BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014 BeamWell(former StingRay-DC) FILAMENT POWER SUPPLY Operating Manual Manual Version 2.3 (March 2014) Stingray Version V2 DC FT / Rack-Mount The Stingray-DC filament power supply is compatible with the following products: “WARP” High-Voltage Power Supply, “CARRERA” High-Voltage Power Supply and “BeamTrek Evaporation Controller” SmartBeam Design SRL 287 Theodor Pallady, S3 032258, Bucharest, Romania T: +40 21 318 6929 F: +40 21 345 0055 [email protected] www.smartegun.com

Upload: doanhanh

Post on 06-Feb-2018

243 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

“BeamWell”

(former StingRay-DC) FILAMENT POWER SUPPLY

Operating Manual

Manual Version 2.3 (March 2014) Stingray Version V2 DC FT / Rack-Mount

The Stingray-DC filament power supply is compatible with the following products: “WARP” High-Voltage Power Supply, “CARRERA” High-Voltage Power Supply and “BeamTrek Evaporation Controller”

SmartBeam Design SRL 287 Theodor Pallady, S3 032258, Bucharest, Romania T: +40 21 318 6929 F: +40 21 345 0055 [email protected] www.smartegun.com

Page 2: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

Liability

The manufacturer´s liability for the Stingray-DC® Filament power

supply is based on the principles of Romanian law. Please note that

the manufacturer accepts no liability for damages and losses due to the

following:

- Improper use.

- Operation through unauthorized personnel.

- Failure to follow safety regulations/ instructions.

- Failure to adhere to the information given in the instruction

handbook.

Translation

If the machine is sold to a country within the EEA, this instruction

handbook must be translated into the language of the country in which

the machine is to be used respectively. Should the translation be

unclear, the original instruction handbook (English) must be consulted

or the manufacturer must be contacted for clarification.

Copyright

Information in this document is subject to change without notice and

does not represent a commitment on the part of SmartBeam Design.

No part of this manual may be reproduced or transmitted in any form

or by any means, electronic or mechanical, including photocopying,

recording, or information storage and retrieval systems, for any

purpose other than the purchaser’s personal use, without the expressed

written permission of SmartBeam Design.

© 2014 SmartBeam Design. All rights reserved.

Page 3: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

1 Content

1.1 Table of Contents

1 Content ............................................................................................................................................. 3

1.1 Table of Contents .................................................................................................................... 3

1.2 Tables ...................................................................................................................................... 4

1.3 Figures ..................................................................................................................................... 4

1.4 Manufacturer´s Declaration ..................................................................................................... 5

2 Overview........................................................................................................................................... 6

2.1 Designated Application ............................................................................................................ 6

2.2 Definition of Terms................................................................................................................... 6

2.3 Specifications ........................................................................................................................... 7

2.3.1 Technical Specifications ...................................................................................................... 7

2.3.2 General Specifications ......................................................................................................... 7

3 Safety ............................................................................................................................................... 8

3.1 Symbols, Notes & Explanations .............................................................................................. 8

3.2 Machine Identification .............................................................................................................. 9

3.3 Standards & Directives observed by the Manufacturer ........................................................... 9

3.4 Built-In Safety Systems ......................................................................................................... 10

3.5 Safety Precautions (by the Operator) .................................................................................... 12

3.6 Responsibilities of the Operator ............................................................................................ 13

3.7 Safety Inspections & Tests .................................................................................................... 15

4 General Warnings .......................................................................................................................... 16

4.1 Dangers ................................................................................................................................. 16

4.2 Operating Areas & Danger Zones at the Machine ................................................................ 17

4.3 Operating & Maintenance Personnel..................................................................................... 17

4.4 Spare Parts & Accessories .................................................................................................... 18

4.5 Shut-Down Procedure ........................................................................................................... 18

5 Installation ...................................................................................................................................... 19

5.1 Delivery Package ................................................................................................................... 19

5.2 Transport, Packaging & Storage ........................................................................................... 19

5.2.1 Delivery (also for Spare and Replacement Parts) ............................................................. 19

5.3 Intermediate Storage ............................................................................................................. 20

5.4 Transportation to the point of Installation (by the Operator) .................................................. 20

5.5 Assembly & Installation (only for Trained Personnel)............................................................ 20

5.5.1 Assembly ........................................................................................................................... 21

5.5.2 Electrical Connection ......................................................................................................... 22

5.5.3 Pin Assignment X201 Stingray FPS – CA3GS Connector ................................................ 24

5.5.4 Pin Assignment X202 Stingray FPS - DB25 Socket .......................................................... 25

5.5.5 Pin Assignment X212 Stingray FPS – DB9 Socket ........................................................... 25

Page 4: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

5.5.6 Rack Mount Version .......................................................................................................... 26

5.5.7 Connection of the Filament Power Supply ........................................................................ 27

6 Operation ........................................................................................................................................ 28

6.1 Display Elements ................................................................................................................... 28

6.2 Putting in Operation for First Time (Specialized Personnel Only) ......................................... 28

6.3 Operation Modes ................................................................................................................... 29

7 Cleaning / Maintenance.................................................................................................................. 30

7.1 Complete Daily Cleaning ....................................................................................................... 30

7.1.1 Maintenance ...................................................................................................................... 31

7.1.2 Function Test Plan ............................................................................................................. 31

