blp -ss hydraulic accumulatorhidraer.com/pdf/blp-ss.pdf20 psi with dry nitrogen gas. this pre-charge...

3
HIDRAER S.L CIF :B66 c/ Leonardo da Vinci Web: www.hidraer.co HYDRAULIC ACCUMULAT Bladder type LOW PRESSURE NOMINAL CAPACITY (L) MWP ( Bar) T 4 80 10 80 20 80 35 80 50 80 >50 CONSULT 6300039 i 14 ;08901 L´Hospitalet de Llobregat / Barcelona -España om E-mail: [email protected] E Stainless Steel Design Features include: Bladder type 316 -304 Stainless steel welded-f Design approved to CE marke available if required). U code option available, for more Working pressure from 10 to 80 Optional bladder materials to suit Optional fluid end connections th Material certification to BS EN 10 Benefits: High corrosion resistance typically for API Low inertia and fast response for control s Applications Mechanical Sealing Systems API Plan 53B is a dual pressurized system t with the barrier liquid. The Plan 53B u physical barrier between the gas and t pressurized with gas prior to filling the sys system is filled, the bladder is compr pressure on the barrier liquid. Circulation i Lubricating systems;Compressor The purpose of LP-SS is to provide suffici of pump failure we can supply enough meanwhile the auxiliary pump reaches o Water Distribution ;Processing pr Low pressure Offshore applicatio Condition Monitoring units Hydraulic valve actuators ,pipelin Accessories Safety Blocks , oil side Manometer, burst disc ,transfer s SS brackets , fitting, clamps TYPE CERTIFICATION L ( WELDED /FORGED CE/ASME/ USTAMP WELDED /FORGED CE/ASME/ USTAMP WELDED /FORGED CE/ASME/ USTAMP WELDED /FORGED CE/ASME/ USTAMP WELDED /FORGED CE/ASME/ USTAMP WELDED /FORGED CE/ASME/ USTAMP 10-80 Bar forged construction. ed (calculated ASME VIII Div 1 e information please contact us. Bar. t system fluid hreaded or flanged. 0204 3.1 if requested. systems or O&G applications system applications I 682: PLAN 53B, 53BM, that eliminates direct gas contact uses a bladder accumulator as a the barrier fluid. The bladder is stem with barrier liquid. As the ressed thus providing a positive is via a pumping ring & gas turbines (API 614:PLAN 54 ient flow to API system ,in case h oil to lubricate the systems operating conditions. roduced fluids ons ;TOP side applications ne shock absorbers system adapted block up side ( mm) D ( mm) WEIGHT CONSULT 355 220 - 232 30 575 220 - 232 45 885 220 - 232 63 1405 220 - 232 95 1920 220 - 232 124 HYDRAULIC ACCUMULATOR BLP -SS

Upload: others

Post on 22-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BLP -SS HYDRAULIC ACCUMULATORhidraer.com/pdf/BLP-SS.pdf20 psi with dry Nitrogen gas. This pre-charge protects the bladders from getting damaged during shipping. After installation

HIDRAER S.L CIF :B66300039 c/ Leonardo da Vinci 14 ;08901 L´Hospitalet de Llobregat / Barcelona Web: www.hidraer.com

HYDRAULIC ACCUMULATOR Bladder type LOW PRESSURE

NOMINAL CAPACITY (L)

MWP ( Bar)

TYPE

4 80

10 80

20 80

35 80

50 80

>50 CONSULT

:B66300039

c/ Leonardo da Vinci 14 ;08901 L´Hospitalet de Llobregat / Barcelona -España www.hidraer.com E-mail: [email protected]

LOW PRESSURE Stainless Steel

Design Features include:

• Bladder type • 316 -304 Stainless steel welded-forged• Design approved to CE marked (

available if required). • U code option available, for more information please contact us.• Working pressure from 10 to 80 Bar• Optional bladder materials to suit system fluid • Optional fluid end connections threaded or flanged.• Material certification to BS EN 10204 3.1 if requested.

Benefits: High corrosion resistance typically for API systemsLow inertia and fast response for control system applications

Applications

• Mechanical Sealing Systems API Plan 53B is a dual pressurized system that eliminates direct gas cwith the barrier liquid. The Plan 53B uses a bladder accumulator as a physical barrier between the gas and the barrierpressurized with gas prior to filling the system with barrier liquid. As thesystem is filled, the bladder is compressed thus providing a positpressure on the barrier liquid. Circulation is via a pumping ring

• Lubricating systems;Compressor &The purpose of LP-SS is to provide sufficientof pump failure we can supply enoughmeanwhile the auxiliary pump reaches operating conditions

• Water Distribution ;Processing produced fluids• Low pressure Offshore applications• Condition Monitoring units • Hydraulic valve actuators ,pipeline

Accessories

• Safety Blocks , oil side • Manometer, burst disc ,transfer system adapted block up side • SS brackets , fitting, clamps

TYPE CERTIFICATION L ( mm)

WELDED /FORGED CE/ASME/ USTAMP

WELDED /FORGED CE/ASME/ USTAMP

WELDED /FORGED CE/ASME/ USTAMP

WELDED /FORGED CE/ASME/ USTAMP

WELDED /FORGED CE/ASME/ USTAMP

WELDED /FORGED CE/ASME/ USTAMP

10-80 Bar

forged construction. CE marked (calculated ASME VIII Div 1

U code option available, for more information please contact us. 10 to 80 Bar.

