board of county commissioners - palm beach county,...

143

Upload: others

Post on 07-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • Board of County Commissioners Budget Workshop

    FY 2020 Proposed Budget June 10, 2019

    Page # Roll Call

    Prayer

    Pledge of Allegiance

    A. Overview of FY 2020 Budget

    1. Major Budget Assumptions and Factors 1 2. Increase/Decrease in Taxes and Millage Rates 2 3. Summary of Tax Equivalent Funding

    i. BCC Departments 3-4 ii. Judicial 4

    iii. Constitutional Officers 4

    B. Personnel Analysis 5

    C. Supplementals - Requested/Approved 6 - 79

    D. Capital 80-89

    E. Financial Policies 90-95

    F. BCC Departments Funding History 96-140

    G. Public Comment

    6:00 PM

  • PALM BEACH COUNTY FY 2020 Major Budget Assumptions and Factors

    Ad Valorem Revenue (based on June 1 estimated values) The budget proposed is balanced at the current rate of 4.7815 mills. The proposed Countywide Ad Valorem taxes are $947,085,467 and are:

    • $49.1 million over the current year; and • Requires a simple majority vote of the BCC

    BCC Departments The net Ad Valorem budgets for BCC departments are up $11.6 million (3.1%). This increase includes funding for a 3% pay increase, and increased FRS rates. Health insurance contributions decreased. The budget includes the addition of 170 new BCC positions, 32, of which, are General Fund ad valorem supported. These 32 new positions are primarily in Engineering, Facilities Development & Operations, Youth Services, and Housing & Economic Sustainability. The budget also includes 138 non-Countywide ad valorem and non-ad valorem supported positions in Fire Rescue, Library, Airports, Water Utilities, Building Division, and The Office of Inspector General. The Personnel Position Analysis can be found on page 5 of this packet. Sheriff The Sheriff requested a gross budget of $705 million, which is included in this proposed budget. Included in this request is an increase of 10 Deputies, and $8.9 million in new capital requests. After an increase in revenue, the net ad valorem funded budget is up $38.2 million (6.6%). Capital The proposed budget includes $37.1 million in ad valorem funding, primarily for R&R projects. The Summary of FY 2020 Capital Projects starts on Page 82 of this package. Reserves General Fund Contingency and Reserve for Balances Forward are at $154.1 million. This is 10.4% of the gross General Fund budget, which complies with the County’s current policy. Our level of reserves is an important factor in the evaluation of the County’s financial strength and to maintain our AAA bond rating. Financially Assisted Agencies The Financially Assisted Agencies (FAAs) are included in the FY 2020 proposed budget at 3% above the current funding level. Library The Library Budget is balanced at the current millage rate of 0.5491. Fire Rescue The Fire Rescue Main MSTU is balanced at the current millage rate of 3.4581. The Jupiter millage rate is 1.9135, up from 1.9026.

    1

  • BO

    AR

    D O

    F C

    OU

    NT

    Y C

    OM

    MIS

    SIO

    NE

    RS

    FY 2

    019

    Mill

    age

    Rat

    es

    % (D

    ecre

    ase)

    Fro

    mM

    illag

    e M

    illag

    eTa

    xes

    Mill

    age

    Taxe

    sM

    illag

    eTa

    xes

    Cou

    ntyw

    ide

    (2)

    4.78

    154.

    5858

    $908

    ,322

    ,605

    4.78

    15$9

    47,0

    85,4

    670.

    1957

    38,7

    62,8

    62$

    4.

    27%

    Cou

    nty

    Libr

    ary

    Dis

    trict

    0.54

    910.

    5266

    $55,

    279,

    465

    0.54

    91$5

    7,64

    1,38

    70.

    0225

    2,36

    1,92

    2

    4.27

    %

    Fire

    -Res

    cue

    MST

    U

    3.45

    813.

    312

    $264

    ,286

    ,076

    3.45

    81$2

    75,9

    44,3

    470.

    1461

    11,6

    58,2

    71

    4.

    41%

    Jupi

    ter F

    ire-R

    escu

    e M

    STU

    1.

    9026

    1.83

    31$2

    0,85

    3,26

    21.

    9135

    $21,

    767,

    889

    0.08

    0491

    4,62

    7

    4.

    39%

    Agg

    rega

    te M

    illag

    e R

    ate

    (3)

    6.57

    896.

    3890

    6.57

    560.

    1866

    2.92

    %

    Tota

    l Tax

    es$1

    ,265

    ,487

    ,619

    $1,3

    02,4

    39,0

    9036

    ,951

    ,471

    $

    (1

    ) R

    olle

    d-B

    ack

    Rat

    e is

    the

    mill

    age

    rate

    whi

    ch, e

    xclu

    sive

    of n

    ew c

    onst

    ruct

    ion,

    will

    pro

    vide

    the

    sam

    e A

    d V

    alor

    em ta

    x re

    venu

    e as

    w

    as le

    vied

    dur

    ing

    the

    prio

    r yea

    r.

    (2)

    Excl

    usiv

    e of

    vot

    ed d

    ebt m

    illag

    es fo

    r FY

    201

    9 an

    d FY

    202

    0 as

    show

    n be

    low

    :FY

    201

    9FY

    202

    0C

    ount

    ywid

    e0.

    1169

    0.07

    69C

    ount

    y Li

    brar

    y0.

    0412

    0.03

    81To

    tal

    0.15

    810.

    1150

    (3

    ) Agg

    rega

    te M

    illag

    e R

    ate

    is th

    e su

    m o

    f all

    Ad

    Val

    orem

    taxe

    s lev

    ied

    by th

    e go

    vern

    ing

    body

    of a

    cou

    nty

    for c

    ount

    ywid

    e pu

    rpos

    es,

    plu

    s Ad

    Val

    orem

    taxe

    s lev

    ied

    for a

    ny d

    epen

    dent

    dis

    trict

    to th

    e go

    vern

    ing

    body

    , div

    ided

    by

    the

    tota

    l tax

    able

    val

    ue o

    f the

    cou

    nty,

    c

    onve

    rted

    to a

    mill

    age

    rate

    .

    PER

    CE

    NT

    INC

    RE

    ASE

    (DE

    CR

    EA

    SE) I

    N M

    ILL

    AG

    E O

    VE

    R R

    OL

    LE

    D-B

    AC

    K R

    AT

    E (1

    )

    Rol

    led-

    Bac

    k R

    ate

    % In

    crea

    se O

    r

    Ten

    tativ

    e In

    crea

    se o

    r D

    ecre

    ase

    Ten

    tativ

    e T

    axes

    FY 2

    020

    FY 2

    020

    Rol

    led-

    Bac

    k R

    ate

    2

  • PALM

    BEA

    CH

    CO

    UN

    TY, F

    LOR

    IDA

    SUM

    MA

    RY O

    F D

    EPA

    RTM

    ENT

    REQ

    UES

    TFY

    202

    0 B

    UD

    GET

    REQ

    UES

    T

    2019

    2020

    2019

    2020

    Cha

    nge

    Expe

    nses

    Cha

    nge

    Rev

    enue

    s20

    2020

    19C

    hang

    eN

    ET A

    d Va

    lore

    m %

    Cha

    nge

    BC

    C A

    d Va

    lore

    m F

    unde

    d D

    epar

    tmen

    ts a

    nd A

    genc

    ies

    Com

    mun

    ity S

    ervi

    ces

    %0.

    6840

    ,211

    ,890

    40,5

    91,9

    3018

    ,590

    ,584

    18,8

    24,3

    4538

    0,04

    023

    3,76

    121

    ,621

    ,306

    21,7

    67,5

    8514

    6,27

    9C

    ount

    y Ad

    min

    istra

    tion

    %11

    .21

    2,38

    0,56

    22,

    621,

    117

    349,

    922

    362,

    788

    240,

    555

    12,8

    662,

    030,

    640

    2,25

    8,32

    922

    7,68

    9C

    ount

    y At

    torn

    ey%

    )(1

    .29

    5,90

    3,33

    55,

    847,

    397

    2,68

    0,60

    02,

    666,

    100

    )(5

    5,93

    8)

    (14,

    500

    3,22

    2,73

    53,

    181,

    297

    )(4

    1,43

    8C

    ount

    y C

    omm

    issi

    on%

    0.24

    3,61

    9,04

    43,

    627,

    662

    00

    8,61

    80

    3,61

    9,04

    43,

    627,

    662

    8,61

    8C

    ount

    y C

    oope

    rativ

    e Ex

    tens

    ion

    %3.

    502,

    888,

    511

    3,05

    2,10

    431

    0,63

    938

    4,08

    916

    3,59

    373

    ,450

    2,57

    7,87

    22,

    668,

    015

    90,1

    43C

    rimin

    al J

    ustic

    e C

    omm

    issi

    on%

    2.79

    3,47

    4,98

    03,

    218,

    409

    2,74

    4,93

    62,

    467,

    992

    )(2

    56,5

    71)

    (276

    ,944

    730,

    044

    750,

    417

    20,3

    73En

    gine

    erin

    g an

    d Pu

    blic

    Wor

    ks%

    )(1

    .47

    60,1

    44,3

    9360

    ,602

    ,445

    14,3

    38,8

    4315

    ,471

    ,809

    458,

    052

    1,13

    2,96

    645

    ,805

    ,550

    45,1

    30,6

    36)

    (674

    ,914

    Envi

    ronm

    enta

    l Res

    ourc

    es M

    anag

    emen

    t%

    5.23

    41,3

    16,6

    3641

    ,232

    ,776

    25,6

    72,8

    9724

    ,770

    ,784

    )(8

    3,86

    0)

    (902

    ,113

    15,6

    43,7

    3916

    ,461

    ,992

    818,

    253

    Faci

    litie

    s D

    evel

    opm

    ent a

    nd O

    pera

    tions

    %5.

    8044

    ,929

    ,648

    45,5

    41,3

    324,

    991,

    400

    3,28

    6,74

    861

    1,68

    4)

    (1,7

    04,6

    5239

    ,938

    ,248

    42,2

    54,5

    842,

    316,

    336

    Fire

    Res

    cue

    Dis

    patc

    h/D

    row

    ning

    and

    Pre

    vent

    ion

    %2.

    3812

    ,097

    ,035

    12,3

    84,5

    720

    028

    7,53

    70

    12,0

    97,0

    3512

    ,384

    ,572

    287,

    537

    Hou

    sing

    and

    Eco

    nom

    ic S

    usta

    inab

    ility

    %)

    (4.8

    673

    ,740

    ,031

    66,1

    64,3

    1168

    ,560

    ,696

    61,2

    36,7

    52)

    (7,5

    75,7

    20)

    (7,3

    23,9

    445,

    179,

    335

    4,92

    7,55

    9)

    (251

    ,776

    Hum

    an R

    esou

    rce

    %1.

