HUAWEI TECHNOLOGIES Co., Ltd.

BBU3900 V300

Installation Guide

Issue: 17Date: 2010-09-03

Page 2: BBU3900 Installation Guide(V300_17)

1

Contents

Installation Tools…………………………………Installation Scenarios……………………………BBU Hardware……………………………………Installation Procedure……………………………Installing the BBU in the APM30………………Installing the BBU in the APM30H(Ver.A) ……Installing the BBU in the 19-Inch Rack…………Installing the BBU in the TMC……………………Installing the BBU in the PS4890 Cabinet……Installing the BBU in the RRU3004 Rack………Installing the IMB03 on the H-Shaped Stand…Installing the RRU on the H-Shaped Stand …Installing the BBU on the Wall…………………Installing the BBU in the APM30H(Ver.B)……Installing the BBU in the TMC11H(Ver.B)……Installing the BBU in theAPM30H(Ver.B, +24V) ……………………………Installing the BBU in the OMB …………………BBU Hardware Installation Checklist…………Powering On the BBU……………………………Appendix……………………………………………Obtaining the ESN ………………………………Change History……………………………………

2356713151720232728293337

39414747484856

Copyright © Huawei Technologies Co., Ltd. 2010. All rights reserved.

Page 3: BBU3900 Installation Guide(V300_17)

2

Installation Tools

Measuring tape Phillips screwdriver (M3-M6) Flat-head screwdriver (M3-M6)

Adjustable wrench Socket wrench Hammer drill

ESD wrist strap Vacuum cleaner Wire stripper

Torque wrench Marking pen Level

RJ-45 crimping tool Multimeter

Power cable crimping tool Cable cutter ESD gloves

Rubber Mallet

Page 4: BBU3900 Installation Guide(V300_17)

3

Installation Scenarios

In the APM30/APM30H(Ver.A) In the PS4890

In the RRU3004 rackIn the TMC

In the 19-inch rack

The GTMU in this document is based on the first type of GTMU.

In the APM30H(Ver.B)

Page 5: BBU3900 Installation Guide(V300_17)

4

Installation Scenarios

In the TMC11H(Ver.B) In the APM30H (Ver.B, +24V)

On the wall In the OMB

Page 6: BBU3900 Installation Guide(V300_17)

5

BBU Hardware

1. Exterior of the BBU

2. Configuration Principles of the BBU Boards

Preferentially installed in the slot4.S0 or S41OptionalUTRP

A single UELP is preferentially configured in the S4 slot.

S0 or S42OptionalUFLP

Preferentially installed in the S1 slot.S0 or S11OptionalUSCU

Preferentially installed in the S18 slot.S181OptionalUEIU

A single UELP is preferentially configured in the S4 slot.

S0 or S42OptionalUELP

Can be installed only in the S16 slot.S161MandatoryFAN

A single UPEU is preferentially configured in the S19 slot.

S18 or S192MandatoryUPEU

Can be installed only in S5 and S6.S5 and S61MandatoryGTMU

RemarksInstallation Slot

Full ConfigurationMandatory/Optional

Board

The UELP and UFLP need to be optionally configured in the BBU or SLPU on site according to the field requirements.

UTRP is supported in V300R012 and later versions.

86 mm(2U)

442 mm

310 mm

Page 7: BBU3900 Installation Guide(V300_17)

6

Installation Procedure

When the equipment is unpacked, it must be powered on in 24 hours. The maximum duration of the power-off state of the equipment is 24 hours during maintenance.

Page 8: BBU3900 Installation Guide(V300_17)

7

Installing the BBU Casea

Installing the BBU Cablesb

External power supply

External alarm device

Monitoring signal cable

Alarm cable

E1/T1cable

CPRI signal cable

E1/T1 surge protection transfer cable

Power cable

Cable connections of the BBU

External monitoring device

Installing the BBU in the APM30

BBUM6 bolt

PDU

1. Install the mounting ears at both sides of the BBU reversely.

2. Slide the BBU case into the cabinet.

FE/GE cable

FE/GE surge protection transfer cable

Page 9: BBU3900 Installation Guide(V300_17)

8

Installing the BBU in the APM30

Winding pipe

Installing the BBU Cablesb

2. Install the CPRI optical cable.

Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the GTMU, and connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU.

The TX port on the BBU is connected to the RX port on the RRU.The RX port on the BBU is connected to the TX port on the RRU.

Connect the OT terminal of the power cable to the LOAD3 terminal of the PDU, and then fix the 3V3 connector of the power cable to the PWR port on the BBU.

1. Install BBU power cable.

The OT terminals of the power cable is to be made on site.

Optical module

Puller

a. Insert the optical module into the CPRI0, CPRI1, CPRI2 CPRI3, CPRI4 or CPRI5 port, and then turn outwards the puller on the optical module.

b. Insert one end of the CPRI optical cable into the optical module, and then lead the CPRI optical cable out of the cabinet along the right side of the cabinet.

c. Wrap the fiber tail with the winding pipe.