7.1.3 Inspections ......................................................................................................................... 31

8 Troubleshooting .............................................................................................................................. 32

9 Emergency ..................................................................................................................................... 33

10 Dismantling / Disposal ............................................................................................................... 34

Appendix 1 : RS232 Protocol

1.2 Tables

Table 1 Technical Specification ........................................................................................................ 7 Table 2 Pin Assignment X202 ........................................................................................................ 25 Table 3 Pin Assignment X212 ........................................................................................................ 25 Table 4 Function Test Plan ............................................................................................................. 31 Table 5 Trouble Shooting ............................................................................................................... 32

1.3 Figures

Figure 1 Mounting:HV Feed-Through and Stingray separated ........................................................ 21 Figure 2 Mounting: Stingray installed on chamber baseplate .......................................................... 22 Figure 3 Connection Plan Evaporation System ...................................................................................... 23 Figure 4 Overview of Electrical Connection ..................................................................................... 24 Figure 5 Display Elements ............................................................................................................... 28

Page 5: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

1.4 Manufacturer´s Declaration

SmartBeam Design SRL 287 Theodor Pallady, S3 032258, Bucharest, Romania Phone: +40 21 318 6929 Fax: +40 21 345 0055

Manufacturer´s Declaration

EC Declaration of Conformity

We hereby declare that the design of the

Description: Stingray– FT – Filament Power Supply

Has been tested and was found to be in full conformity with the following current standards and

requirements:

- Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

- Electromagnetic Compatibility - Emission Standard: SR EN 61000-6-3;

- Electromagnetic Compatibility - Immunity Standard: SR EN 61000-6-1.

Unauthorized changes to the machine invalidate this declaration.

Operation of this machine is forbidden until the complete plant is found to be in conformity

with the regulations of all relevant, applicable directives.

Bucharest, February 1, 2012

..............................................

Signature

Title / Name / Function

Authorized person for the composition of the technical documentation:

Dr. Mihai Stanciu Managing Director SmartBeam Design SRL 287 Theodor Pallady, S3 032258, Bucharest, Romania

Page 6: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

2 Overview

2.1 Designated Application

The filament power supply is part of a group of devices for the operation of an electron beam evaporator installed in a vacuum chamber.

As an integrated system it consists of the following:

- High-voltage power supply (HVPS) - Electron beam evaporation controller with integrated remote controller

(BeamTrek) - Filament power supply (FPS) - Grounding rod

Use of the filament power supply for any other purpose requires the approval of the manufacturer. The filament power supply heats the filament. Due to the thermionic effect, the electrons are released from the filament. Other fields of application are only permitted with the written authorization of the manufacturer. This operating manual deals solely with the design and operation of the filament power supply. Please see the relevant operating manuals for operation of the other devices in the group (high-voltage power supply HVPS). These devices were developed, designed and built solely for commercial / industrial use.

DANGER

The filament power supply Stingray is intended solely for the purpose described above. Any other use or modification of the filament power supply without the written consent of the manufacturer is deemed improper. The manufacturer accepts no liability for resultant damage. The risk is borne solely by the operator. The high filament power supply Stingray may only be put into operation when it has been ensured that all safety equipment is operative and the total installation of the vacuum system comply with EU directives.

Proper use of the machine in accordance with its intended use includes compliance with the manufacturer's operating, maintenance and repair instructions. The use is restricted to rooms in a building or halls. The instructions given in the operation manual of the filament power supply Stingray have to be followed.

2.2 Definition of Terms

HVPS / Warp - High-voltage power supply

BeamTrek - Electron beam evaporation controller

FPS / BeamWell / Stingray - Filament power supply

Page 7: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

2.3 Specifications

2.3.1 Technical Specifications

Physical specification

Case Aluminum black anodized

AC Input 230VAC, 50 Hz, CA3GS Connector

Size (mm) 320(L)[ 420 incl. cables] x 106(W) x 106(H)

19” , 3U x 220mm (400 incl. cables); occupying ½ 19”

Weight 4 kg 5 kg

Cables

From HV PWS 12 kV rated, 1Amp, Shielded, Custom design; FISCHER HV connector with interlock bridge

Length 4m standard 1m (customer specified)

To filament 12 kV rated to the SmartBeam HV Feedthrough

Length 120mm 2m (customer specified)

Electrical specification

Output current 50 Amps max

Output voltage Max 15VDC (no load)

Technology Primary switched, with full DSP control

Filaments Coil

Control input 0-10VDC (10V = 50Amp)

Feedback 0-10VDC (10V = 50Amp)

Table 1 Technical Specification

2.3.2 General Specifications

Ambient temperature: -10 to 30 °C

Air humidity max.: 65 %

Noise level: < 50 dB

Page 8: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

3 Safety

3.1 Symbols, Notes & Explanations

Mandatory Instruction Manual

is marked with a “book” symbol.

Notes

are characterized through a “hand”.

Warning signs are earmarked through a “stop sign”.

Hazard notes

are symbolized through a “warning triangle”.

Danger from electric current

is framed and marked with the symbol shown on the left.

Danger of burns

is framed and marked with the symbol shown on the left.

Danger from magnetism

is framed and marked with the symbol shown on the left.

Danger for people with cardiac pacemakers (and with insulin pumps

and people with active or passive prostheses and ferromagnetic or

conductive foreign bodies) is marked with the symbol shown on the

left.