    623,

    342,

    125

    3,39

    6,28

    20

    054

    ,157

    03,

    342,

    125

    3,39

    6,28

    254

    ,157

    Info

    rmat

    ion

    Syst

    em S

    ervi

    ces

    %)

    (0.5

    835

    ,668

    ,684

    33,9

    44,5

    6210

    ,661

    ,157

    9,08

    1,68

    3)

    (1,7

    24,1

    22)

    (1,5

    79,4

    7425

    ,007

    ,527

    24,8

    62,8

    79)

    (144

    ,648

    Inte

    rnal

    Aud

    it%

    )(0

    .17

    1,18

    3,66

    41,

    181,

    702

    00

    )(1

    ,962

    01,

    183,

    664

    1,18

    1,70

    2)

    (1,9

    62Le

    gisl

    ativ

    e Af

    fairs

    %0.

    9248

    4,53

    948

    9,01

    60

    04,

    477

    048

    4,53

    948

    9,01

    64,

    477

    Med

    ical

    Exa

    min

    er%

    )(1

    1.24

    4,84

    1,95

    44,

    346,

    798

    382,

    000

    388,

    000

    )(4

    95,1

    566,

    000

    4,45

    9,95

    43,

    958,

    798

    )(5

    01,1

    56O

    ffice

    of C

    omm

    unity

    Rev

    italiz

    atio

    n%

    3.26

    2,83

    3,66

    12,

    627,

    585

    1,73

    2,44

    31,

    490,

    418

    )(2

    06,0

    76)

    (242

    ,025

    1,10

    1,21

    81,

    137,

    167

    35,9

    49O

    ffice

    of E

    qual

    Bus

    ines

    s O

    ppor

    tuni

    ty%

    16.7

    91,

    120,

    321

    1,27

    1,02

    935

    ,000

    3,50

    015

    0,70

    8)

    (31,

    500

    1,08

    5,32

    11,

    267,

    529

    182,

    208

    Offi

    ce o

    f Equ

    al O

    ppor

    tuni

    ty%

    4.44

    1,15

    2,98

    41,

    145,

    202

    374,

    000

    331,

    620

    )(7

    ,782

    )(4

    2,38

    077

    8,98

    481

    3,58

    234

    ,598

    Offi

    ce o

    f Fin

    anci

    al M

    anag

    emen

    t and

    Bud

    get

    %1.

    934,

    028,

    319

    4,15

    9,41

    342

    3,50

    748

    5,11

    613

    1,09

    461

    ,609

    3,60

    4,81

    23,

    674,

    297

    69,4

    85O

    ffice

    of R

    esilie

    nce

    %76

    .51

    362,

    122

    433,

    085

    204,

    023

    154,

    023

    70,9

    63)

    (50,

    000

    158,

    099

    279,

    062

    120,

    963

    Palm

    Bea

    ch T

    rans

    porta

    tion

    Plan

    ning

    Age

    ncy

    %)

    (100

    .00

    4,33

    8,49

    65,

    642,

    225

    4,24

    4,14

    25,

    642,

    225

    1,30

    3,72

    91,

    398,

    083

    94,3

    540

    )(9

    4,35

    4Pa

    lm T

    ran

    %14

    .84

    135,

    204,

    500

    150,

    020,

    462

    68,4

    24,3

    4573

    ,331

    ,885

    14,8

    15,9

    624,

    907,

    540

    66,7

    80,1

    5576

    ,688

    ,577

    9,90

    8,42

    2Pa

    rks

    and

    Rec

    reat

    ion

    %)

    (1.6

    778

    ,579

    ,421

    77,7

    70,5

    2622

    ,659

    ,486

    22,7

    82,7

    27)

    (808

    ,895

    123,

    241

    55,9

    19,9

    3554

    ,987

    ,799

    )(9

    32,1

    36Pl

    anni

    ng a

    nd Z

    onin

    g%

    )(7

    .06

    20,3

    19,6

    4121

    ,078

    ,737

    10,8

    85,2

    0312

    ,310

    ,029

    759,

    096

    1,42

    4,82

    69,

    434,

    438

    8,76

    8,70

    8)

    (665

    ,730

    Publ

    ic A

    ffairs

    %2.

    275,

    595,

    438

    5,57

    6,89

    580

    2,13

    667

    4,64

    4)

    (18,

    543

    )(1

    27,4

    924,

    793,

    302

    4,90

    2,25

    110

    8,94

    9Pu

    blic

    Saf

    ety

    %0.

    7440

    ,345

    ,137

    40,6

    61,8

    4020

    ,756

    ,204

    20,9

    27,5

    3231

    6,70

    317

    1,32

    819

    ,588

    ,933

    19,7

    34,3

    0814

    5,37

    5Pu

    rcha

    sing

    %)

    (0.2

    94,

    271,

    905

    4,25

    8,97

    42,

    250

    1,61

    0)

    (12,

    931

    )(6

    404,

    269,

    655

    4,25

    7,36

    4)

    (12,

    291

    Ris

    k M

    anag

    emen

    t%

    4.48

    136,

    502,

    266

    131,

    539,

    690

    136,

    149,

    154

    131,

    170,

    754

    )(4

    ,962

    ,576

    )(4

    ,978

    ,400

    353,

    112

    368,

    936

    15,8

    24Yo

    uth

    Serv

    ices

    %2.

    2214

    ,344

    ,892

    14,6

    74,4

    341,

    033,

    668

    1,06

    7,87

    732

    9,54

    234

    ,209

    13,3

    11,2

    2413

    ,606

    ,557

    295,

    333

    BC

    C A

    d Va

    lore

    m F

    unde

    d D

    epar

    tmen

    ts a

    nd A

    genc

    ies

    %3.

    1478

    5,22

    6,13

    478

    9,10

    2,51

    241

    7,00

    9,23

    540

    9,31

    5,05

    03,

    876,

    378

    )(7

    ,694

    ,185

    368,

    216,

    899

    379,

    787,

    462

    11,5

    70,5

    63

    BC

    C N

    on-A

    d Va

    lore

    m D

    epar

    tmen

    tsAi

    rpor

    ts%

    0.00

    90,8

    43,7

    2910

    3,10

    5,82

    790

    ,843

    ,729

    103,

    105,

    827

    12,2

    62,0

    9812

    ,262

    ,098

    00

    0Fl

    eet M

    anag

    emen

    t%

    0.00

    61,2

    55,0

    4153

    ,016

    ,644

    61,2

    55,0

    4153

    ,016

    ,644

    )(8

    ,238

    ,397

    )(8

    ,238

    ,397

    00

    0PZ

    &B -

    Build

    ing

    Div

    isio

    n%

    0.00

    62,7

    36,8

    8576

    ,132

    ,458

    62,7

    36,8

    8576

    ,132

    ,458

    13,3

    95,5

    7313

    ,395

    ,573

    00

    0To

    uris

    t Dev

    elop

    men

    t Cou

    ncil

    %0.

    0080

    ,510

    ,752

    94,6

    66,2

    7180

    ,510

    ,752

    94,6

    66,2

    7114

    ,155

    ,519

    14,1

    55,5

    190

    00

    Wat

    er U

    tiliti

    es%

    0.00

    190,

    438,

    755

    207,

    516,

    793

    190,

    438,

    755

    207,

    516,

    793

    17,0

    78,0

    3817

    ,078

    ,038

    00

    0B

    CC

    Non

    -Ad

    Valo

    rem

    Dep

    artm

    ents

    %0.

    0048

    5,78

    5,16

    253

    4,43

    7,99

    348

    5,78

    5,16

    253

    4,43

    7,99

    348

    ,652

    ,831

    48,6

    52,8

    310

    00

    3

  • PALM

    BEA

    CH

    CO

    UN

    TY, F

    LOR

    IDA

    SUM

    MA

    RY O

    F D

    EPA

    RTM

    ENT

    REQ

    UES

    TFY

    202

    0 B

    UD

    GET

    REQ

    UES

    T

    2019

    2020

    2019

    2020

    Cha

    nge

    Expe

    nses

    Cha

    nge

    Rev

    enue

    s20

    2020

    19C

    hang

    eN

    ET A

    d Va

    lore

    m %

    Cha

    nge

    Dep

    ende

    nt D

    istr

    icts

    Libr

    ary

    %5.

    4962

    ,600

    ,669

    68,1

    69,6

    157,

    958,

    971

    10,5

    28,2

    285,

    568,

    946

    2,56

    9,25

    754

    ,641

    ,698

    57,6

    41,3

    872,

    999,

    689

    Fire

    Res

    cue

    - Mai

    n M

    STU

    %5.

    2441

    8,26

    5,10

    645

    2,02

    2,84

    315

    6,05

    2,90

    217

    6,07

    8,49

    633

    ,757

    ,737

    20,0

    25,5

    9426

    2,21

    2,20

    427

    5,94

    4,34

    713

    ,732

    ,143

    Jupi

    ter F

    ire R

    escu

    e%

    5.19

    20,2

    04,9

    3021

    ,006

    ,076

    )(4

    89,7

    51)

    (761

    ,813

    801,

    146

    )(2

    72,0

    6220

    ,694

    ,681

    21,7

    67,8

    891,

    073,

    208

    Dep

    ende

    nt D

    istr

    icts

    %5.

    2750

    1,07

    0,70

    554

    1,19

    8,53

    416

    3,52

    2,12

    218

    5,84

    4,91

    140

    ,127

    ,829

    22,3

    22,7

    8933

    7,54

    8,58

    335

    5,35

    3,62

    317

    ,805

    ,040

    Oth

    erC

    omm

    issi

    on o

    n Et

    hics

    %5.

    2968

    1,53

    371

    7,57

    30

    036

    ,040

    068

    1,53

    371

    7,57

    336

    ,040

    Com

    mun

    ity R

    edev

    elop

    men

    t Age

    ncie

    s%

    8.00

    41,8

    85,1

    7145

    ,234

    ,935

    00

    3,34

    9,76

    40

    41,8

    85,1

    7145

    ,234

    ,935

    3,34

    9,76

    4H

    ealth

    Dep

    artm

    ent

    %0.

    002,

    114,

    162

    2,11

    4,16

    20

    00

    02,

    114,

    162

    2,11

    4,16

    20

    Fina

    ncia

    lly A

    ssis

    ted

    Agen

    cies

    /Cnt

    y Sp

    onso

    red

    %3.