LOAD3

NEG(-)

RNT(+)

PWR

The single-mode optical module is labeled "SM" and multi-mode optical module is labeled "MM".

Page 10: BBU3900 Installation Guide(V300_17)

9

Installing the BBU in the APM30

b

4.3. Strip the jacket off the E1/T1 cable near the grounding point at the lower right corner of the cabinet to expose the shielding layer

4.4. Thread the E1/T1 cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the E1/T1 cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the ground bolt of the APM30.

4.2. Fix the DB26 connector of the E1/T1 cable to the OUTSIDE port on the UELP.

3. Install the E1/T1 surge protection transfer cable.

4. Install the E1/T1 cable.

E1/T1 surge protection transfer cable

4.1. Cabling the E1/T1 cable.

E1/T1cable

Shielding layer of the E1/T1 cable

Shielding layer of the E1/T1 cable (25 mm)

Fix the DB25 connector of the E1/T1 surge protection transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the GTMU.

Grounding clip

Installing the BBU Cables

Before soldering the connectors to the E1/T1 cable, ensure that both ends of the E1 cable are disconnected from any devices. In addition, all the connectors should be soldered to the cable.

Page 11: BBU3900 Installation Guide(V300_17)

10

b

FE/GE surge protection transfer

cableFE/GE cable

(25 mm)

Shielding layer of the FE/GE cable

Connect one end of the FE/GE surge protection transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the GTMU.

5. Install the FE/GE surge protection transfer cable (FE/GE transmission mode).

6. Install the FE/GE cable (FE/GE transmission mode).

6.1. Connect one end of the FE/GE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.

6.2. Thread the FE/GE cable through the grounding clip. Then, tighten the screw on the grounding clip to make the shielding layer of the FE/GE cable in full contact with the grounding clip. Finally, connect the PGND cable on the grounding clip to the ground bolt of the APM30.

Installing the BBU Cables

Installing the BBU in the APM30

7. Install the monitoring signal cable between the APMI and the BBU. 7.1. Fix the RJ45 connector at one end of the cable to the MON1 port on the UPEU. 7.2. Cut off the RJ45 connector at the other end of the cable on site, and then connect the four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI.

The shielded straight-through cable must be used as the FE/GE Ethernet cable.

Page 12: BBU3900 Installation Guide(V300_17)

11

8. Install the EMUA monitoring signal cable. (The EMUA is configured if there are external dry contacts or analog detection is required.)

Cut off the RJ45 connector of the EMUA monitoring signal cable, and then connect the four exposed wires to the RX+, RX-, TX+, and TX- ports on the APMI. Fix the DB9 connector to the corresponding port on the EMUA.

Installing the BBU CablesbInstalling the BBU in the APM30

RX-Twisted pairWhiteX2.6X1.5

RX+Twisted pairBlueX2.2X1.4

TX-Twisted pairOrangeX2.7X1.2

TX+Twisted pairWhiteX2.3X1.1

Port on the APMI

Wire TypeWire ColorPin of the DB9Male Connector

Pin on the RJ45 Connector

EMUA monitoring signal cable

Page 13: BBU3900 Installation Guide(V300_17)

12

9. Install the alarm cable.Connect one end of the alarm cable to the EXT-ALM port on the UPEU and the other end to the corresponding alarm device.

Installing the BBU CablesbInstalling the BBU in the APM30

Page 14: BBU3900 Installation Guide(V300_17)

13

Installing the BBU in the APM30H(Ver.A)

The other end is connected to...One end is connected to...

CPRI port on the RRUCPRI port on the GTMUCPRI optical cable

MON1 port on the BBUCOM IN port on the HEUAMonitoring signal cable

No.

External transmission deviceOUTSIDE port on the UELPE1/T1 cable

INSIDE port on the UELPE1/T1 port on the GTMUE1/T1 surge protection transfer cable

PWR port on the BBULOAD3 terminal of the PDUBBU power cable

Installation PositionCable

a BBU Cable Connections

The procedure for installing the BBU case in the APM30H is the same as that in the APM30. For details, see pages 7 to 12. The following figure shows the cable connections of the BBU. For details on how to install the monitoring signal cable between the HEUA and the BBU in the APM30H, see page 14.

Page 15: BBU3900 Installation Guide(V300_17)

14

Installing the BBU in the APM30H(Ver.A)

b Installing the Monitoring Signal Cable Between the HEUA and the BBU

MON1

COM IN

UPEU on the BBU

HEUA

Page 16: BBU3900 Installation Guide(V300_17)

15

b Installing the DCDU-03Bc

When the BBU3900 is installed in the 19-inch cabinet, no space is required on the left and right of the BBU3900.

