National ICT Infra-Network for Bangladesh

TRANSCRIPT

  • Development of National ICT Infra-Network for Bangladesh Government (BanglaGovNet) Bangladesh Computer Council (BCC)Ministry of Science and Information & Communication Technology (MoSICT)March 2011

  • Development of National ICT Infra-Network for Bangladesh Government (BanglaGovNet) Duration of the ProjectOwner of the ProjectIn Lac TakaEstimated Project CostIn Million US$Title of the Project

    Sponsoring MinistryMinistry of Science and ICTExecuting AgencyBangladesh Computer Council

    Date of CommencementApril 2010Date of Completion (With O&M)April 2010 to June 20145 yrs

    GOBEDCF LoanTotal67,08.10214,40.20281,48.309.5830.6340.21

  • What is BanglaGovNet?BanglaGovNet Stands for Bangladesh Government wide Network.

    It is a Public Network to connect all the Government entities throughout the country under a single Network.

    It is a dedicated Government Intranet.

  • Why BanglaGovNet?To ensure a Basic Infrastructure for e-Government.To ensure a Secured Connectivity among all the Government entities.To ensure e-Governance through an integrated common platform. To provide vast free Bandwidth for data Communication within the Government.

  • Objectives of the ProjectTo improve Government efficiency and promote interaction between governments Ministry/ Divisions, Departments, Districts and Upazillas by construction of Government network infrastructureTo use ICT system within the public administration to improve efficiency and transparency, reduce wastage of resources, enhance planning and raise the quality of services.To maximize the computerization of work processes and resources through integrated information management system enabling real time administration.To construct a public network as a backbone for the effective implementation of e-Government

  • Master Plan for Government Wide Network

    Phase Year wise PlanScope of WorkEstimated Budget(US Dollar)Main Solutions(BanglaGovNet)Apr 2010 ~ June 2014- National ICT Center( NICTC)- Ministries/Divisions(45)- Major Departments ( >100)- District Offices(64 DICTC)- Upazila Offices(64 UICTC)40.21 Million- E-mail - Security Solutions- E-Document- Government WEB- G2G (Info-Sarker)July 2011 ~ Dec 2015- Expand Network to Upazila level- Interoperability between Central and Local Govt. Administration - Development of Bangladesh Education Network (BanglaEduNet) => Primary & Secondary level Education- Connecting High level education Institutions- Making an ICT-driven society- Final preparation for Digital Bangladesh 150 Million- e-Education- e-Procurement- e-Financial Services- e-Local Government- e-Community- G2B, G2C, G2P- Etc

  • Location of the ProjectBangladesh Computer Council (BCC), DhakaAll Ministries and Divisions in Dhaka (Capital City). Major Departments and Corporations under Ministries and Divisions in Dhaka. 64 Deputy Commissioners Offices. Minimum 64 UNO Offices.

  • Scope of the Project (contd..)Construct Government Data Resource Centre (Data Centre) which will be the core part of the network to interconnect every government Ministry/Division, Department, District and Upazila administration to provide : Centralized Control and Management of the Network (NOC); Secure Single Point of Entry/Exit to the Internet; Secure Communication; Broadband Connectivity through IP Backbone; Centralized Government-wide Secure e-mail System and IP-based Voice Services; Open Interoperability Standards; Virtual Private Network (VPN) Connection for authorized agencies; Hosting of Government Websites etc.

  • Scope of the Project (contd..)Construct District Data Resource Centre (DICTC) in each of the Deputy Commissioner (DC) offices which will be connected with the NICTC. Construct Upazila Data Resource Centre (UICTC) in 64 UNO offices in Dhaka, which will be connected with the NICTC and DICTC. Provide the government-wide intranet enabling government agencies to access and share their information and data. Develop the centralized government-wide electronic mail and filing system to provide an electronic mailbox and storage to the registered government users. (Gov e-Mail) Develop and install related applications such as interactive websites, e-Approval, Electronic Document Management System etc. (Web Portal, Groupware)

  • Scope of the Project (contd..)Training & Visiting Program for enhancing ICT Knowledge & SkillConsultancy ServicesOperation & Maintenance ServicesThe project scope might be adjusted to accommodate the results of detailed site surveys, engineering requirements or as per demand. Supply and install comprehensive security solution such as Firewall, Anti-Spam Filters and Intrusion Prevention System (IPS) in order to ensure identification of hackers and abuses of government network and intruders into privacy of users. (UTM, Anti-Virus, Anti-Spam, Physical Security, etc.)