Protective conductor connection

is marked at the connection points by the symbol shown on the left.

Page 9: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

3.2 Machine Identification

The information in this operating manual only applies for operation in combination with the high-voltage power supply device and evaporation controller specified on the front page. The identification plate including the serial number is attached to the housing of the high-voltage power supply and evaporation controller. When you need to consult us it is essential that the following details are correctly stated:

- Type - Serial number

Please note that we can only process your query quickly and effectively if this information is correct .

3.3 Standards & Directives observed by the Manufacturer

The device was manufactured in conformity with the following EN standards and Romanian standards: 1. EC Low-voltage directive (73/23/EEC, 93/68/EEC): 1.1 SR EN ISO 12100-1 : Part 1 - Safety of Machinery; principles; 1.2 SR EN ISO 12100-2 : Part 2 - Safety of Machinery; principles; 1.3 SR EN 60204-1 : Safety of Machinery; Electrical equipment of machinery. 2. EC Directive EMC (89/336/EEC, 91/263/EEC, 92/31/EEC, 93/68/EEC): 2.1 SR EN 61000-6-3:2003, EMC Part 1; 2.2 SR EN 61000-6-1:2003, EMC Part 1.

Page 10: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

3.4 Built-In Safety Systems

The filament power supply is intended for use in combination with

electron beam evaporators. The safety systems have been designed

accordingly. If this device is operated outside this equipment

combination then the approval of SmartBeam Design must be

obtained.

The filament power supply is equipped with non-interchangeable connectors. The filament power supply is connected to the mains power supply through a 4-pin CA3LD Socket - 230 V, current-carrying N and L (pins 1 and 3) and protective PE conductors with GREEN / YELLOW insulation (PE marked pin).

The filament power supply is operated at a potentially lethal high

voltage. It is strictly forbidden to disable or deactivate the safety

devices. Such an action can result in damage to the equipment and

personal injury.

The integrated safety systems must be checked at regular

intervals (d= daily, w = weekly, m = monthly, ½ y = half-yearly,

y = yearly).

The respective test methods which are to be applied are as

follows: V = visual inspection, F = function test,

M = measurement.

The operator must implement the following in the overall plant:

Mains Isolator (Main Switch)

The filament power supply is connected to

the main power supply system. The filament

power supply is connected to and

disconnected from the power supply with

the main switch for this power supply

system.

When the main switch is switched off for cleaning, maintenance and

repair work, it must be locked with a padlock to prevent unauthorized

switching on.

Test

Interval Method

j F

Page 11: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

Emergency Stop System

The filament power supply has to be

integrated in a master emergency stop

system that immediately puts the electron

beam evaporator into a safe operating mode

when actuated.

DANGER

The owner is required to ensure that unauthorized people

(i.e., who are not operating or maintenance personnel) are

prevented from entering the operating area.

The switch cabinets can only be opened with a special key. Only

authorized personnel may have access to the special key. Please

ensure that the doors are only opened by suitably competent personnel

for maintenance and troubleshooting work and that they are otherwise

kept locked!

The operating and maintenance personnel are trained in the use of the

machine at its point of installation by personnel from BeamTec

GmbH, SmartBeam Design Srl or their designated service companies.

Should you have any questions or be uncertain about anything, please

contact BeamTec GmbH.

It is strictly forbidden to render any of the safety systems inoperative

or to modify their action.

This instruction handbook is an integral part of the filament power

supply and must be kept readily at hand for the operating personnel at

all times. The safety instructions contained in it must be obeyed. If the

filament power supply is resold, the instruction handbook must always

be delivered with it as well.

The type, scope and action of the safety systems were arranged with

the operator.

Test

Interval Method

j F

Page 12: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

3.5 Safety Precautions (by the Operator)

This operating manual is an integral part of the filament power supply and the operator must:

- Instruct his operating and maintenance personnel in the use of the safeguards of the filament power supply.

- Ensure the safety precautions are being observed including the use of personal protective equipment.

- The owner must ensure that entry to the hazard area of the machine (into which the filament power supply has been built) by unauthorized persons (no operating and maintenance personnel) is prevented.

This instruction handbook must be kept in a safe place for future reference. The frequency of inspections and checks must be observed. The work described in this instruction handbook is explained in such a way that the chapters on operation and modes of operation can be understood by an instructed person and those on transport, installation and assembly, maintenance and troubleshooting by a skilled person. The chapters on transport, installation and assembly, maintenance and troubleshooting are intended for skilled persons only. Work described in these chapters may only be carried out by such skilled persons. Instructed Person A person familiarized with and, if applicable, trained in his or her particular duties by a skilled person and advised of the risks of improper conduct and about the necessary safeguards and safety precautions. Skilled Person A person with relevant technical training, know-how, experience and knowledge of applicable standards and regulations to enable him or her to assess the work assigned to him or her and to perceive potential risks and dangers. The above definitions are based on EN 60204-1.

Page 13: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

3.6 Responsibilities of the Operator

In the EU (European Union) national implementation of the

framework directive 89/391/EEC and corresponding individual

directives, in particular the directive 89/655/EEC concerning the

minimum safety and health protection requirements for the use of

work materials and tools by employees at work, as amended, are to be

observed and adhered to. In Germany the Plant Safety Ordinance of

October 2002 must be observed (translation of the above-mentioned

directive into national law).