    7012

    ,912

    ,143

    13,3

    89,5

    070

    047

    7,36

    40

    12,9

    12,1

    4313

    ,389

    ,507

    477,

    364

    Gen

    eral

    Gov

    ernm

    ent

    %26

    .31

    17,9

    28,5

    5322

    ,744

    ,981

    010

    0,00

    04,

    816,

    428

    100,

    000

    17,9

    28,5

    5322

    ,644

    ,981

    4,71

    6,42

    8G

    ener

    al G

    over

    nmen

    t - In

    dire

    ct C

    ost C

    ente

    rs%

    3.94

    )(2

    1,81

    9,56

    8)

    (22,

    680,

    260

    00

    )(8

    60,6

    920

    )(2

    1,81

    9,56

    8)

    (22,

    680,

    260

    )(8

    60,6

    92O

    ther

    Cou

    nty

    Fund

    ed P

    rogr

    ams

    %)

    (0.5

    722

    ,011

    ,270

    21,8

    85,0

    000

    0)

    (126

    ,270

    022

    ,011

    ,270

    21,8

    85,0

    00)

    (126

    ,270

    Offi

    ce o

    f Ins

    pect

    or G

    ener

    al%

    7.08

    3,33

    8,06

    33,

    478,

    744

    1,06

    7,12

    11,

    046,

    953

    140,

    681

    )(2

    0,16

    82,

    270,

    942

    2,43

    1,79

    116

    0,84

    9Va

    lue

    Adju

    stm

    ent B

    oard

    %10

    .00

    620,

    000

    655,

    000

    270,

    000

    270,

    000

    35,0

    000

    350,

    000

    385,

    000

    35,0

    00O

    ther

    %9.

    9479

    ,671

    ,327

    87,5

    39,6

    421,

    337,

    121

    1,41

    6,95

    37,

    868,

    315

    79,8

    3278

    ,334

    ,206

    86,1

    22,6

    897,

    788,

    483

    Judi

    cial C

    ourt

    Adm

    inis

    tratio

    n%

    29.7

    12,

    097,

    048

    2,55

    0,02

    544

    2,33

    040

    3,65

    045

    2,97

    7)

    (38,

    680

    1,65

    4,71

    82,

    146,

    375

    491,

    657

    Law

    Lib

    rary

    %0.

    0057

    5,77

    451

    5,76

    857

    5,77

    451

    5,76

    8)

    (60,

    006

    )(6

    0,00

    60

    00

    Publ

    ic D

    efen

    der

    %4.

    7325

    7,00

    826

    9,17

    30

    012

    ,165

    025

    7,00

    826

    9,17

    312

    ,165

    Stat

    e At

    torn

    ey%

    5.09

    414,

    785

    435,

    879

    00

    21,0

    940

    414,

    785

    435,

    879

    21,0

    94C

    ourt

    Rel

    ated

    Info

    rmat

    ion

    Tech

    nolo

    gy%

    6.81

    4,65

    3,54

    94,

    843,

    356

    2,34

    2,50

    02,

    375,

    000

    189,

    807

    32,5

    002,

    311,

    049

    2,46

    8,35

    615

    7,30

    7Ju

    dici

    al%

    14.7

    17,

    998,

    164

    8,61

    4,20

    13,

    360,

    604

    3,29

    4,41

    861

    6,03

    7)

    (66,

    186

    4,63

    7,56

    05,

    319,

    783

    682,

    223

    Con

    stitu

    tiona

    l Offi

    cers

    Cle

    rk a

    nd C

    ompt

    rolle

    r%

    4.65

    15,2

    24,4

    6215

    ,909

    ,563

    500,

    000

    500,

    000

    685,

    101

    014

    ,724

    ,462

    15,4

    09,5

    6368

    5,10

    1Pr

    oper

    ty A

    ppra

    iser

    %1.

    2619

    ,558

    ,000

    19,8

    03,5

    850

    024

    5,58

    50

    19,5

    58,0

    0019

    ,803

    ,585

    245,

    585

    Sher

    iff%

    6.56

    663,

    634,

    859

    704,

    945,

    782

    81,0

    92,0

    7784

    ,167

    ,104

    41,3

    10,9

    233,

    075,

    027

    582,

    542,

    782

    620,

    778,

    678

    38,2

    35,8

    96Sh

    eriff

    Gra

    nts/

    Oth

    er%

    0.00

    9,63

    1,13

    110

    ,766

    ,426

    9,34

    6,13

    110

    ,481

    ,426

    1,13

    5,29

    51,

    135,

    295

    285,

    000

    285,

    000

    0Su

    perv

    isor

    of E

    lect

    ions

    %)

    (18.

    9421

    ,946

    ,124

    17,9

    79,7

    071,

    000,

    000

    1,00

    0,00

    0)

    (3,9

    66,4

    170

    20,9

    46,1

    2416

    ,979

    ,707

    )(3

    ,966

    ,417

    Tax

    Col

    lect

    or%

    0.00

    13,5

    85,0

    0013

    ,585

    ,000

    00

    00

    13,5

    85,0

    0013

    ,585

    ,000

    0C

    onst

    itutio

    nal O

    ffice

    rs%

    5.40

    743,

    579,

    576

    782,

    990,

    063

    91,9

    38,2

    0896

    ,148

    ,530

    39,4

    10,4

    874,

    210,

    322

    651,

    641,

    368

    686,

    841,

    533

    35,2

    00,1

    652,

    603,

    331,

    068

    2,74

    3,88

    2,94

    51,

    162,

    952,

    452

    1,23

    0,45

    7,85

    514

    0,55

    1,87

    767

    ,505

    ,403

    1,44

    0,37

    8,61

    61,

    513,

    425,

    090

    73,0

    46,4

    74

    4

  • Adopted Adopted Final Total

    Department FY 2008 FY 2019 Additions Deletions Transfers FY 2019 Additions Deletions Transfers FY 2020

    Board of County CommissionersCommunity Services 469 167 167 1 0 0 168County Administration 13 12 1 13 0 0 0 13County Attorney 55 42 42 0 0 0 42County Commission 28 27 27 0 0 0 27County Cooperative Extension Service 39 31 31 0 0 0 31Criminal Justice Commission 19 11 11 0 0 0 11Engineering & Public Works 499 458 458 7 0 0 465Environmental Resources Management 151 126 126 1 0 0 127Facilities Development & Operations 386 323 323 3 0 0 326Housing & Economic Sustainability 61 55 55 3 0 0 58Human Resources 39 34 34 0 0 0 34Information Systems Services 225 213 213 0 0 0 213Internal Auditor 12 9 9 0 0 0 9Legislative Affairs 4 3 3 0 0 0 3Medical Examiner 22 25 25 1 0 0 26Office of Community Revitalization 9 7 7 0 0 0 7Office of Equal Business Opportunity 8 10 10 2 0 0 12Office of Equal Opportunity 12 12 12 0 0 0 12Office of Financial Mgmt & Budget 43 33 33 0 0 0 33Office of Resilience 0 3 3 0 0 0 3Palm Beach Tansportation Planning Agency* 10 13 13 2 0 0 15Palm Tran 570 627 627 2 0 0 629Parks & Recreation 699 588 588 2 0 0 590PZ&B - Planning & Zoning 203 159 7 166 0 0 0 166Public Affairs 56 44 (1) 43 1 0 0 44Public Safety 372 267 2 269 4 (1) (5) 267Purchasing 51 45 45 0 0 0 45Risk Management 37 30 30 0 0 0 30

    Youth Services 0 84 84 3 0 0 87Total BCC General Ad Valorem Funded 4,092 3,458 9 0 0 3,467 32 (1) (5) 3,493Other Departments and Agencies Airports 159 158 158 3 0 0 161

    PZ&B - Building Division 197 156 156 16 0 0 172

    County Library 481 429 429 19 0 0 448

    Fire-Rescue 1,471 1,541 1,541 89 0 0 1,630

    Fleet Management 72 59 59 0 0 0 59Tourist Development 4 5 5 0 0 0 5Water Utilities 518 597 6 603 9 0 0 612Commission on Ethics 0 5 5 0 0 0 5Office of Inspector General 0 25 25 2 0 0 27

    Total Other Departments and Agencies 2,902 2,975 6 0 0 2,981 138 0 0 3,119

    Total BCC 6,994 6,433 15 0 0 6,448 170 (1) (5) 6,612

    Constitutional Officers

    Clerk & Comptroller 144 140 140 6 0 0 146

    15th Judicial Circuit 20 33 33 1 0 5 39

    Property Appraiser 280 245 245 0 0 0 245

    Sheriff 3,812 4,259 4 4,263 26 0 0 4,289

    Supervisor of Elections 45 52 52 6 0 0 58

    Tax Collector 269 322 322 0 0 0 322

    Total Constitutional Officers 4,570 5,051 4 0 0 5,055 39 0 5 5,099

    Grand Total 11,564 11,484 19 0 0 11,503 209 (1) 0 11,711

    * TPA Positions will be removed from this report upon their separation from the County

    FY 2019 Mid Year Adj Proposed FY 2020

    POSITION SUMMARY BY DEPARTMENT

    5

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    015

    ,400

    015

    ,400

    015

    ,400

    0

    020

    ,000

    020

    ,000

    00

    0

    Uni

    t: C

    omm

    unity

    Ser

    vice

    sR

    eque

    stin

    g: C

    omm

    unity

    Ser

    vice

    s A

    dmin

    Cus

    todi

    al S

    ervi

    ces.

    The

    Com

    mun

    ity S

    ervi

    ces

    Dep

    artm

    ent i

    s op

    en to

    the

    publ

    ic 5

    day

    s a

    wee

    k an

    d se

    es a

    ppro

    xim

    atel

    y 75

    clie

    nts

    each

    day

    at

    810

    Dat

    ura,

    a 2

    sto

    ry b

    uidl

    ing

    with

    a b

    asem

    ent.

    As

    such

    , the

    inte

    rior o

    f the

    bui

    ldin

    g, in

    par

    ticul

    ar th

    e ba

    thro

    oms,

    ne

    eds

    to b

    e se

    rvic

    ed m

    ore

    than

    the

    curre

    nt c

    ount

    y le

    vel,

    due

    to h

    ealth

    issu

    es a

    s w

    ell a

    s m

    oral

    e of

    bui

    ldin

    g oc

    cupa

    nts

    and

    gues

    ts.