  • GovernmentInfra-Network NICTC (BCC) Secretariat Major Depts. All Districts Limited Upazilas District ICTC Upazila ICTC Mesh WiFi Broadband Wireless Advanced ICT Culture & Tech Basic Network Wireless Network Wired Network etc. For 2 year Support 24/7 Operating Consulting Keep Maintenance QualityWirelessNetworkFellowshipTraining &EducationOperation& MaintenanceSupport TOSS Web-Portal MailGroupWareSoftware/ApplicationDevelopmentScope of the Project

  • Terms of EDCF Loan

    Interest Rate0.5% per annumMaturity30 yrs including grace period (10 yrs)Method of RepaymentSemi-annual equal installment after the grace periodInterest PaymentEvery 6 months in arrears on outstanding balancesOverdue Charge2.0% per annum above the interest rate Service Charge0.1%

  • Major ComponentsEquipments and Machineries 41.15%Furniture2.26%Motor Vehicles0.23%Manpower 1.85%Foreign Training and Visit2.40%CD/VAT13.11%Consultancy2.49%Operation & Maintenance3.45%Installation & Services10.75%Contingency/Others11.08%Connectivity (Line rent, Bandwidth Cost)4.48%Software6.75%

  • Estimated CostIn Lac Taka

    No.SectionQuantityGOBEDCFTotalPercentage(%) of Total Budget1EquipmentFor PIU,NICTC,DICTC,UICTC-11582.02115,82.0241.15%2FurnitureDO635.51-6,35.512.26%3SoftwareAs Required-1899.7018,99.706.75%4Motor Vehicle1xJeep, 2x Microbus-65.1065.100.23%5CD/VAT27.253691.51-36,91.5113.11%6Manpower216 Officers and Staffs)522.14-5,22.141.85%7Foreign Training & Visit70-676.846,76.842.40%8Consultancy12-7007,002.49%9Connectivity (Line rent, Bandwidth Cost)LS-1260.0012,60.004.48%10Operation & MaintenanceLS-970.529,70.523.45%11Service Charge1%-21.7021.700.08%12InstallationLS-3004.3230,04.3210.67%13Contingency (Physical, Price & Others)LS18,58.941260.0031,18.9411.08%Grand Total67,08.1021440.2028148.30

  • ManpowerYearwise Manpower

    UnitProposed LocationApproved by MoFinPIUBCC Bhaban08NICTCBCC Bhaban16DICTC64 District x 3192UICTC64 Upazila0Grand Total : 216

    Unit1st Year2nd Year3rd YearPIU080808NICTC-1616DICTC-15192UICTC---

  • Secretariat GEL3 SW 10GEGE Dhaka23 ~ 42 * E1Slab-1 : 3~18Mbps512K ~ Slab-1512K ~ E1 per Site 4 Tier Hierarchy : NICTC DHQ DICTC UICTC Use Dark Fiber : NICTC Secretariat (10 GE), - Dhaka DHQ (1GE) Bandwidth (Speed) : Start at 64Kbps for saving rental feeTopology of BanglaGovNet

  • Benefit of Wireless Network High performance for voice, video and Internet services Share of the Knowledge from Wireless Data store Safety at Government Data Resource Centre (GDRC) Providing Non-line of sight Mesh Wi-Fi Wireless Network or P-t-P Long Distance Wireless Broadband Connectivity between District Data ICT Centre (DICTC) - Upozila ICT Centre (UICTC) Mesh WiFi Max 16KmLong Distance Broadband WirelessWireless Solution Infra-Network Wireless Connectivity

  • RouterWebServerFirewallBackboneSwitch - ABackboneSwitch - BDMZIPS Place between Firewall And Backbone SwitchesInternetDNSServer: Primarily protecting harmful internet traffic: Blocking the traffic by Filtering and Security policing: Intrusion detection and Response to intrusion attemptAnti-Spam MailMail Server: Protect spam mail Infra-Network Security Network Security

  • BanglaGovNet Connectivity Plan

  • NICTCBanglaGovNet Connectivity Plan BCCData CentreNOC

  • NICTCAll Ministries/DivisionsFOBanglaGovNet Connectivity Plan BCCData CentreNOC

  • NICTCAll Ministries/DivisionsMajor Departments/OrganizationsFOFOBanglaGovNet Connectivity Plan BCCData CentreNOC

  • NICTCAll Ministries/DivisionsDICTCMajor Departments/Organizations7 Divisions

    57 DistrictsFOFOFOBanglaGovNet Connectivity Plan BCCData CentreNOC

  • NICTCAll Ministries/DivisionsDICTCUICTCMajor Departments/Organizations7 Divisions

    57 Districts64 UpazilasFOFOFO/WirelessFOBanglaGovNet Connectivity Plan BCCData CentreNOC

  • NICTCAll Ministries/DivisionsDICTCUICTCMajor Departments/Organizations7 Divisions

    57 Districts64X UpazilasAll District Level Govt. Offices FOFOFO/WirelessFO/WirelessInfo-Sarker (2nd Phase) FOBanglaGovNet Connectivity Plan BCCData CentreNOC

  • NICTCAll Ministries/DivisionsDICTCUICTCMajor Departments/Organizations7 Divisions

    57 Districts64 UpazilasAll District Level Govt. Offices FOFO417 UpazilasFO/WirelessFO/WirelessFO/WirelessInfo-Sarker (2nd Phase) FOBanglaGovNet Connectivity Plan BCCData CentreNOC

  • NICTCAll Ministries/DivisionsDICTCUICTCMajor Departments/Organizations7 Divisions

    57 Districts64 UpazilasAll District Level Govt. Offices FOFOFO/WirelessInfo-Sarker (2nd Phase) 417 UpazilasAll Upazila Level Govt. OfficesFO/WirelessFOFO/WirelessBanglaGovNet Connectivity PlanFO/WirelessFO/Wireless BCCData CentreNOC

  • BanglaGovNet Implementation Plan

  • BanglaGovNet

    Resources Plan for DICTC & UICTC

  • District ICT Center Layout

  • Furniture, Fixture and Equipment Allocation for District ICT Center

    SL Description of Works Qty.Unit

    1Secretarial Table1No.s

    2Operators Table1No.

