architectural case study on Beedi workers colony Bangalore.

TRANSCRIPT

Page 1: Beedi Workers Colony Case Study

LIVE CASE STUDY

Page 2: Beedi Workers Colony Case Study

CONTENT INTRODUCTION SITE PLANNING LAYOUT BUILDING AESTHETICS INTERNAL ENVIRONMENT

CONDITION STRUCTURES AND MATERIAL SERVICES SPECIAL FEATURES INFERENCE

Page 3: Beedi Workers Colony Case Study

INTRODUCTION

Page 4: Beedi Workers Colony Case Study

ABOUT ARCHITECTS:GAYATHRI AND NAMITH ASSOCIATES

• DESIGNS ALMOST ALWAYS WRAP AROUND NATURE WITH NO CLEAR BOUNDARIES.

• FORM FOLLOWS FUNCTION APPROACH.

Page 5: Beedi Workers Colony Case Study

• IT IS ESTABLISHED BY THE GOVERNMENT OF KARNATAKA TO CATER TO THE HOUSING NEEDS OF THE ECONOMICALLY AND SOCIALLY WEAKER SECTIONS OF THE SOCIETY. REGISTERED IN APRIL 2000, ITS AUTHORIZED CAPITAL IS RS. 10 CRORES.

• FUNDED BY : RAJIV GANDHI RURAL HOUSING CORPORATION• DESIGN AND LAYOUT : GAYATHRI AND NAMITH ASSOCIATES

Page 6: Beedi Workers Colony Case Study

BEEDI WORKERS COLONY

TECHNICAL DATA• LOCATION: KENGERI, BANGALORE• START OF PROJECT : 2003• POPULATION : 4500• NUMBER OF HOUSES : 800• AREA : 11.13 ACRES• UNIT COST :  RS. 97000/-• ARCHITECTS: GAYATHRI & NAMITH ASSOCIATES.

Page 7: Beedi Workers Colony Case Study

CLIMATIC Condition

LOCATION: Kengeri main road. CLIMATE: Tropical savanna (typical wet dry climate) TEMPERATURE: mean max- 36 degree C. mean min- 17 degree C. AVG ANNUAL RAINFALL: 859mm. TOPOGRAPHY: 949m above sea level.

Page 8: Beedi Workers Colony Case Study

SITE PLANNING

Page 9: Beedi Workers Colony Case Study

LOCATION

Page 10: Beedi Workers Colony Case Study

ROAD NETWORK

BEEDI WORKER’S COLONY

MAJOR ROADS

MINOR ROADS

INTERNAL ROADS

Page 11: Beedi Workers Colony Case Study

URBANISED on north east parts

BEEDI WORKERS COLONY

GREEN LANDS on the South west, west and north west

Impacts of site on site planning

Page 12: Beedi Workers Colony Case Study

LAYOUT

Page 13: Beedi Workers Colony Case Study

BEEDI WORKERS COLONY

RAILWAY STATION

2 Km

HOSPITAL

3.1 Km

POLICE STATION

2.3 Km

Proximity Chart

BUS STOP

1.9 Km

BANK2.5 Km

FIRE STATIO

N

7.5 Km

3.3

KmPETROL BUNK

GAS STATION

1.7 km

Page 14: Beedi Workers Colony Case Study

ZONING

PUBLIC

SEMI PRIVATE

PRIVATE

Page 15: Beedi Workers Colony Case Study

EASTWEST

SUN PATH & WIND MOVEMENT

MONSOON WINDS

SUMMER WINDS

Page 16: Beedi Workers Colony Case Study

LIGHTING & VENTILATION

Page 17: Beedi Workers Colony Case Study

BUILDING

Page 18: Beedi Workers Colony Case Study

ISOMETRIC VIEW

SHADING DEVICESOPEN COURTYARDS

Page 19: Beedi Workers Colony Case Study

BASIC PLAN

Bedroom

COURTYARD

BATHROOM

HALL kitchen

Page 20: Beedi Workers Colony Case Study

AESTHETICS

Page 21: Beedi Workers Colony Case Study

EXTERIOR (form & texture)

Page 22: Beedi Workers Colony Case Study

SERVICES

Page 23: Beedi Workers Colony Case Study

Sanitary •One pipe system.•Approx 2000kg of effluent is collected. •Daily flow of water: 36/m3/day•Effluent collected is further carried to treatment plants.

BIOGASBiogas used for: cookingBiogas generation: 5m3/dayApprox 120 house are benefitted from bio-gas plant.It provides gas for cooking & manure for gardening purpose RAIN WATER HARVESTING•Ample rain water is collected & stored.(water tank capacity is about 80K litters)

Page 24: Beedi Workers Colony Case Study
Page 25: Beedi Workers Colony Case Study

CONCLUSION

Page 26: Beedi Workers Colony Case Study

Strength.Level: ground to earth, i.e. G+1hence no need of lift.Community: since it’s a community based project security would not be least concern.Services: RWH, Bio-gas plant, water treatment plant, makes the community self dependent.

Weakness.Location: site located on outskirts.Travelling: since site is located on outskirts,Travelling is an issue for EWS people.Commercials: no major commercial space alloted.

OpportunityCentral open courtyards can be used for landscaping.

Threats.No compound walls causes threat for community.

SWOT ANALYSI

S.

Page 27: Beedi Workers Colony Case Study

DEMERITS

there are no boundary , or fencing provided – no safety

no allotted parking spaces

scarcity of water – summers

Self depended Good amount of area around every

housing unit (set back, courtyard in between)

Using low cost materials ( which were available locally)

Filler slab ( aesthetic quality , decreases weight of slab)

Schools , commercial , mosque, all available with in the locality

Even though there are 20 houses in each unit , each house has a good amount of lighting and ventilation

The houses in ground floors are provided with outdoor area, and the people living on the first floor are provided with terraces

Insurance – natural disaster

MERITS