The operator must (where necessary) obtain any local operating

permits required and observe the provisions contained therein.

In addition to this he must observe local laws and regulations on the

following:

- Personnel safety (accident prevention regulations)

- Safety of work materials and tools (safety equipment and

maintenance)

- Disposal of products (laws on wastes)

- Disposal of materials (laws on wastes)

- Cleaning (cleaning agents and disposal)

- Environmental protection.

The customer must observe any local regulations on, for example, the

connection of electric power supplies when installing and

commissioning the device himself.

The customer is to install only one equipotential busbar on the floor of

the vacuum chamber. All the devices (HVPS, BeamTrek, FPS and

grounding rod) are to be connected to this grounding point in a star

shape. The grounding points on the individual devices are to be used

for this.

In addition, the owner must note:

- A constant hazard evaluation of the workplaces (danger of

hands being crushed, danger of stumbling) is to be carried out.

The measures are to be defined in work instructions and the

working personnel are to be instructed accordingly.

- The supervisors must check compliance with the measures

stated in the work instructions.

- Ensure that the operating personnel are suitably trained.

- Work on electrical equipment is only to be carried out by

suitably trained persons. The connecting cables and terminals

must be properly insulated and covered.

- It is only possible to ensure optimal functioning of the

elements if the machine controller is working perfectly. The

switching states of the limit switches must be properly

Page 14: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

incorporated into the machine controller and the signal cables

must be in perfect condition.

- The switching and safety facilities for setting up, testing,

shutting down (including shutting down in an emergency),

operation, maintenance, cleaning and servicing are to be

installed and verified by the person setting up the entire unit.

This includes also lockable main switches and emergency shut

off switches.

- The owner must ensure that the operating stations are not

affected by waste gases (such as diesel engine exhaust fumes)

or a lack of oxygen.

- The workplaces are to be assessed by the owner in accordance

with the noise and vibration regulations. Any noisy areas are

to be marked, the employees are to be instructed about them

and must use hearing protection.

- The owner is required to provide suitable safety measures for

protection against fire such as suitable fire extinguishers of the

stipulated number and size at easily accessible points and is to

instruction his employees about protection against fire.

- The warning notes from the documentation for modules

supplied by other companies are to be complied with and

integrated into the workplace-related hazard evaluations.

- The operator is required to ensure that the filament power

supply is only operated when it is in perfect working order.

Connections:

Before starting the filament power supply the operator must ensure

that only specifically trained personnel are used for installation and

start-up if this work is done by the operator himself and that local

rules and laws are followed in the way this is installed.

Lightening: The operator must ensure that there is adequate and

uniform lightening in all areas of use of the electron beam evaporator.

The recommended illumination is 300 Lux (maintenance value; ASR

7/3 applies in Germany).

The owner envisages only one earth circuit connector on the floor of

the vacuum chamber. All the devices (WARP, BeamTrek, FPS, and

grounding rod) are to be connected in star form from this earthing

point. Use the grounding points that have been provided at the

individual devices for this purpose. The earth circuit connector itself

must be earthed at the earthing point of the building. The guarantee is

null and void if the installation is not carried out correctly.

Page 15: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

3.7 Safety Inspections & Tests

Safety inspections and tests in accordance with DIN EN 60204-1 by the manufacturer:

- Continuous connection of the protective conductor system (chap. 20.2) - Insulation resistance inspections (chap. 20.3) - Voltage tests (chap. 20.4) - Protection against residual voltage (chap. 20.5) - Testing of electromagnetic compatibility (chap. 4.1) - Function tests (chap. 20.7)

The functions of the electrical equipment, particularly those concerning safety and protective measures, were tested. However, these inspections and tests must be carried out again in accordance with EN 60 204-1, chapter 20, by the manufacturer of the vacuum system after installation of the device in the vacuum system.

Page 16: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

4 General Warnings

4.1 Dangers

The safety systems and safety instructions described in this handbook must be paid attention to accordingly. The machine is operated from the control unit in combination with the BeamTrek controller, the WARP high-voltage power supply and the overall plant. The danger zone of the filament power supply is the immediate area around the filament power supply and the vacuum system in which the filament power supply is integrated.

The operator must ensure that the danger zone around the machine is

free of object so that there is no limitation for getting access to the

filament power supply.

DANGER

Pay attention to the danger of electric shock when carrying out

adjustment, maintenance and repair work!

Before touching the electron beam evaporator, discharge it with the

grounding rod.

Pay attention to the dangers from magnetism when using and

handling the electron beam evaporator.

People with cardiac pacemakers (and with insulin pumps and people

with active or passive prostheses and ferromagnetic or conductive

foreign bodies) must keep clear of the electron beam evaporator! The

limits of how close they may approach the machine must be clearly

marked.

Page 17: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

4.2 Operating Areas & Danger Zones at the Machine

The operating area is defined by the operator (overall plant).

The danger zone during adjustment and maintenance work is defined

as the immediate area around the filament power supply.

The danger zone during adjustment, maintenance and repair work

extends 1 m around the filament power supply. The area needed to

open the switch cabinet doors must be taken into account. Keep the

danger zone around the machine free of objects. Lay cables in such a

way that they cannot be tripped over! The operator must ensure that

access to the danger zones by unauthorized persons is prevented.