    3Secretarial Chair1No.s

    4Operators Chair1No.

    5Visitor Chair4No.

    6Side Rack1No.s

    7File Cabinet2No.s

    8Steel Almirah1No.s

    9Three Seated Sofa1No.

    10Cyber Desk with Chairs for 4 users1No.

    11Center table for Sofa1No.

    12Tool/Chair for MLSS/Security1No.

    13Window/Door Screen (7-0 Height)140Sft.

    14Half height partition (4-6 height)45Sft.

    15Painting/Distemper work 700Sft.

    16Split type Air Cooler (Maximum 3 ton)1No.

    17Electrical Works1LS

    18PC with UPS2No.

    19Printer2No.

  • Upazilla ICT Center Layout

  • Furniture, Fixture and Equipment Allocation for Upazila ICT Center

  • Furniture and Fixtures to be Deployed for DICTC

    SL Description of Works Qty.Unit1Secretarial Table1Nos2Operators Table1Nos3Secretarial Chair1Nos4Operators Chair1Nos5Visitor Chair4Nos6Side Rack1Nos7File Cabinet2Nos8Steel Almirah1Nos9Three Seated Sofa1Nos10Cyber Desk with Chairs for 4 users1Nos11Center table for Sofa1Nos12Tool/Chair for MLSS/Security1Nos13Window/Door Screen (7-0 Height)140Sft.14Half height partition (4-6 height)45Sft.15Painting/Distemper work 700Sft.

  • Equipment to be Deployed for DICTC

    SL Description of Works Qty.Unit1Router1Nos2L2 Switch1Nos3Microwave EquipmentAs Required4PC with UPS2Nos5Laser Printer2Nos6Security System7Air Cooler (Split type, Max. 3 ton)1Nos8Electrical Works1LS

  • Upazilla ICT Center Layout

  • Furniture and Fixtures to be Deployed for UICTC

    SL Description of Works Qty.Unit1Secretarial Table1Nos2Operators Table1Nos3Secretarial Chair1Nos4Operators Chair1Nos5Visitor Chair4Nos6Side Rack1Nos7File Cabinet2Nos8Steel Almirah1Nos9Three Seated Sofa1Nos10Cyber Desk with Chairs for 4 users1Nos11Center table for Sofa1Nos12Tool/Chair for MLSS/Security1Nos13Window/Door Screen (7-0 Height)140Sft.14Half height partition (4-6 height)45Sft.15Painting/Distemper work 700Sft.

  • Equipment to be Deployed for UICTC

    SL Description of Works Qty.Unit1Router1Nos2L2 Switch1Nos3Microwave EquipmentAs RequiredNos4PC with UPS2Nos5Laser Printer2Nos6Security System7Air Cooler (Split type, Max. 3 ton)1Nos8Electrical Works1LS

  • Year wise Deployment Plan in DICTC & UICTC

    1st Year2010-2011(PPNB Program)2nd Year2011-2012( BanglaGovNet)3rd Year2012-2013(BanglaGovNet)FurnitureComputer Table & Chair (10 Set)Table(02), Chair(06), Side Rack(01), Almirah(01), File Cabinet(01), Sofa Set(01), Internal Partitions & renovation etc.------EquipmentServer(01), Computer(15),Multimedia Projector(01),Network (LAN)PC with UPS(02), Printer(02), Air Cooler(01), Router, L2 Switch, Microwave Equipment, Security System. -------Manpower

    -------1 x Asstt. Programmer/Asstt. Maintenance Engr1 x Computer Operator1 x MLSS

    ContinueTrainingBasic Network Operation, Maintenance & Troubleshooting(10 days for 300 Participants)

    Advanced Networking

    Wireless and Wired Network

  • What we need to do at present?We need to know the existing basic ICT infrastructure of all the Ministries/Divisions, Departments: Electrical connectivityLAN, WAN Computers, Servers, Switches, RoutersInternet connectivity and Bandwidth etc.

  • What we need to do at present?To select a suitable Room (min 15'x20') for DICTC.To make available of 3 phase Electrical power line in the Room. Renovation of the Room (if necessary).To assign someone as In charge of the Room until Manpower is deployed.Physical security should be ensured.

  • Concluding RemarksTo have a Government wide Network to ensure delivery of citizen services through the effective implementation of e-Governance towards achieving a Digital Bangladesh by 2021.

  • A Typical Data Centre

  • BCC Data Centre Layout

  • Sample Network Operation Centre (NOC)

  • *Nothing has really been changed since 1st F/S dispatchWe explained EXIM bank for wireless network using Mesh WiFi and microwave