and recommendations to improve project deliverables for (i.e., Task 1 – Task 8). It is intended that this focused summary will provide practical suggestions and lessons learned by VSE members that may be leveraged by others seeking to permit sustainable shellfish aquaculture for commercial purposes in federal waters in the future. ALG will provide the lead, the following staff would be involved in this task: Dr. Linda Santschi, Dr. Ralph Imondi, Doug Bush, Everard Ashworth, Brooke Ashworth, Brian Pendleton, Richard Parsons, Scott Lindell, Blake Stok.

TOTAL COST for Task 8: $0 (In-Kind Contribution only) TOTAL VPD GRANT REQUEST: $266,660 TOTAL CA SEA GRANT REQUEST: $35,000 TOTAL SEA GRANT REQUEST: $301,660 Separately, VSE team collaborators (Doug Bush, General Manager, The Cultured Abalone) is teaming with the University of Southern California on a 2018 SeaGrant proposal to optimize the development in a hatchery of Mediterranean mussel larvae for use in the Santa Barbara Channel. This parallel effort supports the implementation of Best Management Practices for VSE grower producers.

ATTACHMENT 1

Page 22: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Title: Ventura Shellfish Enterprise: Implementing an Integrative Model for New Shellfish Aquaculture Permitting and Production in California Grant: 2018 Sea Grant Proposal Budget Justification: TOTAL VPD GRANT REQUEST: $266,660 TOTAL CA SEA GRANT REQUEST: $35,000 TOTAL SEA GRANT REQUEST: $301,660 Task 4: Permit Assignment Strategy - The project will be the first of its kind in California to develop an offshore aquaculture permit with NOAA that authorizes assignment of sub-permits to individual shellfish growers. A key part of the project will be drafting and negotiation of permit terms that contemplate this unique situation, with the goal of developing a template that can be used by other aquaculture projects in the future.

Task 5: Environmental Review - To complete the permitting process and secure all necessary permits, we propose that Dudek, environmental consultant for the VSE project, will identify necessary supplemental studies, reports and documentation as required by federal and state regulators prior to permit issuance. Consistent coordination and guidance throughout the permitting process is extremely important to ensure that permits are issued in a timely manner with appropriate conditions and mitigation measures that balance any environmental concerns with the operational needs of the project.

Task 6: Seafood Safety and Quality - VSE team members Coastal Marine Biolabs (CMB) and legal counsel Plauche & Carr are committed to working collaboratively with NOAA-SIP and other relevant federal entities, to align with agency goals to “ensure the safety and quality of sustainably cultured seafood products’ by assisting with the development of a sanitation plan for a federal waters siting alternative and testing facility based in Ventura Harbor.

Task 7: Grower/Producer Compliance Training Program and Information Dissemination – The VSE is committed to continuing the robust outreach program directed at educating prospective grower/producers on all associated permit guidelines and ensuring understanding of regulatory agency compliance requirements. We will also continue to communicate the benefits of this innovative model which facilitates inclusion of grower/producers that might otherwise be precluded due to regulatory barriers and cost constraints.

Task 8: Project Summary As a final task, the VSE will provide a concise report to document the practical and strategic decisions that were made to keep the project on a critical path for timely completion of all permit applications. The project utilizes the expertise of a wide array of policy, legal, scientific, and industry representatives from both the private and public sector and a groundswell of in-kind participation. This output will help to create a permitting pathway for subsequent offshore aquaculture projects, develop a permit assignment strategy, complete the environmental review and entitlement processes, develop a sanitation plan and testing facility, and create a grower/producer education and training program.

ATTACHMENT 2

Page 23: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Project Personnel: The Ventura Shellfish Enterprise is a collaboration of seasoned technical experts uniquely capable of defining a successful permitting strategy and the legal and technical experts to provide a complete and defensible permit application package for a commercial mussel farm consisting of twenty 100 -acre parcels to be located in open federal waters proximate to Ventura Harbor, California.