Optional bladder materials to suit system fluid Optional fluid end connections threaded or flanged. Material certification to BS EN 10204 3.1 if requested.

API systems or O&G applications Low inertia and fast response for control system applications

API 682: PLAN 53B, 53BM, Plan 53B is a dual pressurized system that eliminates direct gas contact

Plan 53B uses a bladder accumulator as a physical barrier between the gas and the barrier fluid. The bladder is pressurized with gas prior to filling the system with barrier liquid. As the system is filled, the bladder is compressed thus providing a positive

Circulation is via a pumping ring

Compressor & gas turbines (API 614:PLAN 54 sufficient flow to API system ,in case

enough oil to lubricate the systems operating conditions.

Processing produced fluids applications ;TOP side applications

Hydraulic valve actuators ,pipeline shock absorbers

,transfer system adapted block up side

L ( mm) D ( mm) WEIGHT

CONSULT

355 220 - 232 30

575 220 - 232 45

885 220 - 232 63

1405 220 - 232 95

1920 220 - 232 124

HYDRAULIC ACCUMULATOR BLP -SS

Page 2: BLP -SS HYDRAULIC ACCUMULATORhidraer.com/pdf/BLP-SS.pdf20 psi with dry Nitrogen gas. This pre-charge protects the bladders from getting damaged during shipping. After installation

gradation of product.

n Creates steady and continuous flow when dosing, blending or proportioning additives.

n Ensures accuracy, longevity, and repeat-ability of in-line meters.

n Enables uniform application of material in spraying and coating systems.

n Reduces agitation, foaming, splashing and de

n Provides liquid energy storage for emer-gency valve closure and other equipment shutdown.

n Reduces overall energy cost with continuous flow, rather than start/stop flow.

n Operates as a reservoir for make-up fluid.

n Protects pipes, valves, fittings, meters, and in-line instrumentation from destructive pulsations, surges, cavitations, thermal expansion, and water-hammer.

HIDRAER S.L CIF :B66300039 c/ Leonardo da Vinci 14 ;08901 L´Hospitalet de Llobregat / Barcelona Web: www.hidraer.com

CIF :B66300039

c/ Leonardo da Vinci 14 ;08901 L´Hospitalet de Llobregat / Barcelona -España www.hidraer.com E-mail: [email protected]

HIDRAER BLP Benefits:

Hidraer BLP mainly range for API plans and seal applications are designed to maintain flow and pressure to the seal systems ,High reliability as a stand-alone system without need for a permanent nitrogen source and external pressure , this reduces the possibility of costly damage to the pumps , compressors ,etc,..

HYDRAULIC ACCUMULATOR Bladder type LOW PRESSURE

LOW PRESSURE Stainless Steel 10-80 Bar HYDRAULIC ACCUMULATOR BLP -SS

Page 3: BLP -SS HYDRAULIC ACCUMULATORhidraer.com/pdf/BLP-SS.pdf20 psi with dry Nitrogen gas. This pre-charge protects the bladders from getting damaged during shipping. After installation

Features:

A

BB

A

C4 to 50 Liters 100 to 2000 Liters

Hidraer BLP accumulators are made for mainly range for API plans ,barrier fluid system pressurized by a bladder accumulator supplying clean liquid for pressurizing the seal.The barrier fluid and nitrogen are separated by a bladder which effectively prevents the nitrogen from mixing with the barrier fluid

Pre-Charge Monitor Schedule

For newly installed units, the pre-charge should be monitored every two weeks. There should be no fluid pumping through the pipeline during this process. If the pre-charge has dropped, then more Nitrogen gas should be pumped into the bladder to raise the pre-charge in the bladder to the recommended pressure. When there is no loss of pre-charge noticed, the pre-charge should be monitored every four weeks.

Caution: Do not use Oxygen or air to pre-charge the bladder. Use only Nitrogen for pre-charging.

The Accumulators, Surge Suppressors and Pulsation dampeners shipped from the factory of Hidraer are normally pre-charged to20 psi with dry Nitrogen gas. This pre-charge protects the bladders from getting damaged during shipping. After installation of the unit, the bladder inside the unit needs to be properly pre-charged with dry Nitrogen gas to 70-80% of the working pressure of the pipeline. The pre-charging is accomplished before the fluid starts pumping in the pipeline.

HIDRAER S.L CIF :B66300039 c/ Leonardo da Vinci 14 ;08901 L´Hospitalet de Llobregat / Barcelona Web: www.hidraer.com

CIF :B66300039

c/ Leonardo da Vinci 14 ;08901 L´Hospitalet de Llobregat / Barcelona -España www.hidraer.com E-mail: [email protected]

n Buna-N bladder standard; other compounds available: Viton, EPR, Hydrin

European CE, Canadian CRN, Brazilian NR-13, Chinese SELO, and Malaysian DOSH

n 304 Stainless Steel construction standard(316 Stainless Steel construction available)

n Other certifications available:

n API Standard 614

n Buna-N compound bladder (Other bladder compounds available upon request)

n Transfer barrier design to maximize usable volume

n Designed and stamped per CE+PED 2014/68 UE or ASME Code Section VIII, Div. 1

n Temperature service -40°C to +145°Cn 330 Bar maximum design

HYDRAULIC ACCUMULATOR Bladder type LOW PRESSURE

LOW PRESSURE Stainless Steel 10-80 Bar HYDRAULIC ACCUMULATOR BLP -SS