LIVE CASE STUDY
CONTENT INTRODUCTION SITE PLANNING LAYOUT BUILDING AESTHETICS INTERNAL ENVIRONMENT
CONDITION STRUCTURES AND MATERIAL SERVICES SPECIAL FEATURES INFERENCE
INTRODUCTION
ABOUT ARCHITECTS:GAYATHRI AND NAMITH ASSOCIATES
• DESIGNS ALMOST ALWAYS WRAP AROUND NATURE WITH NO CLEAR BOUNDARIES.
• FORM FOLLOWS FUNCTION APPROACH.
• IT IS ESTABLISHED BY THE GOVERNMENT OF KARNATAKA TO CATER TO THE HOUSING NEEDS OF THE ECONOMICALLY AND SOCIALLY WEAKER SECTIONS OF THE SOCIETY. REGISTERED IN APRIL 2000, ITS AUTHORIZED CAPITAL IS RS. 10 CRORES.
• FUNDED BY : RAJIV GANDHI RURAL HOUSING CORPORATION• DESIGN AND LAYOUT : GAYATHRI AND NAMITH ASSOCIATES
BEEDI WORKERS COLONY
TECHNICAL DATA• LOCATION: KENGERI, BANGALORE• START OF PROJECT : 2003• POPULATION : 4500• NUMBER OF HOUSES : 800• AREA : 11.13 ACRES• UNIT COST : RS. 97000/-• ARCHITECTS: GAYATHRI & NAMITH ASSOCIATES.
CLIMATIC Condition
LOCATION: Kengeri main road. CLIMATE: Tropical savanna (typical wet dry climate) TEMPERATURE: mean max- 36 degree C. mean min- 17 degree C. AVG ANNUAL RAINFALL: 859mm. TOPOGRAPHY: 949m above sea level.
SITE PLANNING
LOCATION
ROAD NETWORK
BEEDI WORKER’S COLONY
MAJOR ROADS
MINOR ROADS
INTERNAL ROADS
URBANISED on north east parts
BEEDI WORKERS COLONY
GREEN LANDS on the South west, west and north west
Impacts of site on site planning
LAYOUT
BEEDI WORKERS COLONY
RAILWAY STATION
2 Km
HOSPITAL
3.1 Km
POLICE STATION
2.3 Km
Proximity Chart
BUS STOP
1.9 Km
BANK2.5 Km
FIRE STATIO
N
7.5 Km
3.3
KmPETROL BUNK
GAS STATION
1.7 km
ZONING
PUBLIC
SEMI PRIVATE
PRIVATE
EASTWEST
SUN PATH & WIND MOVEMENT
MONSOON WINDS
SUMMER WINDS
LIGHTING & VENTILATION
BUILDING
ISOMETRIC VIEW
SHADING DEVICESOPEN COURTYARDS
BASIC PLAN
Bedroom
COURTYARD
BATHROOM
HALL kitchen
AESTHETICS
EXTERIOR (form & texture)
SERVICES
Sanitary •One pipe system.•Approx 2000kg of effluent is collected. •Daily flow of water: 36/m3/day•Effluent collected is further carried to treatment plants.
BIOGASBiogas used for: cookingBiogas generation: 5m3/dayApprox 120 house are benefitted from bio-gas plant.It provides gas for cooking & manure for gardening purpose RAIN WATER HARVESTING•Ample rain water is collected & stored.(water tank capacity is about 80K litters)
CONCLUSION
Strength.Level: ground to earth, i.e. G+1hence no need of lift.Community: since it’s a community based project security would not be least concern.Services: RWH, Bio-gas plant, water treatment plant, makes the community self dependent.
Weakness.Location: site located on outskirts.Travelling: since site is located on outskirts,Travelling is an issue for EWS people.Commercials: no major commercial space alloted.
OpportunityCentral open courtyards can be used for landscaping.
Threats.No compound walls causes threat for community.
SWOT ANALYSI
S.
DEMERITS
there are no boundary , or fencing provided – no safety
no allotted parking spaces
scarcity of water – summers
Self depended Good amount of area around every
housing unit (set back, courtyard in between)
Using low cost materials ( which were available locally)
Filler slab ( aesthetic quality , decreases weight of slab)
Schools , commercial , mosque, all available with in the locality
Even though there are 20 houses in each unit , each house has a good amount of lighting and ventilation
The houses in ground floors are provided with outdoor area, and the people living on the first floor are provided with terraces
Insurance – natural disaster
MERITS