Installing the BBU in the 19-Inch RackSpace Requirementsa

Installing the BBU Case

Page 17: BBU3900 Installation Guide(V300_17)

16

Installing the BBU CablesdInstalling the BBU in the 19-Inch Rack

External power equipmentBEG(-) and RTN(+) on the DCDU-03BExternal power cable

The other end is connected to...One end is connected to...

No.

LOAD6 on the DCDU-03BPWR1 on the UPEUBBU power cable

CPRI port on the RRUCPRI port on the GTMUCPRI optical cable

Installation PositionCable

Page 18: BBU3900 Installation Guide(V300_17)

17

Installing the BBU in the TMC

Installing the DCDU-03BaSlide the DCDU-03B into the TMC. Then, tighten the four M6 screws.

Installing the BBU CasebSlide the BBU into the TMC. Then, tighten the four M6 screws.

Page 19: BBU3900 Installation Guide(V300_17)

18

Installing the BBU in the TMC

Installing the BBU Cablesc

DCDU-03B input power cable

For details on how to install the TMC alarm cable, see page 19.The DCDU-03B input power cable is connected to the external DC power supply system.For cable connections of the BBU, see page 7.

Page 20: BBU3900 Installation Guide(V300_17)

19

Installing the BBU in the TMC

Installing the BBU Cablesc

Procedure for installing the TMC alarm cable: APMI panel

Door status sensor

b. Connect the two bare terminals X1.4 (blue) and X1.5 (white) to the alarm wiring terminals of the door status sensor. c. Connect the two bare terminals X1.1 (white) and X1.2 (orange) to the OUT1+ and OUT1-alarm wiring terminals on the APMI.

d. Connect the two bare terminals X1.3 (white) and X1.6 (green) to the alarm wiring terminals of the DCDU.

a. Fix the RJ45 connector at one end of the alarm cable to the EXT_ALM1 port on the BBU.

The white and green bare wire terminals are not distinguished from different wiring terminals.

Page 21: BBU3900 Installation Guide(V300_17)

20

Installing the BBU in the PS4890 Cabinet

Installing the DCDU-03Ba1. Slide the DCDU-03B into the PS4890 cabinet. Then, tighten the four M6 screws.

2. Install the DCDU-03B input power cable.Connect one end of the power cable in blue to the DC output terminal LOAD2(-) on the power subrack and the other end to the DC input terminal NEG(-) on the DCDU-03B . Connect one end of the power cable in black to the DC output terminal RTN(+) on the power subrack and the other end to the DC input terminal RTN(+) on the DCDU-03B.

Installing the BBU Case b

Slide the BBU case into the PS4890 cabinet. Then, tighten the four M6 screws.

DC output terminal on the power subrack

DC input terminal on the DCDU-03B

Page 22: BBU3900 Installation Guide(V300_17)

21

In addition to the BBU cables installed in the APM30, a monitoring signal cable between the PMU and the BBU needs to be installed when the BBU is installed in the PS4890 cabinet. The monitoring signal cable between the APMI and the BBU is not required. For details on how to install the monitoring signal cable between the PMU and the BBU, see page 22.

Cable connections of the BBU

Connect the BBU power cable to the DC output terminal LOAD6 of the DCDU-03B.

BBU alarm cableMonitoring signal cable between the PMU and the BBU

E1/T1 cableBBU power cableCPRI optical cable

Installing the BBU in the PS4890 Cabinet

Installing the BBU Cablesc

Page 23: BBU3900 Installation Guide(V300_17)

22

Install the monitoring signal cable between the PMU and the BBU.

Connect one end of the cable to the MON port on the BBU and the other end to the RS232/RS422 port on the PMU.

Monitoring signal cable between the PMU and the BBU

RS232/RS422 port

Installing the BBU in the PS4890 Cabinet

Installing the BBU Cablesc

Page 24: BBU3900 Installation Guide(V300_17)

23

Installing the BBU in the RRU3004 Rack

a Marking Anchor Points (Unit: mm)a Drilling Holes and Installing theExpansion Bolt Assemblyb

a Installing the H-shaped Stand c3. Install the beam.1. Secure the stand. 2. Adjust the level of the

stand.

Pre-tightening

Tightening

The beam on the other side is installed in the same way.

Bolt M10x60Spring washer 12Flat washer 12

Expansion tube

Page 25: BBU3900 Installation Guide(V300_17)

24

Installing the BBU in the RRU3004 Rack

af Installing the Adapting Piecesg

a Removing the Washersd Fitting the Tabs on One Side of the RRU3004Rack into the Anchor Slots on the Stande

h Installing the BBU Case i

Tighten the screws

Installing the EPS30-4815AF (AC Input Power)

Case 2

Fixing the Lower Part of the RRU3004 Rack

Installing the DCDU-03B (–48 V Input Power)

Page 26: BBU3900 Installation Guide(V300_17)

25

DCDU

–48 V input power

Installing the BBU Cablesj

Installing the BBU in the RRU3004 Rack

Ground terminal of the RRU3004 rackGround terminal of the RRU3004 rackEquipotential cable for the subrack

