8. BASIC WELL CONTROL
Habiburrohman abdullah 1
![Page 2: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/2.jpg)
Basic Well Control
• Origin of overpressure
• Kick recognition
• Shut-in procedure
• Kill Procedure
2
![Page 3: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/3.jpg)
Kick Detection and Control
• Primary well control involves efforts at preventing formation fluid influx into the wellbore.
• Secondary well control involves detecting an influx and bringing it to the surface safely.
3
![Page 4: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/4.jpg)
Basic Well Control
Two primary objectives:
1. To kill the well safely
2. To minimize borehole stresses
4
![Page 5: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/5.jpg)
Blow Out Preventer (BOP)
5
![Page 6: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/6.jpg)
Successful Well Control
• Keep the BHP constant throughout using the choke.
6
![Page 7: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/7.jpg)
Slow Pump Rate
• The pump rate at which the system pressure loss is recorded for purposes of well control is called the slow pump rate, slow pump pressure, kill rate, or reduced circulating pressure
• Also called slow pump rate, slow pump pressure, kill rate, reduced circulating pressure or slow circulating rate
7
![Page 8: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/8.jpg)
Slow Pump Rate: When To Take
• Every tour
• After repairing the pumps or when the liner is changed
• When the mud properties are changed
• Every 500 ft of new hole drilled
• BHA changes
• When the bit nozzles are changed
8
![Page 9: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/9.jpg)
SIDPP
• Shut-in DP Pressure is the measure of the difference between the formation pressure and the hydrostatic column of the mud in the drillstring.
• Gives a direct reading of the formation pressure
9
![Page 10: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/10.jpg)
Formation Pressure / Kill MW
• FP (ppg) = (SIDPP / (0.0519 x TVD)) + Original MW
• BHP = ((SIDPP x 19.23) / TVD) + Original MW
10
![Page 11: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/11.jpg)
SICP
• Shut-in Casing Pressure is the measure of the difference between the formation pressure and the hydrostatic column of the fluids in the annulus during a kick.
• Not an good indicator of the formation pressure.
FP = HPmud + HPkick + SICP
11
![Page 12: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/12.jpg)
Pressure at the Casing Shoe
• Pcsg = SICP + 0.052 x MW x Casing shoe TVD
12
![Page 13: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/13.jpg)
U Tube
Kick
Annulus sideDP side
SIDPP + HPmud =
SICP + HPmud + HPkick =
Fm Pressure
13
![Page 14: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/14.jpg)
Materials to Weight Up Mud
• Barite• Ilmenite• Fe oxide (Hematite)• Galena
14
![Page 15: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/15.jpg)
Materials to Weight Up Completion Fluids
• KCl• NaCl
• CaCl2• CaBr2
• ZnBr
15
![Page 16: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/16.jpg)
Barite
• The amount of barite necessary to increase the MW to the kill MW is:
Sx/100 bbl mud = 1490 x ((Kill MW – Old MW)/(35.8 – Kill MW) Or
100-lb sx of barite = (Mud vol x 14.7 x (KMW – OMW)) / (35 – KMW)
• The volume of increase caused by weighting up:
(100 x (Kill MW – MW)) / (35.8 – Kill MW) Or
Vol incr = sx of Barite / 14.7
16
![Page 17: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/17.jpg)
Shut-In Procedures
• Hard shut-in• Soft shut-in• Shut-in while tripping• Shut-in with diverter in use• Shut-in while running casing
17
![Page 18: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/18.jpg)
Hard Shut-in
• Assure beforehand the choke manifold line is open to preferred choke and choke is in closed position.
• After a kick is indicated, pick up the string and position tool joint above rotary table.
• Shut off pump.• Flow check.• If flow is verified, shut the well in by closing the BOP using
annular preventer.• Open the HCR valve (hydraulically controlled remote valve) to the
choke manifold.
18
![Page 19: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/19.jpg)
Hard Shut-in
• Close the choke if open.• Notify supervisor (company drilling supervisor,
toolpusher or rig manager).• Read and record SIDPP, SICP, pit gain, TVD and time.• Rotate the drillstring through the closed annular
preventer if feasible.• Prepare to implement kill procedures.
19
![Page 20: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/20.jpg)
Soft Shut-in
• Assure beforehand choke manifold line is open to preferred choke and choke in in open position.