Dr. Paul Olin, Principal Investigator with California Sea Grant will provide overall coordination of project components and will be involved in the design and implementation of the grower/producer training program. Dr. Olin will also work with the project team during the environmental review and entitlement processes as well as development of the permitting strategy and sanitation plan.

In-kind services will be provided by the following experts, which total $272,210 (or $136,105 per year). All of this work is considered in-kind as these nine experts will receive no remuneration under this grant.

• Mr. Everard Ashworth, a Vice-Chari with the Ventura Port District, and a principal with Ashworth Leininger Group, has direct experience in siting and securing environmental approvals for commercial projects proposing to locate proximate to National Parks, sensitive receptors, and in the coastal waters off Ventura and Santa Barbara Counties. He routinely advises Fortune 500 companies on the selection of expert environmental, legal and technical services to support project development, has worked with scores of legal counsels on environmental permitting matters.

• Ms. Brooke Ashworth is a Senior Planner with Ashworth Leininger Group. She has previously worked as an environmental analyst with international law firms, specializing in hazardous waste management and environmental due diligence. She has served as a County land use planner and holds a B.Sc. in environmental Planning and Management from UC Davis.

• Mr. Doug Bush, General Manager of the Cultured Abalone Farm, a commercial abalone farm in Santa Barbara County, will provide essential technical guidance on the acquisition of seed for the commercial mussel operation, the design and deployment of commercial equipment, and the design and delivery of education and outreach activities.

• Mr. Richard Parsons, an independent consultant under contract with the Ventura Port District to manage special projects, is responsible for securing all environmental entitlements for annual dredging projects that can exceed $5MM. He will coordinate project requirements with the Ventura Port District, leverage his direct experience with key environmental regulatory staff at the federal, state, and local level, and manage technical consultants.

• Dr. Linda Santschi and Dr. Ralph Imondi, with Coastal Marine Biolabs, will help lead coordinated efforts with federal regulators during the process of developing NSSP-compliant sanitation protocols for bivalve shellfish cultivated in federal waters. Drs. Santschi and Imondi will also partner with other project collaborators in the design, development and presentation of the education and training program.

• Mr. Brian Pendleton, Deputy General Manager of the Ventura Port District, brings 25 years of municipal management experience in commercial revitalization, economic development and real estate. He oversees the District’s facilities, marina, property and risk management and is providing project and grant management duties.

ATTACHMENT 2

Page 24: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Diane Windham is NOAA’s Aquaculture Coordinator for the Southwestern region. She will participate in all phases of the project, but her contribution is not included in this proposal as an in-kind match.

Position Name Standard Billing Rate (per hour)

In-Kind Adjusted Rate, Less Profit

Annual Salary

Level of Effort Months/Yr.

In-Kind Contribution Per Year

E. Ashworth $165/hr. N/A N/A $79,200 B. Ashworth $155/hr. N/A N/A $18,600 D. Bush $95/hr. N/A N/A $54,720 R. Parsons $100/hr. N/A N/A $20,000

Collaborators Dr. L Santschi $50/hr. N/A N/A 12/Yr. $25,600

Dr. R. Imondi $50/hr. N/A N/A $25,600

B. Pendleton $93.25/hr. N/A N/A $48,490

Totals $272,210

Pricing for expert legal, professional permitting assistance, environmental and industry consultants was obtained from firms currently under contract providing VSE services to complete 2015 NOAA Sea Grant deliverables. All other costs have been estimated based on the collective experience of the team in permitting commercial projects and therefore the budgetary analysis in preparing the budget and in-kind contributions is considered robust.

Task 4: Permit Assignment Strategy - $60,000

Legal Services ($60,000)

Robert Smith (Plauché & Carr LLP)

Y1 $40,000 I Y2 $20,000

Plauché & Carr LLP is a Seattle-based law firm with a practice focused on environmental, land use, and natural resource-based issues. Plauché & Carr LLP has represented a number of non-profit, private, and governmental entities regarding environmental and regulatory matters ranging from regulatory compliance/permitting, to administrative litigation, to litigation in state and federal courts, to conservation acquisition. Mr. Smith continues to provide consultant services for the Sea Grant Aquaculture Extension 2015 sub-award Task 1 – Strategic Permitting Analysis and Task 2 – Environmental Reports and Permitting.