The Other End Is Connected to...One End Is Connected to...Cable

LOAD6 port of the DCDUPWR port of the BBUPower cable for the BBU

GEHUB or HUBBTSE1/T1 port of the BBUE1/T1 cable

External power supply systemRTN (+) and NEG (-) terminals at the DC input end of the DCDU

Power cable for the DCDU

External ground busbarGround bar of the standExternal PGND cable

Ground terminal of the DCDUGround terminal of the RRU3004 rackGround cable for the DCDU

Ground bar of the standGround terminal of the RRU3004 rackGround cable for the subrack

The end with the optical cable labels 1A and 1B is connected to the CPRI_W port of the cabling cavity of the RRU.

The end with the optical cable labels 2A and 2B is connected to CPRI ports 0 to 5 of the GTMU of the BBU.

CPRI optical cable

Page 27: BBU3900 Installation Guide(V300_17)

26

4815

Only two countersunk screws are required.

Installing the BBU Cablesj

Installing the BBU in the RRU3004 Rack

220 V input power

GEHUB or HUBBTSE1/T1 port of the BBUE1/T1 cable

Power supply equipment of the customerAC INPUT port of the 4815Input power cable for the 4815

Ground terminal of the RRU3004 rackBolts for the mounting ears of the 4815PGND cable for the 4815

The Other End Is Connected to...One End Is Connected to...Cable

External ground busbarGround bar of the standExternal PGND cable

Ground terminal of the RRU3004 rackGround terminal of the RRU3004 rackEquipotential cable for the rack

LOAD1 port of the 4815PWR port of the BBUPower cable for the BBU

RS232/RS485 port of the 4815, close to the 232 side

MON1 port of the BBU4815 - BBU monitoring signal cable

Ground bar of the standGround terminal of the RRU3004 rackPGND cable for the RRU3004 rack

The end with the optical cable labels 1A and 1B is connected to the CPRI_W port of the cabling cavity of the RRU.

The end with the optical cable labels 2A and 2B is connected to CPRI ports 0 to 5 of the GTMU of the BBU.

CPRI optical cable

The mounting ears need to be installed in an inverse manner during the installation of the 4815.

Page 28: BBU3900 Installation Guide(V300_17)

27

a Installing the IMB03c Securing the IMB03d

aa Installing the Boltsb

Insulation padFitting to the mounting hole

3 N•m

M6x16

Installing the IMB03 on the H-Shaped Stand

For details about how to install the BBU and DCDU, see page 24.

Upper mounting hole for the IMB03

Lower mounting hole for the IMB03

Beam

Installing the Mounting Ears for the IMB03

20 mm to 30 mm

M10x30

30 N•m

Page 29: BBU3900 Installation Guide(V300_17)

28

Installing the RRU on the H-Shaped Stand

Brackets for installing the RRU

Main bracketAuxiliary Bracket

Dual-nut bolt

Only the main bracket is used for installing the RRU on the H-shaped stand, and the dual-nut bolt and auxiliary bracket are not used.

Main bracket

a Preparing the Installationa Installing the Main Bracketb

a Installing the RRUc Securing the RRUd

For details about cable connections, see pages 25 and 26.

When the expansion bolt assemblies are used to secure the H-shaped stand, only the bolt and spring washer are used, and the expansion tube and plastic tube are removed.

Page 30: BBU3900 Installation Guide(V300_17)

29

a Space Requirements

A single BBU BBU+DCDU-03B

Installing the BBU on the Wall

a Installing the Mounting Ears for Wall Installationb

Mounting ears for wall installation

Mounting ears on the BBU case

The DCDU should be installed close to the BBU, but the distance between BBU and DCDU must be greater than 100 mm.

Use screws to join the mounting ears for wall installation and the mounting ears on the BBU case.

BBU

DCDU-03B

≥100mm

Page 31: BBU3900 Installation Guide(V300_17)

30

Installing the BBU on the Wall

a Installing the Expansion Boltsd

Place the BBU against the wall, and then use the marking pen to mark the anchor points.

ac Determining the Anchor Points on the Wall

e Fixing the BBU Case on the Wall

BBU

Wall

Bolt M6×60NutSpring washer 6Flat washer 6

Expansion tube

Flat washer

Spring washer

Page 32: BBU3900 Installation Guide(V300_17)

31

Installing the BBU on the Wall

Installing the DCDU-03B Case

Wall

2 N•m

M6x12

1. Installing the mounting ears for the DCDU-03B.

2. Place the mounting ears for wall installation against the wall, and then use the marker to mark the holes of the mounting ears for wall installation.