• After kick is indicated, pick up string & position tool joint above rotary table.
• Shut off pump.• Flow check.• If flow is verified, open the HCR.• Close the BOP using the annular preventer.
20
![Page 21: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/21.jpg)
Soft Shut-in
• Close the choke if open.• Notify supervisor (company drilling supervisor,
toolpusher, rig manager). • Read and record SIDPP, SICP, pit gain, TVD and time.• Rotate the drillstring through the closed annular
preventer if feasible.• Prepare to implement kill procedures.
21
![Page 22: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/22.jpg)
Shut-in While Tripping• Set the slips below the tool joint.• Stab a full opening valve (TIW) and close it.• Open the HCR and close the BOPs and choke.• Pick up and stab the kelly/TDS or pump-in line.• Open the safety valve.• Notify the supervisors.• Read and record SIDPP, SICP, pit gain, TVD of the well, TVD of the
bit and time.• Prepare to implement kill procedures.
22
![Page 23: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/23.jpg)
Shut-in with Diverters in Use
• When a shallow kick occurs a full opening diverter valve is opened to divert the flow away from the rig.
• The low pressure annular is then closed.
23
![Page 24: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/24.jpg)
Shut-in While Running Casing
• Lower the casing until the swage and a valve can be stabbed.
• Close the casing rams or annular preventer.• Stab the swage and valve.• Notify the supervisors.• Read and record the pressures, TVDs, pit gain and time.• Prepare to implement kill procedures.
24
![Page 25: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/25.jpg)
Well Kill Procedures
• Kill equations• 3 Major Kill Procedures• Other Kill Procedures
25
![Page 26: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/26.jpg)
Initial Circulating Pressure (ICP)
• ICP = system pressure loss at kill rate + SIDPP
Note:• When we start to circulate, the DP will increase due to the friction loss and the pressured
drop across the bit.
• BHP = HSPDP + Circulating DPP – DP press loss
• In order to utilize the DP gauge we have to know the DP press loss. The DP press loss = SPP
• Circulating DPP = BHP – HSPDP + SPP
• Since SIDPP =BHP – HSPDP
• Circ DPP = SIDPP + SPP
26
![Page 27: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/27.jpg)
Final Circulating Pressure (FCP)
• FCP = System pressure loss x (Kill MW/Old MW)
• Note:• As the KMW is circulated through the bit the circ DP Press will
decrease until the KMW will reach the bit. At the bit the SIDPP will be zero. The circ DP pressure with the KMW at the bit is the FCP.
27
![Page 28: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/28.jpg)
ICP and FCP Relationship
• In a vertical well the circulating drillpipe pressure will decrease linearly from the ICP to the FCP.
28
![Page 29: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/29.jpg)
Major Kill Procedures
• Engineer’s or Wait and Weight Method• Driller’s or Two Circulation Method• Concurrent or Circulate and Weight Method
29
![Page 30: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/30.jpg)
Introduction To Kick Killing Procedures
• Introduction
The purpose of any well kill procedure is to maintain the BHP constant at a level equal to or slightly greater than the FP. Since the drill pipe pressure is a direct bottom hole pressure indicator, the drill pipe pressure can be manipulated in a systematic manner, and the well can be controlled.
• There are three well kill procedures in common usage. These are:
Wait and Weight Method – After the well is shut-in, the surface mud system is weighted up to the required kill mud weight. The kill mud is then pumped and the well is killed in one complete circulation. This method is also called the Engineer’s or the One Circulation Method.
Driller’s Method – After the well is shut-in and the readings are recorded, pumping is begun immediately. The influx is pumped from the wellbore without any prior weighting up of the mud. Once the influx has been pumped from the well, the well is shut-in, and the surface mud system is weighted up to the kill mud weight. The lighter mud is then displaced by the kill mud. This method is sometimes called the Two Circulation Method.
Concurrent Method – After the well is shut-in, pumping is begun immediately and the mud weight is raised while the kick is being circulated out. The use of this method may require several circulations before the well is fully killed. This method is also called the Circulate and Weight Method.