    We

    are

    requ

    estin

    g cu

    stod

    ial s

    ervi

    ces

    for f

    our h

    ours

    per

    day

    .

    Uni

    t: C

    omm

    unity

    Ser

    vice

    sR

    eque

    stin

    g: C

    omm

    unity

    Ser

    vice

    s A

    dmin

    Tran

    scrip

    tion

    Ser

    vice

    s fo

    r boa

    rd m

    eetin

    gs a

    nd c

    ontra

    ct re

    view

    pan

    els.

    The

    Com

    mun

    ity S

    ervi

    ces

    Dep

    artm

    ent h

    as fi

    ve a

    dvis

    ory

    boar

    ds a

    long

    with

    var

    ious

    sub

    -com

    mitt

    ees

    of th

    ese

    boar

    ds.

    Cur

    rent

    ly th

    ese

    mee

    tings

    are

    reco

    rded

    and

    man

    ually

    tran

    scrib

    ed b

    y ad

    min

    istra

    tive

    pers

    onne

    l. A

    s th

    ere

    are

    num

    erou

    s vo

    ices

    at t

    hese

    mee

    tings

    , it o

    ften

    crea

    tes

    a ch

    alle

    nge

    to tr

    ansc

    ribe.

    For

    incr

    ease

    d ef

    ficie

    ncy,

    we

    are

    seek

    ing

    fund

    ing

    to

    cont

    ract

    with

    a tr

    ansc

    riptio

    n se

    rvic

    es p

    rovi

    der i

    n or

    der f

    or u

    s to

    mak

    e ou

    r mee

    tings

    ava

    ilabl

    e to

    the

    publ

    ic in

    an

    man

    ner

    whi

    ch c

    onfo

    rms

    to A

    DA

    requ

    irem

    ents

    . We

    have

    app

    roxi

    mat

    ely

    150

    boar

    d m

    eetin

    gs a

    nd re

    view

    pan

    els

    annu

    ally

    , of

    vary

    ing

    time

    leng

    ths

    and

    num

    ber o

    f atte

    ndee

    s. O

    utso

    urci

    ng th

    is fu

    nctio

    n w

    ill a

    llevi

    ate

    the

    burd

    en o

    n ou

    r adm

    inis

    trativ

    e st

    aff,

    allo

    win

    g th

    em to

    focu

    s on

    oth

    er k

    ey d

    utie

    s.

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    Cou

    ntyw

    ide

    Ad

    Val

    orem

    BC

    C D

    epar

    tmen

    ts

    Com

    mun

    ity S

    ervi

    ces

    6

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    068

    ,100

    068

    ,100

    10

    0

    051

    ,030

    051

    ,030

    10

    0

    Uni

    t: C

    omm

    unity

    Ser

    vice

    sR

    eque

    stin

    g: C

    omm

    unity

    Ser

    vice

    s A

    dmin

    Dat

    a S

    trate

    gist

    (PG

    36),

    Ann

    ual C

    ost $

    82,2

    91

    Cur

    rent

    ly, C

    omm

    unity

    Ser

    vice

    s us

    es tw

    elve

    (12)

    uni

    que

    syst

    ems

    to c

    aptu

    re c

    lient

    -leve

    l dat

    a fo

    r int

    erna

    l div

    isio

    ns a

    nd

    Com

    mun

    ity p

    rogr

    ams

    that

    are

    fund

    ed th

    roug

    h th

    e de

    partm

    ent (

    man

    y of

    thes

    e sy

    stem

    s ar

    e m

    anda

    ted

    by e

    xter

    nal

    fund

    ers)

    . The

    se m

    ultip

    le s

    yste

    ms

    crea

    te a

    uni

    que

    chal

    leng

    e in

    com

    pilin

    g da

    ta th

    at is

    nee

    ded

    for r

    epor

    ting

    and

    deci

    sion

    -m

    akin

    g. T

    he d

    epar

    tmen

    t is

    ofte

    n a

    refe

    renc

    e fo

    r dec

    isio

    ns th

    at re

    quire

    qui

    ck a

    cces

    s to

    cur

    rent

    pro

    gram

    mat

    ic d

    ata

    and

    outc

    omes

    . The

    Dat

    a S

    trate

    gist

    /Bus

    ines

    s A

    naly

    st w

    ill p

    rovi

    de c

    ritic

    al d

    ata

    anal

    ysis

    and

    the

    utili

    zatio

    n of

    info

    rmat

    ion

    for

    the

    depa

    rtmen

    t to

    supp

    ort d

    ecis

    ion

    mak

    ing

    to m

    eet f

    inan

    cial

    , stra

    tegi

    c, a

    nd o

    pera

    tiona

    l goa

    ls. T

    he d

    epar

    tmen

    t is

    prov

    idin

    g se

    rvic

    es a

    nd s

    uppo

    rting

    sys

    tem

    s of

    car

    e th

    at a

    lign

    with

    the

    prio

    ritie

    s of

    the

    coun

    ty in

    clud

    ing

    hom

    eles

    snes

    s,

    subs

    tanc

    e us

    e, a

    nd e

    cono

    mic

    sta

    bilit

    y. T

    his

    posi

    tion

    will

    allo

    w fo

    r the

    use

    of d

    ata

    acro

    ss d

    ata

    syst

    ems

    in th

    e de

    partm

    ent a

    nd w

    ill b

    e re

    spon

    sibl

    e fo

    r pre

    sent

    ing

    key

    perfo

    rman

    ce in

    dica

    tors

    thro

    ugh

    the

    use

    of d

    ata

    visu

    aliz

    atio

    n to

    ols

    incl

    udin

    g de

    velo

    pmen

    t of d

    ashb

    oard

    s an

    d sc

    orec

    ards

    . A D

    ata

    Stra

    tegi

    st is

    nee

    ded

    to a

    ct a

    s a

    liais

    on fo

    r eac

    h sy

    stem

    , cr

    eate

    and

    mai

    ntai

    n re

    ports

    , int

    egra

    te d

    ata

    betw

    een

    syst

    ems,

    and

    ana

    lyzi

    ng/e

    valu

    atin

    g pe

    rform

    ance

    dat

    a an

    d ou

    tcom

    es.

    Uni

    t: V

    eter

    ans

    Affa

    irsR

    eque

    stin

    g: V

    eter

    ans

    Ser

    vice

    s

    Ass

    ista

    nt V

    eter

    ans

    Ser

    vice

    s O

    ffice

    rs (P

    G24

    ). A

    nnua

    l Cos

    t 61,

    965

    In 2

    018

    Vet

    eran

    's S

    ervi

    ces

    has

    serv

    ed 1

    ,175

    clie

    nts

    with

    four

    sta

    ff m

    embe

    rs -t

    hree

    Ass

    ista

    nt V

    eter

    an's

    Ser

    vice

    s O

    ffice

    r an

    d on

    e V

    eter

    an's

    Ser

    vice

    s O

    ffice

    r. Th

    e nu

    mbe

    r of v

    eter

    ans

    cont

    inue

    to in

    crea

    se a

    nd th

    ey a

    re p

    roje

    cted

    to s

    erve

    2,4

    36

    in 2

    019.

    Wai

    t tim

    e fo

    r app

    oint

    men

    ts h

    as e

    xcee

    ded

    four

    wee

    ks d

    ue to

    the

    volu

    me

    of v

    eter

    ans

    seek

    ing

    serv

    ices

    for a

    m

    yria

    d of

    issu

    es w

    ith th

    e V

    A, i

    nclu

    ding

    the

    new

    VA

    sys

    tem

    for a

    ppea

    ls, w

    hich

    has

    incr

    ease

    d su

    bsta

    ntia

    lly in

    com

    plex

    ity.

    This

    has

    incr

    ease

    d tim

    e re

    quire

    d fo

    r com

    plet

    ion

    of p

    aper

    wor

    k du

    e to

    tim

    e to

    brie

    f clie

    nts

    and

    obta

    in th

    e ex

    pand

    ed

    info

    rmat

    ion

    on a

    dditi

    onal

    form

    s fo

    r all

    clai

    m ty

    pes,

    whi

    ch o

    ften

    requ

    ires

    exte

    nsiv

    e re

    sear

    ch. T

    he n

    ew A

    ssis

    tant

    Vet

    eran

    S

    ervi

    ces

    Offi

    cer w

    ill lo

    wer

    the

    wai

    ting

    time

    for o

    ur c

    lient

    s an

    d al

    low

    the

    Hum

    an a

    nd V

    eter

    an S

    ervi

    ces

    Div

    isio

    n to

    pro

    vide

    tim

    ely

    and

    effe

    ctiv

    e re

    sults

    for a

    ll ou

    r clie

    nts.

    In

    addi

    tion,

    this

    will

    als

    o al

    low

    us

    to e

    xpan

    d in

    the

    futu

    re in

    Nor

    th C

    ount

    y (o

    ffice

    s ar

    e cu

    rrent

    ly in

    Sou

    th a

    nd C

    entra

    l Cou

    nty)

    .

    7

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    049

    ,860

    049

    ,860

    149

    ,860

    1

    040

    ,750

    040

    ,750

    10

    0

    024

    5,14

    00

    245,

    140

    465

    ,260

    1C

    omm

    unity

    Ser

    vice

    s

    Uni

    t: C

    SB

    GR

    eque

    stin

    g: C

    SB

    G

    Em

    ploy

    men

    t Cou

    nsel

    or (P

    G23

    ), A

    nnua

    l Cos

    t $60

    ,573

    An

    Em

    ploy

    men

    t Cou

    nsel

    or is

    nec

    essa

    ry to

    ass

    ist b

    oth

    the

    Com

    mun

    ity A

    ctio

    n an

    d Fa

    rmw

    orke

    r Pro

    gram

    s in

    Bel

    le G

    lade

    . Th

    is p

    erso

    n w

    ould

    be

    resp

    onsi

    ble

    for g

    oing

    out

    into

    the

    com

    mun

    ity to

    ass

    ess

    the

    hirin

    g ne

    eds

    of e

    mpl

    oyer

    s in

    the

    wes

    tern

    com

    mun

    ity a

    nd d

    evel

    op e

    mpl

    oym

    ent o

    ppor

    tuni

    ties

    for o

    ur c

    lient

    s. A

    per

    son

    in th

    is p

    ositi

    on w

    ould

    con

    tact

    no

    npro

    fit a

    genc

    ies

    and

    gove

    rnm

    enta

    l org

    aniz

    atio

    ns to

    exp

    lain

    the

    job-

    train

    ing

    prog

    ram

    and

    obt

    ain

    writ

    ten

    agre

    emen

    t to

    use

    exis

    ting

    job

    open

    ings

    for t

    rain

    ing

    enro

    llees

    .