The danger zones may only be entered for cleaning, maintenance and repair work by skilled personnel under compliance with applicable safety regulations.

4.3 Operating & Maintenance Personnel

The operating and maintenance personnel are those people who are responsible for the transport, assembly, installation, operation, adjustment and cleaning of the machine as well as for troubleshooting.

1) The device may only be operated by trained and authorized personnel.

2) The different responsibilities in the operation of the device must be clearly defined and observed so that no confusion with respect to responsibilities arises, thus endangering safety.

3) Whenever any work (operation, maintenance, repair, etc.) is carried out, the shutdown procedure specified in this operating manual must be followed.

4) The cleaning, maintenance and repair work described in this operating manual is explained in such a way that it can be understood by skilled persons (see definition in chapter “Safety Precautions”) with training in: - Electrical engineering / electronics - Mechanical engineering / cleaning and maintenance These skilled persons are to be equipped with the proper tools and test materials.

5) The operating personnel may not apply any working methods that impair the safety of the machine.

6) The operating personnel are co-responsible for ensuring that no unauthorized person works with or on the machine.

7) The operating personnel must immediately report any changes in the device that impair its safety to the responsible executive.

8) The unit may only be operated when it is in perfect working order.

9) The operating personnel are to be equipped by the owner with safety equipment as required by law and appropriate for the materials being processed.

Page 18: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

10) The owner is required to regularly check that the personal safety equipment is actually being used.

4.4 Spare Parts & Accessories

Only spare parts and accessories supplied or approved by SmartBeam Design may be used. SmartBeam Design accepts no liability for damages arising from the use of non-original parts and accessories. You can procure them through BeamTec GmbH.

Basically speaking, it is forbidden to make any repairs within the unit.

Danger: High voltages!

4.5 Shut-Down Procedure

The shutdown procedure may only be initiated by skilled personnel

according to the definition in DIN EN 60 204.

The following shutdown procedure must be followed before any

cleaning, repair or maintenance work is carried out:

1) Switch off the high voltage with the HV-OFF switch on the

Remote Control of BeamTrek.

2) Switch off the “on / off switch” on the high-voltage power

supply HVPS located on the front panel and then switch off

the rear 3 phase breaker.

3) After that unplug HVPS mains cable from the 3 phase mains.

4) Unplug the mains plugs on the filament power supply X201,

the high-voltage power supply X301 and the controller X101.

5) Wait at least 3 minutes before you begin working on the

electrical equipment. The capacitors first have to be

discharged.

6) When working on high-voltage parts, remember to discharge

them with the grounding rod before touching them.

There is a danger to life and limb for the personnel if this procedure is

not followed!

Page 19: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

5 Installation

5.1 Delivery Package

The scope of delivery package is as follows:

1) Filament power supply Stingray FPS 2) Operating manual 3) Power supply cable (mains to CA3LD Socket) 4) High-voltage cable HV input 5) High-voltage cable to filament 6) Ground cable (attached - 0.5m)

5.2 Transport, Packaging & Storage

Machines, devices and other equipment from SmartBeam Design are carefully inspected and packed before shipment. Nevertheless, it is still possible that they might become damaged during transit.

The packing material meets the requirements for safe transportation

of the filament power supply. We therefore recommend that you keep

it for possible storage of the device or for return shipment for

servicing.

5.2.1 Delivery (also for Spare and Replacement Parts)

Receiving inspection:

- Check the shipment against the delivery note to ensure it is complete. - Check the shipment for damage (visual inspection)!

Complaints:

- If the shipment was damaged during transit, immediately contact the last carrier and

- Keep the packing material (for possible inspection or return shipment). Packaging for return shipment:

- Use the original packaging material as far as possible. - If it is no longer available, use the services of a packaging company with

suitably competent personnel. If you have any questions on packing and transport, please contact BeamTec GmbH or SmartBeam Design SRL .

Page 20: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

We wish to point out though that the device can only be shipped back

to us in its original packing material.

5.3 Intermediate Storage

The freight packaging of the filament power supply and spare and replacement parts is designed for a storage period of three months from delivery. Storage Conditions:

- Closed and dry room with a room temperature of +10°C to +35°C. - The relative humidity allowed is max 80% (not condensing).

5.4 Transportation to the point of Installation (by the Operator)

After unpacking of the filament power supply, transport it to its installation site.

The filament power supply weighs about 4 kg.

5.5 Assembly & Installation (only for Trained Personnel)

Assembly and initial start-up must be carried out by skilled personnel from BeamTec GmbH, SmartBeam Design or the customer's skilled personnel who have been especially trained for this work. Consult the instruction handbook and technical reference material supplied for assembly and installation of the filament power supply.

The electrical installation of the filament power supply must be

carried out by trained or skilled personnel only.

Page 21: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

5.5.1 Assembly

The filament power supply should be mounted only using our custom HV

Feed-Through. Care should be taken not to allow the unit to rotate when

tightening the flange-nut, since this could damage the output cables by

twisting them. If a rotated position is required, also rotate the HV Feed-

Through in the chamber.

It is mandatory to keep at least 100mm open space around the unit in order to

provide the required cooling air flow.

Figure 1 Mounting:HV Feed-Through and Stingray separated

Electrical connection of the filament power supply is to be performed by a qualified electrician.