30
![Page 31: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/31.jpg)
Engineer’s Method: Procedure
1. Shut-in well and record SIDPP, SICP, pit gain2. Compute kill MW and compute pump sked. Build kill mud3. Hold casing press constant and bring pump to kill rate (DPP = ICP)4. Follow pump schedule when displacing DP. The choke opening is varied as
required to keep the drill pipe pressure regulated.5. Once DP filled, poss. to shut-in well, SIDPP = 06. Hold casing press constant using choke and bring pump to kill rate, (DPP = FCP)7. Hold at FCP until kill mud at surface8. Shut down pumps, shut-in well. Check for remaining pressure.9. If no more pressure, crack choke and FLC.10. If no flow, open BOP. The well is dead.
31
![Page 32: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/32.jpg)
3232
![Page 33: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/33.jpg)
Pressure Schedule For Drillpipe
• Calculate the number of strokes required to displace the drillpipe with the kill mud
• Calculate ICP and FCP• Plot the mud volume (bbls or strokes) along the horizontal
axis and the DP pressures along the vertical axis• The plot can be completed by plotting the ICP at 0 strokes
and connecting it to the FCP at the number of strokes required to displace the drill pipe.
33
![Page 34: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/34.jpg)
Pump Schedule: Problem 1
• Assume the following: – SIDPP = 500 psi– Kill rate pressure = 1000 psi– Original MW = 10 ppg– Kill MW = 11 ppg– Strokes to displace DP = 500 strokes
• Problem: Fill in the drill pipe pressure schedule.
34
![Page 35: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/35.jpg)
Pump Schedule: Problem 1
35
Strokes Pumped DP Pressure
0
100
200
300
400
500
![Page 36: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/36.jpg)
Pump Schedule: Solution
• ICP = Kill rate pressure + SIDPP – ICP = 1000 psi + 500 psi = 1500 psi at 0 strokes
• FCP = (Kill rate pressure x Kill MW) / Original MW – FCP = (1000 psi x 11 ppg) / 10 ppg = 1100 psi
after 500 strokes
36
![Page 37: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/37.jpg)
Pump Schedule: Solution
37
Strokes Pumped DP Pressure
0 1500
100
200
300
400
500 1100
![Page 38: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/38.jpg)
Pump Schedule: Solution
• Drill pipe decrease per stroke = (ICP – FCP) / Strokes to displace DP with kill mud– Drill pipe decrease per stroke = (1500 psi –
1100 psi) / 500 strokes = 0.8 psi /stroke
38
![Page 39: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/39.jpg)
Pump Schedule: Solution
39
Strokes Pumped DP Pressure
0 1500
100 1420
200 1340
300 1260
400 1180
500 1100Note: This method eliminates any errors that may occur as a result of reading drill
pipe pressures from a graph incorrectly.
![Page 40: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/40.jpg)
Pump Schedule: Solution
• ICP = Kill rate pressure + SIDPP = 1000 psi + 500 psi = 1500 psi at 0 strokes
• FCP = (Kill rate pressure x Kill MW) / Original MW = (1000 psi x 11 ppg) / 10 ppg = 1100 psi after 500 strokes
• Plot 1500 psi at 0 strokes and plot 1100 psi at 500 strokes. Connect the two points.40
DP Pressure Schedule
10001100120013001400150016001700180019002000
0 100 200 300 400 500 600
Strokes Pumped
Pre
ssu
re,
psi
![Page 41: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/41.jpg)
Driller’s Method
• TWO complete circulations
– Circulate kick out of hole using old mud
– Circulate old mud out of hole using kill weight mud
41
![Page 42: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/42.jpg)
Driller’s Method: Procedure1. Shut-in well and record SIDPP, SICP, pit gain2. Compute kill MW3. Hold choke pressure constant and pump at kill rate4. Hold DP pressure steady at ICP until kick out of hole5. Shut-in well and build kill MW6. Hold casing pressure steady and pump at kill rate7. DP pressure is allowed to decline as per pump sked. Once DP full, observe FCP8. Keep pumping at kill rate and constant FCP until kill mud at surface.9. Shut down pumps, shut-in well. Check for remaining pressure.10. If no more pressure, crack choke and FLC.11. If no flow, open BOP. The well is dead.
42
![Page 43: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/43.jpg)
Concurrent Method: Procedure1. Shut-in well using preferred shut-in procedure and record the
SIDPP, SICP and the amount of pit gain2. Hold casing press constant and bring pump to kill rate (DPP = ICP)3. Follow schedule when displacing DP4. Once DP filled, shut-in well, SIDPP = 05. Hold casing press constant and bring pump to kill rate, (DPP =
FCP)6. Hold at FCP until kill mud at surface7. Shut down pumps, shut-in well, check if well is dead8. If not repeat steps 2 to 9.