Subtask 4.1: Negotiation of Permit Terms Plauche & Carr LLP will serve as VPD’s legal counsel, and the following staff will be involved in this task: Robert Smith

ATTACHMENT 2

Page 25: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Costs for Subtask 4.1: Negotiation of Permit Format, Terms, and Conditions: $35,000 (2018 - $25,000, 2019 - $10,000).

SUBTASK 4.2: DRAFTING AND APPROVAL OF SUB-PERMITS Plauche & Carr LLP will serve as VPD’s legal counsel, and the following staff will be involved in this task: Robert Smith

Costs for Subtask 4.2: Drafting and Approval of Sub-permits: $15,000 (2018 - $5,000, 2019 - $10,000).

SUBTASK 4.3: LEGAL ANALYSIS OF SUPPLEMENTAL ENVIRONMENTAL REVIEW Plauché & Carr LLP will work with VPD, DUDEK and the lead federal agency and provide legal analysis of any supplementary environmental review (e.g. supplemnetal studies, reports, surveys, etc.) required by the permitting process.

Costs for Subtask 4.3: Legal Analysis of Supplemental Environmental Review: $10,000 (2018) TOTAL COST FOR Task 4: 2018 - $40,000, 2019 - $20,000; COMBINED TOTAL: $60,000

Task 5: Environmental Review - $119,410 Consulting Services ($119,410)

Dudek

Y1 $108,610 I Y2 $10,800

Dudek is a California-based environmental consulting firm focusing in water/wastewater, energy, transportation, land and community development, healthcare, and education. They have grown to more than 400 environmental planners, scientists, engineers, technicians, and construction professionals with a portfolio of thousands of successful projects. They understand concerned citizenry, environmental goals and constraints, overlapping political jurisdictions, and unique technical and regulatory challenges. Dudek continues to provide consultant services for the Sea Grant Aquaculture Extension 2015 sub-award Task 1- Strategic Permitting Analysis and Task 2 – Environmental Reports and Permitting.

Subtask 5.1: Environmental Reports and Studies Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, John Davis, Andrea Dransfield, Amber Geraghty.

Costs for Subtask 5.1: Environmental Reports and Studies: $22,100 (2018)

Subtask 5.2: Meetings and Agency Coordination Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, David Wickens, John Davis, Amber Geraghty.

ATTACHMENT 2

Page 26: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Cost for Subtask 5.2: Meetings and Agency Coordination: $30,800 (2018 - $20,000, 2019 - $10,800)

Subtask 5.3: Finalize List of BMPs Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, David Wickens, John Davis, Andrea Dransfield, Amber Geraghty, Melis Okter.

Cost for Subtask 5.3: $18,450 (2018) Subtask 5.4: Coordinate and Draft Permit Language and Permit Special Conditions Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, David Wickens, John Davis, Andrea Dransfield, Amber Geraghty, Melis Okter.

Cost for Subtask 5.4: $24,400 (2018)

Subtask 5.5: Draft or Review Monitoring Plans Dudek will serve as VPD’s environmental consultant, and the following staff would be involved in this task: Laurie Monarres, David Wickens, John Davis, Andrea Dransfield, Amber Geraghty, Melis Okter. Cost for Subtask 5.5: $23,660 (2018)

TOTAL COST FOR Task 5: 2018 - $108,610, 2019 - $10,800; COMBINED TOTAL: $119,410

Task 6: Seafood Safety and Quality - $39,000 Consulting Services ($39,000)

Coastal Marine Bio Labs

Y1 $0 I Y2 $39,000

VSE team members Coastal Marine Biolabs (CMB) and legal counsel Plauche & Carr are committed to working collaboratively with NOAA-SIP and other relevant federal entities, to align with agency goals to “ensure the safety and quality of sustainably cultured seafood products” by assisting with the development of a sanitation plan for a federal waters siting alternative. CMB is also committed to establishing a centralized, federally approved, Ventura Harbor-based testing facility to meet the testing requirements articulated in the sanitation plan. This process can be initiated independently of the sanitation plan and concurrently with the permit application process.