    Uni

    t: D

    oss

    Oaa

    Titl

    e III

    C1

    Req

    uest

    ing:

    DO

    SS

    Oaa

    Titl

    e III

    C1

    Site

    Man

    ager

    (PG

    14) A

    nnua

    l Cos

    t $40

    ,846

    . W

    ith th

    e gr

    owin

    g fo

    od/h

    unge

    r nee

    ds in

    the

    com

    mun

    ity fo

    r the

    eld

    erly

    , DO

    SS

    has

    incr

    ease

    d its

    feed

    ing

    site

    s an

    d cu

    rrent

    ly o

    pera

    tes

    18 m

    eal s

    ites

    with

    onl

    y fiv

    e M

    eal S

    ite M

    anag

    ers.

    Thi

    s is

    the

    mos

    t site

    s D

    OS

    S h

    as o

    pera

    ted

    and

    we

    curre

    ntly

    hav

    e a

    wai

    t lis

    t for

    mor

    e fe

    edin

    g si

    tes

    in th

    e co

    mm

    unity

    . An

    addi

    tiona

    l pos

    ition

    is n

    eede

    d to

    ove

    rsee

    the

    new

    si

    tes

    and

    train

    the

    volu

    ntee

    rs.

    DO

    SS

    ser

    ved

    a to

    tal o

    f 120

    ,808

    mea

    ls a

    t mea

    l site

    s in

    FY

    201

    7, a

    tota

    l of 1

    33,6

    01 m

    eals

    w

    ere

    serv

    ed in

    FY

    201

    8, a

    nd D

    OS

    S is

    pro

    ject

    ing

    a 10

    % in

    crea

    se in

    FY

    201

    9. T

    o m

    eet t

    his

    criti

    cal g

    row

    ing

    need

    of

    food

    /hun

    ger f

    or th

    e el

    derly

    in c

    omm

    unity

    , we

    will

    nee

    d an

    othe

    r pos

    ition

    for s

    ervi

    ce d

    eliv

    ery.

    8

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    58,0

    000

    058

    ,000

    058

    ,000

    0

    2,80

    92,

    000

    04,

    809

    04,

    809

    0

    60,8

    092,

    000

    062

    ,809

    062

    ,809

    0

    Req

    uest

    ing:

    Com

    pute

    rs &

    Lap

    tops

    One

    -tim

    e pu

    rcha

    se o

    f 3 d

    eskt

    op c

    ompu

    ters

    and

    2 la

    ptop

    s - $

    4,80

    9

    The

    Com

    pute

    r Agi

    ng R

    epor

    t con

    duct

    ed b

    y th

    e IS

    S D

    epar

    tmen

    t (12

    /02/

    18) i

    ndic

    ated

    that

    3 d

    eskt

    op c

    ompu

    ters

    and

    one

    la

    ptop

    in th

    e C

    oope

    rativ

    e E

    xten

    sion

    Dep

    artm

    ent s

    houl

    d be

    repl

    aced

    . Th

    e 4H

    Ext

    ensi

    on A

    gent

    will

    be

    fille

    d an

    d th

    is

    posi

    tion

    will

    nee

    d a

    lapt

    op. I

    SS

    indi

    cate

    d th

    at p

    arts

    are

    no

    long

    er a

    vaila

    ble,

    the

    mac

    hine

    s ar

    e pr

    one

    to fa

    ilure

    , low

    pr

    oduc

    tivity

    is a

    n ex

    pect

    atio

    n, a

    nd o

    ur b

    usin

    ess

    func

    tion

    is a

    t ris

    k. T

    hese

    com

    pute

    rs a

    re u

    nrel

    iabl

    e si

    nce

    they

    can

    not

    acco

    mm

    odat

    e th

    e de

    man

    ds o

    f cur

    rent

    sta

    tistic

    al a

    nd p

    rese

    ntat

    ion

    softw

    are,

    as

    wel

    l as,

    web

    -bas

    ed w

    ebin

    ars

    requ

    ired

    for

    on-li

    ne m

    eetin

    gs, d

    ista

    nce

    educ

    atio

    n, a

    nd o

    n-lin

    e pr

    ofes

    sion

    al d

    evel

    opm

    ent e

    fforts

    . IS

    S re

    com

    men

    ds re

    plac

    emen

    t with

    al

    l-in-

    one

    units

    like

    the

    Del

    l Opt

    iple

    x 74

    50.

    With

    a u

    nit c

    ost o

    f $94

    5, th

    e re

    plac

    emen

    t cos

    t for

    3 c

    ompu

    ters

    = $

    2,83

    5.

    With

    a u

    nit c

    ost o

    f $98

    7, th

    e re

    plac

    emen

    t of 2

    lapt

    ops

    = $1

    ,974

    . For

    a to

    tal o

    f $4,

    809

    for t

    he re

    plac

    emen

    t of a

    ll m

    achi

    nes.

    Add

    ed s

    ome

    as re

    curri

    ng to

    allo

    w fo

    r fut

    ure

    repl

    acem

    ents

    bas

    ed o

    n th

    e ag

    ing

    list.

    Cou

    nty

    Coo

    pera

    tive

    Exte

    nsio

    n

    Cou

    nty

    Coo

    pera

    tive

    Exte

    nsio

    n

    Uni

    t: A

    dmin

    istra

    tion-

    Cty

    Co-

    Op

    Ext

    Req

    uest

    ing:

    Tab

    les

    & C

    hairs

    The

    Ext

    ensi

    on D

    epar

    tmen

    t mus

    t rep

    lace

    furn

    iture

    that

    ann

    ually

    ser

    ves

    the

    need

    s of

    thou

    sand

    s of

    peo

    ple

    a ye

    ar th

    at

    atte

    nd e

    duca

    tion

    prog

    ram

    s, c

    ount

    y go

    vern

    men

    t eve

    nts,

    and

    mee

    tings

    hel

    d by

    cou

    nty

    partn

    ers.

    Our

    Exh

    ibit

    Hal

    ls

    curre

    ntly

    hav

    e an

    tiqua

    ted

    tabl

    es s

    how

    ing

    surfa

    ce d

    amag

    e w

    ith le

    gs/b

    race

    s th

    at a

    re b

    reak

    ing

    with

    incr

    easi

    ng fr

    eque

    ncy.

    In

    the

    past

    yea

    r, 8

    tabl

    es w

    ere

    disc

    arde

    d du

    e to

    stru

    ctur

    al fa

    ilure

    s. C

    hairs

    are

    als

    o br

    eaki

    ng d

    own.

    The

    ir ex

    cess

    ive

    wei

    ght m

    akes

    nor

    mal

    mov

    emen

    t ver

    y di

    fficu

    lt, a

    nd u

    npro

    tect

    ed le

    gs w

    ill d

    amag

    e ou

    r new

    car

    pet.

    We

    need

    ligh

    twei

    ght

    tabl

    es/c

    hairs

    that

    will

    allo

    w fo

    r fle

    xibl

    e se

    atin

    g ar

    rang

    emen

    ts (t

    heat

    er v

    s cl

    assr

    oom

    sty

    le v

    s cl

    uste

    r arra

    ngem

    ents

    ).

    Rep

    lace

    men

    t cos

    t (30

    tabl

    es, 1

    50 c

    hairs

    ) = $

    50,0

    00

    Furth

    erm

    ore,

    the

    Ext

    ensi

    on D

    epar

    tmen

    t mus

    t rep

    lace

    the

    agin

    g pl

    astic

    cha

    irs in

    the

    scre

    ened

    -in P

    avili

    on n

    ear t

    he

    Mou

    nts

    Bot

    anic

    al G

    arde

    n en

    tranc

    e. T

    his

    faci

    lity

    is p

    opul

    ar fo

    r gar

    den

    tour

    s an

    d an

    y fu

    nctio

    n th

    at w

    ants

    an

    outd

    oor

    conn

    ectio

    n to

    the

    surro

    undi

    ng g

    arde

    n as

    they

    con

    duct

    thei

    r bus

    ines

    s. T

    he c

    urre

    nt in

    vent

    ory

    of p

    last

    ic c

    hairs

    are

    de

    grad

    ed a

    nd fr

    agile

    , sub

    ject

    to ra

    ndom

    sha

    tterin

    g w

    hich

    cou

    ld h

    arm

    the

    safe

    ty o

    f our

    gue

    sts.

    Rep

    lace

    men

    t cos

    t (50

    ch

    airs

    , sta

    ckab

    le) =

    $8,

    000

    Uni

    t: A

    dmin

    istra

    tion-

    Cty

    Co-

    Op

    Ext

    9

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    061

    ,290

    061

    ,290

    10

    0Tr

    aini

    ng P

    rogr

    am C

    oord

    inat

    or (1

    ) Pay

    Gra

    de 3

    6 (a

    nnua

    l cos

    t $81

    ,720

    )

    The

    Dep

    artm

    ent i

    s in

    nee

    d of

    som

    eone

    who

    can

    inde

    pend

    ently

    coo

    rdin

    ate

    train

    ing

    and

    adhe

    renc

    e to

    the

    depa

    rtmen

    t's

    mis

    sion

    : *

    Stra

    tegi

    c P

    lann

    ing

    Coo

    rdin

    atio

    n - t

    he C

    ount

    y E

    ngin

    eer h

    ired

    a co

    nsul

    tant

    to d

    raft

    a st

    rate

    gic

    plan

    for t

    he d

    epar

    tmen

    t w

    hich

    incl

    udes

    a c

    ompl

    ete

    revi

    sion

    of t

    he o

    bjec

    tives

    . The

    stra

    tegi

    c pl

    an w

    as la

    unch

    ed in

    Apr

    il of

    201

    8 w

    hich

    cre

    ated

    five

    st

    rate

    gic

    team

    s w

    ith 4

    0 em

    ploy

    ees

    parti

    cipa

    ting

    on th

    ose

    team

    s. It

    is th

    e go

    al o

    f the

    dep

    artm

    ent t

    o up

    date

    the

    stra

    tegi

    c pl

    an b

    y th

    e su

    mm

    er o

    f 201

    9. T

    he d

    epar

    tmen

    t is

    wor

    king

    with

    the

    Dire

    ctor

    of S

    trate

    gic

    Pla

    nnin

    g an

    d P

    erfo

    rman

    ce

    Man

    agem

    ent i

    n th

    e O

    ffice

    of F

    inan

    cial

    Man

    agem

    ent a

    nd B

    udge

    t to

    crea

    te a

    new

    way

    of e

    valu

    atin

    g pe

    rform

    ance

    m

    anag

    emen

    t and

    stra

    tegi

    c pl

    anni

    ng. S

    ever

    al s

    taff

    mem

    bers

    hav

    e be

    en re

    crui

    ted

    to p

    artic

    ipat

    e in

    the

    proc

    ess.