3. Install the expansion bolt. 4. Install the DCDU-03 on the wall.

f

Bolt M6×60NutSpring washer 6Flat washer 6

Expansion tube

Page 33: BBU3900 Installation Guide(V300_17)

32

Installing the BBU Cables

Installing the BBU on the Wall

External transmission equipment

External monitoring equipment

External powerequipment

External ground bar

External ground bar

External power equipmentDC input port on the DCDU-03DCDU power cable

LOAD6 on the DCDU-03PWR port on the BBUBBU power cable

The Other End Connected to...One End Connected to...

External ground barGround bolt on the equipmentPGND cable

External monitoring equipmentMON/ALM port on the BBUMonitoring signal cable

SN

GEHUB or HUBBTSE1/T1 port on the GTMUE1/T1 cable

CPRI port on the RRUCPRI port on the BBUCPRI optical cable

Power supply socket on the RRULOAD0 to LOAD5 on the DCDU-03RRU power cable

Installation PositionCable

g

Page 34: BBU3900 Installation Guide(V300_17)

33

BBU

EPS 01

Installing the BBU in the APM30H(Ver.B)Installing the BBU Casea

b BBU Cable Connections

M6 screws

Slide the BBU into the 2 U space close to the EPS along the guide rails, and then tighten the four M6 screws on the BBU panel.

1. Installing the BBU Case

Monitoring signal cable

Alarm cable

BBU power cable

E1/T1 cable

FE/GE cableFE/GE surge protection transfer cableE1/T1 surge protection transfer cableCPRI optical cable

Slide the SLPU box into the 1U space above the EPS in the cabinet, and then fasten the two M6 screws on the panel.

2. Installing the SLPU Case

SLPU

2 N•m

M6x16

Page 35: BBU3900 Installation Guide(V300_17)

34

LOAD1

Installing the BBU in the APM30H(Ver.B)Installing the BBU Cablesc

2. Install the CPRI optical cable.

The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI5 on the GTMU of the BBU, the connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU.

Optical module

Puller

Winding pipe

Link the easy power receptacle (pressfit type) connector at one end to the LOAD1 terminal of the EPS01, and then link the 3V3 connector at the other end to the -48V port on the BBU.

1. Install power cable.

2.1. Turn the puller on the optical module outwards, and then insert the optical module to the port CPRI 0 to CPRI5.2.2. Remove the dustproof caps from the optical connectors.

Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.2.3. Wrap the winding pipe at the fiber tails.

Connect the fiber tails labeled 1A and 1B to the CPRI_W port on the RRU.

Connect the fiber tails labeled 2A and 2B to one of the CPRI0 to CPRI5 ports on the GTMU.

Page 36: BBU3900 Installation Guide(V300_17)

35

Installing the BBU in the APM30H(Ver.B)Installing the BBU Cablesc

4.2. Fix the DB26 connector of the E1/T1 cable to the OUTSIDE port on the UELP.

3. Install the E1/T1 surge protection transfer cable.

4. Install the E1/T1 cable.4.1. Cabling the E1/T1 cable.

Fix the DB25 connector of the E1/T1 surge protection transfer cable to the INSIDE port on the UELP and the DB26 connector to the E1/T1 port on the GTMU.

E1/T1 surge protection transfer cable

E1/T1 cable

Connect one end of the FE/GE surge protection transfer cable to the FE0 port near the INSIDE label on the UFLP and the other end to the FE0 port on the GTMU.

5. Install the FE/GE surge protection transfer cable (FE/GE transmission mode).

6. Install the FE/GE cable (FE/GE transmission mode).

6.1. Connect one end of the FE/GE cable to the FE0 port near the OUTSIDE label on the UFLP. Then, lead the other end out of the cabinet along the right side of the cabinet.

FE/GE surge protection transfer cable

FE/GE cable

Before soldering the connectors to the E1/T1 cable, ensure that both ends of the E1 cable are disconnected from any devices. In addition, all the connectors should be soldered to the cable.

The shielded straight-through cable must be used as the FE/GE Ethernet cable.

Page 37: BBU3900 Installation Guide(V300_17)

36

Installing the BBU in the APM30H(Ver.B)Installing the BBU Cablesc

7. Install the monitoring signal cable between the CMUA and the BBU.

COM_IN

MON1

Page 38: BBU3900 Installation Guide(V300_17)

37

Installing the BBU in the TMC11H(Ver.B)

Installing the BBUaSlide the BBU into the TMC11H along guide rails, and then tighten the four M6 screws on the BBU panel.

Slide the SLPU into the TMC11H along the guide rails, and then tighten the two M6 screws on the SLPU panel.

b Installing the BBU Cable

LOAD6

Install the BBU power cable.

BBU

DCDU

2 N•m

M6x16

2 N•m

M6x16

SLPU

Page 39: BBU3900 Installation Guide(V300_17)

38

Installing the BBU in the TMC11H(Ver.B)

The procedure for installing BBU cables (except the power cable) in the TMC11H cabinet is the same as that in the APM30H(Ver.B). For details, see the description on pages 33 to 36.

For details on the BBU cable connections, see BBU Cable Connections on pages 33.