The funds requested for this budget item represent a reasonable estimate of the overall costs associated with conducting a sanitary survey of the proposed mussel farming sites. More specifically, funds are requested to conduct bacteriological testing on 600 water samples obtained from a single sampling station in each of twenty 100-acre sites. Based on industry

ATTACHMENT 2

Page 27: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

standards, the cost for testing services is estimated at $50/sample. The cost for sample collection is estimated at $15/sample.

Subtask 6.1: Coordinating a Growing Area Sanitary Survey with NOAA-SIP Representatives

Cost for Subtask 6.1: $39,000 (2019)

Subtask 6.2: Establishing the Administrative and Technical Framework for a Locally Based, FDA-Approved Safety Testing Laboratory

Cost for Subtask 6.2: $0 (In-Kind Contribution)

TOTAL COST for Task 6: $39,000 (2019) Task 7: Grower/Producer Compliance Training Program and Information Dissemination – $48,250 Consulting and Video Production Services ($48,250)

Mr. Scott Lindell, Blake Stok, CMB, CAPS Media

Y1 $21,250 I Y2 $28,500

Subtask 7.1: Grower/Producer Outreach and Inclusion Mr. Lindell of the Woods Hole Oceanographic Institution has conducted aquaculture research in academic and private enterprise settings for over 25 years and successfully permitted commercial mussel farms in federal and state waters off Massachusetts. He brings a unique perspective to the team through research projects aimed at improving methods for culturing algae, shellfish and finfish in partnership with natural resource management agencies, commercial enterprises and other academic institutions. Recently funded projects include development of partnerships and methods for open-ocean mussel and seaweed farming, and nutrient bioextraction with seaweeds and shellfish. Two current projects involve the design and engineering of new offshore aquaculture gear to prevent the possible entanglement of protected species.

Mr. Lindell will bring his decades of experience to provide an advisory role in assisting the VPD in developing a grower/producer application process and assist with the preparation of curriculum components and supplemental materials that align with established objectives for grower/producers participating in the VSE.

Scott Lindell Y1 $10,250 I Y2 $0 $7,500 Consulting Expense; $2,750 Travel Expense Mr. Blake Stok, special projects consultant, provided consulting services to the Ventura Port District as part of the outreach efforts during the VSE site selection process. He will assist the VSE in researching and identifying prospective local, regional, national, and international grower-producers that are suitable candidates for participation in the VSE, and providing direct engagement with potential grower/producers.

ATTACHMENT 2

Page 28: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Blake Stok Y1 $11,000 I Y2 $0

Cost for Subtask 7.1: $21,250 (2018) Subtask 7.2: Curriculum and Materials Design Scott Lindell, Blake Stok and CMB will provide curriculum and educational training materials for in-person and on-line training as further described in Task 7 of the project description. Scott Lindell Y1 $0 I Y2 $10,250 $7,500 Consulting Expense; $2,750 Travel Expense Blake Stok Y1 $0 I Y2 $13,750

Cost for Subtask 7.2: $24,000 (2019)

Subtask 7.3: Training Video Production Narrated field demonstrations (5 in total) of mussel aquaculture tasks and certification procedures will be produced as supporting instructional resources to accompany written manual resources and used, in preparation of, and during the in-person workshop series. These will be digitally produced and housed to on the learning management system to provide flexible access to information for VSE participants. CAPS Media Y1 $0 I Y2 $3,000

Cost for Subtask 7.3 $3,000 (2019)

Subtask 7.4: Training and Certification The logistics of the proposed training and certification pathway (e.g., the timing and form of recruitment, program duration, host institution, instructor selection, assessment/performance rubrics/instruments, etc.) will be determined in parallel with the design of major program components, as described above. It bears noting that implementation of the program is dependent on the timing of issuance of required aquaculture permits.

