Page 1: Beam Transfer Systems

Beam Transfer Systems

J.Borburgh, E.Carlier, L.Ducimetière, B.Goddard, V.Mertens, et al.Outline:Brief reminder of LHC activitiesPlans for “backbone” machines (PSB, PS, SPS)Plans for other facilities (AD, ISOLDE, CTF3)Conclusions

Page 2: Beam Transfer Systems

SPS

LHC

PS• Presenting only work▫ requiring access to the machines▫ with priority 1 (= absolutely mandatory), priority 2 (= highly recommended)

• Not discussing work ongoing in parallel for▫ projects▫ refurbishment of spares following exchange

… competing for same manpower

Page 3: Beam Transfer Systems

Brief reminder of LHC activities• Completion of staged MKB installation (1 tank = 2 magnets per

side) + electronics and controls

• Overhaul of remaining 20 MKD/ 20 MKB generators and magnet entry boxes

• Replacement of a (small) number of MKI as function of progress with mitigation studies and tests on heating, UFOs, …

• 2 x TCDQ upgrade to beyond nominal performance

• Lots of electronics and controls improvements (HW/SW)

• LBDS tests and reliability run to be firmly planned in

Page 4: Beam Transfer Systems

LHC: TCDQ• Remove existing 2 tanks (per beam) and girder• Create space and install new 3 tank solution with

girder• Consolidation of electronics and controls (split of

reference/interlock logic)

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Construction of new TCDQs Exchange/installation

Support needs

► DGS-RP

► EN-HE

► EN-EL

► TE-VSC

► BE-ABP

► BE-CO

► EN -STISchedule still to be confirmedInstall TCDQ sufficiently robust for 7 TeV and ultimate intensity

New TCDQ

2013 2014

1

Page 5: Beam Transfer Systems

PSB: extraction septum BE.SMH • Exchange one extraction septum (preventive)• Consolidation of electronics and controls (including full recabling)

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Construction Lab testing Exchang

e

Support needs

► DGS-RP

► EN-HE

EN-EL

► TE-VSC

► BE-ABP

BE-COAdvance work from LS2 (2 GeV compatible)

2013 2014

2

Page 6: Beam Transfer Systems

PSB: kicker KFA10-20 • Replacement of hydraulic group (ready since

2011)• Consolidation of electronics and controls

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Replacement/ cabling Tests

Support needs

DGS-RP

► EN-HE

► EN-EL

TE-VSC

BE-ABP

► BE-COReliability & safety in case of fire

2

In principle no machine access required

2013 2014

Page 7: Beam Transfer Systems

PS: dummy septum 15, SMH16 and SEH23 • Exchange of SEH23 preventive, (w elimination of oil) and

SMH16• Replace feedthrough and connect 3M Fluorinert station• Install dummy septum 15 & provide electronics and controls

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Construction Dummy septum 15 Modify

3M station

Install dummy15

Exchange SEH23

Support needs

► DGS-RP

► EN-HE

► EN-EL

► TE-VSC

► BE-ABP

► BE-CO

2013 2014

1

Dummy septum 15 will protect SMH16 (MTE)

Page 8: Beam Transfer Systems

PS: MTE hybrid kickers• Re-cabling + overhaul of CT electronics and controls , eradication of CAMAC• Overhaul of RSG HV switches + magnet feedthroughs

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Replacement/ cabling Tests

Support needs

► DGS-RP

► EN-HE

► EN-EL

► TE-VSC

BE-ABP

► BE-COCompatibility MTE and CT

2013 2014

2

Page 9: Beam Transfer Systems

SPS: LSS1 kickers • Equip MKDV2, MKQH, MKQV with gap shielding• Exchange one MKP kicker magnet + change HV irradiated cables • Change control cables in LSS1+ MKDV electronics, controls & HV power supplies

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Remove

Reinstall

DC cond.

Test

Support needs

► DGS-RP

► EN-HE

► EN-EL

► TE-VSC

► BE-ABP

BE-COBeam impedance reduction, consolidation, diagnostics

2013 2014

1

Page 10: Beam Transfer Systems

SPS: LSS2 septa• Dismantling of TPSN and subsequent installation of

TPST• Exchange of ZS4, 3 MST and 4 MSE

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Construction TPST Exchange

Support needs

► DGS-RP

► EN-HE

EN-EL

► TE-VSC

► BE-ABP

BE-COConsolidate TPST : greater mechanical stability, easier alignment

Preventive exchange of ZS and MS

2013 2014

1

Page 11: Beam Transfer Systems

SPS: MKE LSS4 & LSS6 • Exchange last kicker magnet / LSS4 + PFN retuning + G-64 eradication• Change vacuum gauge / LSS6 (implies full reconditioning)

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Exchange

DC cond.

Tests

Support needs

► DGS-RP

► EN-HE

EN-EL

► TE-VSC

► BE-ABP

BE-COBeam impedance reduction

2013 2014

1

Page 12: Beam Transfer Systems

SPS: LSS6 septa• Exchange of  3 MST (preventive)• Exchange of  ZSTF (for further studies)

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Exchange

Support needs

► DGS-RP

► EN-HE

EN-EL

► TE-VSC

► BE-ABP

BE-CO

2013 2014

1

Page 13: Beam Transfer Systems

AD: displacement of kicker generators• Moving of full platform into future new building• Re-cabling, renovation of electronics and controls• Replacement of mineral oil by Ester oil

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Move Cabling

Support needs

DGS-RP

► EN-HE

► EN-EL

TE-VSC

BE-ABP

► BE-CONeed to free space for ELENA construction

2013 2014

1

Page 14: Beam Transfer Systems

AD: extraction septum SM05/07 Open roof of AD Replace leaking septum by spare, followed by bake-out Close AD roof and shielding

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Repl

.

Support needs

► DGS-RP

► EN-HE

EN-EL

► TE-VSC

► BE-ABP

BE-COSchedule driven by availability of HE and VSC

1

2013 2014

Page 15: Beam Transfer Systems

Controls upgrade (ACCOR project)

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Upgrade TESTS

2013 2014

Support needs

DGS-RP

EN-HE

► EN-EL

TE-VSC

BE-ABP

► BE-CO

1

Migration to FESA & InCAIn principle no machine access required

• Eradication of LynxOS/PowerPC Platform & MIL1553 from SPS (and LHC)

• Renovation of kickers and septa in AD

Page 16: Beam Transfer Systems

Other facilities (ISOLDE, CTF3)• ISOLDE – motor protection for hydraulics• CTF3 – help with installation of fast feedback

kickers (from Oxford)

01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04Installation

Support needs

► DGS-RP

► EN-HE

EN-EL

► TE-VSC

► BE-ABP

BE-COCTF3 : First feedback/feed-forward tests in 2013

2013 2014

2

Page 17: Beam Transfer Systems

Conclusions• Important share of LS1 work to make LHC equipment fit for 7

TeV and higher intensities.• Also many high priority activities in the injectors.• 2012 preparation work will be decisive.• Most activities in injectors compatible with present access

planning (Except some kicker magnet conditioning in SPS and septa work in region 15-16 of the PS).

• Good coordination with and support by HE, EL, VSC, ABP, CO, RP, … essential.

• Detailed preparation plannings coming forward.• List of requirements (test times) and constraints (access) being

worked out and communicated.