Installing the BBU Cableb

E1/T1 port on the GTMUDB26 connectorE1/T1 surge protection transfer cable

INSIDE port on the UELP DB25 connector

FE0 port at the OUTSIDE side on the UFLPRJ45 connectorFE/GE cable

Port on the transmission device RJ45 connector

COM_IN port on the CMUA RJ45 connector

MON1 port on the BBURJ45 connectorMonitoring signal cable between the CMUA and the BBU

LOAD6 port on the DCDU-03BOT terminal

-48V port on the UPEU3V3 connectorBBU power cable

FE0 port at the INSIDE side on the UFLPRJ45 connectorFE/GE surge protection transfer cable

FE0 port on the GTMURJ45 connector

Port on the transmission device The connector needs to be made on site according to the field requirements.

OUTSIDE port on the UELPDB26 connectorE1/T1 cable

The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU.

DLC

The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI5 on the GTMU.

DLCCPRI optical cable

Connects toConnector TypeCable

Page 40: BBU3900 Installation Guide(V300_17)

39

Installing the BBU in the APM30H(Ver.B, +24V)

Installing the BBUaSlide the BBU to the APM30H (+24V) along guide rails, and then tighten the four M6 screws on the BBU panel.

BBU

EPS48100D

2 N•m

M6x16

Slide the SLPU to the APM30H (+24V) along guide rails, and then tighten the two M6 screws on the SLPU panel.

Installing BBU CablesbInstalling the monitoring signal cable for the PSU and the in-position signal cable for the PSU ALM PRESENT

EXT-ALM1 EXT-ALM0

2 N•m

M6x16

Page 41: BBU3900 Installation Guide(V300_17)

40

Installing BBU Cablesb

Installing the BBU in the APM30H(Ver.B, +24V)

The procedure for installing BBU cables (except the power cable) in the APM30H(+24 V) cabinet is the same as that in the APM30H(Ver.B). For details, see the description on pages 33 to 36.

For details on the BBU cable connections, see BBU Cable Connections on pages 33.

FE0 port at the INSIDE side on the UFLPRJ45 connectorFE/GE Surge Protection Transfer Cable

FE0 port on the GTMURJ45 connector

E1/T1 port on the GTMUDB26 connectorE1/T1 Surge Protection Transfer Cable

INSIDE port on the UELP DB25 connector

-48V port on the UPEU3V3BBU power cable

LOAD6 port on the DCDU-03BOT

EXT-ALM1 port on the UPEURJ-45In-position signal cable for the PSU

PRESENT port on the EPS48100DCord end terminal

EXT-ALM0 port on the UPEURJ-45Monitoring signal cable for the PSU

ALM port on the EPS48100DRJ-45

MON1 port on the BBURJ45 connectorMonitoring signal cable between the CMUA and the BBU

COM_IN port on the CMUA RJ45 connector

FE0 port on the GTMURJ45 connectorFE/GE cable

Port on the transmission device RJ45 connector

Port on the transmission device The connector needs to be made on site according to the field requirements.

E1/T1 port on the GTMUDB26 ConnectorE1/T1 cable

The connectors labeled 1A and 1B are connected to the optical module on the port labeled CPRI_W on the RRU.

DLC

The connectors labeled 2A and 2B are connected to the optical module on the port labeled CPRI0 to CPRI2 on the GTMU.

DLCCPRI optical cable

Connects toConnector TypeCable

Page 42: BBU3900 Installation Guide(V300_17)

41

Installing the BBU in the OMB

Installing the Brackets on the Metal Pole and Mounting Platea

Use a level to adjust the level of the brackets to ensure that the front and back brackets are on the same plane.

1. Install the brackets on the metal pole.

255-306 kgf·cm

M10x110Flat washer

Spring washer

Bolt

2. Install the mounting plate.

255-306 kgf·cm

M10x40

Flat washer

Springwasher

Bolt

Mounting plate

Page 43: BBU3900 Installation Guide(V300_17)

42

Installing the BBU in the OMB

Installing the OMBbSlide the BBU case into the OMB gently. Then, tighten the four M6 screws.

c Installing the BBU Cables

Ground bar

Ensure that the fan is on the bottom when installing the BBU.

1. Install the PGND cable for OMB.

The procedures for installing the PGND cable, E1/T1 cable or FE/GE cable, and optical cable in the DC OMB and in the AC OMB are the same:

PGND cableE1/T1 cable or FE/GE cableOptical cable

The following description takes the installation in the DC OMB as an example.

Page 44: BBU3900 Installation Guide(V300_17)

43

Installing the BBU in the OMB

Installing the BBU Cablesc

NEG(-)

RNT (+)

L N PE

3. Install the input power cable for the AC OMB.

2. Install the input power cable for the DC OMB.

Page 45: BBU3900 Installation Guide(V300_17)

44

LOAD6

Installing the BBU in the OMB

Installing the BBU Cablesc

DC INPUT

PWR

LOAD1

5. Install the BBU power cable for the AC OMB.

4. Install the BBU power cable for the DC OMB.

Page 46: BBU3900 Installation Guide(V300_17)

45

Installing the BBU in the OMB

Installing the BBU Cablesc6. Install the E1/T1 cable (E1/T1 transmission mode).

