basics of drawing for engineers

Upload: muthu06101987

Post on 03-Apr-2018

239 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/28/2019 Basics of Drawing for Engineers

    1/64

    BASICS OF DRAWING FOR

    Kirloskar Pneumatic Co. Ltd

    ENGINEERS- PART 2

    Kirloskar Pneumatic Co. Ltd

  • 7/28/2019 Basics of Drawing for Engineers

    2/64

  • 7/28/2019 Basics of Drawing for Engineers

    3/64

  • 7/28/2019 Basics of Drawing for Engineers

    4/64

  • 7/28/2019 Basics of Drawing for Engineers

    5/64

  • 7/28/2019 Basics of Drawing for Engineers

    6/64

  • 7/28/2019 Basics of Drawing for Engineers

    7/64

  • 7/28/2019 Basics of Drawing for Engineers

    8/64

  • 7/28/2019 Basics of Drawing for Engineers

    9/64

  • 7/28/2019 Basics of Drawing for Engineers

    10/64

  • 7/28/2019 Basics of Drawing for Engineers

    11/64

  • 7/28/2019 Basics of Drawing for Engineers

    12/64

  • 7/28/2019 Basics of Drawing for Engineers

    13/64

  • 7/28/2019 Basics of Drawing for Engineers

    14/64

  • 7/28/2019 Basics of Drawing for Engineers

    15/64

  • 7/28/2019 Basics of Drawing for Engineers

    16/64

  • 7/28/2019 Basics of Drawing for Engineers

    17/64

  • 7/28/2019 Basics of Drawing for Engineers

    18/64

  • 7/28/2019 Basics of Drawing for Engineers

    19/64

  • 7/28/2019 Basics of Drawing for Engineers

    20/64

  • 7/28/2019 Basics of Drawing for Engineers

    21/64

  • 7/28/2019 Basics of Drawing for Engineers

    22/64

  • 7/28/2019 Basics of Drawing for Engineers

    23/64

  • 7/28/2019 Basics of Drawing for Engineers

    24/64

  • 7/28/2019 Basics of Drawing for Engineers

    25/64

  • 7/28/2019 Basics of Drawing for Engineers

    26/64

  • 7/28/2019 Basics of Drawing for Engineers

    27/64

  • 7/28/2019 Basics of Drawing for Engineers

    28/64

  • 7/28/2019 Basics of Drawing for Engineers

    29/64

  • 7/28/2019 Basics of Drawing for Engineers

    30/64

  • 7/28/2019 Basics of Drawing for Engineers

    31/64

    Guide to types of ISO limits & fits

  • 7/28/2019 Basics of Drawing for Engineers

    32/64

    General Tolerancing

  • 7/28/2019 Basics of Drawing for Engineers

    33/64

    Limits & Fits for Shafts & HolesBasic Size & Shaft/ Hole Tolerancing System

  • 7/28/2019 Basics of Drawing for Engineers

    34/64

    Basic Size & Shaft/ Hole Tolerancing System

  • 7/28/2019 Basics of Drawing for Engineers

    35/64

    Fits

  • 7/28/2019 Basics of Drawing for Engineers

    36/64

    Fits

  • 7/28/2019 Basics of Drawing for Engineers

    37/64

  • 7/28/2019 Basics of Drawing for Engineers

    38/64

  • 7/28/2019 Basics of Drawing for Engineers

    39/64

    Limits & Fits Determining Working Limits

  • 7/28/2019 Basics of Drawing for Engineers

    40/64

  • 7/28/2019 Basics of Drawing for Engineers

    41/64

  • 7/28/2019 Basics of Drawing for Engineers

    42/64

  • 7/28/2019 Basics of Drawing for Engineers

    43/64

    Surface Finish

  • 7/28/2019 Basics of Drawing for Engineers

    44/64

  • 7/28/2019 Basics of Drawing for Engineers

    45/64

  • 7/28/2019 Basics of Drawing for Engineers

    46/64

  • 7/28/2019 Basics of Drawing for Engineers

    47/64

  • 7/28/2019 Basics of Drawing for Engineers

    48/64

  • 7/28/2019 Basics of Drawing for Engineers

    49/64

  • 7/28/2019 Basics of Drawing for Engineers

    50/64

  • 7/28/2019 Basics of Drawing for Engineers

    51/64

  • 7/28/2019 Basics of Drawing for Engineers

    52/64

  • 7/28/2019 Basics of Drawing for Engineers

    53/64

  • 7/28/2019 Basics of Drawing for Engineers

    54/64

  • 7/28/2019 Basics of Drawing for Engineers

    55/64

  • 7/28/2019 Basics of Drawing for Engineers

    56/64

  • 7/28/2019 Basics of Drawing for Engineers

    57/64

    ENGINEERING CHANGE NOTICE

  • 7/28/2019 Basics of Drawing for Engineers

    58/64

    Changes made in engineering documents, viz Drawings SBM BOM & STANDARDS,released for production/development, are communicated to all concerned, through adocument called as Engineering change notice. Kpcl stand. Gives guidelines for procedureto be followed. ( the subject procedure is not applicable to drawings sent to customer forapproval.)

    Enclosed is a format of the ECN .

    The ECN format, after filling the information, bears a specific number. & date. Configurationof the number can be decided by respective design offices This is recorded in a separatereg s er w a ona n orma on as, - pro uc re erence. r e recor o e c ange,

    reason for change, & signature of authority.

    ECN number & brief record of change is also written on the drawing. Every change ondrawing is indicated by a symbolic letter, A to H. This symbol is also written near areawhere the change is carried out. In addition to that a circle is marked around the symbol, toknow the change at a glance

    Guidelines are also given for entering the data,- reason, effect on stock, , action by otherdepts. Effect on processes.