Cost for Subtask 7.4 $0 (In-Kind Contribution)

VSE Partners Y1 $0 I Y2 $0

TOTAL COST for Task 7: $48,250

Task 8: Project Summary - $0

ATTACHMENT 2

Page 29: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

As a final task, the VSE will provide a concise report to document the practical and strategic decisions that were made to keep the project on a critical path for timely completion of all permit applications. VSE Partners Y1 $0 I Y2 $0

TOTAL COST for Task 8: $0 (In-Kind Contribution) TOTAL VPD GRANT REQUEST: $266,660 TOTAL CA SEA GRANT REQUEST: $35,000 TOTAL SEA GRANT REQUEST: $301,660

ATTACHMENT 2

Page 30: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Collaborators List: Competition Title: NOAA National Sea Grant College Program 2018 Ocean, Coastal and Great Lakes National Aquaculture Initiative PROJECT TITLE: Olin – Ventura Shellfish Enterprise: Implementing an Integrative Model for New Shellfish Aquaculture Permitting and Production in California Ralph Imondi, Ph.D. Scientific Co-Director Coastal Marine Biolabs Integrative Biosciences Institute 1559 Spinnaker Drive, Suite 101 Ventura, CA 93001-5302 (805) 377-8696 [email protected] Linda Santschi, Ph.D. Scientific Co-Director Coastal Marine Biolabs Integrative Biosciences Institute 1559 Spinnaker Drive, Suite 101 Ventura, CA 93001-5302 (805) 289-9275 [email protected] Diane Windham Aquaculture Coordinator, California NOAA Fisheries West Coast Region 650 Capitol Mall, Suite 5-100 Sacramento, CA 95814 (916) 930-3619 [email protected] Brooke Ashworth Senior Planner ALG – Ashworth, Leininger Group 161 Eugenia Drive Ventura, CA 93003 (805) 218-6340 [email protected] Everard Ashworth, QEP, CEPA Ventura Port Commission Chairman ALG – Ashworth, Leininger Group 161 Eugenia Drive Ventura, CA 93003 (805) 432-9732 [email protected]

Richard Parsons, MA Ventura Port District, Consultant 1603 Anchors Way Drive Ventura, CA 93001 (805) 890-8505 [email protected] Oscar Peña General Manager Ventura Port District 1603 Anchors Way Drive Ventura, CA 93001 (805) 642-8538 [email protected] Brian Pendleton, MRED Deputy General Manager Ventura Port District 1603 Anchors Way Drive Ventura, CA 93001 (805) 642-8538 [email protected] Douglas E. Bush, MSc. General Manager The Cultured Abalone Farm LLC 9580 Dos Pueblos Canyon Road Goleta, CA 93117 (805) 729-4830 [email protected]

Scott Lindell, MSc. Visiting Investigator Biology Department, MS #34 Woods Hole Oceanographic Institution Woods Hole, MA 02543 (508) 289-1113 [email protected]

Blake Stok, MSc. Sustainability Projects Consultant Ventura Port District 1603 Anchors Way Drive Ventura, CA 93001 (240) 543- 0994 [email protected]

ATTACHMENT 3

Page 31: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

BOARD OF PORT COMMISSIONERS

FEBRUARY 28, 2018

STANDARD AGENDA ITEM 3 VENTURA HARBOR VILLAGE

PAINTING PROJECT

Page 32: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

VENTURA PORT DISTRICT STANDARD AGENDA ITEM 3 BOARD COMMUNICATION Meeting Date: February 28, 2018 TO: Board of Port Commissioners FROM: Brian Pendleton, Deputy General Manager SUBJECT: Ventura Harbor Village Painting Project