Shielding layer

Shielding layer(25 mm)

PGND

INSIDE

OUTSIDE

E1/T1

b

Page 47: BBU3900 Installation Guide(V300_17)

46

Installing the BBU in the OMB

Installing the BBU Cablesc7. Install the FE/GE cable (FE/GE transmission mode).

8. Install the CPRI optical cable.

Connect the longer end of the optical cable to CPRI0, CPRI1, CPRI2, CPRI3,CPRI4 or CPRI5 on the GTMU. Then, connect the other end to the RRU.

Optical module

Puller

c

a

b

b

a

c

2. Turn outwards the puller on the optical module.

1. Insert the optical module into the CPRI0, CPRI1, CPRI2, CPRI3, CPRI4 or CPRI5 port.

3. Remove the dustproof caps from the optical connectors.

4. Insert the optical connector at one end of the CPRI optical cable into the optical module. Lead the CPRI optical cable out of the cabinet along the left side of the cabinet.

The shielded straight-through cable must be used as the FE/GE Ethernet cable.

Page 48: BBU3900 Installation Guide(V300_17)

47

Powering On the BBU

BBU Hardware Installation Checklist

All the labels at both ends of the cables are legible.10

The extra length of each indoor cable tie is cut, and the cut surface is smooth without sharp edges. An extra length of 3 mm to 5 mm is reserved for each outdoor cable tie.

11

The cable layout facilitates maintenance and future capacity expansion, and the bending radius of the cables meet the requirements.

9

The idle connectors of the cables are properly protected.12

The power cable, PGND cable, feeder, optical cable and the E1/T1/FE/GE signal cable are bound separately with a spacing of larger than 3 cm.

8

The cables are neatly and tightly bound. The cable ties are evenly spaced and face the same direction.7

All cables are connected securely and reliably. Pay special attention to the cable connections at the bottom of the cabinet.

6

The flat washer and the spring washer are well mounted on all OT terminals.5

The bare wires and the terminal handles at the wiring terminals are coated with heat-shrinkable tubes.4

The terminals at both ends of the power cable or PGND cable are securely soldered or crimped.3

The redundant part of the power cable or PGND cable is stripped off rather than coiled.2

All self-made PGND cables are copper-based with the proper wire diameters. No breaking device such as switch and fuse is allowed for the electric connection of the grounding system. No short circuit is allowed. Each terminal on the ground bar can be connected with only one wiring terminal of the PGND cable.

1

ItemSN

Page 49: BBU3900 Installation Guide(V300_17)

48

Appendix

Remove the GTMU and UELP from the BBU.

Setting the DIP Switchesa

Wear an ESD wrist strap during the operations on the boards to prevent damage to the boards.

The UELP is optional. Please check the settings of the DIP switches according to the field conditions.

Obtaining the ESNRecord the Electronic Serial Number (ESN) shown on the label attached to the mounting ear of the BBU, and report the ESN to the engineer for the commissioning of the base station.

ESN

Page 50: BBU3900 Installation Guide(V300_17)

49

Appendix

a Setting the DIP Switches

Settings of the DIP switches on the UELP

Settings of the DIP switches on the GTMU

Set the DIP switches of the BBU.

All the DIP bits of S2 on the GTMU are set to OFF by default in all modes. When four 75-ohm E1/T1 links are faulty, all the DIP bits of S2 should be set to ON so that the faults are rectified.

75-ohm E1 Mode

120-ohm E1 Mode

T1 Mode

75-ohm E1 Mode

Other Modes

Page 51: BBU3900 Installation Guide(V300_17)

50

Appendixa Setting the DIP SwitchesSettings of S4 and S5 on the GTMU

Reinstall the GTMU and the UELP.

Description Setting of DIP BitDIP Switch

Miscellaneous

OFF

ON

1

OFF

ON

2

OFF

ON

3 4

OFF

ON

Not available

The E1 link cannot be bypassed.

The E1 link can be bypassed.S4

The E1 link of the Level 1 cascaded BTS can be bypassed.

OFFONONOFF

The E1 link can be bypassed.ONONONON

Description Setting of DIP BitDIP Switch

OFF

ON

1

OFF

OFF

2

ON

ON

3 4

OFF

OFF

The E1 link of the Level 3 cascaded BTS can be bypassed.

The E1 link of the Level 2 cascaded BTS can be bypassed.

S5

Page 52: BBU3900 Installation Guide(V300_17)

51

Appendix

Setting the DIP Switchesa

Set as ON, indicating that the baud rate is 9600. (If it is set as OFF, the baud rate is 19200.)