    Codes R1 TO R7 are given for various reasons of ECN e g drawing update drawing

  • 7/28/2019 Basics of Drawing for Engineers

    59/64

    Codes R1 TO R7 are given for various reasons of ECN, e.g. drawing. update, drawing.error, improvement etc.

    Codes S1 TO S7 are provided for actions on stock ,e.g.-use as it is , rework, scrap, etc.Accordingly instructions are required to be given for Stock at various positions viz.inprocess , in assembly ,with dealers / branches etc.

    Effect on manufacturing departments, -m shop, assembly, materials, imports , stores etc. andeffect on manufacturing process- tooling , pattern, heat treatment. material, machiningmanualInformation is also given for effect on interchangeability & requirement of service bulletin.

    Different depts. To whom drg./ only ECN copy is to be circulated , are listed in a column .

    These are to be marked accordingly.

    Engineering changes in drawings. submitted for customers approval. -Differentdrawings. eg. GA drg, P I Diagram Electrical drawing. are submitted to customer / consultant,for approval as per contract.

    As per comments / suggestions drawing is changed. The changes are recorded on drg, &are identified by a REVISION NUMBER 1, 2, 3, ETC. written in a triangle. After final approvalof drawing changes are incorporated on tracings & drg copies are released for production,through Release sheet Approved drawing prints are stored with R&D / MKTG. DEPT.

    Present Format Proposed Format

  • 7/28/2019 Basics of Drawing for Engineers

    60/64

    DRAWING RELEASE

    Before drg is released for manufacturing or customer as authentic document which may

  • 7/28/2019 Basics of Drawing for Engineers

    61/64

    Before drg is released for manufacturing or customer as authentic document which maybear commercial as well as legal aspect, it should be signed by an authorized person. OnDrg. sheet Three blocks are provided for signature. DRAWN , CHECKED & APPROVE.

    Computer signature/ initials of the draftsman or engineer is required in the column DRAWN. Checked signature is to be done by an engineer. He is supposed to be aresponsible person for technical contents the in drawing. Approval should be given by otherperson. This is supposed to be an approval for expenditure for manufacturing the depictedcomponent

    If a Draftsman, has drawn the drawing, & an engineer has checked the drawing & approvalcan be done by the same engineer, if authorized so.

    ,has to be given by the other authorized person

    RELEASE SHEET-.

    It is a Separate format made, which is to be filled in, & issued along with drawing prints. Aseparate number is allotted to each release sheet, through which DRAWINGS. SBM & BOMare released for a OA or Shop order. All documents need not be released at a time, but can

    be released in groups. Each group is called release number. .List of departments is printedon the sheet . Concerned departments are marked to whom drawing is released .

    This release sheet is to be used for first release of the document. If some drg or bom usedin a product is common to some other product it need not be released again. In case of anyspecific requirement from the user document reference can be given, on release sheet with

    a special mention about it.

  • 7/28/2019 Basics of Drawing for Engineers

    62/64

    DRAWING STANDARDS .

  • 7/28/2019 Basics of Drawing for Engineers

    63/64

    I] IS STANDARDS --

    IS 696- - CODE OF PRACTICE FOR - GENERAL ENGINEERING DRAWINGS (withdrawn )

    IS 9609 PART (1) -1983 LETTERING OF TECHNICAL DRAWINGS.

    IS 10164 - 1985 REQUIREMENT TO EXECUTE TECHNICAL DRAWINGS FOR MICRO COPING

    IS 10714-1983 GENERAL PRINCIPLES OF PRESENTATION OF TECH DRAWING.

    IS 107181983 METHOD OF DIMENSIONING & TOLERANCING OF CONES ON TECH DRAWINGS

    IS 8000 PART (1) - 1985 GEOMETRICAL TOLERANCES ON TECHNICAL DRAWINGS FORMS ,LOCATION , RUN OUT & GEOMETRICAL DEFINITION

    IS 8000 PART (2) -1992 MAXIMUM MATERIAL PRINCIPLE.

    IS 8000 PART (3) -1992 DIMENSIONING & TOLERANCING OF PROFILE

    IS 8000 PART (4) 1976 PRACTICAL EXAMPLES OF INDICATIONS ON DRAWINGS .

    IS 11664 -1986 FOLDING OF DRAWING PRINTS

    IS 11665 1985 TITLE BLOCK

    .IS 11666 -1985. TECHNICAL DRAWINGS ITEM LIST

    IS 11667 1985 INDICATION OF LINEAR & ANGULAR TOLERANCES ON TECHNICAL DRAWINGS

  • 7/28/2019 Basics of Drawing for Engineers

    64/64

    IS 11668 1985 TECHNICAL DRAWINGS SPECIFIED REPRESENTATION OF CENTER HOLES

    IS 11669 1986 GENERAL PRINCIPLES OF PRESENTATION OF TECH DRAWINGS

    IS 11670 - 1993 TECHNICAL DRAWINGS ABBREVIATION SYMBOLS FOR USE IN TECHNICAL

    DRAWINGS.

    IS 3073 - 1967 ASSESSMENT OF SURFACE ROUGHNESS.

    2] KPC STANDARDS

    CODE & PRACTICE FOR DRAWING KPCL STD. NO- 999 700.

    It consists of-Guidelines for lay out drawings, sectional views , spacingMat. Spec, alternative mat, heat treatment & special notesGuidelines for dimensioning & tolerancingGuidelines for checking & drawing detailsGuidelines for writing BOM & SBM

    Guidelines for ECN writingGuidelines for metrication of drawings.Guidelines for drawing sheet sizes for SBM , BOM & folding of prints.Abbreviations & conventions to be used in drafting work

    3] ANSI Y-14 5 M GEOMETRIC DIMENSIONING & TOLERANCING