RECOMMENDATION: That the Board of Port Commissioners provide direction to staff regarding scope of work and next steps for the Ventura Harbor Village Painting Project. SUMMARY: On July 26, 2017, the Commission received a presentation on the previously approved paint palette (not implemented), actual paint colors used when the Harbor Village was last repainted and new alternatives. The Commission asked for further analysis of paint palettes along with additional design consideration of building fascia elements such as awnings and signage given some of the planned remodeling in the Village. BACKGROUND: The Board provided direction to move away from the City approved, but never implemented, color palette and additionally was not supportive of other alternatives presented at the meeting. A couple of stakeholder comments included the desire to move away from existing Harbor Village paint colors, and instead provide a fresh new look, with clean and classic colors. One example suggested was blue, white and grey. The desire for smooth stucco finish was mentioned and need for standardized signage was also discussed. Additionally, the BS Taproom is now fully approved and should begin construction soon. This major remodel and building addition triggered further Board discussion about fascia materials such as awnings and patio covers along with paint considerations. As a result of the Board meeting, staff evaluated the collective comments and identified three areas for a potential scope of work:

• Paint (Buildings, Doors/Trims, Railings, Decking) • Awning and Patio Covers (Materials, Colors, Style) • Signage (Tenant Signs, Tenant Directories)

As previously discussed new color palettes (other than what was previously approved by the City with minor changes) will require review and approval by the City’s Design Review Committee (DRC). The awnings, patio covers, tenant signs and directory signage will require the same and would be processed as one comprehensive application for City approval. For discussion purposes, staff has included the City approved color palette for Portside, which is under construction as well as photographs of existing improvements at Harbor Village. First, however, a design professional will be needed to provide alternatives to the Commission and stakeholders. Staff has conducted some preliminary design professional interviews, but is seeking direction on scope of work before completing a tentative selection and returning to the Board with a recommendation for contract design services. This design services scope would likely include the following:

• Consider Board and stakeholder initial comments; • Review Portside design criteria for paint, and as applicable awnings and signage;

Page 33: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

• Study existing awnings, patio covers and signage at Harbor Village; • Prepare and present alternatives for each of the design elements for Board

consideration; • Complete application materials for the City as required; • Present recommendations to the City’s DRC and incorporate recommended changes;

and, • Obtain approval for paint, awning and patio cover designs and signage program.

The budget allocated for the project is $600,000 for repainting Harbor Village. See details below in the Fiscal Impact. Repainting of the Village will occur after the project is approved by the City and replacement of awnings, patio covers and individual tenant signs would likely occur at the end of their useful life and/or when new tenancies occur. Cost allocation between VPD and individual tenants would be based on Village lease requirements. New tenant directory signage can be considered as part of the District’s 5-Year Capital Improvement Program (CIP) and implemented as budgeted. FISCAL IMPACT: As part of the Fiscal Year 2017-2018 Mid-Year Budget, the Board approved allocating $60,000 for professional design services in FY2017-2018 and allocated $600,000 in improvement costs to the FY 2018-2019 Budget. ATTACHMENT: Attachment 1 – Portside Partners Building Color Schemes Attachment 2 – Existing Harbor Village Conditions (Paint, Awnings, Patio Covers, Signage)

Page 34: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

ATTACHMENT 1

Page 35: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

ATTACHMENT 1

Page 36: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

ATTACHMENT 1

Page 37: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

ATTACHMENT 1

Page 38: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

ATTACHMENT 1

Page 39: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

ATTACHMENT 1

Page 40: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

ATTACHMENT 1

Page 41: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

ATTACHMENT 1

Page 42: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Overall View of Promenade

Page 43: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Current Harbor Village Paint

Page 44: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Current Harbor Village Awnings

Page 45: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Current Harbor Village Patio Covers

Page 46: BOARD OF P C F 28, 2018 S A I 1 PORTSIDE VENTURA …draft rev. description public works department land development division drn. by: city transportation manager des. by: ck'd by:

Current Harbor Village Signage