    How

    ever

    , no

    w th

    at th

    e pr

    oces

    s ha

    s st

    arte

    d, w

    e ne

    ed a

    coo

    rdin

    ator

    for t

    he e

    ntire

    pro

    cess

    . Thi

    s ne

    eds

    to b

    e an

    em

    ploy

    ee w

    ho h

    as

    a hi

    gher

    leve

    l edu

    catio

    n in

    man

    agem

    ent o

    r org

    aniz

    atio

    nal m

    anag

    emen

    t or b

    ehav

    ior.

    The

    depa

    rtmen

    t is

    in n

    eed

    of a

    n em

    ploy

    ee w

    ho c

    an im

    plem

    ent a

    stra

    tegi

    c pl

    an a

    s w

    ell a

    s be

    abl

    e to

    adj

    ust t

    hat p

    lan

    as n

    eces

    sary

    thro

    ugh

    onco

    min

    g ye

    ars.

    The

    em

    ploy

    ee w

    ould

    nee

    d to

    be

    able

    to k

    eep

    all p

    artic

    ipan

    ts o

    f the

    pro

    cess

    info

    rmed

    of d

    evel

    opm

    ents

    and

    co

    ordi

    nate

    with

    div

    isio

    n di

    rect

    ors.

    The

    pos

    ition

    wou

    ld a

    lso

    need

    to b

    e ab

    le to

    trai

    n ot

    her s

    taff

    mem

    bers

    /lead

    ers/

    man

    ager

    s on

    the

    stra

    tegi

    c pr

    oces

    s. M

    ost i

    mpo

    rtant

    ly, t

    his

    posi

    tion

    wou

    ld n

    eed

    to b

    e ab

    le to

    ens

    ure

    that

    the

    stra

    tegi

    c pl

    an a

    nd o

    bjec

    tives

    are

    feas

    ible

    and

    abl

    e to

    be

    impl

    emen

    ted

    in th

    e de

    partm

    ent.

    * M

    arke

    ting

    and

    Out

    reac

    h - T

    he n

    ew C

    ount

    y E

    ngin

    eer i

    s de

    term

    ined

    to in

    crea

    se m

    arke

    ting/

    adve

    rtisi

    ng/p

    ublic

    rela

    tions

    an

    d ou

    treac

    h ef

    forts

    for t

    he d

    epar

    tmen

    t. Th

    is p

    ositi

    on w

    ould

    dev

    elop

    and

    mai

    ntai

    n pr

    ogra

    ms

    to in

    form

    the

    publ

    ic a

    nd

    garn

    er in

    tere

    st in

    the

    depa

    rtmen

    t's in

    itiat

    ives

    . Thi

    s po

    sitio

    n w

    ould

    cre

    ate

    pres

    enta

    tion

    mat

    eria

    ls fo

    r the

    Cou

    nty

    Eng

    inee

    r.

    * S

    tand

    ardi

    zed

    Trai

    ning

    - Th

    e po

    sitio

    n w

    ould

    be

    resp

    onsi

    ble

    for e

    nsur

    ing

    that

    the

    train

    ing

    wou

    ld b

    e ef

    fect

    ivel

    y an

    d ef

    ficie

    ntly

    pro

    vide

    d to

    all

    depa

    rtmen

    tal s

    taff.

    Thi

    s w

    ould

    incl

    ude

    the

    revi

    ew a

    nd c

    omm

    unic

    atio

    n of

    bot

    h C

    ount

    ywid

    e an

    d D

    epar

    tmen

    tal P

    olic

    ies

    and

    Pro

    cedu

    res.

    Thi

    s po

    sitio

    n w

    ould

    als

    o pr

    ovid

    e su

    ppor

    t thr

    ough

    dev

    elop

    men

    t pla

    ns fo

    r eac

    h di

    visi

    on in

    com

    plet

    ing

    thei

    r sep

    arat

    e m

    issi

    ons

    as th

    ey d

    ovet

    ail i

    nto

    that

    of t

    he e

    ntire

    dep

    artm

    ent.

    Thi

    s po

    sitio

    n w

    ould

    al

    so o

    vers

    ee a

    ll as

    pect

    s of

    pro

    gram

    s re

    spon

    sibl

    e fo

    r dev

    elop

    men

    t and

    ong

    oing

    coo

    rdin

    atio

    n to

    fill

    volu

    ntar

    y in

    tern

    ship

    s an

    d ot

    her r

    oles

    as

    need

    ed. W

    ith th

    e im

    plem

    enta

    tion

    of th

    is p

    ositi

    on, m

    etric

    s co

    uld

    be e

    stab

    lishe

    d w

    hich

    trac

    ks th

    e pe

    rcen

    tage

    of e

    mpl

    oyee

    s tra

    ined

    .

    Engi

    neer

    ing

    Uni

    t: E

    ngin

    eerin

    g A

    dmin

    Ser

    vice

    sR

    eque

    stin

    g: T

    rain

    ing

    Pro

    gram

    Coo

    rdin

    ator

    10

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    038

    ,313

    038

    ,313

    10

    0

    Uni

    t: R

    oad

    & B

    ridge

    Adm

    inis

    tratio

    nR

    eque

    stin

    g: R

    oad

    and

    Brid

    ge W

    areh

    ouse

    - S

    tore

    keep

    er

    Sto

    reke

    eper

    (1) P

    ay G

    rade

    16

    (ann

    ual c

    ost $

    51,0

    84)

    We

    requ

    est t

    he a

    dditi

    on o

    f a S

    tore

    keep

    er p

    ositi

    on fo

    r Roa

    d an

    d B

    ridge

    War

    ehou

    se d

    ue to

    add

    ed d

    eman

    ds p

    lace

    d on

    ou

    r exi

    stin

    g pr

    ocur

    emen

    t sta

    ff. T

    here

    are

    thre

    e m

    embe

    rs c

    urre

    ntly

    ass

    igne

    d to

    the

    Roa

    d an

    d B

    ridge

    war

    ehou

    se: a

    W

    areh

    ouse

    Man

    ager

    , Tec

    hnic

    al P

    rocu

    rem

    ent S

    peci

    alis

    ts, a

    nd a

    Pro

    cure

    men

    t Spe

    cial

    ist.

    Thei

    r tim

    e is

    con

    sum

    ed

    mee

    ting

    the

    curre

    nt d

    eman

    ds o

    f pro

    curin

    g eq

    uipm

    ent,

    mat

    eria

    ls, a

    nd s

    uppl

    ies

    of v

    aryi

    ng q

    uant

    ities

    and

    tech

    nica

    litie

    s.

    Ther

    e is

    an

    ever

    -incr

    easi

    ng n

    umbe

    r of p

    rocu

    rem

    ent p

    roce

    sses

    and

    pol

    icie

    s se

    t for

    th, (

    i.e. v

    endo

    r coo

    rdin

    atio

    n, c

    ross

    de

    partm

    ent/d

    ivis

    ion

    coor

    dina

    tion,

    rece

    iver

    s, s

    ole

    sour

    ce, p

    ropr

    ieta

    ry, O

    EB

    O, e

    tc.).

    Thi

    s do

    es n

    ot a

    llow

    add

    ition

    al ti

    me

    to

    effe

    ctiv

    ely

    and

    effic

    ient

    ly m

    aint

    ain

    the

    num

    erou

    s an

    d te

    chni

    cal a

    spec

    ts o

    f our

    phy

    sica

    l inv

    ento

    ry w

    hich

    incl

    ude

    the

    daily

    re

    quis

    ition

    ing,

    insp

    ectin

    g, s

    torin

    g, c

    ount

    ing,

    repo

    rting

    , and

    issu

    ing

    of p

    arts

    , mat

    eria

    ls, s

    uppl

    ies

    and

    equi

    pmen

    t.

    Th

    e ad

    ditio

    n of

    a S

    tore

    keep

    er w

    ill e

    nabl

    e us

    to b

    ette

    r ide

    ntify

    , rec

    eive

    , sto

    re a

    nd is

    sue

    a va

    riety

    of s

    uppl

    ies

    and

    mat

    eria

    ls w

    hile

    con

    duct

    ing

    daily

    mai

    nten

    ance

    and

    ope

    ratio

    n of

    the

    war

    ehou

    se a

    reas

    and

    the

    num

    erou

    s lo

    aner

    tool

    s,

    (i.e.

    han

    d an

    d ga

    s po

    wer

    ed to

    ols)

    mai

    ntai

    ning

    suf

    ficie

    nt in

    vent

    ory

    leve

    ls.

    Req

    uire

    d A

    dditi

    onal

    Dut

    ies:

    * P

    roce

    ss a

    ppro

    xim

    atel

    y 3,

    000+

    /- re

    quis

    ition

    rece

    iver

    s a

    fisca

    l yea

    r.*

    Pro

    cess

    pur

    chas

    ing

    cont

    rols

    for a

    dditi

    onal

    con

    tract

    s: (i

    .e. w

    ater

    , eye

    glas

    ses,

    boo

    ts, p

    est c

    ontro

    l, et

    c.).

    * M

    aint

    enan

    ce o

    f Inv

    ento

    ry M

    anag

    emen

    t Sys

    tem

    con

    sist

    ing

    of a

    n in

    crea

    sed

    inve

    ntor

    y am

    ount

    of a

    ppro

    xim

    atel

    y $3

    00,0

    00.

    * U

    nifo

    rm in

    take

    and

    acc

    ount

    app

    roxi

    mat

    ely:

    (2,7

    50 g

    arm

    ents

    eve

    ry w

    eek

    for c

    lean

    ing

    serv

    ices

    )

    11

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    250,

    000

    228,

    024

    047

    8,02

    46

    00

    Pub

    lic W

    orks

    Cre

    w C

    hief

    (1) P

    ay G

    rade

    25

    (ann

    ual c

    ost $

    62,6

    76)

    Mot

    or E

    quip

    men

    t Ope

    rato

    r II (

    1) P

    ay G

    rade

    15

    (ann

    ual c

    ost $

    49,9

    56)

    Mai

    nten

    ance

    Wor

    ker I

    I (4)

    Pay

    Gra

    de 1

    3 (a

    nnua

    l cos

    t $19

    1,40

    0)

    Roa

    d &

    Brid

    ge c

    urre

    ntly

    em

    ploy

    ees

    one

    Han

    d M

    owin

    g C

    rew

    that

    mai

    ntai

    ns b

    y ha

    nd, a

    ppro

    xim

    atel

    y 14

    6+/-

    acre

    s lo

    cate

    d re

    mot

    ely

    thro

    ugho

    ut th

    e C

    ount

    y's

    2,40

    0 S

    quar

    e M

    iles.