Page 22: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

Figure 2 Mounting: Stingray installed on chamber baseplate

5.5.2 Electrical Connection

Connection requirements:

- Only use the connection cables delivered with and for the connection of the filament power supply.

- Make sure that the protective ground is connected as specified. The cable might have to be shortened (do not lay it in loops).

- Ensure that there is protective fault current circuit. - Integrate the filament power supply into the emergency-stop system of the

overall system.

All cabling of the high-voltage power supply HVPS, vacuum system,

electron beam evaporator and control module must be completed

before the filament power supply is connected to the mains.

Connection plan (standard version with an electron beam evaporator).

In case of special versions the connection plan enclosed is applicable.

The connection plan shows all connections. The connections are marked with X…; You will find these markings on the devices as well.

Page 23: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

Figure 3 Connection Plan Evaporation System

Page 24: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

Figure 4 Overview of Electrical Connection

The electrical connections are located on the rear panel of the filament power supply.

- HV output cable (the cables are prefabricated to fit the HV feedthrough)

- X204 HV input

- X201 mains connection (connection between the mains power supply and filament power supply)

- X200 ground screw

- X202 filament control cable

- X212 slave serial port

- FMAIN safety fuse main block

5.5.3 Pin Assignment X201 Stingray FPS – CA3GS Connector

Pin Nr,

1 AC Neutral Line

PE PE Line

2 NC

3 AC Live Line

Page 25: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

5.5.4 Pin Assignment X202 Stingray FPS - DB25 Socket

Pin Nr,

1 GND

2 GND

3 GND

4A Filament Error (12V if I < 8A, 0V if I > 8A)

(RS232 Reverse OK; ID25 set to 1) *

4B Filament OK (12V if I > 8A, 0V if I < 8A)-

(RS232 Reverse OK; ID25 set to 0; BeamTrek configuration) *

5 NC

6 Filament Set-Point (0-10V for 0-50A)

7 NC

8 Filament ON_Plus to Opto-Isolator (5 - 24V)

9 NC

10 NC

11 NC

12 NC

13 NC

14 GND

15 GND

16 Filament ON_Minus to Opto-Isolator

17A Filament Error (12V if I < 8A, 0V if I > 8A)

(RS232 Reverse OK; ID25 set to 1)

17B Filament OK (12V if I > 8A, 0V if I < 8A)-

(RS232 Reverse OK; ID25 set to 0)

18 NC

19 NC

20 Filament current feedback (10V@50A)

21 NC

22 NC

23 NC

24 Filament ON_Minus to Opto-Isolator

25 Filament ON_Plus to Opto-Isolator (5 - 24V)

Table 2 Pin Assignment X202

*) Refer to QC sheet for applied setting

5.5.5 Pin Assignment X212 Stingray FPS – DB9 Socket

Pin No.

1 NC

2 TX (Output to Master Controller)

3 RX (Input from Master Controller)

4 NC

5 GND

6 NC

7 NC

8 NC

9 NC

Table 3 Pin Assignment X212

Page 26: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

5.5.6 Rack Mount Version

The Rack Mount Version of the StingRay DC can be ordered with a custom HV and Filament Cable Length to suit a specific installation requirement. The Unit is mounted on a 3U front plate which can accommodate 2 StingRay DC Power Supplies for multiple evaporation systems, thus keeping the space requirements to a minimum. The connections are the same as with the Feed-Through mounted power supply, except for the Filament Connection which requires the extra Spacer and Gland (the Gland’s clamp has to be tightened to prevent the cable from slipping out of the HV Feed-Through). Also the HV Return and Filament Cable Shield must be connected directly to the Chamber Grounding Point through the 2 Yellow-Green Cables provided at the end of the Filament Cable (Fig. 5.5.6.2)

Figure 5.5.6.1 – Back View of the Rack Mount Unit (one FPS mounted)

Figure 5.5.6.2 – Filament Cable Adaptor, Gland and PE Connections

Page 27: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

5.5.7 Connection of the Filament Power Supply

Connect the filament power supply in accordance with the installation plan. The following are to be connected:

- Ground cable - Control cable - Cable to high-voltage input - Cable to filament - Power supply cable

Ground Cable:

1. Connect the ground contact X200 of the filament power supply to the grounding point of the vacuum system. Use a cable with cable lugs, yellow / green insulation and a cross-section of 10 mm2 for this. The lugs are mandatory to be crimped with specialized tool or soldered.

Control cable: The control cable/high voltage cables connect the filament power supply to the individual devices.

2. Connect the devices in accordance with Figure 3 “Connection Plan Evaporation

System” Power supply cable: The power supply cable connects the filament power supply to the mains power supply.

3. Plug the power supply cable into the mains connection on the filament power supply.

The connectors are non-interchangeable, i.e. every connector can

only be plugged into its particular socket.

Page 28: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

6 Operation

6.1 Display Elements

Figure 5 Display Elements

- LED Green (power led):

o ON means FPS is powered o BLINKING means the filament is on.

- LED Red (error led):

o ON means the fan is not turning o BLINKING means the filament is short (over-current detected).

6.2 Putting in Operation for First Time (Specialized Personnel Only)

The filament power supply is commissioned as stand alone or in combination with the complete system.

The equipment may only be put in operation by trained and

specialized personnel.

Components of the complete system:

- Filament power supply (FPS) - High-voltage power supply (HVPS) - Controller (BeamTrek) - Vacuum system - Electron beam evaporator

They must be completely set up and connected before the system is first put in operation.

