blow out preventer system
TRANSCRIPT
RIG PDSI #15.3/N110-MPT PERTAMINA DRILLING SERVICES
INDONESIAAREA JAWA
BLOWOUT PREVENTER SYSTEM
Kreshna wisnu brata12010133
TEKNIK PERMINYAKAN
*WHY THIS HAPPENS ?* WHAT CAUSES IT?
*COULD IT IN PREVENT?
SHOULD BOP ?
*The Background
Blow Out
Pf >> Ph
Blow Out Equipment
* Kick Indication
Drilling Break
The weight of
mud down
Temperatur mud and pressure abnormal
rise
Pressure down
Volume of mud thank
rise
Current speed in flow line
rise
Rig Crew Less Training
Pressure Hidrostatik Down
Pressure Abnormal Formation
Tools not good function
Late Handled Kick
Rig Crew Less Training For Close and Kill Whel
Factor Kick
Factor Blow Out
*Bop Stuck 13 5/8’’- 5000 psiTrayek Casing 7’’
BLOWOUT PREVENTER (BOP) EQP.
FUNCTION BOP EQP.
Close well at situation there a pipe or not pipe stripping in or stripping out
Withstand pressure well that arise and can be passed all the equipment who were used to operating the drilling / rework
Control well pressure and can be used for workcirculation kill kick
Hang (hanging off) and cut the drill pipe in an emergency.
Having a system backup equipment if one breaks down, specifically for high pressure wells
BOPEQUIPMENT
BOP Stack Type
1. Annular Type BOP2. Ram Type BOP3. Diverter
BOP In a pipe
1. Upper Kelly Cock2. Lower Kelly Cock3. Inside BOP4. Drill Pipe Float Valve
Control System
1. Accumulator Unit2. Driller Remote Control Panel
Line ControlSysteml
1. Drilling Spool2. Killing Line3. Choke Line4. Choke Manifold 5. Manual Choke & Super Choke
*Annular PreventerHYDRIL Type GK
13- 5/8 ‘’Flexible Closing Tools
Closing the Hole In Pipe Nor There
Ways of working ?Packing ElementPressing piston powered Rubber Nitrogen Fluid From Accumulator Unit
*WORKING ANNULAR
CLOSE OPENNETRAL
Accumulator Bank
*Ram Preventer
o The workings of Ram uses hydraulic fluid from the accumulator unit to open and close the wild bursts
Pipe Ram
Blind Ram
Shear Ram
*KERJA RAM
13
Closing
Dril
lpip
e
Opening
SICP
Leak while closed
*BOP inside pipe *Upper Kelly Cock 3- ½ ‘’ Between the swivel and the kelly joint to isolate the mud from the drill string with a swivel, rotary house and stand pipe in the event of a leakLower Kelly cock 3- ½ ‘’ under kellyTo prevent mud from falling apart as a freelance kelly kelly, which accommodated the pressure of 5000 psi
* INSIDE BOP*close / withstand pressure from the string during a kick or bursts.
*Inside bop should be available on the rig floor position Standby
Drilling Spools CONNECTION
Kill Line Choke Line
Kill line 2 1/8” x 10.000 psiChoke line 3-1/8’’ x
10.000 psi
* Kill line serves as a conduit to the injection of fluid into the well if
necessary to shut down wellsChoke line
To stream high pressure fluid to the manifold in case of kick
*Back Pressure Manifold
CHOKE MANIFOLD OR BACK PRESSURE MANIFOLD
serves as a flow divider in the event kick by dividing the flow of appropriate safety procedures
Accumulator Unit
o Accumulator unit steel which contains high-pressure nitrogen
o Known for Closing Unit has the main function to close the BOP during a kick
o Accumulator unit produksi ABS 80
o 3000 Psio 3 unit Air Pump, 1 unit
Triplexo 20 Botol
* BOP Remote Control Panel
Operation Drilling
Rig FLoorDriller
*Prosedur Closed Well
1. Soft ClosedOpen choke line valveClosed BOPClosed choke slowlyRead and record the
pressure cap drill pipe and casing
2. Hard ClosedClosed BOPOpen choke line slowlyRead and record the
pressure cap drill pipe and casing
* Metode Killing Well
Wait and Weight Driller Concurre
nt
* CONCLUSION*BOP (Blowout Preventer) is a tool used to
cover / hold kick or the flow of formation fluids into the wellbore uncontrolled
*Source of power Acummulator is the water pump and Electric pump
*Back Pressure Manifold serves to mud to mud gas to separator, reserve pit, or flare
*BOP handling system on RIG PDSI #15.3/N110-M wells relatively good, as long as the drilling does not problem