    The

    Han

    d M

    owin

    g C

    rew

    con

    sist

    s of

    one

    Cre

    w C

    hief

    , one

    Mot

    or

    Equ

    ipm

    ent O

    pera

    tor I

    I and

    four

    Mai

    nten

    ance

    Wor

    ker I

    Is th

    at is

    task

    ed w

    ith m

    aint

    aini

    ng th

    e C

    ount

    y on

    a ro

    tatio

    nal b

    asis

    tw

    ice

    a ye

    ar. H

    owev

    er, g

    iven

    the

    decr

    ease

    of g

    rass

    sho

    ulde

    r are

    as a

    nd in

    crea

    se o

    f gra

    ss a

    reas

    bor

    dere

    d w

    ith c

    urb

    and

    gutte

    r and

    adj

    oini

    ng s

    idew

    alks

    , the

    y st

    rugg

    le a

    nnua

    lly to

    ach

    ieve

    thei

    r goa

    l.

    Stra

    tegi

    c P

    riorit

    y: In

    frast

    ruct

    ure

    Goa

    l: S

    afe,

    hea

    lthy

    and

    attra

    ctiv

    e ne

    ighb

    orho

    ods

    and

    com

    mun

    ities

    .

    The

    prop

    osed

    per

    form

    ance

    man

    agem

    ent d

    ata

    will

    incr

    ease

    Han

    d M

    owin

    g C

    rew

    site

    vis

    its fr

    om 1

    to 2

    tim

    es a

    yea

    r to

    3 to

    4 ti

    mes

    a y

    ear o

    n th

    eir c

    ount

    ywid

    e ro

    tatio

    nal s

    ched

    ule.

    The

    requ

    est i

    nclu

    des

    the

    asso

    ciat

    ed v

    ehic

    les

    and

    equi

    pmen

    t:

    (1) 3

    /4 to

    n ex

    tend

    ed c

    ab p

    icku

    p

    (1

    ) F-4

    50 U

    tility

    cre

    w c

    ab p

    icku

    p

    (1) F

    -450

    Dum

    p bo

    dy

    (1) E

    dger

    Tra

    ctor

    (1

    ) Zer

    o tu

    rn m

    ower

    (1) T

    raile

    r for

    zer

    o tu

    rn m

    ower

    V

    ehic

    le &

    Equ

    ipm

    ent P

    urch

    ase

    $250

    ,000

    .

    Uni

    t: R

    oad

    Sec

    tion

    Req

    uest

    ing:

    Roa

    d S

    ectio

    n - H

    and

    Cre

    w

    12

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    35,0

    0064

    ,449

    099

    ,449

    10

    0

    Uni

    t: R

    oad

    Sec

    tion

    Req

    uest

    ing:

    Roa

    d S

    ectio

    n - S

    torm

    wat

    er O

    pera

    tions

    Man

    ager

    Sto

    rmw

    ater

    Ope

    ratio

    ns M

    anag

    er (1

    ) Pay

    Gra

    de 3

    8 (a

    nnua

    l cos

    t $85

    ,932

    ) W

    e re

    ques

    t the

    add

    ition

    of a

    Sto

    rmw

    ater

    Ope

    ratio

    ns M

    anag

    er to

    sup

    port

    and

    man

    age

    the

    Cou

    nty'

    s st

    orm

    wat

    er p

    rogr

    am

    and

    mai

    nten

    ance

    ope

    ratio

    ns. T

    his

    posi

    tion

    wou

    ld c

    oord

    inat

    e an

    d su

    perv

    ise

    the

    mai

    nten

    ance

    and

    repa

    ir of

    dra

    inag

    e sy

    stem

    s an

    d st

    ruct

    ures

    . The

    Sto

    rmw

    ater

    Ope

    ratio

    ns M

    anag

    er w

    ould

    als

    o pl

    an, d

    irect

    and

    sch

    edul

    e th

    e pr

    even

    tativ

    e m

    aint

    enan

    ce a

    ctiv

    ities

    . It w

    ould

    als

    o be

    resp

    onsi

    ble

    for t

    he e

    ffect

    ive

    supe

    rvis

    ion

    and

    adm

    inis

    tratio

    n of

    the

    stor

    mw

    ater

    m

    aint

    enan

    ce b

    udge

    t pre

    para

    tion,

    mon

    itorin

    g ex

    pend

    iture

    s, s

    taff

    deve

    lopm

    ent a

    nd tr

    aini

    ng, p

    erfo

    rman

    ce m

    anag

    emen

    t, re

    view

    s an

    d pr

    iorit

    izes

    ass

    igne

    d w

    ork

    and

    rela

    ted

    activ

    ities

    . Las

    tly, i

    t will

    be

    resp

    onsi

    ble

    for N

    PD

    ES

    and

    MS

    4 pe

    rmit

    com

    plia

    nce

    and

    repo

    rting

    .

    Stra

    tegi

    c P

    riorit

    y: E

    nviro

    nmen

    tal P

    rote

    ctio

    n; G

    oal:

    Sto

    rmw

    ater

    Man

    agem

    ent a

    nd C

    ompl

    ianc

    eS

    trate

    gic

    Prio

    rity:

    Infra

    stru

    ctur

    e; G

    oal:

    Incr

    ease

    con

    nect

    ivity

    and

    saf

    ety

    of p

    edes

    trian

    s an

    d bi

    cycl

    e la

    nes.

    Dra

    inag

    e M

    aint

    enan

    ce th

    roug

    h R

    otat

    iona

    l CC

    TV O

    pera

    tions

    o

    Doc

    umen

    ting

    and

    insp

    ectin

    g un

    derg

    roun

    d dr

    aina

    ge s

    yste

    ms

    (stru

    ctur

    es /

    pipe

    s), R

    oad

    Sw

    eepi

    ng

    o

    Cur

    bs

    o

    Bik

    e la

    nes

    o

    Pat

    hway

    s

    Dra

    inag

    e M

    aint

    enan

    ce th

    roug

    h R

    otat

    iona

    l Cle

    anin

    go

    V

    acto

    ring

    unde

    rgro

    und

    drai

    nage

    sys

    tem

    s (s

    truct

    ures

    / pi

    pes)

    Veh

    icle

    Pur

    chas

    e $3

    5,00

    0

    13

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    240,

    000

    168,

    268

    (408

    ,268

    )0

    30

    3V

    ehic

    le D

    etec

    tion

    Cre

    w -

    Thre

    e (3

    ) Tra

    ffic

    Con

    stru

    ctio

    n W

    orke

    r I -

    Pay

    Gra

    de 1

    8 (a

    nnua

    l cos

    t $16

    0,17

    6)

    Veh

    icle

    det

    ectio

    n de

    vice

    s ar

    e cr

    itica

    l com

    pone

    nts

    for t

    he e

    ffici

    ent o

    pera

    tion

    of tr

    affic

    sig

    nals

    . Whe

    n a

    vehi

    cle

    dete

    ctio

    n de

    vice

    mal

    func

    tions

    this

    cau

    ses

    incr

    ease

    s in

    del

    ays

    and

    redu

    ces

    trave

    l tim

    e re

    liabi

    lity

    alon

    g th

    e co

    rrido

    r. In

    Pal

    m B

    each

    C

    ount

    y, th

    ere

    are

    two

    type

    s of

    veh

    icle

    det

    ectio

    n de

    vice

    s th

    at a

    re p

    redo

    min

    atel

    y us

    ed: v

    ideo

    det

    ectio

    n ca

    mer

    as a

    nd in

    pa

    vem

    ent i

    nduc

    tive

    loop

    s.

    Traf

    fic c

    urre

    ntly

    has

    a p

    artia

    l veh

    icle

    det

    ectio

    n cr

    ew th

    at w

    orks

    at n

    ight

    to re

    pair

    and

    inst

    all d

    etec

    tion

    devi

    ces.

    Thi

    s cr

    ew

    is s

    uppl

    emen

    ted

    by C

    onst

    ruct

    ion

    Wor

    ker 1

    s fro

    m th

    e da

    y sh

    ifts

    who

    will

    wor

    k ni

    ghts

    to h

    elp

    mak

    e th

    e co

    mpl

    ete

    crew

    . Th

    e ad

    ditio

    nal s

    taff

    wou

    ld p

    rovi

    de fo

    r a c

    ompl

    ete

    full

    time

    crew

    ded

    icat

    ed to

    veh

    icle

    det

    ectio

    n in

    stal

    latio

    n an

    d re

    pair

    and

    free

    up th

    e da

    y tim

    e co

    nstru

    ctio

    n st

    aff t

    hat h

    ave

    been

    sup

    plem

    entin

    g th

    is n

    ight

    cre

    w. H

    avin

    g th

    is d

    edic

    ated

    cre

    w w

    ould

    le

    ad to

    fast

    er re

    pairs

    and

    inst

    alla

    tion

    of v

    ehic

    le d

    etec

    tion

    devi

    ces.

    Tra

    ffic

    curre

    ntly

    has

    a c

    ontra

    ctor

    that

    pro

    vide

    s lo

    op

    inst

    alla

    tion.

    Thi

    s co

    ntra

    ct s

    tarte

    d to

    sup

    port

    the

    Traf

    fic E

    ngin

    eerin

    g D

    ivis

    ion

    in 2

    017.

    Sin

    ce th

    en, T

    raffi

    c ha

    s fo

    und

    that

    th

    ey d

    o no

    t pro

    vide

    the

    sam

    e qu

    ality

    of s

    ervi

    ces

    as th

    e in

    hou

    se c

    rew

    can

    in te

    rms

    of re

    spon

    se ti

    me,

    pro

    ject

    com

    plet

    ion

    time

    and

    cost

    .

    This

    pro

    posa

    l is

    antic

    ipat

    ed to

    hav

    e th

    e fo

    llow

    ing

    bene

    fits:

    *

    Fas

    ter i

    nsta

    llatio

    n of

    in p

    avem

    ent v

    ehic

    le d

    etec

    tion

    (loop

    det

    ectio

    n). C

    an c

    ompl

    ete

    loop

    inst

    alla

    tion

    at a

    n in

    ters

    ectio

    n 37

    .9 d

    ays

    fast

    er u

    sing

    in h

    ouse

    sta

    ff ve

    rsus

    a c

    ontra

    ctor

    .