Selecting baud rate for communicating with the BTS

6

Set as OFFReserved and not defined7 and 8

(1) Switches 1 to 5 correspond to bits 0 to 4. ON:1; OFF: 0

For example: to set the address of PMU to 3, set switches 3 to 5 as OFF.

(2) Default setting before delivery:

1 (BIT0), ON

2 (BIT1), ON

3 (BIT2), OFF

4 (BIT3), OFF

5 (BIT4), OFF

Defining the communication address of the PMU

1 to 5

No. OperationFunction

Set the DIP switches of the PMU.

Page 53: BBU3900 Installation Guide(V300_17)

52

Pin Assignment for the BBU Signal Cablesb75-ohm E1 cable

Appendix

TX4-RingX1.26

TX4+8TipX1.25

TX3-RingX1.24

TX3+6TipX1.23

TX2-RingX1.22

TX2+4TipX1.21

TX1-RingX1.20

TX1+2TipX1.19

RX4-RingX1.8

RX4+7TipX1.7

RX3-RingX1.6

RX3+5TipX1.5

RX2-RingX1.4

RX2+3TipX1.3

RX1-RingX1.2

RX1+1TipX1.1

LabelCoaxial Series No.Wire TypePin of the DB26 Male Connector

Page 54: BBU3900 Installation Guide(V300_17)

53

Appendix

Pin Assignment for the BBU Signal Cablesb120-ohm E1 cable

TX4-RedX1.26

TX4+Twisted pair

GreenX1.25

TX3-RedX1.24

TX3+Twisted pair

OrangeX1.23

TX2-RedX1.22

TX2+Twisted pair

BlueX1.21

TX1-WhiteX1.20

TX1+Twisted pair

GreyX1.19

RX4-WhiteX1.8

RX4+Twisted pair

BrownX1.7

RX3-WhiteX1.6

RX3+Twisted pair

GreenX1.5

RX2-WhiteX1.4

RX2+Twisted pair

OrangeX1.3

RX1-WhiteX1.2

RX1+Twisted pair

BlueX1.1

LabelWire TypeWire ColorPin of the DB26 Male Connector

Page 55: BBU3900 Installation Guide(V300_17)

54

Appendix

Pin Assignment for the BBU Signal Cablesb

RX-Twisted pairX5WhiteX1.5

RX+Twisted pairX4BlueX1.4

TX-Twisted pairX3OrangeX1.2

TX+Twisted pairX2WhiteX1.1

Port on the APMI

Wire TypePins of X2, X3, X4, and X5

Wire ColorPin of the RJ45 Connector

Monitoring signal cable between the APMI and the BBU

RX-Twisted pairWhiteX2.6X1.5

RX+Twisted pairBlueX2.2X1.4

TX-Twisted pairOrangeX2.7X1.2

TX+Twisted pairWhiteX2.3X1.1

Port on the APMI

Wire TypeWire ColorPin of the DB9Male Connector

Pin on the RJ45 Connector

EMUA monitoring signal cable

Page 56: BBU3900 Installation Guide(V300_17)

55

Appendix

Pin Assignment for the BBU Signal Cablesb

BrownX2.8X1.8

Twisted pairWhite/brownX2.7X1.7

BlueX2.4X1.4

Twisted pairWhite/blueX2.5X1.5

GreenX2.6X1.6

Twisted pairWhite/greenX2.3X1.3

OrangeX2.2X1.2

Twisted pairWhite/orangeX2.1X1.1

Wire TypeWire ColorPin of the RJ45 Connector

Pin of the RJ45 Connector

BBU alarm cable

Page 57: BBU3900 Installation Guide(V300_17)

56

Change History

This describes the changes in the BBU3900 Installation Guide.

17 (2010-09-03)This is the seventeenth commercial release.Compared with issue 16 (2010-07-30) of V300R008&R009, this issue added safety information about the FE/GE Ethernet cable.

16 (2010-07-30)This is the sixteenth commercial release.Compared with issue 15 (2010-06-30) of V300R008&R009, this issue excludes the safety information.

15 (2010-06-30)This is the fifteenth commercial release.Compared with issue 14 (2010-04-10) of V300R008&R009, this issue incorporates the description about installing the IMB03 on the H-Shaped stand.

14 (2010-04-10)This is the fourteen commercial release.Compared with issue 13 (2010-03-15) of V300R008&R009, the UTRP is added.

13 (2010-03-15)This is the thirteenth commercial release.Compared with issue 12 (2010-01-30) of V300R008&R009, the procedure for obtaining the ESN is added.

12 (2010-01-30)This is the twelfth commercial release.Compared with issue 11 (2009-12-30) of V300R008&R009, the configuration principles of the UFLP is modified.

11 (2009-12-30)This is the eleventh commercial release.Compared with issue 10 (2009-11-10) of V300R008&R009, the installation scenarios of OMB are added.