43
![Page 44: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/44.jpg)
Major Kill Procedures: Conclusion
• The Wait and Weight Method using the proper kill weight results in the least amount of casing pressure and the least borehole stresses.
• The Concurrent Method allows lower casing pressure values than the Driller’s Method.
• Overkilling the well has no tangible benefit.
44
![Page 45: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/45.jpg)
Other Calculations
• Height of the Influx
• Identification of Influx
• Choke Line Friction (CLFP)
• MASCP
45
![Page 46: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/46.jpg)
Height Of Influx
• Pit level gain < ann. vol. around the DC:
Length of kick, ft = kick volume (bbls) / ((Hole ID2 – DCOD2) x 0.000971)
• Pit level gain > ann. vol. around the DC:
Length of kick, ft = Length of DC + ((kick volume – DC ann. vol.) / ((Hole ID2 – DPCOD2) x 0.000971))
46
![Page 47: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/47.jpg)
Identification Of Influx Density• Influx Density, ppg = MW, ppg – ((SICP-SIDPP)/(Height of influx, ft x
0.0519))
Note:• The influx may either be gas, oil, water or a combination of the three. The calculation is an approximation at best
because the hole may not be gauge and the pit gain may not be necessarily accurately noted.
• The formula for determining the gradient of the influx fluid is:
Influx gradient = Mud gradient in DP– ((SICP-SIDPP)/Height of influx)
Height of influx = bbls gained / annulus volume, bbls/ft
Influx density (ppg) = Influx gradient / 0.52
• As a general rule, an influx with an equivalent mud weight of 1 to 3 ppg is assumed to be gas, 3 to 5 ppg is assumed to be a mixture of gas and water or gas and oil, and 5 to 7 ppg is assumed to be either oil, water or an oil-water mixture.
47
![Page 48: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/48.jpg)
Identification Of Influx
As a general rule:• 1 to 3 ppg EMW is assumed to be gas• 3 to 5 ppg EMW is assumed to be a
mixture of gas and water or gas and oil• 5 to 7 ppg EMW is assumed to be either
oil, water or an oil-water mixture
48
![Page 49: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/49.jpg)
Influx Identification: Problem 1
• Identify the type of influx assuming the following:– TVD = 10000 ft– MW in DP = 12 ppg– Hole ID = 9.875 in– DP OD = 5 in– SIDPP = 520 psi– SICP = 650 psi– Pit Gain = 40 bbls
49
![Page 50: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/50.jpg)
Influx Identification: Solution
• Mud gradient = 12 ppg x .052 = 0.624 psi/ft
• Annulus volume, bbl/ft = ((9.875)2 – (5)2) / 1029 = 0.70 bbls/ft
• Length of influx, ft = 40 bbls / 0.70 bbls/ft = 571 ft
50
![Page 51: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/51.jpg)
Influx Identification: Solution• Gradient of influx, psi/ft:• = 0.624 psi/ft –((650 psi – 520 psi) / 571 ft) • = 0.624 psi/ft – (130 psi/571 ft) • = 0.624 psi/ft – 0.228 psi/ft = 0.396 psi/ft
• Influx density, ppg = 0.396 psi/ft / .052 = 7.61 ppg
• The influx would probably be oil or water. The comparatively high weight means that not much gas is associated within the influx.
51
![Page 52: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/52.jpg)
Choke Line Friction (CLFP)
• Used to determine the amount by which the casing pressure is to be adjusted to maintain BHP = FP when starting the pumps on a kill operation. We reduce the SICP by the amount of CLFP to make allowances for the back pressure imposed by the CLFP.
52
![Page 53: Basic Well Control](https://reader033.vdocuments.mx/reader033/viewer/2022061607/557e0947d8b42a16408b4e1b/html5/thumbnails/53.jpg)
Maximum Allowable Shut-in Casing Pressure
• Surface pressure acting ontop of the current hydrostatic pressure that will exceed the measured fracture pressure at the casing seat.
• MASCP = 0.0519 x (FGmin – MW) x Dwf
• Where,
MASCP = psi
FGmin = Fracture Gradient of weakest formation, ppg
MW = ppg
Dwf = TVD of weakest formation
53