    * S

    ave

    Pal

    m B

    each

    Cou

    nty

    driv

    ers

    appr

    oxim

    atel

    y $4

    3,94

    2 pe

    r int

    erse

    ctio

    n in

    del

    ay s

    avin

    gs.

    *

    Inst

    all m

    ore

    loop

    s in

    hou

    se a

    t a ra

    te o

    f $47

    5 pe

    r loo

    p ve

    rsus

    a c

    ontra

    ctor

    inst

    all a

    t $1,

    200

    per l

    oop.

    In y

    ear o

    ne, w

    e an

    ticip

    ate:

    a

    ) To

    assi

    gn a

    t lea

    st 1

    10 m

    ore

    loop

    s to

    our

    in h

    ouse

    cre

    ws

    whi

    ch is

    equ

    ival

    ent t

    o 28

    inte

    rsec

    tions

    .

    b) S

    ave

    $79,

    750

    in a

    nnua

    l bud

    get b

    y ha

    ving

    the

    wor

    k co

    mpl

    eted

    in h

    ouse

    ver

    sus

    cont

    ract

    or.

    c

    ) Sav

    e P

    alm

    Bea

    ch C

    ount

    y dr

    iver

    s $1

    ,230

    ,386

    in d

    elay

    .

    d) S

    ave

    appr

    oxim

    atel

    y $1

    ,310

    ,136

    ove

    rall

    by re

    assi

    gnin

    g m

    ore

    wor

    k to

    in h

    ouse

    cre

    ws.

    e

    ) Est

    imat

    e av

    erag

    e de

    lay

    savi

    ngs

    = 48

    veh

    icle

    -hou

    rs p

    er d

    ay p

    er in

    ters

    ectio

    n if

    loop

    det

    ectio

    n is

    inst

    alle

    d in

    ho

    use.

    *

    Red

    uce

    the

    time

    vehi

    cle

    dete

    ctio

    n sy

    stem

    s ar

    e ou

    t.

    * R

    educ

    e de

    lay

    asso

    ciat

    ed w

    ith d

    amag

    ed v

    ehic

    le d

    etec

    tion.

    *

    Impr

    ove

    the

    Cou

    nty'

    s In

    frast

    ruct

    ure

    Met

    rics:

    Red

    uce

    annu

    al a

    vera

    ge tr

    affic

    del

    ay, p

    eak

    perio

    d tra

    vel t

    ime,

    and

    im

    prov

    e tra

    vel t

    ime

    relia

    bilit

    y an

    d bu

    s on

    tim

    e pe

    rform

    ance

    .

    * Im

    prov

    e pr

    oduc

    tivity

    and

    cos

    ts a

    ssoc

    iate

    d w

    ith v

    ehic

    le d

    etec

    tion

    inst

    alla

    tion

    and

    mai

    nten

    ance

    ser

    vice

    s.

    This

    requ

    est i

    nclu

    des

    the

    purc

    hase

    of o

    ne 4

    2ft.

    buck

    et tr

    uck

    and

    one

    quad

    cab

    4x4

    truc

    k.

    Uni

    t: Tr

    affic

    Ope

    ratio

    nsR

    eque

    stin

    g: V

    ehic

    le D

    etec

    tion

    Cre

    w

    14

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    28,0

    0010

    3,56

    9(5

    1,78

    5)79

    ,784

    279

    ,784

    2

    Uni

    t: Tr

    affic

    Ope

    ratio

    nsR

    eque

    stin

    g: T

    raffi

    c S

    igna

    l Sys

    tem

    Des

    ign

    and

    Inst

    alla

    tion

    Sta

    ff

    Con

    stru

    ctio

    n C

    oord

    inat

    or (S

    igna

    l Ins

    pect

    or) (

    1) P

    ay G

    rade

    33

    (ann

    ual c

    ost $

    75,9

    24)

    Tech

    nica

    l Aid

    e (1

    ) Pay

    Gra

    de 1

    9 (a

    nnua

    l cos

    t $54

    ,600

    )

    The

    Traf

    fic S

    igna

    l Des

    ign

    sect

    ion

    curre

    ntly

    sup

    ports

    70+

    pro

    ject

    s ev

    ery

    year

    in w

    hich

    traf

    fic s

    igna

    ls a

    re in

    stal

    led

    and

    or

    traffi

    c si

    gnal

    sys

    tem

    com

    pone

    nts

    are

    incl

    uded

    . The

    Tra

    ffic

    Sig

    nal D

    esig

    n se

    ctio

    n ge

    nera

    lly p

    rovi

    des

    traffi

    c si

    gnal

    des

    ign

    and

    cons

    truct

    ion

    insp

    ectio

    n se

    rvic

    es. T

    hese

    pro

    ject

    s ar

    e co

    mpl

    eted

    thro

    ugh

    a co

    mbi

    natio

    n of

    in h

    ouse

    sta

    ff an

    d co

    nsul

    tant

    sup

    port.

    It is

    est

    imat

    ed th

    at 5

    0% o

    f the

    tim

    e w

    ould

    be

    char

    geab

    le to

    pro

    ject

    s.

    This

    pro

    posa

    l is

    antic

    ipat

    ed to

    hav

    e th

    e fo

    llow

    ing

    bene

    fits:

    *

    Red

    uce

    the

    time

    it ta

    kes

    to in

    stal

    l a m

    ast a

    rm tr

    affic

    sig

    nal f

    rom

    40

    mon

    ths

    to 3

    0 m

    onth

    s.

    *R

    educ

    e th

    e tim

    e it

    take

    s to

    inst

    all a

    spa

    n w

    ire tr

    affic

    sig

    nal f

    rom

    36

    mon

    ths

    to 2

    4 m

    onth

    s.

    *R

    educ

    e w

    ork

    zone

    rela

    ted

    dela

    ys b

    y re

    duci

    ng th

    e tim

    e it

    take

    s to

    inst

    all a

    traf

    fic s

    igna

    l.

    *Im

    prov

    e re

    spon

    se ti

    me

    to c

    onst

    ruct

    ion

    issu

    es.

    *

    Sav

    e th

    e C

    ount

    y ap

    prox

    imat

    ely

    $32,

    000

    per y

    ear i

    n ad

    min

    istra

    tive

    cost

    s by

    hav

    ing

    low

    er le

    vel s

    taff

    perfo

    rm th

    e ad

    min

    istra

    tive

    task

    s as

    soci

    ated

    with

    wor

    k or

    ders

    .

    *R

    educ

    e th

    e tim

    e to

    pro

    cess

    wor

    k or

    ders

    from

    10

    wee

    ks to

    4 w

    eeks

    .

    *R

    educ

    e th

    e tim

    e to

    pro

    cess

    invo

    ices

    from

    8 w

    eeks

    to 2

    wee

    ks.

    *

    Impr

    ove

    the

    Cou

    nty'

    s In

    frast

    ruct

    ure

    Met

    rics:

    Red

    uce

    annu

    al a

    vera

    ge tr

    affic

    del

    ay, p

    eak

    perio

    d tra

    vel t

    ime,

    and

    im

    prov

    e tra

    vel t

    ime

    relia

    bilit

    y an

    d bu

    s on

    tim

    e pe

    rform

    ance

    .

    *S

    uppo

    rts th

    e C

    ount

    y's

    Mis

    sion

    to a

    chie

    ve a

    hig

    h le

    vel o

    f pub

    lic s

    atis

    fact

    ion

    by p

    rovi

    ding

    Tra

    ffic

    Sig

    nal s

    yste

    ms

    fast

    er

    and

    min

    imiz

    ing

    wor

    k zo

    ne re

    late

    d de

    lay.

    $51,

    785

    in re

    venu

    e is

    exp

    ecte

    d fro

    m th

    e FD

    OT

    acco

    rdin

    g to

    the

    traffi

    c si

    gnal

    mai

    nten

    ance

    agr

    eem

    ent a

    ppro

    ved

    by

    BC

    C.

    15

  • One

    Tim

    eR

    ecur

    ring

    Rev

    enue

    Net

    P

    os.

    Bud

    get

    Pos

    .

    Pal

    m B

    each

    Cou

    nty,

    Flo

    rida

    Sup

    plem

    enta

    l Req

    uest

    Req

    uest

    edA

    ppro

    ved

    022

    ,964

    022

    ,964

    211

    ,482

    1Te

    chni

    cal A

    ssis

    tant

    I (2

    ) Pay

    Gra

    de 2

    4 (a

    nnua

    l cos

    t $12

    2,47

    2)

    Roa

    dway

    Pro

    duct

    ion

    curre

    ntly

    has

    2 T

    echn

    ical

    Ass

    ista

    nts

    I. C

    urre

    ntly

    onl

    y on

    e Te

    chni

    cal A

    ssis

    tant

    I is

    ava

    ilabl

    e to

    wor

    k fu

    ll tim

    e on

    the

    proc

    essi

    ng o

    f co

    nsul

    tant

    's s

    cope

    and

    fee

    subm

    ittal

    s fo

    r the

    des

    ign

    cont

    ract

    s on

    pro

    ject

    s id

    entif

    ied

    on

    the

    5 Y

    ear R

    oad

    Pro

    gram

    , Loc

    al R

    oads

    (MS

    TU),

    Traf

    fic D

    ivis

    ion,

    Roa

    d an

    d B

    ridge

    Div

    isio

    n, a

    nd o

    ther

    mis

    cella

    neou

    s pr

    ojec

    ts. O

    ver t

    he p

    ast t

    wo

    fisca

    l yea

    rs, t

    here

    has

    bee

    n a

    sign

    ifica

    nt in

    crea

    se in

    the

    volu

    me

    of d

    esig

    n pr

    ojec

    ts p

    rodu

    ced

    by th

    e D

    ivis

    ion,

    man

    y of

    whi

    ch a

    re a

    ttrib

    uted

    to p

    roje

    cts

    fund

    ed b

    y th

    e re

    cent

    ly a

    ppro

    ved

    Infra

    stru

    ctur

    e S

    ales

    Tax

    . The

    nu

    mbe

    r of a

    men

    dmen

    ts to

    ann

    ual c

    ontra

    cts

    has

    also

    incr

    ease

    d in

    ord

    er to

    kee

    p th

    em c

    ompl

    iant

    with