Page 29: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

Furthermore, carry out the following inspections as part of the commissioning:

1) Check for correct cabling and firm connection: o Ground connections o Power supply cable o Control cables and o High-voltage cable

2) Check the safety circuit

3) Check the emergency-stop system

Carry out the relevant tests in compliance with 60 204, item 20.

Before carrying out the work, remove the plug to avoid any damage to

the electronics. The PE Grounding cables must be laid directly and

made as short as possible, coils of Grounding cable can lead to

problems and are therefore forbidden.

6.3 Operation Modes

The modes of operation of the overall system are described in the

separate operating instructions of the electron beam evaporator.

Page 30: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

7 Cleaning / Maintenance

The chapter “Cleaning / Maintenance” is only intended for skilled

personnel. Maintenance, cleaning and repair work may only be

carried out by skilled personnel.

Skilled Person This is a person who has relevant technical training, know-how, experience and knowledge of applicable standards to enable him or her to assess the work assigned to him or her and to perceive potential risks. The above definition is based on EN 60204-1.

The operating and maintenance personnel are trained in the use of the

filament power supply at its point of installation by personnel from

BeamTec GmbH/Smartbeam Design SRL. Should you have any

questions or be uncertain about anything, please contact BeamTec

GmbH/Smartbeam Design SRL.

For trouble-free operation of the electron beam evaporator it is absolutely essential that it is cleaned and serviced at regular intervals.

The shutdown procedure may only be initiated by skilled personnel

according to the definition in DIN EN 60 204 (see also chapter on

“Safety Precautions”).

7.1 Complete Daily Cleaning

The shutdown procedure must be followed before any cleaning,

maintenance or repair work is carried out (see chapter “Shut-Down

Procedure”). Do not use sharp objects or tools to clean the machine

unless they are explicitly intended for this purpose.

Page 31: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

7.1.1 Maintenance

Maintenance and cleaning work with regards to the filament power supply is restricted to cleaning of the housing when the device has been switched off.

In case there is a need for other maintenance work, please, contact

BeamTec GmbH/Smartbeam Design SRL.

7.1.2 Function Test Plan

Interval for One-Shift System

To Be Tested: W M ½ Y Y MIH

Mains isolator (main switch) X

All electric terminal and plug connections X

Push buttons and switches on the switch cabinet

X

All plug, screw and clamped joints for firmness; Tighten them if necessary

X

Function check of the electric drives X

Table 4 Function Test Plan

7.1.3 Inspections

1) Carry out a visual inspection of the switch cabinet and check: o Wiring for kinks, abrasions and burns o Covers and insulation for damage o Switch cabinet doors for ease of movement

2) Carry out a function test of all subassemblies in setting mode and in manual

mode. If all the functions work properly, the machine is handed over to the operating personnel.

Page 32: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

8 Troubleshooting

The situations and information on faults, their causes and correction

in this chapter are described in such a way that they can be

understood by skilled persons (see definition in chapter 3.5 „Safety

Precautions (by the Operator)” with training in

- Electrical engineering./.electronics

- Mechanical engineering./.maintenance.

These technicians must be equipped with the proper tools and test

materials. The shutdown procedure (see chapter 4.5) must be followed

before any maintenance and repair work is carried out. If the

measures described below do not prove successful, please contact

BeamTec GmbH/Smartbeam Design SRL.

Fault Cause Remedy

Power supply cannot be switched ON

Disconnected mains plug Connect the mains plug

The high-voltage connector is not connected and locked

Connect and lock the high-voltage connector

Safety conditions are no met Check safety interlock circuit

Control cable not connected correctly

Connect control cable correctly

Table 5 Trouble Shooting

Page 33: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

9 Emergency

In the event of an emergency:

1) Press the emergency stop button on the master control unit. The emergency stop button is released by pulling out or turning anticlockwise / clockwise.

2) Switch off the main switch if necessary.

Page 34: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

10 Dismantling / Disposal

Dismantling: Dismantling may only be performed by skilled personnel. Make sure the shutdown procedure is followed before beginning with the dismantling work. Disposal: The machine is primarily made of copper (except for the electrical equipment) and must be disposed of in accordance with local environmental protection regulations. Oil and cleaning materials must be disposed of in accordance with the local laws and the instructions given in the material safety data sheets. Contaminated cleaning tools (brushes, cloths, etc.) must also be disposed of in accordance with the manufacturer's instructions.

Page 35: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

Appendix 1 : RS232 Protocol

1. Overview

The RS232 Protocol is based on a SOT (Start Of Transmission) and EOT (End Of Transmission) format. All the data is transmitted binary and the SOT, EOT and other special delimiters are not repeated in the body. The format of a packet is presented below (the same format is used for transmitted and incoming packets):

Byte0 Byte7

SOT SA DA LP HP LV HV CHKS

Parameter ID Parameter Value

Description: SOT : Start Of Transmission, one of the available SOT symbols (8 bit); SA : Source Address (7 bit : ‘`’ = PC, ‘a’ – ‘z’); DA : Destination Address (7 bit : ‘b’ if the default one for FQ or StingRay FPS); LP : Low Parameter (7 bit – the least significant part of the 14 bit Parameter ID); HP : High Parameter (7 bit – the most significant part of the 14 bit Parameter ID); LV : Low Value (7 bit – the least significant part of the 14 bit Value); HV : High Value (7 bit – the most significant part of the 14 bit Value); CHKS : Checksum (7 bit) – the XOR-ed value of Bytes 0-6 and 0x80 (to clear the most

significant bit of the SOT symbol); The allowed range of any value is -4000;12000. Considering all the fields in the packet are unsigned 7 or 14 bit values (except for the SOT symbol, which allows a communication to recover instantly at the next packet if the current one was corrupted), a COMMUNICATION_OFFSET of 4000 is used. For example: To send -3000, first add 4000 to -3000, and then send 1000 as Parameter Value; To send 1000, first add 4000 to 1000, and then send 5000 as Parameter Value. Available SOT symbols (name, value, description):

SOTSD 0x90 Set Data to unit; SOTA 0xB0 Answer from unit to SD command; SOTRD 0xA0 Read Data from unit; SOTRA 0xE0 Answer from unit to RD command;

Set Data Command Flow:

a) PC sends the SOTSD packet, with the Parameter ID and associated Value; b) Unit responds with a SOTA packet, where the Parameter ID is the same, and the Value

field represents the actual value set in the unit (may differ from the one supplied if invalid or out of range).

Read Data Command Flow:

c) PC sends the SOTRD packet, with the Parameter ID and associated Value = 0; d) Unit responds with a SOTRA packet, where the Parameter ID is the same, and the Value

field represents the value set in the unit.

Page 36: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

2. Examples For the latest values of the FQ_ parameters check the latest version of the ‘FQIds.h’ file. Set Data Example: To change the On State to active, for example, the master should issue the following

command (all bytes in hexadecimal): FQ_ONRelayOut = 17 (0x11) Value : 1 : (HV=0x1F) & (LV=0x21)

Byte0 Byte7

SOT SA DA LP HP LV HV CHKS

0x90 0x60 0x62 0x11 0x00 0x21 0x1F 0x3D

The FPS will reply with a SOTA answer:

Byte0 Byte7

SOT SA DA LP HP LV HV CHKS

0xB0 0x62 0x60 0x11 0x00 0x21 0x1F 0x1D

Get Data Example: To get the current Version, for example, the master should issue the following command: FQ_Version = 2 (0x02)

Byte0 Byte7

SOT SA DA LP HP LV HV CHKS

0xA0 0x60 0x62 0x02 0x00 0x20 0x1F 0x1F

The StingRay will reply for example with: 102 (version 1.02) : (HV=0x20) & (LV=0x06)

Byte0 Byte7

SOT SA DA LP HP LV HV CHKS

0xE0 0x62 0x60 0x02 0x00 0x06 0x20 0x46

Page 37: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

3. FPS RS232 Operation

To operate the unit in RS232 mode, first the unit has to be placed in service mode. This is

accomplished by the following Set Command: Id : FQ_ServiceMode = 7; Value : 0x09; In this mode, to turn on/off the output stage, the following Set Command should be used: Id : FQ_ONRelayOut= 17; Value : 0x01 (ON) or 0x00 (OFF); To read the filament current, the following Read Command should be used: Id : FQ_CurrentInput= 23; Value : 0 to 1000; Warning : The calibration of the StingRay is not to be used as a reference. Due to the HF AC

nature of the FPS this output is provided only as a reference. By determining the maximum modulation value and the associated current input feedback, one should have the safe working envelope for the system defined.

To adjust the output, the following Set Command should be used: Id : FQ_Modulation = 11; Value : 0 to 1000; Warning : In this mode, there is no protection active besides the short circuit and fan errors,

so maximum care should be taken to avoid excessive load current, especially when not using SmartBeam standard filament assemblies. Always start with the minimum setting and increase slowly the modulation. The maximum value for the setup should be used as a maximum safe value in the controlling master algorithm (so that this value is not exceeded during normal operation).

Normal Workflow: To operate in RS232 mode usually the following steps are required:

- set service mode on (value : 9); - set modulation to minimum; - turn on the output stage; - Operation : read emission current and adjust modulation within the predetermined safe

values; - set modulation to minimum; - turn off the output stage; - set service mode off (value : 0);

Page 38: BeamWell - Smartegunsmartegun.com/wp-content/uploads/2017/02/BeamWell-2014-03.pdf · “BeamWell ” (former StingRay ... - Safety Standards : SR EN ISO 12100-1,2; SR EN 60204-1;

BeamWell® - Filament Power Supply Operating Manual: V2.3, March 2014

4. FPS Firmware Update Procedure: - Power OFFUnit; - load the attached files into a RS232 native computer, and connect to X212 using a standard

1:1 serial Master/Slave cable; - change in load.bat the comport number if not "1"; - launch SmartCLT command line software (change the comport number if not "1"); - Power ON Unit; - input ID : 20, and Value : 55, press Set Value (value should change in "ok"); Now the unit is in firmware update mode; - Power OFFUnit; - close SmartCLT software; - Power ON Unit; - launch load.bat (you should see some dots on the screen, almost a row); - launch SmartCLT (change the comport number if not "1"); - confirm the new FirmWare Version : input ID : 2 and press Get Value; - input ID : 20, and Value : 0, press Set Value (value should change in "ok"); Now the unit is NOT in firmware update mode anymore; - Power OFF BeamWell; - close SmartCLT software;